A flood-proof dam leak-proof reinforcement structure during flood season
By using internal plugging brackets and plugging sandbags at breaches of flood control dams, combined with expanded cement and cover plate structures, the problem of weak leakage plugging with sandbags in the existing technology is solved, and effective plugging of breaches and improved stability are achieved.
Patent Information
- Application Number
- CN202011018799.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-24
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2040-09-24
AI Technical Summary
In the prior art, when sandbags are used to plug breaches of flood control dams, single sandbags are small in size and light in weight, and are easily washed away by floods. Moreover, the stacking strength between sandbags is low, making it difficult to effectively plug breaches.
Adopt an internal leak-stopping bracket structure, including a metal mesh box-type leak-proof bracket and leak-plugging sandbags, which are fixed at the breach by manpower or machinery, and filled with expanded cement to enhance stability, combined with the post-patched front cover and the post-patched rear cover. The use of slabs forms a plugging and reinforcing structure for dam breaches.
It effectively reduces the flood flow at the breach, improves the blocking effect, enhances the stability and firmness of the breach, prevents the breach from breaching again, reduces the difficulty of transportation and improves sealing.
Smart Images

Figure CN112195860B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a flood-prevention dam leakage plugging and reinforcement structure during flood season, belonging to the field of flood prevention equipment. Background Art
[0002] Flood control is a water conservancy work that studies and takes various countermeasures and measures according to the laws and characteristics of floods to prevent or mitigate flood disasters and ensure social and economic development. Its basic work content includes flood control planning, flood control construction, management and application of flood control projects, flood control (ice prevention), flood dispatching and arrangement, post-disaster recovery and reconstruction, etc. Flood control measures include engineering measures and non-engineering measures. Flood control is also an important professional discipline in water conservancy science.
[0003] A flood levee is a dam built to prevent a river from overflowing. Flood levees can suppress floods, but they have both good and bad sides. The good side is that flood levees can protect people living along the riverbank from floods and property losses every year. But the bad side is that small breaches may occur on the flood levees, and they may also be flooded by the river.
[0004] When a flood comes, if a breach appears on the dam, it is necessary to plug the breach and reinforce it to prevent the flood from entering the urban area through the breach. In the prior art, the breach is usually plugged by throwing flood-resistant sandbags into the breach to plug it. This method is not effective in plugging the breach because a single sandbag is small in size and light in weight and can be easily washed away by the flood. Moreover, even if the breach is plugged with sandbags, the sandbags are only stacked and have low strength, so they can be easily washed away again. Summary of the invention
[0005] The technical problem to be solved by the present invention is: when plugging a dam breach, a single sandbag is small in size and light in weight and is easily washed away by the flood, failing to achieve the effect of plugging the breach. Moreover, even if the breach is plugged with sandbags, the sandbags are only stacked and have low strength, making them easily washed away again. The purpose is to provide a flood control dam leak plugging reinforcement structure during the flood season, so as to solve the problem of difficulty in plugging dam breaches with sandbags.
[0006] The present invention is achieved through the following technical solutions:
[0007] A flood-prevention dam leak-plugging reinforcement structure during flood season, comprising a plurality of internal leak-plugging brackets arranged in a dam breach of the dam body, wherein two adjacent internal leak-plugging brackets are fixedly connected; a back-filled front cover plate is arranged on the water-facing surface of the dam body, and a back-filled rear cover plate is arranged on the water-receiving surface of the dam body, wherein the back-filled front cover plate and the back-filled rear cover plate respectively cover the openings of the dam breach located on the water-facing surface and the water-receiving surface of the dam body; the back-filled front cover plate and the back-filled rear cover plate are respectively fixedly connected to the internal leak-plugging brackets; expansive cement is filled between the two end surfaces of the dam breach and the internal leak-plugging brackets; the internal leak-plugging bracket is a metal mesh box with an upper opening, and a plurality of leak-plugging sandbags are filled in the internal leak-plugging brackets.
[0008] Optimized, the above-mentioned flood-prevention dam flood season leak-plugging reinforcement structure, the internal leak-plugging bracket includes a bottom plate and a plurality of side plates, the bottom plate and the side plates are both metal mesh plates, each side edge of the bottom plate is respectively connected to a side plate, and the side plate is pivotally connected to the bottom plate; two adjacent side plates are fixed by steel wire binding; two adjacent internal leak-plugging brackets are fixed by steel wire binding.
