A combined tailings pond auxiliary dam and construction method thereof
Through the concrete retaining wall, rock pile dam and mold bag pile structure of the composite tailings pond sub-dam, combined with the anti-seepage layer, the construction difficulty and high investment problems in the complex terrain of the tailings pond are solved, and low cost is achieved. Low complexity construction and maximization of storage capacity.
Patent Information
- Application Number
- CN202011026415.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-09-25
AI Technical Summary
The existing tailings pond sub-dam has a difficult construction, high investment, high geological conditions and a large occupancy of storage capacity, making it difficult to maximize storage capacity.
A combined structure of concrete retaining wall, rock pile dam and mold bag pile dam is built in two areas, combining the anti-seepage layer and the drainage layer to form a combined tailings sub-dam to reduce the geological and topographic conditions requirements and reduce the construction complexity and invest.
It has achieved low-cost and low-complex construction under various terrain and geological conditions, avoided storage capacity occupation, improved the accumulation elevation and service life of tailings ponds, and enhanced the quality of return water.
Smart Images

Figure CN112012170B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tailings ponds, and in particular to a combined tailings pond auxiliary dam and a construction method thereof. Background Art
[0002] Tailings ponds are an important part of mining projects. With the current strict management of environmental protection and safety, it has become a general trend to make full use of the terrain of the valley where the tailings pond is located to maximize the storage capacity. For some tailings ponds with complex terrain and many passes, it is necessary to build auxiliary dams to close the tailings pond area to achieve the required storage capacity. At this time, the problem of auxiliary dams is very critical, which directly affects the final accumulation elevation, total storage capacity and service life of the tailings pond.
[0003] The tailings pond auxiliary dam has various structural forms, which can be concrete dam, mortar masonry dam, rockfill dam, homogeneous earth dam, tailings dam, etc. As rigid dams, concrete dams and mortar masonry dams have high requirements for geological conditions and lithological characteristics at the pass, high investment in foundation treatment, and great construction difficulty; rockfill dams and homogeneous earth dams generally have a gentle slope ratio, high requirements for the terrain at the mountain pass and need to be treated for seepage prevention, large engineering volume, occupying storage capacity, and complex construction; tailings pile auxiliary dams need to meet the requirements of dry beach length and clarification distance, and have high requirements for the depth of the reservoir area. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a combined tailings pond auxiliary dam and a construction method thereof which is suitable for various terrain and geological conditions, does not occupy the storage capacity, is simple to construct and has low investment. The combined structure of concrete retaining wall, rockfill dam and bag-formed dam is adopted and constructed in two areas. The shortcomings of concrete dam, mortar-made stone dam, rockfill dam, homogeneous earth dam and tailings dam as auxiliary dams of tailings ponds are overcome, and the requirements for geological and terrain conditions for the construction of the auxiliary dam are reduced.
[0005] To achieve the above object, the present invention is implemented by adopting the following technical solutions:
[0006] On the one hand, the present invention provides a combined tailings pond auxiliary dam, comprising a first area, a second area and a tailings area, the first area comprising a concrete retaining wall arranged outside the tailings area and a first rockfill dam outside the concrete retaining wall, the elevation of the first area and the tailings area is H1, the second area comprises an impermeable layer arranged at the upper end of the tailings area, a mold bag dam on the upper side of the impermeable layer and a second rockfill dam outside the mold bag dam, a drainage layer is arranged on the upper side of the impermeable layer, the first rockfill dam and the second rockfill dam are built as a whole, and a dry beach of a certain length is formed inside the auxiliary dam.
[0007] In a possible technical solution, a mortar-stone retaining dam is provided on the outer side of the first rockfill dam.
[0008] In a possible technical solution, the concrete retaining wall foundation is located in a strongly weathered layer, and the tooth grooves are located in a moderately weathered layer.
[0009] In a possible technical solution, the first rockfill dam and the second rockfill dam use stones with a softening coefficient greater than 0.8, a saturated compressive strength of not less than 30 MPa, a soil content of less than 5%, and a stone particle size of 20 to 500 mm.
[0010] In a possible technical solution, the drainage layer is a geotextile wrapped gravel structure, the gravel particle size is 10-35mm, the drainage layer thickness is 500mm, the width is 5.0m, and a DN100PE pipe is used to guide the seepage water into the drainage ditch.
