A spliced ​​steel structure corridor

By designing vertical pipes, vertical rods and other components in the steel structure corridor, the splicing function is realized, which solves the problem of the lack of splicing function in the existing corridors and improves the practicality and user experience of the corridor.

CN111809723BActive Publication Date: 2024-11-26CHINA THIRD METALLURGICAL GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010743424.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-29
Publication Date
2024-11-26
Estimated Expiration
2040-07-29

AI Technical Summary

Technical Problem

The lack of splicing function of existing steel structure corridors leads to difficulties in transportation and use, reducing practicality and experience, and unable to meet market demand.

Method used

A spliced ​​steel structure corridor is designed, which realizes the splicing function through the coordination of vertical pipes, vertical rods, slots, connecting sleeves, horizontal plates, roof plates, through grooves, horizontal rods, insert plates, pull rings and springs, and The structural stability and convenience are enhanced by setting connection holes, connecting rods, threaded sleeves, support rods, through holes, threaded sleeves, clamps, handwheels and mounting plates.

Benefits of technology

The splicing function of steel structure corridors has been realized, which improves user experience and practicality, meets market demands, and simplifies the transportation and use process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111809723B_ABST
    Figure CN111809723B_ABST
Patent Text Reader

Abstract

The present invention discloses a splicing steel structure corridor, comprising a vertical pipe, an inner cavity of the vertical pipe is provided with a vertical rod, a slot is provided on the surface of the vertical rod, a connecting sleeve is provided on the top of the vertical rod, a cross plate is fixedly connected to the top of the connecting sleeve, a top plate is provided on the top of the cross plate, a through groove is provided on the surface of the connecting sleeve, a cross rod is provided in the inner cavity of the through groove, and a plug plate is fixedly connected to one end of the cross rod. The present invention achieves the purpose of having a splicing function through the coordination of the vertical pipe, the vertical rod, the slot, the connecting sleeve, the cross plate, the top plate, the through groove, the cross rod, the plug plate, the pull ring and the spring, thereby avoiding troubles for users in transporting and using the steel structure corridor, improving the user's experience of the steel structure corridor, meeting the needs of the current market, improving the practicality and usability of the steel structure corridor, and solving the problem that the previous steel structure corridor did not have a splicing function.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel structures, in particular to a spliced ​​steel structure corridor. Background Art

[0002] Steel structure is a structure made of steel materials and is one of the main types of building structures. The structure is mainly composed of beams, steel columns, steel trusses and other components made of steel sections and steel plates, and adopts rust removal and rust prevention processes such as silanization, pure manganese phosphating, water washing and drying, and galvanizing. Steel structure corridors are one of them, but most of the previous steel structure corridors do not have splicing functions, which brings troubles to users in transporting and using steel structure corridors, reduces users' experience of steel structure corridors, and cannot meet the needs of today's market. Due to the above problems, the practicality and usability of steel structure corridors are reduced, and a spliced ​​steel structure corridor is introduced in a targeted manner. Summary of the invention

[0003] The purpose of the present invention is to provide a spliced ​​steel structure corridor, which has the advantage of having a splicing function and solves the problem that the previous steel structure corridor has no splicing function.

[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a spliced ​​steel structure corridor, comprising a vertical pipe, the inner cavity of the vertical pipe is provided with a vertical rod, the surface of the vertical rod is provided with a slot, the top of the vertical rod is sleeved with a connecting sleeve, the top of the connecting sleeve is fixedly connected with a horizontal plate, the top of the horizontal plate is provided with a top plate, the surface of the connecting sleeve is provided with a through groove, the inner cavity of the through groove is provided with a cross rod, one end of the cross rod is fixedly connected with a plug plate, the other end of the cross rod is fixedly connected with a pull ring, the surface of the cross rod is sleeved with a spring, one end of the spring is fixedly connected to one end of the connecting sleeve, and the other end of the spring is fixedly connected to the surface of the pull ring.

[0005] Preferably, connecting holes are opened on both sides of the top of the top plate, the inner cavity of the connecting hole is provided with a connecting rod, the bottom of the connecting rod is fixedly connected to the top of the cross plate, and the top of the connecting rod is threadedly connected with a first threaded sleeve.

[0006] Preferably, the bottom of the top plate is fixedly connected to a support rod via bolts, and the bottom of the support rod is fixedly connected to the top of the cross plate via bolts.

[0007] Preferably, the top of the transverse plate is provided with through holes, and the number of the through holes is four.

