New anti-blowout anchoring integrated tool

By designing anti-rotation anchors, hand-loss packers, pressure relief channels and gravity shutters in the integrated anti-rotation anchor tool, the anti-rotation effect in existing tools is not ideal, incomplete sealing of the rubber cylinder and leakage. The problem of insufficient design of the pressing part achieves higher sealing effect and safety.

CN111677474BActive Publication Date: 2024-11-01LIAONING XINHUA INSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010517299.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-09
Publication Date
2024-11-01
Estimated Expiration
2040-06-09

AI Technical Summary

Technical Problem

The existing anti-blast anchor integrated tools have problems such as unsatisfactory anti-rotation effect of the flip-board anchor, incomplete sealing of the rubber cylinder, weak spring structure, and insufficient design of the pressure relief part during use, resulting in tool failure and safety hazards.

Method used

A new anti-blast anchor integrated tool was designed, using anti-rotation anchors, hand-loss packers, pressure relief channels and gravity shutters, including enhanced spring thickness, improved tile structure, pressure relief channels and float switches , ensure sealing effect and safety.

Benefits of technology

Achieve more ideal anti-rotation effect, more complete rubber cylinder seal, avoid the inability to recover the tiles and the pressure relief function of the pressure relief channel, improve the stability and safety of the tool, and avoid the rushing of the pipe column during operation. danger.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111677474B_ABST
    Figure CN111677474B_ABST
Patent Text Reader

Abstract

The present invention relates to a new type of anti-blowout anchoring integrated tool, including an anti-rotation part, a throw-away part, a pressure relief channel part, an anchoring part, a gravity valve part and a through rod, wherein the anchoring part includes a support slip; the upper joint of the anti-rotation anchor is connected to the lower end of the screw pump; the lower joint of the anti-rotation anchor is connected to the screen tube, and the lower end of the screen tube is connected to the connecting joint of the throw-away packer; the lower end of the connecting rod is connected to the through rod; the upper joint of the pressure relief channel is connected to the lower joint of the throw-away packer; the upper joint of the support slip is connected to the lower joint of the pressure relief channel; the upper joint of the gravity valve is connected to the center pipe of the support slip; and the lower joint of the gravity valve is connected to the oil pipe through a thread. The anti-rotation effect of the device is more ideal, and the hand packer is prevented from failing due to insufficient meshing force after long-term use. The pressure relief channel part can avoid the danger of the pipe column running up during operation, and prevent the float switch from failing due to the accumulation of well sediment after fracturing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of screw pumps and oil pumps, and in particular to a novel anti-blowout anchoring integrated tool. Background Art

[0002] At present, the plugging pipe and production pipe need to be pulled up and down twice in succession, which increases the operation time and construction cost. Although the existing anti-blowout anchoring integrated tool can realize the pipe downhole in one trip, the anti-rotation effect of the flap anchor is not ideal in actual use. When the old-style hand-free packer is released, the slip is anchored first, which may lead to incomplete sealing of the rubber cylinder seat, and the structure of the float switch cannot pass the test instrument.

[0003] The main problems include the following aspects: (1) When the flap anchor is used to prevent reverse rotation in screw pump wells, the tool often fails due to the breakage of the leaf spring; (2) The structure of the existing drop-out packer is to compress the rubber cylinder seat seal first and then compress the slip anchor. Therefore, after the rubber cylinder seat is completely sealed, it will continue to move down a certain distance in the casing. This release method will cause certain wear on the rubber cylinder and affect the sealing effect; (3) The existing retaining spring structure is relatively weak. When used in the well for a long time, due to well fluid corrosion, vibration and other reasons, the one-way tooth meshing will loosen, causing the packer to be released prematurely; (4) The existing retaining spring seat structure ( Fig. 9 ) When the hand-free packer is released, the release load will be transferred from the retaining spring to the retaining spring seat and then to the release pin. If the release load is too large, the release pin will be directly sheared off during release, causing the retaining spring to fail and fail to seal. In addition, the installation of the release pin on the retaining spring seat will limit the size of the release pin, resulting in insufficient thread length of the release pin, which is not stable and reliable enough; (5) The anti-top slip structure used in the existing hand-free packer is a track type ( Fig.11 ), after long-term use, this structure will get stuck in the track due to well fluid corrosion, scaling, etc., resulting in the inability to extend or retract the slips; (6) The existing integrated tool structure does not have a pressure relief part. If the anti-top-up slip fails and the lost packer is pushed up, the lower pressure cannot be released, which is prone to dangerous accidents; (7) The existing float switch structure has a solid float inside, which cannot pass the test instrument and will cause the float switch to fail when there is a lot of sand in the fracturing well.

[0004] In view of this situation, the present invention designs a new type of anti-blowout and anchoring integrated tool, which can effectively solve many disadvantages of the original tool in use. Summary of the invention

[0005] In order to make up for the deficiencies of the above-mentioned prior art, the purpose of the present invention is to propose a new type of integrated blowout prevention and anchoring tool, which has a more ideal anti-rotation effect and a more complete rubber cylinder sealing, and can prevent the hand sealer from failing due to insufficient engagement force after long-term use. It can effectively avoid the failure caused by premature shearing of the unsealing pin during release, and avoid the situation where the slip cannot be retracted during unsealing. The pressure relief channel part prevents the lost part from continuing to push up, and avoids the danger of the pipe string running up during operation; the gravity valve can prevent the accumulation of sand in the well after fracturing and cause the float switch to fail.

