By designing a metal pipe inner wall grinding device, using a combination of clamping plate, telescopic cylinder and grinding wheel, the clamping and fixing of metal pipes of different diameters and the inner wall grinding of metal pipes is achieved, and dust and debris are treated through vacuuming and recycling systems, the problems of single functions and pollution of existing equipment are solved, and work efficiency and safety are improved.
Patent Information
- Application Number
- CN202011191894.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-30
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2040-10-30
AI Technical Summary
The existing metal pipe inner wall grinding equipment has a single function, and a large amount of metal dust is generated during the grinding process, polluting the environment and posing a threat to the health of the operators. At the same time, metal debris is difficult to clean, which increases the workload.
A metal pipe inner wall grinding device is designed, and the combination of a first connecting rod, a first clamping plate, a first telescopic cylinder and a second clamping plate is used to achieve clamping and fixing of metal pipes of different diameters; through the coordination of the third telescopic cylinder and a grinding wheel, the grinding of metal pipes of different inner diameters is achieved; through the coordination of through holes and recovery grooves, metal debris is recovered; through the combination of a vacuum cover, a vacuum tube, a vacuum fan, a Shakron dust collector and a recovery tube, metal dust is absorbed and recovered to prevent environmental pollution.
Effective clamping and fixing of metal pipes of different diameters and grinding of inner walls, recycling of metal debris and dust, improving raw material utilization, reducing environmental pollution and operating personnel health risks.
Smart Images

Figure CN112157496B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mechanical processing, and in particular to a metal pipe inner wall grinding device. Background Art
[0002] As the name implies, metal pipes are pipe fittings made of metal as raw materials. Metal pipe fittings have high strength, high flame retardancy, and high temperature resistance, and are widely used in steam pipes and hot water pipes. In the use of existing metal pipes, it is often necessary to butt multiple metal pipes together, and the inner walls of some metal pipes are not smooth enough, which easily leads to the connection between metal pipes not being tight enough and leaking. Therefore, in order to make the butt joint of metal pipes tighter and more airtight, the inner wall of the metal pipe needs to be polished during the processing of the metal pipe. However, most of the existing polishing equipment for the inner wall of metal pipes has a relatively single function, and a large amount of metal dust is easily generated during the polishing process. These metal dusts overflow into the air, which will cause certain pollution to the environment. At the same time, these metal dusts are inhaled by the operator, which will cause great harm to the operator's body. In addition, a large amount of metal debris generated during the polishing process remains on the workbench, which is difficult to clean and increases the workload. Summary of the invention
[0003] The purpose of the present invention is to provide a metal pipe inner wall grinding device to solve the problems raised in the above background technology.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A metal pipe inner wall grinding device comprises a base, a support frame is installed above the base, a first connecting rod is installed below the right inner wall of the support frame, a first clamping plate is installed on the side of the first connecting rod away from the right inner wall of the support frame, a first telescopic cylinder is installed below the left inner wall of the support frame, a second clamping plate is installed on the side of the first telescopic cylinder away from the left inner wall of the support frame, a metal pipe body is placed between the first clamping plate and the second clamping plate; a connecting plate is installed on the upper left side of the support frame, a screw rod is installed between the connecting plate and the right inner wall of the support frame, a first motor is installed on the right side of the screw rod, a threaded sleeve is installed on the screw rod, a second telescopic cylinder is installed below the threaded sleeve, and a second telescopic cylinder is installed below the threaded sleeve. A second motor is installed below the compression cylinder, a rotating shaft is installed below the second motor, a fixed sleeve is installed below the rotating shaft, a plurality of third telescopic cylinders are installed around the edges of the fixed sleeve, a grinding wheel is installed on the side of the third telescopic cylinder away from the fixed sleeve; a plurality of through holes are evenly distributed on the base, a dust hood is installed on the upper left side of the inside of the support frame, a dust suction pipe is installed on the left side of the dust hood, a dust suction fan is installed on the dust suction pipe, a Shaklon dust collector is installed on the lower left side of the dust suction pipe, a recovery pipe is installed below the Shaklon dust collector, a guide rail is installed below the base, a recovery trough is installed on the guide rail, the upper left and right edges of the recovery trough are overlapped on the guide rail, and a connection interface is provided on the left side of the recovery trough.
