A flat ceramic membrane lap assembly
By designing a flat-panel ceramic membrane overlap assembly including filler strips, cushion strips and relieving springs, the movable socket method of the flat-panel ceramic membrane is changed to a clamping method, which solves the easy cracking and connection of the flat-panel ceramic membrane during installation. The problem of stability and simplifies the subsequent assembly process through thread-locking structure.
Patent Information
- Application Number
- CN202011166054.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-27
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2040-10-27
AI Technical Summary
There are two major problems in the assembly process of the existing flat ceramic membrane lap assembly with flat ceramic membrane: First, the flat ceramic membrane is prone to cracks due to excessive friction and squeeze pressure during the installation process, and the other is the movable socket method. This leads to unstable connection after assembly and prone to gaps.
By designing a lap assembly including a first lap member main board, a filler strip, a cushion pad strip and a cushion pad strip, the first fixing screw presses the filler strip and a cushion pad strip to fit the bottom surface of the flat ceramic membrane, and transforms the The active socket is a snap-on method to enhance connection stability. At the same time, a thread locking structure is formed by a transition rod, a second fixing screw, a connecting shaft, and a torsion bar, and the first assembly rod is fixedly installed, and the conventional protruding peripheral locking structure is replaced by an elastic block.
It solves the problem that flat ceramic membrane is prone to crack due to excessive force under the clamping method during installation. At the same time, it improves the connection stability between the flat ceramic membrane and the overlapping components, avoids the emergence of gaps, and simplifies the subsequent assembly process.
Smart Images

Figure CN112316731B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flat ceramic membrane components, in particular to a flat ceramic membrane overlap component. Background Art
[0002] Ceramic membrane is a type of inorganic membrane and belongs to the solid membrane material in membrane separation technology. It is mainly supported by inorganic ceramic materials such as aluminum oxide, zirconium oxide, titanium oxide and silicon oxide of different specifications, and is made by surface coating and high-temperature firing. Ceramic membranes are resistant to acids and alkalis, high temperatures and chemically stable in extreme environments. The pore size of commercialized ceramic membranes is small, so they can successfully achieve molecular-level filtration. Therefore, they are mainly used for filtering and separating liquid and gaseous mixtures. They can replace traditional separation technologies such as centrifugation, evaporation, distillation and filtration to achieve the goal of improving product quality and reducing production costs. They have broad application prospects in harsh environments such as the petroleum and chemical industries.
[0003] However, there are still some problems to be solved in the assembly process of the flat ceramic membrane overlap assembly currently used with the flat ceramic membrane. First, the installation method of the flat ceramic membrane and the overlap assembly is usually that the flat ceramic membrane is installed inside the slot structure of the overlap assembly mainboard, but the flat ceramic membrane itself has the characteristics of high brittleness and low elasticity of inorganic materials. If the mainboard slot and the flat ceramic membrane are fixedly installed by a snap-on method, the friction and extrusion force on the surface of the flat ceramic membrane during the installation process may cause cracks in the flat ceramic membrane and produce defective products. Therefore, a movable sleeve method is usually adopted for fixed installation. In this way, the friction and extrusion force on the surface of the flat ceramic membrane during the installation process will be much smaller, but there may be a gap in the connection between the flat ceramic membrane and the overlap assembly mainboard, and the tightness of the connection structure of the assembled flat ceramic membrane assembly itself may not meet the standard. Second, the connection structure of the existing two sets of identical overlap assemblies is usually an external structure. Although the fixed connection between the two can be achieved, the protrusion of the external structure will cause some trouble to the subsequent assembly of the overall equipment. Summary of the invention
[0004] The present invention provides a flat ceramic membrane overlap assembly, which solves the problems mentioned in the above background technology.