[0009] Optimized, the above-mentioned flood control dam flood season plugging and reinforcement structure has a lower pressure plate arranged in the internal plugging bracket, the lower pressure plate is located at the bottom of the internal plugging bracket and below the plugging sandbag; a plurality of plugging rods are arranged on the surface of the lower pressure plate facing the inner bottom end surface of the internal plugging bracket, and the plugging rods pass through the bottom end surface of the internal plugging bracket.
[0010] Optimized, the above-mentioned flood-prevention dam flood season leak plugging reinforcement structure, the internal leak-plugging bracket includes a base plate and two side plates, the base plate is a rectangular mesh plate, and the two side plates are respectively pivotally connected to two parallel side surfaces of the base plate; a plurality of bracket expansion rods are respectively provided on both sides of the internal leak-plugging bracket, a plurality of spaced-apart threaded holes are provided on the bracket expansion rod, and the threaded holes on the bracket expansion rod are evenly arranged along the length extension direction of the bracket expansion rod; support screws are provided on the sides of the side plates, the support screws pass through the threaded holes on the bracket expansion rods, the sides of the side plates, and are threadedly connected with the bracket expansion rods and the side plates.
[0011] Optimized, in the flood season plugging and reinforcement structure of the flood control dam, the two ends of the rear cover plate are respectively fixedly connected with an end sealing tube, the end sealing tube is attached to the back water surface of the dam body and the length extension direction of the end sealing tube is arranged from the top to the bottom of the dam body; the end sealing tube is attached to an opening on one side of the back water surface of the dam body, and the end sealing tube is filled with expansive concrete.
[0012] Optimized, the above-mentioned flood control dam flood season plugging and reinforcement structure has a casting pipe arranged in the end sealing pipe, the casting pipe is arranged along the length extension direction of the end sealing pipe, and a plurality of casting ports are arranged on the casting pipe, and the casting ports are evenly arranged in the length extension direction of the casting pipe.
[0013] Optimized, the above-mentioned flood control dam flood season plugging and reinforcement structure, the back-filled rear cover plate and the back water surface of the dam body are spaced apart and provided with a number of plugging sandbags, the plugging sandbags between the back-filled rear cover plate and the back water surface of the dam body cover the opening of the dam breach located on the back water surface of the dam body.
[0014] Optimized, in the flood season plugging and reinforcement structure of the flood control dam, a plurality of positioning tubes are arranged on the rear cover plate, the positioning tubes are arranged in contact with the surface of the rear cover plate and are fixedly welded to the rear cover plate; fixed anchor rods are arranged in the positioning tubes, the fixed anchor rods pass through the positioning tubes and the ends are anchored to the bottom of the river channel or the river bank.
[0015] Optimized, the above-mentioned flood-season plugging and reinforcement structure of the flood control dam, the rear cover plate is connected with the rear support plate, the positioning tube is arranged between the rear cover plate and the rear support plate and is fixedly welded with the rear cover plate and the rear support plate; a plurality of support rods are connected to the rear support plate, one end of the support rod is hinged to the rear support plate, and the other end of the support rod is hinged to a ground plate, and the ground plate is anchored to the river bank ground through a ground anchor.
[0016] Optimized, the above-mentioned flood control dam flood season plugging and reinforcement structure is provided with a tension rod between the rear supplementary support plate and the rear supplementary front cover plate, the tension rod passes through the supplementary support plate, the rear supplementary rear cover plate, and the rear supplementary front cover plate, and the two ends are respectively fixed to the rear supplementary support plate and the rear supplementary front cover plate.
