A ruler for controlling the thickness, elevation and flatness of concrete

By designing the scale connecting the vertical pole and the adjusting nut, the problem of concrete thickness and flatness control is solved, precise pouring at different sites and base layers is achieved, and the quality and efficiency of concrete are improved.

CN112160605BActive Publication Date: 2024-10-11NO 3 ENG COMPANY OF CHINA RAILWAY NO 8 ENG GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011101029.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-15
Publication Date
2024-10-11
Estimated Expiration
2040-10-15

AI Technical Summary

Technical Problem

The existing technology cannot accurately control the thickness and flatness of concrete, especially in the absence of fixed reference objects, and traditional methods have problems such as large errors, strong inapplicability, and high consumables.

Method used

A ruler including a vertical pole and an adjusting nut is designed to adjust the height of the indicator plate through a precise transmission ratio to achieve precise control of the elevation and thickness of the concrete pouring surface at various locations, and is suitable for different base layers and sites.

Benefits of technology

It achieves precise control of concrete thickness and elevation, improves pouring flatness, is suitable for a variety of sites and base layers, and the ruler can be recycled, avoiding the shortcomings of traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112160605B_ABST
    Figure CN112160605B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of construction tools, and specifically relates to a ruler for controlling the thickness, elevation and flatness of concrete. The technical scheme is as follows: a ruler for controlling the thickness, elevation and flatness of concrete, comprising a vertical pole, the vertical pole being threadedly connected with an adjusting nut; and an indicator plate, the indicator plate being provided with a sleeve frame, the sleeve frame being sleeved on the adjusting nut, and the indicator plate being accurately adjusted up and down by the sleeve frame and the nut. The present invention provides a ruler that can be accurately adjusted according to elevation requirements, thereby facilitating and accurately controlling the thickness, elevation and flatness of concrete.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction tools, and in particular relates to a ruler used for controlling the thickness, elevation and flatness of concrete. Background Art

[0002] During the concrete pouring process, thickness and flatness control has always been a difficult problem. For example, in the field of construction engineering, the thickness and flatness control of cast-in-place concrete slabs directly affects the floor load and the thickness of the steel bar protective layer, and also affects the later decoration and renovation. When pouring the floor, the flatness control is directly related to the quality of the finished product. In the field of municipal engineering, some fields that require large-scale pouring, such as stadiums and squares, have a direct impact on the later quality due to the flatness control. The same is true for other engineering fields that require field pouring.

[0003] The existing technology usually uses the following three methods to control the thickness or flatness of concrete:

[0004] 1. Wire pulling method: commonly known as "wire pulling", find a fixed reference object around the upper part of the casting surface, such as columns and walls in the construction project, first use a level to measure a horizontal line on it, and then measure the height difference downward to get the final casting surface elevation, which is used to control the flatness and thickness of the casting surface.

[0005] 2. Insertion method: After the concrete is poured, insert a thin steel bar into the poured concrete layer, measure the thickness of the steel bar, and compare it with the standard value to control the thickness of the concrete.

[0006] 3. Concrete thickness controller: Before pouring concrete, put in the concrete thickness controller. The general practice is to use concrete blocks of a certain thickness, or plastic blocks, etc., and place them in a fixed position before pouring. During pouring, the concrete should be flush with the upper part of the thickness controller.

[0007] The above three types mainly have the following problems

[0008] 1. Wire method: There must be an object for wire fixing, such as a column, wall, etc. If it is a municipal site casting, there is no object for fixing around, so it is not practical. Secondly, the mark can only be made in a fixed position and cannot be moved.

[0009] 2. Insertion method: In this method, the concrete can be inspected only after it is poured. If the steel bar is not inserted to the bottom during the insertion process, there will be an error. This method is only applicable to the case where there is a template at the bottom. It is not applicable to concrete poured on a sand cushion or soil cushion, and is greatly affected by human factors. If the elevation of the base is inconsistent, the thickness of each point is inconsistent. If they are all unified as one thickness, it cannot be accurately controlled.

[0010] 3. Concrete thickness controller: Its biggest disadvantage is that it can only control one thickness, cannot be recycled, and consumes a lot of materials. Whether it is prefabricated small blocks of concrete on site or directly processed in the factory, it is a consumable item. Secondly, if the insertion method is used, the use of this device requires that the base of the casting surface must be flat. If the casting surface is not flat, the accuracy of the elevation will be low.

