Automatic tube bundle threading device and method for shell and tube heat exchanger equipment
Through the automatic tube bundle threading device, using the lifting platform, fixed platform and driving mechanism, the efficient, safe and automated threading of the shell and tube heat exchanger is realized, which solves the problems of high assembly resistance, easy scratching of the inner wall and potential safety hazards in the traditional process. , reducing labor costs and quality issues.
Patent Information
- Application Number
- CN202010425107.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-19
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2040-05-19
AI Technical Summary
During the process of threading the tube bundle of traditional shell-and-tube heat exchangers, there are problems such as high assembly resistance, easy scratching of the inner wall, potential safety hazards, and high labor costs.
An automatic tube bundle threading device is designed, including a lifting platform, a fixed platform, a movable baffle and a movable bracket. The infrared sensor is used to achieve the centering of the cylinder and the tube bundle. The ball matrix is used to reduce friction. The ultrasonic atomizer forms ice. The layers reduce friction and automatically advance the tube bundle through the drive mechanism.
It improves the efficiency and quality of threading, reduces labor costs, and reduces quality problems caused by assembly. It has a wide range of applications and is suitable for heat exchanger equipment of different sizes.
Smart Images

Figure CN111496498B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of heat exchanger equipment processing and manufacturing, and in particular relates to an automatic tube bundle threading device and method for shell and tube heat exchanger equipment. Background Art
[0002] With the rapid development of industrial technology and the increasing strategic position of energy, heat exchangers have attracted more and more attention from countries around the world. A large number of high-end heat exchangers are needed in the fields of aviation, nuclear power, fine chemicals, etc. It can be seen that various types of high-end heat exchangers have broad market application prospects and application value. Wearing the tube bundle is an indispensable process in the manufacture of shell and tube heat exchangers. However, in the traditional process of wearing the tube bundle, the tube bundle needs to be suspended in the air, and the workers use the fall chain to slowly send the tube bundle into the cylinder. Since the tube bundle is suspended in the air, it is easy to shake. During the assembly process, it is inevitable that the tube bundle will collide with the cylinder and affect the quality of the cylinder. In order to ensure the cleanliness of the inner wall of the cylinder, lubrication measures are usually not taken. Therefore, during the process of the tube bundle entering the cylinder, the baffle directly rubs against the cylinder, which makes the assembly resistance larger and easily causes scratches on the inner wall. Long-term hoisting of the tube bundle is also prone to safety hazards. In addition, the entire assembly process requires 4 to 5 workers to cooperate and takes 2 to 3 hours to complete. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide an automatic tube bundle threading device for shell and tube heat exchanger equipment in view of the deficiencies in the above-mentioned prior art. The device has a reasonable structural design, a simple and convenient operation method, and is easy to assemble. By setting a lifting platform to place the cylinder of the heat exchanger, and setting a fixed platform to place the tube bundle of the heat exchanger, the layout height of the cylinder can be adjusted at any time according to needs, and the tube bundle threading process of heat exchanger equipment of different sizes can be completed safely and conveniently. At the same time, the spacing and opening size of the movable bracket can be adaptively adjusted, and the scope of application is wide. The entire tube bundle threading process has a high degree of automation, which can effectively improve work efficiency, reduce labor costs, and reduce quality problems caused by assembly. The use effect is good, it can be used for multiple turnovers, and is easy to promote and use.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: an automatic tube bundle threading device for shell and tube heat exchanger equipment, characterized in that: it includes a lifting platform and a fixed platform that cooperate with each other, the lifting platform is provided with a movable baffle for pushing the cylinder of the heat exchanger to move, the movable baffle is slidably installed on the lifting platform, the lifting platform is provided with a baffle driving mechanism for driving the movable baffle to translate, the lifting platform is also provided with a ball matrix for reducing the friction between the cylinder and the lifting platform, the fixed platform is provided with a plurality of movable brackets for fixing the tube sheet and the baffle of the heat exchanger, the movable bracket is a U-shaped bracket composed of a rigid movable plate and two rigid movable arms, the rigid movable plate is slidably installed on the fixed platform, a lifting mechanism is installed in the middle part of the upper side of the rigid movable plate, the two rigid movable arms are respectively slidably installed on the upper parts of the two ends of the rigid movable plate, and the bottom of the rigid movable plate is provided with a movable arm driving mechanism for driving the two rigid movable arms to translate.
[0005] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: two first guide rails for guiding the movable baffle are arranged on the lifting platform, and the two first guide rails are parallel to each other; two second guide rails for guiding the movable bracket are arranged on the fixed platform, and the two second guide rails are parallel to each other.
[0006] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: the lifting platform and the fixed platform are both rectangular platforms, each corner of the lower part of the lifting platform is supported by a liftable leg, and each corner of the lower part of the fixed platform is provided with a fixed leg.
[0007] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: the baffle driving mechanism includes a driving motor and two chain transmission units symmetrically arranged on both sides of the lifting platform, the chain transmission unit includes a sprocket, chain and tensioner that cooperate with each other, the sprocket and tensioner in the chain transmission unit are respectively arranged at both ends of the lifting platform, and the driving motor is arranged at one end of the lifting platform close to the sprocket.
[0008] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: an ear plate for chain installation is provided on both sides of the movable baffle, one end of the chain is fixed to one side of the corresponding ear plate, and the other end of the chain is fixed to the other side of the corresponding ear plate after crossing the corresponding sprocket and tensioning wheel in sequence.
[0009] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: the two sprockets are installed on the output shaft of the driving motor through a rotating shaft, the two sprockets are fixedly installed at both ends of the rotating shaft respectively, and one end of the rotating shaft is fixed on the output shaft of the driving motor and is coaxially arranged with the output shaft of the driving motor.
[0010] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: the movable arm driving mechanism includes a linear motor arranged directly below the rigid movable plate, and a groove-shaped bracket for installing the linear motor is provided at the lower part of the rigid movable plate, and the stator of the linear motor is fixed on the groove-shaped bracket, and the mover of the linear motor is hingedly connected to two push rods respectively used to drive the movement of two rigid movable arms.
[0011] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: a slide groove for sliding installation of a rigid movable arm is opened on the rigid movable plate along its length direction, and a clamping groove for clamping the tube plate and the baffle is opened on the rigid movable arm along its length direction, and the opening width of the clamping groove is not less than the thickness of the tube plate and the baffle; a magnetic pad strip for adjusting the opening width of the clamping groove is arranged in the clamping groove.