[0017] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0018] 1. The present invention provides a flood-proof dam leak-proof reinforcement structure during flood season. An internal leak-proof bracket is used to plug the breach at the beginning. After the internal leak-proof bracket is sunk into the breach, the internal leak-proof bracket can be fixed in the breach by human traction or mechanical means standing on the dam. The internal leak-proof bracket is a mesh structure that allows part of the flood to flow through the internal leak-proof bracket, reducing the fixing resistance. Then sandbags or stones are thrown into the internal leak-proof bracket. Due to the fixation of the internal leak-proof bracket, heavy objects will not be easily washed away by the flood, so that the heavy objects can be fixed at the breach position. When the number of sandbags or stones is large enough, the weight of the heavy objects can fix the internal leak-proof bracket in the breach to prevent the internal leak-proof bracket from being washed away by the flood, thereby reducing the flood flow at the breach. Finally, the back-filled front cover plate and the back-filled rear cover plate are covered on the water-facing and water-retaining surfaces of the breach to reduce the impact of the flood on the internal plugging bracket and prevent the flood from flowing through the breach. After the back-filled front cover plate and the back-filled rear cover plate are fixed, the breach is blocked. Then, the expansion cement is poured between the back-filled front cover plate and the back-filled rear cover plate to fill the gap between the internal plugging bracket and the breach, completing the breach plugging operation;
[0019] 2. The present invention provides a flood-proof dam leak-proof reinforcement structure during flood season. Leak-proof sandbags or stones are used as weights for leak-proofing. The operation is convenient and can be obtained on site, which reduces the difficulty of transportation and allows for quick operation. Filling with expansion cement can plug the gaps and increase the weight of the internal leak-proof bracket to improve the leak-proofing stability.
[0020] 3. The present invention provides a flood-proof dam leak-proof reinforcement structure during flood season, wherein the internal leak-proof bracket is formed by pivoting a bottom plate and a plurality of side plates, which is convenient for on-site assembly and reduces the difficulty of transportation, and is convenient for delivery to the site;
[0021] 4. In order to improve the sealing performance of the flood-proof dam plugging and reinforcement structure during the flood season, an end sealing tube is respectively arranged at both ends of the back-filled rear cover plate and filled with expansive concrete. The expansive concrete forms water retaining strips on both sides of the back water surface of the breach to prevent water seepage on both sides of the back-filled rear cover plate, thereby improving the sealing performance;
[0022] 5. The present invention provides a flood-proof dam leakage plugging and reinforcement structure during flood season. Since the diameter of the end sealing pipe is relatively small in reality, a pouring pipe is used to pour concrete inside the end sealing pipe, which can prevent uneven distribution of concrete caused by internal air accumulation.
[0023] 6. The present invention provides a flood-proof dam leakage plugging and reinforcement structure during flood season. The plugging sandbags between the rear cover plate and the back surface of the dam body can increase the firmness of the dam breach after plugging, and prevent the breach from bursting again after being subjected to a large impact.
[0024] 7. The present invention provides a flood-proof dam and dam reinforcement structure for plugging leaks during flood season. The positioning tube is fixed to the ground of the river bank using a fixed ground anchor rod, thereby fixing the back-filled back cover plate, improving the support of the back-filled back cover plate to the plugging sandbag and the internal plugging bracket, and improving the strength of the breach after plugging. The positioning tube serves as the skeleton of the back-filled back cover plate, which improves the strength of the back-filled back cover plate, prevents the back-filled back cover plate from deforming after being subjected to a large impact force, and improves the firmness of the dam breach after plugging leaks;
[0025] 8. The present invention provides a flood-proof dam leakage plugging and reinforcement structure during flood season. The support rods on the back-filled rear cover plate support the position and strength of the back-filled rear cover plate, so that the impact resistance of the back-filled rear cover plate and the back-filled support plate is higher, further improving the firmness of the dam breach after plugging.
[0026] 9. The present invention provides a flood-prevention dam leakage plugging and reinforcement structure during flood season, wherein the tension rods connect the back-up support plate, the back-up rear cover plate, and the back-up front cover plate as a whole, thereby improving the integrity of the dam after leakage plugging at the breach, and making the overall strength higher. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0028] Figure 1 This is a schematic diagram of the structure of this application;
[0029] Figure 2 for Figure 1 A top view of
[0030] Figure 3 This is a schematic diagram of the expanded structure of the internal leak-blocking bracket of Example 1;
[0031] Figure 4 This is a schematic diagram of the internal structure of the internal leak-proof bracket of Example 1;
[0032] Figure 5 It is a schematic diagram of the unfolded structure of the internal leak-proof bracket of Example 2;
[0033] Figure 6 This is a schematic diagram of the connection structure between the internal leak-blocking bracket and the bracket expansion rod of Example 2;
[0034] Figure 7 for Figure 6 Side view of.