[0005] The present invention provides the following technical solution: a flat ceramic membrane lap joint assembly, comprising a first lap joint main board, an installation groove is provided inside the first lap joint main board, a first clearance groove is provided at the bottom of the installation groove, the first clearance groove is provided on the inner wall of the bottom of the first lap joint main board, a filling strip is movably sleeved inside the first clearance groove, a first fixing screw is movably sleeved on the inner side of the bottom of the filling strip, and the middle part of the first fixing screw is threadedly connected to the bottom of the first lap joint main board, second clearance grooves are provided on both sides of the first lap joint main board, a first assembly rod is movably sleeved inside the second clearance groove, a transition rod is clamped on one side of the first assembly rod, and the transition rod One end and one end of the first assembly rod are movably connected with a second fixing screw, one end of the second fixing screw is threadedly connected to the side wall of the first lap joint main board, the second fixing screw is movably connected with a twist bar inside, one end of the twist bar is movably connected with a connecting shaft inside, the connecting shaft is fixedly connected to the inside of one end of the second fixing screw, the other end of the twist bar is movably connected with an elastic block, the elastic block is fixedly connected to the side surface of one side of the transition rod, the other end of the first assembly rod is movably connected to the inside of the first lap joint main board and the end face of the other end of the first assembly rod is fixedly connected to the second lap joint main board, and the end face of one end of the first lap joint main board is fixedly connected to the second assembly rod.
[0006] Preferably, a buffer pad strip is fixedly connected to the top surface of the filling strip, and the top of the buffer pad strip is movably sleeved inside the mounting groove, a pressure relief spring is fixedly installed between the inner wall of the filling strip and the first clearance groove, and the top end of the pressure relief spring is fixedly sleeved on the inner side of the bottom of the filling strip, and the bottom end of the pressure relief spring is fixedly connected to the inner wall of the first clearance groove.
[0007] Preferably, a receiving hole is arranged on the outer side of the bottom end of the first fixing screw, and the receiving hole is opened at the bottom of the first connecting member mainboard, a sealing sleeve is arranged between the receiving hole and the first fixing screw, and the sealing sleeve is fixedly sleeved inside the receiving hole.
[0008] Preferably, one side of the transition rod opposite to the first assembly rod is respectively fixedly connected with a triangular protrusion and provided with a triangular groove, and the end surfaces at both ends of the transition rod are movably connected with the interior of the second give way groove.
[0009] Preferably, a protrusion is fixedly connected to the inner wall of one side of the elastic block, and the protrusion is in an arc shape.
[0010] Preferably, a torsion groove is provided inside one end of the twist bar, and the length of the torsion groove inside the twist bar is equal to half of the length of the twist bar.
[0011] Preferably, the second assembly rod and the first assembly rod have the same structure, and the second bridging member mainboard fixedly connected to one end of the first assembly rod is movably connected to the first bridging member mainboard.
[0012] Preferably, a water outlet groove is provided on the top surface of the main board of the first connecting member, and a water delivery hole is provided on the front surface of the water outlet groove, and the water delivery hole is provided inside the main board of the first connecting member.
[0013] The present invention has the following beneficial effects:
[0014] 1. The present invention uses a first fixing screw to rotate and push the filling strip and the buffer pad strip at the bottom of the first lap part mainboard after the flat ceramic membrane is inserted into the installation groove and assembled with the first lap part mainboard, and the top surface of the buffer pad strip is fitted with the bottom surface of the flat ceramic membrane, thereby slightly socketing the space inside the installation groove, and converting the movable socketing mode between the flat ceramic membrane and the installation groove into a clamping mode, thereby solving the problem that the flat ceramic membrane is subjected to great force and prone to cracks when the first lap part mainboard and the flat ceramic membrane are installed in a fully movable socketing mode, and the gap is prone to appear between the flat ceramic membrane and the first lap part mainboard, resulting in an unstable connection of the device structure.
