Installation tool and installation method for extra-large immersed tube tunnel pipe segment

By using buoyancy control devices and planar control devices, combined with satellite positioning systems and winch equipment, the precise installation of extra-large immersed tunnel sections was achieved, solving the problems of equipment idleness and control, and improving construction efficiency and precision.

CN111519663BActive Publication Date: 2024-10-18CCCC SECOND HARBOR CONSULTANTS CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202010440310.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-22
Publication Date
2024-10-18
Estimated Expiration
2040-05-22

AI Technical Summary

Technical Problem

The existing large immersed tunnel construction equipment generally has low performance, resulting in idle and wasted equipment, and it is difficult to efficiently control the orderly sinking and planar position of tunnel segments.

Method used

The system employs a buoyancy control device and a planar control device, using components such as positioning suction cups and positioning columns to control the sinking and planar position of tunnel sections, and combines a satellite positioning system and winch equipment to achieve precise installation.

Benefits of technology

It improves the control precision and ease of operation of tunnel segment installation, reduces costs, and increases construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111519663B_ABST
    Figure CN111519663B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of traffic construction technology, and in particular to an installation tool and installation method for a super-large immersed tube tunnel segment, comprising a tunnel segment, which is a double-chamber long strip structure with a length of about 180 meters. Before leaving the dock, the tunnel segment is temporarily divided into two equal-length chambers in the length direction, and both ends are closed, a floating and sinking control device, which is arranged on the tunnel segment and used to control the orderly sinking of the tunnel segment, and a plane control device, which is arranged around the tunnel segment and used to control the plane position of the tunnel segment. The tunnel segment is a double-chamber long strip structure. When the ports at both ends of the tunnel segment are closed, it can float on the water surface. When installing, water is added to the inside of the tunnel segment to make it gradually sink. In order to facilitate the orderly sinking of the tunnel segment, a floating and sinking control device is arranged on the tunnel segment. In order to facilitate the control of the plane position of the tunnel segment, a plane control device is arranged around the tunnel segment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of traffic construction, and in particular to an installation tool and an installation method for a super-large immersed tube tunnel pipe segment. Background Art

[0002] With the development of construction technology, large-scale immersed tube tunnel projects on the seabed and lakebed have made great progress. The immersed tube tunnel sections used in my country's Hong Kong-Zhuhai-Macao Bridge project are about 180 meters long and weigh more than 70,000 tons. A huge number of new construction equipment were used in the construction. Most of these new equipment were tailor-made for this project, and their general performance for the project is not high. After the project is completed, the equipment is of little use to other projects, resulting in a large amount of equipment being idle, causing a certain amount of waste. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention provides an installation tool and method for an extra-large immersed tube tunnel pipe segment. When the ports at both ends of the tunnel pipe segment are closed, the tunnel pipe segment can float on the water surface. During installation, water is added into the tunnel pipe segment to make it gradually sink. To facilitate the orderly sinking of the tunnel pipe segment, a floating and sinking control device is provided on the tunnel pipe segment. To facilitate the control of the plane position of the tunnel pipe segment, a plane control device is provided around the tunnel pipe segment. The sinking control bracket not only transfers the installation control of the pipe segment from underwater to above water, thereby improving the control accuracy, but also the sinking control bracket is simple and reliable to operate. The position of the tunnel pipe segment is controlled by a positioning column in a turnover manner, which has low cost, simple operation and high efficiency.

[0004] In order to achieve the above object, the technical solution applied by the present invention is as follows:

[0005] A tool for installing a super-large immersed tube tunnel segment comprises a tunnel segment, which is a double-chamber hollow long strip structure. Before installation, the tunnel segment is divided into two equal-length chambers in the length direction and the ends are sealed. A floating and sinking control device is arranged on the tunnel segment and used to control the orderly sinking of the tunnel segment. A plane control device is arranged around the tunnel segment and used to control the plane position of the tunnel segment.

