Low-pressure cylinder zero-output coupled water thermal storage peak-shaving heating system

Through the low-pressure cylinder zero-output coupling water storage and peak-shaving heating system, the problem of peak-shaving power shaving in the heating season in the Northeast and Northwest regions has been solved, the heat storage and regulation has been realized, the peak-shaving capacity and flexibility of the unit have been improved, and the current solution has been solved. There is a problem of insufficient peak shaving capability in the technology.

CN112012805BActive Publication Date: 2024-11-05STATE POWER INVESTMENT CORPORATION RESEARCH INSTITUTE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910473042.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-05-31
Publication Date
2024-11-05
Estimated Expiration
2039-05-31

Smart Images

  • Figure CN112012805B_ABST
    Figure CN112012805B_ABST
Patent Text Reader

Abstract

The present application discloses a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system, the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system comprises: a steam turbine unit, a heat exchanger, a hot water storage tank, a water supply interface, a return water interface and a switching water circuit; the steam turbine unit can be selectively connected to the first circuit of the heat exchanger, the hot water storage tank, the second circuit of the heat exchanger, the water supply interface, and the return water interface are connected through the switching water circuit, so that the hot water storage tank, the second circuit of the heat exchanger, the water supply interface, and the return water interface can be selectively connected, and the switching water circuit has a water pump. Excess heat can be stored during non-peak and non-peak periods, and by utilizing the stored heat during peak-shaving moments, the steam turbine unit can be kept in a low-load state, which can both ensure the heating demand and achieve deep peak-shaving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of power peak regulation, and specifically, relates to a low-pressure cylinder zero-output coupled water heat storage peak regulation heating system. Background Art

[0002] In recent years, my country's wind power, photovoltaic and other renewable energy sources have developed rapidly, and my country's efforts to absorb renewable energy have gradually increased. Now in the heating season in the Northeast and Northwest regions, the problem of difficulty in absorbing renewable energy and difficulty in peak load regulation of the power grid is very prominent due to overcapacity of power generation. The main reasons for the above problems include: first, the economic growth rate and electricity consumption growth in the Northeast and Northwest regions are relatively slow; second, the Northeast and Northwest regions have good wind and solar resources, and the installed capacity of renewable energy such as wind power and photovoltaics has grown rapidly; third, most of the thermal power units in the Northeast and Northwest regions are cogeneration units, which need to undertake heating tasks in the heating season. Cogeneration units are based on heat to determine electricity. In order to ensure heating, they need to operate at a higher load rate. These three factors make it difficult to regulate the peak load in the Northeast and Northwest regions during the heating season, which also makes the wind and solar abandonment rates high.

[0003] In 2016, in order to accelerate energy technology innovation, tap the peak-shaving potential of coal-fired units, improve the flexibility of my country's thermal power operation, and comprehensively improve the system's peak-shaving and new energy consumption capabilities, the National Energy Administration identified two batches of 22 thermal power flexibility transformation pilot projects, opening the curtain on thermal power flexibility transformation. From 2016 to 2018, Northeast China (including the three northeastern provinces and eastern Inner Mongolia), Xinjiang, Shandong, Gansu, Ningxia, Jiangsu and other places successively issued power auxiliary market operation rules, established a new power auxiliary service compensation mechanism, and increased the enthusiasm of thermal power plants for peak-shaving.

[0004] In the related technology, in order to adjust the power ratio of heating and power generation of thermal power generator units, low-pressure cylinder zero output technology is usually used. Low-pressure cylinder zero output technology refers to a technology that uses a completely sealed hydraulic butterfly valve to cut off the steam inlet of the original steam inlet pipe of the low-pressure cylinder under high vacuum conditions in the low-pressure cylinder, so as to achieve zero low-pressure cylinder output and steam to heat, thereby improving the heating capacity. However, the above-mentioned low-pressure cylinder zero output technology can only be applied to units with a small heating grid area. For units with a large heating grid area, the peak-shaving capacity is still insufficient. Taking a 350MW unit of the State Power Investment Northeast Company as an example, after the low-pressure cylinder zero output transformation, the minimum power generation of the unit is 47.1MW, but in the period of maximum heating load, in order to ensure heating, the minimum power generation of the unit cannot be less than 128.0MW. In order to ensure a certain margin, the unit is maintained at 38% rated load operation. Therefore, in theory, there is still room for deep peak regulation of the unit. At the same time, after switching to the cylinder cutting mode, all the exhaust steam from the intermediate pressure cylinder of the unit enters the first station heater for heating. At this time, the unit can only change the heating power by changing the steam inlet volume of the turbine, and the operation is not flexible. Summary of the invention

[0005] The present application aims to solve at least one of the technical problems existing in the prior art.

[0006] According to the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the embodiment of the present application, it includes: a steam turbine unit, a heat exchanger, a hot water storage tank, a water supply interface, a return water interface and a switching water circuit; the steam turbine unit can be selectively connected to the first path of the heat exchanger, and the hot water storage tank, the second path of the heat exchanger, the water supply interface, and the return water interface are connected through the switching water circuit, so that the hot water storage tank, the second path of the heat exchanger, the water supply interface, and the return water interface can be selectively connected, and the switching water circuit has a water pump; the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system has a first and a second working mode. In the first working mode, the steam turbine unit Switching to the low-pressure cylinder zero-output working mode, the water pump is turned on, and the switching water circuit is configured to enable the return water interface and the cold water port of the hot water tank to supply water to the second path of the heat exchanger, and the second path of the heat exchanger supplies water to the water supply interface and the hot water port of the hot water tank; in the second working mode, the steam turbine unit is switched to the low-pressure cylinder zero-output working mode, the water pump is turned on, and the switching water circuit is configured to enable the return water interface to supply water to the cold water port of the hot water tank and the second path of the heat exchanger, the hot water port of the hot water tank supplies water to the second path of the heat exchanger and one of the water supply interface, and the second path of the heat exchanger supplies water to the water supply interface.

