Gas storage well injection and production sand simulation system and method

Through the gas storage well injection and production sand simulation system and method, the problem of inaccurate sand production prediction in gas storage wells is solved, the downhole gas injection and production state can be accurately simulated under ground conditions, and the accuracy and accuracy of sand production monitoring are improved. Controllability.

CN112377169BActive Publication Date: 2024-10-29CHINA NAT PETROLEUM CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011374696.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-30
Publication Date
2024-10-29
Estimated Expiration
2040-11-30

AI Technical Summary

Technical Problem

Existing technologies have problems with human error when predicting sand production from gas storage wells and the inability of the simulation environment to completely reproduce the formation environment, resulting in inaccurate sand production prediction and difficulty in control.

Method used

Provides a gas storage well injection and production sand simulation system, including an underground environment simulation device and a corresponding method, simulating underground conditions through a sealed kettle, a heater, a confining pressure device and a core holder, and simulating injection and evacuation devices During the gas injection and production process, it is necessary to detect whether the gas contains sand and to determine whether the rock sample has sand.

Benefits of technology

It can accurately simulate the state of downhole gas injection and production under surface conditions, directly measure and adjust gas volume, temperature, and pressure parameters, timely monitor whether sand is produced in rock samples, record the start time of sand production, and improve the accuracy and controllability of sand production prediction. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112377169B_ABST
    Figure CN112377169B_ABST
Patent Text Reader

Abstract

The present invention discloses a gas storage well injection and production sand simulation system and method, wherein the system comprises: an underground internal environment simulation device, comprising a sealed kettle, a heater, a confining pressure device and a core clamp arranged inside the sealed kettle, the core clamp being used to clamp the core sample; the confining pressure device is used to give the rock sample a pressure equal to the formation pressure; the heater is used to maintain the temperature in the sealed kettle at a temperature equal to the formation temperature; an injection device is used to compress the gas to a first preset pressure to obtain pressurized gas; the pressurized gas of a preset simulated injection and production volume is injected into the underground internal environment simulation device within a preset time; an emptying device is used to control the outlet pressure to be a second preset pressure, and discharge the gas in the underground internal environment simulation device; by detecting whether the gas discharged from the outlet contains sand, it is determined whether the rock sample has produced sand. The present invention can accurately simulate the injection and production gas state of the underground perforated well section under ground conditions, and instantly monitor whether the rock sample has produced sand.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of completion of injection and production gas wells in oil fields and gas storage reservoirs, and in particular to a sand production simulation system and method for injection and production of gas storage reservoir wells. Background Art

[0002] This section is intended to provide a background or context to the embodiments of the invention recited in the claims. No admission is made that the description herein is prior art by inclusion in this section.

[0003] With the advancement of gas storage construction, a large number of high-quality reservoirs have been put into operation as first- and second-generation gas storages. However, the demand for clean energy and the imbalance between gas production and supply in the east and west have far from met the demand for gas storage. Therefore, the geological conditions for reservoir construction will become more and more complex. At present, the Hutubi, Lei 61 and other gas storages that have been built in China all have a certain risk of sand production. Due to the strong injection and production of gas storages, the risk of sand production in the formation is relatively high. Once the sand and gravel enter the production system, it will not only destroy the integrity of the ground gathering and transportation pipelines, but also have the risk of damaging the compressor during the gas injection cycle. The traditional method of predicting sand production is mainly to analyze the cored reservoir rocks through numerical simulation and ground triaxial stress tests, but these also have the following main disadvantages:

[0004] 1. The existing numerical simulation method mainly uses software fitting. The operation of the software itself is affected by certain human errors, and the confidence of sand control tests needs to be improved.

[0005] 2. The judgment of the triaxial stress test of the core also mainly relies on the traditional rock mechanics formula to measure the Young's modulus and other parameters of the core. However, since the ground conditions cannot take into account the actual state of the high-pressure gas in the voids, the simulated environment cannot completely reproduce the formation environment.