[0008] Preferably, a second threaded sleeve is provided through the surface of the vertical pipe, a threaded rod is threadedly connected to the inner wall of the first threaded sleeve, one end of the threaded rod is movably connected to a clamping plate via a bearing, and the inner wall of the clamping plate contacts the surface of the vertical rod.

[0009] Preferably, the other end of the threaded rod is fixedly connected to a hand wheel, and the surface of the hand wheel is provided with anti-slip grooves.

[0010] Preferably, a mounting plate is fixedly connected to the bottom of the vertical pipe, and a mounting hole is provided on the surface of the mounting plate.

[0011] Compared with the prior art, the present invention has the following beneficial effects:

[0012] 1. The present invention achieves the purpose of having a splicing function through the coordination of vertical pipes, vertical rods, slots, connecting sleeves, horizontal plates, top plates, through grooves, horizontal rods, plug plates, pull rings and springs, thereby avoiding troubles for users in transporting and using the steel structure corridor, improving users' experience of the steel structure corridor, meeting the needs of today's market, improving the practicality and usability of the steel structure corridor, and solving the problem that the previous steel structure corridor did not have a splicing function.

[0013] 2. The present invention is used to connect the horizontal plate and the top plate by setting a connecting hole, a connecting rod and a first threaded sleeve, is used to improve the stability of the connection between the horizontal plate and the top plate by setting a supporting rod, is used to fix the lighting fixture by setting a through hole, is used to fix the vertical rod by setting a second threaded sleeve, a threaded rod and a clamping plate, is used to facilitate the user to rotate the threaded rod by setting a hand wheel, and is used to install and fix the vertical pipe by setting a mounting plate and a mounting hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of an embodiment of the present invention;

[0015] Figure 2 for Figure 1 External view of

[0016] Figure 3 for Figure 1 A partial enlarged view of point A in the middle.

[0017] In the figure: 1. vertical tube; 2. vertical rod; 3. slot; 4. connecting sleeve; 5. cross plate; 6. top plate; 7. through slot; 8. cross rod; 9. plug plate; 10. pull ring; 11. spring; 12. connecting hole; 13. connecting rod; 14. first threaded sleeve; 15. support rod; 16. through hole; 17. second threaded sleeve; 18. threaded rod; 19. clamping plate; 20. hand wheel; 21. mounting plate; 22. mounting hole. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] See also Figure 1-3 A spliced ​​steel structure corridor comprises a vertical pipe 1, a vertical rod 2 is arranged in the inner cavity of the vertical pipe 1, a slot 3 is provided on the surface of the vertical rod 2, a connecting sleeve 4 is sleeved on the top of the vertical rod 2, a horizontal plate 5 is fixedly connected to the top of the connecting sleeve 4, a top plate 6 is arranged on the top of the horizontal plate 5, a through groove 7 is provided on the surface of the connecting sleeve 4, a cross bar 8 is arranged in the inner cavity of the through groove 7, one end of the cross bar 8 is fixedly connected to a plug plate 9, the other end of the cross bar 8 is fixedly connected to a pull ring 10, a spring 11 is sleeved on the surface of the cross bar 8, one end of the spring 11 is fixedly connected to one end of the connecting sleeve 4, the other end of the spring 11 is fixedly connected to the surface of the pull ring 10, and the top plate 6 is provided. Both sides of the top are provided with connecting holes 12, the inner cavity of the connecting hole is provided with a connecting rod 13, the bottom of the connecting rod 13 is fixedly connected to the top of the cross plate 5, the top of the connecting rod 13 is threadedly connected with a first threaded sleeve 14, the bottom of the top plate 6 is fixedly connected with a support rod 15 by bolts, the bottom of the support rod 15 is fixedly connected with the top of the cross plate 5 by bolts, the top of the cross plate 5 is provided with a through hole 16, the number of through holes 16 is four, the surface of the vertical pipe 1 is penetrated by a second threaded sleeve 17, the inner wall of the first threaded sleeve 14 is threadedly connected with a threaded rod 18, one end of the threaded rod 18 is movably connected with a clamping plate 19 through a bearing, and the clamping plate The inner wall of 19 contacts the surface of the vertical rod 2, the other end of the threaded rod 18 is fixedly connected to a hand wheel 20, the surface of the hand wheel 20 is provided with anti-slip grooves, the bottom of the vertical tube 1 is fixedly connected to a mounting plate 21, and the surface of the mounting plate 21 is provided with a mounting hole 22. The connecting hole 12, the connecting rod 13 and the first threaded sleeve 14 are provided to connect the horizontal plate 5 and the top plate 6, the support rod 15 is provided to improve the stability of the connection between the horizontal plate 5 and the top plate 6, the through hole 16 is provided to fix the lighting fixture, the second threaded sleeve 17, the threaded rod 18 and the clamping plate 19 are provided to fix the vertical rod 2, and the vertical rod 2 is provided. A hand wheel 20 is arranged to facilitate the user to rotate the threaded rod 18. A mounting plate 21 and a mounting hole 22 are arranged to install and fix the vertical pipe 1. Through the cooperation of the vertical pipe 1, the vertical rod 2, the slot 3, the connecting sleeve 4, the horizontal plate 5, the top plate 6, the through groove 7, the horizontal rod 8, the plug plate 9, the pull ring 10 and the spring 11, the purpose of having a splicing function is achieved, thereby avoiding trouble for users in transporting and using the steel structure corridor, improving the user's experience of the steel structure corridor, meeting the needs of the current market, improving the practicability and usability of the steel structure corridor, and solving the problem that the steel structure corridor did not have a splicing function in the past.

