A method and system for intelligent decision-making on power grid short-circuit safety integrating expert knowledge

By integrating expert knowledge, the power grid information is automatically processed and an optimized short-circuit safety operation method is generated, which solves the problems of high labor cost, small number of samples and poor practicality in power grid short-circuit safety decision-making, and improves the safety and efficiency of power grid operation.

CN112101708BActive Publication Date: 2024-10-18CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202010758192.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-31
Publication Date
2024-10-18
Estimated Expiration
2040-07-31

AI Technical Summary

Technical Problem

The existing technology consumes a lot of labor costs in power grid short-circuit safety decision-making, has a limited number of analysis samples, and has poor practicality, making it difficult to obtain optimized decision-making solutions.

Method used

Using the method of integrating expert knowledge, through short-circuit current calculation, expert knowledge rule base generation, extended operation mode set generation and island detection, the short-circuit safety evaluation index is calculated, the optimal short-circuit safety operation mode is selected, and automated decision-making is realized.

Benefits of technology

It reduces the workload and calculation burden of staff, improves the speed, comprehensiveness and accuracy of power grid operation arrangements, enhances the safe operation level of the power grid, and generates a more comprehensive mass operation mode and optimized decision-making plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112101708B_ABST
    Figure CN112101708B_ABST
Patent Text Reader

Abstract

The present invention discloses a power grid short-circuit safety intelligent decision-making method and system integrating expert knowledge, which calculates short-circuit current according to power grid basic operation mode flow data and transient stability model, and obtains short-circuit current exceeding busbar; generates expert knowledge rule base according to power grid basic operation mode flow data and the short-circuit current exceeding busbar; generates extended operation mode set according to power grid basic operation mode flow data and expert knowledge rule base; performs island detection and short-circuit current calculation verification of extended operation mode set according to extended operation mode set and transient stability model, and generates short-circuit safety operation mode set; calculates short-circuit safety evaluation index of short-circuit safety operation mode set, generates short-circuit safety preferred operation mode set by screening, and makes decision on power grid short-circuit safety operation by selecting short-circuit safety preferred operation mode in operation mode set. The method solves the problems of large labor cost consumption, limited number of analysis samples, and difficulty in obtaining optimized decision-making scheme in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power grid analysis and control, and specifically to a power grid short-circuit safety intelligent decision-making method integrating expert knowledge, and also to a power grid short-circuit safety intelligent decision-making system integrating expert knowledge. Background Art

[0002] The formulation of the grid operation mode plan plays a vital role in ensuring the safe and economic operation of the entire grid and guaranteeing high-quality and reliable power supply to users. With the strengthening of grid electrical connections, large-scale access to new energy, rapid changes in grid structure and the commissioning of new electrical equipment, the grid has gradually developed into a multi-source access, high-density, multi-load type network system, facing the influence of more and more variable factors, and the problem of excessive short-circuit current has become more prominent. When formulating short-circuit safety strategies, on the one hand, as the AC and DC grid structures become more and more complex, the mode arrangement will become extremely cumbersome and complex, and the amount of information that staff need to process will increase greatly; on the other hand, in response to the increasingly refined needs of grid safety operation management and the actual needs of the power market, more scenarios of operation modes need to be calculated and specified, such as short-circuit safety analysis of operation modes under different output conditions of new energy, a large number of maintenance operation modes, and extreme operation modes under special weather conditions, which will bring about a continuous increase in workload and work intensity. Manual work efficiency is low according to the previous working methods, and it seems that they are no longer competent for this work.

[0003] The development of software technology and simulation technology provides sufficient conditions for more intelligent operation mode arrangement. In addition to more types of models and more accurate single component models, in the optimization of simulation calculation modules, the algorithms of power grid flow and short-circuit current are continuously studied in depth, the single processing program runs more efficiently, the operation is more reliable, and the operation interface mode is more flexible, providing more friendly and efficient support for intelligent decision-making of power grid short-circuit safety. In the analysis of power grid short-circuit safety measures, a large number of scanning calculations are involved, which meets the requirements of task parallelism. In the process of implementing task parallelism, two types of task parallel processing technologies can be used, namely single-machine multi-core parallelism and multi-machine multi-core parallelism. As an important branch of computer technology, hardware technology has been continuously changed and improved, and the trend of hardware is becoming smaller and smaller, more and more precise functions, better and better performance, higher and higher cost performance, and more and more obvious personalization. At present, the mainstream storage technologies include magnetic storage, optical storage and semiconductor storage. When using parallel computing technology in the intelligent arrangement of complex power grids, network performance is one of the key factors affecting computing efficiency. The use of optical fiber media and high-performance switches can obtain transmission bandwidths of hundreds of MHZ or even tens of THz (multi-mode, single-mode optical fiber).

