10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system and method

By designing a 10kV magnetically biased superconducting current limiter grid-connected fault current limiting test system, the problem of low current limiting rate measurement in the existing technology was solved, and the magnetically biased superconducting current limiter was tested under 10kV grid-connected conditions. The actual current limiting rate test ensures the safety and accuracy of the test.

CN111537844BActive Publication Date: 2024-10-11STATE GRID LIAONING ELECTRIC POWER CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010334812.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-24
Publication Date
2024-10-11
Estimated Expiration
2040-04-24

AI Technical Summary

Technical Problem

In the existing technology, the fault current limiting test method of the magnetically biased superconducting current limiter under 10kV grid-connected conditions is imperfect, resulting in a low measured current limiting rate, unrealistic current limiting effect, and lack of effective testing means. .

Method used

A 10kV magnetically biased superconducting current limiter grid-connected fault current limiting test system is designed, including a grid-connected test transformer, switchgear, intermediate transformer, simulated line load and measurement and control protection subsystem. Through simulated load and adjustable electrical impedance device and other components to simulate the real power grid environment to achieve the current limiting rate test of the magnetically biased superconducting current limiter under 10kV power frequency voltage grid-connected operating conditions, and ensure the safety of the test through test protection control logic and result determination methods and accuracy.

Benefits of technology

It provides a real grid-connected operating environment, supports high-capacity current limiting tests, realizes effective current limiting rate testing of magnetically biased superconducting current limiters, ensures the safety and stability of the test and the accuracy of the results, and meets the technical requirements Require.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111537844B_ABST
    Figure CN111537844B_ABST
Patent Text Reader

Abstract

The present invention discloses a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system and method, including a 10kV grid-connected current limiting test system, a test operation method, a test protection control logic, and a test result judgment method. The test system includes a grid-connected test transformer, a switch-type device, an intermediate transformer, a centralized parameter simulation line, a tested superconducting current limiter, a simulated load, and a measurement and control protection device; the test operation method includes the initial state of the test system and the test operation steps. According to the specific superconducting unit current carrying capacity and access scale of different tested magnetic bias superconducting current limiters, the impedance parameters of the simulated line load are determined, and for magnetic bias superconducting current limiters equipped with only small-scale superconducting units, an intermediate transformer is used to realize the real current limiting rate test under 10kV grid-connected conditions. The present invention has significant advantages such as high test safety and reliability, wide applicability of the test method, and strong controllability of the test parameters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of new power equipment testing and application, and in particular relates to a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system and method, which is suitable for fault current limiting test and current limiting rate test under grid-connected conditions of 10kV magnetic bias superconducting current limiter. Background Art

[0002] With the growth of power load, the scale of transmission and distribution network is gradually expanding, and the interconnection of power grid is constantly strengthening, which also makes the short-circuit impedance of power grid smaller and smaller, and the short-circuit current level increases sharply. Especially in urban load centers and power supply collection points, the short-circuit current level of 10kV distribution network is close to or even exceeds the maximum allowable interruption capacity of the system primary equipment, and the safe operation of the power grid is under unprecedented pressure. For this reason, people have proposed a new superconducting current limiting technology and developed a magnetic bias superconducting current limiter to improve the current limiting level of the power grid and limit the short-circuit current in the power grid.

[0003] However, due to the limitation of experimental conditions, the research work on the comprehensive characteristic evaluation of the grid-connected operation of magnetic biased superconducting current limiters is still insufficient, and there is a lack of experimental means for the practical technical research of superconducting current limiters connected to the grid.

[0004] At present, the imperfections of the grid-connected current limiting test method are mainly manifested in the following aspects: for magnetically biased superconducting current limiters that are in the product development and performance testing stage, the superconducting units used as test products inside are often small in scale, and the rated short-circuit fault current allowed to pass through them is relatively small. For such situations, in order to obtain such a small fault short-circuit current under 10kV grid-connected conditions, according to the basic circuit law Ue=Isc*Zln, when the system voltage Ue is high and the short-circuit fault current Isc is small, it is necessary to connect a line impedance Zln that is far greater than the reasonable range of the actual value in series in the test loop. In this case, the current limiting impedance Zcl of the magnetic bias superconducting current limiter will be much smaller than the line impedance Zln in the test system and will be almost submerged by it. By comparing the formula Ue=Isc0*Zln with the formula Ue=Isc1*(Zln+Zcl), it can be seen that the short-circuit fault current Isc changes very little before and after the magnetic bias superconducting current limiter is connected, and the measured current limiting rate is very low and not in line with reality, reflecting that the current limiting effect of the tested magnetic bias superconducting current limiter is also very poor and unrealistic. Summary of the invention

[0005] In view of the defects and improvement needs in the above-mentioned prior art, the present invention proposes a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system and method. Its purpose is to provide a reasonably designed 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system, and to achieve the invention purpose of the fault current limiting test and current limiting rate test under the grid-connected condition of the 10kV magnetic bias superconducting current limiter.

[0006] The present invention is achieved through the following technical solutions:

[0007] The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system takes the actual grid side as the starting point, and the grid-connected test transformer T, the protection circuit breaker PCB, the current transformer CT, the closing circuit breaker CCB, the grounding switch ES, the isolating switch DS and the intermediate transformer TM are connected in sequence; the tested superconducting current limiter SFCL is connected in parallel with the single-phase switching circuit breaker SCB, and is integrally connected between one terminal of the intermediate transformer TM and the simulated load LD; the simulated load LD is connected in parallel with the single-phase grounding circuit breaker ECB, and is connected between the end of the tested superconducting current limiter SFCL and the simulated line TL; the centralized parameter simulated line TL is connected between the other terminal of the intermediate transformer TM and the simulated load LD; the measurement and control protection device MCPD is connected to the current transformer CT through the measurement signal line MSL, and is respectively connected to the protection circuit breaker PCB, the closing circuit breaker CCB, the isolating switch DS, the single-phase switching circuit breaker SCB, the single-phase grounding circuit breaker ECB, and the grounding switch ES through the control signal line CSL.

[0008] The ends of the isolating switch DS serve as outlets Ea, Eb, and Ec of the three-phase test equipment; the outlet position of any phase of the three-phase test equipment can serve as the grounding point N of the test system.

[0009] The intermediate transformer TM includes a high-voltage side winding, a low-voltage side winding, an iron core and a box, wherein the outlet terminal TA of the high-voltage side winding is connected to the test system grounding point N, the reference terminal TX of the high-voltage side winding, the low-voltage side winding terminal Tx as the same end of the high-voltage side winding reference terminal TX, the iron core and the box are all short-circuited with each other and connected together to any phase outlet position that is not the test system grounding point N; the intermediate transformer TM as a whole is maintained at a safe distance from the ground through supporting insulators to reliably withstand a voltage of 10kV;

[0010] The intermediate transformer TM is a single-phase test transformer with a rated voltage of 10 kV on the high-voltage side and an adjustable transformation ratio. According to the specific test conditions, its transformation ratio k=grid-connected test voltage Ue / ; line impedance modulus value |Zln| selected according to test requirements* short-circuit fault current Isc selected according to test requirements;

[0011] The intermediate transformer TM is a short-circuit test transformer with strong short-circuit bearing capacity. Its rated short-circuit capacity Q TM ≥Grid-connected test voltage Ue*selected short-circuit fault current Isc / transformation ratio k;

[0012] The resistive and inductive components of the short-circuit impedance Zsc of the intermediate transformer TM do not exceed the high-voltage side conversion value of the corresponding component of the line impedance Zln selected according to the test requirements, that is, the short-circuit resistance Rsc≤k 2 *Line resistance Rln, short-circuit inductance Lsc≤k 2 * Line inductance Lln;

[0013] When the line impedance Zln*the selected short-circuit fault current Isc≥0.9*grid-connected test voltage Ue selected according to the test requirements, the intermediate transformer TM can be removed from the test system, and the tested superconducting current limiter SFCL, the simulated load LD, and the centralized parameter simulated line TL are directly connected to the high-voltage side test main circuit;

[0014] After the intermediate transformer TM is removed from the test system, when calculating the test parameters, the short-circuit resistance Rsc and the short-circuit inductance Lsc of the intermediate transformer TM are both zero, and the transformation ratio k is 1;

[0015] After the intermediate transformer TM is removed from the test system, when the above-mentioned test equipment is connected, the centralized parameter simulation line TL originally connected to the Ta terminal on the low-voltage side of the intermediate transformer TM is directly connected to the position connected to the original high-voltage side TA terminal; the head end P of the tested superconducting current limiter SFCL originally connected to the Tx terminal on the low-voltage side of the intermediate transformer TM is directly connected to the position connected to the original high-voltage side TX terminal.