[0012] The above-mentioned automatic tube bundle threading device for shell and tube heat exchanger equipment is characterized in that: a proximity switch connected to the controller is installed on a rigid movable arm in each of the movable brackets corresponding to the baffle, a proximity switch connected to the controller is installed on the tube plate, and an infrared transmitter is installed on each of the two rigid movable arms close to the movable baffle. Two infrared receivers matching the infrared transmitters are installed on one end of the cylinder close to the rigid movable arm, and the infrared receiver is connected to the controller.
[0013] At the same time, the present invention also discloses a method for automatically threading a tube bundle of a shell and tube heat exchanger, characterized in that the method comprises the following steps:
[0014] Step 1: Install the movable bracket on the fixed platform. The process is as follows:
[0015] Step 101, determining the number of movable supports: determining the number of movable supports installed on the fixed platform according to the number of tube sheets and baffles in the heat exchanger, wherein the number of movable supports is equal to the total number of tube sheets and baffles;
[0016] Step 102, determining the spacing of the movable supports: determining the spacing between the movable supports according to the spacing between the tube sheet and the baffle plate adjacent thereto, and the spacing between two adjacent baffle plates, so that each tube sheet and baffle plate corresponds to one of the movable supports;
[0017] Step 103, installing the movable bracket: slidingly installing a plurality of the movable brackets on the fixed platform in sequence, and fixing the rigid movable plates of the movable brackets on the fixed platform by bolts;
[0018] Step 104, determining the slot width of the rigid movable arm: a slot for mounting the tube sheet and the baffle is provided on the rigid movable arm along its length direction, and the opening width of the slot is not less than the thickness of the tube sheet and the baffle. When the thickness of the tube sheet or the baffle is less than the opening width of the slot, a magnetic pad is installed in the slot of the rigid movable arm corresponding to the tube sheet or the baffle, so that the opening width of the slot where the magnetic pad is installed is equal to the thickness of the tube sheet or the baffle.
[0019] Step 2, hoisting the tube bundle of the heat exchanger: hoist the tube bundle of the heat exchanger by a hoist so that the tube sheet and the baffle are placed on the multiple rigid movable plates fixed in step 1 in sequence, and adjust the lifting heights of the lifting mechanisms on the multiple rigid movable plates according to the diameters of the tube sheet and the baffle, so that the tube bundle of the heat exchanger is arranged horizontally, and adjust the distance between two rigid movable arms in the multiple movable brackets by the multiple movable arm driving mechanisms, so that the tube sheet and the baffle are respectively clamped in the two corresponding clamping slots;
[0020] Step 3: Hoisting and centering of the heat exchanger cylinder. The process is as follows:
[0021] Step 301, hoisting of the heat exchanger cylinder: hoisting the heat exchanger cylinder by a hoist and placing it on the ball matrix on the lifting platform, wherein the cylinder is arranged horizontally;
[0022] Step 302, installation of infrared sensors: two infrared transmitters are installed on two rigid movable arms close to the cylinder, the arrangement height of the two infrared transmitters is the same as the arrangement height of the center axis of the tube bundle of the heat exchanger, two infrared receivers matching with the infrared transmitters are respectively installed on both sides of one end of the cylinder close to the fixed platform, the infrared receivers are connected to the controller, the arrangement height of the two infrared receivers is equal to the arrangement height of the center line of the cylinder, and the distance between the two infrared receivers is equal to the distance between the two infrared transmitters;
[0023] Step 303, centering the heat exchanger cylinder and the tube bundle: the lower part of the lifting platform is supported by a plurality of liftable legs, and the height of the lifting platform is adjusted by the plurality of liftable legs. When the infrared receivers of the two infrared sensors receive the signals emitted by the infrared transmitter, the controller controls the plurality of liftable legs to stop moving, thereby completing the centering of the heat exchanger cylinder and the tube bundle;
[0024] Step 4: Making ice inside the cylinder: Use an ultrasonic atomizer to evenly spray small water droplets on the inner wall of the cylinder, cover the outside of the cylinder with heat insulation cotton, and spray dry ice inside the cylinder to form evenly dense small ice droplets on the inner wall of the cylinder;
[0025] Step 5: Thread the tube bundle. The process is as follows:
[0026] Step 501: A proximity switch connected to a controller is installed on a rigid movable arm of each movable bracket corresponding to the baffle, and a proximity switch is installed on a side of the tube sheet close to the cylinder;
[0027] Step 502: the controller controls the baffle driving mechanism to start, the baffle driving mechanism drives the movable baffle to move toward the tube bundle, the movable baffle pushes the cylinder to move toward the tube bundle on the ball matrix, so that the cylinder is sequentially sleeved on the outside of the plurality of baffles, when the cylinder hits the proximity switch installed on the tube sheet, the cylinder stops moving, and the tube bundle in the cylinder is inserted;
[0028] When the cylinder moves to the position of the baffle or tube sheet, the proximity switch on the rigid movable arm corresponding to the baffle or tube sheet transmits a signal to the controller, and the controller controls the movable arm driving mechanism to move the two rigid movable arms outward by a specified distance, and at the same time, the controller controls the jacking mechanism corresponding to the two rigid movable arms to descend to a specified height, so that the baffle or tube sheet is in a suspended state. As the cylinder continues to move, the baffle or tube sheet enters the cylinder and slides on the ice layer formed by small ice beads evenly distributed in the cylinder;
[0029] Step 6, lifting the cylinder: After the tube bundle is inserted in step 5, the controller controls the baffle drive mechanism to stop running, and when the temperature inside the cylinder rises to room temperature, the operator lifts away the cylinder after the tube bundle is inserted.
[0030] Compared with the prior art, the present invention has the following advantages:
[0031] 1. The automatic tube bundle insertion device adopted by the present invention provides a lifting platform to place the cylinder of the heat exchanger, and provides a fixed platform to place the tube bundle of the heat exchanger. The height of the lifting platform can be adjusted to adapt to heat exchangers with cylinders of different sizes, and the application range is wide.
[0032] 2. The automatic tube bundle threading device adopted by the present invention can effectively improve the stability of the movement of the cylinder by arranging a movable baffle on the lifting platform to push the cylinder to move, and at the same time drive the movable baffle to move through the baffle driving mechanism, which can effectively improve the automation degree of the device, reduce the investment of manpower and material resources, and improve the efficiency of tube bundle threading.
[0033] 3. The automatic tube bundle threading device adopted by the present invention can effectively reduce the friction between the cylinder and the table surface of the lifting platform when threading the tube bundle by arranging a ball matrix on the lifting platform, thereby effectively improving the efficiency of tube bundle threading.
