An assembled building
By using a combination of a variety of embedded parts and hanging parts in prefabricated buildings, using a bubble meter to detect verticality, the problems of low assembly accuracy and efficiency in the prior art are solved, the stability and reliability of the structure are achieved, and cost savings are saved.
Patent Information
- Application Number
- CN202010567509.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-19
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2040-06-19
AI Technical Summary
During the assembly process, the existing prefabricated assembled concrete structures are difficult to ensure the verticality and horizontality of anchor bolts, resulting in low assembly accuracy and efficiency and high cost.
A variety of embedded parts and hanging parts that are machined are adopted, including the first embedded parts, the second embedded parts, the embedded hanging parts, the removable hanging parts and the locking parts. The verticality is detected by the bubble meter, and the combination of the embedded screw and the connecting plate is achieved quickly assembled and hoisted.
It improves assembly accuracy and efficiency, ensures structural stability and reliability, saves labor costs, reduces material waste, and achieves rapid lifting and locking.
Smart Images

Figure CN111851753B_ABST
Abstract
Description
Technical Field
[0001] The invention mainly relates to drilling construction technology, and in particular to an assembled building. Background Art
[0002] Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in factories, transported to construction sites, and assembled and installed on site through reliable connection methods. Prefabricated buildings mainly include prefabricated concrete structures, steel structures, modern wooden structures, etc., and are representatives of modern industrialized production methods because they use standardized design, factory production, assembly construction, information management, and intelligent applications.
[0003] The existing prefabricated concrete structures all first lay the foundation, and then pre-embed the anchor bolts on the foundation to achieve the rapid assembly of the wall panels and the foundation. Similarly, the connecting bolts are pre-embedded on the wall panels and beams to achieve the connection of the wall panels, floor slabs and beams on different floors. Since it is impossible to achieve a very high flatness when excavating the foundation, and when placing the anchor bolts, it is difficult to ensure the verticality, height, spacing and horizontal deflection of all the anchor bolts of the entire building, so a lot of manpower is needed on site for manual observation and adjustment of the anchor bolts at each node position. In addition, since the area involved in the arrangement of the anchor bolts on site is very large, even if a lot of manpower and material resources are spent, it is impossible to ensure the consistency of the verticality, height, spacing and horizontal deflection of all the anchor bolts. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a prefabricated building with a stable and reliable structure, low cost, and improved assembly accuracy and efficiency.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] An assembled building, comprising a plurality of first embedded parts, second embedded parts, embedded hanging parts, detachable hanging parts, locking parts, prefabricated walls, prefabricated beams and columns and prefabricated floor slabs formed by machine processing, wherein the first embedded parts comprise a first plug-in platform and a first connecting plate arranged at the bottom of the first plug-in platform, the first connecting plate is connected with an embedded screw, a bubble meter for detecting its verticality is arranged at the top of the first plug-in platform, the second embedded parts comprise an embedded frame and a second plug-in platform and a second connecting plate arranged on the embedded frame, each first embedded part is embedded in each connection node position of the foundation, the prefabricated beams and columns and the top of the prefabricated floor slab through the embedded screw, and the second embedded parts are connected to the embedded frame through the embedded frame. Embedded in each connection node position at the bottom of the prefabricated wall and the prefabricated beams and columns, each embedded hanging piece is embedded in the top of the prefabricated wall. During assembly, the second plug-in platform at the bottom of the prefabricated beam and column is plugged into and matched with the first plug-in platform on the foundation, the second connecting plate at the bottom of the prefabricated beam and column is connected to the corresponding first connecting plate through embedded screws, the detachable hanging piece is connected to the embedded hanging piece and the second plug-in platform at the bottom of the prefabricated wall is plugged into and matched with the first plug-in platform on the foundation through lifting, the second connecting plate at the bottom of the prefabricated wall is connected to the corresponding first connecting plate through embedded screws, the prefabricated floor slab is lapped on the top of the prefabricated wall, the locking piece is connected to the embedded hanging piece and locks the prefabricated floor slab and the prefabricated wall.