[0011] Therefore, the above three methods are unable to precisely control the concrete elevation and thickness. Summary of the invention

[0012] In order to solve the above problems existing in the prior art, the purpose of the present invention is to provide a ruler which can be precisely adjusted according to elevation requirements, so as to facilitate and accurately control the thickness, elevation and flatness of concrete.

[0013] The technical solution adopted by the present invention is:

[0014] A ruler for controlling the thickness, elevation and flatness of concrete comprises a vertical pole, which is threadedly connected with an adjusting nut; and an indicator plate, on which a sleeve frame is arranged, and the sleeve frame is sleeved on the adjusting nut. When in use, a number of rulers of the present invention are placed at various positions on the site, and then the bottom end of the indicator plate is adjusted to the designed elevation position. Since the vertical pole is threadedly connected with the adjusting nut, there is an accurate transmission ratio between the vertical pole and the adjusting nut, and the height of the adjusting nut can be accurately adjusted. Since the sleeve frame is sleeved on the adjusting nut, the indicator plate can move with the adjusting nut, so that the height of the indicator plate can also be accurately adjusted. The bottom end of the indicator plate of the ruler at each position can be accurately adjusted to the designed elevation position, so that when pouring concrete, the elevation of each position can be accurately controlled. The worker compares the concrete liquid level with the bottom end of the indicator plate at that location, and scrapes the concrete to be flush with the bottom end of the indicator plate.

[0015] As a preferred embodiment of the present invention, the shape of the indicator plate is an inverted triangle. When the indicator plate is an inverted triangle, it is easier for workers to observe and judge the distance between the concrete liquid surface and the tip of the indicator plate. It is easier to judge when the tip of the indicator plate is flush with the concrete liquid surface, thereby avoiding the situation where the worker misjudges and causes deviation in the thickness of the concrete pouring.

[0016] As a preferred solution of the present invention, the sleeve frame is parallel to the indicator plate, and the width of the sleeve frame is larger than the maximum rotation diameter of the adjusting nut. The width of the sleeve frame can be slightly larger than the maximum rotation diameter of the adjusting nut, so that the adjusting nut can rotate freely, avoiding the situation where the sleeve frame blocks the rotation of the adjusting nut.

[0017] As a preferred solution of the present invention, the indicator plate is provided with a size scale. The worker can judge the height of the concrete above the indicator plate by the size scale on the indicator plate, so when the worker scrapes the concrete to the elevation position, it is easier to judge how thick the concrete needs to be scraped to reach the designed elevation, which can improve efficiency accordingly.

[0018] As a preferred solution of the present invention, the zero scale line of the size scale is located at the bottom of the indicator plate. When the zero scale line is at the bottom of the indicator plate, the size scale on the indicator plate is the thickness of the concrete exceeding the elevation. Workers scrape the concrete according to the size, which can make the concrete liquid level flush with the bottom of the indicator plate more quickly, and the operation is more convenient.

[0019] As a preferred solution of the present invention, a sleeve is fixed on the indicator plate, and the sleeve is sleeved on the vertical pole. When the indicator plate is lifted and lowered for adjusting the nut, the sleeve moves on the vertical pole, and the sleeve frame of the indicator plate will not fall off the adjusting nut, thus ensuring the reliable use of the present invention.

[0020] As a preferred solution of the present invention, a cross bar is fixed to the upper section of the vertical pole, so that workers can hold the cross bar to operate and conveniently insert the vertical pole into the soil, sand cushion layer, etc.

[0021] As a preferred solution of the present invention, a protruding brim is provided at the upper end of the vertical pole. When it is difficult for a worker to insert the vertical pole into the soil or the cushion sand layer, the worker can use a hammer to knock the brim to facilitate the operation.

[0022] As a preferred solution of the present invention, the lower part of the vertical pole is provided with a pointed end. When the lower part of the vertical pole is provided with a pointed end, the present invention is used in the case where the casting surface base is a soft base, such as a sand cushion layer, a rammed earth base, a crushed stone base, etc.

[0023] As a preferred solution of the present invention, a base is fixed at the bottom of the vertical pole. When a base is fixed at the bottom of the vertical pole, the present invention is used when the casting surface base is a hard base, such as a template, a concrete base, a water-stable layer, etc.