[0007] The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the present application can store excess heat during non-peak periods, and by utilizing the stored heat during peak-shaving moments, the steam turbine unit can be kept in a low-load state, thereby ensuring the heating demand and achieving deep peak-shaving of the steam turbine unit.

[0008] According to an embodiment of the present application, a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system also includes a first temperature detection device for detecting the second water outlet temperature of the heat exchanger. In a first working mode, if the first temperature detection device detects that the water outlet temperature is greater than the first target temperature of the hot water storage tank, the switching water circuit is also configured to enable the return water interface to supply water to the hot water port of the hot water storage tank.

[0009] According to an embodiment of the present application, a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system also includes a second temperature detection device for detecting the hot water temperature of the hot water storage tank. In a second working mode, if the second temperature detection device detects that the hot water temperature of the hot water storage tank reaches a second target temperature, the switching water circuit is configured to enable the hot water port of the hot water storage tank to supply water to the water supply interface. Conversely, the switching water circuit is configured to enable the hot water port of the hot water storage tank to supply water to the inlet of the second circuit of the heat exchanger.

[0010] According to an embodiment of the present application, the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system also has a third working mode. In the third working mode, the intermediate-pressure cylinder of the steam turbine unit is connected to the low-pressure cylinder, and the intermediate-pressure cylinder is connected to the first path of the heat exchanger.

[0011] According to a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to an embodiment of the present application, a medium- and low-pressure control valve is arranged between the medium-pressure cylinder and the low-pressure cylinder, the medium-pressure cylinder and the first path of the heat exchanger are connected through a steam extraction pipeline, the steam extraction pipeline is provided with a steam extraction control valve, and the low-pressure cylinder is also connected to a cooling steam pipeline, and the cooling steam pipeline is provided with a cooling steam valve; when the low-pressure cylinder is in a zero-output working mode, the medium- and low-pressure control valves are closed, the steam extraction control valve is opened, and the cooling steam valve is opened; in a third working mode, the medium- and low-pressure control valves are opened, the cooling steam valve is closed, and the steam extraction control valve can be selectively opened.

[0012] According to a low-pressure cylinder zero-output coupled water thermal storage peak-shaving heating system in one embodiment of the present application, the steam extraction control valve is a flow regulating valve, and in the third working mode, the opening of the steam extraction control valve is adjustable.

[0013] According to a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to an embodiment of the present application, the switching water circuit includes: a first main pipe, the first main pipe is connected between the cold water port of the hot water storage tank and the water inlet of the second circuit of the heat exchanger, and the return water interface is arranged on the first main pipe; a second main pipe, the second main pipe is connected between the hot water port of the hot water storage tank and the water outlet of the second circuit of the heat exchanger, and the water supply interface is arranged on the second main pipe; a first inlet valve is arranged between the inlet of the water pump and the cold water port of the hot water storage tank, a second inlet valve is arranged between the inlet of the water pump and the hot water port of the hot water storage tank, a first outlet valve is arranged between the outlet of the water pump and the return water interface, and a second outlet valve is arranged between the outlet of the water pump and the water supply interface; wherein in a first working mode, the first inlet valve and the first outlet valve are opened, the second inlet valve and the second outlet valve are closed, and the second main pipe is connected; in a second working mode, the first inlet valve and the first outlet valve are closed, the second inlet valve and the second outlet valve are opened, and the first main pipe is connected.

[0014] According to a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to an embodiment of the present application, the switching water circuit also includes: an inlet branch pipe, the inlet branch pipe is connected between the first main pipe and the second main pipe, the first inlet valve and the second inlet valve are both arranged on the inlet branch pipe, the inlet of the water pump is connected to the inlet branch pipe, and the inlet of the water pump is connected between the first inlet valve and the second inlet valve; an outlet branch pipe, the outlet branch pipe is connected between the first main pipe and the second main pipe, the first outlet valve and the second outlet valve are both arranged on the outlet branch pipe, the outlet of the water pump is connected to the outlet branch pipe, and the outlet of the water pump is connected between the first outlet valve and the second outlet valve; wherein, the connection between the inlet branch pipe and the first main pipe and the second main pipe is located on a side close to the hot water storage tank relative to the connection between the outlet branch pipe and the first main pipe and the second main pipe, and the connection between the outlet branch pipe and the first main pipe and the second main pipe is located on a side of the return water interface and the water supply interface close to the hot water storage tank.

[0015] According to a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to one embodiment of the present application, the switching water circuit also includes: a first main valve, which is arranged on the first main pipe and is located between the connection between the outlet branch pipe and the first main pipe and the return water interface; a second main valve, which is arranged on the second main pipe and is located between the connection between the outlet branch pipe and the second main pipe and the water outlet; wherein, in a first working mode, the first main valve and the second main valve are opened; in a second working mode, the first main valve is opened and the second main valve is closed.

[0016] According to a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to one embodiment of the present application, the switching water circuit also includes: a mixing pipeline, the mixing pipeline is connected between the second main pipe and the inlet end of the second circuit of the heat exchanger, and the connection between the mixing pipeline and the second main pipe is located between the connection between the outlet branch pipe and the second main pipe and the second main valve, and the mixing pipeline is provided with a mixing valve.