[0016] The internal components of the tested superconducting current limiter SFCL include: main circuit current transformer MCT, primary branch current transformer PCT, secondary branch current transformer SCT, primary voltage transformer PPT, double split reactor DSR, secondary voltage transformer SPT, superconducting unit SCU, superconducting unit voltage transformer UPT, first fast switch KA, second fast switch KB, protection switch KP, superconducting current limiter measurement and control protection device CLMCPD, superconducting current limiter measurement signal line CLMSL, superconducting current limiter control signal Line CLCSL; among them, after the head end P of the tested superconducting current limiter SFCL is connected to the main circuit current transformer MCT, the main circuit is divided into two branches, the primary side and the secondary side; after the primary winding A1-X1 of the double-split reactor DSR is connected in parallel with the primary voltage transformer PPT, the whole is connected in series with the primary branch current transformer PCT to form the primary branch; after the secondary winding A2-X2 of the double-split reactor DSR is connected in parallel with the secondary voltage transformer SPT, and the superconducting unit SCU is connected in parallel with the superconducting unit voltage transformer UPT, according to the secondary branch current The transformer SCT, the secondary winding A2-X2 of the double-split reactor DSR and the secondary voltage transformer SPT parallel module, the second fast switch KB, the superconducting unit SCU and the superconducting unit voltage transformer UPT parallel module, and the first fast switch KA are connected in series in sequence to form a secondary branch; after the primary branch and the secondary branch are connected in parallel, they are connected between the main circuit current transformer MCT and the protection switch KP, and the protection switch KP is connected to the end Q of the tested superconducting current limiter SFCL; the superconducting current limiter measurement and control protection device CLMCPD passes the superconducting current limiter The measurement signal line CLMSL is respectively connected to the main circuit current transformer MCT, the primary branch current transformer PC, the secondary branch current transformer SCT, the primary voltage transformer PPT, the secondary voltage transformer SPT, the superconducting unit voltage transformer UPT, the double-split reactor DSR oil level thermometer, and the superconducting unit SCU liquid level thermometer; the superconducting current limiter measurement and control protection device CLMCPD is respectively connected to the first fast switch KA, the second fast switch KB, and the protection switch KP through the superconducting current limiter control signal line CLCSL.

[0017] The simulated load LD includes: a load resistor R and a load reactance X; wherein the load resistor R and the load reactance X are connected in series, connected in parallel with the single-phase grounding circuit breaker ECB, and then connected together between the end Q of the superconducting current limiter SFCL under test and the simulated line TL; according to the selected different steady-state power factor angles φ, the load reactance X may be a load inductance L or a load capacitance C; the resistance value R of the load resistor R = the system steady-state power factor cosφ*Ue / (k*Ie)-Rln selected according to the test requirements, and its capacity must meet P R ≥Ie 2*R, otherwise the selected power factor should be reduced until the load resistance capacity meets the requirements; the load reactance X = sinφ*Ue / (k*Ie)-2πf*Lln, when X>0, the load reactance X is an inductor, the load inductance L=X / 2πf, when X<0, the load reactance X is a capacitor, the load capacitance C=1 / (2πf*|X|).

[0018] The centralized parameter simulation circuit TL includes: an adjustable resistor RT and an adjustable reactor LT; wherein the adjustable resistor R0 is connected in series with the adjustable reactor L0 and connected between the Ta terminal of the intermediate transformer TM and the simulated load LD; the adjustable resistor R0 is a non-inductive resistor, and its resistance value R0=Rln-Rsc / k 2 , its rated capacity P R0 ≥Ie 2 *R0; the adjustable reactor L0 is a low-resistance air-core reactor, and its inductance value L0 = Lln-Lsc / k 2 .

[0019] The grid-connected test transformer T is a three-phase power transformer with a rated voltage of 10.5 kV on the low-voltage side that can be connected to the actual power system. Its rated capacity Qe≥3*Qst, and its short-circuit test capacity Qsc≥2*Qtr, wherein the steady-state current test capacity Qst=√3*grid-connected test voltage Ue*steady-state current Ie selected according to test requirements, and the fault transient current test capacity Qtr=√3*grid-connected test voltage Ue*short-circuit fault current Isc selected according to test requirements.

[0020] The protection circuit breaker PCB, closing circuit breaker CCB, single-phase switching circuit breaker SCB, single-phase earthing circuit breaker ECB, disconnector DS and earthing switch ES are all standard switchgear for 10kV power system.

[0021] A 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test method, including a test operation method, a test protection control logic, and a test result determination method; the test operation method includes a test system initial state and a test operation step;

[0022] The initial state of the test system is that the closing circuit breaker CCB, the single-phase earthing circuit breaker ECB, and the isolating switch DS are all in the open state, and the protection circuit breaker PCB, the single-phase switching circuit breaker SCB, the earthing switch ES, the first fast switch KA, the second fast switch KB, and the protection switch KP are all in the closed state;

[0023] The test operation steps include:

[0024] a) Disconnect the earthing switch ES;

[0025] b) Close the disconnector DS;

[0026] c) Close the circuit breaker CCB, and the test system starts to operate with power;

[0027] d) After the tested superconducting current limiter SFCL runs stably at the test voltage of 10 kV for the first pre-test time Tp1, the single-phase grounding circuit breaker ECB is closed, the simulated load LD is short-circuited, and the original short-circuit fault current Isc0 is generated in the test loop;

[0028] e) collecting the measured waveform of the original short-circuit fault current Isc0 before connecting to the tested superconducting current limiter SFCL through the current transformer CT;

[0029] f) After the single-phase grounding circuit breaker ECB remains in the closed state for the first transient test time Tt1, a trip signal is issued to disconnect it;

[0030] g) After the tested superconducting current limiter SFCL runs stably at the test voltage of 10kV for the second pre-test time Tp2, the single-phase switching circuit breaker SCB is disconnected, and the tested superconducting current limiter SFCL is connected to the through-current test circuit;

[0031] h) After stable operation at the predetermined steady-state current Ie for the steady-state test time Ts, the single-phase grounding circuit breaker ECB is closed again, and an actual short-circuit fault current Isc1 is generated in the circuit where the tested superconducting current limiter SFCL is located;

[0032] i) After the superconducting current limiter measurement and control protection device CLMCPD automatically detects the superconducting unit SCU superconducting signal, it sends a trip control signal to disconnect the first fast switch KA and the second fast switch KB;

[0033] j) After the single-phase grounding circuit breaker ECB remains in the closed state for the second transient test time Tt2, the protection switch KP is disconnected;

[0034] k) collecting and recording the current waveform flowing through the superconducting current limiter SFCL under test from step g to step j through the main circuit current transformer MCT;

[0035] l) Disconnect the closing circuit breaker CCB;

[0036] m) Close the earthing switch ES to fully discharge the test system;

[0037] n) Close the single-phase switching circuit breaker SCB;

[0038] o) Close the first fast switch KA, the second fast switch KB and the protection switch KP;

[0039] p) Disconnect the single-phase grounding circuit breaker ECB;

[0040] q) Disconnect the isolating switch DS and the fault current limiting test is completed.

[0041] The test protection control logic includes:

[0042] Ⅰ) When the instantaneous value of the current detected by the current transformer CT exceeds the protection setting value I of the measurement and control protection device MCPD P When the test circuit is tripped, the MCPD protection device sends a trip signal to the circuit breaker PCB, automatically cutting off the test circuit.

[0043] Ⅱ) When the instantaneous value of the tested superconducting current limiter SFCL current measured by the main circuit current transformer MCT is higher than the first protection setting value I A When the main circuit overcurrent alarm and protection switch KP and closing circuit breaker CCB trip signal are issued;

[0044] III) When the top oil temperature of the double-split reactor DSR exceeds the standard, the temperature alarm of the double-split reactor DSR and the tripping signal of the protection switch KP and the closing circuit breaker CCB are issued;

[0045] IV) When the instantaneous value of the superconducting current limiting branch current measured by the secondary branch current transformer SCT is higher than the second protection setting value I B When the superconducting current limiting branch overcurrent alarm and the first fast switch KA and the second fast switch KB trip signal are issued;

[0046] V) When the liquid nitrogen level thermometer in the superconducting unit SCU dewar indicates a temperature higher than the nitrogen liquefaction temperature, a low liquid level alarm and a trip signal of the first fast switch KA and the second fast switch KB are issued;

[0047] The test result determination method is: when the grid-connected fault current limiting test meets the following conditions at the same time, it is determined that "the test result is qualified, and the tested magnetic bias superconducting current limiter passes the fault current limiting test under the 10kV grid-connected condition", and the conditions include:

[0048] ⅰ) The test system has no protection action or abnormal alarm signal;

[0049] ii) There is no abnormal discharge or insulation breakdown in the tested superconducting current limiter SFCL body;

[0050] ⅲ) All component voltages and branch currents inside the tested superconducting current limiter SFCL are within normal and reasonable ranges;

[0051] iv) The superconducting current limiter measurement and control protection device CLMCPD reliably detects the superconducting unit SCU superconducting signal and sends a trip control signal to reliably disconnect the first fast switch KA and the second fast switch KB;

[0052] v) Before executing step j, the protection switch KP is reliably kept in the closed state;

[0053] ⅵ) The oil temperature at the top layer of the double split reactor DSR is not abnormally high;

[0054] ⅶ) The liquid nitrogen level in the superconducting unit SCU dewar is not abnormally low;

[0055] (viii) The current limiting rates of the tested superconducting current limiter SFCL in the first current limiting stage, i.e., the superconducting unit quench current limiting stage, and in the second current limiting stage, i.e., the double-split reactor unbalanced current limiting stage, are calculated using the measured current waveform. The values ​​are both within a reasonable range and are basically consistent with the theoretical calculation results, wherein the first current limiting rate Rcl1=(1-actual short-circuit fault current Isc11 in the first current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%, and the second current limiting rate Rcl2=(1-actual short-circuit fault current Isc12 in the second current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%.