[0035] Marks and corresponding parts names in the attached drawings:
[0036] 1-dam body, 2-dam breach, 3-internal plugging bracket, 31-bottom plate, 32-side plate, 33-lower pressure plate, 34-insertion rod, 35-bracket expansion rod, 36-threaded hole, 37-support screw, 4-rear-supplemented front cover plate, 5-rear-supplemented rear cover plate, 6-end sealing pipe, 7-plugging sandbag, 8-casting pipe, 9-casting port, 10-positioning pipe, 11-fixed ground anchor rod, 12-rear-supplemented support plate, 13-bracket rod, 14-anchor plate, 15-tension rod. DETAILED DESCRIPTION
[0037] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0038] In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is apparent to one of ordinary skill in the art that these specific details are not necessarily employed to practice the present invention. In other instances, well-known structures, circuits, materials, or methods are not specifically described in order to avoid obscuring the present invention.
[0039] Throughout the specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment," "an embodiment," "an example," or "an example" appearing in various places throughout the specification do not necessarily all refer to the same embodiment or example. In addition, particular features, structures, or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or sub-combination. In addition, it will be appreciated by those of ordinary skill in the art that the figures provided herein are for illustrative purposes and that the figures are not necessarily drawn to scale. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0040] In the description of the present invention, the directions or positional relationships indicated by terms such as “front”, “rear”, “left”, “right”, “up”, “down”, “vertical”, “horizontal”, “high”, “low”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limiting the scope of protection of the present invention.
[0041] Example 1
[0042] like Figures 1 to 3 As shown, a flood-prevention dam leak-plugging reinforcement structure during flood season of the present invention comprises a plurality of internal leak-plugging brackets 3 arranged in a dam breach 2 of a dam body 1, and two adjacent internal leak-plugging brackets 3 are fixedly connected; a back-filling front cover plate 4 is arranged on the water-facing surface of the dam body 1, and a back-filling rear cover plate 5 is arranged on the water-receiving surface of the dam body 1, and the back-filling front cover plate 4 and the back-filling rear cover plate 5 respectively cover the openings of the dam breach 2 located on the water-facing surface and the water-receiving surface of the dam body 1; the back-filling front cover plate 4 and the back-filling rear cover plate 5 are respectively fixedly connected to the internal leak-plugging brackets 3; expansive cement is filled between the two end surfaces of the dam breach 2 and the internal leak-plugging brackets 3; the internal leak-plugging bracket 3 is a metal mesh box with an upper opening, and a plurality of leak-plugging sandbags 7 are filled in the internal leak-plugging bracket 3.
[0043] In the technical solution of the present application, an internal plugging support 3 is used to plug the breach at the beginning. After the internal plugging support 3 is sunk into the breach, the internal plugging support 3 can be fixed in the breach by human traction or mechanical means standing on the embankment. The internal plugging support 3 is a cage structure, which can allow part of the flood to flow through the internal plugging support 3, thereby reducing the fixing resistance. Then, sandbags or stones are thrown into the internal plugging support 3. Due to the fixation of the internal plugging support 3, the heavy objects will not be easily washed away by the flood, so that the heavy objects can be fixed at the breach position. When the number of sandbags or stones is sufficient, the weight of the heavy objects can fix the internal plugging support 3 in the breach to prevent the internal plugging support 3 from being washed away by the flood, thereby reducing the flood flow at the breach. Finally, the front cover plate 4 and the rear cover plate 5 are covered on the water-facing and water-retaining surfaces of the breach to reduce the impact of the flood on the internal plugging bracket 3 and prevent the flood from flowing through the breach. After the front cover plate 4 and the rear cover plate 5 are fixed, the breach is blocked, and then the expansion cement is poured between the front cover plate 4 and the rear cover plate 5 to fill the gap between the internal plugging bracket 3 and the breach to complete the breach plugging operation. Using plugging sandbags or stones as heavy objects for plugging is easy to operate, can also be obtained on-site, reduce the difficulty of transportation, and can be operated quickly. Filling the expansion cement can block the gap, and can increase the weight of the internal plugging bracket 3 to improve the stability of plugging.
[0044] The internal leak-proof bracket 3 includes a bottom plate 31 and a plurality of side plates 32. Both the bottom plate 31 and the side plates 32 are metal mesh plates. Each side edge of the bottom plate 31 is respectively connected to a side plate 32, and the side plates 32 are pivotally connected to the bottom plate 31. Two adjacent side plates 32 are fixed by steel wire tying. Two adjacent internal leak-proof brackets 3 are fixed by steel wire tying.