[0006] As a further solution of the present invention: a buffer pad is provided on one side of the first clamping plate and the second clamping plate close to the metal pipe body.
[0007] As a further solution of the present invention: a slide groove is arranged above the inner wall of the support frame, a limit rod is installed above the threaded sleeve, a slider is installed above the limit rod, and the slider is arranged in the slide groove.
[0008] As a further solution of the present invention: the lower right side of the recovery pipe is connected to the connection interface via a flange.
[0009] As a further solution of the present invention: first supporting legs are installed around the bottom of the base, a second supporting leg is installed below the first supporting leg, a mounting groove is provided in the second supporting leg, and a buffer spring is installed between the first supporting leg and the mounting groove.
[0010] As a further solution of the present invention: a foot is installed below the second supporting leg, and an anti-slip pad is installed below the foot.
[0011] Compared with the prior art, the present invention can adjust the spacing between the first clamping plate and the second clamping plate through the coordinated use of the first connecting rod, the first clamping plate, the first telescopic cylinder and the second clamping plate, so as to facilitate the clamping and fixing of metal pipe bodies of different diameters and have a wider range of applications; through the direct coordinated use of the third telescopic cylinder and the grinding wheel, metal pipes with different inner diameters can be ground; through the coordinated use of the through holes and the recovery grooves, metal debris generated during the grinding process can be recovered to improve the utilization rate of raw materials; through the coordinated use of the dust hood, the dust pipe, the dust fan, the Shaklon dust collector and the recovery pipe, the dust generated during the grinding process can be absorbed to prevent the dust from polluting the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 The figure is a schematic diagram of the structure of a metal pipe inner wall grinding device.
[0013] Figure 2 The present invention is a schematic diagram of the top view of the structure of a first clamping plate and a second clamping plate in a metal tube inner wall grinding device.
[0014] Figure 3 It is a schematic diagram of the enlarged structure of A in a metal tube inner wall grinding device.
[0015] In the figure: 1. base; 2. support frame; 3. first connecting rod; 4. first telescopic cylinder; 5. first clamping plate; 6. second clamping plate; 7. buffer pad; 8. metal pipe body; 9. through hole; 10. guide rail; 11. recovery groove; 12. first supporting leg; 13. second supporting leg; 14. mounting groove; 15. buffer spring; 16. foot; 17. anti-skid pad; 18. connecting plate; 19. screw rod; 20. first motor; 21. threaded sleeve; 22. slide groove; 23. limit rod; 24. slider; 25. second telescopic cylinder; 26. second motor; 27. rotating shaft; 28. fixed sleeve; 29. third telescopic cylinder; 30. flange; 31. grinding wheel; 32. dust hood; 33. dust suction pipe; 34. dust suction fan; 35. Shaklon dust collector; 36. recovery pipe; 37. connecting interface. DETAILED DESCRIPTION
[0016] The present invention is further described below in conjunction with the accompanying drawings and specific preferred embodiments, but the protection scope of the present invention is not limited thereby.
[0017] See also Figure 1-3A metal pipe inner wall grinding device comprises a base 1, a first telescopic cylinder 4, a metal pipe body 8, a screw rod 19, a second telescopic cylinder 25, a grinding wheel 31, a dust suction fan 34 and a recovery pipe 36; a support frame 2 is installed above the base 1, a first connecting rod 3 is installed below the right inner wall of the support frame 2, a first clamping plate 5 is installed on the side of the first connecting rod 3 away from the right inner wall of the support frame 2, a first telescopic cylinder 4 is installed below the left inner wall of the support frame 2, a second clamping plate 6 is installed on the side of the first telescopic cylinder 4 away from the left inner wall of the support frame 2, and the first clamping plate 5 and the second clamping plate 6 are installed on the side of the first telescopic cylinder 4 away from the left inner wall of the support frame 2. A buffer pad 7 is installed on the side where the clamping plates 6 are close to each other, and a metal pipe body 8 is placed between the first clamping plate 5 and the second clamping plate 6. The second clamping plate 6 can be driven to move left and right by the first telescopic cylinder 4, and the distance between the second clamping plate 6 and the first clamping plate 5 can be adjusted, so that the metal pipe body 8 of different diameters can be fixed, and the scope of use is wider. The buffer pad 7 can protect the surface of the metal pipe body 8, preventing the first clamping plate 5 and the second clamping plate 6 from clamping the metal pipe body 8 with too much force, so as to damage the surface of the metal pipe body 8.