[0017] According to a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to one embodiment of the present application, the first main pipe is provided with a first return water valve, which is connected between the connection between the inlet branch pipe and the first main pipe and the connection between the outlet branch pipe and the first main pipe; the second main pipe is provided with a second return water valve, which is connected between the connection between the inlet branch pipe and the second main pipe and the connection between the outlet branch pipe and the second main pipe; wherein, in a first working mode, the first return water valve is closed and the second return water valve is opened; in a second working mode, the first return water valve is opened and the second return water valve is closed.

[0018] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0020] Figure 1 It is a structural principle diagram of a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system in one embodiment of the present application.

[0021] Reference numerals:

[0022] Medium-pressure cylinder 1, low-pressure cylinder 2, heat exchanger 3, hot water storage tank 4, heat network circulation pump 5, water pump 6, medium- and low-pressure cylinder connecting pipeline 7, medium- and low-pressure control valve 8, steam extraction pipeline 9, steam extraction control valve 10, cooling steam pipeline 11, cooling steam valve 12, cooling steam flowmeter 13, first main valve 14, first inlet valve 15, first outlet valve 16, first return water valve 17, second main valve 18, second inlet valve 19, second outlet valve 20, second return water valve 21, heat exchanger inlet valve 22, heat exchanger outlet valve 23, mixing pipeline 24, mixing valve 25, first main pipe 31, second main pipe 32, return water interface 33, water supply interface 34, inlet branch pipe 35, outlet branch pipe 36, decondenser 37, switching water circuit 40. DETAILED DESCRIPTION

[0023] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0024] In the description of this application, it should be understood that a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0025] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0026] Reference below Figure 1 A low-pressure cylinder zero-output coupled water thermal storage peak-shaving heating system according to an embodiment of the present application is described.

[0027] like Figure 1 As shown, according to an embodiment of the present application, a low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system includes: a steam turbine unit, a heat exchanger 3, a hot water storage tank 4, a water supply interface 34, a return water interface 33 and a switching water circuit 40.

[0028] Among them, the steam turbine unit can be a steam turbine generator unit of a thermal power plant. The steam turbine generator unit can include a high-pressure cylinder, a medium-pressure cylinder 1 and a low-pressure cylinder 2. The high-pressure cylinder receives high-temperature steam produced from a boiler. The outlet of the high-pressure cylinder is connected to the inlet of the medium-pressure cylinder 1, and the outlet of the medium-pressure cylinder 1 is connected to the inlet of the low-pressure cylinder 2.

[0029] The hot water storage tank 4 may include a single-tank thermoclimatic hot water storage tank, which can store hot water and cold water at the same time. The principle is that different water temperatures have different water densities. In a sufficiently large container, due to gravity, hot and cold water with different densities are naturally layered, with hot water on the top and cold water on the bottom, forming a temperature transition layer of about 1m in the middle. Because the single-tank thermoclimatic hot water storage tank can store hot water and cold water at the same time, it is less expensive and saves space compared to multi-tank and multi-tank heat storage devices. The above-mentioned water tank can be a tank body, a box body, and a tank body.

[0030] The heat exchanger 3 can be a heater of the heat network. The heat exchanger 3 can include a first path and a second path. The first path can be connected to the steam turbine unit. In actual implementation, the inlet end of the first path of the heat exchanger 3 is connected to the outlet of the intermediate pressure cylinder 1, and the outlet end of the first path of the heat exchanger 3 is connected to the decondenser 37. When the inlet end of the first path of the heat exchanger 3 is connected to the outlet of the intermediate pressure cylinder 1, the high-temperature steam of the intermediate pressure cylinder 1 enters the first path of the heat exchanger 3 to heat the medium of the second path of the heat exchanger 3. The second path of the heat exchanger 3 can be connected to the hot water tank 4 and the heat network to supply hot water to the hot water tank 4 and the heat network.

[0031] The steam turbine unit can be selectively connected to the first path of the heat exchanger 3. When the steam turbine unit supplies high-temperature steam to the first path of the heat exchanger 3, the medium of the first path of the heat exchanger 3 is heated and used to supply hot water to the heat network or the hot water storage tank 4. The steam turbine unit has a low-pressure cylinder zero-output working mode. In the low-pressure cylinder zero-output working mode, all the steam discharged from the medium-pressure cylinder 1 enters the first path of the heat exchanger 3 to reduce the power generation and transfer the heat of the boiler to the hot water storage tank 4 and the heat network through the heat exchanger 3 as much as possible.

[0032] The switching water circuit 40 may include a plurality of interconnected pipelines, a water pump 6 and a plurality of valves arranged in the pipelines. The water pump 6 is a booster pump, which is used to increase the water pressure of the switching water circuit 40. The switching water circuit 40 may also be provided with a water supply interface 34 and a return water interface 33. The return water interface 33 is used to be connected to the heating return water pipe of the heating network, and the water supply interface 34 is used to be connected to the heating water supply pipe of the heating network. By adjusting the switching states of the various valves of the switching water circuit 40, different connection relationships between the heat exchanger 3, the hot water tank 4, the water supply interface 34 and the return water interface 33 and different water flow directions can be achieved.

[0033] The hot water tank 4, the second path of the heat exchanger 3, the water supply interface 34, and the return water interface 33 are connected by a switching water path 40 so that the hot water tank 4, the second path of the heat exchanger 3, the water supply interface 34, and the return water interface 33 can be selectively connected.

[0034] Due to the arrangement of the above-mentioned switching water circuit 40, the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system has a first and a second working mode.

[0035] In the first working mode, the steam turbine unit switches to the low-pressure cylinder zero-output working mode, the water pump 6 is turned on, and the switching water circuit 40 is configured to make the return water interface 33 and the cold water port (lower port) of the hot water tank 4 supply water to the second circuit of the heat exchanger 3, and the second circuit of the heat exchanger 3 supplies water to the water supply interface 34 and the hot water port (upper port) of the hot water tank 4.

