A highway drainage ditch traction extrusion slipform construction equipment and construction method

By developing traction extruded sliding mold construction equipment, the problems of complex construction technology, slow progress and high cost are solved, and rapid and high-quality sliding mold forming of drainage ditches of different shapes and sizes are achieved.

CN111501492BActive Publication Date: 2025-04-18ANHUI XINLU CONSTR ENG GRP +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010475796.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-29
Publication Date
2025-04-18
Estimated Expiration
2040-05-29

AI Technical Summary

Technical Problem

The construction process of traditional highway drainage ditches is complex, the progress is slow, and the cost is high. The existing machinery cannot flexibly adjust the style and size of the drainage ditch, which cannot meet the high-quality construction requirements under complex working conditions.

Method used

A traction extrusion type sliding mold construction equipment is developed, including a main load-bearing frame, a guide device, a pump material storage device, a cross-sectional adjustment device and a surface-receiving device, which can realize the primary sliding mold forming of drainage ditches of different shapes and sizes.

Benefits of technology

This equipment can quickly and effectively realize the sliding molding of drainage ditches in various styles and sizes, reduce construction costs, and improve construction progress and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111501492B_ABST
    Figure CN111501492B_ABST
Patent Text Reader

Abstract

The present invention relates to a traction extrusion slipform construction equipment and a construction method for a highway drainage ditch. The equipment is pulled by a winch and consists of a load-bearing frame, a guide device, a pump material storage device, a cross-section adjustment device, and a surface finishing device. The guide device of the equipment can ensure that the equipment moves along the fixed axis direction of the adobe groove, so as to realize the construction of drainage ditches with a large difference between the groove width and the equipment width; the cross-section adjustment function of the equipment forming template can be used to complete the construction of drainage ditches with different cross-sectional shapes and sizes; the surface finishing device of the equipment can realize automatic surface finishing after the drainage ditch slipform is formed. When the drainage ditch is subjected to traction extrusion slipform construction, the reasonable range of concrete slump is 10-45mm, the vibration frequency range of the vibrating rod is 30-60Hz, the amplitude range of the vibrating rod is 1.5-2.5mm, the vibration time range of the concrete is 15s-30s, and the slipform speed range is 0.6m / min-1.2m / min. The construction equipment and method are fast, reliable, and economical, and have good prospects for promotion and application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of highway auxiliary drainage ditch construction, and in particular to a construction device and a use method thereof that can meet the requirements of one-time slipform forming of highway drainage ditches of different shapes and sizes. Background Art

[0002] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention, and should not necessarily be regarded as an admission or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art.

[0003] Drainage ditches are usually set up on the outside of the slope foot of the roadbed on both sides of the road or on one side, and are the main components of highway ancillary facilities. According to the shape of the cross section, drainage ditches can be divided into different types such as trapezoidal, rectangular, triangular, etc., and their sizes are generally determined by hydrological and hydraulic calculations. On highways of all levels, drainage ditches can be used to clean up road surface water. Generally, the location where drainage ditches are set up is relatively low-lying, and the water will automatically flow to the drainage ditch. Then the accumulated water on the road surface will flow underground through the drainage ditch, and then the water from various sources within the roadbed and pavement will be diverted to the outside of the road boundary. In order to ensure that the highway drainage ditch has good functionality and durability, the drainage ditch usually needs to take certain measures to reinforce it. There are many types of reinforcement for highway drainage ditches, which are mainly determined by the soil quality of the drainage ditch, the longitudinal slope of the ditch bottom, the water flow speed and the use requirements.

[0004] At present, the construction of highway drainage ditches in my country usually adopts methods such as template casting concrete, prefabricated parts assembly construction and concrete slipform construction. The template casting construction method requires the use of fixed templates to support concrete manually. It is a casting method that includes multiple processes such as erecting, dismantling and pouring. This construction process is complicated, time-consuming and costly. The quality of drainage ditch construction mainly depends on the quality of template laying. It can be seen that template casting concrete construction will not only affect the construction quality of drainage ditches, but also affect the overall progress of the project. Prefabricated parts assembly construction requires workers to pre-cast prefabricated parts as required at a special construction site, and then transport the prefabricated parts to the construction site for assembly construction. This construction process requires the establishment of a special prefabrication plant. At the same time, leakage and other phenomena are prone to occur at the joints of each section of prefabricated parts, which will increase construction costs and affect construction quality.

