A method and system for evaluating maintenance plan of wiring busbar electrical network

Through preset node modeling and topological risk grading, combined with the disturbance recorded by the WAMS system for time domain simulation, the problem of analyzing the maintenance plan of the 500 kV site in the large power grid was solved, and the intelligent evaluation and optimization of the maintenance plan was realized, which improved the efficiency of the maintenance plan. efficiency and accuracy.

CN112395715BActive Publication Date: 2024-10-18CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202011179436.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-29
Publication Date
2024-10-18
Estimated Expiration
2040-10-29

Smart Images

  • Figure CN112395715B_ABST
    Figure CN112395715B_ABST
Patent Text Reader

Abstract

The present invention discloses an evaluation method and system for the maintenance plan of a wiring busbar electric network, and belongs to the technical field of electric power grid. The method of the present invention comprises: for each 3 / 2 wiring busbar in the wiring busbar electric network, modeling is performed in a preset node modeling mode to determine the topological model of the electric network; for the topological model of the electric network, topological risk grading is performed to determine the risk level of the topological model; according to the risk level, a maintenance plan scheduling fitness function is established, and the maintenance plan table of the topological model is determined according to the maintenance plan scheduling fitness function; maintenance state flow calculation is carried out to obtain fault scanning results, and the maintenance plan is evaluated according to the fault scanning results. The present invention realizes the intelligent analysis, evaluation and optimization of the 3 / 2 busbar node network maintenance and outage plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power grid, and more particularly to an evaluation method and system for a maintenance plan of a busbar electric network. Background Art

[0002] According to the "Guidelines for Power System Safety and Stability" and "Power System Safety and Stability Calculation Specifications", the power grid under maintenance is a normal mode, and the power system must meet the N-1 verification principle. For larger regional power grids, there are hundreds of 500 kV stations. When they are under maintenance at the same time, manual analysis of the risk level can no longer meet actual needs (for example, the number of maintenance components in a month is mostly in the order of dozens, and the workload of analyzing and optimizing 30 operating modes within a given few days is beyond the scope of manual analysis capabilities).

[0003] The current status and importance of 3 / 2 busbar component analysis for 500 kV electrical wiring mode;

[0004] The 500 kV electrical wiring method mostly adopts the 3 / 2 electrical wiring method. Under the full wiring method, it is safe and stable, and can meet the ability to not affect the power supply and the change of the electrical characteristics of the components when one bus trips. However, with the continuous development of the power grid, the 500 kV grid has become the main transmission grid structure of the large power grid. It is often encountered that "one bus maintenance shutdown" or "one bus maintenance shutdown + 500 kV component maintenance shutdown in the same station (that is, 3 / 2 wiring method multiple component maintenance shutdown)". With the gradual expansion of the power grid, the situation of multiple 500 kV substations stopping at the same time in the network also often occurs. The energy and time-consuming risk verification of maintenance risk simulation analysis is becoming more and more time-consuming.

[0005] The existing simulation system, taking China's mainstream PSASP comprehensive stability program database as an example, often has two methods of modeling. However, for a busbar maintenance, the graphic expression of the tripping equipment of the same tower line is relatively lacking, and the setting of the simulation fault is relatively complicated, which is not conducive to the high-speed analysis of large-scale simultaneous shutdown. The serious faults of the two 3 / 2 connections are more dependent on the setting of manual simulation fault cards. Summary of the invention

[0006] In view of the above problems, the present invention proposes an evaluation method for a wiring busbar electrical network maintenance plan, comprising:

[0007] Modeling is performed for each 3 / 2 busbar in the busbar electrical network using a preset node modeling method to determine a topological model of the electrical network;

[0008] Carry out topological risk grading for the topological model of the electric network and determine the risk level of the topological model;

[0009] According to the risk level, a maintenance plan scheduling fitness function is established, and the maintenance schedule of the topology model is determined according to the maintenance plan scheduling fitness function;

[0010] The disturbances recorded by the WAMS system of the busbar network in the previous month and similar months of the year are obtained, injected into the topology model by means of excitation injection, and the operation mode with high adaptability is selected. The topology model is simulated in the time domain according to the maintenance schedule, and the maintenance state flow calculation is carried out to obtain the fault scanning results, and the maintenance plan is evaluated based on the fault scanning results.

