A device and method for correcting eccentric hoisting of prefabricated culvert side wall components
By designing a device for correcting the eccentric hoisting of prefabricated side wall components, the problems of unstable, low efficiency and poor safety of component hoisting during construction are solved, and the stable vertical hoisting of components is achieved, and the construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202011356719.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-27
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2040-11-27
AI Technical Summary
During the construction of prefabricated culverts, the eccentric lifting of prefabricated side wall components causes the concrete components to collide with the ground, damage the structural lines and structure, reduce lifting efficiency, increase costs, and reduce safety.
A device is designed, including a first panel and a second panel arranged in parallel, fixedly connected by a support plate, a suspended rope and a circular rod member are provided, and a prefabricated side wall member is installed using the gaps of the first side panel and the second side panel, and connected with the lifting ring through the second rod member to ensure that the lifting point, the center of gravity and the center of gravity of the entire combination are on the same vertical line.
The eccentric lifting problem of prefabricated side wall components is effectively corrected, the collision of components during lifting is reduced, the integrity of components is protected, the safety and efficiency of lifting is improved, and the cost is reduced.
Smart Images

Figure CN112320561B_ABST
Abstract
Description
[Technical field]
[0001] The invention relates to the technical field of side wall hoisting, and in particular to a device and a method for correcting eccentric hoisting of a prefabricated culvert side wall component. [Background technology]
[0002] With the rapid development of my country's economy, infrastructure construction is in full swing. With the acceleration of infrastructure construction, the project construction is required to be completed quickly during the construction process. Prefabricated prefabricated components can quickly complete the installation and construction of the project while ensuring quality, meeting the current infrastructure construction requirements. More and more infrastructure construction uses concrete prefabricated components to achieve rapid construction. In the rapid application of prefabricated components, the hoisting of components is the key process to complete prefabricated construction. With the application of prefabricated construction in various projects, the requirements for the hoisting of concrete prefabricated components in projects are getting higher and higher.
[0003] In infrastructure, when constructing new or expanding highways or railways and other facilities, culvert construction is a key project that determines whether the project can enter full construction. Prefabricated culvert construction provides a guarantee for the rapid completion of culvert construction. At present, the prefabricated culvert side wall structure adopts a single-side reserved lifting ring for lifting, which not only simplifies the production of prefabricated molds, but also facilitates the pouring of prefabricated concrete components. At the same time, it also meets the requirements of culvert clearance and prevents the appearance of lifting rings in the culvert clearance, which may cause safety hazards in the operation process.
[0004] During the construction of prefabricated culverts, the lifting construction of side wall components is mainly based on eccentric lifting. However, there are currently main problems with the eccentric lifting of side wall components during the prefabricated construction of culverts: 1. Concrete components collide with the ground, etc., damaging the structural lines and structures. 2. Single-sided lifting is prone to inaccurate positioning, requiring repeated lifting and adjustment of positions, etc., which reduces the efficiency of culvert lifting. 3. Single-sided lifting causes single-sided force on concrete, requiring the laying of reinforcing steel bars, which increases costs. 4. Single-sided lifting of components causes large cable stress, which reduces the safety of lifting prefabricated culvert side wall components under the same conditions. How to solve the problem of eccentric lifting of components during the lifting process has become a key point in the current rapid construction of transportation facilities. Therefore, it is urgent to apply a method and model for correcting the eccentric lifting problem of prefabricated side wall components to ensure the vertical lifting and installation of prefabricated side wall components, reduce the damage to components caused by eccentric lifting and increase in economic costs, which is also a technical problem that infrastructure urgently needs to solve.
[0005] At present, there is still a lack of eccentric lifting solutions in the construction process of prefabricated culverts. [Summary of the invention]
[0006] The purpose of the present invention is to address the above-mentioned problems and to provide a device and method for correcting the eccentric lifting of prefabricated culvert side wall components, which can not only solve the problem of eccentric lifting of prefabricated side wall components during the lifting process, reduce collisions of components during the lifting process, and protect the integrity of prefabricated side wall components, but also improve the safety factor of prefabricated side wall components during the lifting process, thereby providing a basis for safe construction.