[0006] 3. Traditional indoor tests on reservoir sand production generally use ground sand-filled tubes for testing. The sand sample cannot be completely fitted with the reservoir, and the critical flow rate and pressure of sand production cannot be controlled and operated on the ground. Summary of the invention

[0007] The embodiment of the present invention provides a gas storage well injection and production sand simulation system, which is used to accurately simulate the injection and production gas state of the underground perforation section under ground conditions and to monitor in real time whether the rock sample produces sand. The system includes:

[0008] The underground environment simulation device comprises a sealed kettle, a heater, a confining pressure device and a core holder, wherein the heater, the confining pressure device and the core holder are arranged inside the sealed kettle; the core holder is used to clamp the core sample; the confining pressure device is used to give the rock sample a pressure equal to the formation pressure; the heater is used to maintain the temperature inside the sealed kettle at a temperature equal to the formation temperature;

[0009] The injection device is connected to the underground environment simulation device and is used to compress the gas to a first preset pressure to obtain pressurized gas; and inject the pressurized gas with a preset simulated injection and production volume into the underground environment simulation device within a preset time;

[0010] The emptying device is connected to the underground environment simulation device and is used to control the outlet pressure to be a second preset pressure to discharge the gas in the underground environment simulation device; by detecting whether the gas discharged from the outlet contains sand, it is determined whether the rock sample contains sand.

[0011] The embodiment of the present invention further provides a method for simulating sand production in a gas storage well, which is used to accurately simulate the gas production state of a perforated well section in a well under ground conditions, and to monitor in real time whether a rock sample produces sand. The method is applied to a sand production simulation system for a gas storage well, and the method includes:

[0012] Compressing the gas to a first preset pressure through the injection device to obtain pressurized gas;

[0013] Injecting a preset simulated injection and production volume of pressurized gas into a downhole internal environment simulation device within a preset time, wherein the downhole internal environment simulation device contains a rock sample;

[0014] Controlling the outlet pressure to a second preset pressure through the exhaust device to exhaust the gas in the underground environment simulation device;

[0015] Whether the rock sample contains sand can be determined by detecting whether the gas discharged from the outlet contains sand.

[0016] The embodiment of the present invention provides a gas storage well injection and production sand simulation system and method, which can accurately simulate the injection and production gas status of the underground perforated well section under ground conditions, especially the gas volume, temperature, pressure and other parameters existing in the well can be directly measured and adjusted, and can instantly monitor whether the rock sample produces sand, record the start time of sand production, etc., can fully simulate the underground injection and production status of the gas storage injection and production well that is prone to sand production, and provide support for the actual sand production monitoring of the injection and production gas well. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0018] Figure 1 This is a structural schematic diagram of a gas storage well injection and production sand simulation system in an embodiment of the present invention;

[0019] Figure 2A flow chart of a method for simulating sand production and injection in a gas storage well in an embodiment of the present invention;

[0020] Figure 3 Another flow chart of the method for simulating sand injection and production in a gas storage well in an embodiment of the present invention;

[0021] Figure 4 Another flow chart of the method for simulating sand injection and production in a gas storage well in an embodiment of the present invention;

[0022] Figure 5 Another flow chart of the sand production simulation method for gas storage wells in an embodiment of the present invention.

[0023] 1: High pressure compressor 2: Gas storage tank

[0024] 3: Inlet gas pressure flow controller 4: Pressure display

[0025] 5: Temperature display 6: Import pressure RTU probe

[0026] 7: RTU probe at the outlet 8: Core holder

[0027] 9: Confining pressure device 10: Test instrument storage table

[0028] 11: Heater 12: Thermal insulation layer

[0029] 13: Outlet gas pressure flow controller 14: Exhaust pressure transition tank

[0030] 15: Drainage pipeline 16: Emergency discharge pipeline and spray tank

[0031] 17: Sealed kettle DETAILED DESCRIPTION

[0032] To make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Here, the exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.