[0005] In summary, the inventors found that the traditional highway drainage ditch construction process has the disadvantages of complex procedures, slow construction progress and high economic costs. Existing drainage ditch construction machinery cannot flexibly adjust the style and size of the drainage ditch. The style and size of the drainage ditch are single, and it is impossible to carry out construction of multiple demand combinations, which can no longer meet the requirements of high-quality construction of drainage ditches under complex working conditions. Summary of the invention

[0006] In view of the defects or shortcomings in the construction of highway drainage ditches, the purpose of this patent is to provide a construction equipment and a method of use that can meet the one-time slip-form forming of drainage ditches of different shapes and sizes, which can effectively and quickly realize the one-time slip-form forming of drainage ditches of various styles and sizes.

[0007] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:

[0008] The first aspect of the present invention provides a highway drainage ditch traction extrusion slipform construction equipment, including: a main load-bearing frame 4, a guide device 2, a pump material storage device, a cross-section adjustment device 19 and a surface finishing device; the main load-bearing frame 4 is provided with a pump material storage device, the front bottom of the main load-bearing frame 4 is provided with a guide device 2, the rear end of the main load-bearing frame 4 is also provided with a slipform support frame 22, the slipform support frame 22 is provided with a cross-section adjustment device 19 and a slipform forming plate, and the slipform forming plate is connected to the surface finishing device.

[0009] In order to improve the overall progress of highway engineering, shorten the construction period, and reduce construction costs, the present invention conducts special research on traditional highway drainage ditch construction machinery and construction technology. Therefore, a drainage ditch slipform construction equipment that can meet different shapes and sizes is developed, and a reasonable drainage ditch construction technology is proposed.

[0010] The second aspect of the present invention provides a highway drainage ditch traction extrusion slipform construction method, comprising:

[0011] A guide device is used to guide the moving direction of the entire device;

[0012] The concrete material is stored in a hopper, and the concrete material is sent into the concrete discharge part through the forward movement of the whole equipment, and then the concrete material is vibrated and squeezed to be dense, and the dense concrete is squeezed into the space formed by the slipform forming side plate, slipform forming bottom plate, slipform forming top plate and the drainage ditch adobe wall and the ground;

[0013] The cross-section adjustment device is used to adjust the bottom width of the formed concrete ditch, and the upper adjustment rod is used to adjust the angle between the side plate of the slipform forming mold and the vertical direction to construct drainage ditches with different side wall inclination angles;

[0014] The entire device is dragged forward in the rough trench by a winch for construction.

[0015] The present invention has a simple structure, can adapt to the construction of drainage ditches with different styles and sizes, occupies a small space, can effectively reduce the cost of ditch construction, and at the same time improves the construction progress and construction quality, and has high engineering practical value.

[0016] The beneficial effects of the present invention are:

[0017] (1) The present invention can ensure that the equipment can move along the fixed axis direction of the adobe trench through the guiding device of the equipment, so as to realize the construction of drainage ditches with a large difference between the trench width and the equipment width; the cross-sectional adjustment function of the equipment forming template can be used to complete the construction of concrete drainage ditches with different cross-sectional shapes and sizes; and the finishing device of the equipment can realize automatic finishing operation after the concrete drainage ditch is slipformed.

[0018] (2) The present invention has a simple structure and can adapt to the construction of drainage ditches of different styles and sizes. It occupies a small space and can effectively reduce the cost of ditch construction while improving the construction progress and quality. It has high engineering practical value. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0020] Figure 1 is a schematic diagram of the front structure of the construction equipment of Example 1 of the present invention;

[0021] Figure 2 Schematic diagram of the rear structure of the construction equipment of Example 1 of the present invention;

[0022] Figure 3 It is a schematic diagram of the support skeleton connection structure in the construction equipment of Example 1 of the present invention;

[0023] Figure 4 It is a schematic diagram of the structure of the guide device in the construction equipment of Example 1 of the present invention;

[0024] Figure 5 It is a structural schematic diagram of a cross-section adjustment device in a construction equipment according to Embodiment 1 of the present invention;

[0025] Figure 6 It is a diagram of a slip-formed concrete drainage ditch according to the construction equipment embodiment 1 of the present invention;

[0026] Figure 7 This is a diagram of a slipformed concrete drainage ditch according to construction equipment embodiment 2 of the present invention.