[0034] 4. The automatic tube bundle insertion device used in the present invention is convenient for fixing the tube sheet and baffle of the heat exchanger by arranging a plurality of movable brackets on the fixed platform, and then fixing the tube bundle of the heat exchanger on the fixed platform, which is helpful for the insertion of the tube bundle.
[0035] 5. The automatic tube bundle threading device adopted by the present invention can adjust the number and spacing of movable brackets according to different heat exchanger structures by slidingly installing the rigid movable plate of the movable bracket on the fixed platform, and can adjust the spacing between the two rigid movable arms according to the diameters of different tube sheets and baffles by slidingly installing two rigid movable arms on the two ends of the rigid movable plate, and has a wide range of applications.
[0036] 6. The automatic tube bundle threading device adopted by the present invention has a lifting mechanism installed in the middle of the upper side of the rigid movable plate. When the diameters of the tube sheet and the baffle are different, the laying height of the tube sheet and the baffle can be adjusted by the lifting mechanism to ensure that the tube bundle is always in a horizontal state.
[0037] 7. The automatic tube bundle threading method adopted by the present invention realizes the centering of the cylinder and the tube bundle through the infrared sensor before the tube bundle is threaded, which can ensure the centering of the cylinder and the tube bundle before the tube bundle is threaded, avoid the error caused by traditional human eye observation, and cause the cylinder and the tube bundle to collide during the tube bundle threading process, which can effectively improve the threading efficiency and quality of the tube bundle and reduce the investment in labor costs.
[0038] 8. The automatic tube bundle threading method adopted by the present invention uses an ultrasonic atomizer to evenly spray fine water droplets on the inner wall of the cylinder, and sprays dry ice inside the cylinder to form an ice layer on the inner wall of the cylinder, which can effectively reduce the friction between the cylinder and the tube sheet, and between the cylinder and the baffle, avoid direct friction between the cylinder and the tube sheet or the baffle during assembly, and greatly reduce the assembly resistance.
[0039] 9. The automatic tube bundle threading method adopted by the present invention is carried out on a lifting platform and a fixed platform during assembly. The cylinder and the tube bundle do not need to be suspended in the air for a long time, which greatly reduces the safety hazard. In addition, the cylinder and the tube bundle will not be bent due to lifting when assembled on the platform, which makes it easier to align the assembly and avoids the collision between the cylinder and the tube bundle during assembly, reducing the quality problems caused by the transfer.
[0040] To sum up, the present invention has a reasonable structural design, a simple and convenient operation method, and is easy to assemble. By setting a lifting platform to place the cylinder of the heat exchanger, and setting a fixed platform to place the tube bundle of the heat exchanger, the layout height of the cylinder can be adjusted at any time according to needs, and the tube bundle threading process of heat exchanger equipment of different sizes can be completed safely and conveniently. At the same time, the spacing and opening size of the movable bracket can be adaptively adjusted, and the application range is wide. The entire tube bundle threading process has a high degree of automation, which can effectively improve work efficiency, reduce labor costs, and reduce quality problems caused by assembly. The use effect is good, it can be used for multiple turnovers, and it is easy to promote and use.
[0041] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 It is a schematic structural diagram of the automatic tube bundle threading device of the present invention.
[0043] Figure 2 for Figure 1 Top view of the .
[0044] Figure 3 It is a schematic diagram of the installation structure of the movable arm driving mechanism of the present invention.
[0045] Figure 4 It is a schematic diagram of the installation structure of the movable bracket and the magnetic pad strip of the present invention.
[0046] Figure 5 It is a circuit principle block diagram of the control system of the present invention.
[0047] Figure 6 It is a flowchart of the method of the present invention.
[0048] Description of reference numerals:
[0049] 1—Lifting platform; 2—Movable baffle; 3—Ball matrix;
[0050] 4—liftable legs; 5—first guide rail; 6—driving motor;
[0051] 7—fixed platform; 8—infrared receiver; 9—fixed legs;
[0052] 10—second guide rail; 11—rigid movable plate; 11-1—slideway;
[0053] 12—rigid movable arm; 12-1—card slot; 13—linear motor;
[0054] 14—oil cylinder; 15—magnetic pad; 16—cylinder body;
[0055] 17—tube sheet; 18—baffle; 19-1—sprocket;
[0056] 19-2—chain; 19-3—tensioner; 19-4—rotating shaft;
[0057] 20—push rod; 21—slot bracket; 22—controller;
[0058] 23—proximity switch; 24—first oil pump; 25—second oil pump;
[0059] 26—Discipline. DETAILED DESCRIPTION
[0060] like Figures 1 to 5 As shown, the present invention includes a lifting platform 1 and a fixed platform 7 that cooperate with each other, the lifting platform 1 is provided with a movable baffle 2 for pushing the cylinder 16 of the heat exchanger to move, the movable baffle 2 is slidably installed on the lifting platform 1, and the lifting platform 1 is provided with a baffle driving mechanism for driving the movable baffle 2 to translate, and the lifting platform 1 is also provided with a ball matrix 3 for reducing the friction between the cylinder 16 and the lifting platform 1, and the fixed platform 7 is provided with a plurality of movable brackets for fixing the tube sheet 17 and the baffle 18 of the heat exchanger, and the movable bracket is a U-shaped bracket composed of a rigid movable plate 11 and two rigid movable arms 12, the rigid movable plate 11 is slidably installed on the fixed platform 7, a lifting mechanism is installed in the middle part of the upper side of the rigid movable plate 11, and the two rigid movable arms 12 are respectively slidably installed on the upper parts of the two ends of the rigid movable plate 11, and the bottom of the rigid movable plate 11 is provided with a movable arm driving mechanism for driving the two rigid movable arms 12 to translate.
[0061] In actual use, a lifting platform 1 is provided to place the cylinder 16 of the heat exchanger, and a fixed platform 7 is provided to place the tube bundle of the heat exchanger. The height of the lifting platform 1 can be adjusted to accommodate heat exchangers with cylinders 16 of different sizes, and the application range is wide.
[0062] It should be noted that by arranging a movable baffle 2 on the lifting platform 1 to push the cylinder 16 to move, and driving the movable baffle 2 to move by the baffle driving mechanism, the stability of the movement of the cylinder 16 can be effectively improved, and the degree of automation of the device can be effectively improved, reducing the investment in manpower and material resources, and improving the efficiency of the installation of the tube bundle.