[0006] The object of the present invention is achieved through the following technical scheme: a new type of anti-blowout and anchoring integrated tool, including an anti-rotation part, a throw-away part, a pressure relief channel part, an anchoring part, a gravity valve part, a through rod, and a screen pipe, wherein the anchoring part includes a supporting slip; the technical key points are:

[0007] The anti-rotation part includes an anti-rotation anchor, which includes an upper joint, a center pipe, a slip, a fixing ring, a spacer ring, a retaining ring, a friction block, a friction body, a spring, a guide pin, a guide ring, a release pin, a guide sleeve, a retaining spring, a connecting sleeve, an anti-blowout pin, an anti-blowout plug and a lower joint;

[0008] The lower end of the upper joint is connected to the center tube, and the outer wall of the lower part of the upper joint is a conical surface, which is used for slip anchoring; the slip and the friction block are fixed to the friction body by a fixing ring, a spacer ring, a retaining ring, a spring and a guide sleeve. The center tube is provided with a track groove and is divided into a long track and a short track, and the guide pin is placed in the track groove of the center tube; the lower end of the center tube is provided with a pin groove, and the bottom of the release pin is placed in the pin groove at the lower end of the center tube; the inner side of the guide sleeve has a guide ring, and the guide ring is used to fix the guide pin; the lower end of the center tube is provided with a retaining ring groove, and the retaining ring is placed in the retaining ring groove at the lower end of the center tube, the connecting sleeve is placed at the lower end of the guide sleeve, and the connecting sleeve is connected to the lower joint; the outside of the retaining ring is provided with a one-way tooth, and the inside of the front end of the connecting sleeve is provided with a one-way tooth; the one-way tooth outside the retaining ring can mesh with the one-way tooth inside the connecting sleeve; a blowout prevention plug is installed inside the lower end of the center tube and is fixed to the center tube by a blowout prevention pin;

[0009] The release part includes a release packer, which includes a connecting joint, a dead plug, a positioning ring, a salvage joint, a connecting rod, a release sleeve, an upper center pipe, an outer sleeve, a retaining ring, an unsealing pin, a retaining spring, a release pin, a connecting sleeve, two side rubber tubes, a middle rubber tube, two gaskets, a bushing, an upper cone, a shear pin, a guide pin, a spring, a slip, a slip sleeve, a lower joint and a top ring;

[0010] The connecting joint is connected to the connecting rod and inserted into the salvage joint, and the positioning ring is connected to the connecting joint; the dead plug is arranged in the connecting joint; the lower part of the salvage joint is connected to the release sleeve, the outer sleeve and the connecting sleeve in sequence; the upper center tube is arranged in the gap between the outer sleeve and the connecting rod; the front end of the upper center tube is divided into petals, and the top ring is connected and fixed to the upper center tube by threading; the retaining ring is fixed to the upper center tube by an unsealing pin; the retaining ring is installed between the retaining ring and the top ring; the bushing sleeve is installed on the upper center tube and contacts with the end face of the top ring; the connecting sleeve is connected by The release pin is fixed on the bushing; the two side rubber tubes, the middle rubber tube and the two gaskets are all sleeved on the bushing; the middle rubber tube is placed between the two side rubber tubes; the two gaskets are respectively placed between the side rubber tube and the middle rubber tube; the upper cone is sleeved on the upper center tube, connected to the end of the bushing by threads and fixed to the upper center tube by shortening pins; the spring and slip are installed at the slip sleeve window and sleeved on the upper cone, fixed to the upper cone by guide pins, and the slip contacts the inclined surface of the upper cone; the lower joint is connected to the upper center tube, and the lower joint contacts the inclined surface of the slip;

[0011] The pressure relief channel part includes a pressure relief channel, and the pressure relief channel includes an upper joint, a central tube, a copper gasket, and a lower joint; the upper joint is sleeved with the central tube and fixedly connected by a pin; the central tube is provided with an opening, and the lower joint is connected with the central tube; the copper gasket is sleeved outside the central tube and fixed between the upper joint and the lower joint;

[0012] The anchoring part includes a support slip, the support slip, the central tube of the support slip is provided with a track groove which is the same as the anti-rotation anchor, and the guide pin I of the support slip 4 is placed in the track groove;

[0013] The gravity valve part includes a gravity valve, which includes an upper joint, a central tube, an outer tube, a counterweight block I, a counterweight block II, a fixed block, a baffle, a pin shaft, a gear bar, a screw, and a lower joint; the central tube is inserted into the inner hole of the upper joint and welded; the fixed block is welded to the central tube; the baffle is welded to the gear bar and connected to the fixed block through a pin shaft; a screw is installed on the baffle at a position away from the pin shaft; the counterweight block I and the counterweight block II are welded together and placed between the central tube and the outer tube, and the counterweight block II is provided with a rack and meshes with the gear bar teeth; the outer tube is sleeved on the outside of the central tube, the counterweight block I and the counterweight block II, and is connected to the upper joint; the lower joint is connected to the lower end of the outer tube.

[0014] Furthermore, the upper joint of the anti-rotation anchor is connected to the lower end of the screw pump; the lower joint of the anti-rotation anchor is connected to the screen tube, and the lower end of the screen tube is connected to the connecting joint of the release packer; the lower end of the connecting rod is connected to the through rod; the upper joint of the pressure relief channel is connected to the lower joint of the release packer; the upper joint of the supporting slip is connected to the lower joint of the pressure relief channel; the upper joint of the gravity valve is connected to the center tube of the supporting slip; and the lower joint of the gravity valve is connected to the oil pipe through a thread.