[0027] Among them: 1: front side plate; 2: guide device; 201. guide fixing frame; 202. adjustment box body; 203. adjustment fastening bolt; 204. left guide rod; 205. right guide rod; 3: front bottom plate; 4: main load-bearing frame; 5: front top plate; 6: vibration pump; 7: controller; 8: vibration pipe; 9: hopper; 10. sliding mold top plate; 11. sliding mold forming top plate; 12. left scraper; 13. sliding mold forming side plate; 14. rear side plate; 15. fixing bolt; 16. vibration rod fixing device; 17. front baffle plate; 18. right scraper; 19. cross-section adjustment Device; 1901. right frame; 1902. right bottom adjustment rod; 1903. bottom adjustment box body; 1904. bottom adjustment control rod; 1905. left bottom adjustment rod; 1906. left upper adjustment rod; 1907. connecting pin; 1908. left frame; 1909. upper adjustment box body; 1910. upper adjustment control rod; 1911. right upper adjustment rod; 20. slip forming bottom plate; 21. bottom scraper; 22. slip forming support frame; 23. rear bottom plate; 24. rear baffle plate; 25. fixing nut; 26. connecting bolt. DETAILED DESCRIPTION

[0028] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0029] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0030] Explanation of terms

[0031] The top plate 10 of the slipform represents the top plate of the entire slipform device, which mainly supports and connects the entire slipform device and does not contact the concrete;

[0032] The slipformed top plate 11 refers to the top plate on the upper part of the side of the drainage ditch when the concrete is formed. It directly contacts the concrete and affects the forming quality of the drainage ditch.

[0033] A highway drainage ditch traction extrusion slipform construction equipment and method, including: a load-bearing frame, a guide device, a pump material storage device, a cross-section adjustment device and a surface finishing device. The load-bearing frame is composed of a main load-bearing frame, a slipform support frame, connecting bolts and fixing nuts. The connection method of the main load-bearing frame and the slipform support frame is adjusted by the connecting bolts and fixing nuts to control the thickness of the bottom of the construction concrete drainage ditch; the guide device is composed of a guide fixing frame, an adjustment box, an adjustment fastening bolt, a left guide rod, a right guide rod, etc. The guide fixing frame is installed at the front of the main load-bearing frame. The adjustment fastening bolt adjusts and fixes the right guide rod and the left guide rod to extend and retract to the left and right, so that the other end of the guide rod contacts the adobe surface to ensure the position of the entire construction equipment between the adobes; the pump material storage device is composed of a hopper, a front baffle plate, and a rear baffle plate , vibration pump, controller, vibration tube, rear side plate, connecting bolts and connecting lines and other components. The hopper is installed on the main load-bearing frame by fastening screws, the vibration pump and controller are installed on the front top plate, the controller is connected to the vibration pump through a control cable, the vibration pump is connected to the vibration tube, the vibration rod fixing device is installed on the main load-bearing frame at the bottom of the hopper, and the vibration tube is installed on the vibration rod fixing device; the dough collecting device includes a left scraper, a right scraper, a bottom scraper and fixing bolts. The left scraper is fixed to the left slipform side plate by fixing bolts, the right scraper is fixed to the right slipform side plate by fixing bolts, and the bottom scraper is installed on the slipform forming bottom plate by fixing bolts.

[0034] In some embodiments, the main load-bearing frame and the sliding formwork support frame are made of steel sections by welding. There are corresponding screw holes and hole slots on the main load-bearing frame and the sliding formwork support frame for connecting and installing cross-section adjustment devices, connecting bolts and hoppers, etc. The specifications of the main load-bearing frame are 1200mm in length and 700mm in width.

[0035] In some embodiments, the cross-section adjustment device has a height specification of 1000 mm, a bottom width adjustment range of 400-800 mm, an angle adjustment range of 0-15° between the left and right frames and the vertical direction, and a distance adjustment range of 100-1000 mm between the top plate of the slipform and the bottom plate of the slipform.

