A highway engineering project inspection system based on BIM technology
Through the highway engineering project inspection system based on BIM technology, combined with hardware and modules, automated inspection problems are achieved, and the problems of high labor costs and low automation in highway engineering construction are solved, and construction efficiency and Security, saving costs.
Patent Information
- Application Number
- CN202011030859.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2040-09-27
AI Technical Summary
During the construction of existing highway projects, engineering inspections rely on manual data collection, resulting in high labor costs, low degree of automation, and backward processing methods, which increase safety and quality hazards.
Adopt a highway engineering project engineering inspection system based on BIM technology, combining hardware such as safety helmets, drones and voice intelligent recognition devices, and integrates modules, problem library creation modules, inspection problem creation modules, distribution modules, and processing modules. , audit module and statistical analysis module to realize automated matching and handling of inspection problems.
The efficiency and accuracy of construction units, supervision units and construction units discover and deal with problems during the construction stage have been improved, manpower, material resources and time costs have been saved, project cost expenditure has been reduced, and effective prevention of safety and quality hazards have been achieved.
Smart Images

Figure CN112200535B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of highway engineering construction management information technology, and in particular to a highway engineering project engineering inspection system based on BIM technology. Background Art
[0002] The existing highway engineering inspection is generally carried out through manual data collection. However, since highway engineering is a linear project, with the continuous advancement of construction progress, the scale of the project and the working surface are getting larger and larger. Under the condition of ensuring a certain inspection frequency, the investment in manpower costs will become larger and larger; if the inspection frequency is reduced to save costs, it will inevitably increase the safety and quality risks of the project. If these risks are not handled in time, they may lead to greater safety or quality risks. So, can we combine the Internet of Things and intelligent identification technology to design a highway engineering project inspection system based on BIM technology that can quickly and accurately locate engineering inspection problems, automatically match responsible persons and handling measures, and have a certain preventive effect on common inspection problems, so as to lay the foundation for improving the quality and safety of highway engineering construction? However, there has been no public report so far. Summary of the invention
[0003] In view of the above situation, in order to overcome the defects of the prior art, the purpose of the present invention is to provide a highway engineering project inspection system based on BIM technology, which can effectively solve the problems of large manpower investment, low degree of automation and backward processing methods in highway engineering inspection.
[0004] To achieve the above-mentioned purpose, the technical solution provided by the present invention is a highway engineering project inspection system based on BIM technology, comprising hardware and modules, wherein the hardware comprises a safety helmet, a drone and a voice intelligent recognition device; and the modules comprise the following modules:
[0005] a. BIM model integration module: Build a BIM model of the entire project. The BIM model is split based on the division of specific highway engineering projects. The BIM model and the division of parts and items are made to correspond one to one through BIM model coding and part and item coding, and accurate attribute data is given to the corresponding BIM model unit. The attribute data includes geometric data, construction process reference data, data of the person in charge of the construction unit and construction quality inspection data; the BIM model integration module is organically combined with the problem library creation module, the inspection problem creation module, the inspection problem distribution module, the inspection problem processing module, the inspection problem review module and the inspection problem statistical analysis module to form the application software;
[0006] b. Problem database creation module: including safety problem database and quality problem database. The safety problem database is based on the requirements of the Ministry of Transport for applying for safe construction sites; the quality problem database is based on the basic requirements of each process inspection item under each sub-project in the sub-item division of the "Highway Engineering Quality Inspection and Assessment Standards" as the inspection point, combined with the problem-solving knowledge base accumulated by the project construction unit itself, and automatically establishes associations in the system through sub-item division and BIM model;
[0007] c. Inspection problem creation module: Create engineering problems found during the inspection process through the system mobile APP, locate the inspector's position through GPS, the system automatically matches the sub-items and BIM model units of the engineering project, automatically inputs the engineering part data and pile number data, manually enters or selects the problem title and description from the system problem database, and uploads the image data of the engineering project inspection problem. When it is difficult for personnel to reach the location of the engineering problem and it is impossible to create the inspection problem in time, use the high-definition camera on the helmet or drone to take pictures or videos of the scene, and automatically match the corresponding sub-items, BIM model units, and pile number basic data when creating the inspection problem through the GPS information of the current part displayed on the picture or video;