[0004] In conventional offline calculation and analysis, due to the limitation of computing power and time, manual analysis can only be carried out on a small amount of typical operation mode data, using proprietary power system calculation software to conduct grid simulation analysis, and then adjusting and formulating grid short-circuit safety measures and operation mode plans with the help of experience knowledge. The use of experience-based operation mode determination and verification simulation calculation has the following disadvantages: the impact of mode changes is limited by computing tools and manual computing power, and there is an analysis hysteresis effect; due to professional cognition constraints, the number of operation plan samples obtained is limited, and some calculation and analysis indicators and important analysis contents may be omitted without efficient arrangement tools, making it difficult to obtain more or better feasible operation plans to ensure grid safety; even if several feasible short-circuit safety operation modes are obtained based on experience, there is currently no quantifiable screening and evaluation indicator.

[0005] At present, there is little research and development on short-circuit safety decision-making software for power grid operation modes. Some software provides some fixed algorithms to assist analysis functions, but from an application perspective, these application software often do not conform to the actual workflow of personnel arranging power grid operation modes, have poor functional interactivity, and are not practical, making it difficult to truly play a role in decision support. Summary of the invention

[0006] The present application provides a method and system for intelligent decision-making on power grid short-circuit safety that integrates expert knowledge, which solves the problems of existing technologies such as high labor costs, limited number of analysis samples, poor practicality, and difficulty in obtaining optimized decision-making solutions.

[0007] The present application provides a power grid short-circuit safety intelligent decision-making method integrating expert knowledge, including:

[0008] Calculate short-circuit current based on power grid basic operation mode flow data and transient stability model to obtain busbars with excessive short-circuit current;

[0009] Generate an expert knowledge rule base according to the power grid basic operation mode flow data and the short-circuit current exceeding the standard bus;

[0010] Generate an extended operation mode set according to the power grid basic operation mode flow data and the expert knowledge rule base;

[0011] According to the extended operation mode set and the transient stability model, island detection and short-circuit current calculation verification of the extended operation mode set are performed to generate a short-circuit safety operation mode set;

[0012] A short-circuit safety evaluation index is calculated for the short-circuit safety operation mode set, a short-circuit safety preferred operation mode set is generated by screening, a short-circuit safety preferred operation mode is selected from the short-circuit safety preferred operation mode set, and a decision is made on the short-circuit safety operation of the power grid.

[0013] Preferably, the short-circuit current is calculated according to the power flow data of the basic operation mode of the power grid and the transient stability model to obtain the busbar with excessive short-circuit current, including:

[0014] According to the power grid basic operation mode flow data, transient stability model, and fault type, the short-circuit current is calculated to obtain the actual short-circuit current value of the AC / DC bus; the power grid basic operation mode flow data includes: the operation mode flow data of the generator bus, AC / DC bus, AC / DC line, transformer and FACTS equipment; the transient stability model includes: generator, excitation system, power system stabilizer, speed regulator and prime mover, new energy, DC control system, power electronic equipment, load transient stability model;

[0015] If the short-circuit current of busbar i meets the over-limit criterion I short.i >μ i I inter.i , then the busbar i is regarded as the busbar with excessive short-circuit current; where I short.i is the actual short-circuit current value of the AC / DC bus i, I inter.i is the interrupting current value of AC / DC busbar i, μ i is the breaking current coefficient.

[0016] Preferably, an expert knowledge rule base is generated according to the power grid basic operation mode flow data and the short-circuit current exceeding the standard bus, including:

[0017] According to the busbar with excessive short-circuit current, set the voltage range condition, topology depth condition and the maximum number of connected lines that can be disconnected by a single busbar;

[0018] The voltage range condition, topology depth condition and the maximum number of connected lines disconnected by a single bus are used as forward rule generation conditions;

[0019] The set of lines that meet the forward rule generation conditions constitutes a forward rule;

[0020] According to the power grid basic operation mode flow data, a generator associated line set, a transformer associated line set and a load associated line set are formed;

[0021] According to the union of the generator associated line set, the transformer associated line set and the load associated line set, a reverse rule is formed;

[0022] The expert knowledge rule base is composed of forward rules and reverse rules.

[0023] Preferably, the voltage range condition, the topological depth condition and the maximum number of connected lines disconnected by a single bus are set according to the bus with excessive short-circuit current, including:

[0024] Set the voltage range condition (Vmin ,V max ), where V min 、V max They are respectively the lower and upper limits of the voltage level of the busbar link line with short-circuit current exceeding the standard;

[0025] Set the topological depth condition [T min ,T max ], where T min , T max are the lower and upper limits of the number of busbar extension lines with short-circuit current exceeding the standard, T min , T max is an integer;

[0026] Set the maximum number of connected lines that can be disconnected by a single busbar D max , where D max The principle of selecting the lines is to sort the busbar short-circuit current branch coefficient from large to small, and select the D max Lines.

[0027] Preferably, a set of lines that meet the forward rule generation conditions is used to form a forward rule, including:

[0028] Find the set of lines L that simultaneously meet the forward rule generation conditions in the basic operation mode power flow data FR , L FR The number of lines in the middle is N LFR ;

[0029] Line Collection L FR Constitute positive rules.