[0036] In some embodiments, the reasonable range of slump of concrete suitable for drainage ditch traction extrusion slipform construction is 10-45mm, the vibration frequency range of the vibrating rod is 30-60Hz, the amplitude range of the vibrating rod is 1.5-2.5mm, the vibration time range of the concrete is 15s-30s, and the slipform speed range is 0.6m / min-1.2m / min.

[0037] In the present invention, the guide device contacts the wall of the adobe ditch through the guide rod to guide the moving direction of the entire device. The hopper of the storage pump device stores concrete material, and the concrete material is sent into the concrete discharge component through the advancement of the entire equipment. Then the control box controls the vibration pump to vibrate and extrude the concrete material to make it dense, and extrude the dense concrete into the space formed by the slipform forming side plate, the slipform forming bottom plate, the slipform forming top plate, the drainage ditch adobe wall and the ground. In the cross-section adjustment device, the bottom width of the concrete ditch is adjusted by the bottom adjustment rod, and the angle between the slipform forming mold side plate and the vertical direction is adjusted by the upper adjustment rod to construct drainage ditches with different side wall inclination angles. The entire device is dragged forward in the roughcast groove by a winch for construction.

[0038] The following is a detailed description of the technical solution of the present invention by taking the construction of a highway drainage ditch as an example, but the protection scope of the present invention is not limited to this example.

[0039] The present invention also provides a highway drainage ditch traction extrusion slipform construction equipment, and the drainage ditch construction device includes a load-bearing frame, a guide device, a pump material storage device, a cross-section adjustment device and a surface finishing device. The load-bearing frame is the main load-bearing structure of the entire equipment, and the guide device, the pump material storage device and the cross-section adjustment device are all installed on the load-bearing frame. During construction, the winch pulls the steel wire rope fixed on the load-bearing frame to realize the advancement of the equipment; during construction, the guide device mainly plays a guiding role for the entire equipment, guiding and determining the position of the construction equipment in the adobe drainage ditch to ensure the construction quality; during construction, the pump material storage device stores and vibrates concrete materials to provide qualified concrete materials for slipform forming construction; during construction, the cross-section adjustment device uses an adjustment rod to make the slipform device reach the shape and size required for construction; during construction, the surface finishing device can automatically finish the concrete drainage ditch surface that has been formed by slipform construction, thereby improving construction efficiency and reducing the cost of manual finishing.

[0040] In some embodiments, the load-bearing frame includes a main load-bearing frame 4, a slipform support frame 22, a fixing nut 25 and a connecting bolt 26. The main load-bearing frame 4 and the slipform support frame 22 are connected by the connecting bolt 26 and the fixing nut 25. The thickness of the concrete at the bottom of the equipment slipform forming drainage ditch is adjusted and controlled by the different connecting bolt hole positions between the main load-bearing frame 4 and the slipform support frame 22. The traction wire rope is connected to the front connection of the main load-bearing frame 4, and the winch drags the wire rope to make the entire construction equipment move forward and construct stably.

[0041] In some embodiments, the guide device includes a guide fixing frame 201, an adjustment box 202, an adjustment fastening bolt 203, a left guide rod 204, and a right guide rod 205 to guide the equipment forward. The guide fixing frame 201 is welded at a symmetrical position in the middle of the front bottom of the main load-bearing frame 4, and the adjustment box 202 is installed on the guide fixing frame 201. One end of the left guide rod 204 and the right guide rod 205 are in the control box 202, and the other end is in contact with the adobe wall of the drainage ditch. The outward expansion and contraction size is determined by adjusting the size and position of the adjustment fastening bolt 203 in the control box 202, so that the construction equipment can adapt to adobe drainage ditches of different construction shapes such as rectangles and trapezoids.