[0008] d. Inspection problem distribution module: The creator distributes the engineering problems found during the inspection. When distributing the problem, he selects the problem type and severity, the rectification time and the relevant responsible persons. The information of the distributed problem flows to the review engineer, who reviews the details of the inspection problem again. If the sub-items or BIM model association is incorrect, the data is unclear or the supporting materials are insufficient, the distributed problem will be rejected during the review and will be submitted after modification and improvement. The system automatically matches the responsible person according to the list of responsible persons associated with the BIM model of the problem location and the problem type;
[0009] The inspection problem types include safety hazards and quality hazards, and the severity levels are divided into levels I, II, and III;
[0010] e. Inspection problem handling module: According to the type, severity and rectification requirements of the inspection problem, the module automatically associates the same or similar problems under the BIM model of this part online, and gives reference handling opinions; when the reference handling opinions are available, they are handled according to the reference handling opinions; if they are not available, they are handled by studying prevention and control measures offline, improving the construction organization design, special construction plans and formulating special emergency plans. The handling measures are uploaded to the system platform as supplementary problems and saved in the database, and are associated with this part and the same type of BIM model, so that similar problems can be automatically matched and handled in the future;
[0011] f. Inspection problem review module: The reviewer makes a review decision on whether the corresponding inspection problem is passed or not by checking the measures and progress of the handled problems and combining the video data during and after the on-site rectification process. The inspection problems that fail are returned to the corresponding responsible persons for reprocessing. The inspection problems that pass are automatically added to the system problem library and associated with the automatic BIM model unit. Combined with the inspection problems, a closed loop of inspection problem processing is formed;
[0012] g. Inspection problem statistical analysis module: Filter out high-frequency problems and common problems. The system will push the filtered problems to the project leader and relevant responsible persons. Through statistical analysis of inspection problems, the correspondence mechanism between the inspection problem database and the BIM model will be improved. According to the project site processing records and big data analysis results, reference processing opinions are given for subsequent similar or similar problems, and they are pushed in a graded manner.
[0013] The present invention is based on BIM technology and relies on the latest computer and communication technologies such as artificial intelligence, wireless communication and the Internet of Things to achieve accurate matching of the BIM model of the entire highway project with the engineering inspection problem library, studies and determines preventive measures to avoid repeated occurrences of similar problems and save project cost expenditures. Through the automatic association of the entire BIM model with the problem library, the efficiency and accuracy of construction units, supervision units and construction units in discovering and handling problems during the construction phase are improved, which saves manpower, material resources, time and other costs for highway engineering project construction, and has huge economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural diagram of a highway engineering project inspection system based on BIM technology of the present invention.
[0015] Figure 2 It is a flow chart of a highway engineering project inspection system based on BIM technology of the present invention. DETAILED DESCRIPTION
[0016] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings and specific circumstances.
[0017] In conjunction with the accompanying drawings, a highway engineering project inspection system based on BIM technology is provided, including hardware equipment and modules. The hardware equipment includes: a safety helmet, a drone and a voice intelligent recognition device. The safety helmet includes a high-definition camera, a speaker, a GPS or Beidou positioning module and a data transmission module arranged on the safety helmet, and has a hat-off alarm function; the drone includes a high-definition camera, a GPS or Beidou positioning module and a data transmission module arranged on the drone; the voice intelligent recognition device can automatically translate the user's voice into text instead of manual entry of data in a specific environment.
[0018] Modules include:
[0019] a. BIM model integration module: according to the requirements of specific highway engineering projects, build a BIM model of the entire project. The BIM model is split based on the sub-item division of the specific highway engineering project. The BIM model and the sub-item division are made to correspond one to one through BIM model coding and sub-item coding, and accurate attribute data is given to the corresponding BIM model unit, including but not limited to precise geometric data, rich construction process reference data, detailed data of responsible persons of the construction unit, construction quality inspection data, etc.; the BIM model integration module is organically combined with the problem library creation module, the inspection problem creation module, the inspection problem distribution module, the inspection problem processing module, the inspection problem review module and the inspection problem statistical analysis module to form the application software;
[0020] b. Problem database creation module: including safety problem database and quality problem database. Safety problem is based on the requirements of the Ministry of Transport for applying for safe construction sites; quality problem is based on the basic requirements of each process inspection item under each sub-project in the sub-item division of the "Highway Engineering Quality Inspection and Assessment Standards". Combined with the accumulation of the project construction unit itself, a complete problem database is established. The system automatically establishes associations through sub-item division and BIM model, which is convenient for automatic screening when creating inspection problems later;
[0021] This system uses the BIM model to associate data with highway engineering process inspection and quality inspection materials. When sub-projects with unresolved quality and safety issues in this system cannot be inspected on site, it ensures that the project quality meets the standard requirements and the construction process is safe.