[0015] Furthermore, the supporting cava includes an upper joint, a center tube, a cava I, a fixing ring I, a retaining ring I, a spacer ring I, a friction block I, a spring I, a friction body I, a guide sleeve I, and a guide pin I; the outer wall of the upper joint is a conical surface, which is used for anchoring the cava; the center is provided with a track groove identical to the anti-rotation anchor, and the guide pin I is placed in the track groove; the cava I and the friction block I are fixed on the friction body I through the fixing ring I, the retaining ring I, the spacer ring I, the spring I, and the guide sleeve I.

[0016] Furthermore, the thickness of the retaining spring II is 4.5 mm, the one-way tooth depth is 1.2 mm, the tooth pitch is 3 mm, and the lower end of the outer sleeve has one-way teeth with the same size and reverse tooth shape as the retaining spring II.

[0017] Beneficial effects of the present invention:

[0018] 1. The anti-rotation anchor 1 is used to replace the flap anchor, and the anti-rotation effect is more ideal. After verification by on-site batch tests, the anti-rotation success rate of the screw pump can reach 100%, and the release pin 1-12 structure is designed to be used together with the support slips at the same time in the well without affecting each other.

[0019] 2. Use the bushing 2-17 of the drop packer 2 in conjunction with the shear pin 2-19 ( Figure 7 ), the order of anchoring the slip 2-22 first, and then sealing the side rubber cylinder 2-14 and the middle rubber cylinder 2-15 can make the rubber cylinder seal more completely, and there is no displacement of the rubber cylinder after sealing, which effectively protects the rubber cylinder and has a better sealing effect.

[0020] 3. Replace the retaining spring Ⅱ2-11 ( Figure 8 ) The thickness is increased from 3mm to 4.5mm, the one-way tooth depth is increased from 0.7mm to 1.2mm, and the tooth pitch is increased from 2mm to 3mm. At the same time, the interior of the outer sleeve 2-8 has a reverse tooth shape with the same size as the retaining spring II 2-11. After the release of the drop-out packer 2 is completed, the meshing force of the retaining spring II 2-11 and the outer sleeve 2-8 is multiplied, which can effectively prevent failure due to insufficient meshing force after long-term use.

[0021] 4. The retaining ring seat of the original drop packer is cancelled and replaced by retaining ring 2-9 and top ring 2-26 ( Fig.10), when the release packer 2 is released, the impact force of the release load on the retaining ring II 2-11 is completely transmitted to the top ring 2-26, preventing the unsealing pin 2-10 from bearing the load. This can effectively prevent the unsealing pin 2-10 from being sheared off in advance and causing failure during release. Moreover, the unsealing pin 2-10 is installed on the retaining ring 2-9, and there is enough space to lengthen the thread length of the unsealing pin 2-10, which is more stable and reliable.

[0022] 5. The anti-top slip 2-22 structure of the drop packer 2 is now changed to a window-type structure ( Fig.12 ), which can avoid the situation where the Kava cannot be retrieved when unsealed.

[0023] 6. A pressure relief channel is provided, wherein the opening of the center pipe 3-3 can connect the oil pipe with the casing during salvage, and discharge the liquid in the oil pipe into the annulus of the casing to prevent liquid from leaking out of the oil pipe. Moreover, during secondary operation, if the anti-top-up slip 2-22 fails and causes the lost part to move upward, the upper joint 3-1 of the pressure relief channel 3 will move upward at the same time, and the opening position of the center pipe 3-3 can also be vacated to release the bottom hole pressure, thereby realizing the pressure relief function, preventing the lost part from continuing to top up, and avoiding the danger of the pipe string running up during operation.

[0024] 7. The gravity valve 5 is used to replace the float switch, the tool length is shortened, the structure is simpler, and the sealing function of the baffle 5-7 and the central tube 5-2 is realized by relying on the gravity of the counterweight block I 5-4 and the counterweight block II 5-5, which is more effective and reliable. The baffle 5-7 structure can prevent the failure of the float switch caused by the accumulation of sediment in the well after fracturing, and when the gravity valve 5 is used in conjunction with the hollow through rod 6, it can be used for annular test wells, and the test instrument can pass through the hollow through rod 6. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic structural diagram of the anti-rotation part (anti-rotation anchor 1) of the present invention;

[0026] Figure 2 It is a schematic structural diagram of the release part (release packer 2) of the present invention;

[0027] Figure 3 It is a schematic structural diagram of the pressure relief channel part (pressure relief channel 3) of the present invention;

[0028] Figure 4 It is a schematic diagram of the structure of the anchoring part (supporting slip 4) of the present invention;

[0029] Figure 5 It is a structural schematic diagram of the gravity valve part (gravity valve 5) of the present invention;

[0030] Figure 6 It is a schematic structural diagram of the through rod part (through rod 6) of the present invention;

[0031] Figure 7 It is a schematic diagram of the structure of the bushing 2-17 etc. of the present invention;

[0032] Figure 8 It is a schematic diagram of the structure of the retaining spring Ⅰ1-14 and retaining spring Ⅱ2-11 of the present invention;

[0033] Fig. 9 It is a schematic diagram of the structure of the existing retaining spring seat, etc.;

[0034] Fig.10 It is a schematic diagram of the structure of the retaining ring II 2-11, the retaining ring 2-9, the top ring 2-26, etc. of the present invention;

[0035] Fig.11 It is a schematic diagram of the slip structure of the existing drop packer;

[0036] Fig.12 It is a schematic diagram of the structure of the slip 2-22 and slip sleeve 2-23 of the hand-free packer of the present invention;

[0037] Fig.13 It is a schematic diagram of the tool connection of the present invention (split);

[0038] Fig.14 It is a schematic diagram of the tool connection of the present invention (overall).