[0042] In some embodiments, the cross-section adjustment device includes a right frame 1901, a right bottom adjustment rod 1902, a bottom adjustment box 1903, a bottom adjustment control rod 1904, a left bottom adjustment rod 1905, a left upper adjustment rod 1906, a connecting pin 1907, a left frame 1908, an upper adjustment box 1909, an upper adjustment control rod 1910, and a right upper adjustment rod 1911, which adjust and control the bottom width and the angle between the side wall and the horizontal direction of the constructed concrete drainage ditch. The bottom and upper parts of the right frame 1901 are respectively connected to the right bottom adjustment rod 1902 and the right upper adjustment rod 1911 through connecting pins, and the bottom and upper parts of the left frame 1908 are respectively connected to the left bottom adjustment rod 1905 and the left upper adjustment rod 1906 through connecting pins. The slipformed side panel 13 is connected to the left frame 1908 and the right frame 1901; the left frame 1908 and the right bottom adjusting rod 1902 and the left bottom adjusting rod 1905 are adjusted in the bottom adjusting box 1903 by the bottom adjusting control rod 1904 to adjust the left and right telescopic dimensions, thereby adjusting the angle between the left frame 1908 and the right frame 1901 and the vertical direction, thereby controlling the angle between the side wall of the construction concrete drainage ditch and the vertical direction; the right upper adjusting rod 1911 and the left upper adjusting rod 1910 are adjusted in the bottom adjusting box 1909 by the bottom adjusting control rod 1910 to adjust the left and right telescopic dimensions, thereby adjusting and controlling the bottom width of the construction concrete drainage ditch.

[0043] In some embodiments, the finishing device includes a left scraper 12, a right scraper 18, a bottom scraper 21 and connecting screws. The left scraper 12 is fixed to the left frame 1908 by connecting screws, and the degree of contact between the scraper surface of the left scraper 12 and the left wall surface of the formed concrete drainage ditch is fixed by the connecting screws; the right scraper 18 is fixed to the right frame 1901 by connecting screws, and the degree of contact between the scraper surface of the right scraper 18 and the right wall surface of the formed concrete drainage ditch is fixed by connecting screws; the bottom scraper 21 is fixed to the slipform bottom plate 20 by connecting screws, and the degree of contact between the scraper surface of the bottom scraper 21 and the bottom surface of the formed concrete drainage ditch is fixed by connecting screws.

[0044] In some embodiments, the method is specifically described as follows:

[0045] Install and connect the load-bearing frame, guide device, pump material storage device, cross-section adjustment device and surface finishing device, and adjust the cross-section adjustment device so that the angle between the slip-formed side plate 13 and the vertical direction meets the construction requirements, and the width of the slip-formed bottom plate 20 meets the requirements for the bottom width of the construction concrete drainage ditch;

[0046] The whole device is placed in the drainage ditch to be constructed, the main load-bearing frame 4 is connected with the steel wire rope, the winch is started, the concrete material is introduced into the hopper 9, the vibration pump 6 is started through the controller 7, and the concrete at the bottom of the hopper 9 is vibrated through the vibration pipe 8. The vibrated concrete is squeezed into the space formed by the slipform forming side plate 13, the slipform forming bottom plate 20 and the adobe wall surface by the forward movement of the equipment and the gravity of the concrete in the hopper 9. The winch rotates, and the whole construction device is driven forward by the steel wire rope to construct a concrete drainage ditch;

[0047] During the construction process, according to the concrete with different proportions, the controller 7 controls the vibration pump 6 to vibrate and compact the concrete. The winch controls the entire construction device to move forward according to the concrete proportion and the size of the concrete drainage ditch to be formed.

[0048] The highway drainage ditch traction extrusion slipform construction equipment comprises a load-bearing frame, a guide device, a pump material storage device, a cross-section adjustment device and a surface finishing device.

[0049] The load-bearing frame includes a main load-bearing frame 4, a sliding support frame 22, a fixing nut 25 and a connecting bolt 26; the guide device includes a guide fixing frame 201, an adjustment box 202, an adjustment fastening bolt 203, a left guide rod 204, and a right guide rod 205; the pump material storage device includes a front top plate 5, a vibration pump 6, a controller 7, a vibration tube 8, a hopper 9, a rear side plate 14, a fixing bolt 15, a vibration rod fixing device 16, a front baffle plate 17, and a rear baffle plate 24; The cross-section adjustment device includes a right frame 1901, a right bottom adjustment rod 1902, a bottom adjustment box body 1903, a bottom adjustment control rod 1904, a left bottom adjustment rod 1905, a left upper adjustment rod 1906, a connecting pin 1907, a left frame 1908, an upper adjustment box body 1909, an upper adjustment control rod 1910, and a right upper adjustment rod 1911; the surface collecting device includes a left scraper 12, a right scraper 18, a bottom scraper 21 and connecting screws.