[0063] In this embodiment, the ball matrix 3 includes a plurality of circular balls embedded on the lifting platform 1, and the plurality of circular balls can rotate freely on the lifting platform 1. By arranging the ball matrix 3 on the lifting platform 1, when the tube bundle 26 is inserted, the friction between the cylinder 16 and the table surface of the lifting platform 1 can be effectively reduced, thereby effectively improving the efficiency of the tube bundle insertion.
[0064] In actual use, by providing a plurality of movable brackets on the fixed platform 7 , it is convenient to fix the tube sheet 17 and the baffle 18 of the heat exchanger, and then fix the tube bundle 26 of the heat exchanger on the fixed platform 7 , which is helpful for the installation of the tube bundle 26 .
[0065] It should be noted that by sliding the rigid movable plate 11 of the movable bracket on the fixed platform 7, the number and spacing of the movable brackets can be adjusted according to different heat exchanger structures, and the two rigid movable arms 12 are slidably installed on both ends of the rigid movable plate 11, and the spacing between the two rigid movable arms 12 can be adjusted according to the diameters of different tube sheets 17 and baffles 18, which has a wide range of applications.
[0066] In this embodiment, the lifting mechanism includes a cylinder 14 and a first oil pump 24 for controlling the extension and retraction of the cylinder 14. The cylinder 14 is installed in the middle of the upper side of the rigid movable plate 11. The first oil pump 24 is connected to the controller 22. By installing a cylinder 14 on the rigid movable plate 11, when the diameters of the tube sheet 17 and the baffle 18 are different, the layout heights of the tube sheet 17 and the baffle 18 can be adjusted by controlling the extension and retraction of the cylinder 14 to ensure that the tube bundle 26 is always in a horizontal state.
[0067] In this embodiment, the lifting platform 1 is provided with two first guide rails 5 for guiding the movable baffle 2, and the two first guide rails 5 are parallel to each other. The fixed platform 7 is provided with two second guide rails 10 for guiding the movable bracket, and the two second guide rails 10 are parallel to each other.
[0068] In actual use, the lower part of the movable baffle 2 is provided with two guide grooves that cooperate with the first guide rail 5, so that the movable baffle 2 can slide along the first guide rail 5, and the lower part of the rigid movable plate 11 in the movable bracket is provided with two guide grooves that cooperate with the second guide rail 10, so that the rigid movable plate 11 can slide along the second guide rail 10; when the rigid movable plate 11 slides into place, the rigid movable plate 11 is fixed to the fixed platform 7 by bolts.
[0069] In this embodiment, the center lines of the two first guide rails 5 and the center lines of the two second guide rails 10 are collinear.
[0070] In this embodiment, the ball matrix 3 is arranged between the two first guide rails 5 .
[0071] In this embodiment, the lifting platform 1 and the fixed platform 7 are both rectangular platforms. A liftable leg 4 is supported on each corner of the lower part of the lifting platform 1, and a fixed leg 9 is provided on each corner of the lower part of the fixed platform 7.
[0072] In actual use, the liftable legs 4 are preferably hydraulic lift columns. By arranging the liftable legs 4 at the lower part of the lift platform 1 , the height of the lift platform 1 can be quickly and accurately adjusted through the liftable legs 4 .
[0073] In this embodiment, the lifting platform 1 and the fixed platform 7 have the same width, the two sides of the lifting platform 1 are respectively flush with the two sides of the fixed platform 7, the first guide rail 5 is opened along the length direction of the lifting platform 1, and the two first guide rails 5 are symmetrically arranged on both sides of the lifting platform 1; the fixed platform 7 is opened along the length direction of the fixed platform 7, and the two second guide rails 10 are symmetrically arranged on both sides of the fixed platform 7.
[0074] In this embodiment, the lifting and lowering of the four liftable legs 4 are all controlled by the second oil pump 25 , and the second oil pump 25 is connected to the controller 22 .
[0075] In this embodiment, the baffle driving mechanism includes a driving motor 6 and two chain transmission units symmetrically arranged on both sides of the lifting platform 1, the chain transmission unit includes a sprocket 19-1, a chain 19-2 and a tensioning wheel 19-3 that cooperate with each other, the sprocket 19-1 and the tensioning wheel 19-3 in the chain transmission unit are respectively arranged at the two ends of the lifting platform 1, and the driving motor 6 is arranged on the lifting platform 1 at one end close to the sprocket 19-1.
[0076] In actual use, the driving motor 6 is controlled by the controller 22 , and the two chain transmission units are driven by the same driving motor 6 , which can ensure synchronous transmission between the two chain transmission units, thereby ensuring smooth movement of the movable baffle 2 .
[0077] It should be noted that chain transmission has no elastic sliding and slipping, the average transmission ratio is accurate, the operation is reliable and the efficiency is high; it has large power transmission, strong overload capacity, and small transmission size under the same working conditions; the required tension force is small and the pressure acting on the shaft is small; it can work in harsh environments such as high temperature, humidity, dust and pollution.
[0078] In this embodiment, the two chain transmission units are arranged on the outer sides of the two first guide rails 5 respectively.
[0079] In this embodiment, an ear plate for installing the chain 19-2 is provided on both sides of the movable baffle 2, one end of the chain 19-2 is fixed to one side of the corresponding ear plate, and the other end of the chain 19-2 is fixed to the other side of the corresponding ear plate after crossing the corresponding sprocket 19-1 and tensioning wheel 19-3 in sequence.
[0080] In actual use, the chain 19-2 is meshed with the sprocket 19-1, and the sprocket 19-1 and the tensioning wheel 19-3 are respectively arranged at both ends of the lifting platform 1 to ensure that the movable baffle 2 always reciprocates on the lifting platform 1 between the sprocket 19-1 and the tensioning wheel 19-3.
[0081] It should be noted that the movable baffle 2 is fixedly connected to the chain 19 - 2 via the ear plate, and the movable baffle 2 can be driven to move via the chain 19 - 2 .
[0082] In this embodiment, the two sprockets 19-1 are installed on the output shaft of the drive motor 6 through the rotating shaft 19-4, and the two sprockets 19-1 are fixedly installed at both ends of the rotating shaft 19-4 respectively. One end of the rotating shaft 19-4 is fixed on the output shaft of the drive motor 6 and is coaxially arranged with the output shaft of the drive motor 6.
[0083] During actual use, the rotating shaft 19 - 4 is arranged along the width direction of the lifting platform 1 , and the rotating shaft 19 - 4 is arranged at one end of the lifting platform 1 away from the fixed platform 7 .
[0084] In this embodiment, two rotating shaft mounting seats for mounting the rotating shaft 19 - 4 are provided on the lifting platform 1 , and the rotating shaft 19 - 4 is rotatably mounted in the rotating shaft mounting seats.