[0007] As a further improvement of the above technical solution:
[0008] The first docking station is provided with at least one pair of interconnected scanning holes, and the center connecting line of the pair of scanning holes intersects perpendicularly with the vertical center axis of the first docking station.
[0009] The first plug-in platform is provided with a vertical marking line, and the vertical marking line passes through the scanning hole.
[0010] The first docking station is also provided with a plurality of transverse marking lines, which intersect the vertical marking lines perpendicularly.
[0011] The scanning holes are arranged in two pairs, wherein one pair of scanning holes is arranged in the X-axis direction, and the other pair of scanning holes is arranged in the Y-axis direction.
[0012] The first docking station includes a mating column and a guide body, the guide body is arranged on the top of the mating column, the mating column is connected to the first connecting plate, the scanning hole is arranged on the mating column, the bubble meter is arranged on the top of the guide body, and the second docking station is arranged as a sleeve, and the sleeve is fitted and sleeved with the mating column.
[0013] The sleeve is provided with a grouting hole which is communicated with the inner cavity thereof.
[0014] The second plug-in platform is provided with reinforcing ribs around its periphery.
[0015] The embedded screw rod comprises a connecting straight rod and a tensile cross rod bent at the bottom of the connecting straight rod, and the connecting straight rod is connected to the first connecting plate and the second connecting plate.
[0016] The second connecting plate is provided with a waist-shaped adjustment hole, and the connecting straight rod is passed through the waist-shaped adjustment hole and is locked by a nut.
[0017] The embedded hanging part comprises an internal thread sleeve, and the detachable hanging part comprises a hanging part and a screw part arranged at the bottom of the hanging part. During hanging, the screw part is threadedly connected with the internal thread sleeve.
[0018] The embedded hanging part also includes a tensile step, and the tensile step is arranged at the bottom of the internal threaded sleeve.
[0019] The hanging part comprises a hanging ring and a force transmission platform arranged at the bottom of the hanging ring, the screw part is arranged at the bottom of the force transmission platform, and the bottom and side of the force transmission platform are in contact with the prefabricated floor slab.
[0020] The locking member is configured as a bolt, and when the prefabricated floor slab is assembled, the locking member is threadedly connected with the embedded hanging member and locks the prefabricated floor slab and the prefabricated wall.
[0021] It also includes a clamping platform. When the prefabricated floor slabs are assembled, two prefabricated floor slabs are overlapped on the top of the prefabricated wall. The clamping platform clamps the two prefabricated floor slabs. The locking piece is threadedly connected with the embedded hanging piece and locks the two floor slabs and the wall below.
[0022] Compared with the prior art, the advantages of the present invention are:
[0023] The prefabricated building of the present invention is used, and the second embedded part is first prefabricated at the bottom of the wall body, and then the first embedded parts at the corresponding node positions are arranged at the construction site according to the plane shape of the building body, and the first embedded parts at each node position are adjusted according to the bubble meter on the top of each first plug-in platform, so that each first plug-in platform is adjusted to be vertical, and then pouring is carried out, and the second plug-in platform at the bottom of the prefabricated beam column is plugged in with the first plug-in platform at the corresponding position to realize the assembly of the prefabricated beam column, and then the detachable hanging parts are connected with the embedded hanging parts, and the lifting equipment is used to connect the detachable hanging parts to realize the lifting of the prefabricated wall body, so that the second plug-in platform is plugged in with the first plug-in platform, and then the second connecting plate and the first connecting plate are used to lock through the embedded screw and nut to complete the rapid assembly, and when the prefabricated wall assembly is completed, the prefabricated floor slab needs to be assembled, and at this time, the detachable hanging parts are separated from the embedded hanging parts, and then the prefabricated floor slab is erected on the top of the prefabricated wall, and the locking parts are used to connect and lock the prefabricated wall and the prefabricated floor slab. Compared with the traditional structure, the present invention sets the embedded parts as the plug-in combination of the first embedded parts and the second embedded parts, and then uses the bubble meter on the top of the first plug-in platform to adjust the first plug-in platform at each node position to be vertical. The overall structure is stable and reliable, which saves labor costs, improves the vertical adjustment accuracy, and improves the assembly accuracy and efficiency. The present invention can realize the rapid lifting of prefabricated walls and the rapid locking of prefabricated floor slabs through the cooperation of embedded hangers, detachable hangers and locking parts. The embedded hangers can be connected to both the detachable hangers and the locking parts, that is, the embedded hangers realize the dual functions of lifting and connection, and the detachable hangers can be reused, which saves costs and consumables as a whole, facilitates the standardization and unification of lifting, and has a simple and ingenious structure, which greatly improves the assembly quality and efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a three-dimensional structural schematic diagram of the prefabricated building of the present invention.