[0050] The main load-bearing frame 4 adjusts and controls the connection between the sliding form support frame 22 through the connecting bolts 26 and the fixing nuts 25, and the hopper 9 is fixed to the bottom of the main load-bearing frame 4 by the fixing bolts 15. The front side plate 1, the front bottom plate 3, the front top plate 5, the rear side plate 14, the rear bottom plate 23, the front baffle plate 17, and the rear baffle plate 24 are welded to the main load-bearing frame 4, and the guide device 2 is installed at the front bottom of the main load-bearing frame. The cross-section adjustment device 19 is installed on the sliding form support frame 22, the sliding form forming side plates 13 are welded to the right frame 1901 and the left frame 1908 respectively, and the sliding form forming top plate 11 is fixed to the sliding form forming side plates 13 by fastening screws. The vibration pump 6 and the controller 7 are installed on the front top plate 5, the controller 7 is connected to the vibration pump 6 through the control cable, the vibration pump 6 is connected to the vibration tube 8, the vibration rod fixing device 16 is installed on the main load-bearing frame 4 at the bottom of the hopper 9, and the vibration tube 8 is installed on the vibration rod fixing device 16.

[0051] During construction, the steel wire rope is connected to the front connection of the main load-bearing frame 4, and the winch drags the steel wire rope to drive the entire construction equipment forward for construction work. Concrete material is stored in the hopper 9, which is convenient for concrete vibration and compaction. The slump range of concrete is 10mm~45mm. The concrete in the hopper 9 is driven by the vibration pump 6 to drive the vibration pipe 8 to vibrate the concrete at the bottom of the hopper 9. In order to better vibrate and compact the concrete, the parameter setting range of the vibration pump 6 is: the vibration frequency range of the vibration rod is 30-60Hz, the amplitude range is 1.5~2.5mm, and the optimal vibration time range is 15s~30s. Through the gravity extrusion of concrete in the hopper 9 and the forward movement of the construction equipment, the concrete material is extruded from the bottom of the hopper 9 to the space formed by the slipform forming side plate 13, the slipform forming top plate 11 and the slipform forming bottom plate 20 and the ditch adobe wall and the ground. The winch drives the entire construction device to move forward stably to complete the drainage ditch concrete slipform forming construction operation, which is convenient for taking into account both the rapid construction and the construction quality. The optimal slipform speed range is 0.6m / min to 1.2m / min. The construction of the highway traction extrusion drainage ditch slipform construction equipment can quickly and continuously perform concrete slipform forming operations on highway drainage ditches, improve the ditch construction efficiency, shorten the construction period, and reduce the construction cost.

[0052] Embodiment 1:

[0053] The highway drainage ditch traction extrusion slipform construction equipment and construction method mainly include the following steps:

[0054] Place the construction equipment in the adobe ditch of the drainage ditch, adjust the bottom width of the formwork section adjustment device to 500mm, adjust the angle between the left and right frames and the vertical direction to 0°, and adjust the distance between the slipform top plate and the slipform bottom plate to 600mm.

[0055] Pour the concrete with slump of 30mm into the hopper of the construction equipment, and use the winch to pull the construction equipment forward at a speed of 1.0m / min. Set the vibration frequency of the vibrating rod to 40Hz, the amplitude to 2mm, and the vibration time to 20s. Start the drainage ditch traction extrusion slipform construction. During the construction process, add concrete materials in time according to the storage situation in the hopper. The construction of the drainage ditch is as follows: Figure 6 shown.

[0056] The concrete drainage ditch was inspected and the inspection results are shown in Table 1. From the inspection data, it can be seen that the results of the construction inspection items meet the design requirements.

[0057] Table 1 Highway drainage ditch structure test results

[0058] Serial number Test items Detection bias results Inspection methods Permissible deviation 1 Surface finish better Visual inspection — 2 Groove bottom flatness 15mm 2.5m long ruler and steel ruler 20mm 3 Center position of trench bottom 80mm Measure ±100mm 4 Clearance size -5mm Measure ±20mm 5 Thickness of ditch paving -4mm Measure -10mm

[0059] Embodiment 2:

[0060] The highway drainage ditch traction extrusion slipform construction equipment and construction method mainly include the following steps:

[0061] Place the construction equipment in the adobe ditch of the drainage ditch, adjust the bottom width of the formwork section adjustment device to 650mm, adjust the angle between the left and right frames and the vertical direction to 10°, and adjust the distance between the slipform forming top plate and the slipform bottom plate to 700mm.