[0030] Preferably, according to the power grid basic operation mode flow data, a generator associated line set, a transformer associated line set and a load associated line set are formed, including:

[0031] In the power grid basic operation mode flow data, find the lines directly connected to the generator busbar to form the generator associated line set L Gen ;

[0032] In the power grid basic operation mode flow data, find the lines directly connected to the transformer to form the transformer associated line set L Tran ;

[0033] In the power grid basic operation mode flow data, find the lines directly connected to the load busbar to form the load associated line set L Load .

[0034] Preferably, an extended operation mode set is generated according to the power grid basic operation mode flow data and the expert knowledge rule base, including:

[0035] Remove the set of lines that meet the reverse rule from the set of lines that meet the forward rule to form the valid line set L Effe ;

[0036] Set the number of line disconnection combinations [N min ,N max ], where N min Indicates the lower limit of the number of combinations, N max Indicates the upper limit of the number of combinations, N min 、N max is an integer;

[0037] Using the combination operation method in mathematics, we can get the Effe Select N in turn min ,N min +1,…,N max lines, forming a line disconnection combination set S Lcut , S Lcut ={S 1 ,S 2 ,…,S i ,…,S M},S i Indicates the line disconnection combination set S Lcut The total number of line breaking combinations is Where C represents the combinatorial operation in mathematics;

[0038] From S Lcut Select the line breaking combination S in turn i (i=1~M), find the line disconnection combination S in the basic operation mode flow data i Corresponding lines, and set the corresponding lines to the disconnected state, and save them as extended operation mode flow data EO i (i=1~M), the extended operation mode set is S EO ={EO 1 ,EO 2 ,…,EO M}.

[0039] Preferably, according to the extended operation mode set and the transient stability model, island detection and short-circuit current calculation verification of the extended operation mode set are performed to generate a short-circuit safety operation mode set, including:

[0040] The deep search algorithm is used to calculate the basic operation mode flow data and the extended operation mode flow data EO respectively. i The number of electrical islands (i = 1 ~ M) is denoted by N Land.Base 、N Land.EOi (i=1~M);

[0041] Calculate the electrical island difference N in sequenceLand.Diffi =N Land.EOi -N Land.Base , if N Land.Diffi =0, then the corresponding EO i Pass the island detection, and the EO that passes the island detection i Construct a topologically valid set S RT ;

[0042] For the topologically effective set S RT Each EO in i , calculate the short-circuit current and obtain the short-circuit current calculation result. If the number of buses with short-circuit current exceeding the standard is 0, the corresponding EO i Through the short-circuit current safety detection, the EO that has passed the short-circuit current safety detection i The short-circuit safety operation mode set S SCC .

[0043] Preferably, the short-circuit safety evaluation index is calculated for the short-circuit safety operation mode set, and a short-circuit safety preferred operation mode set is generated by screening, including:

[0044] For S SCC EO i Calculate the short-circuit current evaluation index Index(EO i ),

[0045]

[0046] Among them I short.i ,I inter.i , μ i They represent the actual short-circuit current value of AC / DC bus i, the interrupting current value of AC / DC bus i, and the interrupting current coefficient respectively; P represents the total number of busbars; λ 1 and λ 2 Represents the weighting coefficient, which must satisfy λ 1 +λ 2 =1; max means taking the maximum value;

[0047] Index(EO i ) Sort from small to large, take the first N Opti Index(EO i ) corresponding to EO i Constitute the short-circuit safety optimal operation mode set S Opti .

[0048] The present application also provides a power grid short-circuit safety intelligent decision-making system integrating expert knowledge, including:

[0049] The short-circuit current exceeding bus acquisition module calculates the short-circuit current according to the power grid basic operation mode flow data and transient stability model, and obtains the short-circuit current exceeding bus;

[0050] An expert knowledge rule base generation module generates an expert knowledge rule base according to the power grid basic operation mode flow data and the short-circuit current exceeding the standard bus;

[0051] An extended operation mode set generation module generates an extended operation mode set according to the power grid basic operation mode flow data and the expert knowledge rule base;

[0052] A short-circuit safety operation mode set generation module performs island detection and short-circuit current calculation verification of the extended operation mode set according to the extended operation mode set and the transient stability model to generate a short-circuit safety operation mode set;

[0053] The short-circuit safety preferred operation mode set generation module calculates the short-circuit safety evaluation index for the short-circuit safety operation mode set, generates the short-circuit safety preferred operation mode set by screening, selects the short-circuit safety preferred operation mode from the short-circuit safety preferred operation mode set, and makes decisions on the short-circuit safety operation of the power grid.