[0056] The present invention has the following advantages and beneficial effects:

[0057] The present invention provides a grid-connected test transformer, switch equipment, intermediate transformer, simulated line load, and measurement, control, and protection subsystem required for a grid-connected fault current limiting test of a magnetic bias superconducting current limiter, provides a real grid-connected operating environment of 10kV industrial frequency voltage for the magnetic bias superconducting current limiter, provides necessary power supply capacity support for the current limiting test, and has a switch equipment control function. At the same time, in order to cope with various fault abnormalities that may occur in the test, the system can monitor the loop current in real time and provide necessary automatic power-off protection measures; according to the specific superconducting unit current carrying capacity and access scale of different tested magnetic bias superconducting current limiters, the impedance parameters of the simulated line load and the wiring mode of the test system are determined according to their unique steady-state current carrying and fault transient current carrying levels; for the magnetic bias superconducting current limiter equipped with only small-scale superconducting units, the intermediate transformer is used to realize the real current limiting rate test under the 10kV grid-connected condition. The present invention describes the access mode of the tested magnetic bias superconducting current limiter with protection function at the instant of the test start and the protection action logic during the test, so as to prevent the transient overcurrent at the instant of the test system closing from causing impact on the tested magnetic bias superconducting current limiter, and ensure the safe and stable operation of the superconducting current limiter during the test; clarifies the initial state, operation process and action sequence of each switching device in the test system, ensures that the fault current limiting test of the magnetic bias superconducting current limiter meets the technical requirements, realizes the control protection in the test and the grounding discharge function after the test, and proposes a test result judgment method. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to facilitate those skilled in the art to understand and implement the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods, but it should be understood that the protection scope of the present invention is not limited to the specific implementation methods.

[0059] Figure 1 A schematic diagram of a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system in one embodiment of the present invention;

[0060] Figure 2 It is a schematic diagram of a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system after removing the intermediate transformer in one embodiment of the present invention;

[0061] Figure 3 A schematic diagram of the internal circuit and measurement and control system of a 10kV magnetic bias superconducting current limiter in one embodiment of the present invention;

[0062] Figure 4 The present invention is a flowchart of the operation of a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test in one embodiment of the present invention.

[0063] In the figure: grid-connected test transformer T1, protection circuit breaker PCB2, current transformer CT3, closing circuit breaker CCB4, disconnector DS5, intermediate transformer TM6, single-phase switching circuit breaker SCB7, tested superconducting current limiter SFCL8, single-phase grounding circuit breaker ECB9, simulated load LD10, centralized parameter simulation line TL11, grounding switch ES12, measurement and control protection device MCPD13, measurement signal line MSL14, control signal line CSL15, high-voltage side winding 61, low-voltage side winding 62, iron core 63, box 64, main circuit current transformer MCT81, primary branch current transformer PC T82, secondary branch current transformer SCT83, primary voltage transformer PPT84, double split reactor DSR85, secondary voltage transformer SPT86, superconducting unit SCU87, superconducting unit voltage transformer UPT88, first fast switch KA89, second fast switch KB810, protection switch KP811, superconducting current limiter measurement and control protection device CLMCPD812, superconducting current limiter measurement signal line CLMSL813, superconducting current limiter control signal line CLCSL814, load resistor R101, load reactance X102, adjustable resistor RT111, adjustable reactor LT112. DETAILED DESCRIPTION

[0064] The present disclosure will be further described below with reference to the accompanying drawings. It is specifically stated that the following description essentially only serves as a macroscopic explanation and example illustration, and does not limit the present disclosure and its application or use in any way. Unless otherwise specifically stated, the relative arrangement of the parts and steps described in the embodiments and the numerical expressions and values ​​do not limit the scope of the present disclosure. In addition, techniques, methods and devices known to those skilled in the art may not be discussed in detail, but are intended to be part of the specification where appropriate.

[0065] Example 1

[0066] The present invention provides a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system and method, comprising a 10kV grid-connected current limiting test system, a test operation method, a test protection control logic, and a test result determination method.

[0067] The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system includes: a grid-connected test transformer T1, a protection circuit breaker PCB2, a current transformer CT3, a closing circuit breaker CCB4, an isolating switch DS5, an intermediate transformer TM6, a single-phase switching circuit breaker SCB7, a tested superconducting current limiter SFCL8, a single-phase grounding circuit breaker ECB9, a simulated load LD10, a centralized parameter simulation line TL11, a grounding switch ES12, a measurement and control protection device MCPD13, a measurement signal line MSL14, and a control signal line CSL15.

[0068] Taking the actual grid side as the starting point, the connection relationship of the equipment in the system test is: grid-connected test transformer T1→protective circuit breaker PCB2→current transformer CT3→closing circuit breaker CCB4→grounding switch ES12→isolating switch DS5, with the end of the isolating switch DS5 as the outlets Ea, Eb, and Ec of the three-phase test equipment; the outlet position of any phase of the three-phase test equipment can be selected as the grounding point N of the test system.

[0069] The intermediate transformer TM6 includes: a high-voltage side winding 61, a low-voltage side winding 62, an iron core 63, and a box 6. The wiring method of the intermediate transformer TM6 is as follows: the outlet terminal TA of the high-voltage side winding 61 is connected to the test system grounding point N, such as the c-phase outlet Ec of the three-phase test equipment. The reference terminal TX of the high-voltage side winding 61, the low-voltage side winding 62 terminal Tx as the same-named end of the high-voltage side winding reference terminal TX, the iron core 63 and the box 64 are all short-circuited with each other, and are connected together to any phase outlet position that is not the test system grounding point N, such as the a-phase outlet Ea of the three-phase test equipment. The intermediate transformer TM6 as a whole maintains a safe distance from the ground to reliably withstand a voltage of 10kV through supporting insulators.

[0070] The access mode of the tested superconducting current limiter SFCL8 is as follows: after being connected in parallel with the single-phase switching circuit breaker SCB7, the tested superconducting current limiter SFCL8 is placed as a whole between the Tx terminal of the low-voltage side winding 62 of the intermediate transformer TM6 and the simulated load LD10.

[0071] The wiring method of the simulated load LD10 is as follows: the load resistor R101 is connected in series with the load reactance X102, and then connected in parallel with the single-phase grounding circuit breaker ECB9, and then placed together between the end Q of the tested superconducting current limiter SFCL8 and the simulated line TL11.

[0072] The wiring method of the centralized parameter simulation circuit TL11 is as follows: the adjustable resistor RT111 and the adjustable reactor LT112 are connected in series and then placed between the Ta terminal of the intermediate transformer TM6 and the simulation load LD10.

[0073] The measurement and control protection device MCPD13 is connected to the current transformer CT3 through the measurement signal line MSL14, and is respectively connected to the protection circuit breaker PCB2, the closing circuit breaker CCB4, the disconnector DS5, the single-phase switching circuit breaker SCB7, the single-phase grounding circuit breaker ECB9, and the grounding switch ES12 through the control signal line CSL15.

[0074] The grid-connected test transformer T1 is a three-phase power transformer with a rated voltage of 10.5 kV on the low-voltage side that can be connected to the actual power system. Its rated capacity Qe≥3*Qst, and its short-circuit test capacity Qsc≥2*Qtr, wherein the steady-state current test capacity Qst=√3*grid-connected test voltage Ue*steady-state current Ie selected according to test requirements, and the fault transient current test capacity Qtr=√3*grid-connected test voltage Ue*short-circuit fault current Isc selected according to test requirements.

[0075] The protection circuit breaker PCB2, closing circuit breaker CCB4, single-phase switching circuit breaker SCB7, single-phase earthing circuit breaker ECB9, isolating switch DS5, and earthing switch ES12 are all standard switchgear for 10kV power system.

[0076] The intermediate transformer TM6 is a single-phase test transformer with a rated voltage of 10 kV on the high-voltage side and an adjustable transformation ratio. According to specific test conditions, its transformation ratio k=grid-connected test voltage Ue / (line impedance module value |Zln| selected according to test requirements*short-circuit fault current Isc selected according to test requirements).

[0077] The intermediate transformer TM6 is a short-circuit test transformer with strong short-circuit bearing capacity. Its rated short-circuit capacity is Q TM ≥Grid-connected test voltage Ue*selected short-circuit fault current Isc / transformation ratio k.

[0078] The resistive component and the inductive component of the short-circuit impedance Zsc of the intermediate transformer TM6 do not exceed the high-voltage side conversion value of the corresponding component of the line impedance Zln selected according to the test requirements, that is, the short-circuit resistance Rsc≤k 2 *Line resistance Rln, short-circuit inductance Lsc≤k 2 *Line inductance Lln.