[0085] In this embodiment, the movable arm driving mechanism includes a linear motor 13 arranged directly below the rigid movable plate 11, and the linear motor 13 is controlled by a controller 22. A groove-shaped bracket 21 for installing the linear motor 13 is provided at the lower part of the rigid movable plate 11. The stator of the linear motor 13 is fixed on the groove-shaped bracket 21, and the mover of the linear motor 13 is hingedly connected to two push rods 20 respectively used to drive the two rigid movable arms 12 to move.
[0086] During actual use, the slot-shaped bracket 21 is fixed to the bottom of the fixed platform 7, the opening of the slot-shaped bracket 21 faces upward and the upper ends of both sides of the opening are fixed as a whole with the rigid movable plate 11; the stator of the linear motor 13 is fixed in the middle of the bottom of the slot-shaped bracket 21, and the mover of the linear motor 13 always reciprocates in the slot-shaped bracket 21.
[0087] In this embodiment, the mover of the linear motor 13 is fixed with a push rod mounting plate for installing the push rod 20. The lower ends of the two push rods 20 are respectively hinged on both sides of the push rod mounting plate. The upper ends of the two push rods 20 pass through the fixed platform 7 and the rigid movable plate 11 in sequence and then are respectively hinged at the lower ends of the two rigid movable arms 12. The fixed platform 7 and the rigid movable plate 11 are both provided with strip holes for the push rods 20 to pass through.
[0088] In actual use, when the distance between the two rigid movable arms 12 needs to be reduced, the mover of the linear motor 13 is controlled to retract downward, and the push rod 20 pulls the two rigid movable arms 12 inward; when the distance between the two rigid movable arms 12 needs to be increased, the mover of the linear motor 13 is controlled to extend upward, and the push rod 20 pushes the two rigid movable arms 12 outward.
[0089] In this embodiment, a slide groove 11-1 for sliding installation of the rigid movable arm 12 is opened on the rigid movable plate 11 along its length direction, and a clamping groove 12-1 for clamping the tube plate 17 and the baffle plate 18 is opened on the rigid movable arm 12 along its length direction, and the opening width of the clamping groove 12-1 is not less than the thickness of the tube plate 17 and the baffle plate 18; a magnetic pad strip 15 for adjusting the opening width of the clamping groove 12-1 is arranged in the clamping groove 12-1.
[0090] In actual use, a vertical clamping groove 12 - 1 is provided on the inner side of the rigid movable arm 12 , so as to facilitate clamping and positioning of the tube sheet 17 and the baffle 18 .
[0091] It should be noted that the card slot 12-1 has a certain degree of magnetism and can fit tightly with the magnetic pad 15. The length of the magnetic pad 15 is equal to the length of the card slot 12-1, the width of the magnetic pad 15 is equal to the depth of the card slot 12-1, and the thickness of the magnetic pad 15 is generally 1mm, 2mm, 5mm or 10mm.
[0092] In this embodiment, a proximity switch 23 connected to the controller 22 is installed on a rigid movable arm 12 in each of the movable brackets corresponding to the baffle 18, a proximity switch 23 connected to the controller 22 is installed on the tube plate 17, an infrared transmitter is installed on each of the two rigid movable arms 12 close to the movable baffle 2, and two infrared receivers 8 cooperating with the infrared transmitters are installed on one end of the cylinder 16 close to the rigid movable arm 12, and the infrared receivers 8 are connected to the controller 22.
[0093] In actual use, the drive motor 6, the infrared receiver 8, the linear motor 13, the controller 22, the first oil pump 24 and the second oil pump 25 constitute the control system of the automatic tube bundle threading device of the present invention. By adding a control system to the automatic tube bundle threading device of the present invention, the automatic control of the device can be realized and the work efficiency can be improved.
[0094] In this embodiment, the infrared transmitter and the infrared receiver 8 constitute an infrared sensor, which is preferably a photoelectric sensor of model Omron E3Z-T81A; the controller 22 is preferably a computer, and the proximity switch 23 is preferably an eddy current proximity switch, and a magnetic block that cooperates with the eddy current proximity switch is provided on the cylinder 16.
[0095] In actual use, the infrared transmitter sends out an infrared signal after being powered on, and the infrared receiver 8 is installed within the effective signal receiving distance. After receiving the infrared signal, the infrared receiver 8 can transmit the signal to the controller 22.
[0096] like Figure 5 and Figure 6 The method for automatically threading a tube bundle of a shell and tube heat exchanger device is characterized in that the method comprises the following steps:
[0097] Step 1: Install the movable bracket on the fixed platform. The process is as follows:
[0098] Step 101, determining the number of movable supports: determining the number of movable supports installed on the fixed platform 7 according to the number of tube sheets 17 and baffles 18 in the heat exchanger, wherein the number of movable supports is equal to the total number of tube sheets 17 and baffles 18;
[0099] In actual use, first determine the number of baffles 18 and tube sheets 17 in the heat exchanger, and then install a corresponding number of movable brackets on the fixed platform 7 according to the number of baffles 18 and tube sheets 17 to ensure that all tube sheets 17 and baffles 18 have a corresponding movable bracket.
[0100] Step 102, determining the spacing of the movable brackets: determining the spacing between the movable brackets according to the spacing between the tube sheet 17 and the baffle 18 adjacent thereto, and the spacing between two adjacent baffles 18, so that the tube sheet 17 and the baffle 18 respectively correspond to one of the movable brackets;
[0101] In actual use, the distance between two adjacent baffles 18 and the distance between adjacent tube sheets 17 and baffles 18 are measured in sequence from one end to the other end of the tube bundle 26, and a plurality of movable brackets are installed on the fixed platform 7 at specified intervals.
[0102] Step 103, installing the movable bracket: slidingly installing a plurality of the movable brackets on the fixed platform 7 in sequence, and fixing the rigid movable plates 11 of the movable brackets on the fixed platform 7 by bolts;
[0103] In actual use, after the movable bracket is positioned, the rigid movable plate 11 is fixed to the fixed platform 7 by bolts, which can ensure the connection reliability between the movable bracket and the fixed platform 7 and prevent the movable bracket from shifting during the pipe bundle installation process.
[0104] In this embodiment, when fixing the movable bracket, first slide the first movable bracket along the two second guide rails 10 to the side of the fixed platform 7 close to the lifting platform 1, and fix the first movable bracket to the fixed platform 7 by bolts, and then install the other movable brackets according to the spacing determined in step 102, and the installation method of each movable bracket is the same.