[0022] When users conduct safety technical briefings before construction, they can retrieve corresponding preventive measures from the quality and safety problem database associated with the BIM model for mandatory learning based on the location to be constructed, and push necessary preventive measures confirmation messages to relevant personnel in the area at regular intervals during the construction process. The push interval is configurable.
[0023] c. Inspection problem creation module. When creating inspection problems through the system mobile APP, the sub-projects, BIM model units, project location data and pile number data are automatically filled in according to the GPS positioning information. The problem title and description are manually entered or selected from the system problem library, and the image data when the problem is found is uploaded. When the inspection problem cannot be created in time due to harsh conditions or difficult access for personnel, the high-definition pictures and videos of the scene can be taken in real time with the help of a safety helmet or a drone. The GPS information of the current part will be displayed on the picture or video, which is convenient for automatically matching the corresponding sub-projects, BIM model units, pile numbers and other basic data when creating inspection problems later;
[0024] Manual entry includes manual entry or entry via a voice intelligent recognition device, which can automatically translate the user's voice into text instead of manual entry of data in a specific environment;
[0025] d. Inspection problem dispatching module: The creator dispatches the engineering problems found during the inspection. When dispatching the problem, the problem type and severity are selected, the rectification time and the relevant responsible person are selected. When dispatching the inspection problem, the engineer needs to review the details of the inspection problem again. If the sub-items or BIM model association is incorrect, the data is unclear or the supporting materials are insufficient, it will be rejected and submitted after modification and improvement. When dispatching the problem, the problem type and severity are selected, the rectification time and the responsible person are required;
[0026] The inspection problem types include safety hazards and quality hazards, and the severity levels are divided into levels I, II, and III. When selecting the responsible person, the responsible person will be automatically matched according to the list of responsible persons associated with the BIM model of the problem location and the problem type;
[0027] e. Inspection problem handling module: Inspection problem handling module is based on the type, severity and rectification requirements of the inspection problem. First, it automatically associates the same or similar problems under the BIM model of this part online, and combines the basic requirements of each process inspection item of the "List of Quality Non-Conformities of Highway Project Handover Inspection" and the "Highway Engineering Quality Inspection and Assessment Standards" to give reference handling opinions; when the reference handling opinions are available, they are handled according to the reference handling opinions. If they are not available, they are handled through offline research and decision-making on prevention and control measures, improvement of construction organization design, special construction plans, and formulation of special emergency plans. The handling measures are uploaded to the system platform and associated with this part and the same type of BIM model. When similar problems occur in similar parts in the future, they can be automatically matched and handled;
[0028] f. Inspection problem review module: The reviewer makes a review decision on whether the corresponding inspection problem is passed or not by checking the measures and progress of the handled problems and combining the video data during and after the on-site rectification process. The inspection problems that fail are returned to the corresponding responsible persons for reprocessing. The inspection problems that pass are automatically added to the system problem library and associated with the automatic BIM model unit. Combined with the inspection problems, a closed loop of inspection problem processing is formed;
[0029] For safety issues, after the problem is handled, the closed-loop review process can be flexibly configured according to the project requirements based on the different levels of the problem: the closed-loop review process for level I issues is closed by the resident office safety supervisor; the closed-loop review process for level II issues is closed by the general manager's office safety supervisor and the person in charge of the safety department of the construction unit; the closed-loop review process for level III issues is closed by the person in charge of the safety department of the construction unit, the project manager or project chief engineer, the resident supervisor, the general manager's office director, the person in charge of the safety department of the construction unit, and the leader in charge of safety of the construction unit;
[0030] g. Inspection problem statistical analysis module: screen out high-frequency and common problems, research and determine preventive measures, avoid repeated occurrence of similar problems, save project cost expenditures, continuously improve the correspondence mechanism between the inspection problem database and the BIM model through statistical analysis of inspection problems, and give reference processing opinions for subsequent similar or similar problems based on project site processing records and big data analysis results, and push them in a graded manner.