[0079] When the line impedance Zln*selected short-circuit fault current Isc≥0.9*grid-connected test voltage Ue selected according to test requirements, the intermediate transformer TM6 can be removed from the test system, and the tested superconducting current limiter SFCL8, simulated load LD10, and centralized parameter simulated line TL11 are directly connected to the high-voltage side test main circuit.

[0080] After the intermediate transformer TM6 is removed from the test system, when calculating the test parameters, the short-circuit resistance Rsc and the short-circuit inductance Lsc of the intermediate transformer TM6 are both zero, and the transformation ratio k is taken as 1.

[0081] After the intermediate transformer TM6 is removed from the test system, when the above-mentioned test equipment is connected, the centralized parameter simulation circuit TL11 originally connected to the Ta terminal on the low-voltage side of the intermediate transformer TM6 is directly connected to the position connected to the original high-voltage side TA terminal, such as the c-phase outlet Ec of the three-phase test equipment, and the head end P of the tested superconducting current limiter SFCL8 originally connected to the Tx terminal on the low-voltage side of the intermediate transformer TM6 is directly connected to the position connected to the original high-voltage side TX terminal, such as the a-phase outlet Ea of the three-phase test equipment.

[0082] The internal components of the tested superconducting current limiter SFCL8 include: main circuit current transformer MCT81, primary branch current transformer PCT82, secondary (superconducting current limiting) branch current transformer SCT83, primary voltage transformer PPT84, double split reactor DSR85, secondary voltage transformer SPT86, superconducting unit SCU87, superconducting unit voltage transformer UPT88, first fast switch KA89, second fast switch KB810, protection switch KP811, superconducting current limiter measurement and control protection device CLMCPD812, superconducting current limiter measurement signal line CLMSL813, and superconducting current limiter control signal line CLCSL814.

[0083] The connection relationship of the internal components of the tested superconducting current limiter SFCL8 is as follows: after the head end P of the tested superconducting current limiter SFCL8 is connected to the main circuit current transformer MCT81, the main circuit is divided into two branches, the primary side and the secondary side; the primary winding A1-X1 of the double-split reactor DSR85 is connected in parallel with the primary voltage transformer PPT84, and then connected in series with the primary branch current transformer PCT82 as a whole to form the primary branch; the secondary winding A2-X2 of the double-split reactor DSR85 is connected in parallel with the secondary voltage transformer PPT84 to form the primary branch; After the secondary voltage transformer SPT86 is connected in parallel, the superconducting unit SCU87 and the superconducting unit voltage transformer UPT88 are connected in parallel, the secondary branch current transformer SCT83 → the secondary winding A2-X2 of the double-split reactor DSR85 and the secondary voltage transformer SPT86 are connected in parallel → the second fast switch KB810 → the superconducting unit SCU87 and the superconducting unit voltage transformer UPT88 are connected in parallel → the first fast switch KA89 is connected in series to form the secondary branch. The primary branch is connected in parallel with the secondary branch and then connected between the main circuit current transformer MCT81 and the protection switch KP811. The protection switch KP811 is connected to the end Q of the superconducting current limiter SFCL8 under test. The superconducting current limiter measurement and control protection device CLMCPD812 is connected to the main circuit current transformer MCT81, the primary branch current transformer PCT82, and the secondary branch current transformer through the superconducting current limiter measurement signal line CLMSL813. The superconducting current limiter measurement and control protection device CLMCPD812 is connected to the first fast switch KA89, the second fast switch KB810 and the protection switch KP811 through the superconducting current limiter control signal line CLCSL814.

[0084] The simulated load LD10 includes a load resistor R101 and a load reactance X102. The load reactance X102 may be a load inductance L or a load capacitance C according to different selected steady-state power factor angles φ.

[0085] The resistance value of the load resistor R101 is R = the system steady-state power factor cosφ*Ue / (k*Ie)-Rln selected according to the test requirements, and its capacity must meet P R ≥Ie 2 *R, otherwise the selected power factor should be reduced until the load resistance capacity meets the requirements; the load reactance X=sinφ*Ue / (k*Ie)-2πf*Lln, when X>0, the load reactance X102 is an inductor, the load inductance L=X / 2πf, when X<0, the load reactance X102 is a capacitor, the load capacitance C=1 / (2πf*|X|).

[0086] The centralized parameter simulation circuit TL11 includes an adjustable resistor RT111 and an adjustable reactor LT112; the adjustable resistor RT111 is a non-inductive resistor, and its resistance value RT=Rln-Rsc / k 2 , its rated capacity P RT ≥Ie 2 *RT; The adjustable reactor LT112 is a low-resistance air-core reactor, and its inductance value LT = Lln-Lsc / k 2 .

[0087] The test operation method includes a test system initial state and test operation steps.

[0088] The initial state of the test system is that the closing circuit breaker CCB4, the single-phase grounding circuit breaker ECB9, and the isolating switch DS5 are all in the disconnected state, and the protective circuit breaker PCB2, the single-phase switching circuit breaker SCB7, the grounding switch ES12, the first fast switch KA89, the second fast switch KB810, and the protective switch KP811 are all in the closed state.

[0089] The test operation steps include:

[0090] a) Disconnect the grounding switch ES12;

[0091] b) Close the disconnector DS5;

[0092] c) Close the circuit breaker CCB4, and the test system starts to operate with power;

[0093] d) After the tested superconducting current limiter SFCL8 operates stably at the test voltage of 10 kV for the first pre-test time Tp1, the single-phase grounding circuit breaker ECB9 is closed, the simulated load LD10 is short-circuited, and the original short-circuit fault current Isc0 is generated in the test loop;

[0094] e) collecting the measured waveform of the original short-circuit fault current Isc0 before connecting to the tested superconducting current limiter SFCL8 through the current transformer CT3;

[0095] f) After the single-phase grounding circuit breaker ECB9 remains in the closed state for the first transient test time Tt1, a trip signal is issued to disconnect it;

[0096] g) After the tested superconducting current limiter SFCL8 operates stably at the test voltage of 10 kV for the second pre-test time Tp2, the single-phase switching circuit breaker SCB7 is disconnected, and the tested superconducting current limiter SFCL8 is connected to the through-current test circuit;

[0097] h) After stable operation at the predetermined steady-state current Ie reaches the steady-state test time Ts, the single-phase grounding circuit breaker ECB9 is closed again, and an actual short-circuit fault current Isc1 is generated in the circuit where the tested superconducting current limiter SFCL8 is located;

[0098] i) After the superconducting current limiter measurement and control protection device CLMCPD812 automatically detects the superconducting unit SCU87 superconducting signal, it sends a trip control signal to disconnect the first fast switch KA89 and the second fast switch KB810;

[0099] j) After the single-phase grounding circuit breaker ECB9 remains in the closed state for the second transient test time Tt2, the protection switch KP811 is disconnected;

[0100] k) collecting and recording the current waveform flowing through the tested superconducting current limiter SFCL8 from step g to step j through the main circuit current transformer MCT81;

[0101] l) Disconnect the closing circuit breaker CCB4;

[0102] m) Close the earthing switch ES12 to fully discharge the test system;

[0103] n) Close the single-phase switching circuit breaker SCB7;

[0104] o) Close the first fast switch KA89, the second fast switch KB810 and the protection switch KP811;

[0105] p) Disconnect the single-phase grounding circuit breaker ECB9;

[0106] q) Disconnect the isolating switch DS5 and the fault current limiting test is completed.

[0107] The test protection control logic includes:

[0108] Ⅰ) When the instantaneous value of the current detected by the current transformer CT3 exceeds the protection setting value I of the measurement and control protection device MCPD13 P When the test circuit is tripped, the measurement and control protection device MCPD13 sends a tripping signal to the protection circuit breaker PCB2, automatically cutting off the test circuit;

[0109] Ⅱ) When the instantaneous value of the current of the tested superconducting current limiter SFCL8 measured by the main circuit current transformer MCT81 is higher than the first protection setting value I A When the main circuit overcurrent alarm and protection switch KP811 and closing circuit breaker CCB4 trip signal are issued;

[0110] III) When the top oil temperature of the double-split reactor DSR85 exceeds the standard, the temperature alarm of the double-split reactor DSR85 and the tripping signal of the protection switch KP811 and the closing circuit breaker CCB4 are issued;

[0111] IV) When the instantaneous value of the superconducting current limiting branch current measured by the secondary branch current transformer SCT83 is higher than the second protection setting value I B When the superconducting current limiting branch overcurrent alarm and the first fast switch KA89 and the second fast switch KB810 trip signal are issued;

[0112] V) When the liquid nitrogen level thermometer in the superconducting unit SCU87 dewar indicates a temperature higher than the nitrogen liquefaction temperature (minus 196°C), a low liquid level alarm and a trip signal of the first fast switch KA89 and the second fast switch KB810 are issued.