[0054] The present application provides a method and system for intelligent decision-making on short-circuit safety of power grids that integrates expert knowledge. The method calculates short-circuit current according to power grid basic operation mode flow data and transient stability model, and obtains the busbar with excessive short-circuit current; generates an expert knowledge rule base consisting of forward rules and reverse rules according to power grid basic operation mode flow data and the busbar with excessive short-circuit current; generates an extended operation mode set according to power grid basic operation mode flow data and the expert knowledge rule base; performs island detection and short-circuit current calculation verification of the extended operation mode set according to the extended operation mode set and transient stability model, and generates a short-circuit safety operation mode set; calculates short-circuit safety evaluation indexes for the short-circuit safety operation mode set, generates a short-circuit safety preferred operation mode set by screening, and makes decisions on the short-circuit safety operation of the power grid by selecting the short-circuit safety preferred operation mode in the operation mode set. The method solves the problems of high labor cost consumption, limited number of analysis samples, poor practicality, and difficulty in obtaining optimized decision-making solutions in the existing technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 It is a flow chart of the intelligent decision-making method for power grid short-circuit safety integrating expert knowledge provided by this application;

[0056] Figure 2 This is a schematic diagram of the structure of the power grid short-circuit safety intelligent decision-making system that integrates expert knowledge provided by this application. DETAILED DESCRIPTION

[0057] Many specific details are described in the following description to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways than those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the present application, so the present application is not limited by the specific implementation disclosed below.

[0058] Combine the following Figure 1 The provided flow chart of the intelligent decision-making method for power grid short-circuit safety integrating expert knowledge provides a detailed description of the method provided in this application.

[0059] Step S101, calculating the short-circuit current according to the power flow data of the basic operation mode of the power grid and the transient stability model, and obtaining the bus with excessive short-circuit current.

[0060] Before obtaining the busbar with excessive short-circuit current, it is first necessary to select the calculation and analysis data in the existing data, and select the data in the basic operation mode flow data file and the transient stability model file in the existing data.

[0061] Then, the short-circuit current is calculated based on the operation mode. According to the power grid basic operation mode flow data, transient stability model, and fault type, the short-circuit current is calculated to obtain the actual short-circuit current value of the AC and DC bus. Based on the SCCPC software (power system analysis software), the basic operation mode flow data and transient stability model can be input, and the fault type can be set to three-phase short circuit and single-phase short circuit. The short-circuit current of the entire network can be scanned and calculated to generate the actual short-circuit current value of the AC and DC bus.

[0062] Based on the actual short-circuit current value of the AC and DC busbars (the actual short-circuit current value of the marked busbar i is I short.i ), AC and DC busbar interrupting current value (the interrupting current value corresponding to the marked busbar i is I inter.i ), interrupting current coefficient (the interrupting current coefficient corresponding to busbar i is μ i ), the criterion for extracting the busbar with excessive short-circuit current is: I short.i >μ i I inter.i , if the short-circuit current of busbar i meets the over-limit criterion I short.i >μ i I inter.i , then the busbar i is regarded as the busbar with excessive short-circuit current; where I short.i is the actual short-circuit current value of the AC / DC bus i, I inter.i is the interrupting current value of AC / DC busbar i, μ i is the breaking current coefficient.

[0063] The basic operation mode flow data of the power grid include: operation mode flow data of generator bus, AC / DC bus, AC / DC line, transformer and FACTS equipment; the transient stability model includes: generator, excitation system, power system stabilizer, speed regulator and prime mover, new energy, DC control system, power electronic equipment, and load transient stability model.

[0064] Step S102, generating an expert knowledge rule base according to the power grid basic operation mode flow data and the bus with excessive short-circuit current.

[0065] This step is used to generate the rule base. The expert knowledge rule base includes two parts: forward rules and reverse rules. The steps for generating forward rules are as follows:

[0066] According to the busbar with excessive short-circuit current, set the voltage range condition, topology depth condition and the maximum number of connected lines disconnected by a single busbar, including: setting the voltage range condition (V min ,V max ), where V min 、V max The short-circuit current exceeds the limit of the busbar link line voltage level lower limit and upper limit respectively; set the topology depth condition [T min ,T max ], where T min , T max are the lower and upper limits of the number of busbar extension lines with short-circuit current exceeding the standard, T min , T max Integer; set the maximum number of connected lines that a single bus can disconnect D max , where D max The principle of selecting the lines is to sort the busbar short-circuit current branch coefficient from large to small, and select the D max lines;

[0067] The voltage range condition, topology depth condition and the maximum number of connected lines disconnected by a single bus are used as forward rule generation conditions;

[0068] The set of lines that meet the forward rule generation conditions constitutes the forward rule. Find the set of lines L that meet the forward rule generation conditions in the basic operation mode flow data. FR , L FR The number of lines in the middle is N LFR ;

[0069] Line Collection L FR Constitute positive rules.