[0024] The beneficial effects of the present invention are:

[0025] 1. The vertical pole of the present invention is threadedly connected to the adjusting nut, and there is a precise transmission ratio between the vertical pole and the adjusting nut, so that the height of the adjusting nut can be precisely adjusted. Since the sleeve frame is sleeved on the adjusting nut, the indicator plate can move with the adjusting nut, so that the height of the indicator plate can also be precisely adjusted. The bottom end of the indicator plate of each position scale can be precisely adjusted to the designed elevation position, so that the elevation of each position can be accurately controlled when pouring concrete. The worker compares the concrete liquid level with the bottom end of the indicator plate at that location, and scrapes the concrete to be flush with the bottom end of the indicator plate, so that the thickness and elevation of the concrete can be precisely controlled. When each position is scraped flat according to the bottom end of the indicator plate, the flatness of the concrete pouring is correspondingly improved.

[0026] 2. When using the wire pulling method, an object must be used to fix the wire, but the scale of the present invention does not need to rely on a fixed object and can be applied to site casting.

[0027] 3. The ruler of the present invention can control different thicknesses, the elevation can be accurately adjusted, and can be pulled out after use and can be recycled.

[0028] 4. Since the present invention can be reused, when multiple rulers are used together, the distance between the rulers can be increased, so that the elevation and flatness of the casting surface can be accurately controlled. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a front view of the present invention when the lower part of the vertical pole is a pointed end;

[0030] Figure 2 It is a left view of the present invention when the lower part of the vertical pole is a pointed end;

[0031] Figure 3 It is a front view of the present invention when the base is fixed at the lower part of the upright pole;

[0032] Figure 4 It is an assembly diagram when the present invention is used for a soft base layer;

[0033] Figure 5 It is an assembly diagram when the present invention is used for a hard base.

[0034] In the figure, 1-vertical pole; 2-adjusting nut; 3-indicator plate; 4-sleeve; 5-cross bar; 6-base; 7-leveling scale; 11-brim; 12-tip; 31-frame; 32-size scale. DETAILED DESCRIPTION

[0035] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0036] like Figure 1 to Figure 3 As shown, the ruler for controlling the thickness, elevation and flatness of concrete in this embodiment includes a vertical pole 1, which is threadedly connected with an adjusting nut 2; and also includes an indicator plate 3, on which a sleeve frame 31 is provided, and the sleeve frame 31 is sleeved on the adjusting nut 2.

[0037] like Figure 4 and Figure 5 As shown, when in use, the level is placed at the location to be placed, and the concrete pouring thickness at the point can be obtained by measuring and calculating the elevation. When the ruler of the present invention is placed at the point, if the leveling tower is not moved, the leveling tower scale can be used as a reference (if the tower scale is moved, a tape measure can be used instead), and the indicator plate 3 is adjusted so that the lower end of the indicator plate 3 is aligned with the scale line of the concrete pouring thickness calculated on the leveling tower scale 7 (or tape measure), and the lower end of the indicator plate 3 is the design elevation line.

[0038] Since the upright pole 1 is threadedly connected with the adjusting nut 2, there is an accurate transmission ratio between the upright pole 1 and the adjusting nut 2, and the height of the adjusting nut 2 can be accurately adjusted. Since the sleeve frame 31 is sleeved on the adjusting nut 2, the indicator plate 3 can move with the adjusting nut 2, so that the height of the indicator plate 3 can also be accurately adjusted. The bottom end of the indicator plate 3 of each position scale can be accurately adjusted to the designed elevation position, so when pouring concrete, the elevation of each position can be accurately controlled. The worker compares the concrete liquid level with the bottom end of the indicator plate 3 at that location, and scrapes the concrete to be flush with the bottom end of the indicator plate 3, so that the thickness and elevation of the concrete can be accurately controlled. When each position is scraped flat according to the bottom end of the indicator plate 3, the flatness of the concrete pouring is correspondingly improved. After the concrete pouring is completed, the ruler is pulled out before the initial setting, and the hole is smoothed, so that the present invention can be reused.

[0039] like Figure 3 As shown, when the present invention is applied to a soft base layer such as a sand cushion layer, a compacted soil base layer, a crushed stone base layer, etc., the lower part of the vertical pole 1 is set as a tip 12. The tip 12 of the vertical pole 1 can be easily inserted into the soft base layer to ensure that the vertical pole 1 is stably connected.

[0040] like Figure 4 As shown, when the present invention is applied to a hard base such as a formwork, a concrete base, a water-stable layer, etc., a base 6 is fixed at the bottom of the vertical pole 1. Then the present invention can be placed in a certain position without the vertical pole 1 falling.

[0041] Furthermore, the shape of the indicator plate 3 is an inverted triangle. When the indicator plate 3 is an inverted triangle, it is easier for workers to observe and judge the distance between the concrete liquid surface and the tip 12 of the indicator plate 3. It is easier to judge when the tip 12 of the indicator plate 3 is flush with the concrete liquid surface, thereby avoiding the situation where the worker misjudges and causes deviation in the thickness of the concrete pouring.