[0015] 2. The present invention uses a transition rod, a second fixing screw, a connecting shaft, and a torsion bar to form a threaded locking structure to fix the first assembly rod inside the second clearance groove, thereby completing the splicing and installation of the first lap joint main board and the second lap joint main board, and then uses the second clearance groove and the elastic card block to store and position the threaded locking structure, thereby replacing the existing conventional raised external locking structure, thereby facilitating the subsequent assembly of the device with a flat ceramic membrane and the overall equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a cross-sectional schematic diagram of the main board of the first bridging member of the structure of the present invention;
[0017] Figure 2 It is a schematic bottom view of a cross-section of the main board of the first bridging member of the structure of the present invention;
[0018] Figure 3 This is a three-dimensional schematic diagram of the first assembly rod of the structure of the present invention;
[0019] Figure 4 It is a three-dimensional schematic diagram of the structural transition rod of the present invention;
[0020] Figure 5 This is a three-dimensional schematic diagram of the twisted strip structure of the present invention;
[0021] Figure 6 This is a schematic diagram of the elastic card block of the structure of the present invention;
[0022] Figure 7 The structure of the present invention Figure 1 The enlarged schematic diagram at A in the middle;
[0023] Figure 8 This is a schematic front view of the installation slot of the structure of the present invention;
[0024] Fig. 9 The structure of the present invention Figure 8 The enlarged schematic diagram of point B in the middle;
[0025] Fig.10 It is a left view schematic diagram of the filling strip structure of the present invention.
[0026] In the figure: 1. first lap joint main board; 2. mounting groove; 3. first clearance groove; 4. filling strip; 5. first fixing screw; 6. second clearance groove; 7. first assembly rod; 8. transition rod; 9. second fixing screw; 10. connecting shaft; 11. twist bar; 12. elastic block; 13. second lap joint main board; 14. second assembly rod; 15. buffer pad strip; 16. pressure-reducing spring; 17. sealing sleeve; 18. storage hole; 19. bump; 20. water delivery hole; 21. water outlet trough. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] See also Figure 1-10A flat ceramic membrane lap assembly includes a first lap main board 1, a water outlet groove 21 is provided on the top surface of the first lap main board 1, and a water delivery hole 20 is provided on the front of the water outlet groove 21, the water delivery hole 20 is provided inside the first lap main board 1, the water delivery hole 20 and the water outlet groove 21 provide a self-discharge channel for the liquid entering during the subsequent installation groove 2, and further optimize the structure of the device, the first lap main board 1 is provided with an installation groove 2, the bottom of the installation groove 2 is provided with a first clearance groove 3, the first clearance groove 3 is provided on the inner wall of the bottom of the first lap main board 1, and the first clearance groove 3 is movably sleeved with a filling strip 4 inside, and the top surface of the filling strip 4 is fixed A buffer pad strip 15 is fixedly connected, and the top of the buffer pad strip 15 is movably sleeved inside the installation groove 2. A decompression spring 16 is fixedly installed between the inner wall of the filling strip 4 and the first makeshift groove 3, and the top of the decompression spring 16 is fixedly sleeved on the inner side of the bottom of the filling strip 4. The bottom end of the decompression spring 16 is fixedly connected to the inner wall of the first makeshift groove 3. After the flat ceramic membrane is fitted into the installation groove 2 and assembled with the first bridging member mainboard 1, the subsequent first fixing screw 5 is used to twist and push the filling strip 4 and the buffer pad strip 15 at the bottom of 1, and the top surface of the buffer pad strip 15 is fitted with the bottom surface of the flat ceramic membrane, thereby slightly compressing the space inside the installation groove 2. The sleeve connection changes the movable sleeve installation mode of the flat ceramic membrane and the installation groove 2 into a card-type installation mode in disguise, so as to solve the problems that the first lap joint main board 1 and the flat ceramic membrane are fixedly installed by the full card-type connection, the friction and extrusion force on the surface of the flat ceramic membrane are large during the installation process, and cracks are prone to occur, resulting in defective products; and the first lap joint main board 1 and the flat ceramic membrane are fixedly installed by the full movable sleeve type, and the connection between the flat ceramic membrane and the first lap joint main board 1 is prone to gaps, resulting in unstable connection of the device structure. The inner side of the bottom of the filling strip 4 is movably sleeved with a first fixing screw 5, and the outer side of the bottom end of the first fixing screw 5 is provided A storage hole 18 is provided, and the storage hole 18 is opened at the bottom of the first bridging member main board 1. A sealing sleeve 17 is provided between the storage hole 18 and the first fixing screw 5. The sealing sleeve 17 is fixedly sleeved inside the storage hole 18. The storage hole 18 