[0062] Pour the concrete with slump of 45mm into the hopper of the construction equipment, and use the winch to pull the construction equipment forward at a speed of 0.8m / min. Set the vibration frequency of the vibrating rod to 50Hz, the amplitude to 2mm, and the vibration time to 25s. Start the drainage ditch traction extrusion slipform construction. During the construction process, add concrete materials in time according to the storage situation of the hopper. The construction of the drainage ditch is as follows: Figure 7 shown.

[0063] The constructed concrete drainage ditch was tested, and the test results are shown in Table 2. From the test data, it can be seen that the results of the construction test items all meet the design requirements.

[0064] Table 2 Highway drainage ditch structure detection indicators

[0065]

[0066]

[0067] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to perform equivalent replacements on parts thereof. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention. Although the above describes the specific implementation methods of the present invention, it is not intended to limit the protection scope of the present invention. Those skilled in the art should understand that, based on the technical solution of the present invention, various modifications or deformations that can be made by those skilled in the art without creative labor are still within the protection scope of the present invention.

Claims

1. A highway drainage ditch traction extrusion slipform construction equipment, characterized in that: include: A main load-bearing frame (4), a guide device (2), a pump material storage device, a cross-section adjustment device (19) and a surface finishing device; the main load-bearing frame (4) is provided with a pump material storage device, the front bottom of the main load-bearing frame (4) is provided with a guide device (2), the rear end of the main load-bearing frame (4) is also provided with a sliding form support frame (22), the sliding form support frame (22) is provided with a cross-section adjustment device (19) and a sliding form forming plate, and the sliding form forming plate is connected to the surface finishing device; The guide device (2) comprises: a guide fixing frame (201), an adjustment box (202), an adjustment fastening bolt (203), a left guide rod (204), and a right guide rod (205); the guide fixing frame (201) is surrounded by two side rods and a cross rod; the left guide rod (204) and the right guide rod (205) pass through the two side rods and are connected to the adjustment box (202); and the side of the adjustment box (202) is provided with an adjustment fastening bolt (203); The pump material storage device comprises: a hopper (9) and a vibration device, wherein the hopper (9) is arranged on the main load-bearing frame (4), and a vibration device is arranged below the hopper (9); The guide device contacts the wall of the adobe ditch through the guide rod to guide the moving direction of the device. The hopper of the pump material storage device stores concrete material, and the concrete material is sent into the concrete discharge component through the forward movement of the equipment. The control box controls the vibration pump to vibrate and extrude the concrete material to make it dense, and extrude the dense concrete into the space formed by the slipform forming side plate, the slipform forming bottom plate and the slipform forming top plate and the adobe wall of the drainage ditch and the ground. The cross-section adjustment device adjusts the bottom width of the concrete ditch through the bottom width by the bottom adjustment rod, and adjusts the angle between the slipform forming mold side plate and the vertical direction through the upper adjustment rod to construct drainage ditches with different side wall inclination angles. The device is dragged forward in the roughcast groove by a winch for construction; The cross-section adjustment device (19) is surrounded by a sliding mold top plate (10), a sliding mold forming side plate (13), and a sliding mold forming bottom plate (20) to form a hollow cavity; The entire device is placed in the drainage ditch to be constructed, the main load-bearing frame (4) is connected with a steel wire rope, the winch is started, the concrete material is introduced into the hopper (9), the vibration pump (6) is started through the controller (7), and the concrete at the bottom of the hopper (9) is vibrated through the vibration pipe (8). The vibrated concrete is squeezed into the space formed by the slipform forming side plate (13), the slipform forming bottom plate (20) and the adobe wall surface due to the forward movement of the equipment and the gravity of the concrete in the hopper (9). The winch rotates and drives the entire construction device forward through the steel wire rope to construct a concrete drainage ditch.

2. The highway drainage ditch traction extrusion slipform construction equipment according to claim 1, characterized in that: The vibration device comprises: a vibration rod, a vibration pump (6), a controller (7), and a vibration tube (8); the vibration rod is arranged below the hopper (9) and is sequentially connected to the vibration tube (8), the vibration pump (6), and the controller (7).