[0036] It can be understood that the first working mode is used during non-peak hours, and the load factor of the steam turbine unit increases. In this case, it is necessary to increase the power of the boiler while keeping the power generation unchanged, thereby producing more heat.

[0037] In the related art, if the heating network cannot absorb the large amount of heat produced during non-peak hours, energy waste will occur.

[0038] In the embodiment of the present application, the steam turbine unit can maintain the operation in the low-pressure cylinder zero-output working mode. At this time, the steam extraction amount of the steam turbine unit is higher than the steam extraction amount required for heating, and the excess steam extraction is mixed with the heating return water and enters the hot water storage tank 4. The flow direction of the water circuit is: the return water of the return water interface 33 flows to the inlet end of the second circuit of the heat exchanger 3, and the cold water of the hot water storage tank 4 flows to the inlet end of the second circuit of the heat exchanger 3; the outlet hot water of the second circuit of the heat exchanger 3 flows to the water supply interface 34 to supply heat through the heat network, and the outlet hot water of the second circuit of the heat exchanger 3 flows to the hot water port of the hot water storage tank 4 to store heat through the hot water storage tank 4.

[0039] In this way, during non-peak hours, the steam turbine unit can maintain high-load operation. During this period, the power generation demand can be met only by the work of the high and medium pressure cylinders 1. Part of the heat of the exhaust steam from the medium pressure cylinder 1 is used to heat the return water of the heat network for heating, and the other part is used to heat the cold water in the hot water storage tank 4 and return it to the hot water storage tank 4 for storage.

[0040] In some embodiments, the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the present application further includes a first temperature detection device for detecting the outlet water temperature of the second circuit of the heat exchanger 3. In the first working mode, if the first temperature detection device detects that the outlet water temperature is greater than the first target temperature of the hot water storage tank 4, the switching water circuit 40 is further configured to make the return water interface 33 supply water to the hot water port of the hot water storage tank 4. The first target temperature may be the rated pressure water vaporization temperature of the hot water storage tank 4, so that part of the heating hot return water can be mixed with the outlet hot water of the second circuit of the heat exchanger 3 into hot water lower than the rated pressure water vaporization temperature of the hot water storage tank 4 and flow into the hot end of the hot water storage tank 4 for storage.

[0041] In the second working mode, the steam turbine unit switches to the low-pressure cylinder zero-output working mode, the water pump 6 is turned on, and the switching water circuit 40 is configured to make the return water interface 33 supply water to the cold water port of the hot water tank 4 and the second circuit of the heat exchanger 3, the hot water port of the hot water tank 4 supplies water to the second circuit of the heat exchanger 3 and one of the water supply interface 34, and the second circuit of the heat exchanger 3 supplies water to the water supply interface 34.

[0042] It is understandable that the second working mode is used during the peak load period, and the load factor of the steam turbine unit increases. In this case, it is necessary to increase the power of the boiler while keeping the power generation unchanged, thereby producing more heat.

[0043] In the related technology, during the peak-shaving period, due to the large amount of wind power and photovoltaic power, if only electricity demand is considered, the steam turbine unit should maintain low-load operation. However, in order to ensure the minimum heating demand, the actual load of the steam turbine unit is much greater than the aforementioned low load, resulting in waste of electricity.

[0044] In the embodiment of the present application, during the peak-shaving period, the steam turbine unit is kept in the low-pressure cylinder zero-output working mode, so that the steam turbine unit can maintain low-load operation and still discharge a portion of steam for heating, and the insufficient part can be supplemented by the hot water in the hot water storage tank 4. In this way, less thermal power can be generated and more wind power or photovoltaic power can be used, making full use of the excess heat stored in the first working mode.

[0045] In some embodiments, the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the present application further includes a second temperature detection device for detecting the temperature of hot water in the hot water storage tank 4. In the second working mode, if the second temperature detection device detects that the temperature of hot water in the hot water storage tank 4 reaches the second target temperature, the switching water circuit 40 is configured to make the hot water port of the hot water storage tank 4 supply water to the water supply interface 34. Conversely, the switching water circuit 40 is configured to make the hot water port of the hot water storage tank 4 supply water to the inlet of the second circuit of the heat exchanger 3. It can be understood that the second target temperature can be a standard temperature for heating. If the temperature of the hot water in the hot water storage tank 4 is too low, it cannot meet the heating demand. At this time, the hot water in the hot water storage tank 4 needs to be passed into the second circuit of the heat exchanger 3 and heated before heating. If the temperature of the hot water in the hot water storage tank 4 meets the heating demand, it can flow directly into the heat network.

[0046] The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the embodiment of the present application can store excess heat during non-peak periods, and by utilizing the stored heat during peak-shaving moments, the steam turbine unit can be kept in a low-load state, thereby ensuring the heating demand and achieving deep peak-shaving of the steam turbine unit.

[0047] In some embodiments of the present application, the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system also has a third working mode.

[0048] In the third working mode, the intermediate pressure cylinder 1 of the steam turbine unit is connected to the low pressure cylinder 2 , and the intermediate pressure cylinder 1 is connected to the first path of the heat exchanger 3 .

[0049] It can be understood that the third working mode is used during peak hours. During peak hours, the load factor of the steam turbine unit reaches the maximum and the steam turbine unit operates normally (low-pressure cylinder 2 output). The system will not affect the power generation capacity of the steam turbine unit during peak hours.

[0050] In actual implementation, Figure 1As shown, a medium- and low-pressure control valve 8 is arranged between the medium-pressure cylinder 1 and the low-pressure cylinder 2. The medium-pressure cylinder 1 is connected to the first path of the heat exchanger 3 through a steam extraction pipeline 9. The steam extraction pipeline 9 is provided with a steam extraction control valve 10. The low-pressure cylinder 2 is also connected to a cooling steam pipeline 11. The cooling steam pipeline 11 is provided with a cooling steam valve 12 and a cooling steam flowmeter 13.