[0039] Figure 1-Figure 14The names of the structures are: anti-rotation anchor 1, upper joint 1-1, center pipe 1-2, slip 1-3, fixing ring 1-4, spacer ring 1-5, retaining ring 1-6, friction block 1-7, friction body 1-8, spring 1-9, guide pin 1-10, guide ring 1-11, release pin 1-12, guide sleeve 1-13, retaining spring Ⅰ 1-14, connecting sleeve 1-15, anti-blowout pin 1-16, anti-blowout plug 1-17, lower joint 1-18 track Groove Ⅰ 1-19, hand-free packer 2, connecting joint 2-1, dead plug 2-2, positioning ring 2-3, salvage joint 2-4, connecting rod 2-5, release sleeve 2-6, upper center pipe 2-7, outer sleeve 2-8, retaining ring 2-9, unsealing pin 2-10, retaining ring Ⅱ 2-11, release pin 2-12, connecting sleeve 2-13, two side rubber tubes 2-14, middle rubber tube 2-15, two gaskets 2-16, bushing 2-17, upper cone 2-1 8, shortening pin 2-19, guide pin 2-20, spring 2-21, slip 2-22, slip sleeve 2-23, locking nut 2-24, lower joint 2-25, top ring 2-26, pressure relief channel 3, upper joint 3-1, pin 3-2, center pipe 3-3, copper gasket 3-4, lower joint 3-5; opening 3-6, support slip 4, upper joint 4-1, center pipe 4-2, slip I 4-3, fixing ring I 4-4, retaining ring I 4 -5, spacer ring Ⅰ4-6, friction block Ⅰ4-7, spring Ⅰ4-8, friction body Ⅰ4-9, guide sleeve Ⅰ4-10, guide pin Ⅰ4-11, track groove Ⅱ4-12; gravity valve 5, upper joint 5-1, center tube 5-2, outer tube 5-3, counterweight block Ⅰ5-4, counterweight block Ⅱ5-5, fixed block 5-6, baffle 5-7, pin shaft 5-8, gear bar 5-9, screw 5-10, lower joint 5-11, through rod 6, screen tube 7. DETAILED DESCRIPTION

[0040] The specific structure of this example is: a new type of anti-blowout anchoring integrated tool includes an anti-rotation part, a throw-away part, a pressure relief channel part, an anchoring part, a gravity valve part, a through rod 6, a screen tube 7, and the anchoring part includes a supporting slip 4;

[0041] The anti-rotation part includes an anti-rotation anchor 1, which includes an upper joint 1-1, a center pipe 1-2, a slip 1-3, a fixing ring 1-4, a spacer ring 1-5, a retaining ring 1-6, a friction block 1-7, a friction body 1-8, a spring 1-9, a guide pin 1-10, a guide ring 1-11, a release pin 1-12, a guide sleeve 1-13, a retaining ring Ⅰ 1-14, a connecting sleeve 1-15, an anti-blowout pin 1-16, an anti-blowout plug 1-17 and a lower joint 1-18;

[0042] The upper end of the upper joint 1-1 is connected to the lower end of the screw pump through a thread, and the lower end of the upper joint 1-1 is connected to the central pipe 1-2 through a thread. The outer wall of the lower part of the upper joint 1-1 is a conical surface, and the conical surface is used for anchoring the slip 1-3;

[0043] The slip 1-3 and the friction block 1-7 are fixed on the friction body 1-8 through a fixing ring 1-4, a spacer ring 1-5, a retaining ring 1-6, a spring 1-9 and a guide sleeve 1-13.

[0044] The central tube 1-2 is provided with a track groove Ⅰ1-19 and is divided into a long track and a short track, and the bottom end of the guide pin 1-10 is placed in the track groove Ⅰ1-19 of the central tube 1-2; the lower end of the central tube 1-2 is provided with a pin groove, and the bottom of the release pin 1-12 is placed in the pin groove at the lower end of the central tube 1-2, which is used to fix the friction body 1-8 through the release pin 1-12 when going down the well;

[0045] The guide sleeve 1-13 has a guide ring 1-11 inside, and the guide ring 1-11 is used to stabilize the guide pin 1-10. The guide pin 1-10 moves along the track groove on the center pipe 1-2 to control the setting and unsealing of the slip 1-3;

[0046] The lower end of the central tube 1-2 is provided with a retaining ring groove, the retaining ring I1-14 is placed in the retaining ring groove at the lower end of the central tube 1-2, the connecting sleeve 1-15 is placed at the lower end of the guide sleeve 1-13, and the connecting sleeve 1-15 is connected to the lower joint 1-18;

[0047] The outer side of the said clamping spring Ⅰ1-14 is provided with a one-way tooth, and the inner side of the front end of the said connecting sleeve 1-15 is provided with a one-way tooth; the one-way tooth on the outer side of the said clamping spring Ⅰ1-14 can mesh with the one-way tooth inside the connecting sleeve 1-15;

