Filling preparation station and mining system having the same
By designing an underground filling preparation station, the mixing chamber and conveying pipe are used to achieve stable transportation of filling materials, solving the problems of insufficient surface space and high environmental protection requirements in the mine, and achieving a filling preparation station with a small area, environmentally friendly and high stability.
Patent Information
- Application Number
- CN202010752415.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-30
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2040-07-30
AI Technical Summary
In the prior art, the mine surface industrial site area is limited and the environmental protection requirements are high, which makes it impossible to set up filling preparation stations on the surface. The filling paste needs to be transported through long-distance pipelines, which is neither economical nor environmentally friendly.
A filling preparation station is designed, including a first material silo, a second material silo, a stirring chamber and a conveying pipe. By setting up an underground structure, the surface area is reduced, environmental protection is improved, and the stable transportation of filling materials is achieved through a stirring device and a conveying pipe.
The filling preparation station has achieved small footprint, environmentally friendly, high stability, good safety and good economy, and solved the problems of insufficient surface space and high environmental protection requirements.
Smart Images

Figure CN111997684B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of mines, in particular to a filling preparation station and a mine system having the filling preparation station. Background Art
[0002] The filling preparation stations in the related technologies are all built in the industrial sites on the surface of the mine, and the industrial sites are required to be large enough. With the continuous development of mining projects, mining conditions are becoming more and more difficult. The industrial sites of some mines are relatively tight, and the environmental protection requirements of some mines are relatively high, which makes it impossible to set up filling preparation stations in the industrial sites on the surface of the mine. In this way, the filling paste needs to be transported to the filling area over a long distance through pipelines, which is neither economical nor environmentally friendly. Summary of the invention
[0003] The present invention aims to solve one of the technical problems in the related art at least to a certain extent. To this end, the present invention provides a filling preparation station and a mining system having the filling preparation station.
[0004] According to an embodiment of the present invention, the filling preparation station includes: a first material bin and a second material bin; a first conveying chamber and a first conveying device, the first conveying device is arranged in the first conveying chamber, and the receiving end of the first conveying device cooperates with the discharge port of the first material bin; a second conveying chamber and a second conveying device, the second conveying device is arranged in the second conveying chamber, and the receiving end of the second conveying device cooperates with the discharge port of the second material bin; a stirring chamber and a stirring device, the stirring chamber is located below each of the first conveying chamber and the second conveying chamber, the stirring device is arranged in the stirring chamber, and the feeding port of the stirring device cooperates with each of the discharge end of the first conveying device and the discharge end of the second conveying device; and a first conveying pipe, the first end of the first conveying pipe is connected to the discharge port of the stirring device, and the second end of the first conveying pipe can extend to the filling area of the mine.
[0005] The filling preparation station according to the embodiment of the present invention has the advantages of occupying a small industrial site, being environmentally friendly, having high stability, good safety and good economy.
[0006] Optionally, the first material bin is a horizontal bin, the second material bin is a vertical bin, each of the first material bin and the second material bin is located underground, the first conveying chamber is located below the first material bin, and the second conveying chamber is located below the second material bin.
[0007] Optionally, the first conveying device is a quantitative feeder, and the second conveying device is a screw feeder.
[0008] Optionally, the length of the first conveying device is greater than or equal to a preset value.
[0009] Optionally, the stirring device includes a first spiral stirrer and a second spiral stirrer, the feed port of the first spiral stirrer cooperates with each of the discharge end of the first conveying device and the discharge end of the second conveying device, the discharge port of the first spiral stirrer is connected to the feed port of the second spiral stirrer, and the discharge port of the second spiral stirrer is connected to the first end of the first conveying pipe.
[0010] Optionally, the filling preparation station further includes: a filling chamber, which is located below the stirring chamber and has an accident pool; and a second conveying pipe, a first end of the second conveying pipe is connected to the discharge port of the stirring device, and a second end of the second conveying pipe is connected to the accident pool.
[0011] Optionally, the filling preparation station further includes a filling pump, which is located in the filling chamber and is arranged on the first delivery pipe.