3. The highway drainage ditch traction extrusion slipform construction equipment according to claim 1, characterized in that: The hopper (9) is provided with a front top plate (5), a rear side plate (14), a front material stop plate (17), and a rear material stop plate (24) on the four sides thereof.

4. The highway drainage ditch traction extrusion slipform construction equipment according to claim 1, characterized in that: The cross-section adjustment device (19) comprises: a right frame (1901) and a left frame (1908); the right frame (1901) is provided with a right bottom adjustment rod (1902) and a right upper adjustment rod (1911); the left frame (1908) is provided with a left bottom adjustment rod (1905) and a left upper adjustment rod (1906); the right bottom adjustment rod (1902) and the left bottom adjustment rod (1905) both pass through a bottom adjustment box body (1903); the right upper adjustment rod (1911) and the left upper adjustment rod (1906) both pass through an upper adjustment box body (1909); and the bottom adjustment box body (1903) and the upper adjustment box body (1909) are provided with a bottom adjustment control rod (1904) and an upper adjustment control rod (1910), respectively.

5. The highway drainage ditch traction extrusion slipform construction equipment according to claim 4, characterized in that: The right upper adjustment rod (1911), the left upper adjustment rod (1906), the upper adjustment box body (1909), the bottom adjustment box body (1903), the upper adjustment box body (1909), and the bottom adjustment control rod (1904) form a group, and multiple groups are provided; The multiple groups are arranged in parallel and share a bottom adjustment control rod (1904) and an upper adjustment control rod (1910).

6. The highway drainage ditch traction extrusion slipform construction equipment according to claim 1, characterized in that: The front ends of the slip-formed side plates (13) are respectively provided with a left scraper (12) and a right scraper (18); Or a bottom scraper (21) is provided at the front end of the slip-formed bottom plate (20); Or slip-formed top plates are provided on both sides of the slip-form top plate (10).

7. A construction method of the highway drainage ditch traction extrusion type slipform construction equipment according to any one of claims 1 to 6, characterized in that: include: A guide device is used to guide the moving direction of the entire device; The concrete material is stored in a hopper, and the concrete material is sent into the concrete discharge part through the forward movement of the whole equipment, and then the concrete material is vibrated and squeezed to be dense, and the dense concrete is squeezed into the space formed by the slipform forming side plate, slipform forming bottom plate, slipform forming top plate and the drainage ditch adobe wall and the ground; The cross-section adjustment device is used to adjust the bottom width of the formed concrete ditch, and the upper adjustment rod is used to adjust the angle between the side plate of the slipform forming mold and the vertical direction to construct drainage ditches with different side wall inclination angles; The whole device is dragged forward in the roughcast trench by a winch for construction; The guide device (2) comprises: a guide fixing frame (201), an adjustment box (202), an adjustment fastening bolt (203), a left guide rod (204), and a right guide rod (205); the guide fixing frame (201) is surrounded by two side rods and a cross rod; the left guide rod (204) and the right guide rod (205) pass through the two side rods and are connected to the adjustment box (202); and the side of the adjustment box (202) is provided with an adjustment fastening bolt (203); The pump material storage device comprises: a hopper (9) and a vibration device, wherein the hopper (9) is arranged on the main load-bearing frame (4), and a vibration device is arranged below the hopper (9); The guide device contacts the wall of the adobe ditch through a guide rod to guide the moving direction of the device. The hopper of the pump material storage device stores concrete material, and the concrete material is sent into the concrete discharge component through the advancement of the equipment. The control box controls the vibration pump to vibrate and extrude the concrete material to make it dense, and extrude the dense concrete into the space formed by the slipform side plate, the slipform bottom plate, the slipform top plate, the drainage ditch adobe wall and the ground. In the cross-section adjustment device, the bottom width of the concrete ditch is adjusted by the bottom adjusting rod, and the angle between the slipform mold side plate and the vertical direction is adjusted by the upper adjusting rod to construct drainage ditches with different side wall inclinations. The device is dragged forward in the rough groove by a winch for construction.

Citation Information

Patent Citations

  • Construction method for continuously casting subgrade side ditch through vibrating and stirring type automatic slip form

    CN106245488A

  • Supporting construction suitable for escape canal steel form

    CN207919708U

  • Traction extrusion type slip form construction equipment for highway drainage ditch

    CN212582360U