[0048] When the tool is released, the center tube 1-2 drives the retaining spring Ⅰ1-14 to move downward, and the one-way teeth of the retaining spring Ⅰ1-14 mesh with the one-way teeth of the connecting sleeve 1-15, thereby fixing the position of the center tube 1-2 and the connecting sleeve 1-15;

[0049] A blowout prevention plug 1-17 is installed inside the lower end of the central pipe 1-2 and fixed on the central pipe 1-2 by a blowout prevention pin 1-16. The sealing ring between the blowout prevention plug 1-17 and the central pipe 1-2 realizes the blowout prevention function when going down the well. After the release is completed, the blowout prevention pin 1-16 can be cut off by pressing 5MPa into the oil pipe, opening the channel in the oil pipe, and the blowout prevention plug 1-17 falls onto the dead plug 2-2 of the drop packer 2 described below;

[0050] The upper end of the lower joint 1-18 is connected to the connecting sleeve 1-15 through a thread, and a locking screw is installed at the threaded connection;

[0051] The release part includes a release packer 2, and the release packer 2 includes a connecting joint 2-1, a dead plug 2-2, a positioning ring 2-3, a salvage joint 2-4, a connecting rod 2-5, a release sleeve 2-6, an upper center pipe 2-7, an outer sleeve 2-8, a retaining ring 2-9, an unsealing pin 2-10, a retaining spring II 2-11, a release pin 2-12, a connecting sleeve 2-13, two side rubber tubes 2-14, a middle rubber tube 2-15, two gaskets 2-16, a bushing 2-17, an upper cone 2-18, a shortening pin 2-19, a guide pin 2-20, a spring 2-21, a slip 2-22, a slip sleeve 2-23, a locking nut 2-24, a lower joint 2-25 and a top ring 2-26;

[0052] The connecting joint 2-1 is connected to the connecting rod 2-5 by threads and inserted into the salvage joint 2-4, and the positioning ring 2-3 is connected to the connecting joint 2-1 by threads; the dead plug 2-2 is arranged in the connecting joint 2-1; the lower part of the salvage joint 2-4 is connected to the release sleeve 2-6, the outer sleeve 2-8 and the connecting sleeve 2-13 by threads in sequence; an upper center pipe 2-7 is arranged in the gap between the outer sleeve 2-8 and the connecting rod 2-5; the front end of the upper center pipe 2-7 is split, and the top ring 2-26 is connected and fixed to the upper center pipe 2-7 by threads; the retaining ring 2-9 is fixed to the upper center pipe 2-7 by the unsealing pin 2-10; the retaining ring II 2-11 is installed between the retaining ring 2-9 and the top ring 2-26; the bushing 2-17 is installed on the upper center pipe 2-7 and contacts with the end face of the top ring 2-26; the connecting sleeve 2-13 is fixed to the bushing 2-17 by the release pin 2-12;

[0053] The thickness of the circlip II 2-11 is 4.5 mm, the one-way tooth depth is 1.2 mm, and the tooth pitch is 3 mm. At the same time, the lower end of the outer sleeve 2-8 has one-way teeth with the same size and reverse tooth shape as the circlip II 2-11;

[0054] The side rubber tubes 2-14 are two, one is an upper tube and the other is a lower tube. The middle rubber tube 2-15 is placed between the two side rubber tubes 2-14. The two side rubber tubes 2-14, the middle rubber tube 2-15 and the two gaskets 2-16 are all mounted on the bushing 2-17.

[0055] The upper rubber cylinder 2-14 contacts the end face of the connecting sleeve 2-13, the other end face of the side rubber cylinder 2-14 contacts the gasket 2-16, the other end face of the gasket 2-16 contacts the middle rubber cylinder 2-15, the other end face of the middle rubber cylinder 2-15 contacts the gasket 2-16, and the other end face of the gasket 2-16 contacts the lower rubber cylinder 2-14;

[0056] The upper cone 2-18 is sleeved on the upper center tube 2-7, connected to the end of the bushing 2-17 by threads and fixed to the upper center tube 2-7 by shortening pins 2-19; ​​the three groups of springs 2-21 and slips 2-22 are installed at the window opening of the slip sleeve 2-23 and sleeved on the upper cone 2-18, fixed to the upper cone 2-18 by guide pins 2-20, at which time the slips 2-22 are in contact with the inclined surface of the upper cone 2-18; the lower joint 2-25 is connected to the upper center tube 2-7 by threads and fixed with a top screw and a locking nut 2-24 at the threaded connection, at which time the lower joint 2-25 is in contact with the inclined surface of the slip 2-22.

[0057] The pressure relief channel part includes a pressure relief channel 3, and the pressure relief channel 3 includes an upper joint 3-1, a pin 3-2, a center tube 3-3, a copper gasket 3-4, and a lower joint 3-5; the upper joint 3-1 is sleeved together with the center tube 3-3 and fixed together by the pin 3-2; the upper joint 3-1 and the center tube 3-3 are both provided with a key slot, and torque can be transmitted downward when connected together; the center tube 3-3 is provided with an opening 3-6, and the lower joint 3-5 is connected to the center tube 3-3 by a thread; the copper gasket 3-4 is sleeved on the outside of the center tube 3-3 and fixed between the upper joint 3-1 and the lower joint 3-5. When the tool is released, the pin 3-2 is cut off, and the upper joint 3-1 is displaced downward by the weight of the pipe column and the release load, thereby blocking the opening of the center tube 3-3, and at the same time, the copper gasket 3-4 can be squeezed between the upper joint 3-1 and the lower joint 3-5 to achieve a sealing function;

