A contact network support assembly intelligent arm operation vehicle group and operation method
By designing catenary pillars to assemble smart arm operating vehicles, and using smart arms and machine vision devices to achieve semi-automatic installation of pillars, the problems of low construction efficiency and insufficient automation have been solved, and construction efficiency and automation levels have been improved.
Patent Information
- Application Number
- CN202010664546.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-10
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-07-10
AI Technical Summary
During the installation process of the existing catenary pillars, there are problems such as strong physical labor for construction personnel, low operating efficiency, and lack of information collection of pillar positions, resulting in insufficient automation and mechanization levels.
A catenary pillar assembly intelligent arm operating vehicle unit is designed, including a road-rail dual-purpose basic platform, a robotic arm, a pillar manipulator, an operating room, a pillar storage device, a pillar information identification device and a machine vision device to achieve semi-automatic installation of pillars. Reduce the technical requirements for workers through automatic and semi-automatic modes, and use machine vision devices to detect and measure construction conditions, and connect with the BIM management system to share data.
It improves the efficiency of on-site construction. The pillar manipulator has high mobility and safety, and can quickly and flexibly handle different types of pillars. The machine vision device ensures precise alignment and measurement, reduces the requirements for workers' technical level, and improves the level of automation. .
Smart Images

Figure CN111976547B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of electrified railway overhead contact network design, construction and engineering application, in particular to the field of semi-automatic assembly of overhead contact network pillars, and specifically relates to an overhead contact network pillar assembly intelligent arm operation vehicle group and an operation method. Background Art
[0002] As of July 2019, the operating mileage of China's high-speed railways reached 31,000 kilometers. At present, the construction of the national railway backbone network and intercity railways is still being vigorously promoted. With the progress of modern science and technology such as information technology, big data application and artificial intelligence, and the overall trend of social progress, new challenges have been raised for the scientific management of the high-speed railway construction process and the entire process and life cycle. Recently, the new concept of "intelligent high-speed railway" engineering construction, "Beijing-Zhangjiakou in the north and Fuzhou-Xiamen in the south", has released a strong signal, that is, the state and society have higher expectations for the mechanization, informatization and intelligence of high-speed railway construction, and the industry needs to create a new era of intelligent construction technology to improve the automation level of high-speed railway construction. As an important part of the high-speed railway construction process, the overhead contact engineering mainly includes the processes of pole erection, arm installation, and wire laying, and the connection between each process is relatively independent. At present, the operation means are mainly manual, with low automation level and operation efficiency, and high labor intensity. Therefore, each link in the construction process of the overhead contact engineering has higher requirements for the level of mechanization and automation.
[0003] At present, the standard construction process of high-speed railway contact network mainly includes pole erection, measurement, calculation, pre-assembly, arm installation, and wire laying, and the connection between each process is relatively independent. Except for the deployment process of the contact wire of the contact network, which uses a mechanized wire laying operation vehicle, most other construction processes are mainly manual and supplemented by machinery.
[0004] At present, the installation of overhead wire posts mainly adopts the method of lifting the posts with cranes, adopting manual protection, connecting the flange holes of steel posts, and tightening the flange nuts and washers. At present, the main problems are heavy physical labor of construction workers, low operation efficiency, and lack of information collection on the posts' positions. Summary of the invention
[0005] In view of at least one of the above defects or improvement needs of the prior art, the present invention provides a contact network pillar assembly intelligent arm operation vehicle group and operation method, including a road-rail dual-purpose basic platform, a mechanical arm, a pillar manipulator, an operation room, a pillar storage device, a pillar information identification device and a machine vision device, etc. The pillar operation vehicle group realizes the semi-automatic installation function of the pillar, adopts automatic forms in the two links of grabbing the pole and installing, and adopts semi-automatic forms in the middle shift, which reduces the technical level requirements for workers and improves the on-site construction efficiency. During the pillar installation process, the machine vision device simultaneously detects and measures the user's basic construction conditions, and connects with the user's BIM management system to share installation process data and measurement data information.