[0033] The embodiment of the present invention provides a gas storage well injection and production sand simulation system, such as Figure 1 As shown, the system includes:

[0034] The underground environment simulation device includes a sealed kettle 17, a heater 11, a confining pressure device 9 and a core clamp 8, wherein the heater 11, the confining pressure device 9 and the core clamp 8 are arranged inside the sealed kettle 17; the core clamp 8 is used to clamp the core sample; the confining pressure device 9 is used to give the rock sample a pressure equal to the formation pressure; the heater 11 is used to maintain the temperature inside the sealed kettle 17 at a temperature equal to the formation temperature.

[0035] The injection device is connected to the underground environment simulation device and is used to compress the gas to a first preset pressure to obtain pressurized gas; and inject the pressurized gas of a preset simulated injection and production volume into the underground environment simulation device within a preset time. The gas may be air or nitrogen, etc.

[0036] The emptying device is connected to the underground environment simulation device and is used to control the outlet pressure to be a second preset pressure to discharge the gas in the underground environment simulation device; by detecting whether the gas discharged from the outlet contains sand, it is determined whether the rock sample contains sand.

[0037] It should be noted that the second preset pressure is lower than the first preset pressure. Under the action of the pressure difference, the gas entering from the injection device blows through the rock sample and flows to the outlet. If the rock sample produces sand, the gas carries the sand to the outlet. By detecting whether the outlet air contains sand, it can be determined whether the rock sample produces sand.

[0038] In one implementation of the embodiment of the present invention, the underground environment simulation device further includes:

[0039] Two pressure RTU probes, each of which is arranged at one of the two ends of the rock sample, are used to monitor the change of the pressure on the rock sample.

[0040] It should be noted that the two pressure RTU probes are located in different positions. Figure 1 , which can be divided into an inlet pressure RTU probe 6 and an outlet pressure RTU probe 7. The inlet pressure RTU probe 6 is set at the end of the rock sample close to the gas inlet, and the outlet pressure RTU probe 7 is set at the end of the rock sample close to the gas outlet, which are used to monitor the confining pressure felt by the rock samples at their respective locations. It can be judged whether the rock sample has plastic deformation through slight changes in the confining pressure. When the rock sample has plastic deformation, it may be about to or has produced sand. However, it should be noted that there may be a situation where the rock sample has not produced sand even though it has undergone plastic deformation.

[0041] In one implementation of the embodiment of the present invention, the underground internal environment simulation device further includes a temperature display 5. The temperature display 5 is in contact with the rock sample and is used to detect and display the current temperature of the rock sample. The temperature of the rock sample can be obtained through the temperature display 5, and the heater 11 is adjusted according to the temperature to ensure that the temperature of the rock sample is at the formation temperature, thereby simulating the formation environment more realistically.

[0042] In an implementation of the embodiment of the present invention, the underground environment simulation device further includes a test instrument placement table 10 disposed inside the sealed reactor 17 for placing the core holder 8 .

[0043] In one implementation of the present invention, the underground environment simulation device further includes: a thermal insulation layer 12 wrapped around the outside of the sealed kettle. In addition to preventing temperature loss, the thermal insulation layer 12 can also serve as a secondary buffer protection layer for the sealed kettle 17 to improve the safety of the sealed kettle 17.

[0044] It should be noted that the temperature display 5, pressure RTU probe and confining pressure device are probes or test instruments in contact with the rock sample. The probes or test instruments are connected to the data display screen arranged outside the underground environment simulation device through different pipelines. The data display screen is used to display the data measured by each probe or test instrument.

[0045] In one implementation of the embodiment of the present invention, the injection device includes:

[0046] High pressure compressor 1, gas storage tank 2 and inlet gas pressure flow controller 3;

[0047] The high-pressure compressor 1 is connected to the gas storage tank 2 and is used to compress the gas to a first preset pressure to obtain pressurized gas; and the pressurized gas is input into the gas storage tank for storage.