[0042] The inverted triangle indicator plate 3 is provided with a size scale 32. The worker can judge the height of the concrete above the indicator plate 3 by the size scale 32 on the indicator plate 3. When the worker scrapes the concrete to the elevation, it is easier to judge how thick the concrete needs to be scraped away, which can improve efficiency accordingly. The zero scale line of the size scale 32 is located at the lowest end of the indicator plate 3. When the zero scale line is at the lowest end of the indicator plate 3, the size scale 32 on the indicator plate 3 is the thickness of the concrete exceeding the elevation. The worker scrapes the concrete according to the size, which can make the concrete liquid level flush with the bottom end of the indicator plate 3 more quickly, and the operation is more convenient.

[0043] Furthermore, the sleeve frame 31 is parallel to the indicator plate 3, and the width of the sleeve frame 31 is greater than the maximum rotation diameter of the adjusting nut 2. The width of the sleeve frame 31 can be slightly greater than the maximum rotation diameter of the adjusting nut 2, so that the adjusting nut 2 can rotate freely, avoiding the situation where the sleeve frame 31 blocks the rotation of the adjusting nut 2.

[0044] In order to prevent the indicator plate 3 from falling, a sleeve 4 is fixed on the indicator plate 3, and the sleeve 4 is sleeved on the vertical pole 1. When the indicator plate 3 is lifted and lowered relative to the adjusting nut 2, the sleeve 4 moves on the vertical pole 1, and the sleeve frame 31 of the indicator plate 3 will not fall off from the adjusting nut 2, thereby ensuring the reliable use of the present invention.

[0045] In order to facilitate the insertion of the vertical pole 1 into the base layer, a cross bar 5 is fixed to the upper section of the vertical pole 1. The worker can hold the cross bar 5 to operate, and it is convenient to insert the vertical pole 1 into the soil, sand cushion layer, etc. A protruding brim 11 is provided at the upper end of the vertical pole 1. When it is difficult for the worker to insert the vertical pole 1 into the soil or sand cushion layer, the brim 11 can be hit with a hammer to facilitate the operation.

[0046] The present invention is not limited to the above-mentioned optional implementation modes. Anyone can derive other various forms of products under the inspiration of the present invention. However, no matter what changes are made in the shape or structure, all technical solutions that fall within the scope defined by the claims of the present invention fall within the protection scope of the present invention.

Claims

1. A ruler for controlling the thickness, elevation and flatness of concrete, characterized in that: The utility model comprises a vertical pole (1), wherein the vertical pole (1) is threadedly connected with an adjusting nut (2); and an indicating plate (3), wherein a sleeve frame (31) is arranged on the indicating plate (3), and the sleeve frame (31) is sleeved on the adjusting nut (2); and a sleeve (4) is fixed on the indicating plate (3), and the sleeve (4) is sleeved on the vertical pole (1); The indicator plate (3) is in the shape of an inverted triangle; The sleeve frame (31) is parallel to the indicator plate (3), and the width of the sleeve frame (31) is greater than the maximum rotation diameter of the adjusting nut (2); The indicator plate (3) is provided with a size scale (32); The zero scale line of the size scale (32) is located at the lowermost position of the indicator plate (3); When in use, the level is placed at the location of the point to be placed, and the concrete pouring thickness at the point is obtained by measuring and calculating the elevation; the ruler is placed at the point, and when the leveling tower is not removed, the leveling tower scale is used as a reference to adjust the indicator plate (3) so that the lower end of the indicator plate (3) is aligned with the scale line of the concrete pouring thickness calculated on the leveling tower scale (7), and the lower end of the indicator plate (3) is the design elevation line.

2. A ruler for controlling the thickness, elevation and flatness of concrete according to claim 1, characterized in that: A crossbar (5) is fixed to the upper section of the vertical pole (1).

3. A ruler for controlling the thickness, elevation and flatness of concrete according to claim 1, characterized in that: The upper end of the upright pole (1) is provided with a protruding hat brim (11).

4. A ruler for controlling the thickness, elevation and flatness of concrete according to any one of claims 1 to 3, characterized in that: The lower part of the upright pole (1) is provided with a pointed end (12).

5. A ruler for controlling the thickness, elevation and flatness of concrete according to any one of claims 1 to 3, characterized in that: A base (6) is fixed to the bottom of the upright pole (1).