[0070] The steps for generating reverse rules are as follows:

[0071] According to the power grid basic operation mode flow data, a generator associated line set, a transformer associated line set and a load associated line set are formed; in the power grid basic operation mode flow data, the lines directly connected to the generator bus are found to form the generator associated line set L Gen ; In the power grid basic operation mode flow data, find the lines directly connected to the transformer to form the transformer associated line set L Tran ; In the power grid basic operation mode flow data, find the lines directly connected to the load bus to form the load associated line set L Load ;

[0072] According to the union of the generator associated line set, transformer associated line set and load associated line set, that is, L Gen ∪L Tran ∪L Load , constituting a reverse rule.

[0073] Finally, the expert knowledge rule base is composed of two parts: forward rules and reverse rules.

[0074] Step S103, generating an extended operation mode set according to the power grid basic operation mode flow data and the expert knowledge rule base.

[0075] This step is used to extend the run mode set generation.

[0076] Remove the lines that meet the reverse rule from the line set that meets the forward rule to form the effective line set L Effe , that is, L Effe =L FR -L Gen ∪L Tran ∪L Load ;

[0077] Set the number of line disconnection combinations [N min ,N max ], where N min Indicates the lower limit of the number of combinations, N max Indicates the upper limit of the number of combinations, N min 、N max is an integer;

[0078] Using the combination operation method in mathematics, we can get the Effe Select N in turn min ,N min +1,…,N max lines, forming a line disconnection combination set S Lcut , S Lcut ={S 1 ,S 2 ,…,S i ,…,S M},S i Represents the line disconnection combination set S Lcut The total number of line breaking combinations is Where C represents the combinatorial operation in mathematics;

[0079] From S Lcut Select the line breaking combination S in turn i (i=1~M), find the line disconnection combination S in the basic operation mode flow data i Corresponding lines, and set the corresponding lines to the disconnected state, and save them as extended operation mode flow data EO i (i=1~M), the extended operation mode set is S EO ={EO 1 ,EO 2 ,…,EO M}.

[0080] Step S104: performing island detection and short-circuit current calculation verification of the extended operation mode set according to the extended operation mode set and the transient stability model to generate a short-circuit safety operation mode set.

[0081] This step is used to generate a short-circuit safety operation mode set.

[0082] The deep search algorithm is used to calculate the basic operation mode flow data and the extended operation mode flow data EO respectively. i The number of electrical islands (i = 1 ~ M) is denoted by N Land.Base 、N Land.EOi (i=1~M);

[0083] Calculate the electrical island difference N in sequence Land.Diffi =N Land.EOi -N Land.Base , if N Land.Diffi =0, then the corresponding EO i Pass the island detection, and the EO that passes the island detection i Construct a topologically valid set S RT ;

[0084] For the topologically effective set S RT Each EO in i , calculate the short-circuit current and obtain the short-circuit current calculation result. If the number of buses with short-circuit current exceeding the standard is 0, the corresponding EO i Through the short-circuit current safety detection, the EO that has passed the short-circuit current safety detection i The short-circuit safety operation mode set S SCC .

[0085] Step S105, calculating the short-circuit safety evaluation index for the short-circuit safety operation mode set, generating a short-circuit safety preferred operation mode set by screening, selecting a short-circuit safety preferred operation mode from the short-circuit safety preferred operation mode set, and making a decision on the short-circuit safety operation of the power grid.

[0086] This step is used to generate a short-circuit safety optimal operation mode set.

[0087] For S SCC EO i Calculate the short-circuit current evaluation index Index(EO i ),

[0088]

[0089] Among them I short.i ,I inter.i , μ i They represent the actual short-circuit current value of the AC and DC busbars, the breaking current value of the AC and DC busbars, and the breaking current coefficient; P represents the total number of busbars; λ 1 and λ 2 Represents the weighting coefficient, which must satisfy λ 1 +λ 2 =1; max means taking the maximum value;

[0090] Index(EO i ) Sort from small to large, take the first N Opti (where N Opti Completed by manual configuration) Index(EO i ) corresponding to EO i Constitute the short-circuit safety optimal operation mode set S Opti .

[0091] Finally, the short-circuit safety optimal operation mode is selected from the operation mode set to make a decision on the short-circuit safety operation of the power grid.

[0092] The following is a brief explanation of the method of this patent by taking some actual power grid calculation data as an example.

[0093] Select the basic operation mode power flow data DAT file and transient stability model SWI file; perform the basic operation mode short-circuit current calculation and extract 3 buses with excessive short-circuit current:

[0094] Serial number Busbar name Short circuit current (kA) Breaking current(kA) Interrupting current coefficient 1 JSZ21230 54.9574 50 1 2 JXB21230 51.4893 50 1 3 JQH21230 51.2604 50 1

[0095] The rule base conditions are set as follows:

[0096] Voltage range condition setting (V min ,V max )=(200,250), topological depth condition setting [Tmin ,T max ]=[1,2], the maximum number of connected lines that a single bus can disconnect is set to D max =2; Line disconnection combination number condition setting [N min ,N max ]=[1,2];

[0097] According to the rule base conditions, the operation mode set is expanded to generate 210 groups of modes;

[0098] Through island detection, the short-circuit safety operation mode set generates 12 groups of modes;

[0099] Calculate the short-circuit current evaluation index and screen and generate a short-circuit safety optimal operation mode set, which includes 3 groups of modes:

[0100] Serial number Method Name Short circuit current evaluation index 1 JSZ21230_JXX21230_2_JSZ21230_JXX21230_1 0.4866 2 JQH21230_JSZ21230_2_JQH21230_JSZ21230_1 0.5376 3 JHJ21230_JQH21230_2_JHJ21230_JQH21230_1 0.5428

[0101] So far, three modes of the above short-circuit safety optimal operation mode set have been screened.