[0006] According to the above scheme, the floating and sinking control device includes a sinking control bracket and a positioning suction cup, and the sinking control bracket is adsorbed on the top panel wall of the tunnel pipe section through the positioning suction cup.

[0007] According to the above scheme, the sinking control bracket includes a main column and a cross bar. The internal spaces of the main column and the cross bar are connected. The main column is provided with a water inlet hole and an air hole. The air hole is connected to an air compressor through an air pipe and a valve.

[0008] According to the above solution, the water inlet hole is arranged at the bottom of the main column, and the air hole is arranged at the upper part of the main column.

[0009] According to the above solution, the positioning suction cup is connected to a vacuum exhaust device through an exhaust pipe and a valve.

[0010] According to the above scheme, the plane control device includes a positioning column and a position control steel cable, one end of the position control steel cable is fixed on the positioning column, and the other end of the position control steel cable is fixed on the tunnel pipe section.

[0011] According to the above scheme, a directional pulley hoop is hung on the positioning column, a directional pulley is welded on the directional pulley hoop, a winch is fixed on the positioning column, a steering pulley is provided on the winch, one end of the position control steel cable is fixed on the positioning column, and the other end of the position control steel cable is wound around the directional pulley and then around the steering pulley.

[0012] According to the above solution, a first lifting lug is welded on the top of the positioning column, a second lifting lug is welded on the outer side wall of the directional pulley hoop, and the first lifting lug and the second lifting lug are connected by a lifting rope.

[0013] A method for installing a super-large immersed tube tunnel segment comprises the following steps:

[0014] Step 1), use water piling equipment to drive four positioning columns at both ends of the planned tunnel pipe segment installation position, about 150m away from both ends of the tunnel pipe segment, and at a position with a 45-degree angle to the axis of the tunnel pipe segment. The directional pulley hoop is hoisted on the outside of the positioning column under the action of three lifting ropes and is not dropped first. Then the hoisting equipment is installed on the top of the positioning column, and the steering pulley is installed. After the control cable on the hoisting equipment is passed around the steering pulley on the top of the positioning column, it passes through the directional pulley fixed on the directional pulley hoop, and the end of the control cable is connected with a floating belt cable to facilitate timely salvage in the subsequent sequence;

[0015] Step 2), after the tunnel pipe segment is sealed in the prefabricated dry dock, water is injected into the dry dock and the tunnel pipe segment is towed to the installation area by a tugboat, the position-controlling steel cable is connected to the four corners of the tunnel pipe segment, and the processed control sinking bracket is installed on the four top corners of the top surface of the tunnel pipe segment with the cooperation of the floating crane. After each control sinking bracket is installed, the positioning suction cup under the control sinking bracket is vacuumed in time so that the control sinking bracket is adsorbed on the top surface of the tunnel pipe segment, and a satellite positioning system is fixed on each control sinking bracket;

[0016] Step 3) Use the winch to accurately position the tunnel pipe segment on the plane, then evenly inject water into the tunnel pipe segment to make the tunnel pipe segment sink evenly in a controlled state. During the sinking process, determine whether the position of the tunnel pipe segment is correct based on the data of the satellite positioning system on the control support, and adjust it in time through the winch. During the sinking process, the air pipe on the control support is in a closed state;

[0017] Step 4), before the tunnel pipe segment reaches the accurate installation position, the plane position of the tunnel pipe segment should be moved about 100mm in the installation direction. When it is installed to about 200mm from the installation height, the position of the tunnel pipe segment is adjusted with a winch to accurately position it. The tunnel pipe segment is installed by evenly injecting water into the tunnel pipe segment. After the installation is completed, a certain amount of water is injected into the sinking control bracket. The amount of water is determined by calculation so that the gravity and buoyancy of the sinking control bracket filled with water are just equivalent in this state. Then, the exhaust pipe and valve of the positioning suction cup are opened, and pressurized water is injected into the positioning suction cup through the exhaust pipe to release the suction of the positioning suction cup. Then, air is injected into the sinking control bracket with an air compressor to make it float to a certain height and fixed next to the lifting ship for standby use. The connection between the control cable and the tunnel pipe segment is released by a diver.