[0020] When in use, the user moves the cross plate 5, and the connecting sleeve 4 is driven to move by the cross plate 5, and the cross bar 8 is driven to move by the connecting sleeve 4, and the plug plate 9 is driven to move by the cross bar 8, and the vertical rod 2 is inserted into the connecting sleeve 4 through the movement of the connecting sleeve 4, and the plug plate 9 is squeezed by the vertical rod 2, and the plug plate 9 is driven to move by the bias force, and the cross bar 8 is driven to move horizontally by the plug plate 9, and the pull ring 10 is driven to move by the cross bar 8, and the spring 11 is driven to move by the pull ring 10, and elastic potential energy is generated by the deformation of the spring 11, and the plug plate 9 is rebounded by the elastic potential energy of the spring 11, and the vertical rod 2 and the cross plate 5 are connected and fixed by the plug plate 9 and the slot 3.

[0021] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A spliced ​​steel structure corridor, comprising a vertical pipe (1), characterized in that: The inner cavity of the vertical tube (1) is provided with a vertical rod (2), the surface of the vertical rod (2) is provided with a slot (3), the top of the vertical rod (2) is sleeved with a connecting sleeve (4), the top of the connecting sleeve (4) is fixedly connected to a horizontal plate (5), the top of the horizontal plate (5) is provided with a top plate (6), both sides of the top of the top plate (6) are provided with connecting holes (12), the inner cavity of the connecting hole is provided with a connecting rod (13), the bottom of the connecting rod (13) is fixedly connected to the top of the horizontal plate (5), the top of the connecting rod (13) is threadedly connected to a first threaded sleeve (14), the bottom of the top plate (6) is fixedly connected to the top of the horizontal plate (5), The top of the connecting sleeve (4) is fixedly connected to a support rod (15) by bolts, the bottom of the support rod (15) is fixedly connected to the top of the cross plate (5) by bolts, a through groove (7) is provided on the surface of the connecting sleeve (4), a cross rod (8) is provided in the inner cavity of the through groove (7), one end of the cross rod (8) is fixedly connected to a plug plate (9), the other end of the cross rod (8) is fixedly connected to a pull ring (10), a spring (11) is sleeved on the surface of the cross rod (8), one end of the spring (11) is fixedly connected to one end of the connecting sleeve (4), and the other end of the spring (11) is fixedly connected to the surface of the pull ring (10).

2. The spliced ​​steel structure corridor according to claim 1 is characterized in that: The top of the transverse plate (5) is provided with through holes (16), and the number of the through holes (16) is four.

3. The spliced ​​steel structure corridor according to claim 1 is characterized in that: A second threaded sleeve (17) is provided through the surface of the vertical pipe (1), a threaded rod (18) is threadedly connected to the inner wall of the first threaded sleeve (14), one end of the threaded rod (18) is movably connected to a clamping plate (19) via a bearing, and the inner wall of the clamping plate (19) is in contact with the surface of the vertical rod (2).

4. The spliced ​​steel structure corridor according to claim 3 is characterized by: The other end of the threaded rod (18) is fixedly connected to a hand wheel (20), and the surface of the hand wheel (20) is provided with anti-slip grooves.

5. The spliced ​​steel structure corridor according to claim 1 is characterized in that: A mounting plate (21) is fixedly connected to the bottom of the vertical pipe (1), and a mounting hole (22) is provided on the surface of the mounting plate (21).