[0045] In this embodiment, the internal leak-blocking bracket 3 is formed by pivotally connecting a bottom plate 31 and a plurality of side plates 32, which is convenient for on-site assembly and reduces the difficulty of transportation, thereby facilitating transportation to the site.
[0046] A lower pressure plate 33 is provided in the internal plugging bracket 3, and the lower pressure plate 33 is located at the bottom of the internal plugging bracket 3 and below the plugging sandbag 7; a plurality of insertion rods 34 are provided on the surface of the lower pressure plate 33 facing the inner bottom end surface of the internal plugging bracket 3, and the insertion rods 34 pass through the bottom end surface of the internal plugging bracket 3.
[0047] The lower pressure plate 33 in the internal plugging bracket 3 wants to be squeezed downward after being subjected to the heavy pressure of the plugging sandbag 7, and the insertion rod 34 on the lower pressure plate 33 will be squeezed toward the lower part of the breach after the lower pressure plate 33 is squeezed, so that the insertion rod 34 is inserted into the soil or soft part below the breach, and then the internal plugging bracket 3 is fixed to the breach by the insertion rod 34, preventing the internal plugging bracket 3 from being washed away by the flood at the breach.
[0048] The two ends of the rear cover plate 5 are respectively fixedly connected with an end sealing tube 6, which is attached to the back water surface of the dam body 1 and the length extension direction of the end sealing tube 6 is arranged from the top to the bottom of the dam body 1; the end sealing tube 6 is attached to an opening on one side of the back water surface of the dam body 1, and the end sealing tube 6 is filled with expansive concrete.
[0049] In the present application, in order to improve the sealing performance, an end sealing tube 6 is respectively provided at both ends of the back-filled rear cover plate 5 and the inside is filled with expansive concrete. The expansive concrete expands and squeezes the back water surface of the dam during the drying process, thereby reducing the gap between the end sealing tube 6 and the back water surface of the dam. In this way, water retaining strips are formed on both sides of the back water surface of the breach through the expansive concrete, thereby preventing water seepage on both sides of the back water surface of the back-filled rear cover plate 5 and improving the sealing performance.
[0050] A pouring pipe 8 is arranged in the end sealing pipe 6 , and the pouring pipe 8 is arranged along the length extension direction of the end sealing pipe 6 . A plurality of pouring ports 9 are arranged on the pouring pipe 8 , and the pouring ports 9 are evenly arranged in the length extension direction of the pouring pipe 8 .
[0051] Since the diameter of the end sealing tube 6 is relatively small in reality, a pouring tube 8 is used to pour concrete inside the end sealing tube 6, which can prevent uneven concrete distribution caused by internal air accumulation.
[0052] A plurality of plugging sandbags 7 are arranged at intervals between the back-filled rear cover plate 5 and the back water surface of the dam body 1 . The plugging sandbags 7 between the back-filled rear cover plate 5 and the back water surface of the dam body 1 cover the opening of the dam breach 2 located on the back water surface of the dam body 1 .
[0053] In the present application, the plugging sandbags 7 between the rear cover plate 5 and the back surface of the dam body 1 can increase the firmness of the dam breach after plugging, and prevent the breach from breaching again after being subjected to a greater impact.
[0054] A plurality of positioning tubes 10 are arranged on the supplementary rear cover plate 5, and the positioning tubes 10 are arranged in contact with the surface of the supplementary rear cover plate 5 and are fixedly welded to the supplementary rear cover plate 5; a fixed anchor rod 11 is arranged inside the positioning tube 10, and the fixed anchor rod 11 passes through the positioning tube 10 and the end thereof is anchored to the bottom surface of the river channel or the river bank ground.
[0055] In the present application, the positioning tube 10 is fixed to the ground of the river bank using a fixed ground anchor rod 11, thereby fixing the back-up cover plate 5, improving the support of the back-up cover plate 5 to the plugging sandbag 7 and the internal plugging bracket 3, and improving the strength after the breach is plugged. The positioning tube 10 serves as the skeleton of the back-up cover plate 5, improves the strength of the back-up cover plate 5, prevents the back-up cover plate 5 from deforming after being subjected to a large impact force, and improves the firmness of the dam breach after plugging.