[0018] Beneficial effects of the present invention:

[0019] The present invention adopts such a structural setting that when the ports at both ends of the tunnel pipe segment are closed, it can float on the water surface. During installation, water is added to the inside of the tunnel pipe segment to make it gradually sink. In order to facilitate the orderly sinking of the tunnel pipe segment, a floating and sinking control device is provided on the tunnel pipe segment. In order to facilitate the control of the plane position of the tunnel pipe segment, a plane control device is provided around the tunnel pipe segment. The sinking control bracket not only transfers the installation control of the pipe segment from underwater to above water, thereby improving the control accuracy, but also the sinking control bracket is simple and reliable to operate. The position of the tunnel pipe segment is controlled by a positioning column in a turnover manner, which has low cost, simple operation and high efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a top view of the assembly of the tunnel pipe section and the plane control device of the present invention;

[0021] Figure 2 yes Figure 1 A magnified image of position A in the middle;

[0022] Figure 3 The assembly plan view of the tunnel pipe section and the floating and sinking control device of the present invention;

[0023] Figure 4 yes Figure 3 Side view;

[0024] Figure 5 is a schematic diagram of a positioning column of the present invention;

[0025] Figure 6 yes Figure 5 Enlarged view of position B in the middle;

[0026] Figure 7 yes Figure 5 Enlarged view of position C in the middle.

[0027] 1. Tunnel pipe section; 2. Positioning column; 3. Sinking control bracket; 31. Main column; 32. Cross bar; 4. Positioning suction cup; 5. Directional pulley hoop; 6. Directional pulley; 7. Lifting eye 1; 70. Lifting eye 2; 8. Positioning steel cable; 9. Winch; 90. Steering pulley; 10. Exhaust pipe; 11. Air pipe; 12. Lifting rope. DETAILED DESCRIPTION

[0028] The technical solution of the present invention is described below in conjunction with the accompanying drawings and embodiments.

[0029] like Figures 1 to 7 As shown, the installation tool of a super-large immersed tunnel pipe segment of the present invention comprises a tunnel pipe segment 1, which is a double-chamber hollow long strip structure. Before installation, the tunnel pipe segment 1 is divided into two equal-length chambers in the length direction, and the ends are sealed, a floating and sinking control device is arranged on the tunnel pipe segment 1, and is used to control the orderly sinking of the tunnel pipe segment 1, and a plane control device is arranged around the tunnel pipe segment 1, and is used to control the plane position of the tunnel pipe segment 1. With such a structural arrangement, when the ports at both ends of the tunnel pipe segment 1 are sealed, it can float on the water surface. When installing, water is added to the inside of the tunnel pipe segment 1 to make it gradually sink. In order to facilitate the orderly sinking of the tunnel pipe segment 1, a floating and sinking control device is arranged on the tunnel pipe segment 1, and in order to facilitate the control of the plane position of the tunnel pipe segment 1, a plane control device is arranged around the tunnel pipe segment 1.

[0030] In actual applications, the tunnel segment 1 is cast from reinforced concrete weighing tens of thousands of tons.

[0031] In this embodiment, the floating and sinking control device includes a sinking control bracket 3 and a positioning suction cup 4, and the sinking control bracket 3 is adsorbed on the top panel wall of the tunnel pipe section 1 through the positioning suction cup 4. With such a structural setting, the positioning suction cup 4 is adsorbed on the top panel wall of the tunnel pipe section 1 by vacuuming.

[0032] In this embodiment, the sinking control bracket 3 includes a main column 31 and a cross bar 32. The internal spaces of the main column 31 and the cross bar 32 are connected. The main column 31 is provided with a water inlet hole and an air hole. The air hole is connected to an air compressor through an air pipe 11 and a valve.