[0113] The test result determination method is: when the grid-connected fault current limiting test meets the following conditions at the same time, it can be determined that "the test result is qualified, and the tested magnetic bias superconducting current limiter passes the fault current limiting test under 10kV grid-connected conditions", and the conditions include:

[0114] ⅰ) The test system has no protection action or abnormal alarm signal;

[0115] ii) There is no abnormal discharge or insulation breakdown in the tested superconducting current limiter SFCL8;

[0116] ⅲ) All component voltages and branch currents inside the tested superconducting current limiter SFCL8 are within the normal and reasonable range;

[0117] iv) The superconducting current limiter measurement and control protection device CLMCPD812 reliably detects the superconducting unit SCU87 superconducting loss signal and sends a trip control signal to reliably disconnect the first fast switch KA89 and the second fast switch KB810;

[0118] v) Before executing step j, the protection switch KP811 is reliably kept in the closed state;

[0119] ⅵ) The oil temperature at the top layer of the double-split reactor DSR85 is not abnormally high;

[0120] ⅶ) The liquid nitrogen level in the superconducting unit SCU87 dewar is not abnormally low;

[0121] (viii) The current limiting rates of the tested superconducting current limiter SFCL8 in the first current limiting stage (superconducting unit quench current limiting stage) and the second current limiting stage (double-split reactor unbalanced current limiting stage) are calculated using the measured current waveform. The values ​​are both within a reasonable range and are basically consistent with the theoretical calculation results, wherein the first current limiting rate Rcl1=(1-actual short-circuit fault current Isc11 in the first current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%, and the second current limiting rate Rcl2=(1-actual short-circuit fault current Isc12 in the second current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%.

[0122] Example 2

[0123] like Figure 1 As shown, Figure 1 The schematic diagram of the 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system in one embodiment of the present invention. In this embodiment, the 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system includes: a grid-connected test transformer T1, a protection circuit breaker PCB2, a current transformer CT3, a closing circuit breaker CCB4, a disconnector DS5, an intermediate transformer TM6, a single-phase switching circuit breaker SCB7, a tested superconducting current limiter SFCL8, a single-phase grounding circuit breaker ECB9, a simulated load LD10, a centralized parameter simulation line TL11, a grounding switch ES12, a measurement and control protection device MCPD13, a measurement signal line MSL14, and a control signal line CSL15.

[0124] Starting from the actual grid side, the connection relationship of the system test equipment is as follows: grid-connected test transformer T1→protective circuit breaker PCB2→current transformer CT3→closing circuit breaker CCB4→grounding switch ES12→isolating switch DS5, with the end of the isolating switch DS5 as the outlets Ea, Eb, and Ec of the three-phase test equipment; the outlet position of any phase of the three-phase test equipment can be selected as the grounding point N of the test system;

[0125] The wiring method of the intermediate transformer TM6 is as follows: the outlet terminal TA of the high-voltage side winding 61 is connected to the test system grounding point N (such as the c-phase outlet Ec of the three-phase test equipment), the reference terminal TX of the high-voltage side winding 61, the low-voltage side winding 62 terminal Tx as the same-name end of the high-voltage side winding reference terminal TX, the iron core 63 and the box 64 are all short-circuited with each other, and are commonly connected to any phase outlet (such as the a-phase outlet Ea of the three-phase test equipment) that is not the test system grounding point N; the intermediate transformer TM6 as a whole is maintained at a safe distance from the ground that can reliably withstand a voltage of 10kV through supporting insulators;

[0126] The access mode of the tested superconducting current limiter SFCL8 is as follows: after the tested superconducting current limiter SFCL8 is connected in parallel with the single-phase switching circuit breaker SCB7, the whole is placed between the Tx terminal of the low-voltage side winding 62 of the intermediate transformer TM6 and the simulated load LD10;

[0127] The wiring method of the simulated load LD10 is: the load resistor R101 is connected in series with the load reactance X102, connected in parallel with the single-phase grounding circuit breaker ECB9, and then placed together between the end Q of the tested superconducting current limiter SFCL8 and the simulated line TL11;

[0128] The wiring mode of the centralized parameter simulation circuit TL11 is as follows: the adjustable resistor RT111 and the adjustable reactor LT112 are connected in series and then placed between the Ta terminal of the intermediate transformer TM6 and the simulation load LD10;

[0129] The measurement and control protection device MCPD13 is connected to the current transformer CT3 through the measurement signal line MSL14, and is respectively connected to the protection circuit breaker PCB2, the closing circuit breaker CCB4, the disconnector DS5, the single-phase switching circuit breaker SCB7, the single-phase grounding circuit breaker ECB9, and the grounding switch ES12 through the control signal line CSL15.

[0130] In this embodiment, the grid-connected test transformer T1 is an oil-immersed three-phase power transformer with a transformation ratio of 220kV / 10.5kV and a connection method of YNd11, which can be connected to the actual power system. Its rated capacity is 264MVA and its short-circuit test capacity is 1000MVA, providing sufficient power capacity support for the test system.

[0131] In this embodiment, the test system is directly connected to the city's 220kV power system through the grid-connected test transformer T1, meeting the grid-connected test conditions.

[0132] In this embodiment, the protective circuit breaker PCB2, current transformer CT3, closing circuit breaker CCB4, disconnector DS5, single-phase switching circuit breaker SCB7, single-phase earthing circuit breaker ECB9, and earthing switch ES12 in the test system are all standard equipment for 10kV power system, which can realize the test parameter testing and test system control and protection functions.

[0133] In this embodiment, preferably, the intermediate transformer TM6 is an oil-immersed copper winding short-circuit test transformer, which has a higher test capacity, a lower short-circuit impedance and a stronger ability to resist short-circuit impact. Preferably, its connection group is Ii0, and it has a more reasonable electrical insulation structure.

[0134] In this embodiment, the high-voltage side winding 61 and the low-voltage side winding 62 of the intermediate transformer TM6 are coaxially mounted on the iron core 63, and the positions of the three from the inside to the outside are iron core 63 → low-voltage side winding 62 → high-voltage side winding 61. The high-voltage side winding 61, the low-voltage side winding 62, and the iron core 63 maintain a sufficient insulation distance from each other and are placed together in a box 64 filled with transformer oil.

[0135] The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system, when the line impedance Zln*selected short-circuit fault current Isc≥0.9*grid-connected test voltage Ue selected according to the requirement, the intermediate transformer MT6 can be removed from the test system, and the tested superconducting current limiter SFCL8, the centralized parameter simulation line TL11, and the simulated load LD10 are directly connected to the high-voltage side test main circuit.

[0136] In this embodiment, preferably, the adjustable reactor LT112 is a dry-type copper winding reactor, which has good low-resistance characteristics and short-circuit impact resistance.

[0137] In this embodiment, the c-phase outlet Ec of the three-phase test equipment is selected as the test system grounding point N; the TA terminal of the high-voltage side winding 61 of the intermediate transformer is connected to the test system grounding point N, the TX terminal of the high-voltage side winding 61 of the intermediate transformer, the Tx terminal of the low-voltage side winding 62, the iron core 63 and the box 64 are all short-circuited with each other and connected to the a-phase outlet Ea of the three-phase test equipment, and the b-phase outlet Eb of the three-phase test equipment is not used and is in a suspended state; the Ta terminal of the low-voltage side winding 62 of the intermediate transformer is connected to the centralized parameter simulation line TL11, and the Tx terminal of the low-voltage side winding 62 of the intermediate transformer is connected to the head end P of the superconducting current limiter SFCL8 under test.

[0138] like Figure 2 As shown, Figure 2 The schematic diagram of the 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system after removing the intermediate transformer in one embodiment of the present invention. After the intermediate transformer TM6 is removed from the test system, when the test equipment is connected, the centralized parameter simulation line TL11 originally connected to the terminal Ta on the low voltage side of the intermediate transformer TM6 is directly connected to the c-phase outlet Ec of the three-phase test equipment, and the head end P of the superconducting current limiter SFCL8 under test originally connected to the terminal Tx on the low voltage side of the intermediate transformer TM6 is directly connected to the a-phase outlet Ea of the three-phase test equipment.

[0139] like Figure 3 As shown, Figure 3 The figure is a schematic diagram of the internal circuit and measurement and control system of a 10kV magnetic bias superconducting current limiter in one embodiment of the present invention. In this embodiment, the internal components of the tested superconducting current limiter SFCL8 include: main circuit current transformer MCT81, primary branch current transformer PCT82, secondary branch current transformer SCT83, primary voltage transformer PPT84, double split reactor DSR85, secondary voltage transformer SPT86, superconducting unit SCU87, superconducting unit voltage transformer UPT88, first fast switch KA89, second fast switch KB810, protection switch KP811, superconducting current limiter measurement and control protection device CLMCPD812, superconducting current limiter measurement signal line CLMSL813, superconducting current limiter control signal line CLCSL814.