[0025] Figure 2 It is a schematic diagram of the assembly three-dimensional structure of the first embedded part and the second embedded part in the prefabricated building of the present invention.
[0026] Figure 3 It is a schematic diagram of the assembly cross-sectional structure of the first embedded part and the second embedded part in the prefabricated building of the present invention.
[0027] Figure 4 It is a schematic diagram of the main structure of the first embedded part in the prefabricated building of the present invention.
[0028] Figure 5 It is a schematic diagram of the three-dimensional structure of the first embedded part in the prefabricated building of the present invention.
[0029] Figure 6 It is a schematic diagram of the three-dimensional structure of the second embedded part in the prefabricated building of the present invention.
[0030] Figure 7 It is a schematic cross-sectional structural diagram of the second embedded part in the prefabricated building of the present invention.
[0031] Figure 8 It is a schematic diagram of the assembly structure of embedded hanging parts and disassembled hanging parts in the prefabricated building of the present invention.
[0032] Fig. 9 It is a three-dimensional structural schematic diagram of the disassembly hanging parts in the prefabricated building of the present invention.
[0033] Fig.10 It is a schematic diagram of the assembly structure of the embedded hanging parts and locking parts in the prefabricated building of the present invention.
[0034] The symbols in the figure represent:
[0035] 1. The first embedded part; 11. The first plug-in platform; 111. The scanning hole; 112. The vertical marking line; 113. The horizontal marking line; 114. The plug-in column; 115. The guide body; 12. The first connecting plate; 13. The embedded screw rod; 131. The connecting straight rod; 132. The tensile cross rod; 14. The bubble meter; 2. The second embedded part; 21. The embedded frame; 22. The second plug-in platform; 221. The grouting hole; 222. The reinforcing rib; 23. The second connecting plate; 231. The waist-shaped adjustment hole; 3. The embedded hanging part; 31. The internal threaded sleeve; 32. The tensile step; 4. The detachable hanging part; 41. The hanging part; 411. The lifting ring; 412. The force transmission platform; 42. The screw rod part; 5. The locking part; 6. The prefabricated wall; 7. The prefabricated beam and column; 8. The prefabricated floor slab; 9. The clamping platform. DETAILED DESCRIPTION
[0036] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0037] Figures 1 to 10An embodiment of the prefabricated building of the present invention is shown, including a plurality of first embedded parts 1, second embedded parts 2, embedded hanging parts 3, detachable hanging parts 4, locking parts 5, prefabricated walls 6, prefabricated beams and columns 7, and prefabricated floor slabs 8 formed by machine processing. The first embedded part 1 includes a first plug-in platform 11 and a first connecting plate 12 arranged at the bottom of the first plug-in platform 11, and the first connecting plate 12 is connected with an embedded screw 13. The top of the first plug-in platform 11 is provided with a bubble meter 14 for detecting its verticality. The second embedded part 2 includes an embedded frame 21 and a second plug-in platform 22 and a second connecting plate 23 arranged on the embedded frame 21. Each first embedded part 1 is embedded in each connection node position of the foundation, the prefabricated beam column 7, and the top of the prefabricated floor slab 8 through the embedded screw 13. The second embedded part 2 The embedded frames 21 are embedded in the connection nodes at the bottom of the prefabricated wall 6 and the prefabricated beams and columns 7, and the embedded hangers 3 are embedded in the top of the prefabricated wall 6. During assembly, the second plug-in platform 22 at the bottom of the prefabricated beam and column 7 is plugged into the first plug-in platform 11 on the foundation, and the second connecting plate 23 at the bottom of the prefabricated beam