[0033] It should be noted that the height of the sinking control bracket 3 is to ensure that the top of the sinking control bracket 3 is more than 1 m above the water surface when the tunnel pipe segment 1 is installed in place.

[0034] In practical applications, the sinking control bracket 3 is a three-legged three-column bracket, which is welded with steel pipes of larger specifications.

[0035] In this embodiment, the water inlet hole is provided at the bottom of the main column 31 , and the air hole is provided at the upper part of the main column 31 .

[0036] In this embodiment, the positioning suction cup 4 is connected to a vacuum pumping device through an exhaust pipe 10 and a valve. With such a structural arrangement, the positioning suction cup 4 is adsorbed on the top panel wall of the tunnel pipe section 1 by vacuuming the vacuum pumping device.

[0037] In this embodiment, the plane control device includes a positioning column 2 and a position control cable 8, one end of the position control cable 8 is fixed to the positioning column 2, and the other end of the position control cable 8 is fixed to the tunnel pipe section 1. With such a structural arrangement, the plane position of the tunnel pipe section 1 is controlled by the positioning column 2 and the position control cable 8.

[0038] In actual application, there are four positioning columns 2 , which are respectively arranged at the four corner peripheries corresponding to the tunnel pipe segment 1 .

[0039] In actual applications, the positioning column 2 is made of steel plates and is sunk into the mud layer on the seabed by piling equipment.

[0040] In this embodiment, a directional pulley hoop 5 is hung on the positioning column 2, a directional pulley 6 is welded on the directional pulley hoop 5, a hoisting device 9 is fixed on the positioning column 2, a steering pulley 90 is provided on the hoisting device 9, one end of the position control cable 8 is fixed on the positioning column 2, and the other end of the position control cable 8 is wound around the directional pulley 6 and then around the steering pulley 90. With such a structural setting, the plane position of the tunnel pipe section 1 is controlled by driving the position control cable 8 through the traction of the hoisting device 9.

[0041] In this embodiment, a lifting lug 1 7 is welded on the top of the positioning column 2, a lifting lug 2 70 is welded on the outer side wall of the directional pulley hoop 5, and the lifting lug 1 7 and the lifting lug 2 70 are connected by a lifting rope 12. With such a structural setting, the position of the directional pulley hoop 5 on the positioning column 2 can be limited by the lifting rope 12 between the lifting lug 1 7 and the lifting lug 2 70.

[0042] In practical applications, the directional pulley hoop 5 is hung on the positioning column 2 near the mud surface.

[0043] In practical applications, the directional pulley hoop 5 is made of steel plates rolled and welded, and the inner diameter of the directional pulley hoop 5 is 20-30 mm larger than the outer diameter of the positioning column 2.

[0044] In practical applications, there are three lifting ears 7 on the outer side wall of the directional pulley hoop 5, and the interval between two adjacent lifting ears 7 is 120 degrees.

[0045] A method for installing a super-large immersed tube tunnel segment comprises the following steps:

[0046] Step 1), using water piling equipment to drive four positioning columns 2 at both ends of the planned installation position of the tunnel pipe section 1, about 150m away from both ends of the tunnel pipe section 1, and at a position at a 45-degree angle with the axis of the tunnel pipe section 1, the directional pulley hoop 5 is hung on the outside of the positioning column 2 under the action of three suspension ropes 12 without being dropped, and then the hoisting device 9 is installed on the top of the positioning column 2, and the steering pulley 90 is installed, and the control cable 8 on the hoisting device 9 is passed around the steering pulley 90 on the top of the positioning column 2, and then passed through the directional pulley 6 fixed on the directional pulley hoop 5, and the end of the control cable 8 is connected with a floating belt cable, so as to facilitate the timely salvage in the subsequent sequence;