structurally hides and stores the nut structure at the bottom end of the first fixing screw 5, thereby ensuring the flatness of the bottom surface of the first bridging member main board 1. While maintaining the beauty of the device, it avoids the interference of the protruding structure in the subsequent assembly operation. The middle part of the first fixing screw 5 is threadedly connected to the bottom of the first bridging member main board 1. Second clearance grooves 6 are opened on both sides of the first bridging member main board 1. The first assembly rod 7 is movably sleeved inside the second clearance groove 6.A transition rod 8 is clamped on one side of the first assembly rod 7. The transition rod 8 is fixedly connected to a triangular protrusion and has a triangular groove on one side opposite to the first assembly rod 7. The end faces of the transition rod 8 at both ends are movably connected to the inside of the second clearance groove 6. The first assembly rod 7 is fixedly installed in the second clearance groove 6 by using the transition rod 8 and the subsequent second fixing screw 9, the connecting shaft 10, and the twist bar 11 to form a threaded locking structure, thereby completing the splicing and installation of the first lap joint main board 1 and the second lap joint main board 13. One end of the transition rod 8 and one end of the first assembly rod 7 are both movably connected. A second fixing screw 9 is sleeved, one end of which is threadedly connected to the side wall of the first lap joint main board 1, and a twist bar 11 is movably sleeved inside the second fixing screw 9. A torsion groove is provided inside one end of the twist bar 11, and the length of the torsion groove inside the twist bar 11 is equal to half of the length of the twist bar 11. When the connecting shaft 10 is twisted, the twist bar 11 is horizontal with the connecting shaft 10, and the twist bar 11 provides a gripping and twisting structure, and the torsion groove enables the twist bar 11 to be connected to the sheet-like auxiliary rod, which further facilitates the application of force. The connecting shaft 10 is fixedly sleeved inside one end of the second fixing screw 9, and the other end of the twist bar 11 is movably sleeved with an elastic block 12. The inner wall of one side of the elastic block 12 is fixedly connected with a protrusion 19, and the protrusion 19 is arc-shaped. The threaded locking structure is stored and positioned through the second give way groove 6 and the elastic block 12, thereby replacing the existing conventional raised external locking structure, thereby facilitating the subsequent assembly of the device with the flat ceramic membrane and the overall equipment. The elastic block 12 is fixedly connected to the side of one side of the transition rod 8. The first assembly The other end of the rod 7 is movably sleeved inside the first bridging member main board 1, and the end surface of the other end of the first assembly rod 7 is fixedly connected to the second bridging member main board 13, and the end surface of one end of the first bridging member main board 1 is fixedly connected to the second assembly rod 14. The second assembly rod 14 and the first assembly rod 7 have the same structure, and the second bridging member main board 13 fixedly connected to one end of the first assembly rod 7 is movably connected to the first bridging member main board 1. The second assembly rod 14 and the first assembly rod 7 provide a connection and splicing structure for two independent first bridging member main boards 1, respectively, to ensure the normal use of the device.
[0029] Working principle: When in use, the flat ceramic membrane is inserted into the interior of the installation groove 2, and then the first fixing screw 5 is screwed with the existing wrench, and the first fixing screw 5 pushes the filling strip 4 and the buffer pad strip 15 to move upward, so that the top surface of the buffer pad strip 15 fits with the bottom surface of the flat ceramic membrane, reducing the gap between the flat ceramic membrane and the installation groove 2, and in disguised form, the initial movable sleeve installation mode of the flat ceramic membrane and the installation groove 2 is transformed into a clamping installation mode, further increasing the connection stability between the flat ceramic membrane and the installation groove 2. After completion, the first assembly rod 7 is passed through the first lap joint mainboard 1 and inserted into the interior of the second makeshift groove 6, and then the triangular protrusion on one side of the transition rod 8 is clamped to After the first assembly rod 7 is positioned in the triangular groove inside the opposite side of the first assembly rod 7 and the two are snap-fitted, the connecting shaft 10 is passed through the makeshift holes provided at one end of the transition rod 8 and the first assembly rod 7 and is threadedly connected to the threaded hole provided on the side wall of the first lap joint main board 1. When the connecting shaft 10 is twisted, the twist bar 11 is horizontal with the connecting shaft 10, and the twist bar 11 provides a gripping and twisting structure, and finally the first assembly rod 7 is fixedly installed inside the second makeshift groove 6. After the second lap joint main board 13 and the first lap joint main board 1 are stably assembled, one end of the twist bar 11 is then rotated ninety degrees and movably fitted into the inside of the elastic block 12 to avoid a protruding structure on the surface of the first lap joint main board 1.