[0056] The supplementary rear cover plate 5 is connected to the supplementary support plate 12, and the positioning tube 10 is arranged between the supplementary rear cover plate 5 and the supplementary support plate 12 and fixedly welded to the supplementary rear cover plate 5 and the supplementary support plate 12; a plurality of support rods 13 are connected to the supplementary support plate 12, one end of the support rod 13 is hinged to the supplementary support plate 12, and the other end of the support rod 13 is hinged to a ground anchor plate 14, and the ground anchor plate 14 is anchored to the river bank ground through a ground anchor.
[0057] In the present application, the support rod 13 on the supplementary rear cover plate 5 supports the position and strength of the supplementary rear cover plate 5, so that the impact resistance of the supplementary rear cover plate 5 and the supplementary support plate 12 is higher, further improving the firmness of the dam after the breach is plugged.
[0058] A tie rod 15 is arranged between the rear supplement support plate 12 and the rear supplement front cover plate 4. The tie rod 15 passes through the rear supplement support plate 12, the rear supplement rear cover plate 5, and the rear supplement front cover plate 4, and both ends are fixed to the rear supplement support plate 12 and the rear supplement front cover plate 4 respectively.
[0059] The tie rods 15 connect the supplementary support plate 12, the supplementary rear cover plate 5 and the supplementary front cover plate 4 as a whole, thereby improving the integrity of the dam after the breach is plugged and making the overall strength higher.
[0060] Example 2
[0061] The difference between this embodiment and embodiment 1 is that: the internal leak-plugging bracket 3 includes a base plate 31 and two side plates 32, the base plate 31 is a rectangular mesh plate, and the two side plates 32 are respectively pivotally connected to two parallel side surfaces of the base plate 31; a plurality of bracket expansion rods 35 are respectively provided on both sides of the internal leak-plugging bracket 3, and a plurality of spaced threaded holes 36 are provided on the bracket expansion rod 35, and the threaded holes 36 on the bracket expansion rod 35 are evenly arranged along the length extension direction of the bracket expansion rod 35; a support screw 37 is provided on the side of the side plate 32, and the support screw 37 passes through the threaded hole 36 on the bracket expansion rod 35 and the side of the side plate 32 and is threadedly connected with the bracket expansion rod 35 and the side plate 32.
[0062] In this embodiment, the internal plugging bracket 3 is configured to be composed of a bottom plate 31 and two side plates 32 pivotally connected, and the internal plugging bracket 3 is formed by folding the side plates 32 and the bottom plate 31. After the internal plugging bracket 3 is formed, the two side plates 32 are respectively fixed to different positions on the bracket expansion rod 35 using support screws 37, so that the shape of the internal plugging bracket 3 is fixed. Such a configuration can make the internal plugging bracket 3 adapt to the shape of the dam by changing the angle between the side plates 32 and the bottom plate 31, and is convenient for on-site assembly according to the situation.
[0063] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A flood control dam leakage plugging and reinforcement structure during flood season, Features: The invention comprises a plurality of internal leak-proof brackets (3) arranged in a dam breach (2) of a dam body (1), wherein two adjacent internal leak-proof brackets (3) are fixedly connected to each other; a back-filling front cover plate (4) is arranged on the water-facing surface of the dam body (1), and a back-filling rear cover plate (5) is arranged on the back-facing surface of the dam body (1), wherein the back-filling front cover plate (4) and the back-filling rear cover plate (5) respectively cover the openings of the dam breach (2) located on the water-facing surface and the back-facing surface of the dam body (1); the back-filling front cover plate (4) and the back-filling rear cover plate (5) are respectively fixedly connected to the internal leak-proof brackets (3); expansion cement is filled between the two end surfaces of the dam breach (2) and the internal leak-proof brackets (3); the internal leak-proof bracket (3) is a metal mesh box with an upper opening, and a plurality of leak-proof sandbags (7) are filled in the internal leak-proof bracket (3); The two ends of the back-up rear cover plate (5) are respectively fixedly connected with an end sealing tube (6), the end sealing tube (6) is attached to the back water surface of the dam body (1) and the length extension direction of the end sealing tube (6) is arranged along the dam top to the dam bottom of the dam body (1); the end sealing tube (6) is attached to the opening on one side of the back water surface of the dam body (1), and the end sealing tube (6) is filled with expansion concrete; A plurality of positioning tubes (10) are arranged on the post-replacement rear cover plate (5), the positioning tubes (10) are arranged in contact with the surface of the post-replacement rear cover plate (5) and are fixedly welded to the post-replacement rear cover plate (5); a fixed ground anchor rod (11) is arranged inside the positioning tube (10), the fixed ground anchor rod (11) passes through the positioning tube (10) and the end of the fixed ground anchor rod (11) is anchored to the bottom surface of the river channel or the river bank ground.