[0011] In a possible technical solution, the filling height of each layer of the mold bag dam is 0.5m, the longitudinal overlap between the mold bags is not less than 1.0m, and the mold bag plane and each layer of mold bags are arranged with longitudinal and transverse staggered seams.
[0012] Another aspect of the present invention provides a method for constructing a combined tailings pond auxiliary dam, comprising the following steps:
[0013] S1. Determine the location of the auxiliary dam and the elevation H of the auxiliary dam crest according to the actual terrain and design conditions;
[0014] S2, build a concrete retaining wall with a height of H1, a top width of d1, a vertical inner slope, and a downstream slope of 1:m1;
[0015] S3. After the concrete retaining wall is built, the first rockfill dam is built on its outside, with a top width of d2 and an outer slope of 1:m2. The dam is built in layers from bottom to top and compacted;
[0016] S4. After the construction of the first area is completed, ore is discharged into the tailings area reservoir to raise the beach surface of the tailings area to the dam top elevation H1 of the first area;
[0017] S5. A layer of impermeable layer is laid on the beach surface in the tailings area; a drainage layer is set on the upper side of the impermeable layer;
[0018] S6, the second area is from the original ground elevation H1 to the final accumulation elevation H2, with a total dam height of H. The dam is built inside the reservoir on the inner side of the concrete retaining wall using the mold bag method, with a top width of d3, a height of h2, an upstream slope of 1:m3, and a downstream slope of 1:m4;
[0019] S7. Build a second rockfill dam outside the mold bag dam, with a top width of d4 and an outer slope ratio of about 1:m5, which is built as a whole with the first rockfill dam in the first area.
[0020] In a possible technical solution, after step S3, a mortar-laid stone retaining dam is constructed outside the first rockfill dam.
[0021] In a possible technical solution, before step S5, riprap is performed on the beach area that affects the stability of the auxiliary dam to squeeze out silt, so as to improve the bearing capacity.
[0022] In a possible technical solution, in step S6, the mold bag method is used to build a dam inside the reservoir on the inner side of the concrete retaining wall and use tailings for filling. The construction needs to be layered, and the filling height of each layer is 0.5m. The longitudinal overlap between the mold bags is not less than 1.0m. The mold bag plane and the longitudinal and transverse gaps between each layer of mold bags should be staggered. When building the dam, 10% to 20% of the settlement amount is reserved; when filling the mold bag, the tailings slurry concentration is controlled at 15-30%, and the filling pressure is controlled at 0.2MPa. When filling to the screen slurry stage, the filling pressure is controlled to prevent the bag from rupturing; if the ideal filling thickness cannot be reached in one filling, after the tailings in the bag are slightly consolidated, a second or multiple fillings are carried out until the designed filling thickness is reached.
[0023] Compared with the prior art, the invention has the following beneficial effects: Compared with concrete dam and masonry dam, the combined auxiliary dam adopts a flexible structure, which reduces the geological conditions at the dam site and saves the expensive cost of foundation treatment; compared with rockfill dam and homogeneous earth dam, the combined auxiliary dam structure has low requirements for terrain conditions, and the slope ratio can be adjusted according to the actual terrain, reducing the workload; compared with the tailings pile auxiliary dam, the requirements for the depth of the tailings pond are reduced, the beach length in front of the dam can be flexibly controlled, the operation and management of the tailings pond is convenient, and the return water quality is improved. By adopting the mold bag method combined with the anti-seepage layer to pile up the auxiliary dam, the raw materials are easy to obtain, preventing other external materials from occupying the storage capacity; it can be reasonably phased according to the production and operation of the tailings pond, reducing the one-time investment. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the structure of the present invention;