[0051] When the low-pressure cylinder is in zero-output working mode, the medium- and low-pressure control valves 8 are closed, the steam extraction control valve 10 is opened, and the cooling steam valve 12 is opened. At this time, all the steam discharged from the medium-pressure cylinder 1 enters the first path of the heat exchanger 3, and a small amount of steam is introduced into the low-pressure cylinder 2 through the cooling steam pipeline 11.

[0052] In the third working mode, the medium and low pressure control valves 8 are opened, the cooling steam valve 12 is closed, and the steam extraction control valve 10 can be selectively opened, at which time at least a portion of the steam discharged from the medium pressure cylinder 1 enters the low pressure cylinder 2, and the low pressure cylinder 2 outputs power. Of course, the steam extraction control valve 10 can be a flow regulating valve, and in the third working mode, the opening of the steam extraction control valve 10 is adjustable.

[0053] In this way, during peak hours, while ensuring heat supply, the opening of the steam extraction control valve 10 is adjusted (opened as small as possible) to generate as much electricity as possible, the valve of the cooling steam pipeline 11 is closed, and the medium and low pressure control valves 8 and the steam extraction control valve 10 are opened. The steam extraction control valve 10 is used to adjust the steam extraction amount to meet the heat supply demand during peak hours.

[0054] Some structural forms of the switching water channel 40 are described below.

[0055] like Figure 1 As shown, the switching water circuit 40 includes: a first main pipe 31 and a second main pipe 32. The first main pipe 31 is connected between the cold water port of the hot water storage tank 4 and the water inlet of the second circuit of the heat exchanger 3, and the return water interface 33 is provided on the first main pipe 31. The second main pipe 32 is connected between the hot water port of the hot water storage tank 4 and the water outlet of the second circuit of the heat exchanger 3, and the water supply interface 34 is provided on the second main pipe 32.

[0056] A first inlet valve 15 is provided between the inlet of the water pump 6 and the cold water port of the hot water tank 4, a second inlet valve 19 is provided between the inlet of the water pump 6 and the hot water port of the hot water tank 4, a first outlet valve 16 is provided between the outlet of the water pump 6 and the return water interface 33, and a second outlet valve 20 is provided between the outlet of the water pump 6 and the water supply interface 34.

[0057] In the first working mode, the first inlet valve 15 and the first outlet valve 16 are opened, the second inlet valve 19 and the second outlet valve 20 are closed, and the second main pipe 32 is connected; in the second working mode, the first inlet valve 15 and the first outlet valve 16 are closed, the second inlet valve 19 and the second outlet valve 20 are opened, and the first main pipe 31 is connected.

[0058] The first inlet valve 15 can be connected between the cold water end of the hot water tank 4 and the inlet of the water pump 6 through an independently set branch, the second inlet valve 19 can be connected between the inlet of the water pump 6 and the hot water port of the hot water tank 4 through an independently set branch, the first outlet valve 16 can be connected between the outlet of the water pump 6 and the return water interface 33 through an independently set branch, and the second outlet valve 20 can be connected between the outlet of the water pump 6 and the water supply interface 34 through an independently set branch.

[0059] Of course, the structure of the switching water channel 40 can also be simplified by designing the inlet branch pipe 35 and the outlet branch pipe 36 .

[0060] like Figure 1 As shown, the inlet branch pipe 35 is connected between the first main pipe 31 and the second main pipe 32, the first inlet valve 15 and the second inlet valve 19 are both arranged on the inlet branch pipe 35, the inlet of the water pump 6 is connected to the inlet branch pipe 35, and the inlet of the water pump 6 is connected between the first inlet valve 15 and the second inlet valve 19; the outlet branch pipe 36 is connected between the first main pipe 31 and the second main pipe 32, the first outlet valve 16 and the second outlet valve 20 are both arranged on the outlet branch pipe 36, the outlet of the water pump 6 is connected to the outlet branch pipe 36, and the outlet of the water pump 6 is connected between the first outlet valve 16 and the second outlet valve 20, and a one-way valve can also be arranged between the outlet of the water pump 6 and the outlet branch pipe 36, and the one-way valve is unidirectional from the water pump 6 to the outlet branch pipe 36.

[0061] The connection between the inlet branch pipe 35 and the first main pipe 31 and the second main pipe 32 is located at a side close to the hot water tank 4 relative to the connection between the outlet branch pipe 36 and the first main pipe 31 and the second main pipe 32, and the connection between the outlet branch pipe 36 and the first main pipe 31 and the second main pipe 32 is located at a side of the return interface 33 and the water supply interface 34 close to the hot water tank 4. In this way, the total length of the entire switching water circuit 40 is shortened, and the connection relationship between the pipes is clear.

[0062] like Figure 1 As shown, the first main pipe 31 is provided with a first water return valve 17, and the first water return valve 17 is connected between the connection between the inlet branch pipe 35 and the first main pipe 31 and the connection between the outlet branch pipe 36 and the first main pipe 31. A one-way valve may also be provided between the connection between the inlet branch pipe 35 and the first main pipe 31 and the connection between the outlet branch pipe 36 and the first main pipe 31, and the one-way valve is unidirectional from the water return interface 33 to the hot water storage tank 4.

[0063] The second main pipe 32 is provided with a second water return valve 21, which is connected between the connection between the inlet branch pipe 35 and the second main pipe 32 and the connection between the outlet branch pipe 36 and the second main pipe 32. A one-way valve may also be provided between the connection between the inlet branch pipe 35 and the second main pipe 32 and the connection between the outlet branch pipe 36 and the second main pipe 32, and the one-way valve is unidirectional from the water supply interface 34 to the hot water storage tank 4.