[0048] The inlet gas pressure flow controller 3 is connected to the gas storage tank and the underground environment simulation device respectively, and is used to control the flow rate of the pressurized gas in the gas storage tank when it is injected into the underground environment simulation device, so that the pressurized gas of the preset simulated injection and production volume is injected into the underground environment simulation device within a preset time.

[0049] In one implementation of the embodiment of the present invention, the injection device further includes:

[0050] The pressure display 4 is connected to the inlet gas pressure flow controller 3 and is used to detect and display the pressure of the pressurized gas injected into the downhole internal environment simulation device through the inlet gas pressure flow controller 3.

[0051] It should be noted that there is a certain pressure loss in the process of pressurized gas entering the sealed kettle 17 from the gas storage tank 2 through the inlet gas pressure flow controller 3. Through the pressure display 4, the pressure of the pressurized gas before entering the sealed kettle 17 can be read to obtain a more accurate pressure difference between the gas inlet and outlet.

[0052] In one implementation of the embodiment of the present invention, the emptying device includes:

[0053] Outlet gas pressure flow controller 13, exhaust pressure transition tank 14, sand detection device and exhaust pipeline 15;

[0054] The outlet gas pressure flow controller 13 is connected to the downhole internal environment simulation device and is used to control the outlet pressure to be a second preset pressure to discharge the gas in the downhole internal environment simulation device;

[0055] The sand detection device is arranged inside the exhaust pressure transition tank 14 and is used to detect whether the gas discharged from the outlet contains sand;

[0056] The exhaust pipeline 15 is connected to the exhaust pressure transition tank 14 and is used to discharge the gas in the exhaust pressure transition tank 14 into the air.

[0057] In one implementation of the embodiment of the present invention, the emptying device further includes:

[0058] The emergency pressure relief pipeline and the water spraying trough 16 are connected to the underground environment simulation device and are used to discharge the gas in the underground environment simulation device in an emergency. Wherein, since the discharged gas may contain sand, the water spraying trough can prevent the sand from being discharged into the air.

[0059] The actual production process is divided into gas injection process and gas collection process. Assume that during the gas injection process, the A end of the rock sample is close to the gas inlet and the B end is close to the gas outlet. After the simulation of the gas injection process is completed, it is only necessary to swap the A and B ends of the rock sample, and make the B end of the rock sample close to the gas inlet and the A end close to the gas outlet. In this way, the collection process can be simulated.

[0060] The embodiment of the present invention provides a gas storage well injection and production sand simulation system and method, which can accurately simulate the injection and production gas status of the underground perforated well section under ground conditions, especially the gas volume, temperature, pressure and other parameters existing in the well can be directly measured and adjusted, and can instantly monitor whether the rock sample produces sand, record the start time of sand production, etc., can fully simulate the underground injection and production status of the gas storage injection and production well that is prone to sand production, and provide support for the actual sand production monitoring of the injection and production gas well.

[0061] The present invention also provides a method for simulating sand production in a gas storage well, as described in the following embodiments. The method is applied to a simulation system for sand production in a gas storage well, such as Figure 2 As shown, the method includes steps 201 to 204:

[0062] Step 201: compressing gas to a first preset pressure through an injection device to obtain pressurized gas.

[0063] Step 202: Inject a preset simulated injection and production volume of pressurized gas into a downhole internal environment simulation device within a preset time, wherein the downhole internal environment simulation device contains a rock sample.

[0064] Among them, Figure 3 As shown, the preset simulated injection and production gas volume is calculated according to the following method:

[0065] Step 301: Obtain the formation perforation density, the length of the perforation section, and the preset injection and production volume of the single well in the formation for collecting rock samples.

[0066] Step 302: Calculate a preset simulated injection and production gas volume according to the formation perforation density, the length of the perforation well section and the preset injection and production gas volume of a single well in the formation.