[0025] Figure 2 It is a schematic diagram of the cross-sectional structure of the concrete retaining wall area;
[0026] Figure 3 is a schematic structural diagram of a drainage layer according to an embodiment of the present invention;
[0027] Figure numerals: 1-concrete retaining wall; 2-first rockfill dam; 3-tailings area; 4-anti-seepage layer; 5-bag-built dam; 6-second rockfill dam; 7-drainage layer; 8-mortar-laid stone retaining dam. DETAILED DESCRIPTION
[0028] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0029] like Figure 1 to Figure 2As shown, the combined tailings pond auxiliary dam of the present invention includes a first area, a second area and a tailings area 3, the first area includes a concrete retaining wall 1 arranged outside the tailings area and a first rockfill dam 2 outside the concrete retaining wall 1, the elevation of the first area and the tailings area 3 is H1, and the first area provides basic conditions for the dam construction of the second area; the second area includes an impermeable layer 4 arranged at the upper end of the tailings area 3, a mold bag dam 5 on the upper side of the impermeable layer 4 and a second rockfill dam 6 outside the mold bag dam 5, a drainage layer 7 is arranged on the upper side of the impermeable layer 4, so that the dam body has water retaining capacity; the first rockfill dam 2 and the second rockfill dam 6 are built as a whole, and a dry beach of a certain length is formed on the inner side of the auxiliary dam. Compared with concrete dam and masonry dam, the combined flexible structure of rockfill dam + concrete retaining wall + mold bag method reduces the geological conditions at the dam site and saves the expensive cost of foundation treatment. Compared with rockfill dam and homogeneous earth dam, the combined auxiliary dam structure has low requirements for terrain conditions and can adjust the slope ratio according to the actual terrain, reducing the workload. Compared with the tailings pile auxiliary dam, it reduces the requirements for the depth of the tailings pond, can flexibly control the length of the beach in front of the dam, facilitates the operation and management of the tailings pond, and improves the quality of return water. By using the mold bag method combined with the anti-seepage membrane to build the auxiliary dam, raw materials are easy to obtain, preventing other external materials from occupying the storage capacity.
[0030] As a specific implementation of the present invention, when the terrain is insufficient or the stability of a dam area cannot meet the requirements, a mortar-stone retaining dam 8 is arranged outside the first rockfill dam 2 as a support body of the first rockfill dam.
[0031] As a specific embodiment of the present invention, Figure 2 As shown, in order to further enhance the firmness of the concrete retaining wall, the foundation of the concrete retaining wall 1 is located in the strongly weathered layer, and the tooth groove is located in the medium weathered layer.
[0032] As a specific implementation of the present invention, the first rockfill dam 2 and the second rockfill dam 6 use stones with a softening coefficient greater than 0.8, a saturated compressive strength of not less than 30Mpa, a soil content of less than 5%, and a stone particle size of 20 to 500mm. When stacking, they are stacked and rolled from bottom to top in layers, with a thickness of no more than 1.0m, and a porosity of ≤30% after rolling.
[0033] As a specific embodiment of the present invention, Figure 3 As shown, the drainage layer 7 is a geotextile wrapped gravel structure, the gravel particle size is 10-35 mm, the drainage layer 7 is 500 mm thick and 5.0 m wide, and a DN100 PE pipe is used to guide the seepage water into the drainage ditch.
[0034] As a specific implementation of the present invention, the filling height of each layer of the mold bag dam 5 is 0.5m, the longitudinal overlap between the mold bags is not less than 1.0m, and the mold bag plane and each layer of mold bags are arranged with longitudinal and transverse staggered seams.