[0058] The anchoring part includes a support slip 4, and the support slip 4 includes an upper joint 4-1, a center pipe 4-2, a slip I 4-3, a fixing ring I 4-4, a retaining ring I 4-5, a spacer ring I 4-6, a friction block I 4-7, a spring I 4-8, a friction body I 4-9, a guide sleeve I 4-10, and a guide pin I 4-11;

[0059] The outer wall of the upper joint 4-1 is a conical surface, which is used for anchoring the slip 4-3; the central tube 4-2 is provided with a track groove II 4-12 which is the same as the anti-rotation anchor 1, and the bottom end of the guide pin I 4-11 is placed in the track groove II 4-12;

[0060] The slip Ⅰ4-3 and the friction block Ⅰ4-7 are fixed on the friction body Ⅰ4-9 through a fixing ring Ⅰ4-4, a retaining ring Ⅰ4-5, a spacer ring Ⅰ4-6, a spring Ⅰ4-8, and a guide sleeve Ⅰ4-10;

[0061] The central tube 4-2 is provided with the same track groove as the anti-rotation anchor 1. To prevent two tools from being anchored at the same time, a pin groove is designed at the lower end of the central tube 1-2 of the anti-rotation anchor 1, which is used to fix the friction body 1-8 by releasing the pin 1-12 when going down the well, so that the support slip 4 can be anchored first, and then the release pin 1-12 can be cut off by pressing down the oil pipe, and then the guide pin 1-10 can enter the guide rail of the central tube 1-2 to change the track normally and anchor;

[0062] The gravity valve part includes a gravity valve 5, and the gravity valve 5 includes an upper joint 5-1, a central tube 5-2, an outer tube 5-3, a counterweight block I 5-4, a counterweight block II 5-5, a fixed block 5-6, a baffle 5-7, a pin 5-8, a gear bar 5-9, a screw 5-10, and a lower joint 5-11;

[0063] The central tube 5-2 is inserted into the inner hole of the upper joint 5-1 and the two parts are welded together; the fixed block 5-6 is provided with a pin hole and is welded to the central tube 5-2; the baffle 5-7 is welded to the gear bar 5-9 and connected to the fixed block 5-6 through the pin 5-8;

[0064] In order to prevent the pin shaft 5-8 from being broken due to excessive shear force, a screw 5-10 is installed on the baffle 5-7 at a position away from the pin shaft 5-8, so that the through rod 6 can first contact the screw 5-10 when poking the baffle 5-7, thereby reducing the shear force on the pin shaft 5-8 and achieving the purpose of protecting the pin shaft 5-8;

[0065] The counterweight block I5-4 is welded with the counterweight block II5-5, and is placed under the inner diameter constraint of the outer tube 5-3, and fixed in the annular space between the central tube 5-2 and the outer tube 5-3. The counterweight block II5-5 is provided with a rack and meshes with the gear bar 5-9; the outer tube 5-3 is sleeved on the outside of the central tube 5-2, the counterweight block I5-4 and the counterweight block II5-5, and is connected to the upper joint 5-1 through threads; the lower joint 5-11 is connected to the lower end of the outer tube 5-3 through threads, and the eccentricity is consistent with the eccentricity of the upper joint 5-1;

[0066] The connection method of the new blowout prevention and anchoring integrated tool is as follows:

[0067] See Fig.13The upper joint 1-1 of the anti-rotation anchor 1 is connected to the lower end of the screw pump through a thread; the lower joint 1-18 of the anti-rotation anchor 1 is connected to the screen tube 7 through a thread, and the lower end of the screen tube 7 is connected to the connecting joint 2-1 of the release packer 2 through a thread; the lower end of the connecting rod 2-5 is connected to the through rod 6 through a thread; the upper joint 3-1 of the pressure relief channel 3 is connected to the lower joint 2-25 of the release packer 2 through a thread; the upper joint 4-1 of the supporting slip 4 is connected to the lower joint 3-5 of the pressure relief channel 3 through a thread; the upper joint 5-1 of the gravity valve 5 is connected to the central pipe 4-2 of the supporting slip 4 through a thread; the lower joint 5-11 of the gravity valve 5 is connected to the oil pipe through a thread.

[0068] The working principle and application effect of the new anti-blowout anchor integrated tool:

[0069] 1. The upper end of the new blowout prevention and anchoring integrated tool is connected to the lower end of the screw pump through a thread, and the lower end is connected to the oil pipe through a thread. After the connection is completed, it is lowered into the oil well to a pre-designed depth, and the pipe string is lifted up for a distance and then lowered. The anchoring part is anchored on the inner wall of the casing.

[0070] 2. Press down the production string with a certain load, the pin 3-2 of the pressure relief channel is cut off, and the upper joint 3-1 moves downward due to the weight of the string, plugging the opening 3-6 of the center pipe 3-3. At the same time, the copper gasket 3-4 can be squeezed to achieve the sealing function.

[0071] 3. While pressing down the production pipe string, cut off the release pin 1-12 of the anti-rotation part, and the center pipe 1-2 drives the retaining spring Ⅰ1-14 to enter the interior of the connecting sleeve 1-15. The retaining spring Ⅰ1-14 and the one-way teeth of the connecting sleeve 1-15 are engaged and positioned, and the guide pin 1-10 enters the guide rail of the center pipe 1-2, and the rail can be changed and anchored normally.