[0105] Step 104, determining the slot width of the rigid movable arm: the rigid movable arm 12 is provided with a slot 12-1 for mounting the tube sheet 17 and the baffle 18 along its length direction, and the opening width of the slot 12-1 is not less than the thickness of the tube sheet 17 and the baffle 18. When the thickness of the tube sheet 17 or the baffle 18 is less than the opening width of the slot 12-1, a magnetic pad 15 is installed in the slot 12-1 of the rigid movable arm 12 corresponding to the tube sheet 17 or the baffle 18, so that the opening width of the slot 12-1 where the magnetic pad 15 is installed is equal to the thickness of the tube sheet 17 or the baffle 18;
[0106] In actual use, since the thickness of the tube sheet 17 and the baffle 18 corresponding to different heat exchangers may be different, and the thickness of the tube sheet 17 and the baffle 18 corresponding to the same heat exchanger may also be inconsistent, it is necessary to first adjust the opening width of the corresponding slot 12-1 according to the thickness of the tube sheet 17 and the baffle 18.
[0107] Step 2, hoisting of the heat exchanger tube bundle: hoist the tube bundle 26 of the heat exchanger by a hoist so that the tube sheet 17 and the baffle 18 are placed on the multiple rigid movable plates 11 fixed in step 1 in sequence, and the lifting heights of the lifting mechanisms on the multiple rigid movable plates 11 are adjusted according to the diameters of the tube sheet 17 and the baffle 18, so that the tube bundle 26 of the heat exchanger is arranged horizontally, and the distance between the two rigid movable arms 12 in the multiple movable brackets is adjusted by the multiple movable arm driving mechanisms, so that the tube sheet 17 and the baffle 18 are respectively clamped in the two corresponding clamping grooves 12-1;
[0108] In actual use, the distance between the two rigid movable arms 12 is adjusted by adjusting the extension and retraction of the linear motor 13 in the movable arm driving mechanism.
[0109] In this embodiment, when adjusting the lifting height of the lifting mechanism on the plurality of rigid movable plates 11, the controller 22 controls the first oil pump 24 to extend and retract the oil cylinder 14 to achieve the change of the lifting height of the lifting mechanism.
[0110] Step 3: Hoisting and centering of the heat exchanger cylinder. The process is as follows:
[0111] Step 301, hoisting of the heat exchanger cylinder: hoisting the heat exchanger cylinder 16 by a hoist and placing it on the ball matrix 3 on the lifting platform 1, wherein the cylinder 16 is arranged horizontally;
[0112] Step 302, installation of infrared sensors: two infrared transmitters are installed on two rigid movable arms 12 close to the cylinder 16, the arrangement height of the two infrared transmitters is the same as the arrangement height of the central axis of the tube bundle 26 of the heat exchanger, two infrared receivers 8 matching with the infrared transmitters are respectively installed on both sides of one end of the cylinder 16 close to the fixed platform 7, the infrared receivers 8 are connected to the controller 22, the arrangement height of the two infrared receivers 8 is equal to the arrangement height of the central line of the cylinder 16, and the distance between the two infrared receivers 8 is equal to the distance between the two infrared transmitters;
[0113] In actual use, by installing two infrared transmitters on two rigid movable arms 12 close to the lifting platform 1 and installing two infrared receivers 8 on the cylinder 16, it is convenient to quickly align the cylinder 16 and the tube bundle 26, which can effectively improve work efficiency; the infrared transmitter is installed on one side of the rigid movable arm 12 close to the cylinder 16.
[0114] Step 303, centering the heat exchanger cylinder and the tube bundle: a plurality of liftable legs 4 are supported at the lower part of the lifting platform 1, and the height of the lifting platform 1 is adjusted by the plurality of liftable legs 4. When the infrared receivers of the two infrared sensors 8 receive the signals emitted by the infrared transmitter, the centering of the heat exchanger cylinder 16 and the tube bundle 26 is completed;
[0115] In actual use, by adjusting the height of the lifting platform 1, when the two infrared receivers installed on the cylinder 16 move to the same height as the two infrared transmitters, the infrared sensor 8 can sense the signal and transmit the signal to the controller 22. At this time, the controller 22 controls the second oil pump 25 to stop running, and the height of the lifting platform 1 is adjusted to the right position.
[0116] Step 4: Making ice inside the cylinder: Use an ultrasonic atomizer to evenly spray small water droplets on the inner wall of the cylinder 16, cover the outside of the cylinder 16 with heat insulation cotton, and spray dry ice inside the cylinder 16 to form evenly dense small ice droplets on the inner wall of the cylinder 16;
[0117] In actual use, water droplets and dry ice form evenly distributed small ice beads on the inner wall of the cylinder 16, which can form an ice layer on the inner wall of the cylinder 16, thereby reducing the friction between the cylinder 16 and the tube sheet 17, and between the cylinder 16 and the baffle 18, making it easier to install the tube bundle 26.
[0118] It should be noted that by covering the outside of the cylinder 16 with heat insulation cotton, the cylinder 16 can be effectively insulated, the melting rate of small ice beads in the cylinder 16 can be reduced, and a certain amount of time can be provided for the installation of the tube bundle 26.
[0119] Step 5: Thread the tube bundle. The process is as follows:
[0120] Step 501: A proximity switch 23 connected to a controller 22 is installed on a rigid movable arm 12 in each of the movable brackets corresponding to the baffle 18, and a proximity switch 23 is installed on a side of the tube sheet 17 close to the cylinder 16;
[0121] In actual use, the proximity switch 23 on the rigid movable arm 12 is installed on one side of the rigid movable arm 12 close to the cylinder 16. A proximity switch 23 is installed on the tube plate 17 and on one of the rigid movable arms 12 in each movable bracket corresponding to the baffle 18, and the proximity switch 23 is connected to the controller 22. When the cylinder 16 moves forward and contacts the proximity switch 23, the proximity switch 23 can sense it and transmit the signal to the controller 22. After receiving the signal, the controller 22 can control the movement of the movable arm drive mechanism. The whole process does not require human participation, has a high degree of automation, and can effectively improve work efficiency.
[0122] Step 502: the controller 22 controls the baffle driving mechanism to start, and the baffle driving mechanism drives the movable baffle 2 to move toward the tube bundle 26. The movable baffle 2 pushes the cylinder 16 to move toward the tube bundle 26 on the ball matrix 3, so that the cylinder 16 is sequentially sleeved on the outside of the plurality of baffles 18. When the cylinder 16 hits the proximity switch 23 installed on the tube sheet 17, the cylinder 16 stops moving, and the tube bundle 26 is inserted into the cylinder 16.