[0006] To achieve the above object, according to one aspect of the present invention, a catenary support assembly intelligent arm operation vehicle group is provided, which is characterized by comprising a road-rail dual-purpose basic platform, a mechanical arm, a support manipulator, an operation room, a support storage device, a support information recognition device and a machine vision device;
[0007] The road-rail dual-purpose basic platform can be detachably connected to a railway flatbed car, and can also be detachably connected to a road vehicle chassis;
[0008] The mechanical arm, operating room and pillar storage device are installed on the dual-purpose road-rail basic platform; the pillar manipulator is installed at the front end of the mechanical arm, and the pillar information identification device is installed on the pillar manipulator; the pillar storage device stores multiple pillars with multiple anchor sections, and each pillar is installed with a label containing the installation position information of the pillar; the operating room is for the operator to operate the pillar manipulator to read the pillar label information from the pillar storage device and grab the mobile installation pillar, and the machine vision device is used for on-site monitoring and guidance.
[0009] Furthermore, the mechanical arm comprises a rotating base, a first-section arm, a second-section arm, and a universal ball seat which are connected in sequence;
[0010] The rotating base is installed on the road-rail dual-purpose basic platform, the first arm and the second arm are respectively provided with a telescopic cylinder, and the support manipulator is installed at the front end of the universal ball seat.
[0011] Furthermore, the pillar manipulator has a switchable clamping assembly, which is used to clamp pillars of different shapes.
[0012] Furthermore, the pillar storage device includes front and rear longitudinal baffles and a plurality of transverse limiting rods.
[0013] Furthermore, the pillars in the pillar storage device are stacked in multiple layers, and each layer includes a plurality of pillars.
[0014] Furthermore, each layer of the multi-layer pillars in the pillar storage device is stacked in reverse order of anchor segments.
[0015] Furthermore, the machine vision device is provided at a fixed position on the road-rail dual-purpose basic platform to provide a fixed viewing angle image.
[0016] Furthermore, the robot arm or support robot is provided with the machine vision device to provide a moving perspective image.
[0017] To achieve the above object, according to another aspect of the present invention, there is also provided an operation method of a contact network pillar assembly intelligent arm operation vehicle group, characterized in that it comprises the following steps:
[0018] The first step is basic inspection:
[0019] The pre-installed foundation is assembled in advance, and the machine vision device then measures and analyzes the pre-installed foundation to check the construction status of the foundation, including checking the GPS coordinates of the foundation and the inclination value of the screws;
[0020] Step 2: Pick up the pole:
[0021] The pole picking process is divided into two modes: automatic completion and manual completion;
[0022] When the process is completed automatically, a label containing the installation position information is affixed to the approximate center of the pillar in advance, and the pillar information recognition device on the pillar manipulator reads and recognizes the pillar to be grasped, and grasps the pillar under the monitoring and guidance of the machine vision device;
[0023] During manual operation, the operator in the operation room visually observes the center position of the pillar under the monitoring and guidance of the machine vision device and performs manual grasping;
[0024] Step 3: Adjust the vertical position:
[0025] This step is a manual operation. The operator in the operation room visually moves the grabbed pillar to the side of the road-rail dual-purpose foundation platform under the monitoring and guidance of the machine vision device and adjusts it to a vertical state;
[0026] Step 4: Move above the foundation:
[0027] This step is also manually operated. The operator in the operation room visually moves the pillar adjusted to the vertical state above the installation foundation under the monitoring and guidance of the machine vision device;
[0028] Step 5: Calibration:
[0029] Prepare two types of calibration blocks in advance. Select at least three of one type of calibration blocks and place them on the flange holes at the bottom of the pillars. Place the same number of another type of calibration blocks on the screws of the foundation.
[0030] At the same time, guide tags are placed on the ground, and the relationship between the guide tags and the calibration blocks is recorded by a machine vision device. After the recording is completed, the calibration blocks on the flange holes at the bottom of the pillars and on the foundation are removed;
[0031] Step 6. Installation:
[0032] The machine vision device guides the movement of the robot arm and the pillar manipulator, and completes the installation of the pillar and foundation through the guidance of the guide label;
[0033] Step 7: Screw tightening:
[0034] After the pillars are installed in place, tighten the pillar screws;
[0035] Step 8. After the screws are tightened, remove the pillar robot and take away the guide label on the ground to complete the pillar installation.
[0036] Further, the first step to the eighth step are looped to carry out the installation process of the next pillar.