[0018] A connecting plate 18 is installed on the upper left side of the support frame 2, a screw rod 19 is installed between the connecting plate 18 and the right inner wall of the support frame 2, a first motor 20 is installed on the right side of the screw rod 19, a threaded sleeve 21 is installed on the screw rod 19, a limit rod 23 is installed above the threaded sleeve 21, a slider 24 is installed above the limit rod 23, a slide groove 22 is provided on the inner wall above the support frame 2, the slider 24 is arranged in the slide groove 22, a second telescopic cylinder 25 is installed below the threaded sleeve 21, and the second telescopic cylinder 25 is installed below the threaded sleeve 21. A second motor 26 is installed below the retracting cylinder 25, a rotating shaft 27 is installed below the second motor 26, a fixed sleeve 28 is installed below the rotating shaft 27, a plurality of third telescopic cylinders 29 are installed around the edges of the fixed sleeve 28, a grinding wheel 31 is installed on the side of the third telescopic cylinder 29 away from the fixed sleeve 28, and the radius of rotation of the grinding wheel 31 around the rotating shaft 27 can be adjusted by setting the third telescopic cylinder 29, so that the grinding wheel 31 can grind the inner wall of the metal pipe body 8 of different diameters.
[0019] A plurality of through holes 9 are evenly distributed on the base 1, a guide rail 10 is installed below the base 1, the through holes 9 are arranged between the guide rails 10 on the left and right sides, a recovery groove 11 is installed on the guide rail 10, and the left and right edges above the recovery groove 11 are installed on the guide rail 10, and a connection interface 37 is arranged on the left side of the recovery groove 11, and the metal debris generated during the grinding process can be collected through the recovery groove 11, a dust hood 32 is installed above the left side of the support frame 2, a dust suction pipe 33 is installed on the left side of the dust hood 32, a dust suction fan 34 is installed on the dust suction pipe 33, a Shaklon dust collector 35 is installed below the left side of the dust suction pipe 33, and a recovery pipe 36 is installed below the Shaklon dust collector 35, and the right side of the recovery pipe 36 is connected to the connection interface 37 through a flange 30, and the metal dust can be recovered by the coordinated use of the dust suction fan 34 and the Shaklon dust collector 35 to prevent environmental pollution, and at the same time, the utilization rate of raw materials can be further improved.
[0020] The base 1 is provided with a first supporting leg 12 installed on all four sides below the base 1, a second supporting leg 13 is installed below the first supporting leg 12, a mounting groove 14 is provided in the second supporting leg 13, a buffer spring 15 is installed between the first supporting leg 12 and the mounting groove 14, the buffer spring 15 can buffer the vibration generated during grinding, and play the role of silencing and reducing noise, a foot 16 is installed below the second supporting leg 13, an anti-skid pad 17 is installed below the foot 16, the anti-skid pad 17 can prevent the instability caused by vibration during grinding from sliding.