[0011] Optionally, perform topological risk assessment, including:

[0012] Enter the node number of the outage busbar and disconnect all branches connected to the node number of the outage busbar;

[0013] The non-shutdown busbar nodes are invalidated, and all the connected branches are invalidated;

[0014] Control the line, main transformer element or the same tower to trip, invalidate the connected nodes in the power network, and invalidate all the connected branches;

[0015] Perform topological risk rating.

[0016] Optionally, the risk levels include: Level 1, Level 2, and Level 3;

[0017] The first level is unacceptable risk, and the criteria for judging the first level are:

[0018] Together with the maintenance element, the trip element and the trip element exceed the preset first integer threshold; or

[0019] Together with the repair elements, trip elements and tripped elements, the loss of elements in a given 500 kV cut-off set exceeds 50% of the original number of sections;

[0020] The second level is a high-level risk, and the criteria for judging the second level are:

[0021] Together with the maintenance element, the trip element and the trip element exceed the preset second integer threshold; or

[0022] Together with the repair elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 30% of the original number of sections;

[0023] The third level is a medium risk, and the criteria for judging the third level are:

[0024] Together with the maintenance element, the trip element and the trip element exceed the preset third integer threshold;

[0025] Together with the maintenance elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 10% of the original number of sections.

[0026] Optionally, when the risk level 1 appears, it is fed back to the initial maintenance plan schedule to adjust the maintenance period.

[0027] Optionally, determine a maintenance schedule for the topology model, including:

[0028] According to the topology model, a periodic maintenance sequence is given and the operation mode is determined;

[0029] Determine the number of components to be shut down for maintenance, number them, and determine the start date and duration of the shutdown within the defined time zone;

[0030] Generate a maintenance schedule based on the outage start date and outage duration within a given time zone.

[0031] The present invention also proposes an evaluation system for a wiring busbar electrical network maintenance plan, comprising:

[0032] The model building module models each 3 / 2 busbar in the busbar electrical network using a preset node modeling method to determine the topological model of the electrical network;

[0033] The risk level classification module classifies the topological risk of the electric network topological model and determines the risk level of the topological model;

[0034] The maintenance plan generation module establishes a maintenance plan scheduling fitness function according to the risk level, and determines the maintenance plan table of the topology model according to the maintenance plan scheduling fitness function;

[0035] The evaluation module obtains the disturbances recorded by the WAMS system of the busbar network in the previous month and similar months of the year, injects them into the topology model by means of excitation injection, selects the operation mode with high adaptability, performs time domain simulation on the topology model according to the maintenance schedule, carries out maintenance state power flow calculation, obtains the fault scanning results, and evaluates the maintenance plan based on the fault scanning results.

[0036] Optionally, perform topological risk assessment, including:

[0037] Enter the node number of the outage busbar and disconnect all branches connected to the node number of the outage busbar;

[0038] The non-shutdown busbar nodes are invalidated, and all the connected branches are invalidated;

[0039] Control the line, main transformer element or the same tower to trip, invalidate the connected nodes in the power network, and invalidate all the connected branches;

[0040] Perform topological risk rating.

[0041] Optionally, the risk levels include: Level 1, Level 2, and Level 3;

[0042] The first level is unacceptable risk, and the criteria for judging the first level are:

[0043] Together with the maintenance element, the trip element and the trip element exceed the preset first integer threshold; or

[0044] Together with the repair elements, trip elements and tripped elements, the loss of elements in a given 500 kV cut-off set exceeds 50% of the original number of sections;

[0045] The second level is a high-level risk, and the criteria for judging the second level are:

[0046] Together with the maintenance element, the trip element and the trip element exceed the preset second integer threshold; or

[0047] Together with the repair elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 30% of the original number of sections;

[0048] The third level is a medium risk, and the criteria for judging the third level are:

[0049] Together with the maintenance element, the trip element and the trip element exceed the preset third integer threshold;

[0050] Together with the maintenance elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 10% of the original number of sections.