[0037] The above-mentioned preferred technical features can be combined with each other as long as they do not conflict with each other.
[0038] In general, the above technical solution conceived by the present invention has the following beneficial effects compared with the prior art:
[0039] 1. The intelligent arm operation vehicle group and operation method for assembling the contact network pillar of the present invention include a dual-purpose road-rail foundation platform, a mechanical arm, a pillar manipulator, an operation room, a pillar storage device, a pillar information identification device and a machine vision device, etc. The pillar operation vehicle group realizes the semi-automatic installation function of the pillar, and adopts an automatic form in the two links of grabbing the pole and installing, and a semi-automatic form in the intermediate shift, which reduces the technical level requirements for workers and improves the efficiency of on-site construction. During the pillar installation process, the machine vision device simultaneously detects and measures the user's basic construction conditions, and connects with the user's BIM management system to share installation process data and measurement data information.
[0040] 2. The contact network pillar assembly intelligent arm operation vehicle group and operation method of the present invention, the pillar manipulator can quickly, flexibly and efficiently handle different types of H-type pillars, and can meet the grasping function of all H-type pillars of the contact network. The entire manipulator adopts a side clamping solution, which has high maneuverability, safety and accuracy during the construction process. Soft materials are set on the clamping surface to avoid damage to the pillar during the clamping process. 360-degree continuous rotation gears can achieve infinitely precise operation and positioning. The pillar manipulator has functions such as pitch, rotation, and clamping. It can meet the requirements of 6 degrees of freedom adjustment in conjunction with the mechanical arm to meet the requirements of pillar installation and adjustment.
[0041] 3. The contact network pillar assembly intelligent arm operation vehicle and operation method of the present invention are equipped with a machine vision device, which can guide the operation vehicle to find a suitable installation position for installation during the work process. The machine vision device uses a dual industrial camera as a guide to cooperate with the pillar operation vehicle to complete the precise alignment of the pillar. At the same time, the machine vision device has a measuring tool that can measure and analyze the pre-installed base and check the construction status of the base.
[0042] 4. The contact network pillar assembly intelligent arm operation vehicle group and operation method of the present invention are provided with a manual mode and an automatic mode; in the manual mode, the pillar installation process is completed by adjusting the pillar's left and right movement, front and back movement, center rotation, and up and down installation movements through a manual controller; in the automatic mode, when the pillar moves to the top of the pillar foundation, the machine vision device is used to guide the operation vehicle to adjust 6 degrees of freedom to complete the pillar automatic installation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 Schematic diagram of a contact network support pillar assembly intelligent arm operation vehicle group according to an embodiment of the present invention;
[0044] Figure 2 It is a traction schematic diagram of a contact network support pillar assembly intelligent arm operation vehicle group according to an embodiment of the present invention;
[0045] Figure 3 It is a schematic diagram of a mechanical arm base flange of a contact network support assembly intelligent arm operation vehicle group according to an embodiment of the present invention;
[0046] Figure 4 It is a flow chart of the operation method of the overhead line support assembly intelligent arm operation vehicle group according to an embodiment of the present invention.
[0047] The dimensions in the figure are in mm. DETAILED DESCRIPTION
[0048] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in each embodiment of the present invention described below can be combined with each other as long as they do not conflict with each other. The present invention is further described in detail below in conjunction with specific embodiments.
[0049] As a preferred embodiment of the present invention, Figure 1-4 As shown, the present invention provides a contact network pillar assembly intelligent arm operation vehicle group, including a road-rail dual-purpose basic platform 1, a mechanical arm 2, a pillar manipulator 3, an operating room 4, a pillar storage device 5, a pillar information recognition device and a machine vision device, as well as an electronic control system, a hydraulic system, a piping system, etc.
[0050] The dual-purpose platform 1 can be detachably connected to the railway flatbed car 6 and the chassis of the road vehicle. It is the basic carrier of the pillar assembly equipment and provides support for the mechanical arm 2, the pillar manipulator 3, the pillar storage device 5, etc. The dual-purpose platform 1 can be installed and separated from the railway flatbed car 6 by a bolt group to meet the needs of railway construction. The pillars can be transported on the railway flatbed car in straight lines, curves, turnouts and other sections; the railway flatbed car 6 is unpowered and is towed by a traction locomotive, preferably as follows Figure 2 The multi-purpose aerial work vehicle shown is more suitable for low-profile operation. It can be installed and separated from the road vehicle chassis through container locks at least at four corners to meet the needs of road transfer. When traveling or not working, the total height of the working vehicle group is within 4.2mm.