[0140] The connection relationship of the internal components of the tested superconducting current limiter SFCL8 is as follows: after the head end P of the tested superconducting current limiter SFCL8 is connected to the main circuit current transformer MCT81, the main circuit is divided into two branches, the primary side and the secondary side; the primary winding A1-X1 of the double-split reactor DSR85 is connected in parallel with the primary voltage transformer PPT84, and then connected in series with the primary branch current transformer PCT82 as a whole to form the primary branch; the secondary winding A2-X2 of the double-split reactor DSR85 is connected to After the secondary voltage transformer SPT86 is connected in parallel, and the superconducting unit SCU87 and the superconducting unit voltage transformer UPT88 are connected in parallel, the secondary branch current transformer SCT83 → the secondary winding A2-X2 of the double-split reactor DSR85 and the secondary voltage transformer SPT86 are connected in parallel → the second fast switch KB810 → the superconducting unit SCU87 and the superconducting unit voltage transformer UPT88 are connected in parallel → the first fast switch KA89 is connected in series to form the secondary branch. The primary branch is connected in parallel with the secondary branch and then connected between the main circuit current transformer MCT81 and the protection switch KP811. The protection switch KP811 is connected to the end Q of the superconducting current limiter SFCL8 under test. The superconducting current limiter measurement and control protection device CLMCPD812 is connected to the main circuit current transformer MCT81, the primary branch current transformer PCT82, and the secondary branch current transformer through the superconducting current limiter measurement signal line CLMSL813. The superconducting current limiter measurement and control protection device CLMCPD812 is connected to the first fast switch KA89, the second fast switch KB810 and the protection switch KP811 through the superconducting current limiter control signal line CLCSL814.

[0141] In this embodiment, according to the access scale of the superconducting unit SCU87 inside the tested superconducting current limiter SFCL8, the rated current carrying capacity of the superconducting unit in the superconducting state is 50A, and the rated current carrying capacity in the quenched state is 500A. Therefore, the rated steady-state current Ie=100A and the rated short-circuit fault current Isc=1000A of the tested magnetic bias superconducting current limiter are determined. According to the line impedance Zln=0.4971+j0.8677Ω selected according to the actual line conditions, the intermediate transformer ratio k=Ue / (|Zln|*Isc)=10kV / (√(0.4971 2 +0.8677 2 )*1000A)=10:1, the measured short-circuit impedance of the intermediate transformer Zsc=4.5+j19.4872Ω, from which the resistance value of the adjustable resistor RT111 is calculated as RT=Rln-Rsc / k 2 =0.4971-4.5 / 102 =0.4521Ω, the inductance value of the adjustable reactor LT112 is LT = (Lln-Lsc / k 2 )=(0.8677-19.4872 / 10 2 ) / (2π*50Hz)=2.1417mH, the steady-state power factor of the selected test system is cosφ=0.8 and is inductive (0°<φ<90°), then the resistance value of the load resistor R101 is R=cosφ*Ue / (k*Ie)-Rln=0.8*10kV / (10*100A)-0.4971Ω=7.5029Ω, the reactance value of the load reactance X102 is X=sinφ*Ue / (k*Ie)-2πf*Lln=0.6*10kV / (10*100A)-0.8677Ω=5.1323Ω, so the load inductance L=X / 2πf=5.1323Ω / (2π*50Hz)=16.3366mH.

[0142] The invention discloses a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test method, comprising: a test operation method, a test protection control logic, and a test result determination method.

[0143] In this embodiment, the test operation method includes: a test system initial state and test operation steps.

[0144] (1) Initial state of the test system

[0145] The initial state of the test system is that the closing circuit breaker CCB4, the single-phase grounding circuit breaker ECB9, and the isolating switch DS5 are all in the disconnected state, and the protective circuit breaker PCB2, the single-phase switching circuit breaker SCB7, the grounding switch ES12, the first fast switch KA89, the second fast switch KB810, and the protective switch KP811 are all in the closed state.

[0146] (2) Test operation steps

[0147] like Figure 4 As shown, Figure 4 The following is a flow chart of the operation of the grid-connected fault current limiting test of a 10kV magnetic biased superconducting current limiter in one embodiment of the present invention. In this embodiment, the test operation steps include:

[0148] a) Disconnect the grounding switch ES12;

[0149] b) Close the disconnector DS5;

[0150] c) Close the circuit breaker CCB4, and the test system starts to operate with power;

[0151] d) After the tested superconducting current limiter SFCL8 operates stably at the test voltage of 10 kV for the first pre-test time Tp1, the single-phase grounding circuit breaker ECB9 is closed, the simulated load LD10 is short-circuited, and the original short-circuit fault current Isc0 is generated in the test loop;

[0152] e) collecting the measured waveform of the original short-circuit fault current Isc0 before connecting to the tested superconducting current limiter SFCL8 through the current transformer CT3;

[0153] f) After the single-phase grounding circuit breaker ECB9 remains in the closed state for the first transient test time Tt1, a trip signal is issued to disconnect it;

[0154] g) After the tested superconducting current limiter SFCL8 operates stably at the test voltage of 10 kV for the second pre-test time Tp2, the single-phase switching circuit breaker SCB7 is disconnected, and the tested superconducting current limiter SFCL8 is connected to the through-current test circuit;

[0155] h) After stable operation at the predetermined steady-state current Ie reaches the steady-state test time Ts, the single-phase grounding circuit breaker ECB9 is closed again, and an actual short-circuit fault current Isc1 is generated in the circuit where the tested superconducting current limiter SFCL8 is located;

[0156] i) After the superconducting current limiter measurement and control protection device CLMCPD812 automatically detects the superconducting unit SCU87 superconducting signal, it sends a trip control signal to disconnect the first fast switch KA89 and the second fast switch KB810;

[0157] j) After the single-phase grounding circuit breaker ECB9 remains in the closed state for the second transient test time Tt2, the protection switch KP811 is disconnected;

[0158] k) collecting and recording the current waveform flowing through the tested superconducting current limiter SFCL8 from step g to step j through the main circuit current transformer MCT81;

[0159] l) Disconnect the closing circuit breaker CCB4;

[0160] m) Close the earthing switch ES12 to fully discharge the test system;

[0161] n) Close the single-phase switching circuit breaker SCB7;

[0162] o) Close the first fast switch KA89, the second fast switch KB810 and the protection switch KP811;

[0163] p) Disconnect the single-phase grounding circuit breaker ECB9;

[0164] q) Disconnect the isolating switch DS5 and the fault current limiting test is completed.

[0165] In this embodiment, the test protection control logic includes:

[0166] Ⅰ) When the instantaneous value of the current detected by the current transformer CT3 exceeds the protection setting value I of the measurement and control protection device MCPD13 P When the test circuit is tripped, the measurement and control protection device MCPD13 sends a tripping signal to the protection circuit breaker PCB2, automatically cutting off the test circuit;

[0167] Ⅱ) When the instantaneous value of the current of the tested superconducting current limiter SFCL8 measured by the main circuit current transformer MCT81 is higher than the first protection setting value I A When the main circuit overcurrent alarm and protection switch KP811 and closing circuit breaker CCB4 trip signal are issued;

[0168] III) When the top oil temperature of the double-split reactor DSR85 exceeds the standard, the temperature alarm of the double-split reactor DSR85 and the tripping signal of the protection switch KP811 and the closing circuit breaker CCB4 are issued;

[0169] IV) When the instantaneous value of the superconducting current limiting branch current measured by the secondary branch current transformer SCT83 is higher than the second protection setting value I B When the superconducting current limiting branch overcurrent alarm and the first fast switch KA89 and the second fast switch KB810 trip signal are issued;

[0170] V) When the liquid nitrogen level thermometer in the superconducting unit SCU87 dewar indicates a temperature higher than the nitrogen liquefaction temperature (minus 196°C), a low liquid level alarm and a trip signal of the first fast switch KA89 and the second fast switch KB810 are issued.

[0171] In this embodiment, the selected measurement and control protection device MCPD13 protection setting value I P =1000A, the first protection setting value I A It is 2.0 times of the amplitude of Isc, and the second protection setting value is I B is 0.8 times the amplitude of Isc, that is, I A =2*√2*Isc=2*√2*1000A≈2800A, I B =0.8*√2*Isc=0.8*√2*1000A≈1100A.

[0172] In this embodiment, in order to fully test the insulation performance and operation stability of the tested superconducting current limiter SFCL8 in a low temperature and high voltage environment and ensure the safe implementation of the grid-connected fault current limiting test, it is preferred to set the first pre-test time Tp1=180s, the second pre-test time Tp2=300s, and the steady-state test time Ts=5min. In order to ensure sufficient short-circuit fault current collection time, it is preferred to set the first transient test time Tt1=100ms and the second transient test time Tt2=100ms.