[0012] Optionally, the stirring chamber is in communication with each of the first transport chamber, the second transport chamber and the filling chamber.
[0013] Optionally, the filling preparation station further includes: a first high-pressure water pipe, the water outlet end of the first high-pressure water pipe is connected to the feed port of the stirring device; an addition water pipe, the water outlet end of the addition water pipe is connected to the feed port of the stirring device; a second high-pressure water pipe, the water outlet end of the second high-pressure water pipe is connected to the first delivery pipe, and the water outlet end of the second high-pressure water pipe is located upstream of the filling pump; and a third high-pressure water pipe, the water outlet end of the third high-pressure water pipe is connected to the first delivery pipe, and the water outlet end of the third high-pressure water pipe is located downstream of the filling pump.
[0014] A mining system according to an embodiment of the present invention includes: a mine, which has a ventilation passage, an escape passage and an equipment transportation layer; and a filling preparation station, which is a filling preparation station according to an embodiment of the present invention, wherein the filling preparation station is adjacent to the ventilation passage and the escape passage, and the stirring chamber of the filling preparation station is adjacent to the equipment transportation layer. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 is a partial structural schematic diagram of a filling preparation station according to an embodiment of the present invention;
[0016] Figure 2 is a partial structural schematic diagram of a filling preparation station according to an embodiment of the present invention;
[0017] Figure 3is a partial structural schematic diagram of a filling preparation station according to an embodiment of the present invention;
[0018] Figure 4 It is a partial structural schematic diagram of a filling preparation station according to an embodiment of the present invention. DETAILED DESCRIPTION
[0019] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0020] The filling preparation station 100 according to an embodiment of the present invention is described below with reference to the accompanying drawings. Figure 1-Figure 4 As shown, the filling preparation station 100 according to an embodiment of the present invention includes a first material bin 11, a second material bin 12, a first conveying chamber 21, a first conveying device 31, a second conveying chamber 22, a second conveying device 32, a stirring chamber 23, a stirring device 33 and a first conveying pipe 41.
[0021] The first conveying device 31 is arranged in the first conveying chamber 21, and the receiving end of the first conveying device 31 cooperates with the discharge port of the first material bin 11, so that the first conveying device 31 can convey the material in the first material bin 11. The second conveying device 32 is arranged in the second conveying chamber 22, and the receiving end of the second conveying device 32 cooperates with the discharge port of the second material bin 12, so that the second conveying device 32 can convey the material in the second material bin 12.
[0022] The stirring chamber 23 is located below each of the first conveying chamber 21 and the second conveying chamber 22, and the stirring device 33 is disposed in the stirring chamber 23. The feeding port of the stirring device 33 cooperates with each of the discharging end of the first conveying device 31 and the discharging end of the second conveying device 32, so as to stir the materials conveyed by the first conveying device 31 and the second conveying device 32. The first end of the first conveying pipe 41 is connected to the discharging port of the stirring device 33, and the second end of the first conveying pipe 41 can extend to the filling area.
[0023] The filling preparation station 100 according to the embodiment of the present invention can be provided with the first conveying chamber 21, the second conveying chamber 22 and the stirring chamber 23, so that the main part of the filling preparation station 100 can be arranged underground. This can not only save the industrial site on the surface of the mine, but also enable the filling preparation station 100 to meet higher environmental protection requirements, and further enable the filling preparation station 100 to be arranged at a position close to the filling area of the mine, so as to reduce the length of the first conveying pipe 41 and improve the economy of the filling preparation station 100.
[0024] Moreover, by locating the stirring chamber 23 below the first conveying chamber 21 and the second conveying chamber 22, the underground excavation space can be greatly reduced, thereby not only greatly improving the stability and safety of the filling preparation station 100, but also reducing the difficulty of supporting the stirring chamber 23, the first conveying chamber 21 and the second conveying device 32.
[0025] Therefore, the filling preparation station 100 according to the embodiment of the present invention has the advantages of occupying a small industrial site, being environmentally friendly, having high stability, good safety, and good economy.