[0051] The mechanical arm 2, the operating room 4, and the pillar storage device 5 are installed on the dual-purpose road-rail basic platform 1; the pillar manipulator 3 is installed at the front end of the mechanical arm 2, and the pillar information identification device is installed on the pillar manipulator 3; the pillar storage device 5 stores multiple pillars 10 with multiple anchor sections, and the pillar types include H-type pillars, circular pillars, etc., and the present embodiment takes the H-type pillar as an example; each of the pillars 10 is installed with a label 11, and the label 11 contains the installation position information of the pillar, including the anchor section, number and pillar assembly parameter data (limit, slope) of the pillar; the operating room 4 is for the operator to operate the pillar manipulator 3 to read the pillar label information from the pillar storage device 5 and grab the mobile installation pillar, and the machine vision device is used for on-site monitoring and guidance.
[0052] Furthermore, the mechanical arm 2 includes a rotating base 21, a first arm 22, a second arm 23, and a universal ball seat 24 connected in sequence; the rotating base 21 is installed on the road-rail dual-purpose basic platform 1, such as Figure 3 As shown, the base flange is connected to the dual-purpose road-rail foundation platform 1 by using M30 screws, and the installation height of the base flange plane is not higher than the upper plane of the dual-purpose road-rail foundation platform 1. The first arm 22 and the second arm 23 are respectively provided with telescopic cylinders, and the front end of the universal ball seat 24 is provided with the support manipulator 3. The working range of the manipulator 2 is divided into half-width left 180°, half-width right 180° and full-width 360° according to the line center; the manipulator 2 can meet the needs of long-distance transportation, and has a self-locking function in the retracted state.
[0053] Furthermore, the pillar manipulator 3 has switchable clamping components, which are used to clamp pillars of different shapes.
[0054] Furthermore, the operating room 4 is installed on the rotating base 21 for automatic and manual control.
[0055] Furthermore, the pillar storage device 5 includes front and rear longitudinal baffles and a plurality of transverse limit rods. Furthermore, the pillars in the pillar storage device 5 are stacked in multiple layers, each layer including multiple pillars. Furthermore, each layer of the multiple layers of pillars in the pillar storage device 5 is stacked in reverse order of the anchor segments. In the process of stacking the pillars in sequence, the pillar storage device 5 itself is also equipped with a pillar information recognition device, which can recognize and read the label 11 of the pillar placed in, guide its stacking position, and give a position error alarm.
[0056] Furthermore, the machine vision device is provided at a fixed position on the road-rail dual-purpose basic platform 1 to provide a fixed-viewing angle image. Furthermore, the machine vision device is also provided on the mechanical arm 2 or the support manipulator 3 to provide a mobile-viewing angle image. During the support installation process, the machine vision device can satisfy the requirement of real-time video transmission to the operating room 4 and / or the cab of the traction locomotive and display.
[0057] The overhead line pillar assembly intelligent arm operation vehicle set of the present invention is used for the on-site construction and installation of various H-type pillars, which improves the automation level of H-type pillar construction and the work intensity of operators. The foundation of the on-site pillar has been completed, and the mutual coordination between the pillar and the foundation has been completed. Figure 4 As shown, the operation method comprises the following steps:
[0058] The first step is basic inspection:
[0059] The pre-installed foundation is assembled in advance, and the machine vision device then measures and analyzes the pre-installed foundation to check the construction status of the foundation, including checking the GPS coordinates of the foundation and the inclination value of the screws;
[0060] Step 2: Pick up the pole:
[0061] The pole picking process is divided into two modes: automatic completion and manual completion;
[0062] When the process is completed automatically, a label 11 containing installation position information is affixed to the approximate center of the pillar in advance, and the pillar information recognition device on the pillar manipulator 3 reads and recognizes the pillar to be grasped, and grasps the pillar under the monitoring and guidance of the machine vision device;
[0063] During manual operation, the operator in the operation room 4 visually observes the center position of the pillar under the monitoring and guidance of the machine vision device and performs manual grasping;
[0064] Step 3: Adjust the vertical position:
[0065] This step is a manual operation, because there are many obstacles at the construction site. When automatic operation is used, it is necessary to identify and calculate the surrounding obstacles, which takes a lot of time. In addition, the manual operation process is simple and convenient, and the requirements for operators are not high. Specifically, the operator in the operating room 4 visually moves the grasped pillar to the side of the road-rail dual-purpose basic platform 1 under the monitoring and guidance of the machine vision device, and adjusts it to a vertical state.