[0021] The working principle of the present invention is as follows: first, the metal pipe body 8 to be polished is placed on the base 1, and the right side of the metal pipe body 8 is close to the first clamping plate 5, and then the second clamping plate 6 is driven to move rightward by the first telescopic cylinder 4, and the second clamping plate 6 pushes the metal pipe body 8 to move rightward, so that the right side of the metal pipe body 8 is in contact with the first clamping plate 5, and finally the metal pipe body 8 is fixed by the joint action of the first clamping plate 5 and the second clamping plate 6, and then the first motor 20 drives the screw rod 19 to rotate, and the screw rod 19 drives the threaded sleeve 21 to move back and forth left and right, so that the grinding wheel 31 moves to The grinding wheel 31 is moved above the metal pipe body 8 through the second telescopic cylinder 25 to enter the metal pipe body 8, and the third telescopic cylinder 29 is driven to rotate by the second motor 26. The third telescopic cylinder 29 drives the grinding wheel 31 to fit the inner wall surface of the metal pipe body 8 for grinding. During the grinding process, the metal debris generated falls into the recovery tank 11 through the through hole 9; the metal dust generated during the grinding process is absorbed by the dust suction fan 34, and then the metal dust is recovered by the Shaklon dust collector 35, and the recovered metal dust is transported to the recovery tank 11 through the recovery pipe 36.
[0022] The above is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment, it is not intended to limit the present invention. Therefore, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the scope of protection of the technical solution of the present invention.
Claims
1. A metal pipe inner wall grinding device, comprising a base (1), characterized in that: A support frame (2) is installed above the base (1); a first connecting rod (3) is installed below the right inner wall of the support frame (2); a first clamping plate (5) is installed on the side of the first connecting rod (3) away from the right inner wall of the support frame (2); a first telescopic cylinder (4) is installed below the left inner wall of the support frame (2); a second clamping plate (6) is installed on the side of the first telescopic cylinder (4) away from the left inner wall of the support frame (2); a metal pipe body (8) is placed between the first clamping plate (5) and the second clamping plate (6); a connecting plate (18) is installed on the upper left side of the interior of the support frame (2); the connecting plate (18) ) and the right inner wall of the support frame (2), a screw rod (19) is installed between the screw rod (19), a first motor (20) is installed on the right side of the screw rod (19), a threaded sleeve (21) is installed on the screw rod (19), a second telescopic cylinder (25) is installed below the threaded sleeve (21), a second motor (26) is installed below the second telescopic cylinder (25), a rotating shaft (27) is installed below the second motor (26), a fixed sleeve (28) is installed below the rotating shaft (27), a plurality of third telescopic cylinders (29) are installed around the edges of the fixed sleeve (28), and a punching cylinder (29) is installed on the side away from the fixed sleeve (28). A grinding wheel (31); a plurality of through holes (9) are evenly distributed on the base (1); a dust hood (32) is installed on the upper left side of the support frame (2); a dust hood (33) is installed on the left side of the dust hood (32); a dust fan (34) is installed on the dust hood (33); a shaklon dust collector (35) is installed on the lower left side of the dust hood (33); a recovery pipe (36) is installed below the shaklon dust collector (35); a guide rail (10) is installed below the base (1); a recovery trough (11) is installed on the guide rail (10); upper left and right edges of the recovery trough (11) are overlapped on the guide rail (10) A connection interface (37) is provided on the left side of the recovery groove (11), a slide groove (22) is provided on the inner wall of the support frame (2), a limit rod (23) is installed above the threaded sleeve (21), a slider (24) is installed above the limit rod (23), and the slider (24) is arranged in the slide groove (22), and a first support leg (12) is installed on all four sides below the base (1), a second support leg (13) is installed below the first support leg (12), a mounting groove (14) is provided in the second support leg (13), and a buffer spring (15) is installed between the first support leg (12) and the mounting groove (14).
2. A metal pipe inner wall grinding device according to claim 1, characterized in that: A buffer pad (7) is provided on one side of the first clamping plate (5) and the second clamping plate (6) close to the metal pipe body (8).
3. A metal pipe inner wall grinding device according to claim 1, characterized in that: The lower right side of the recovery pipe (36) is connected to the connection interface (37) via a flange (30).
4. A metal pipe inner wall grinding device according to claim 1, characterized in that: A foot (16) is installed below the second supporting leg (13), and an anti-slip pad (17) is installed below the foot (16).
Citation Information
Patent Citations
Grinding device for inner wall of metal pipe
CN213702758U