[0173] In this embodiment, the test result determination method is: when the grid-connected fault current limiting test satisfies the following conditions at the same time, it can be determined that "the test result is qualified, and the tested magnetic bias superconducting current limiter passes the fault current limiting test under the 10kV grid-connected condition", and the conditions include:

[0174] ⅰ) The test system has no protection action or abnormal alarm signal;

[0175] ii) There is no abnormal discharge or insulation breakdown in the tested superconducting current limiter SFCL8;

[0176] ⅲ) All component voltages and branch currents inside the tested superconducting current limiter SFCL8 are within the normal and reasonable range;

[0177] iv) The superconducting current limiter measurement and control protection device CLMCPD812 reliably detects the superconducting unit SCU87 superconducting loss signal and sends a trip control signal to reliably disconnect the first fast switch KA89 and the second fast switch KB810;

[0178] v) Before executing step j, the protection switch KP811 is reliably kept in the closed state;

[0179] ⅵ) The oil temperature at the top layer of the double-split reactor DSR85 is not abnormally high;

[0180] ⅶ) The liquid nitrogen level in the superconducting unit SCU87 dewar is not abnormally low;

[0181] (viii) The current limiting rates of the tested superconducting current limiter SFCL8 in the first current limiting stage, i.e., the superconducting unit quenching current limiting stage, and in the second current limiting stage, i.e., the double-split reactor unbalanced current limiting stage, are calculated using the measured current waveform. The values ​​are both within a reasonable range and are basically consistent with the theoretical calculation results, wherein the first current limiting rate Rcl1=(1-actual short-circuit fault current Isc11 in the first current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%, and the second current limiting rate Rcl2=(1-actual short-circuit fault current Isc12 in the second current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%.

[0182] According to the initial state of the test system and the test operation steps proposed in the present invention, this embodiment successfully carried out the fault current limiting test of the magnetic bias superconducting current limiter under the condition of 10kV grid connection. During the test, the test system had no protection action or abnormal alarm signal, the tested superconducting current limiter SFCL8 had no abnormal discharge and no insulation breakdown, the voltage of each component and the branch current of the tested superconducting current limiter SFCL8 were all within the normal and reasonable range, the superconducting current limiter measurement and control protection device CLMCPD812 reliably detected the superconducting unit SCU87 superconducting loss signal, and sent a control signal to reliably disconnect the first fast switch KA89 and the second fast switch KB810, and each switch device operated correctly according to the operation process, the oil temperature of the double split reactor DSR85 was not abnormally high, and the liquid level of liquid nitrogen in the superconducting unit SCU87 dewar was not abnormally low.

[0183] In this embodiment, the measured original short-circuit fault current Isc0=101.36A, the first current limiting stage, i.e., the superconducting unit quenching current limiting stage, the actual short-circuit fault current Isc11=921.74A; the second current limiting stage, i.e., the double-split reactor unbalanced current limiting stage, the actual short-circuit fault current Isc12=409.39A. Then, the first current limiting rate Rcl1 of the tested magnetic bias superconducting current limiter in this embodiment is (1-Isc11 / Isc0 / k)*100%=9.06%, and the second current limiting rate Rcl2 is (1-Isc12 / Isc0 / k)*100%=59.61%, which is basically consistent with the theoretical calculation results.

[0184] Multiple embodiments have verified that this method has significant advantages such as high safety and reliability, wide engineering applicability, and strong parameter controllability.

[0185] Although the present disclosure has been described with reference to the exemplary embodiments, it should be understood that the present disclosure is not limited to the exemplary embodiments described above. It is obvious to those skilled in the art that the exemplary embodiments described above can be modified without departing from the scope and spirit of the present disclosure. The scope of the appended claims should be given the broadest interpretation to include all such modifications and equivalent structures and functions.

Claims

1. 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system, characterized by: Starting from the actual grid side, the grid-connected test transformer T (1), the protective circuit breaker PCB (2), the current transformer CT (3), the closing circuit breaker CCB (4), the earthing switch ES (12), the isolating switch DS (5) and the intermediate transformer TM (6) are connected in sequence; the superconducting current limiter SFCL (8) under test is connected in parallel with the single-phase switching circuit breaker SCB (7), and the whole is connected between one terminal of the intermediate transformer TM (6) and the simulated load LD (10); the simulated load LD (10) is connected in parallel with the single-phase earthing circuit breaker ECB (9), and is connected between the end of the superconducting current limiter SFCL (8) under test and the simulated line TL (11); the centralized parameter simulated line TL (11) is connected between the other terminal of the intermediate transformer TM (6) and the simulated load LD (10); the measurement and control protection device MCPD (13 ) is connected to the current transformer CT (3) through the measurement signal line MSL (14), and is respectively connected to the protection circuit breaker PCB (2), the closing circuit breaker CCB (4), the disconnector DS (5), the single-phase switching circuit breaker SCB (7), the single-phase earthing circuit breaker ECB (9), and the earthing switch ES (12) through the control signal line CSL (15); the end of the disconnector DS (5) serves as the outlets Ea, Eb, and Ec of the three-phase test equipment; the outlet position of any phase of the three-phase test equipment can serve as the earthing point N of the test system; the protection circuit breaker PCB (2), the closing circuit breaker CCB (4), the single-phase switching circuit breaker SCB (7), the single-phase earthing circuit breaker ECB (9), the disconnector DS (5), and the earthing switch ES (12) are all standard switchgear for 10kV power system.

2. The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system according to claim 1, characterized in that: The intermediate transformer TM (6) comprises a high-voltage side winding (61), a low-voltage side winding (62), an iron core (63) and a box (6), wherein the outlet terminal TA of the high-voltage side winding (61) is connected to the test system grounding point N, the reference terminal TX of the high-voltage side winding (61), the low-voltage side winding (62) terminal Tx which is the same as the reference terminal TX of the high-voltage side winding, the iron core (63) and the box (64) are all short-circuited with each other and connected together to any phase outlet position which is not the test system grounding point N; the intermediate transformer TM (6) as a whole is kept at a safe distance from the ground through a supporting insulator so as to reliably withstand a voltage of 10 kV; The intermediate transformer TM (6) is a single-phase test transformer with a rated voltage of 10 kV on the high-voltage side and an adjustable transformation ratio. According to specific test conditions, its transformation ratio k=grid-connected test voltage Ue / ; line impedance modulus value |Zln| selected according to test requirements* short-circuit fault current Isc selected according to test requirements; The intermediate transformer TM (6) is a short-circuit test transformer with strong short-circuit bearing capacity. Its rated short-circuit capacity Q TM ≥Grid-connected test voltage Ue*selected short-circuit fault current Isc / transformation ratio k; The resistive and inductive components of the short-circuit impedance Zsc of the intermediate transformer TM (6) do not exceed the high-voltage side conversion value of the corresponding component of the line impedance Zln selected according to the test requirements, that is, the short-circuit resistance Rsc≤k 2 *Line resistance Rln, short-circuit inductance Lsc≤k 2 * Line inductance Lln; When the line impedance Zln*the selected short-circuit fault current Isc≥0.9*grid-connected test voltage Ue selected according to the test requirements, the intermediate transformer TM (6) can be removed from the test system, and the superconducting current limiter SFCL (8), the simulated load LD (10), and the centralized parameter simulated line TL (11) to be tested are directly connected to the high-voltage side test main circuit; After the intermediate transformer TM (6) is removed from the test system, when calculating the test parameters, the short-circuit resistance Rsc and the short-circuit inductance Lsc of the intermediate transformer TM (6) are both set to zero, and the transformation ratio k is set to 1; After the intermediate transformer TM (6) is removed from the test system, when the above test equipment is connected, the centralized parameter simulation line TL (11) originally connected to the low-voltage side Ta terminal of the intermediate transformer TM (6) is directly connected to the position where the high-voltage side TA terminal was originally connected; the head end P of the superconducting current limiter SFCL (8) under test originally connected to the low-voltage side Tx terminal of the intermediate transformer TM (6) is directly connected to the position where the high-voltage side TX terminal was originally connected.

3. The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system according to claim 1, characterized in that: The internal components of the tested superconducting current limiter SFCL (8) include: a main circuit current transformer MCT (81), a primary branch current transformer PCT (82), a secondary branch current transformer SCT (83), a primary voltage transformer PPT (84), a double split reactor DSR (85), a secondary voltage transformer SPT (86), a superconducting unit SCU (87), a superconducting unit voltage transformer UPT (88), a first fast switch KA (89), a second fast switch KB (810), a protection switch KP (811), a superconducting current limiter measurement and control protection device CLMCPD (812), a superconducting current limiter measurement signal line CLMSL (813), a superconducting The current limiter control signal line CLCSL (814); wherein, after the head end P of the superconducting current limiter SFCL (8) under test is connected to the main circuit current transformer MCT (81), the main circuit is divided into two branches, the primary side and the secondary side; after the primary winding A1-X1 of the double-split reactor DSR (85) is connected in parallel with the primary voltage transformer PPT (84), the whole is connected in series with the primary branch current transformer PCT (82) to form the primary branch; after the secondary winding A2-X2 of the double-split reactor DSR (85) is connected in parallel with the secondary voltage transformer SPT (86), the superconducting unit SCU (87) is connected in parallel with the superconducting unit voltage transformer UPT (88), according to the secondary branch current transformer SCT ( 83), the secondary winding A2-X2 of the double-split reactor DSR (85) and the secondary voltage transformer SPT (86) parallel module, the second fast switch KB (810), the superconducting unit SCU (87) and the superconducting unit voltage transformer UPT (88) parallel module, and the first fast switch KA (89) are connected in series in sequence to form a secondary branch; after the primary branch and the secondary branch are connected in parallel, they are connected between the main circuit current transformer MCT (81) and the protection switch KP (811), and the protection switch KP (811) is connected to the terminal Q of the superconducting current limiter SFCL (8) under test; the superconducting current limiter measurement and control protection device CLMCPD (812) measures the signal line CLMS of the superconducting current limiter through the superconducting current limiter L (813) is respectively connected to the main circuit current transformer MCT (81), the primary branch current transformer PCT (82), the secondary branch current transformer SCT (83), the primary voltage transformer PPT (84), the secondary voltage transformer SPT (86), the superconducting unit voltage transformer UPT (88), the oil level thermometer of the double split reactor DSR (85), and the liquid level thermometer of the superconducting unit SCU (87); the superconducting current limiter measurement and control protection device CLMCPD (812) is respectively connected to the first fast switch KA (89), the second fast switch KB (810), and the protection switch KP (811) through the superconducting current limiter control signal line CLCSL (814).