[0123] When the cylinder 16 moves to the position of the baffle 18 or the tube sheet 17, the proximity switch 23 on the rigid movable arm 12 corresponding to the baffle 18 or the tube sheet 17 transmits a signal to the controller 22, and the controller 22 controls the movable arm driving mechanism to move the two rigid movable arms 12 outward by a specified distance. At the same time, the controller 22 controls the jacking mechanism corresponding to the two rigid movable arms 12 to descend to a specified height, so that the baffle 18 or the tube sheet 17 is in a suspended state. As the cylinder 16 continues to move, the baffle 18 or the tube sheet 17 enters the cylinder 16 and slides on the ice layer formed by small ice beads evenly distributed in the cylinder 16;
[0124] In actual use, when the cylinder 16 moves to the position of the baffle 18 or the tube sheet 17, it is necessary to ensure that the distance the two rigid movable arms 12 move outward and the height to which the lifting mechanism descends can allow the cylinder 16 to pass smoothly and prevent the rigid movable arms 12 and the lifting mechanism from blocking the cylinder 16 to a certain extent.
[0125] In this embodiment, when the tube bundle is being threaded, the baffle 18 enters the cylinder 16 first, and the tube sheet 17 enters the cylinder 16 last. The total number of the baffles 18 and the tube sheets 17 is determined, and the total number of the proximity switches 23 is determined. The number of the proximity switches 23 can be set in the controller 22. When the last proximity switch 23, that is, the proximity switch 23 on the tube sheet 17, senses the touch signal of the cylinder 16, the controller 22 controls the drive motor 6 to stop running, and the threading of the tube bundle is completed.
[0126] Step 6: Lifting away the cylinder: After the tube bundle is inserted in step 5, the controller 22 controls the baffle driving mechanism to stop running. When the temperature inside the cylinder 16 rises to room temperature, the operator lifts away the cylinder 16 after the tube bundle 26 is inserted.
[0127] In actual use, the controller 22 controls the baffle driving mechanism by controlling the start and stop and the forward and reverse rotation of the driving motor 6 .
[0128] In this embodiment, when the cylinder 16 after passing through the tube bundle 26 needs to be lifted away, the controller 22 first controls the drive motor 6 to drive the movable baffle 2 to move a distance away from the cylinder 16, so that the movable baffle 2 is separated from the cylinder 16, which is convenient for lifting the cylinder 16.
[0129] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. An automatic tube bundle threading device for shell and tube heat exchanger equipment, characterized in that: The invention comprises a lifting platform (1) and a fixed platform (7) which cooperate with each other, wherein the lifting platform (1) is provided with a movable baffle (2) for pushing a cylinder (16) of a heat exchanger to move, the movable baffle (2) is slidably mounted on the lifting platform (1), the lifting platform (1) is provided with a baffle driving mechanism for driving the movable baffle (2) to translate, the lifting platform (1) is also provided with a ball matrix (3) for reducing the friction between the cylinder (16) and the lifting platform (1), and the fixed platform (7) is provided with a plurality of balls for fixing the heat exchanger. A movable bracket for the tube sheet (17) and the baffle (18), the movable bracket being a U-shaped bracket consisting of a steel movable plate (11) and two steel movable arms (12), the steel movable plate (11) being slidably mounted on a fixed platform (7), a jacking mechanism being mounted on the middle portion of the upper side of the steel movable plate (11), the two steel movable arms (12) being slidably mounted on the upper portions of both ends of the steel movable plate (11), and a movable arm driving mechanism for driving the two steel movable arms (12) to translate being disposed at the bottom of the steel movable plate (11); The movable arm driving mechanism comprises a linear motor (13) arranged directly below the rigid movable plate (11); a slot-shaped bracket (21) for mounting the linear motor (13) is provided at the lower part of the rigid movable plate (11); a stator of the linear motor (13) is fixed on the slot-shaped bracket (21); a mover of the linear motor (13) is hingedly connected to two push rods (20) respectively used for driving the two rigid movable arms (12) to move; The rigid movable plate (11) is provided with a slide groove (11-1) along its length direction for slidingly installing the rigid movable arm (12), and the rigid movable arm (12) is provided with a clamping groove (12-1) along its length direction for clamping the tube plate (17) and the baffle plate (18), and the opening width of the clamping groove (12-1) is not less than the thickness of the tube plate (17) and the baffle plate (18); and a magnetic pad (15) is provided in the clamping groove (12-1) for adjusting the opening width of the clamping groove (12-1).
2. The automatic tube bundle threading device for shell and tube heat exchanger equipment according to claim 1, characterized in that: The lifting platform (1) is provided with two first guide rails (5) for guiding the movable baffle (2), and the two first guide rails (5) are parallel to each other. The fixed platform (7) is provided with two second guide rails (10) for guiding the movable bracket, and the two second guide rails (10) are parallel to each other.
3. The automatic tube bundle threading device for shell and tube heat exchanger equipment according to claim 1, characterized in that: The lifting platform (1) and the fixed platform (7) are both rectangular platforms; each corner of the lower part of the lifting platform (1) is supported by a liftable support leg (4); each corner of the lower part of the fixed platform (7) is provided with a fixed support leg (9).
4. The automatic tube bundle threading device for shell and tube heat exchanger equipment according to claim 1, characterized in that: The baffle driving mechanism comprises a driving motor (6) and two chain transmission units symmetrically arranged on both sides of the lifting platform (1); the chain transmission unit comprises a sprocket (19-1), a chain (19-2) and a tensioning wheel (19-3) that cooperate with each other; the sprocket (19-1) and the tensioning wheel (19-3) in the chain transmission unit are respectively arranged at two ends of the lifting platform (1); and the driving motor (6) is arranged on one end of the lifting platform (1) close to the sprocket (19-1).
5. The automatic tube bundle threading device for shell and tube heat exchanger equipment according to claim 4, characterized in that: An ear plate for mounting a chain (19-2) is provided on both sides of the movable baffle plate (2); one end of the chain (19-2) is fixed to one side of the ear plate corresponding thereto; the other end of the chain (19-2) sequentially crosses the corresponding sprocket wheel (19-1) and the tension wheel (19-3) and is then fixed to the other side of the corresponding ear plate.
6. The automatic tube bundle threading device for shell and tube heat exchanger equipment according to claim 5, characterized in that: The two sprockets (19-1) are mounted on the output shaft of the drive motor (6) via a rotating shaft (19-4); the two sprockets (19-1) are respectively fixedly mounted on both ends of the rotating shaft (19-4); one end of the rotating shaft (19-4) is fixed on the output shaft of the drive motor (6) and is coaxially arranged with the output shaft of the drive motor (6).