[0066] Step 4: Move above the foundation:
[0067] This step is also manually operated, and the operator in the operating room 4 visually moves the pillar adjusted to the vertical state to the top of the installation foundation under the monitoring and guidance of the machine vision device;
[0068] Step 5: Calibration:
[0069] Prepare two types of calibration blocks in advance. Select at least three of one type of calibration blocks and place them on the flange holes at the bottom of the pillars. Place the same number of another type of calibration blocks on the screws of the foundation.
[0070] At the same time, guide tags are placed on the ground, and the relationship between the guide tags and the calibration blocks is recorded by a machine vision device. After the recording is completed, the calibration blocks on the flange holes at the bottom of the pillars and on the foundation are removed;
[0071] Step 6. Installation:
[0072] The machine vision device guides the robot arm 2 and the pillar robot 3 to move, and completes the installation of the pillar and the foundation through the guidance of the guide label;
[0073] Step 7: Screw tightening:
[0074] After the pillars are installed in place, tighten the pillar screws;
[0075] Step 8. After the screws are tightened, remove the support manipulator 3, take away the guide label on the ground, and complete the support installation.
[0076] Further, the first step to the eighth step are looped to carry out the installation process of the next pillar.
[0077] The operating functions and performance parameters of the present invention are as follows:
[0078] The traction locomotive driver can receive the support base position information to ensure that the parking position error does not exceed ±1000mm;
[0079] Each device realizes safety functions such as operation limit, shutdown protection, and electromechanical interlocking;
[0080] The maximum outer rail superheight of the curve is 175mm;
[0081] The maximum slope of the line is 25‰;
[0082] The error of measuring the inclination rate of the pillar is controlled within 1‰;
[0083] The pillar grabbing position ensures assembly safety without affecting data collection, and has protection measures for the pillar galvanized layer;
[0084] The equipment is equipped with a self-stabilizing device to meet the needs of operating under a few large loads (2T);
[0085] The equipment is equipped with an emergency electric power device; in an emergency, the restricted parts can be dismantled to eliminate the danger.
[0086] The equipment has low noise performance;
[0087] It can meet the outdoor construction conditions of -10℃~45℃, and is resistant to rain, snow, freezing, dust, etc. It has multiple safety protection functions (limit, anti-fall, dumping, buffering, etc.). It has safety interlocking functions such as running limit and shutdown protection with other traveling equipment;
[0088] Able to reliably connect with the user's BIM management system;
[0089] Carry out load calculation to verify the whole machine capacity;
[0090] It can be disassembled for long-distance transportation and installed on site.
[0091] In summary, compared with the prior art, the solution of the present invention has the following significant advantages:
[0092] 1. The intelligent arm operation vehicle group and operation method for assembling the contact network pillar of the present invention include a dual-purpose road-rail foundation platform, a mechanical arm, a pillar manipulator, an operation room, a pillar storage device, a pillar information identification device and a machine vision device, etc. The pillar operation vehicle group realizes the semi-automatic installation function of the pillar, and adopts an automatic form in the two links of grabbing the pole and installing, and a semi-automatic form in the intermediate shift, which reduces the technical level requirements for workers and improves the efficiency of on-site construction. During the pillar installation process, the machine vision device simultaneously detects and measures the user's basic construction conditions, and connects with the user's BIM management system to share installation process data and measurement data information.