[0026] like Figure 1-Figure 4 As shown, the filling preparation station 100 includes a first material bin 11, a second material bin 12, a first conveying chamber 21, a first conveying device 31, a second conveying chamber 22, a second conveying device 32, a stirring chamber 23, a stirring device 33 and a first conveying pipe 41. The filling preparation station 100 can be adjacent to the ventilation channel and the escape channel of the mine system. In this way, the ventilation channel and the escape channel of the filling preparation station 100 can be better integrated with the ventilation channel and the escape channel of the mine, so that the construction amount of the ventilation channel and the escape channel of the filling preparation station 100 can be reduced, so as to reduce the construction cost of the filling preparation station 100.
[0027] The first material bin 11 is a horizontal bin, and dry sand and tailings can be contained in the first material bin 11. The second material bin 12 is a vertical bin, and cement can be contained in the second material bin 12. Each of the first material bin 11 and the second material bin 12 is arranged underground. By arranging each of the first material bin 11 and the second material bin 12 underground, not only can the area of the industrial site occupied by the filling preparation station 100 be further reduced, so as to further save the industrial site on the surface of the mine, but also the filling preparation station 100 can meet higher environmental protection requirements.
[0028] By making the first material bin 11 a horizontal bin, the number of first material bins 11 can be reduced. That is, if the first material bin 11 is a vertical bin, two first material bins 11 need to be provided; if the first material bin 11 is a horizontal bin, only one first material bin 11 needs to be provided. This not only reduces the construction cost of the filling preparation station 100, but also facilitates the arrangement of the first material bin 11 and the second material bin 12.
[0029] like Figure 1-Figure 3 As shown in FIG. 1 , the first conveying chamber 21 is located below the first material bin 11, and the second conveying chamber 22 is located below the second material bin 12. Figure 3 As shown by arrow A in FIG.
[0030] The first conveying device 31 is arranged in the first conveying chamber 21, and the receiving end of the first conveying device 31 cooperates with the discharge port of the first material bin 11, so that the first conveying device 31 can convey the material in the first material bin 11. The second conveying device 32 is arranged in the second conveying chamber 22, and the receiving end of the second conveying device 32 cooperates with the discharge port of the second material bin 12, so that the second conveying device 32 can convey the material in the second material bin 12.
[0031] Optionally, the first conveying device 31 is a quantitative feeder, and the second conveying device 32 is a screw feeder. The length of the first conveying device 31 is greater than or equal to a preset value. In this way, the first material bin 11 and the mixing chamber 23 can be separated by a preset distance, so that the two large excavation projects can be separated, so that the engineering structure of the first material bin 11 and the engineering structure of the mixing chamber 23 will not affect each other.
[0032] like Figure 1-Figure 3 As shown, the stirring chamber 23 is located below each of the first conveying chamber 21 and the second conveying chamber 22. Optionally, the stirring chamber 23 is connected to each of the first conveying chamber 21, the second conveying chamber 22 and the filling chamber 24. This can make the structure of the filling preparation station 100 more reasonable.
[0033] The stirring chamber 23 may be adjacent to the equipment transportation layer of the mine. This allows the equipment transportation layer of the filling preparation station 100 to be well integrated with the equipment transportation layer of the mine, thereby reducing the construction volume of the equipment transportation layer of the filling preparation station 100, so as to reduce the construction cost of the filling preparation station 100. Moreover, by making the stirring chamber 23 adjacent to the equipment transportation layer of the mine, the stirring chamber 23 can be used as the main equipment transportation layer of the filling preparation station 100. Since the stirring device 33 is a large piece of equipment of the filling preparation station 100, the difficulty of equipment transportation can be reduced by using the stirring chamber 23 as the main equipment transportation layer of the filling preparation station 100.
[0034] The stirring device 33 is transported to the stirring chamber 23 through the equipment transportation layer of the mine. The first conveying device 31, the second conveying device 32 and the filling pump 47 can be first transported to the stirring chamber 23 through the equipment transportation layer of the mine, and then transported to the corresponding chamber through the lifting hole.