7. The automatic tube bundle threading device for shell and tube heat exchanger equipment according to claim 1, characterized in that: A proximity switch (23) connected to a controller (22) is installed on a rigid movable arm (12) in each movable bracket corresponding to the baffle (18); a proximity switch (23) connected to the controller (22) is installed on the tube plate (17); an infrared transmitter is installed on each of the two rigid movable arms (12) close to the movable baffle (2); and two infrared receivers (8) cooperating with the infrared transmitters are installed on one end of the cylinder (16) close to the rigid movable arm (12); the infrared receivers (8) are connected to the controller (22).
8. A method for automatically threading tube bundles of a shell and tube heat exchanger using the device as claimed in claim 1, characterized in that: The method comprises the following steps: Step 1: Install the movable bracket on the fixed platform. The process is as follows: Step 101, determining the number of movable supports: determining the number of movable supports installed on the fixed platform (7) according to the number of tube sheets (17) and baffles (18) in the heat exchanger, wherein the number of movable supports is equal to the total number of tube sheets (17) and baffles (18); Step 102, determining the spacing of the movable supports: determining the spacing between the movable supports according to the spacing between the tube sheet (17) and the baffle (18) adjacent thereto, and the spacing between two adjacent baffles (18), so that the tube sheet (17) and the baffle (18) respectively correspond to one of the movable supports; Step 103, installing the movable bracket: slidingly installing a plurality of the movable brackets on the fixed platform (7) in sequence, and fixing the rigid movable plates (11) of the movable brackets on the fixed platform (7) by bolts; Step 104, determining the width of the slot of the rigid movable arm: the rigid movable arm (12) is provided with a slot (12-1) for mounting the tube sheet (17) and the baffle (18) along its length direction, the opening width of the slot (12-1) being not less than the thickness of the tube sheet (17) and the baffle (18), and when the thickness of the tube sheet (17) or the baffle (18) is less than the opening width of the slot (12-1), a magnetic pad (15) is installed in the slot (12-1) of the rigid movable arm (12) corresponding to the tube sheet (17) or the baffle (18), so that the opening width of the slot (12-1) on which the magnetic pad (15) is installed is equal to the thickness of the tube sheet (17) or the baffle (18); Step 2, hoisting the tube bundle of the heat exchanger: hoisting the tube bundle (26) of the heat exchanger by means of a hoist so that the tube sheet (17) and the baffle (18) are placed in sequence on the multiple rigid movable plates (11) that have been fixed in step 1; adjusting the lifting heights of the lifting mechanisms on the multiple rigid movable plates (11) according to the diameters of the tube sheet (17) and the baffle (18) so that the tube bundle (26) of the heat exchanger is arranged horizontally; adjusting the distance between two rigid movable arms (12) in the multiple movable brackets by means of the multiple movable arm driving mechanisms so that the tube sheet (17) and the baffle (18) are respectively clamped in the two corresponding clamping grooves (12-1); Step 3: Hoisting and centering of the heat exchanger cylinder. The process is as follows: Step 301, hoisting of the heat exchanger cylinder: hoisting the heat exchanger cylinder (16) by a hoist and placing it on the ball matrix (3) on the lifting platform (1), wherein the cylinder (16) is arranged horizontally; Step 302, installation of infrared sensors: two infrared transmitters are installed on two rigid movable arms (12) close to the cylinder (16), the arrangement height of the two infrared transmitters being the same as the arrangement height of the central axis of the tube bundle (26) of the heat exchanger, two infrared receivers (8) matching the infrared transmitters are respectively installed on both sides of one end of the cylinder (16) close to the fixed platform (7), the infrared receivers (8) are connected to the controller (22), the arrangement height of the two infrared receivers (8) is equal to the arrangement height of the central line of the cylinder (16), and the distance between the two infrared receivers (8) is equal to the distance between the two infrared transmitters; Step 303, centering the heat exchanger cylinder and the tube bundle: the lower part of the lifting platform (1) is supported by a plurality of liftable legs (4), and the height of the lifting platform (1) is adjusted by the plurality of liftable legs (4). When the infrared receivers of the two infrared sensors (8) receive the signals emitted by the infrared transmitter, the controller (22) controls the plurality of liftable legs (4) to stop moving, thereby completing the centering of the heat exchanger cylinder (16) and the tube bundle (26); Step 4: Making ice inside the cylinder: using an ultrasonic atomizer to evenly spray fine water droplets on the inner wall of the cylinder (16), covering the outside of the cylinder (16) with heat insulation cotton, and spraying dry ice inside the cylinder (16) to form evenly dense small ice droplets on the inner wall of the cylinder (16); Step 5: Thread the tube bundle. The process is as follows: Step 501: A proximity switch (23) connected to a controller (22) is installed on a rigid movable arm (12) in each of the movable brackets corresponding to the baffle (18), and a proximity switch (23) is installed on a side of the tube sheet (17) close to the cylinder (16); Step 502: The controller (22) controls the baffle driving mechanism to start, and the baffle driving mechanism drives the movable baffle (2) to move toward the tube bundle (26). The movable baffle (2) pushes the cylinder (16) to move toward the tube bundle (26) on the ball matrix (3), so that the cylinder (16) is sequentially sleeved on the outside of the plurality of baffles (18). When the cylinder (16) hits the proximity switch (23) installed on the tube sheet (17), the cylinder (16) stops moving, and the tube bundle (26) is inserted into the cylinder (16). When the cylinder (16) moves to the position of the baffle (18) or the tube sheet (17), the proximity switch (23) on the rigid movable arm (12) corresponding to the baffle (18) or the tube sheet (17) transmits a signal to the controller (22), and the controller (22) controls the movable arm driving mechanism to move the two rigid movable arms (12) outward by a specified distance. At the same time, the controller (22) controls the lifting mechanism corresponding to the two rigid movable arms (12) to descend to a specified height, so that the baffle (18) or the tube sheet (17) is in a suspended state. As the cylinder (16) continues to move, the baffle (18) or the tube sheet (17) enters the cylinder (16) and slides on the ice layer formed by small ice beads evenly distributed in the cylinder (16); Step 6: Lifting away the cylinder: After the tube bundle is inserted in step 5, the controller (22) controls the baffle drive mechanism to stop operating. When the temperature inside the cylinder (16) rises to room temperature, the operator lifts away the cylinder (16) after the tube bundle (26) is inserted.