and column 7 is connected to the corresponding first connecting plate 12 through the embedded screws 13. The detachable hanger 4 is connected to the embedded hanger 3 and the second plug-in platform 22 at the bottom of the prefabricated wall 6 is plugged into the first plug-in platform 11 on the foundation through the embedded screws 13. The second connecting plate 23 at the bottom of the prefabricated wall 6 is connected to the corresponding first connecting plate 12 through the embedded screws 13. The prefabricated floor 8 is lapped on the top of the prefabricated wall 6, and the locking member 5 is connected to the embedded hanger 3 and locks the prefabricated floor 8 and the prefabricated wall 6. When in use, the second embedded part 2 is first prefabricated at the bottom of the wall, and then the first embedded parts 1 at the corresponding node positions are arranged at the construction site according to the plane shape of the building body, and the first embedded parts 1 at each node position are adjusted according to the bubble meter 14 on the top of each first plug-in platform 11, so that each first plug-in platform 11 is adjusted to be vertical, and then pouring is carried out, and the second plug-in platform 22 at the bottom of the prefabricated beam column 7 is matched with the first plug-in platform 11 at the corresponding position to realize the assembly of the prefabricated beam column 7, and then the detachable hanging parts 4 are connected to the embedded hanging parts 3, and the hoisting equipment and the detachable hanging parts are used. The prefabricated wall 6 is hoisted by disassembling the hanging parts 4, so that the second plug-in platform 22 is plugged into the first plug-in platform 11, and then the second connecting plate 23 and the first connecting plate 12 are locked by the embedded screws 13 and nuts to complete the quick assembly. After the prefabricated wall 6 is assembled, the prefabricated floor 8 needs to be assembled. At this time, the detachable hanging parts 4 are separated from the embedded hanging parts 3, and then the prefabricated floor 8 is erected on the top of the prefabricated wall 6, and the locking parts 5 are used to connect with the embedded hanging parts 3 and lock the prefabricated wall 6 and the prefabricated floor 8.Compared with the traditional structure, the present invention sets the embedded parts as a plug-in combination of the first embedded part 1 and the second embedded part 2, and then uses the bubble meter 14 on the top of the first plug-in platform 11 to adjust the first plug-in platform 11 at each node position to be vertical. Its overall structure is stable and reliable, saves labor costs, improves the adjustment accuracy of verticality, and improves assembly accuracy and assembly efficiency; the present invention can achieve rapid lifting of prefabricated walls 6 and rapid locking of prefabricated floor slabs 8 through the cooperation of embedded hangers 3, detachable hangers 4 and locking members 5. The embedded hangers 3 can be connected to both the detachable hangers 4 and the locking members 5, that is, the embedded hangers 3 realize the dual functions of lifting and connection, and the detachable hangers 4 can be reused, which saves costs and consumables as a whole, facilitates standardization and unification of lifting, and has a simple and ingenious structure, which greatly improves assembly quality and assembly efficiency.
[0038] In this embodiment, at least one pair of interconnected scanning holes 111 is provided on the first docking station 11, and the center line of the pair of scanning holes 111 perpendicularly intersects the vertical center axis of the first docking station 11. In this structure, infrared rays are used to scan the scanning holes 111 on the first docking station 11, and the height and horizontal deflection of other first embedded parts 1 are adjusted to ensure that the infrared rays can pass through all scanning holes 111 on the same straight line, thereby realizing the adjustment of the height and horizontal deflection of the first embedded part 1.