[0035] like Figure 2 and Figure 3 As shown, the stirring device 33 is disposed in the stirring chamber 23. The feed port of the stirring device 33 cooperates with each of the discharge end of the first conveying device 31 and the discharge end of the second conveying device 32 to stir the materials conveyed by the first conveying device 31 and the second conveying device 32.
[0036] Optionally, the stirring device 33 includes a first spiral stirrer 331 and a second spiral stirrer 332, the feed port of the first spiral stirrer 331 cooperates with each of the discharge end of the first conveying device 31 and the discharge end of the second conveying device 32, the discharge port of the first spiral stirrer 331 is connected to the feed port of the second spiral stirrer 332, and the discharge port of the second spiral stirrer 332 is connected to the first end of the first conveying pipe 41.
[0037] like Figure 1-Figure 4 As shown, the filling preparation station 100 further includes a filling chamber 24 and a second conveying pipe 42. The filling chamber 24 is located below the stirring chamber 23, and the filling chamber 24 has an accident pool 2. The first end of the second conveying pipe 42 is connected to the discharge port of the stirring device 33, and the second end of the second conveying pipe 42 is connected to the accident pool 2. The first end of the first conveying pipe 41 is connected to the discharge port of the stirring device 33, and the second end of the first conveying pipe 41 can extend to the filling area.
[0038] By locating the filling chamber 24 below the stirring chamber 23, the underground excavation space can be further reduced, thereby not only further improving the stability and safety of the filling preparation station 100, but also reducing the difficulty of supporting the stirring chamber 23, the filling chamber 24, the first conveying chamber 21 and the second conveying device 32.
[0039] Furthermore, by providing the filling chamber 24 with the accident pool 2 and the second delivery pipe 42 connected to the accident pool 2, the filling material in the stirring device 33 can be delivered to the accident pool 2 when an accident or failure occurs. This can prevent the filling material from being unable to leave the stirring device 33. Since the filling material solidifies after a period of time, if the filling material cannot leave the stirring device 33, the filling material will block the stirring device 33.
[0040] like Figure 1 As shown, the filling preparation station 100 further includes a filling pump 47, which is located in the filling chamber 24 and is arranged on the first conveying pipe 41. By providing the filling pump 47, the filling material can be conveyed to the filling area above the stirring chamber 23, thereby expanding the application range of the filling preparation station 100.
[0041] like Figure 1 As shown, the filling preparation station 100 further includes a first high-pressure water pipe 43, an additional water pipe 44, a second high-pressure water pipe 45 and a third high-pressure water pipe 46. The water outlet of the first high-pressure water pipe 43 is connected to the feed port of the stirring device 33, so that the stirring device 33 can be flushed by the first high-pressure water pipe 43. The water outlet of the additional water pipe 44 is connected to the feed port of the stirring device 33, so that water, dry sand, tailings and cement are mixed through the stirring device 33 to obtain filling materials.
[0042] The water outlet of the second high-pressure water pipe 45 is connected to the first delivery pipe 41, and the water outlet of the second high-pressure water pipe 45 is located upstream of the filling pump 47. The water outlet of the third high-pressure water pipe 46 is connected to the first delivery pipe 41, and the water outlet of the third high-pressure water pipe 46 is located downstream of the filling pump 47. Thus, the filling pump 47 can be flushed by the second high-pressure water pipe 45, and the part of the first delivery pipe 41 located downstream of the filling pump 47 can be flushed by the third high-pressure water pipe 46.
[0043] Among them, "upstream" and "downstream" are determined according to the flow direction of the filling material in the first conveying pipe 41. The filling material first flows through the water outlet end of the second high-pressure water pipe 45 and then flows through the filling pump 47. The filling material first flows through the filling pump 47 and then flows through the water outlet end of the third high-pressure water pipe 46.