[0035] The method for constructing a combined tailings pond auxiliary dam according to an embodiment of the present invention comprises the following steps:
[0036] (1) Investigate and understand the geographical location of the tailings pond, seismic fortification standards, tailings particle analysis and other information;
[0037] (2) Determine the location of the auxiliary dam and the elevation H of the auxiliary dam crest based on the actual terrain and design conditions;
[0038] (3) Construct a concrete retaining wall 1, the concrete retaining wall 1 has a height of H1, a top width of d1, a vertical inner slope, and a downstream slope of 1: m1; further, d1 is 2-4 m, m1 is 0.6-0.8 m; its foundation is located in the strongly weathered layer, and the trough is located in the moderately weathered layer;
[0039] (4) After the construction of the concrete retaining wall 1 is completed, the first rockfill dam 2 is built outside it, with a top width d2, which is determined according to the actual situation, and an outer slope of 1: m2. When stacking, the dam is stacked and compacted in layers from bottom to top; further, m2 is generally 1.5-1.8m, and the rockfill requires that the softening coefficient of the selected stone is greater than 0.8, the saturated compressive strength is not less than 30Mpa, the soil content is less than 5%, and the block stone particle size is preferably 20-500mm. When stacking, the dam is stacked and compacted in layers from bottom to top, and the thickness should not be greater than 1.0m. The porosity after compaction is ≤30%;
[0040] (5) When the terrain is insufficient or the stability of the dam body in the first area cannot meet the requirements, a mortar-stone retaining dam 8 is built at an appropriate position outside the first rockfill dam 2 as the support body of the first rockfill dam;
[0041] The first area of the combined auxiliary dam mainly involves concrete retaining walls and rockfill dams, and the construction elevations are all below the highest point of the pass, mainly to provide a solid foundation for the second area of the auxiliary dam;
[0042] (6) After the construction of the first area is completed, the ore will be discharged into the tailings area 3 reservoir to raise the beach surface of the tailings area 3 to the dam top elevation H1 of the first area;
[0043] (7) Dump stones and squeeze silt out of the beach area that affects the stability of the auxiliary dam to increase the bearing capacity;
[0044] (8) A layer of impermeable layer 4 is laid on the beach surface of the tailings area 3; preferably, the impermeable layer 4 is a bidirectional geogrid, and a layer of bidirectional geogrid is laid at the bottom of the auxiliary dam in the second area, which is laid smoothly, tied firmly, and has a tensile strength of not less than 50KN; in order to accelerate the consolidation of the film bag tailings dam, a drainage layer 7 is set on the geogrid, preferably, the drainage layer is a geotextile wrapped gravel structure, the gravel particle size d=10-35mm, the drainage body thickness is 500mm, the width is 5.0m, and a DN100PE pipe is used to guide the seepage water into the drainage ditch of the rockfill dam;
[0045] (9) The second area is from the original ground elevation H1 to the final accumulation elevation H2, with a total dam height of H. The dam is built inside the concrete retaining wall 1 by the mold bag method, with a top width of d3, a height of h2, an upstream slope of 1:m3, and a downstream slope of 1:m4. Furthermore, m3 is generally 1 to 2m, and m4 is generally 1 to 2m. A layer of geomembrane is laid at the junction of the mold bag and the tailings area 3 to the concrete retaining wall 1. The outer side of the mold bag tailings dam is built with stone masonry, with a top width of d4, which is determined according to actual conditions, and the outer slope ratio is about 1:m5, and m5 is generally 1.5 to 2.0, and is built as a whole with the rockfill dam in the auxiliary dam area;
[0046] (10) The second rockfill dam 6 is built on the outside of the mold bag dam 5, with a top width of d4 and an outer slope ratio of about 1:m5, and is built as a whole with the first rockfill dam 2 in the first area. The second rockfill dam is built on the outside of the mold bag dam, which not only prevents the mold bag from aging, but also improves the stability of the slope; the mold bag dam is filled with +200 mesh tailings, which needs to be constructed in layers, with each layer of filling height of about 0.5m, and the longitudinal overlap between the mold bags is not less than 1.0m. The mold bag plane and each layer of mold bags should be staggered in the longitudinal and transverse directions. When building the dam, 10% to 20% of the settlement should be reserved. When filling the mold bag, the tailings slurry concentration should be controlled at 15-30%, and the filling pressure should be controlled at about 0.2MPa. When filling to the screen slurry stage, the filling pressure should be controlled to prevent the bag from breaking. If the ideal filling thickness cannot be achieved in one filling, wait for the tailings in the bag to consolidate slightly, and then fill it twice or more until the designed filling thickness is reached.
[0047] The auxiliary dam is built using the membrane bag method, with tailings as the raw material. The material is easily available and does not occupy the reservoir capacity. To further increase the safety reserve of the auxiliary dam, a certain length of dry beach should be formed in front of the dam after the construction of the auxiliary dam is completed to prevent direct water blocking, extend the seepage path, and improve the reliability of the auxiliary dam. The specific beach length can be flexibly controlled according to actual conditions. The second area of the auxiliary dam can be constructed in stages, reducing the amount of one-time investment.