4. The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system according to claim 1, characterized in that: The simulated load LD (10) comprises: a load resistor R (101) and a load reactance X (102); wherein the load resistor R (101) and the load reactance X (102) are connected in series, connected in parallel with a single-phase grounding circuit breaker ECB (9), and then connected together between a terminal Q of a superconducting current limiter SFCL (8) under test and a simulated line TL (11); according to different selected steady-state power factor angles φ, the load reactance X (102) may be a load inductance L or a load capacitance C; the resistance value R of the load resistor R (101) = the system steady-state power factor cosφ*Ue / (k*Ie)-Rln selected according to test requirements, and its capacity must meet P R ≥Ie 2 *R, otherwise the selected power factor should be reduced until the load resistance capacity meets the requirements; the load reactance X = sinφ*Ue / (k*Ie)-2πf*Lln, when X>0, the load reactance X(102) is an inductor, the load inductance L=X / 2πf, when X<0, the load reactance X(102) is a capacitor, the load capacitance C=1 / (2πf*|X|).

5. The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system according to claim 1, characterized in that: The centralized parameter simulation circuit TL (11) comprises: an adjustable resistor RT (111) and an adjustable reactor LT (112); wherein the adjustable resistor R0 (111) and the adjustable reactor L0 (112) are connected in series and connected between the Ta terminal of the intermediate transformer TM (6) and the simulated load LD (10); the adjustable resistor R0 (111) is a non-inductive resistor, and its resistance value R0=Rln-Rsc / k 2 , its rated capacity P R0 ≥Ie 2 *R0; the adjustable reactor L0 (112) is a low-resistance air-core reactor, and its inductance value L0 = Lln-Lsc / k 2 .

6. The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system according to claim 1, characterized in that: The grid-connected test transformer T(1) is a three-phase power transformer with a low-voltage side rated voltage of 10.5 kV that can be connected to the actual power system, and its rated capacity Qe≥3*Qst, and its short-circuit test capacity Qsc≥2*Qtr, wherein the steady-state current test capacity Qst=√3*grid-connected test voltage Ue*steady-state current Ie selected according to test requirements, and the fault transient current test capacity Qtr=√3*grid-connected test voltage Ue*short-circuit fault current Isc selected according to test requirements.

7. The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system according to claim 1, characterized in that: A test method for a 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system, including a test operation method, a test protection control logic, and a test result determination method; the test operation method includes a test system initial state and test operation steps; The initial state of the test system is that the closing circuit breaker CCB (4), the single-phase earthing circuit breaker ECB (9), and the isolating switch DS (5) are all in the open state, and the protection circuit breaker PCB (2), the single-phase switching circuit breaker SCB (7), the earthing switch ES (12), the first fast switch KA (89), the second fast switch KB (810) and the protection switch KP (811) are all in the closed state; The test operation steps include: a) Disconnect the earthing switch ES (12); b) Close the disconnector DS (5); c) Close the circuit breaker CCB (4) and the test system starts to operate under power; d) After the tested superconducting current limiter SFCL (8) operates stably at the test voltage of 10 kV for the first pre-test time Tp1, the single-phase grounding circuit breaker ECB (9) is closed, the simulated load LD (10) is short-circuited, and the original short-circuit fault current Isc0 is generated in the test circuit; e) collecting the measured waveform of the original short-circuit fault current Isc0 before connecting to the superconducting current limiter SFCL (8) under test through the current transformer CT (3); f) After the single-phase earthing circuit breaker ECB (9) remains in the closed state for the first transient test time Tt1, a trip signal is issued to disconnect it; g) After the superconducting current limiter SFCL (8) under test operates stably at the test voltage of 10 kV for a second pre-test time Tp2, the single-phase switching circuit breaker SCB (7) is disconnected, and the superconducting current limiter SFCL (8) under test is connected to the current test circuit; h) After the predetermined steady-state current Ie is stably operated for a steady-state test time Ts, the single-phase grounding circuit breaker ECB (9) is closed again, and an actual short-circuit fault current Isc1 is generated in the circuit where the superconducting current limiter SFCL (8) under test is located; i) after the superconducting current limiter measurement and control protection device CLMCPD (812) automatically detects the superconducting unit SCU (87) quench signal, it sends a trip control signal to disconnect the first fast switch KA (89) and the second fast switch KB (810); j) After the single-phase grounding circuit breaker ECB (9) remains in the closed state for the second transient test time Tt2, the protection switch KP (811) is opened; k) collecting and recording the current waveform flowing through the superconducting current limiter SFCL (8) under test from step g to step j through the main circuit current transformer MCT (81); l) Disconnect the closing circuit breaker CCB (4); m) Close the earthing switch ES (12) to fully discharge the test system; n) Close the single-phase switching circuit breaker SCB (7); o) closing the first fast switch KA (89), the second fast switch KB (810) and the protection switch KP (811); p) Disconnect the single-phase grounding circuit breaker ECB (9); q) Disconnect the isolating switch DS (5) and the fault current limiting test is completed.

8. The 10kV magnetic bias superconducting current limiter grid-connected fault current limiting test system according to claim 7, characterized in that: The test protection control logic includes: Ⅰ) When the instantaneous value of the current detected by the current transformer CT (3) exceeds the protection setting value I of the measurement and control protection device MCPD (13) P When the test circuit is tripped, the measuring and controlling protection device MCPD (13) sends a tripping signal to the protection circuit breaker PCB (2), and the test circuit is automatically cut off; II) When the instantaneous value of the current of the superconducting current limiter SFCL (8) under test measured by the main circuit current transformer MCT (81) is higher than the first protection setting value I A When the main circuit overcurrent alarm is issued, the protection switch KP (811) and the closing circuit breaker CCB (4) trip signal is issued; III) When the top oil temperature of the double split reactor DSR (85) exceeds the standard, a temperature alarm of the double split reactor DSR (85) and a tripping signal of the protection switch KP (811) and the closing circuit breaker CCB (4) are issued; IV) When the instantaneous value of the superconducting current limiting branch current measured by the secondary branch current transformer SCT (83) is higher than the second protection setting value I B When the superconducting current limiting branch overcurrent alarm is issued and the first fast switch KA (89) and the second fast switch KB (810) trip signal is issued; V) When the temperature indicated by the liquid nitrogen level thermometer in the superconducting unit SCU (87) dewar is higher than the nitrogen liquefaction temperature, a low liquid level alarm and a trip signal of the first fast switch KA (89) and the second fast switch KB (810) are issued; The test result determination method is: when the grid-connected fault current limiting test meets the following conditions at the same time, it is determined that "the test result is qualified, and the tested magnetic bias superconducting current limiter passes the fault current limiting test under the 10kV grid-connected condition", and the conditions include: ⅰ) The test system has no protection action or abnormal alarm signal; ii) There is no abnormal discharge or insulation breakdown in the tested superconducting current limiter SFCL(8); iii) All component voltages and branch currents in the tested superconducting current limiter SFCL (8) are within normal and reasonable ranges; iv) the superconducting current limiter measurement and control protection device CLMCPD (812) reliably detects the superconducting unit SCU (87) superconducting loss signal, and sends a trip control signal to reliably disconnect the first fast switch KA (89) and the second fast switch KB (810); v) Before executing step j, the protection switch KP (811) is reliably kept in the closed state; ⅵ) The top oil temperature of the double split reactor DSR (85) is not abnormally high; ⅶ) The liquid nitrogen level in the superconducting unit SCU (87) dewar is not abnormally low; (viii) The current limiting rates of the tested superconducting current limiter SFCL (8) in the first current limiting stage, i.e., the superconducting unit quench current limiting stage, and the second current limiting stage, i.e., the double-split reactor unbalanced current limiting stage, are calculated using the measured current waveform. The values ​​are both within a reasonable range and are basically consistent with the theoretical calculation results, wherein the first current limiting rate Rcl1 = (1-actual short-circuit fault current Isc11 in the first current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%, and the second current limiting rate Rcl2 = (1-actual short-circuit fault current Isc12 in the second current limiting stage / original short-circuit fault current Isc0 / transformation ratio k)*100%.