2. The flood-proof dam leakage-stopping and reinforcement structure during flood season according to claim 1, Features: The internal leak-proof bracket (3) comprises a bottom plate (31) and a plurality of side plates (32), the bottom plate (31) and the side plates (32) are both metal mesh plates, each side edge of the bottom plate (31) is respectively connected to a side plate (32), and the side plates (32) are pivotally connected to the bottom plate (31); two adjacent side plates (32) are fixed by steel wire tying; and two adjacent internal leak-proof brackets (3) are fixed by steel wire tying.
3. The flood-proof dam leakage-stopping and reinforcement structure during flood season according to claim 2, Features: A lower pressing plate (33) is arranged inside the internal plugging support (3), and the lower pressing plate (33) is located at the bottom of the internal plugging support (3) and below the plugging sandbag (7); a plurality of insertion rods (34) are arranged on the surface of the lower pressing plate (33) facing the inner bottom end surface of the internal plugging support (3), and the insertion rods (34) pass through the bottom end surface of the internal plugging support (3).
4. The flood-proof dam leakage plugging and reinforcement structure during flood season according to claim 1, Features: The internal leak-proof bracket (3) comprises a bottom plate (31) and two side plates (32), the bottom plate (31) being a rectangular mesh plate, and the two side plates (32) being pivotally connected to two parallel side surfaces of the bottom plate (31) respectively; a plurality of bracket expansion rods (35) are respectively arranged on both sides of the internal leak-proof bracket (3), a plurality of threaded holes (36) arranged at intervals are arranged on the bracket expansion rod (35), and the threaded holes (36) on the bracket expansion rod (35) are evenly arranged along the length extension direction of the bracket expansion rod (35); a support screw (37) is arranged on the side of the side plate (32), and the support screw (37) passes through the threaded hole (36) on the bracket expansion rod (35) and the side of the side plate (32) and is threadedly connected to the bracket expansion rod (35) and the side plate (32).
5. The flood-proof dam leakage plugging and reinforcement structure during flood season according to claim 1, Features: A pouring pipe (8) is arranged in the end sealing pipe (6), and the pouring pipe (8) is arranged along the length extension direction of the end sealing pipe (6). A plurality of pouring ports (9) are arranged on the pouring pipe (8), and the pouring ports (9) are evenly arranged in the length extension direction of the pouring pipe (8).
6. The flood-proof dam leakage plugging and reinforcement structure during flood season according to claim 5, Features: A plurality of plugging sandbags (7) are arranged at intervals between the back-filled rear cover plate (5) and the back-water surface of the dam body (1); the plugging sandbags (7) between the back-filled rear cover plate (5) and the back-water surface of the dam body (1) cover the opening of the dam breach (2) located on the back-water surface of the dam body (1).
7. The flood-proof dam leakage plugging and reinforcement structure during flood season according to claim 1, Features: The supplementary rear cover plate (5) is connected to a supplementary support plate (12); the positioning tube (10) is arranged between the supplementary rear cover plate (5) and the supplementary support plate (12) and is fixedly welded to the supplementary rear cover plate (5) and the supplementary support plate (12); a plurality of support rods (13) are connected to the supplementary support plate (12); one end of the support rod (13) is hinged to the supplementary support plate (12); the other end of the support rod (13) is hinged to a ground anchor plate (14); the ground anchor plate (14) is anchored to the river bank ground through a ground anchor.
8. The flood-proof dam leakage plugging and reinforcement structure during flood season according to claim 7, Features: A tie rod (15) is provided between the rear supplementary support plate (12) and the rear supplementary front cover plate (4), and the tie rod (15) passes through the rear supplementary support plate (12), the rear supplementary rear cover plate (5), and the rear supplementary front cover plate (4), and the two ends of the tie rod (15) are respectively fixed to the rear supplementary support plate (12) and the rear supplementary front cover plate (4).