[0044] The present invention also provides a mining system. The mining system according to an embodiment of the present invention includes a mine and a filling preparation station 100 according to the above embodiment of the present invention. The mine has a ventilation passage, an escape passage, and an equipment transportation layer. The filling preparation station 100 is adjacent to the ventilation passage and the escape passage, and the stirring chamber 23 of the filling preparation station 100 is adjacent to the equipment transportation layer.
[0045] Therefore, the mining system according to the embodiment of the present invention has the advantages of being environmentally friendly, highly stable, safe, and economical.
[0046] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0047] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0048] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0049] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0050] In the present invention, the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0051] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A filling preparation station, characterized in that: include: A first material warehouse and a second material warehouse; A first conveying chamber and a first conveying device, wherein the first conveying device is arranged in the first conveying chamber, a material receiving end of the first conveying device cooperates with a material discharge port of the first material bin, and a length of the first conveying device is greater than or equal to a preset value; A second conveying chamber and a second conveying device, wherein the second conveying device is arranged in the second conveying chamber, and a receiving end of the second conveying device cooperates with a discharge port of the second material bin; A stirring chamber and a stirring device, wherein the stirring chamber is located below each of the first conveying chamber and the second conveying chamber, the stirring device is disposed in the stirring chamber, and a feed port of the stirring device cooperates with each of a discharge end of the first conveying device and a discharge end of the second conveying device; a first conveying pipe, wherein a first end of the first conveying pipe is connected to a discharge port of the stirring device, and a second end of the first conveying pipe is capable of extending to a filling area of a mine; A filling chamber, the filling chamber is located below the stirring chamber, and the filling chamber has an accident pool; A filling pump, the filling pump is located in the filling chamber, and the filling pump is arranged on the first delivery pipe; A first high-pressure water pipe, wherein a water outlet end of the first high-pressure water pipe is connected to a feed inlet of the stirring device; A water adding pipe, the water outlet end of which is connected to the feed inlet of the stirring device; a second high-pressure water pipe, wherein a water outlet end of the second high-pressure water pipe is connected to the first delivery pipe, and the water outlet end of the second high-pressure water pipe is located upstream of the filling pump; A third high-pressure water pipe, the water outlet end of the third high-pressure water pipe is connected to the first delivery pipe, and the water outlet end of the third high-pressure water pipe is located downstream of the filling pump.
2. The filling preparation station according to claim 1, characterized in that The first material bin is a horizontal bin, the second material bin is a vertical bin, each of the first material bin and the second material bin is arranged underground, the first conveying chamber is located below the first material bin, and the second conveying chamber is located below the second material bin.
3. The filling preparation station according to claim 1, characterized in that The first conveying device is a quantitative feeder, and the second conveying device is a screw feeder.
4. The filling preparation station according to claim 1, characterized in that The stirring device includes a first spiral stirrer and a second spiral stirrer, the feed port of the first spiral stirrer cooperates with each of the discharge end of the first conveying device and the discharge end of the second conveying device, the discharge port of the first spiral stirrer is connected to the feed port of the second spiral stirrer, and the discharge port of the second spiral stirrer is connected to the first end of the first conveying pipe.
5. A filling preparation station according to any one of claims 1 to 4, characterized in that Further including: A second conveying pipe, wherein a first end of the second conveying pipe is connected to the discharge port of the stirring device, and a second end of the second conveying pipe is connected to the accident pool.
6. The filling preparation station according to claim 5, characterized in that The stirring chamber is in communication with each of the first transport chamber, the second transport chamber, and the filling chamber.
7. A mining system, characterized in that: include: A mine having ventilation passages, escape passages and equipment transport layers; and A filling preparation station, wherein the filling preparation station is the filling preparation station according to any one of claims 1-6, wherein the filling preparation station is adjacent to the ventilation passage and the escape passage, and the stirring chamber of the filling preparation station is adjacent to the equipment transport layer.
Citation Information
Patent Citations
Underground all tailings-waste gypsum filling system and filling method
CN108915765A
Ramming device
CN201190581Y
Filling preparation station and mine system with filling preparation station