[0064] In the first working mode, the first water return valve 17 is closed and the second water return valve 21 is opened; in the second working mode, the first water return valve 17 is opened and the second water return valve 21 is closed.

[0065] In some embodiments, Figure 1 As shown, the switching water circuit 40 also includes: a first main valve 14 and a second main valve 18. The first main valve 14 is arranged on the first main pipe 31 and is located between the connection between the outlet branch pipe 36 and the first main pipe 31 and the return water interface 33; the second main valve 18 is arranged on the second main pipe 32 and is located between the connection between the outlet branch pipe 36 and the second main pipe 32 and the water outlet; wherein, in the first working mode, the first main valve 14 and the second main valve 18 are opened; in the second working mode, the first main valve 14 is opened and the second main valve 18 is closed; in the third working mode, the first main valve 14 is closed and the second main valve 18 is closed.

[0066] In some embodiments, Figure 1 As shown, the switching water circuit 40 also includes: a mixing pipeline 24, the mixing pipeline 24 is connected between the second main pipe 32 and the inlet end of the second circuit of the heat exchanger 3, and the connection between the mixing pipeline 24 and the second main pipe 32 is located between the connection between the outlet branch pipe 36 and the second main pipe 32 and the second main valve 18, and the mixing pipeline 24 is provided with a mixing valve 25. In the first working mode, if the first temperature detection device detects that the outlet water temperature is greater than the first target temperature of the hot water storage tank 4, the mixing valve 25 is opened to allow the return water interface 33 to supply water to the hot water port of the hot water storage tank 4. In the second working mode, if the hot water temperature of the hot water storage tank 4 is too low, the mixing valve 25 is opened, and the hot water in the hot water storage tank 4 is passed into the second circuit of the heat exchanger 3, and then heat is supplied after heating. The mixing valve 25 can be a flow regulating valve, and the mixing ratio is adjusted by adjusting the opening of the mixing valve 25.

[0067] Next, we will combine Figure 1 The working principle of the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system in an embodiment of the present application is described in detail.

[0068] The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the present application is composed of a medium-pressure cylinder 1, a low-pressure cylinder 2, a medium- and low-pressure cylinder connecting pipeline 7 and valves, a steam extraction pipeline 9 and valves, a cooling steam pipeline 11 and valves and flow meters, a heat network circulation pump 5, a heat exchanger 3 and valves, a hot water storage tank 4, a water pump 6 and corresponding valves, a mixing pipeline 24 and valves and other equipment and system pipelines and valves.

[0069] In the non-peak-shaving and non-peak phase, the hot water storage tank 4 stores heat. Close the medium and low pressure control valves 8, open the valve of the cooling steam pipeline 11 to pass a small amount of steam into the low pressure cylinder 2, and open the steam extraction control valve 10. All the steam exhausted from the medium pressure cylinder 1 enters the heat exchanger 3. At this time, the exhaust heat of the medium pressure cylinder 1 is greater than the heat supply. Start the water pump 6, open the first main valve 14, the second main valve 18, the first inlet valve 15, the first outlet valve 16, the heat exchanger inlet valve 22, and the heat exchanger outlet valve 23. The heating hot water return water passes through the heat network circulation pump 5, mixes with the water flowing out of the cold end of the hot water storage tank 4, and flows into the heat exchanger 3 to be heated. Open the second return valve 21. Part of the heated water is used for heating, and the other part flows back to the upper part of the hot water storage tank 4 to store heat. If the hot water temperature exceeds the rated pressure water vaporization temperature of the hot water storage tank 4, the mixing valve 25 is opened, and a part of the heating hot return water is mixed with the hot water at the outlet of the heat exchanger 3 to form hot water with a temperature lower than the rated pressure water vaporization temperature of the hot water storage tank 4 and flows into the hot end of the hot water storage tank 4 for storage.

[0070] During the peak load period, the steam turbine unit maintains a low output, and the hot water storage tank 4 releases heat. Close the medium and low pressure control valve 8, open the cooling steam pipeline 11 valve to pass a small amount of steam into the low pressure cylinder 2, and open the steam extraction control valve 10. All the steam discharged from the medium pressure cylinder 1 enters the heat exchanger 3. At this time, the exhaust heat of the medium pressure cylinder 1 is less than the heat supply. Start the water pump 6, open the first main valve 14, the second inlet valve 19, the second outlet valve 20, the first return valve 17, the heat exchanger inlet valve 22, the heat exchanger outlet valve 23, and the mixing valve 25; one of the second main valve 18 and the mixing valve 25 is opened, and the opening condition is whether the hot water temperature of the hot water storage tank 4 meets the standard. If the temperature is sufficient, it is opened, and if the temperature is insufficient, it is opened. The hot water in the hot water storage tank 4 is pressurized by the water pump 6, and the heating hot water return water passes through the heat network circulation pump 5, and a part of it flows into the cold end of the hot water storage tank 4 through the first return valve 17. The other part is mixed with the hot water in the hot water storage tank 4 pressurized by the water pump 6, flows into the heat exchanger 3, and is heated to provide heat.

[0071] During peak hours, while ensuring heat supply, as much power as possible is generated by adjusting (opening as small as possible), closing the valve of the cooling steam pipeline 11, and opening the medium and low pressure control valve 8 and the steam extraction control valve 10. The steam extraction control valve 10 is used to adjust the steam extraction amount to meet the heating demand during peak hours.

[0072] In summary, the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the present application is the combined use of low-pressure cylinder 2 zero-output technology and a single-tank inclined temperature layer hot water storage tank.