[0007] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0008] A device for correcting eccentric lifting of a prefabricated culvert side wall component, the prefabricated culvert side wall component is provided with a lifting ring, the device comprises a first panel and a second panel arranged in parallel in a horizontal direction, the first panel and the second panel are fixedly connected by a plurality of spaced and vertically arranged support plates, each of the support plates is provided with two spaced first through holes, so that two rows of first through holes are formed on the plurality of support plates, each row of the first through holes is penetrated by a first rod, a lifting rope is penetrated by the first panel, one end of the lifting rope is fixedly connected to the first rod, and the other end is connected to a crane;
[0009] The second panel is provided with a first side panel and a second side panel at intervals, so that a gap for fixing and inserting the prefabricated culvert side wall component is formed between the first side panel and the second side panel; a vertical plate is provided on the side of the first side panel away from the gap, a second through hole is provided on the vertical plate, a groove for exposing the lifting ring is provided on the end of the first side panel away from the second panel, and a second rod is passed through the second through hole and the lifting ring at the same time, so that the prefabricated culvert side wall component is fixedly connected to the vertical plate.
[0010] Furthermore, a first rectangular plate arranged horizontally and a first triangular plate arranged vertically are provided in the middle of a side of the first side panel away from the gap, the vertical plates are located on both sides of the first triangular plate, the first rectangular plates are cross-fixedly connected to the first triangular plate and the vertical plates, one side of the first rectangular plate and a right-angled side of the first triangular plate are fixedly connected to a side of the first side panel away from the gap, and the other right-angled side of the first triangular plate is fixedly connected to the second panel.
[0011] Furthermore, a third through hole is opened on each of the four corners of the first panel, and the lifting rope is passed through each of the third through holes. One ends of the four lifting ropes pass through the third through holes and are fixedly connected to the first rod respectively, and the other ends of the four lifting ropes are gathered together and connected to the hook of the crane.
[0012] Furthermore, the second side panel is detachably connected to the second panel, and vertically arranged second triangular plates are provided at both ends of the second side panel away from the gap, and a horizontally arranged second rectangular plate and a vertically arranged third triangular plate are provided in the middle of the second side panel away from the gap, and the second rectangular plate is cross-fixedly connected to the second triangular plate and the third triangular plate, and one right-angle side of the second triangular plate and the third triangular plate are detachably connected to the second panel, and one side of the second rectangular plate and the other right-angle side of the third triangular plate are fixedly connected to the side of the second side panel away from the gap.
[0013] Furthermore, an I-beam is fixedly disposed between the first panel and the second panel, and a vertical portion of the I-beam is located between two rows of the first through holes.
[0014] Furthermore, one end of each of the first side plate and the second side plate away from the second panel is connected to an inclined plate arranged to be inclined outward, and the notch is provided on the inclined plate.
[0015] Furthermore, the first rod and the second rod are both round rods.
[0016] Furthermore, the first panel, the second panel and the support plate are all 10 mm thick steel plates, and the vertical plate is 16a channel steel.
[0017] A method for hoisting using the above-mentioned device for correcting eccentric hoisting of prefabricated culvert side wall components comprises the following steps:
[0018] (1) A first rod is passed through the first through hole, the first rod is fixed to the support plate by a bolt, and one end of the suspension rope is passed through the third through hole and then fixed to the first rod;
[0019] (2) After the device is vertically lifted by a crane through a lifting rope, the device is placed on the prefabricated culvert side wall component by utilizing the gap between the first side plate and the second side plate;
[0020] (3) using a second rod to simultaneously pass through the second through hole on the vertical plate and the lifting ring on the prefabricated culvert side wall component, so that the device is connected to the prefabricated culvert side wall component to form a combined whole;
[0021] (4) The combined whole formed by connecting the device and the prefabricated culvert side wall component is then lifted. During the lifting, the lifting angle α is greater than 60°. Since the second side plate of the device is in close contact with the prefabricated culvert side wall, it can be ensured that the component does not swing arbitrarily during the lifting process, so that the lifting point, the center of gravity of the prefabricated culvert side wall component and the center of gravity of the combined whole are on the same vertical line.