[0072] 4. Continue to press down the production string, and discard part of the connecting joint 2-1 to drive the positioning ring 2-3, the salvage joint 2-4, the release sleeve 2-6, the outer sleeve 2-8 and the connecting sleeve 2-13 to move downward at the same time. The downward load is transmitted to the bushing 2-17 through the release pin 2-12. The bushing 2-17 drives the side rubber tube 2-14, the gasket 2-16, the middle rubber tube 2-15 and the upper cone 2-18 to move downward at the same time. The downward load is transmitted to the upper center pipe 2-7 through the shortening pin 2-19. When the anchoring mechanism is anchored, the upper center pipe 2-7 is in a fixed state. Therefore, when the downward pressure load is large enough, the weaker shortening pin 2-19 will be cut first, and then the upper The cone 2-18 moves downward to squeeze the cava 2-22, and the cava 2-22 is squeezed out along the window of the cava sleeve 2-23 and anchored on the inner wall of the casing to achieve the anti-top function. After the cava 2-22 is anchored, the downward pressure load will release the pin 2-12 to cut it off. At this time, the connecting sleeve 2-13 continues to move downward to compress the side rubber tube 2-14 and the middle rubber tube 2-15 to complete the rubber tube seat sealing. When the rubber tube seat sealing is completed, the outer sleeve 2-8 has moved downward enough, and the one-way teeth on the outer sleeve 2-8 compress the one-way teeth of the open circular ring retaining spring Ⅱ2-11. Under the action of the expansion elastic force of the retaining spring Ⅱ2-11, the one-way teeth can be ensured to engage with each other and be positioned to prevent the side rubber tube 2-14 and the middle rubber tube 2-15 from rebounding.

[0073] 5. After the release part is released, the release sleeve 2-6 moves downward for a certain distance, and the front end of the petal of the upper center pipe 2-7 is freed from the restraint of the release sleeve 2-6. At this time, the pipe column can be lifted up to bring out the connecting joint 2-1, the positioning ring 2-3, the connecting rod 2-5 and the through rod 6, completing the release action.

[0074] 6. Lift the pipe column again for a distance and lower it, and the anti-rotation anchor 1 is anchored on the inner wall of the casing to realize the anti-rotation function of the screw pump.

[0075] 7. After the sucker rod and the ground drive part are installed, pressurize the oil pipe to cut off the anti-blowout pin 1-16 of the anti-rotation anchor 1, and the anti-blowout live plug 1-17 falls into the dead plug 2-2 of the discarded part to prevent it from falling into the bottom of the artificial well and causing accumulation of fallen objects at the bottom of the well. At this time, conventional oil production operations can be carried out.

[0076] 8. During well repair, the production pipe is lifted, the anti-rotation anchor 1 is unanchored, the through rod 6 is pulled out of the gravity valve part, and the counterweight block I 5-4 and the counterweight block II 5-5 cooperate with the gear transmission under the action of gravity to rotate the baffle 5-7 around the pin shaft 5-8 as the center, and finally contact and seal with the lower end surface of the center pipe 5-2, thereby realizing the anti-blowout function during well repair.

[0077] 9. During the salvage operation, the salvage tool enters the inside of the hand-free packer 2, and after the salvage joint 2-4 is threaded, the pipe column is lifted. The lifting load is transmitted to the retaining ring 2-9 through the retaining spring II 2-11, and then to the unsealing pin 2-10. Since the upper center pipe 2-7 is fixed, the unsealing pin 2-10 can be cut off when the lifting load is large enough. At this time, the salvage joint 2-4, the release sleeve 2-6, the outer sleeve 2-8 and the connecting sleeve 2-13 move upward at the same time to make room. The side rubber tube 2-14, the middle rubber tube 2-15 and the slip 2-22 shrink under the action of the rubber tube rebound force and the spring 2-21 rebound force, and the unsealing is completed. Continue to lift and drive the upper joint 3-1 of the pressure relief channel 3 to move upward, making way for the opening position of the center pipe 3-3, so as to achieve the oil casing connection, and the liquid in the oil pipe can flow into the oil casing annulus to prevent the liquid from flowing out of the oil pipe when the pipe column is lifted. For example, during normal production, the anti-top slip 2-22 of the discarded part fails, causing the discarded part to move upward, and the upper joint 3-1 of the pressure relief channel 3 moves upward at the same time, and the opening position of the center pipe 3-3 can also be vacated to release the bottom hole pressure to achieve the pressure relief function, which can effectively prevent the pipe string from being topped up and avoid the danger of the pipe string running up during operation.