[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. At the same time, in the drawings of the present invention, the fill pattern is only for distinguishing layers, without any other limitation.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A flat ceramic membrane lap assembly, comprising a first lap main plate (1), characterized in that: The first bridging member main board (1) is provided with an installation groove (2) inside, and a first clearance groove (3) is provided at the bottom of the installation groove (2). The first clearance groove (3) is provided on the inner wall of the bottom of the first bridging member main board (1). A filling strip (4) is movably sleeved inside the first clearance groove (3), and a first fixing screw (5) is movably sleeved on the inner side of the bottom of the filling strip (4), and the middle part of the first fixing screw (5) is threadedly connected to the bottom of the first bridging member main board (1). Second clearance grooves (6) are provided on both sides of the first bridging member main board (1), and a first assembly rod (7) is movably sleeved inside the second clearance groove (6). A transition rod (8) is clamped on one side of the first assembly rod (7), and one end of the transition rod (8) and one end of the first assembly rod (7) are both movably sleeved with a second fixing screw (9), and the transition rod (8) is fixedly connected to the first assembly rod (7) on one side thereof. A triangular protrusion and a triangular groove are provided, and the end surfaces of both ends of the transition rod (8) are movably connected to the inside of the second give way groove (6); one end of the second fixing screw (9) is threadedly connected to the side wall of the first bridging member main board (1); the second fixing screw (9) is movably sleeved with a twist bar (11) inside; one end of the twist bar (11) is movably sleeved with a connecting shaft (10); the connecting shaft (10) is fixedly sleeved inside one end of the second fixing screw (9); the other end of the twist bar (11) is movably sleeved with an elastic block (12); the elastic block (12) is fixedly connected to the side surface of one side of the transition rod (8); the other end of the first assembly rod (7) is movably sleeved inside the first bridging member main board (1) and the end surface of the other end of the first assembly rod (7) is fixedly connected to the second bridging member main board (13); the end surface of one end of the first bridging member main board (1) is fixedly connected to the second assembly rod (14); The top surface of the filling strip (4) is fixedly connected to a buffer pad strip (15), and the top of the buffer pad strip (15) is movably sleeved inside the mounting groove (2), a pressure relief spring (16) is fixedly installed between the inner wall of the filling strip (4) and the first clearance groove (3), and the top end of the pressure relief spring (16) is fixedly sleeved on the inner side of the bottom of the filling strip (4), and the bottom end of the pressure relief spring (16) is fixedly connected to the inner wall of the first clearance groove (3); A protrusion (19) is fixedly connected to the inner wall of one side of the elastic clamping block (12), and the protrusion (19) is arc-shaped. A torsion groove is provided inside one end of the torsion bar (11), and the length of the torsion groove inside the torsion bar (11) is equal to half the length of the torsion bar (11).
2. A flat ceramic membrane overlap assembly according to claim 1, characterized in that: A receiving hole (18) is provided on the outer side of the bottom end of the first fixing screw (5), and the receiving hole (18) is opened at the bottom of the first bridging member main board (1), and a sealing sleeve (17) is provided between the receiving hole (18) and the first fixing screw (5), and the sealing sleeve (17) is fixedly sleeved inside the receiving hole (18).
3. A flat ceramic membrane overlap assembly according to claim 1, characterized in that: The second assembly rod (14) and the first assembly rod (7) have the same structure, and the second bridging member main board (13) fixedly connected to one end of the first bridging member main board (1) is movably connected to the first bridging member main board (1).
4. The flat ceramic membrane overlap assembly according to claim 1, characterized in that: A water outlet groove (21) is provided on the top surface of the first connecting member main plate (1), and a water delivery hole (20) is provided on the front surface of the water outlet groove (21), wherein the water delivery hole (20) is provided inside the first connecting member main plate (1).
Citation Information
Patent Citations
Flat plate ceramic membrane lap joint assembly
CN214075986U