[0039] In this embodiment, a vertical marking line 112 is provided on the first plug-in platform 11, and the vertical marking line 112 passes through the scanning hole 111. In this structure, the vertical marking line 112 on the first plug-in platform 11 is scanned by infrared rays, and the horizontal deflection and position of other first embedded parts 1 are adjusted to ensure that the infrared rays coincide with the vertical marking lines 112 of other first embedded parts 1 on the same straight line, thereby achieving the adjustment of the horizontal deflection and position of the first embedded parts 1.
[0040] In this embodiment, a plurality of transverse marking lines 113 are further provided on the first plug-in platform 11, and the transverse marking lines 113 intersect perpendicularly with the vertical marking lines 112. In this structure, the transverse marking lines 113 on the first plug-in platform 11 are scanned by infrared rays, and the heights and positions of other first embedded parts 1 are adjusted to ensure that the infrared rays coincide with the transverse marking lines 113 of other first embedded parts 1 at the same position on the same straight line, thereby achieving the adjustment of the heights of the first embedded parts 1 and the positions relative to each other.
[0041] In this embodiment, the scanning holes 111 are arranged in two pairs, one pair of scanning holes 111 is arranged in the X-axis direction, and the other pair of scanning holes 111 is arranged in the Y-axis direction. In this structure, the scanning holes 111 are arranged in two pairs, so that scanning can be performed in both the X-axis and Y-axis directions, further improving the adjustment accuracy.
[0042] In this embodiment, the first plug-in platform 11 includes a plug-in column 114 and a guide body 115, the guide body 115 is arranged on the top of the plug-in column 114, the plug-in column 114 is connected to the first connecting plate 12, the scanning hole 111 is arranged on the plug-in column 114, the bubble meter 14 is arranged on the top of the guide body 115, and the second plug-in platform 22 is arranged as a sleeve, and the sleeve is matched with the plug-in column 114. The plug-in column 114 is mainly used for matching with the sleeve of the superstructure, and the guide body 115 can play a guiding role during assembly, thereby improving assembly efficiency.
[0043] In this embodiment, a grouting hole 221 communicating with the inner cavity of the sleeve is provided. The provision of the grouting hole 221 enables further grouting after assembly, thereby greatly improving the connection strength of the node position.
[0044] In this embodiment, a reinforcing rib 222 is provided around the second plug-in platform 22. The reinforcing rib 222 further improves the strength and reliability of the second plug-in platform 22.
[0045] In this embodiment, the embedded screw rod 13 includes a connecting straight rod 131 and a tensile cross rod 132 bent at the bottom of the connecting straight rod 131, and the connecting straight rod 131 is connected to the first connecting plate 12 and the second connecting plate 23. The connecting straight rod 131 is used to lock and connect the first connecting plate 12 and the second connecting plate 23, and the tensile cross rod 132 can improve the stability and reliability of the first embedded part 1.
[0046] In this embodiment, the second connecting plate 23 is provided with a waist-shaped adjustment hole 231, and the connecting straight rod 131 is inserted into the waist-shaped adjustment hole 231 and locked by a nut. The setting of the waist-shaped adjustment hole 231 enables the second connecting plate 23 to have an adjustable space, thereby improving its adaptability.
[0047] In this embodiment, the embedded hanging part 3 includes an internal threaded sleeve 31, and the detachable hanging part 4 includes a hanging part 41 and a screw part 42 arranged at the bottom of the hanging part 41. When hanging, the screw part 42 is threadedly connected with the internal threaded sleeve 31. In this structure, the fast installation and detachable functions are realized by the cooperation of the screw part 42 and the internal threaded sleeve 31, and the hanging is realized by the hanging part 41.