[0102] Based on the same inventive concept, the present application also provides a power grid short-circuit safety intelligent decision-making system integrating expert knowledge, such as Figure 2 As shown, including:

[0103] The short-circuit current exceeding bus acquisition module calculates the short-circuit current according to the power grid basic operation mode flow data and transient stability model, and obtains the short-circuit current exceeding bus;

[0104] An expert knowledge rule base generation module generates an expert knowledge rule base according to the power grid basic operation mode flow data and the short-circuit current exceeding the standard bus;

[0105] An extended operation mode set generation module generates an extended operation mode set according to the power grid basic operation mode flow data and the expert knowledge rule base;

[0106] A short-circuit safety operation mode set generation module performs island detection and short-circuit current calculation verification of the extended operation mode set according to the extended operation mode set and the transient stability model to generate a short-circuit safety operation mode set;

[0107] The short-circuit safety preferred operation mode set generation module calculates the short-circuit safety evaluation index for the short-circuit safety operation mode set, generates the short-circuit safety preferred operation mode set by screening, selects the short-circuit safety preferred operation mode from the short-circuit safety preferred operation mode set, and makes decisions on the short-circuit safety operation of the power grid.

[0108] Preferably, it also includes: a calculation and analysis data selection module, which selects data in the basic operation mode flow data file and the transient stability model file from the existing data. Compared with the prior art, the method and system provided by the present application have the following beneficial effects:

[0109] (1) The patent establishes a set of intelligent decision-making methods for short-circuit safety of power grid operation mode that integrates expert knowledge. By automatically processing complex power grid information, it generates a more comprehensive and massive operation mode, and realizes intelligent short-circuit safety decision-making for power grid operation mode;

[0110] (2) The entire power grid operation mode short-circuit safety intelligent decision-making process is divided into several clear levels. The next level uses the results of the previous level. It is a progressive decision-making process and also a process of automatic optimization of the operation mode.

[0111] (3) It is proposed to establish an expert knowledge rule base. The application of the rule base can effectively simulate the expert decision-making process and obtain calculation results that are more in line with the actual power grid. On the other hand, it reduces the number of sample processing in the operation mode arrangement process;

[0112] (4) It is proposed to establish the optimal indicators for short-circuit safety decision-making in power grid operation mode. Through indicator screening, the basis for screening can be given relatively clearly, which is convenient for operators to make reference decisions;

[0113] (5) The patent has established an intelligent decision-making system for short-circuit safety in power grid operation mode. The application of the patent can greatly reduce the actual workload and computing burden of staff, improve the speed, comprehensiveness, accuracy and effectiveness of mode arrangement work, enhance power grid computing and analysis methods, and improve the level of safe operation of the power grid. It can solve the problems of existing technologies such as high labor costs, limited number of analysis samples, poor practicality, and difficulty in obtaining optimized decision-making solutions.

[0114] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0115] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0116] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0117] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0118] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the scope of the claims of the present invention to be approved.