[0022] By adopting the above technical solution, the beneficial effects of the present invention are:
[0023] (1) The present invention adopts a device including a first panel, a second panel, a first side panel, a second side panel, a vertical panel, etc., which are fixedly connected with the prefabricated side wall components to form a whole, so that the lifting point, the center of gravity of the prefabricated side wall and the center of gravity of the combined whole are on the same vertical line, thereby solving the eccentric lifting problem of the current prefabricated culvert side panels; (2) The lifting rope in the present invention is connected to the circular first rod, which reduces the shear force on the steel wire rope at the connection, improves the service life of the steel wire rope, and increases the safety of the component lifting process; (3) By arranging a first rectangular plate, a first triangular plate, a second triangular plate, a second rectangular plate, a third triangular plate, etc. for reinforcing, the device is formed into a whole, and the I-beam is used as the main force distribution component, so that the overall force of the device is uniform, reducing the large deformation of the first panel, the second panel, the first side panel, the second side panel and other steel plates due to excessive load, and avoiding the shaking of the prefabricated culvert side wall components during the lifting process.
[0024] Therefore, the method corrects the eccentric hoisting problem of prefabricated components, the structure is simple and fast to operate, the hoisting steps are few, and the construction efficiency of the prefabricated culvert is improved.
Brief Description of the Drawings
[0025] Figure 1 It is a structural schematic diagram of a device for correcting eccentric hoisting of a prefabricated culvert side wall component according to an embodiment of the present invention;
[0026] Figure 2 A schematic diagram of the structure of a device for correcting the eccentric lifting of a prefabricated culvert side wall component according to an embodiment of the present invention when lifting a prefabricated culvert side wall component Figure 1 ;
[0027] Figure 3 A schematic diagram of the structure of a device for correcting the eccentric lifting of a prefabricated culvert side wall component according to an embodiment of the present invention when lifting a prefabricated culvert side wall component Figure 2 ;
[0028] Figure 4 It is a left view of a device for correcting eccentric lifting of a prefabricated culvert side wall component according to an embodiment of the present invention when lifting a prefabricated culvert side wall component.
[0029] In the figure, 100-device, 200-prefabricated culvert side wall component, 1-first panel, 2-second panel, 3-support plate, 4-first through hole, 5-first rod, 6-suspension rope, 7-first side plate, 8-second side plate, 9-vertical plate, 10-second through hole, 11-notch, 12-second rod, 13-first rectangular plate, 14-first triangular plate, 15-third through hole, 16-second triangular plate, 17-second rectangular plate, 18-third triangular plate, 19-I-beam, 20-inclined plate. [Specific implementation method]
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.
[0032] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0033] like Figure 1-Figure 3 , a device for correcting the eccentric lifting of a prefabricated culvert side wall component, the prefabricated culvert side wall component 200 is provided with a lifting ring, the device 100 includes a first panel 1 and a second panel 2 arranged in parallel in the horizontal direction, the first panel 1 and the second panel 2 are fixedly connected by a plurality of spaced and vertically arranged support plates 3, each of the support plates 3 is provided with two spaced first through holes 4, so that two rows of first through holes 4 are formed on the plurality of support plates 3, each row of the first through holes 4 is provided with a first rod 5, and the first rod 5 is fixed to the support plate 3 by bolts. By adopting bolt fixing, it is convenient to disassemble and suitable steel wire rope can be selected according to the size of different prefabricated components. A lifting rope 6 is provided on the first panel 1, one end of the lifting rope 6 is fixedly connected to the first rod 5, and the other end is connected to the crane, so that the device 100 and the prefabricated culvert side wall component 200 are lifted by the crane. In this embodiment, the lifting rope 6 is a steel wire rope.