[0048] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A combined tailings pond auxiliary dam, characterized in that: The invention comprises a first area, a second area and a tailings area (3), wherein the first area comprises a concrete retaining wall (1) arranged outside the tailings area and a first rockfill dam (2) outside the concrete retaining wall (1), the elevation of the first area and the tailings area (3) is H1, the second area adopts a mold bag method to build a dam inside the concrete retaining wall (1) toward the reservoir, the second area comprises an impermeable layer (4) arranged at the upper end of the tailings area (3), a mold bag dam (5) on the upper side of the impermeable layer (4) and a second rockfill dam (6) outside the mold bag dam (5), a drainage layer (7) is arranged on the upper side of the impermeable layer (4), the first rockfill dam (2) and the second rockfill dam (6) are built as a whole, and a dry beach of a certain length is formed inside the auxiliary dam; A mortar-stone retaining dam (8) is arranged outside the first rockfill dam (2); The inner slope of the concrete retaining wall (1) is vertical, the foundation of the concrete retaining wall (1) is located in a strongly weathered layer, and the tooth grooves are located in a moderately weathered layer; The first rockfill dam (2) and the second rockfill dam (6) are made of stones with a softening coefficient greater than 0.8, a saturated compressive strength not less than 30 MPa, a soil content less than 5%, and a rock particle size of 20 to 500 mm.
2. The combined tailings pond auxiliary dam according to claim 1, characterized in that: The drainage layer (7) is a geotextile wrapped gravel structure, the gravel particle size is 10-35 mm, the drainage layer (7) is 500 mm thick and 5.0 m wide, and a DN100 PE pipe is used to guide the seepage water into the drainage ditch.
3. The combined tailings pond auxiliary dam according to claim 1, characterized in that: The filling height of each layer of the mold bag stacking dam (5) is 0.5 m, the longitudinal overlap between the mold bags is not less than 1.0 m, and the mold bag plane and each layer of mold bags are arranged with longitudinal and transverse staggered seams.
4. The method for constructing a combined tailings pond auxiliary dam according to any one of claims 1 to 3, characterized in that: The following steps are involved: S1. Determine the location of the auxiliary dam and the elevation H of the auxiliary dam crest according to the actual terrain and design conditions; S2, construction of concrete retaining wall (1), concrete retaining wall (1) height H1, top width d1, vertical inner slope, downstream slope 1: m1; S3, after the concrete retaining wall (1) is built, the first rockfill dam (2) is built on its outer side, with a top width of d2 and an outer slope of 1: m2, and the stacking is layered and rolled from bottom to top; S4, after the construction of the first area is completed, the tailings area (3) is placed in the reservoir, and the tailings area (3) beach is raised to the first area dam top elevation H1; S5, located in the tailings area (3) on the beach surface laid an impermeable layer (4); the impermeable layer (4) is provided on the upper side of the drainage layer (7); S6, the second area is from the original ground elevation H1 to the final accumulation elevation H2, the total dam height H, the dam is built inside the concrete retaining wall (1) using the mold bag method, the top width d3, height h2, upstream slope 1: m3, downstream slope 1: m4; S7, a second rockfill dam (6) is built outside the mold bag dam (5) with top width d4 and outer slope ratio 1:m5, and is built as a whole with the first rockfill dam (2) in the first area.
5. The method for constructing a combined tailings pond auxiliary dam according to claim 4, characterized in that: After step S3, a mortar-laid stone retaining dam (8) is constructed outside the first rockfill dam (2).
6. The method for constructing a combined tailings pond auxiliary dam according to claim 4, characterized in that: Before step S5, the beach area that affects the stability of the auxiliary dam is firstly ripped out to squeeze out silt, so as to improve the bearing capacity.
7. The method for constructing a combined tailings pond auxiliary dam according to claim 4, characterized in that: In step S6, the mold bag method is used to fill the reservoir with tailings on the inner side of the concrete retaining wall (1). The construction needs to be layered, and the filling height of each layer is 0.5m. The longitudinal overlap between the mold bags is not less than 1.0m. The mold bag plane and the longitudinal and transverse gaps between each layer of mold bags should be staggered. When building the dam, 10% to 20% of the settlement amount is reserved. When filling the mold bag, the tailings slurry concentration is controlled at 15 to 30%, and the filling pressure is controlled at 0.2MPa. When filling to the screen slurry stage, the filling pressure is controlled to prevent the bag from rupturing. If the ideal filling thickness cannot be achieved in one filling, after the tailings in the bag are slightly consolidated, a second or multiple filling is performed until the designed filling thickness is reached.