[0051] Optionally, when the risk level 1 appears, it is fed back to the initial maintenance plan schedule to adjust the maintenance period.

[0052] Optionally, determine a maintenance schedule for the topology model, including:

[0053] According to the topology model, a periodic maintenance sequence is given and the operation mode is determined;

[0054] Determine the number of components to be shut down for maintenance, number them, and determine the start date and duration of the shutdown within the defined time zone;

[0055] Generate a maintenance schedule based on the outage start date and outage duration within a given time zone.

[0056] The present invention realizes intelligent analysis, evaluation and optimization of a 3 / 2 bus node network maintenance and outage plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1A flow chart of an evaluation method for a wiring busbar electrical network maintenance plan according to the present invention;

[0058] Figure 2 A node connection diagram of an evaluation method for a wiring busbar electrical network maintenance plan of the present invention;

[0059] Figure 3 A node connection diagram of an evaluation method for a wiring busbar electrical network maintenance plan of the present invention;

[0060] Figure 4 A maintenance plan arrangement fitness function flow chart is established for an evaluation method for a wiring busbar electrical network maintenance plan of the present invention;

[0061] Figure 5 The present invention is a structural diagram of an evaluation system for a wiring busbar electrical network maintenance plan. DETAILED DESCRIPTION

[0062] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.

[0063] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.

[0064] The present invention proposes an evaluation method for a maintenance plan of a busbar network, such as Figure 1 As shown, including:

[0065] Modeling is performed for each 3 / 2 busbar in the busbar electrical network using a preset node modeling method to determine a topological model of the electrical network;

[0066] Carry out topological risk grading for the topological model of the electric network and determine the risk level of the topological model;

[0067] According to the risk level, a maintenance plan scheduling fitness function is established, and the maintenance schedule of the topology model is determined according to the maintenance plan scheduling fitness function;

[0068] The disturbances recorded by the WAMS system of the busbar network in the previous month and similar months of the year are obtained, injected into the topology model by means of excitation injection, and the operation mode with high adaptability is selected. The topology model is simulated in the time domain according to the maintenance schedule, and the maintenance state flow calculation is carried out to obtain the fault scanning results, and the maintenance plan is evaluated based on the fault scanning results.

[0069] Conduct topological risk assessment, including:

[0070] Enter the node number of the outage busbar and disconnect all branches connected to the node number of the outage busbar;

[0071] The non-shutdown busbar nodes are invalidated, and all the connected branches are invalidated;

[0072] Control the line, main transformer element or the same tower to trip, invalidate the connected nodes in the power network, and invalidate all the connected branches;

[0073] Perform topological risk rating.

[0074] Risk levels include: Level 1, Level 2, and Level 3;

[0075] Level 1 is unacceptable risk, and the criteria for Level 1 are:

[0076] Together with the maintenance element, the trip element and the trip element exceed the preset first integer threshold; or

[0077] Together with the repair elements, trip elements and tripped elements, the loss of elements in a given 500 kV cut-off set exceeds 50% of the original number of sections;

[0078] Level 2 is high-level risk, and the criteria for judging level 2 are:

[0079] Together with the maintenance element, the trip element and the trip element exceed the preset second integer threshold; or

[0080] Together with the repair elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 30% of the original number of sections;

[0081] Level 3 is medium risk, and the criteria for judging level 3 are:

[0082] Together with the maintenance element, the trip element and the trip element exceed the preset third integer threshold;

[0083] Together with the maintenance elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 10% of the original number of sections.