[0067] Specifically, Figure 4 As shown, step 302 can be executed as step 3021 as follows:

[0068] Step 3021: According to Calculate the preset simulated injection and production gas volume Q l .

[0069] Among them, Q n It represents the preset injection and production volume of a single well in the formation; L represents the length of the perforated well section; x represents the perforation density of the formation.

[0070] Step 203: Control the outlet pressure to a second preset pressure through the exhaust device to exhaust the gas in the downhole internal environment simulation device.

[0071] Step 204: Determine whether the rock sample contains sand by detecting whether the gas discharged from the outlet contains sand.

[0072] In an embodiment of the present invention, after determining whether the rock sample contains sand by detecting whether the gas discharged from the outlet contains sand, Figure 5 As shown, the following step 501 may also be performed:

[0073] Step 501, control the emptying device to change the outlet pressure, perform multiple sand production simulations, and determine the sand production of the rock sample under different inlet and outlet pressure differences.

[0074] Under different inlet and outlet pressure differences, the sand production of rock samples may be different. In the embodiment of the present application, the outlet pressure can be changed to change the pressure difference between the gas inlet and the gas outlet, and the sand production of rock samples under different inlet and outlet pressure differences can be recorded to provide a reference for actual production.

[0075] The embodiment of the present invention provides a gas storage well injection and production sand simulation system and method, which can accurately simulate the injection and production gas status of the underground perforated well section under ground conditions, especially the gas volume, temperature, pressure and other parameters existing in the well can be directly measured and adjusted, and can instantly monitor whether the rock sample produces sand, record the start time of sand production, etc., can fully simulate the underground injection and production status of the gas storage injection and production well that is prone to sand production, and provide support for the actual sand production monitoring of the injection and production gas well.

[0076] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0077] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0078] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0079] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0080] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A gas storage well injection and production sand simulation system, characterized in that: The system comprises: The underground environment simulation device comprises a sealed kettle, a heater, a confining pressure device and a core holder, wherein the heater, the confining pressure device and the core holder are arranged inside the sealed kettle; the core holder is used to clamp the core sample; the confining pressure device is used to give the rock sample a pressure equal to the formation pressure; the heater is used to maintain the temperature inside the sealed kettle at a temperature equal to the formation temperature; The injection device is connected to the underground environment simulation device and is used to compress the gas to a first preset pressure to obtain pressurized gas; and inject the pressurized gas with a preset simulated injection and production volume into the underground environment simulation device within a preset time; The emptying device is connected to the underground environment simulation device and is used to control the outlet pressure to be the second preset pressure to discharge the gas in the underground environment simulation device; by detecting whether the gas discharged from the outlet contains sand, it is determined whether the rock sample has produced sand; the second preset pressure is lower than the first preset pressure; the emptying device is also used to change the outlet pressure, perform multiple sand production simulations, and determine the sand production of the rock sample under different inlet and outlet pressure differences; the actual production process is divided into a gas injection process and a gas production process. During the gas injection process, the A end of the rock sample is close to the gas inlet, and the B end is close to the gas outlet. After the simulation of the gas injection process is completed, the A and B ends of the rock sample are swapped, and the B end of the rock sample is close to the gas inlet, and the A end is close to the gas outlet; The underground internal environment simulation device also includes two pressure RTU probes; the two pressure RTU probes are divided into an inlet pressure RTU probe and an outlet pressure RTU probe according to different positions. The inlet pressure RTU probe is arranged at one end of the rock sample close to the gas inlet, and the outlet pressure RTU probe is arranged at one end of the rock sample close to the gas outlet, and are respectively used to monitor the confining pressure felt by the rock samples at their respective positions, and judge whether the rock samples have plastic deformation through slight changes in the confining pressure. When the rock samples have plastic deformation, they are about to produce or have produced sand; The pressure RTU probe and the confining pressure device are in contact with the rock sample through the probe or test instrument, which is connected to the data display screen arranged outside the underground environment simulation device through different pipelines. The data display screen is used to display the data measured by each probe or test instrument; Emptying device, comprising: Outlet gas pressure flow controller, exhaust pressure transition tank, sand detection device and exhaust pipeline; The outlet gas pressure flow controller is connected to the downhole internal environment simulation device and is used to control the outlet pressure to be a second preset pressure to discharge the gas in the downhole internal environment simulation device; The sand detection device is arranged inside the exhaust pressure transition tank and is used to detect whether the gas discharged from the outlet contains sand; The exhaust pipeline is connected to the exhaust pressure transition tank and is used to discharge the gas in the exhaust pressure transition tank into the air.