[0034] The second panel 2 is provided with a first side panel 7 and a second side panel 8 which are arranged vertically and parallel to each other, so that a gap is formed between the first side panel 7 and the second side panel 8 for fixing and inserting the prefabricated culvert side wall component 200; a vertical plate 9 is also provided on the side of the first side panel 7 away from the gap, and a second through hole 10 is also provided on the end of the vertical plate 9 away from the second panel 2, and a notch 11 for the lifting ring to be exposed is also provided on the end of the first side panel 7 away from the second panel 2, and a second rod 12 is simultaneously penetrated through the second through hole 10 and the lifting ring, so that the prefabricated culvert side wall component 200 is fixedly connected to the vertical plate 8, and further the prefabricated culvert side wall component 200 is fixedly connected to the device 100. The vertical plate 9 not only plays the role of fixed connection with the lifting ring of the prefabricated culvert side wall component 200, but also plays the role of reinforcing the device 100 of the present invention. Among them, the first panel 1, the second panel 2 and the support plate 3 are all 10mm thick steel plates, and the vertical plate 9 is 16a channel steel. The first rod 5 and the second rod 12 are both round rods.
[0035] Furthermore, a first rectangular plate 13 disposed transversely and a first triangular plate 14 disposed vertically are provided in the middle of the side of the first side panel 7 away from the gap, and the vertical plates 9 are provided in two groups, and the two groups of vertical plates 9 are respectively located on both sides of the first triangular plate 14, wherein each group of vertical plates 9 includes two vertical plates 9 disposed at intervals. The first rectangular plates 13 are cross-fixedly connected to the first triangular plate 14 and the vertical plates 9, one side of the first rectangular plate 13 and a right angle side of the first triangular plate 14 are fixedly connected to the side of the first side panel 7 away from the gap, and the other right angle side of the first triangular plate 14 is fixedly connected to the second panel 2. The first rectangular plate 13 disposed transversely and the first triangular plate 14 disposed vertically both play a role of reinforcement, thereby improving the safety performance of the present invention.
[0036] Furthermore, a third through hole 15 is provided at each of the four corners of the first panel 1, and each of the third through holes 15 is provided with the suspension rope 6, one end of the four suspension ropes 6 passes through the third through holes 15 and is respectively fixedly connected to the first rod 5, and the other ends of the four suspension ropes 6 are connected to the hook of the crane after being gathered. The provision of the four suspension ropes 6 not only improves the service life of the suspension ropes 6, but also improves the balance of the suspension ropes 6 during hoisting, so that the lifting point, the center of gravity of the prefabricated side wall and the center of gravity of the combined whole are on the same vertical line, further achieving deviation correction.
[0037] Furthermore, the second side plate 8 is detachably connected to the second panel 2, and the two ends of the second side plate 8 away from the gap are also provided with second triangular plates 16 arranged vertically, and the middle of the second side plate 8 away from the gap is provided with a second rectangular plate 17 arranged horizontally and a third triangular plate 18 arranged vertically, and the second rectangular plate 17 is cross-fixedly connected to the second triangular plate 16 and the third triangular plate 18, and the right-angled sides of the second triangular plate 16 and the third triangular plate 18 are detachably connected to the second panel 2, and one side of the second rectangular plate 17 and the other right-angled side of the third triangular plate 18 are fixedly connected to the second side plate 8 away from the gap. By arranging the second triangular plate 16, the second rectangular plate 17 and the third triangular plate 18 on the side of the second side plate 8 away from the gap, the device 100 is reinforced, thereby improving the safety performance and service life of the present invention during hoisting. The second side plate 8 and the second panel 2 are detachably connected, and the right angle sides of the second triangular plate 16 and the third triangular plate 18 are detachably connected to the second panel 2, so that the size of the gap between the first side plate 7 and the second side plate 8 (i.e., the size of the opening of the present invention) can be adjusted according to the size of the prefabricated culvert side wall component 200, thereby increasing the scope of application of the present invention. In this embodiment, the detachable connection is achieved by using the combination of screws and screw holes.
[0038] Furthermore, an I-beam 19 is fixedly disposed between the first panel 1 and the second panel 2, and the vertical portion of the I-beam 19 is located between the two rows of the first through holes 4. The I-beam 19 is used as the main force distribution component, so that the device 100 is subjected to uniform force as a whole, and the large deformation of the first panel 1, the second panel 2, the first side panel 7 and the second side panel 8 due to excessive force is reduced, and the prefabricated culvert side wall component 200 is prevented from shaking during the hoisting process.