[0031] Statistics are collected on the inspection problem closure rate of each participating unit of the project, and ranking is carried out, which is used as a scoring standard for rewards and punishments. Assessments are conducted monthly. The engineering inspection involves all personnel of the participating units, and different positions are assigned specific responsibilities. Generally, technicians are required to fill in reports twice a day, resident supervisors are required to fill in reports twice a week, and directors are required to fill in reports four times a month. Even if there are no problems, reports are required. The above frequencies are included in the personnel assessment points.
[0032] It should be noted that the above is only used to explain the present invention and is not intended to limit the present invention in any form. Any technician familiar with the profession can make changes or modify the technical contents disclosed above into equivalent embodiments with equivalent changes without departing from the scope of the technical solution of the present invention, which all fall within the protection scope of the present invention.
[0033] The present invention provides a highway engineering project inspection system based on BIM technology, which has the following beneficial effects compared with the prior art:
[0034] 1. Based on BIM technology, combined with the latest computer and communication technologies such as artificial intelligence, wireless communication and the Internet of Things, the BIM model of the entire highway project is accurately matched with the engineering inspection problem library, the quality and safety inspection process is standardized, and the inspection records are statistically analyzed to screen out high-frequency and common problems. Preventive measures are studied and determined to avoid repeated occurrence of similar problems, thereby saving manpower, material resources and time for the construction of highway projects, saving project costs, and saving more than 42% of costs through field experiments and practice;
[0035] 2. Through the automatic association of the full-line BIM model with the problem database, the efficiency and accuracy of the construction unit, supervision unit and construction unit in discovering and handling problems during the construction phase are improved. At the same time, each participating unit can check the possible safety and quality risks in the construction site at any time, which plays a good preventive role in such routine or high-frequency problems, ensuring the safety, reliability and economy of each sub-project and even the entire project, with huge economic and social benefits.
Claims
1. A highway engineering project inspection system based on BIM technology, including hardware and modules, It is characterized in that The hardware includes a helmet, a drone and a voice intelligent recognition device. The helmet includes a high-definition camera, a speaker, a GPS or Beidou positioning module and a data transmission module arranged on the helmet, and has a hat removal alarm. The drone includes a high-definition camera, a GPS or Beidou positioning module and a data transmission module arranged on the drone. The modules include the following modules: a. BIM model integration module: Build a BIM model of the entire project. The BIM model is split based on the division of specific highway engineering projects. The BIM model and the division of parts and items are made to correspond one to one through BIM model coding and part and item coding, and accurate attribute data is given to the corresponding BIM model unit. The attribute data includes geometric data, construction process reference data, data of the person in charge of the construction unit and construction quality inspection data; the BIM model integration module is organically combined with the problem library creation module, the inspection problem creation module, the inspection problem distribution module, the inspection problem processing module, the inspection problem review module and the inspection problem statistical analysis module to form the application software; b. Problem database creation module: including safety problem database and quality problem database. The safety problem database is based on the requirements of the Ministry of Transport for applying for safe construction sites; The quality problem database takes the basic requirements of each process inspection item under each sub-project in the sub-item division of the "Highway Engineering Quality Inspection and Assessment Standard" as the inspection point, combined with the problem-solving knowledge base accumulated by the project construction unit itself, and automatically establishes associations in the system through sub-item division and BIM model; c. Inspection problem creation module: Create engineering problems found during the inspection process through the system mobile APP, locate the position of the inspector through GPS, the system automatically matches the sub-items and BIM model units of the engineering project, automatically inputs the engineering part data and pile number data, manually enters or selects the problem title and description from the system problem database. Manual entry includes manual entry or entry through a voice intelligent recognition device. The voice intelligent recognition device can automatically translate the user's voice into text instead of manual entry of data in a specific environment, and uploads the image data of the engineering project inspection problem. When it is difficult for personnel to reach the location of the engineering problem and it is impossible to create the inspection problem in time, use the high-definition camera on the safety helmet or drone to take pictures or videos of the scene. Through the GPS information of the current part displayed