[0048] In this embodiment, the embedded hanging part 3 further includes a tensile step 32, which is arranged at the bottom of the internal threaded sleeve 31. The tensile step 32 can ensure that the embedded hanging part 3 will not fall out during the hoisting, thereby ensuring the reliability and safety of the hoisting.
[0049] In this embodiment, the lifting part 41 includes a lifting ring 411 and a force transmission platform 412 arranged at the bottom of the lifting ring 411, and the screw part 42 is arranged at the bottom of the force transmission platform 412, and the bottom and side of the force transmission platform 412 are in contact with the prefabricated floor 8. The lifting is achieved through the lifting ring 411, and the bottom and side of the force transmission platform 412 are in contact with the prefabricated floor 8, so that the force transmission is achieved, and the reliability and safety of the lifting are further improved.
[0050] In this embodiment, the locking member 5 is configured as a bolt, and when the prefabricated floor 8 is assembled, the locking member 5 is threadedly connected with the embedded hanging member 3 and locks the prefabricated floor 8 and the prefabricated wall 6. The structure is simple and reliable.
[0051] In this embodiment, a clamping platform 9 is also included. When the prefabricated floor slabs 8 are assembled, two prefabricated floor slabs 8 are overlapped on the top of the prefabricated wall 6, and the clamping platform 9 clamps the two prefabricated floor slabs 8. The locking member 5 is threadedly connected with the embedded hanging member 3 and locks the two floor slabs and the wall below. In this structure, the locking effect of the two prefabricated floor slabs 8 and the prefabricated wall 6 is achieved through the cooperation of the locking member 5 and the clamping platform 9, and the structure is simple and ingenious.
[0052] Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the technical content disclosed above without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention should fall within the scope of protection of the technical solution of the present invention.
Claims
1. An assembled building, characterized in that: The invention comprises a plurality of first embedded parts (1), second embedded parts (2), embedded hanging parts (3), detachable hanging parts (4), locking parts (5), prefabricated walls (6), prefabricated beams (7) and prefabricated floor slabs (8) formed by machine processing, wherein the first embedded parts (1) comprise a first plug-in platform (11) and a first connecting plate (12) arranged at the bottom of the first plug-in platform (11), the first connecting plate (12) is connected to an embedded screw rod (13), the top of the first plug-in platform (11) is provided with a bubble meter (14) for detecting its verticality, the second embedded parts (2) comprise an embedded frame (21) and a second plug-in platform (22) and a second connecting plate (23) arranged on the embedded frame (21), each first embedded part (1) is embedded in each connection node position of the foundation, the prefabricated beams (7) and the top of the prefabricated floor slab (8) through the embedded screw rod (13), and the second embedded parts (2) are embedded in each connection node position of the foundation, the prefabricated beams (7) and the top of the prefabricated floor slab (8) through the embedded screw rod (13), and the second embedded parts (2) are embedded in each connection node position of the foundation, the prefabricated beams (7) and the top of the prefabricated floor slab (8) through the embedded frame (21). The prefabricated wall (6) and the prefabricated beam column (7) are embedded in the connection nodes at the bottom. Each prefabricated hanging piece (3) is embedded in the top of the prefabricated wall (6). During assembly, the second plug-in platform (22) at the bottom of the prefabricated beam column (7) is plugged into the first plug-in platform (11) on the foundation. The second connecting plate (23) at the bottom of the prefabricated beam column (7) is connected to the corresponding first connecting plate (12) via the embedded screw rod (13). The detachable hanging piece (4) is connected to the embedded hanging piece. (3) The second plug-in platform (22) at the bottom of the prefabricated wall (6) is connected and plugged into the first plug-in platform (11) on the foundation through hoisting, the second connecting plate (23) at the bottom of the prefabricated wall (6) is connected to the corresponding first connecting plate (12) through the embedded screw rod (13), the prefabricated floor slab (8) is overlapped on the top of the prefabricated wall (6), and the locking member (5) is connected to the embedded hanging member (3) and locks the prefabricated floor slab (8) and the prefabricated wall (6).