[0047] Step 2), after the tunnel pipe segment 1 is sealed in the prefabricated dry dock, water is injected into the dry dock and the tunnel pipe segment 1 is towed to the installation area by a tugboat, the position control cable 8 is connected to the four corners of the tunnel pipe segment 1, and the processed control sinking bracket 3 is installed at the four top corners of the top surface of the tunnel pipe segment 1 with the cooperation of the floating crane. After each control sinking bracket 3 is installed, the positioning suction cup 4 under the control sinking bracket 3 is vacuumed in time so that the control sinking bracket 3 is adsorbed on the top surface of the tunnel pipe segment 1, and a satellite positioning system is fixed on each control sinking bracket 3;

[0048] Step 3), the tunnel pipe segment 1 is accurately positioned on the plane by means of the hoisting device 9, and then water is evenly injected into the tunnel pipe segment 1, so that the tunnel pipe segment 1 sinks evenly in a controlled state. During the sinking process, the position of the tunnel pipe segment 1 is determined to be correct according to the data of the satellite positioning system on the control sinking bracket 3, and the hoisting device 9 is used to adjust it in time. During the sinking process, the air pipe 11 on the control sinking bracket 3 is in a closed state;

[0049] Step 4), before the tunnel pipe segment 1 reaches the accurate installation position, the plane position of the tunnel pipe segment 1 should be moved about 100mm in the installation direction. When it is installed to about 200mm from the installation height, the winch equipment 9 is used to adjust the position of the tunnel pipe segment 1 to accurately position it. The tunnel pipe segment 1 is installed by evenly injecting water into the tunnel pipe segment 1. After the installation is completed, a certain amount of water is injected into the sinking control bracket 3. The amount of water is determined by calculation so that the gravity and buoyancy of the sinking control bracket 3 filled with water are just equivalent in this state. Then, the exhaust pipe 10 and the valve of the positioning suction cup 4 are opened, and pressurized water is injected into the positioning suction cup 4 through the exhaust pipe 10 to release the suction of the positioning suction cup 4. Then, air is injected into the sinking control bracket 3 with an air compressor to make it float to a certain height and fixed next to the lifting ship for standby use. The connection between the control cable 8 and the tunnel pipe segment 1 is released by a diver.

[0050] The technical solutions in the embodiments of the present invention are described above, but the present invention is not limited to the above-mentioned specific implementation modes. The above-mentioned specific implementation modes are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all belong to the protection scope of the present invention.