Claims

1. A power grid short-circuit safety intelligent decision-making method integrating expert knowledge, characterized in that: include: The short-circuit current is calculated based on the power flow data of the basic operation mode of the power grid and the transient stability model to obtain the busbar with excessive short-circuit current, including: According to the power grid basic operation mode flow data, transient stability model, and fault type, the short-circuit current is calculated to obtain the actual short-circuit current value of the AC / DC bus; the power grid basic operation mode flow data includes: the operation mode flow data of the generator bus, AC / DC bus, AC / DC line, transformer and FACTS equipment; the transient stability model includes: generator, excitation system, power system stabilizer, speed regulator and prime mover, new energy, DC control system, power electronic equipment, load transient stability model; If the short-circuit current of busbar i meets the over-limit criterion I short.i >μ i I inter.i , then the busbar i is regarded as the busbar with excessive short-circuit current; where I short.i is the actual short-circuit current value of the AC / DC bus i, I inter.i is the interrupting current value of AC / DC busbar i, μ i is the interrupting current coefficient; According to the power grid basic operation mode flow data and the busbar with excessive short-circuit current, an expert knowledge rule base is generated, including: According to the busbar with excessive short-circuit current, set the voltage range condition, topology depth condition and the maximum number of connected lines that can be disconnected by a single busbar; The voltage range condition, topology depth condition and the maximum number of connected lines disconnected by a single bus are used as forward rule generation conditions; The set of lines that meet the forward rule generation conditions constitutes a forward rule; According to the power grid basic operation mode flow data, a generator associated line set, a transformer associated line set and a load associated line set are formed; According to the union of the generator associated line set, the transformer associated line set and the load associated line set, a reverse rule is formed; The expert knowledge rule base is formed by forward rules and reverse rules; According to the power grid basic operation mode flow data and the expert knowledge rule base, an extended operation mode set is generated, including: Remove the set of lines that meet the reverse rule from the set of lines that meet the forward rule to form the valid line set L Effe ; Set the number of line disconnection combinations [N min ,N max ], where N min Indicates the lower limit of the number of combinations, N max Indicates the upper limit of the number of combinations, N min 、N max is an integer; Using the combination operation method in mathematics, we can get the Effe Select N in turn min , N min +1,…,N max lines, forming a line disconnection combination set S Lcut , S Lcut ={S1,S2,…,S i ,…,S M },s i Indicates the line disconnection combination set S Lcut The total number of line breaking combinations is Where C represents the combinatorial operation in mathematics; From S Lcut Select the line breaking combination S in turn i , i = 1 ~ M, find the line disconnection combination S in the basic operation mode flow data i Corresponding lines, and set the corresponding lines to the disconnected state, save as extended operation mode flow data EQ i , i = 1 ~ M, the extended operation mode set is S EO ={EO1,EO2,…,EO M }; According to the extended operation mode set and the transient stability model, island detection and short-circuit current calculation verification of the extended operation mode set are performed to generate a short-circuit safety operation mode set, including: Apply the deep search algorithm to calculate the basic operation mode flow data and the extended operation mode flow data EQ i , the number of electrical islands with i=1~M is denoted by N Land.Base 、N Land.EQi , i=1~M; Calculate the electrical island difference N in sequence Land.Diffi =N Land.EOi -N Land.Base , if N Land.Diffi =0, then the corresponding EO i Pass the island detection, and the EO that passes the island detection i Construct a topologically valid set S RT ; For the topologically effective set S RT Each EO in i , calculate the short-circuit current and obtain the short-circuit current calculation result. If the number of buses with short-circuit current exceeding the standard is 0, the corresponding EO i Through the short-circuit current safety detection, the EO that has passed the short-circuit current safety detection i The short-circuit safety operation mode set S SCC ; The short-circuit safety evaluation index is calculated for the short-circuit safety operation mode set, and a short-circuit safety optimal operation mode set is generated by screening, including: For S SCC EO i Calculate the short-circuit current evaluation index Index(EO i ), Among them I short.i ,I inter.i , μ i They represent the actual short-circuit current value of AC / DC bus i, the interrupting current value of AC / DC bus i, and the interrupting current coefficient respectively; P represents the total number of bus bars; λ1 and λ2 represent weighting coefficients, which must satisfy λ1+λ2=1; max represents the maximum value; Index(EO i ) Sort from small to large, take the first N Opti Index(EO i ) corresponding to EO i Constitute the short-circuit safety optimal operation mode set S Opti ; A short-circuit safety optimal operation mode is selected from the short-circuit safety optimal operation mode set to make a decision on the short-circuit safety operation of the power grid.

2. The method according to claim 1, characterized in that According to the busbar with excessive short-circuit current, set the voltage range condition, topology depth condition and the maximum number of connected lines that can be disconnected by a single busbar, including: Set the voltage range condition (V min ,V max ), where V min 、V max They are respectively the lower and upper limits of the voltage level of the busbar link line with short-circuit current exceeding the standard; Set the topological depth condition [T min ,T max ], where T min 、T max are the lower and upper limits of the number of busbar extension lines with short-circuit current exceeding the standard, T min 、T max is an integer; Set the maximum number of connected lines that can be disconnected by a single busbar D max , where D max The principle of selecting the lines is to sort the busbar short-circuit current branch coefficient from large to small, and select the D max Lines.

3. The method according to claim 1, characterized in that The set of lines that meet the forward rule generation conditions constitutes a forward rule, including: Find the set of lines L that simultaneously meet the forward rule generation conditions in the basic operation mode power flow data FR , L FR The number of lines in the middle is N LFR ; Line Collection L FR Constitute positive rules.

4. The method according to claim 1, characterized in that According to the power grid basic operation mode flow data, a generator associated line set, a transformer associated line set and a load associated line set are formed, including: In the power grid basic operation mode flow data, find the lines directly connected to the generator busbar to form the generator associated line set L Gen ; In the power grid basic operation mode flow data, find the lines directly connected to the transformer to form the transformer associated line set L Tran ; In the power grid basic operation mode flow data, find the lines directly connected to the load busbar to form the load associated line set L Load .