[0039] Furthermore, the ends of the first side plate 7 and the second side plate 8 away from the second panel 2 are connected with an outwardly inclined inclined plate 20, so that a larger opening is formed between the first side plate 7 and the second side plate 8, so as to facilitate the device 100 to be quickly mounted on the prefabricated culvert side wall component 200. The notch 11 is provided on the inclined plate 20.
[0040] A method for hoisting using the above-mentioned device for correcting eccentric hoisting of prefabricated culvert side wall components comprises the following steps:
[0041] (1) The first rod 5 is passed through the first through hole 4, and the first rod 5 is fixed to the support plate 3 by bolts, and one end of the suspension rope 6 is passed through the third through hole 15 and then fixed to the first rod 5;
[0042] (2) After the device 100 is vertically lifted by a crane through a lifting rope 6, the device 100 is placed on the prefabricated culvert side wall member 200 by utilizing the gap between the first side plate 7 and the second side plate 8;
[0043] (3) Using the second rod 12 to simultaneously pass through the second through hole 10 on the vertical plate 9 and the lifting ring on the prefabricated culvert side wall component 200, the device 100 is connected to the prefabricated culvert side wall component 200 to form a combined whole;
[0044] (4) The combined whole formed by connecting the device 100 and the prefabricated culvert side wall component 200 is then hoisted. During the hoisting, the hoisting angle α is greater than 60°. Since the second side plate 8 of the device 100 is in close contact with the prefabricated culvert side wall component 200, it can be ensured that the prefabricated culvert side wall component 200 does not swing arbitrarily during the hoisting process, so that the hoisting point, the center of gravity of the prefabricated culvert side wall component and the center of gravity of the combined whole are on the same vertical line (such as Figure 4 ).
[0045] In the present invention, the device 100 of the present invention is fixedly connected with the prefabricated culvert side wall component 200 to form a whole, and the prefabricated culvert side wall component 200 is vertically hoisted so that the lifting point, the center of gravity of the prefabricated side wall and the center of gravity of the combined whole are on the same vertical line (such as Figure 4 ), which solves the problem of inaccurate positioning during eccentric hoisting. The present invention sets a circular first rod 5 so that one end of the hoisting rope 6 is fixed on the circular first rod 5, instead of directly tying the hoisting rope 6 to the support plate 3 or the first panel 1, thereby reducing the shear force on the wire rope at the connection and improving the service life of the wire rope. When hoisting, the hoisting angle α is greater than 60 degrees, which reduces the horizontal shear force of the hoisting rope 6, further improves the service life of the hoisting rope 6, and increases the safety of the hoisting process of the prefabricated culvert side wall component 200. By setting a first rectangular plate 13, a first triangular plate 14, a second triangular plate 16, a second rectangular plate 17, a third triangular plate 18, etc. for reinforcing, the device 100 is formed as a whole, and the I-beam 19 is used as the main force distribution component, so that the overall force of the device 100 is uniform, and the large deformation of the steel plates such as the first panel 1, the second panel 2, the first side plate 7, the second side plate 8 and the vertical plate 9 due to excessive load is reduced, and the prefabricated culvert side wall component 200 is prevented from shaking during the hoisting process. Therefore, the present invention corrects the problem of eccentric hoisting of the prefabricated culvert side wall component 200, is simple to operate, has fewer hoisting steps, and improves the construction efficiency of the prefabricated culvert.
[0046] The above description is a detailed description of the preferred feasible embodiments of the present invention, but the embodiments are not intended to limit the scope of the patent application of the present invention. All equivalent changes or modified changes completed under the technical spirit suggested by the present invention should fall within the patent scope covered by the present invention.