on the picture or video, the corresponding sub-items, BIM model units, and pile number basic data are automatically matched when creating the inspection problem; before construction, the problem library creation module retrieves the corresponding preventive measures from the quality and safety problem library associated with the BIM model according to the part to be constructed for mandatory learning, and pushes necessary preventive measures confirmation messages to relevant personnel in the area at regular intervals during the construction process. The push interval is configurable; d. Inspection problem distribution module: The creator distributes the engineering problems found during the inspection. When distributing the problem, he selects the problem type and severity, the rectification time and the relevant responsible persons. The information of the distributed problem flows to the review engineer, who reviews the details of the inspection problem again. If the sub-items or BIM model association is incorrect, the data is unclear or the supporting materials are insufficient, the distributed problem will be rejected during the review and will be submitted after modification and improvement. The system automatically matches the responsible person according to the list of responsible persons associated with the BIM model of the problem location and the problem type; Inspection problem types include safety hazards and quality hazards, and the severity levels are divided into levels I, II, and III; e. Inspection problem handling module: According to the type, severity and rectification requirements of the inspection problem, it automatically associates the same or similar problems under the BIM model of this part online and gives reference handling opinions; When reference treatment opinions are available, they are handled according to the reference treatment opinions. If they are not available, they are handled by studying prevention and control measures offline, improving construction organization design, special construction plans, and formulating special emergency plans. The treatment measures are uploaded to the system platform as supplementary questions and saved in the database, and are associated with the local part and the same type of BIM model, so that similar problems can be automatically matched and handled in the future; f. Inspection problem review module: The reviewer makes a review decision on whether the corresponding inspection problem is passed or not by checking the measures and progress of the handled problems, combined with the video data during and after the on-site rectification process. The inspection problems that have not passed are returned to the corresponding responsible persons for re-processing. For safety issues, after the problem is processed, according to the different levels of the problems, the passed inspection problems are automatically added to the system problem library and associated with the automatic BIM model unit. Combined with the inspection problems, a closed loop of inspection problem processing is formed. The closed loop includes: the closed-loop review process of level I problems is closed by the safety professional supervision of the resident office; the closed-loop review process of level II problems is followed by the safety professional supervision of the general manager's office and the person in charge of the safety department of the construction unit; the closed-loop review process of level III problems is followed by the person in charge of the safety department of the construction unit, the project manager or project chief engineer, the resident supervisor, the director of the general manager's office, the person in charge of the safety department of the construction unit, and the leader in charge of safety of the construction unit; g. Inspection problem statistical analysis module: Filter out high-frequency problems and common problems. The system will push the filtered problems to the project leader and relevant responsible persons. Through statistical analysis of inspection problems, the correspondence mechanism between the inspection problem database and the BIM model will be improved. According to the project site processing records and big data analysis results, reference processing opinions are given for subsequent similar or similar problems, and they are pushed in a graded manner.
2. According to claim 1, the highway engineering project inspection system based on BIM technology, It is characterized in that The highway engineering project engineering inspection system based on BIM technology associates data with highway engineering process reporting and quality inspection materials through the BIM model. In the highway engineering project engineering inspection system based on BIM technology, sub-projects with unresolved quality and safety issues cannot be reported on site.
3. According to claim 1, the highway engineering project inspection system based on BIM technology, It is characterized in that The highway engineering project engineering inspection system based on BIM technology is based on BIM technology and combines computer and communication technologies of artificial intelligence, wireless communication and the Internet of Things to achieve accurate matching of the BIM model of the entire highway project with the engineering inspection problem library, standardize the quality and safety inspection process, and perform statistical analysis on the inspection records.
Citation Information
Patent Citations
Internet-based intelligent management method for engineering safety quality inspection
CN107368967A
Intelligent construction site inspection management system
CN109978355A
Intelligent construction site on-site inspection management system and method based on GPS technology
CN111242574A
Construction engineering quality supervision method
CN111340328A