[0093] 2. The contact network pillar assembly intelligent arm operation vehicle group and operation method of the present invention, the pillar manipulator can quickly, flexibly and efficiently handle different types of H-type pillars, and can meet the grasping function of all H-type pillars of the contact network. The entire manipulator adopts a side clamping solution, which has high maneuverability, safety and accuracy during the construction process. Soft materials are set on the clamping surface to avoid damage to the pillar during the clamping process. 360-degree continuous rotation gears can achieve infinitely precise operation and positioning. The pillar manipulator has functions such as pitch, rotation, and clamping. It can meet the requirements of 6 degrees of freedom adjustment in conjunction with the mechanical arm to meet the requirements of pillar installation and adjustment.
[0094] 3. The contact network pillar assembly intelligent arm operation vehicle and operation method of the present invention are equipped with a machine vision device, which can guide the operation vehicle to find a suitable installation position for installation during the work process. The machine vision device uses a dual industrial camera as a guide to cooperate with the pillar operation vehicle to complete the precise alignment of the pillar. At the same time, the machine vision device has a measuring tool that can measure and analyze the pre-installed base and check the construction status of the base.
[0095] 4. The contact network pillar assembly intelligent arm operation vehicle group and operation method of the present invention are provided with a manual mode and an automatic mode; in the manual mode, the pillar installation process is completed by adjusting the pillar's left and right movement, front and back movement, center rotation, and up and down installation movements through a manual controller; in the automatic mode, when the pillar moves to the top of the pillar foundation, the machine vision device is used to guide the operation vehicle to adjust 6 degrees of freedom to complete the pillar automatic installation process.
[0096] It is to be understood that the embodiments of the system described above are merely illustrative, and the units described as separate components may or may not be physically separated, and may be located in one place, or may be distributed on different network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art may understand and implement the solution without creative effort.
[0097] In addition, it should be understood by those skilled in the art that, in the application documents of the embodiments of the present invention, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
[0098] In the description of the embodiment of the present invention, a large number of specific details are described. However, it should be understood that the embodiment of the embodiment of the present invention can be practiced without these specific details. In some examples, known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this specification. Similarly, it should be understood that in order to streamline the disclosure of the embodiment of the present invention and help understand one or more of the various inventive aspects, in the above description of the exemplary embodiments of the embodiment of the present invention, the various features of the embodiment of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof.
[0099] This method of disclosure, however, is not to be interpreted as reflecting an intention that the claimed embodiments of the invention require more features than are expressly recited in each claim. Rather, as the claims reflect, inventive aspects lie in less than all features of a single foregoing disclosed embodiment. Thus, the claims following the Detailed Description are hereby expressly incorporated into this Detailed Description, with each claim standing on its own as a separate embodiment of an embodiment of the invention.
[0100] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the embodiments of the present invention, rather than to limit them. Although the embodiments of the present invention have been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the embodiments of the present invention.
Claims
1. A contact network support assembly intelligent arm operation vehicle group, characterized in that: It comprises a road-rail dual-purpose basic platform (1), a mechanical arm (2), a support manipulator (3), an operation room (4), a support storage device (5), a support information recognition device and a machine vision device; The road-rail dual-purpose basic platform (1) can be detachably connected to a railway flatbed car (6) and can also be detachably connected to a road vehicle chassis; The mechanical arm (2), the operating room (4), and the pillar storage device (5) are installed on the dual-purpose road-rail basic platform (1); the pillar manipulator (3) is installed at the front end of the mechanical arm (2), and the pillar information identification device is installed on the pillar manipulator (3); the pillar storage device (5) stores a plurality of pillars (10) with a plurality of anchor sections, each of the pillars (10) is installed with a label (11), and the label (11) contains the installation position information of the pillar; the operating room (4) is used by an operator to operate the pillar manipulator (3) to read the pillar label information from the pillar storage device (5) and to grab and move the pillars for installation, and the machine vision device is used for on-site monitoring and guidance; The mechanical arm (2) comprises a rotating base (21), a first arm section (22), a second arm section (23), and a universal ball seat (24) which are connected in sequence; The rotating base (21) is mounted on the road-rail dual-purpose basic platform (1); the first arm (22) and the second arm (23) each have a telescopic oil cylinder; and the support manipulator (3) is mounted at the front end of the universal ball seat (24); The pillars in the pillar storage device (5) are stacked in multiple layers, each layer comprising a plurality of pillars; each layer of the multiple layers of pillars in the pillar storage device (5) is stacked in reverse order of anchor segments; The contact network pillar assembly intelligent arm operation vehicle group pre-attaches a label (11) containing installation position information to the approximate center position of the pillar, and the pillar information identification device on the pillar manipulator (3) reads and identifies it, selects the pillar to be grasped, and grasps the pillar under the monitoring and guidance of the machine vision device; the operator in the operation room (4) visually moves the grasped pillar to the side of the road-rail dual-purpose foundation platform (1) under the monitoring and guidance of the machine vision device, and adjusts it to a vertical state; the operator in the operation room (4) visually moves the pillar adjusted to a vertical state to the top of the installation foundation under the monitoring and guidance of the machine vision device; two types of calibration blocks are prepared in advance, at least three of which are selected and placed at the flange hole position at the bottom of the pillar, and the same number of another calibration blocks are placed on the screws of the foundation; at the same time, a guide label is placed on the ground, and the relationship between the guide label and the calibration block is recorded by the machine vision device. After the recording is completed, the calibration on the flange hole at the bottom of the pillar and on the foundation is removed; the machine vision device guides the mechanical arm (2) and the pillar manipulator (3) to move, and the installation of the pillar and the foundation is completed through the guidance of the guide label.