2. The prefabricated building according to claim 1, characterized in that: At least one pair of interconnected scanning holes (111) is provided on the first plug-in platform (11), and a center line connecting the interconnected scanning holes (111) intersects perpendicularly with a vertical center axis of the first plug-in platform (11).
3. The prefabricated building according to claim 2, characterized in that: A vertical marking line (112) is provided on the first plug-in platform (11), and the vertical marking line (112) passes through the scanning hole (111).
4. The prefabricated building according to claim 3, characterized in that: The first plug-in platform (11) is also provided with a plurality of transverse marking lines (113), wherein the transverse marking lines (113) intersect the vertical marking lines (112) at right angles.
5. The prefabricated building according to any one of claims 2 to 4, characterized in that: The scanning holes (111) are arranged in two pairs, wherein one pair of scanning holes (111) is arranged in the X-axis direction, and the other pair of scanning holes (111) is arranged in the Y-axis direction.
6. The prefabricated building according to any one of claims 2 to 4, characterized in that: The first plug-in platform (11) comprises a plug-in column (114) and a guide body (115), wherein the guide body (115) is arranged on the top of the plug-in column (114), the plug-in column (114) is connected to the first connecting plate (12), the scanning hole (111) is arranged on the plug-in column (114), the bubble meter (14) is arranged on the top of the guide body (115), and the second plug-in platform (22) is arranged as a sleeve, and the sleeve is sleeved with the plug-in column (114).
7. The prefabricated building according to claim 6, characterized in that: The sleeve is provided with a grouting hole (221) communicating with the inner cavity thereof.
8. The prefabricated building according to claim 7, characterized in that: Reinforcing ribs (222) are provided around the second plug-in platform (22).
9. The prefabricated building according to any one of claims 2 to 4, characterized in that: The embedded screw rod (13) comprises a connecting straight rod (131) and a tensile cross rod (132) bent at the bottom of the connecting straight rod (131); the connecting straight rod (131) is connected to the first connecting plate (12) and the second connecting plate (23).
10. The prefabricated building according to claim 9, characterized in that: The second connecting plate (23) is provided with a waist-shaped adjustment hole (231), and the connecting straight rod (131) is inserted into the waist-shaped adjustment hole (231) and is locked by a nut.
11. The prefabricated building according to any one of claims 2 to 4, characterized in that: The embedded hanging piece (3) comprises an internally threaded sleeve (31), and the detachable hanging piece (4) comprises a hanging portion (41) and a screw portion (42) arranged at the bottom of the hanging portion (41); during hanging, the screw portion (42) is threadedly connected to the internally threaded sleeve (31).
12. The prefabricated building according to claim 11, characterized in that: The embedded hanging component (3) further comprises a tensile step (32), wherein the tensile step (32) is arranged at the bottom of the internal threaded sleeve (31).
13. The prefabricated building according to claim 12, characterized in that: The hanging portion (41) comprises a hanging ring (411) and a force transmission platform (412) arranged at the bottom of the hanging ring (411); the screw portion (42) is arranged at the bottom of the force transmission platform (412); and the bottom and side of the force transmission platform (412) are in contact with the prefabricated floor slab (8).
14. The prefabricated building according to claim 13, characterized in that: The locking member (5) is configured as a bolt. When the prefabricated floor slab (8) is assembled, the locking member (5) is threadedly connected to the embedded hanging member (3) and locks the prefabricated floor slab (8) and the prefabricated wall (6).
15. The prefabricated building according to claim 14, characterized in that: It also comprises a clamping platform (9). When the prefabricated floor slabs (8) are assembled, two prefabricated floor slabs (8) are overlapped on the top of the prefabricated wall (6). The clamping platform (9) clamps the two prefabricated floor slabs (8). The locking member (5) is threadedly connected to the embedded hanging member (3) and locks the two floor slabs and the wall below.