2. The system according to claim 1, characterized in that The underground environment simulation device also includes: The temperature display is in contact with the rock sample and is used for detecting and displaying the current temperature of the rock sample.

3. The system according to claim 1, characterized in that The underground environment simulation device also includes: The testing instrument holding table is arranged inside the sealed kettle and is used for placing the core holder.

4. The system according to any one of claims 1 to 3, characterized in that: The underground environment simulation device also includes: The thermal insulation layer wrapped around the outside of the sealed kettle.

5. The system according to claim 1, characterized in that An injection device comprising: High-pressure compressor, gas storage tank and inlet gas pressure flow controller; The high-pressure compressor is connected to the gas storage tank and is used to compress the gas to a first preset pressure to obtain pressurized gas; the pressurized gas is input into the gas storage tank for storage; The inlet gas pressure flow controller is connected to the gas storage tank and the downhole internal environment simulation device respectively, and is used to control the flow rate of the pressurized gas in the gas storage tank when it is injected into the downhole internal environment simulation device, so that the pressurized gas of the preset simulated injection and production volume is injected into the downhole internal environment simulation device within a preset time.

6. The system according to claim 5, characterized in that The injection device further comprises: The pressure display is connected to the inlet gas pressure flow controller and is used to detect and display the pressure of the pressurized gas injected into the downhole internal environment simulation device through the inlet gas pressure flow controller.

7. The system according to claim 1, characterized in that The emptying device further comprises: The emergency pressure relief pipeline and the water spray trough are connected to the underground environment simulation device and are used to discharge the gas in the underground environment simulation device in an emergency.

8. A method for simulating sand production from gas storage wells, characterized in that: The method is applied to the sand injection and production simulation system for a gas storage well as claimed in any one of claims 1 to 7, and the method comprises: Compressing the gas to a first preset pressure through the injection device to obtain pressurized gas; Injecting a preset simulated injection and production volume of pressurized gas into a downhole internal environment simulation device within a preset time, wherein the downhole internal environment simulation device contains a rock sample; Controlling the outlet pressure to a second preset pressure through the exhaust device to exhaust the gas in the underground environment simulation device; Whether the rock sample contains sand can be determined by detecting whether the gas discharged from the outlet contains sand.

9. The method according to claim 8, characterized in that After determining whether the rock sample contains sand by detecting whether the gas discharged from the outlet contains sand, the method further includes: The outlet pressure of the emptying device was controlled to change, and multiple sand production simulations were performed to determine the sand production of the rock sample under different inlet and outlet pressure differences.

10. The method according to claim 8, characterized in that The preset simulated injection and production gas volume is calculated according to the following method: Obtain the formation perforation density, perforation section length, and the preset gas injection and production volume of a single well in the formation for collecting rock samples; The preset simulated injection and production gas volume is calculated according to the formation perforation density, the length of the perforation well section and the preset injection and production gas volume of a single well in the formation.

11. The method according to claim 9, characterized in that The preset simulated injection and production gas volume is calculated according to the formation perforation density, the length of the perforation well section and the preset injection and production gas volume of a single well in the formation, including: according to Calculate the estimated simulated gas injection and production volume Q l ; Among them, Q n It represents the preset injection and production volume of a single well in the formation; L represents the length of the perforated well section; x represents the perforation density of the formation.