5. A power grid short-circuit safety intelligent decision-making system integrating expert knowledge, characterized in that: include: The busbar acquisition module with excessive short-circuit current calculates the short-circuit current according to the power grid basic operation mode flow data and transient stability model, and obtains the busbar with excessive short-circuit current, including: According to the power grid basic operation mode flow data, transient stability model, and fault type, the short-circuit current is calculated to obtain the actual short-circuit current value of the AC / DC bus; the power grid basic operation mode flow data includes: the operation mode flow data of the generator bus, AC / DC bus, AC / DC line, transformer and FACTS equipment; the transient stability model includes: generator, excitation system, power system stabilizer, speed regulator and prime mover, new energy, DC control system, power electronic equipment, load transient stability model; If the short-circuit current of busbar i meets the over-limit criterion I short.i >μ i I inter.i , then the busbar i is regarded as the busbar with excessive short-circuit current; where I short.i is the actual short-circuit current value of the AC / DC bus i, I inter.i is the interrupting current value of AC / DC busbar i, μ i is the interrupting current coefficient; The expert knowledge rule base generation module generates an expert knowledge rule base according to the power grid basic operation mode flow data and the short-circuit current exceeding the standard bus, including: According to the busbar with excessive short-circuit current, set the voltage range condition, topology depth condition and the maximum number of connected lines that can be disconnected by a single busbar; The voltage range condition, topology depth condition and the maximum number of connected lines disconnected by a single bus are used as forward rule generation conditions; The set of lines that meet the forward rule generation conditions constitutes a forward rule; According to the power grid basic operation mode flow data, a generator associated line set, a transformer associated line set and a load associated line set are formed; According to the union of the generator associated line set, the transformer associated line set and the load associated line set, a reverse rule is formed; The expert knowledge rule base is formed by forward rules and reverse rules; The extended operation mode set generation module generates an extended operation mode set according to the power grid basic operation mode flow data and the expert knowledge rule base, including: Remove the set of lines that meet the reverse rule from the set of lines that meet the forward rule to form the valid line set L Effe ; Set the number of line disconnection combinations [N min , N max ], where N min Indicates the lower limit of the number of combinations, N max Indicates the upper limit of the number of combinations, N min 、N max is an integer; Using the combination operation method in mathematics, we can get the Effe Select N in turn min , N min +1,…,N max lines, forming a line disconnection combination set S Lcut , S Lcut ={S1, S2, ..., S i , …, S M },S i Indicates the line disconnection combination set S Lcut The total number of line breaking combinations is Where C represents the combinatorial operation in mathematics; From S Lcut Select the line breaking combination S in turn i , i = 1 ~ M, find the line disconnection combination S in the basic operation mode flow data i Corresponding lines, and set the corresponding lines to the disconnected state, save as extended operation mode flow data EQ i , i = 1 ~ M, the extended operation mode set is S EO ={EO1,EO2,…,EO M }; The short-circuit safety operation mode set generation module performs island detection and short-circuit current calculation verification of the extended operation mode set according to the extended operation mode set and the transient stability model to generate the short-circuit safety operation mode set, including: Apply the deep search algorithm to calculate the basic operation mode flow data and the extended operation mode flow data EQ i , the number of electrical islands with i=1~M is denoted by N Land.Base 、N Land.EQi , i=1~M; Calculate the electrical island difference N in sequence Land.Diffi =N Land.EOi -N Land.Base , if N Land.Diffi =0, then the corresponding EO i Pass the island detection, and the EO that passes the island detection i Construct a topologically valid set S RT ; For the topologically effective set S RT For each EO in the short-circuit current calculation, the short-circuit current calculation result is obtained. If the number of buses with short-circuit current exceeding the standard is 0, the corresponding EO i Through the short-circuit current safety detection, the EO that has passed the short-circuit current safety detection i The short-circuit safety operation mode set S SCC ; The short-circuit safety optimal operation mode set generation module calculates the short-circuit safety evaluation index of the short-circuit safety operation mode set and generates the short-circuit safety optimal operation mode set by screening, including: For S SCC EO i Calculate the short-circuit current evaluation index Index(EO i ), Among them I short.i ,I inter.i , μ i They represent the actual short-circuit current value of AC / DC bus i, the interrupting current value of AC / DC bus i, and the interrupting current coefficient respectively; P represents the total number of bus bars; λ1 and λ2 represent weighting coefficients, which must satisfy λ1+λ2=1; max represents the maximum value; Index(EO i ) Sort from small to large, take the first N Opti Index(EO i ) corresponding to EO i Constitute the short-circuit safety optimal operation mode set S Opti ; A short-circuit safety optimal operation mode is selected from the short-circuit safety optimal operation mode set to make a decision on the short-circuit safety operation of the power grid.

Citation Information

Patent Citations

  • Auxiliary decision-making method for limiting short-circuit current operation mode

    CN110458334A

  • Intelligent mode arrangement and risk analysis method based on real-time power flow

    CN111327045A