Claims

1. A new type of anti-blowout anchoring integrated tool, comprising an anti-rotation part, a throw-away part, a pressure relief channel part, an anchoring part, a gravity valve part, a through rod, and a screen pipe, wherein the anchoring part comprises a supporting slip; the characteristics are: The anti-rotation part includes an anti-rotation anchor, and the anti-rotation anchor includes an upper joint, a center tube, a slip, a fixed ring, a spacer ring, a retaining ring, a friction block, a friction body, a spring, a guide pin, a guide ring, a release pin, a guide sleeve, a retaining spring, a connecting sleeve, an anti-blowout pin, an anti-blowout plug and a lower joint; the lower end of the upper joint is connected to the center tube, and the outer wall of the lower part of the upper joint is a conical surface, which is used for slip anchoring; the slip and the friction block are fixed to the friction body by a fixed ring, a spacer ring, a retaining ring, a spring and a guide sleeve, the center tube is provided with a track groove and is divided into a long track and a short track, and the guide pin is placed in the track groove of the center tube; The lower end of the center tube is provided with a pin groove, and the bottom of the release pin is placed in the pin groove at the lower end of the center tube; the inner side of the guide sleeve is provided with a guide ring, and the guide ring is used to fix the guide pin; the lower end of the center tube is provided with a retaining ring groove, and the retaining ring is placed in the retaining ring groove at the lower end of the center tube, and the connecting sleeve is placed at the lower end of the guide sleeve, and the connecting sleeve is connected to the lower joint; the outer side of the retaining ring is provided with a one-way tooth, and the inner side of the front end of the connecting sleeve is provided with a one-way tooth; the outer side of the retaining ring can mesh with the one-way tooth inside the connecting sleeve; an anti-blowout plug is installed inside the lower end of the center tube, and is fixed to the center tube by an anti-blowout pin; The throwing-away part includes a hands-free packer, which includes a connecting joint, a dead plug, a positioning ring, a salvage joint, a connecting rod, a release sleeve, an upper center pipe, an outer sleeve, a retaining ring, an unsealing pin, a retaining spring, a release pin, a connecting sleeve, two side rubber tubes, a middle rubber tube, two gaskets, a bushing, an upper cone, a shortening pin, a guide pin, a spring, a slip, a slip sleeve, a lower joint and a top ring; the connecting joint is connected to the connecting rod and inserted into the salvage joint, and the positioning ring is connected to the connecting joint; the dead plug is arranged in the connecting joint; the lower part of the salvage joint is connected to the release sleeve, the outer sleeve and the connecting sleeve in sequence; the upper center pipe is arranged in the gap between the outer sleeve and the connecting rod; the front end of the upper center pipe is divided into petals, and the top ring is connected and fixed to the upper center pipe by threads; the retaining ring is fixed to the upper center pipe by the unsealing pin; The retaining ring is installed between the retaining ring and the top ring; the retaining ring is provided with a one-way tooth on the outside, and the outer sleeve is provided with a one-way tooth on the inside, which can mesh with the one-way tooth of the retaining ring; the bushing is installed on the upper center tube and contacts with the end face of the top ring; the connecting sleeve is fixed to the bushing by a release pin; the two side rubber tubes, the middle rubber tube, and the two gaskets are all sleeved on the bushing; the middle rubber tube is placed between the two side rubber tubes; the two gaskets are respectively placed between the side rubber tube and the middle rubber tube; the upper cone is sleeved on the upper center tube, connected to the end of the bushing by threads and fixed to the upper center tube by shortening pins; the spring and slip are installed at the window of the slip sleeve and sleeved on the upper cone, fixed to the upper cone by a guide pin, and the slip contacts the inclined surface of the upper cone; the lower joint is connected to the upper center tube, and the lower joint contacts the inclined surface of the slip; The pressure relief channel part includes a pressure relief channel, and the pressure relief channel includes an upper joint, a central tube, a copper gasket, and a lower joint; the upper joint is sleeved with the central tube and fixedly connected by a pin; the central tube is provided with an opening, and the lower joint is connected with the central tube; the copper gasket is sleeved outside the central tube and fixed between the upper joint and the lower joint; The anchoring part comprises a support slip, and the central tube of the support slip is provided with a track groove which is the same as the anti-rotation anchor; The gravity valve part includes a gravity valve, and the gravity valve includes an upper joint, a central tube, an outer tube, a counterweight block I, a counterweight block II, a fixed block, a baffle, a pin shaft, a gear bar, a screw, and a lower joint; the central tube is inserted into the inner hole of the upper joint and welded; the fixed block is welded to the central tube; the baffle is welded to the gear bar and connected to the fixed block through a pin shaft; a screw is installed on the baffle at a position away from the pin shaft; the counterweight block I and the counterweight block II are welded together and placed between the central tube and the outer tube, and the counterweight block II is provided with a rack and meshes with the gear bar teeth; the outer tube is sleeved on the outside of the central tube, the counterweight block I and the counterweight block II, and is connected to the upper joint; the lower joint is connected to the lower end of the outer tube; The upper joint of the anti-rotation anchor is connected to the lower end of the screw pump; the lower joint of the anti-rotation anchor is connected to the screen tube, and the lower end of the screen tube is connected to the connecting joint of the release packer; the lower end of the connecting rod is connected to the through rod; the upper joint of the pressure relief channel is connected to the lower joint of the release packer; the upper joint of the supporting slip is connected to the lower joint of the pressure relief channel; the upper joint of the gravity valve is connected to the center pipe of the supporting slip; the lower joint of the gravity valve is connected to the oil pipe through a thread.

2. The novel anti-blowout anchoring integrated tool according to claim 1 is characterized in that: The supporting cava includes an upper joint, a center tube, a cava, a fixing ring, a retaining ring, a spacer ring, a friction block, a spring, a friction body, a guide sleeve, and a guide pin; the outer wall of the upper joint is a conical surface, which is used for anchoring the cava; the center tube is provided with a track groove which is the same as the anti-rotation anchor, and the guide pin is placed in the track groove; the cava and the friction block are fixed on the friction body by means of a fixing ring, a retaining ring, a spacer ring, a spring, and a guide sleeve.

3. The novel anti-blowout anchoring integrated tool according to claim 1 is characterized by: The thickness of the retaining spring of the drop-out packer is 4.5 mm, the one-way tooth depth is 1.2 mm, the tooth pitch is 3 mm, and the lower end of the outer sleeve has one-way teeth with the same size and reverse tooth shape as the retaining spring.