2. The overhead line support assembly intelligent arm operation vehicle set according to claim 1, characterized in that: The pillar manipulator (3) has switchable clamping components, which are respectively used to clamp pillars of different shapes.
3. The overhead line support assembly intelligent arm operation vehicle set according to claim 1, characterized in that: The pillar storage device (5) comprises front and rear longitudinal baffles and a plurality of transverse limiting rods.
4. The overhead line support assembly intelligent arm operation vehicle set according to claim 1, characterized in that: The machine vision device is provided at a fixed position on the road-rail dual-purpose basic platform (1) to provide a fixed viewing angle image.
5. The overhead line support assembly intelligent arm operation vehicle set according to claim 1 or 4, characterized in that: The mechanical arm (2) or the supporting mechanical arm (3) is provided with the machine vision device to provide a moving viewing angle image.
6. An operation method of a contact network support assembly intelligent arm operation vehicle group, used for the operation of the contact network support assembly intelligent arm operation vehicle group as claimed in any one of claims 1 to 5, characterized in that: The steps include: The first step is basic inspection: The pre-construction foundation is assembled in advance, and the machine vision device then measures and analyzes the pre-installed foundation to check the construction status of the foundation; Step 2: Pick up the pole: The pole picking process is divided into two modes: automatic completion and manual completion; When the process is completed automatically, a label (11) containing installation position information is affixed to the approximate center of the pillar in advance, and the pillar information recognition device on the pillar manipulator (3) reads and recognizes the pillar, selects the pillar to be grasped, and grasps the pillar under the monitoring and guidance of the machine vision device; During manual operation, the operator in the operation room (4) visually observes the center position of the pillar under the monitoring and guidance of the machine vision device and performs manual grasping; Step 3: Adjust the vertical position: This step is a manual operation, in which the operator in the operation room (4) visually moves the grasped pillar to the side of the road-rail dual-purpose basic platform (1) under the monitoring and guidance of the machine vision device, and adjusts it to a vertical state; Step 4: Move above the foundation: This step is also manually operated. The operator in the operation room (4) visually moves the pillar adjusted to the top of the installation foundation under the monitoring and guidance of the machine vision device; Step 5: Calibration: Prepare two types of calibration blocks in advance. Select at least three of one type of calibration blocks and place them on the flange holes at the bottom of the pillars. Place the same number of another type of calibration blocks on the screws of the foundation. At the same time, guide tags are placed on the ground, and the relationship between the guide tags and the calibration blocks is recorded by a machine vision device. After the recording is completed, the calibration blocks on the flange holes at the bottom of the pillars and on the foundation are removed; Step 6. Installation: The machine vision device guides the movement of the robot arm (2) and the support robot (3), and completes the installation of the support and the foundation through the guidance of the guide label; Step 7: Screw tightening: After the pillars are installed in place, tighten the pillar screws; Step 8. After the screws are tightened, remove the support manipulator (3) and remove the guide label on the ground to complete the support installation.
7. The method for operating a contact network support column assembly intelligent arm operation vehicle group according to claim 6, characterized in that: Repeat steps 1 to 8 to install the next support.