Claims

1. A method for installing a super-large immersed tube tunnel segment. It is characterized in that The following steps are involved: Step 1), using water piling equipment to drive four positioning columns (2) at both ends of the location where the tunnel pipe section (1) is planned to be installed, and at a distance of 150m from both ends of the tunnel pipe section (1), and at a position at an angle of 45 degrees to the axis of the tunnel pipe section (1), the directional pulley hoop (5) is hung on the outside of the positioning column (2) under the action of three suspension ropes (12) without being dropped, and then the hoisting device (9) is installed on the top of the positioning column (2), and the steering pulley (90) is installed, and the control steel cable (8) on the hoisting device (9) is passed around the steering pulley (90) on the top of the positioning column (2), and then passed through the directional pulley (6) fixed on the directional pulley hoop (5), and the end of the control steel cable (8) is connected with a floating belt cable to facilitate timely salvage in the subsequent sequence; Step 2), after the tunnel pipe section (1) is sealed in the prefabricated dry dock, water is injected into the dry dock and the tunnel pipe section (1) is towed to the installation area by a tugboat, the position control steel cable (8) is connected to the four corners of the tunnel pipe section (1), and the processed control support (3) is installed at the four positions near the top corners of the top surface of the tunnel pipe section (1) with the cooperation of the floating crane. After each control support (3) is installed, the positioning suction cup (4) under the control support (3) is vacuumed in time so that the control support (3) is adsorbed on the top surface of the tunnel pipe section (1), and a satellite positioning system is fixed on each control support (3); Step 3), the tunnel pipe segment (1) is accurately positioned on a plane by means of a winch device (9), and then water is evenly injected into the tunnel pipe segment (1), so that the tunnel pipe segment (1) sinks evenly in a controlled state. During the sinking process, the position of the tunnel pipe segment (1) is determined to be correct based on data from a satellite positioning system on the control sinking bracket (3), and the winch device (9) is used to adjust the position in a timely manner. During the sinking process, the air pipe (11) on the control sinking bracket (3) is in a closed state; Step 4), before the tunnel pipe segment (1) reaches the accurate installation position, the plane position of the tunnel pipe segment (1) should be moved 100 mm in the installation direction. When the tunnel pipe segment (1) is installed to a height of 200 mm, the position of the tunnel pipe segment (1) is adjusted by a winch device (9) to accurately position the tunnel pipe segment (1). The tunnel pipe segment (1) is installed by evenly injecting water into the tunnel pipe segment (1). After the installation is completed, a certain amount of water is injected into the sinking control bracket (3). The amount of water is determined by calculation so that the gravity and buoyancy of the sinking control bracket (3) filled with water are just equal in this state. Then, the exhaust pipe (10) and valve of the positioning suction cup (4) are opened, and pressurized water is injected into the positioning suction cup (4) through the exhaust pipe (10) to release the suction of the positioning suction cup (4). Then, air is injected into the sinking control bracket (3) by an air compressor to make it float to a certain height and fixed next to the lifting vessel for standby use. The connection between the control steel cable (8) and the tunnel pipe segment (1) is released by a diver. Installation tools for extra-large immersed tunnel segments include: A tunnel pipe segment (1), wherein the tunnel pipe segment (1) is a double-chamber hollow long strip structure. Before installation, the tunnel pipe segment (1) is divided into two equal-length chambers in the length direction, and the ends are sealed. A floating and sinking control device, the floating and sinking control device is arranged on the tunnel pipe segment (1) and is used to control the orderly sinking of the tunnel pipe segment (1). a plane control device, the plane control device being arranged around the tunnel pipe segment (1) and being used to control the plane position of the tunnel pipe segment (1); The floating and sinking control device comprises a sinking control bracket (3) and a positioning suction cup (4); the sinking control bracket (3) is adsorbed on the top panel wall of the tunnel pipe section (1) via the positioning suction cup (4); The sinking control bracket (3) comprises a main column (31) and a cross bar (32); the internal spaces of the main column (31) and the cross bar (32) are connected; a water inlet hole and an air hole are provided on the main column (31); the air hole is connected to an air compressor through an air pipe (11) and a valve; The water inlet hole is arranged at the bottom of the main column (31), and the air hole is arranged at the upper part of the main column (31); The positioning suction cup (4) is connected to a valve via an exhaust pipe (10) and has a vacuum exhaust device; The plane control device comprises a positioning column (2) and a position control steel cable (8), one end of the position control steel cable (8) is fixed to the positioning column (2), and the other end of the position control steel cable (8) is fixed to the tunnel pipe section (1); A directional pulley hoop (5) is suspended on the positioning column (2), a directional pulley (6) is welded on the directional pulley hoop (5), a hoisting device (9) is fixed on the positioning column (2), a steering pulley (90) is provided on the hoisting device (9), one end of the position control steel cable (8) is fixed on the positioning column (2), and the other end of the position control steel cable (8) is wound around the directional pulley (6) and then wound around the steering pulley (90); A first lifting lug (7) is welded on the top of the positioning column (2), and a second lifting lug (70) is welded on the outer side wall of the directional pulley hoop (5). The first lifting lug (7) and the second lifting lug (70) are connected via a lifting rope (12).

Citation Information

Patent Citations

  • Immersed tube axis adjusting method

    CN104652480A

  • Method for calibrating water surface floating pipe section

    CN106940445A

  • Two -dimentional chi is measured to immersed tube tunnel tube coupling

    CN204753634U

  • Mounting tool for super-huge type immersed tunnel pipe joint

    CN212506416U

  • Final Joint of Immersed Tunnel as well as Prefabrication Method and Installation Method

    US20180274197A1