[0073] The zero-output technology of low-pressure cylinder 2 is used to increase the heating capacity of the unit and reduce the unit output during the peak-shaving period; the system can further reduce the online power consumption of the unit during the peak-shaving period and achieve deeper peak-shaving; the system can achieve thermal and electrical decoupling by adjusting the heat storage / release flow rate and improve the flexibility of the unit; the heat stored in the single-tank inclined temperature layer hot water tank 4 comes from the exhaust steam of the medium-pressure cylinder 1 during the non-peak-shaving and non-peak period, and heat is supplemented during the peak-shaving period without affecting the unit's power generation during the non-peak-shaving period.

[0074] The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system of the present application can reduce the unit's power generation power during the heating period and increase the unit's heating capacity through the low-pressure cylinder 2 zero-output technology. The water heat storage peak-shaving heating system can keep the unit's load unchanged for a period of time. By changing the heat storage / release flow of the hot water storage tank 4, it can match the heat load, greatly improving the flexibility of the unit and increasing the peak-shaving depth of the unit. Moreover, the greater the peak-shaving power of the steam turbine unit, the more peak-shaving compensation is obtained. Through this application, the economic benefits of the thermal power plant can be significantly improved.

[0075] A low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system comprises: a steam turbine unit, a heat exchanger 3, a hot water storage tank 4, a water supply interface 34, a return water interface 33 and a switching water circuit 40; a medium-low pressure control valve 8 is arranged between the medium-pressure cylinder 1 and the low-pressure cylinder 2 of the steam turbine unit, and the medium-pressure cylinder 1 is connected to the first path of the heat exchanger 3 through a steam extraction pipeline 9, and the steam extraction pipeline 9 is provided with a steam extraction control valve 10; the hot water storage tank 4, the second path of the heat exchanger 3, the water supply interface 34, and the return water interface 33 are connected through the switching water circuit 40, so that the hot water storage tank 4, the second path of the heat exchanger 3, the water supply interface 34, and the return water interface 33 can be selectively connected, and the switching water circuit 40 has a water pump 6; the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system has The first and second working modes, in the first working mode, the medium and low pressure control valves 8 are closed, the steam extraction control valve 10 is opened, the water pump 6 is turned on, and the switching water circuit 40 is configured to make the return water interface 33 and the cold water port of the hot water tank 4 supply water to the second route of the heat exchanger 3, and the second route of the heat exchanger 3 supplies water to the water supply interface 34 and the hot water port of the hot water tank 4; in the second working mode, the medium and low pressure control valves 8 are closed, the steam extraction control valve 10 is opened, the water pump 6 is turned on, and the switching water circuit 40 is configured to make the return water interface 33 supply water to the cold water port of the hot water tank 4 and the second route of the heat exchanger 3, the hot water port of the hot water tank 4 supplies water to the second route of the heat exchanger 3 and one of the water supply interface 34, and the second route of the heat exchanger 3 supplies water to the water supply interface 34.

[0076] A low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system, comprising: a steam turbine unit, a heat exchanger 3, a hot water storage tank 4, a water supply interface 34, a return water interface 33 and a switching water circuit 40; a medium- and low-pressure control valve 8 is arranged between the medium-pressure cylinder 1 and the low-pressure cylinder 2 of the steam turbine unit, and the medium-pressure cylinder 1 is connected to the first path of the heat exchanger 3 through a steam extraction pipeline 9, and the steam extraction pipeline 9 is provided with a steam extraction control valve 10; the hot water storage tank 4, the second path of the heat exchanger 3, the water supply interface 34, and the return water interface 33 are connected through the switching water circuit 40, so that the hot water storage tank 4, the second path of the heat exchanger 3, the water supply interface 34, and the return water interface 33 can be selectively connected, and the switching water circuit 40 has a water pump 6; the low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system has a low-pressure cylinder zero-output The low-pressure cylinder zero-output working mode is in the zero-output working mode of the low-pressure cylinder, and the medium- and low-pressure control valves 8 are closed, the steam extraction control valve 10 is opened, and the water pump 6 is turned on. The low-pressure cylinder zero-output working mode includes a first and a second working mode. In the first working mode, the switching water circuit 40 is configured to make the return water interface 33 and the cold water port of the hot water tank 4 supply water to the second route of the heat exchanger 3, and the second route of the heat exchanger 3 supplies water to the water supply interface 34 and the hot water port of the hot water tank 4; in the second working mode, the switching water circuit 40 is configured to make the return water interface 33 supply water to the cold water port of the hot water tank 4 and the second route of the heat exchanger 3, and the hot water port of the hot water tank 4 supplies water to the second route of the heat exchanger 3 and one of the water supply interface 34, and the second route of the heat exchanger 3 supplies water to the water supply interface 34.

[0077] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0078] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system, characterized in that: include: Steam turbine unit, heat exchanger, hot water storage tank, water supply interface, water return interface and switching water circuit, the hot water storage tank is a single tank inclined temperature layer hot water storage tank; The steam turbine unit can be selectively connected to the first path of the heat exchanger, and the hot water storage tank, the second path of the heat exchanger, the water supply interface, and the water return interface are connected through the switching water path, so that the hot water storage tank, the second path of the heat exchanger, the water supply interface, and the water return interface can be selectively connected, and the switching water path has a water pump; The low-pressure cylinder zero-output coupled water thermal storage peak-shaving heating system has a first and a second working mode. In the first working mode, the steam turbine unit switches to the low-pressure cylinder zero-output working mode, the water pump is turned on, and the switching water circuit is configured to make the return water interface and the cold water port of the hot water storage tank supply water to the second circuit of the heat exchanger, and the second circuit of the heat exchanger supplies water to the water supply interface and the hot water port of the hot water storage tank; In the second working mode, the steam turbine unit switches to the low-pressure cylinder zero-output working mode, the water pump is turned on, and the switching water circuit is configured to enable the return water interface to supply water to the cold water port of the hot water tank and the second path of the heat exchanger, the hot water port of the hot water tank supplies water to the second path of the heat exchanger and one of the water supply interface, and the second path of the heat exchanger supplies water to the water supply interface.

2. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 1 is characterized in that: It also includes a first temperature detection device for detecting the second outlet water temperature of the heat exchanger. In the first working mode, if the first temperature detection device detects that the outlet water temperature is greater than the first target temperature of the hot water tank, the switching water circuit is also configured to enable the return water interface to supply water to the hot water port of the hot water tank.

3. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 1 is characterized in that: It also includes a second temperature detection device for detecting the temperature of hot water in the hot water tank. In a second working mode, if the second temperature detection device detects that the temperature of the hot water in the hot water tank reaches a second target temperature, the switching water circuit is configured to enable the hot water port of the hot water tank to supply water to the water supply interface. Conversely, the switching water circuit is configured to enable the hot water port of the hot water tank to supply water to the inlet of the second circuit of the heat exchanger.

4. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 1 is characterized in that: It also has a third working mode. In the third working mode, the intermediate pressure cylinder of the steam turbine unit is connected to the low pressure cylinder, and the intermediate pressure cylinder is connected to the first path of the heat exchanger.

5. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 4 is characterized in that: A medium-low pressure control valve is provided between the medium-pressure cylinder and the low-pressure cylinder. The medium-pressure cylinder is connected to the first path of the heat exchanger via a steam extraction pipeline, and the steam extraction pipeline is provided with a steam extraction control valve. The low-pressure cylinder is also connected to a cooling steam pipeline, and the cooling steam pipeline is provided with a cooling steam valve. When the low-pressure cylinder is in zero-output working mode, the medium- and low-pressure control valves are closed, the steam extraction control valve is opened, and the cooling steam valve is opened; In the third working mode, the medium and low pressure control valves are opened, the cooling steam valve is closed, and the steam extraction control valve can be selectively opened.

6. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 5 is characterized in that: The steam extraction control valve is a flow regulating valve. In the third working mode, the opening of the steam extraction control valve is adjustable.

7. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to any one of claims 1 to 6, characterized in that: The switching waterway comprises: A first main pipe, the first main pipe is connected between the cold water port of the hot water storage tank and the water inlet of the second path of the heat exchanger, and the return water interface is provided on the first main pipe; A second main pipe, the second main pipe is connected between the hot water port of the hot water storage tank and the water outlet of the second path of the heat exchanger, and the water supply interface is provided on the second main pipe; A first inlet valve is provided between the inlet of the water pump and the cold water port of the hot water storage tank, a second inlet valve is provided between the inlet of the water pump and the hot water port of the hot water storage tank, a first outlet valve is provided between the outlet of the water pump and the return water interface, and a second outlet valve is provided between the outlet of the water pump and the water supply interface; wherein In the first working mode, the first inlet valve and the first outlet valve are opened, the second inlet valve and the second outlet valve are closed, and the second main pipe is connected; in the second working mode, the first inlet valve and the first outlet valve are closed, the second inlet valve and the second outlet valve are opened, and the first main pipe is connected.

8. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 7 is characterized in that: The switching waterway also includes: an inlet branch pipe, the inlet branch pipe is connected between the first main pipe and the second main pipe, the first inlet valve and the second inlet valve are both arranged on the inlet branch pipe, the inlet of the water pump is connected to the inlet branch pipe, and the inlet of the water pump is connected between the first inlet valve and the second inlet valve; An outlet branch pipe, the outlet branch pipe is connected between the first main pipe and the second main pipe, the first outlet valve and the second outlet valve are both arranged on the outlet branch pipe, the outlet of the water pump is connected to the outlet branch pipe, and the outlet of the water pump is connected between the first outlet valve and the second outlet valve; wherein, The connection between the inlet branch pipe and the first main pipe and the second main pipe is located on the side close to the hot water tank relative to the connection between the outlet branch pipe and the first main pipe and the second main pipe, and the connection between the outlet branch pipe and the first main pipe and the second main pipe is located on the side of the return interface and the water supply interface close to the hot water tank.

9. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 8 is characterized in that: The switching waterway also includes: a first main valve, which is disposed on the first main pipe and is located between the connection between the outlet branch pipe and the first main pipe and the return water interface; A second main valve, the second main valve is arranged on the second main pipe and is located between the connection between the outlet branch pipe and the second main pipe and the water outlet; wherein, In the first working mode, the first main valve and the second main valve are opened; in the second working mode, the first main valve is opened and the second main valve is closed.

10. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 9 is characterized in that: The switching waterway also includes: A mixing pipeline is connected between the second main pipe and the inlet end of the second pipe of the heat exchanger, and the connection between the mixing pipeline and the second main pipe is located between the connection between the outlet branch pipe and the second main pipe and the second main valve, and the mixing pipeline is provided with a mixing valve.

11. The low-pressure cylinder zero-output coupled water heat storage peak-shaving heating system according to claim 8, characterized in that: The first main pipe is provided with a first water return valve, and the first water return valve is connected between the connection between the inlet branch pipe and the first main pipe and the connection between the outlet branch pipe and the first main pipe; The second main pipe is provided with a second water return valve, and the second water return valve is connected between the connection between the inlet branch pipe and the second main pipe and the connection between the outlet branch pipe and the second main pipe; wherein, In the first working mode, the first water return valve is closed and the second water return valve is opened; in the second working mode, the first water return valve is opened and the second water return valve is closed.