Claims
1. A device for correcting eccentric lifting of prefabricated culvert side wall components, wherein the prefabricated culvert side wall components are provided with lifting rings, characterized in that: The device comprises a first panel and a second panel arranged in parallel in a horizontal direction, wherein the first panel and the second panel are fixedly connected via a plurality of spaced and vertically arranged support plates, each of the support plates is provided with two spaced first through holes, so that two rows of first through holes are formed on the plurality of support plates, a first rod is passed through each row of the first through holes, a suspension rope is passed through the first panel, one end of the suspension rope is fixedly connected to the first rod, and the other end is connected to a crane; The second panel is provided with a first side panel and a second side panel at intervals, so that a gap for fixing and inserting a prefabricated culvert side wall component is formed between the first side panel and the second side panel; a vertical panel is also provided on a surface of the first side panel away from the gap, a second through hole is also provided on the vertical panel, and a notch for exposing the lifting ring is also provided on an end of the first side panel away from the second panel, and a second rod is simultaneously passed through the second through hole and the lifting ring, so that the prefabricated culvert side wall component is fixedly connected to the vertical panel; a first rectangular panel and a first triangular panel are also provided in a horizontal manner in the middle of a surface of the first side panel away from the gap, the vertical panel is located on both sides of the first triangular panel, the first rectangular panel is cross-fixedly connected to the first triangular panel and the vertical panel, one side of the first rectangular panel and a right-angled side of the first triangular panel are fixedly connected to a surface of the first side panel away from the gap, and the other right-angled side of the first triangular panel is fixedly connected to the second panel; an inclined panel tilted outward is connected to one end of the first side panel and the second side panel, and the notch is provided on the inclined panel.
2. The device for correcting eccentric lifting of prefabricated culvert side wall components according to claim 1, characterized in that: A third through hole is provided on each of the four corners of the first panel, and the lifting rope is passed through each of the third through holes. One end of the four lifting ropes passes through the third through holes and is fixedly connected to the first rod respectively, and the other ends of the four lifting ropes are gathered together and connected to the hook of the crane.
3. The device for correcting eccentric lifting of prefabricated culvert side wall components according to claim 1, characterized in that: The second side panel is detachably connected to the second panel, and vertically arranged second triangular plates are provided at both ends of the second side panel away from the gap. A horizontally arranged second rectangular plate and a vertically arranged third triangular plate are provided in the middle of the second side panel away from the gap. The second rectangular plate is cross-fixedly connected to the second triangular plate and the third triangular plate. One right-angle side of the second triangular plate and the third triangular plate are detachably connected to the second panel, and one side of the second rectangular plate and the other right-angle side of the third triangular plate are fixedly connected to the side of the second side panel away from the gap.
4. The device for correcting eccentric lifting of prefabricated culvert side wall components according to claim 1, characterized in that: An I-beam is also fixed between the first panel and the second panel, and a vertical portion of the I-beam is located between two rows of the first through holes.
5. The device for correcting eccentric lifting of prefabricated culvert side wall components according to claim 1, characterized in that: The first rod and the second rod are both round rods.
6. The device for correcting eccentric lifting of prefabricated culvert side wall components according to claim 1, characterized in that: The first panel, the second panel and the support plate are all 10 mm thick steel plates, and the vertical plate is 16a channel steel.
7. A method for hoisting using the device for correcting eccentric hoisting of prefabricated culvert side wall components according to any one of claims 1 to 6, characterized in that: The steps include: (1) A first rod is passed through the first through hole, the first rod is fixed to the support plate by a bolt, and one end of the suspension rope is passed through the third through hole and then fixed to the first rod; (2) After the device is vertically lifted by a crane through a lifting rope, the device is placed on the prefabricated culvert side wall component by utilizing the gap between the first side plate and the second side plate; (3) using a second rod to simultaneously pass through the second through hole on the vertical plate and the lifting ring on the prefabricated culvert side wall component, so that the device is connected to the prefabricated culvert side wall component to form a combined whole; (4) The combined whole formed by connecting the device and the prefabricated culvert side wall component is then lifted. During the lifting, the lifting angle α is greater than 60°. Since the second side plate of the device is in close contact with the prefabricated culvert side wall, it can be ensured that the component does not swing arbitrarily during the lifting process, so that the lifting point, the center of gravity of the prefabricated culvert side wall component and the center of gravity of the combined whole are on the same vertical line.