[0084] When the first level of risk occurs, it will be fed back to the initial maintenance schedule to adjust the maintenance period.

[0085] Determine the maintenance schedule for the topology model, including:

[0086] According to the topology model, a periodic maintenance sequence is given and the operation mode is determined;

[0087] Determine the number of components to be shut down for maintenance, number them, and determine the start date and duration of the shutdown within the defined time zone;

[0088] Generate a maintenance schedule based on the outage start date and outage duration within a given time zone.

[0089] The present invention will be further described below in conjunction with embodiments:

[0090] Step 1: Adopt a new interval modeling approach:

[0091] For each 3 / 2 wiring method, use Figure 2 and Figure 3 The node modeling method shown;

[0092] Suppose a 500 kV station 3 / 2 connection has a total of N distribution strings.

[0093] Assume that the two busbars of 3 / 2 connection are bus1 and bus2. Since there are only two busbars, there are only two numbers 1 and 2, such as XX-501 and XX-502.

[0094] Assume that for any interval of electrical distribution string, the space between the transformer and the middle switch is set as a node. Obviously, there are two nodes in a complete distribution string. Each node is expressed in three segments, such as "XX500-i-BOOL", XX500-1-1, the first segment is the substation name, the second segment is the specific serial number of the i-th string, and the third segment is the bus number on the bus side close to the node.

[0095] Step 2: Carry out topological risk assessment based on the network connection relationship established in the first step:

[0096] 2.1. Input the node number of the outage busbar and disconnect all branches connected to the node number of the outage busbar. Accordingly, the encoding method can physically correspond to all switches when the busbar is out of service, and completely corresponds to the actual physical switch situation.

[0097] 2.2. Fault simulation topology operation

[0098] There are two types of scan verification failures:

[0099] When the other bus loses pressure, the corresponding coded non-shutdown bus node will be invalidated, and all its connected branches will be invalidated. Accordingly, this coding method can physically correspond to all related switches disconnected on the 3 / 2 connection when the double bus loses pressure.

[0100] When the line or main transformer element N-1 or tower N-2 trips, the corresponding connected nodes in the station are invalidated, and all connected branches are invalidated. Accordingly, the coding method can physically correspond to all related switches disconnected on the 3 / 2 wiring when the line or main transformer element N-1 or tower N-2 trips.

[0101] 2.3. Topological risk level (preliminary risk rating)

[0102] Level 1 is unacceptable risk:

[0103] (1) Together with the maintenance components, the trip components and the trip components exceed N_no (integer threshold);

[0104] (2) Together with the maintenance components, trip components and trip components, the loss of components in a given 500 kV cut-off set (section) exceeds 50% of the original number of sections;

[0105] Level 2 is high risk:

[0106] (1) Together with the maintenance components, the trip components and the trip components exceed N_high (integer threshold);

[0107] (2) Together with the maintenance components, trip components and trip components, the loss of components in a given 500 kV cut-off set (section) exceeds 30% of the original number of sections;

[0108] Level 3 is medium risk:

[0109] (1) Together with the maintenance components, the trip components and the trip components exceed N_middle (integer threshold);

[0110] (2) Together with the maintenance components, trip components and trip components, the loss of components in a given 500 kV cut-off set (section) exceeds 10% of the original number of sections;

[0111] If unacceptable risks are found, the initial maintenance schedule will be fed back to adjust the maintenance period; and the fitness function will be entered.

[0112] Step 3: Establish the 500 kV maintenance plan scheduling fitness function:

[0113] For a power grid with M 500 kV substations, there are L branches. Given a period (such as one month or one week) of sorting and maintenance, there are K operating modes.

[0114] Assume that the number of components to be shut down for maintenance is I, and the ternary array Plan_I = (node_i, i, i_day); node_i is the maintenance component number, and the possible values ​​for any i are natural numbers 1 to K, that is, for the shutdown start date within a given time interval, i_day is the shutdown duration of the corresponding maintenance shutdown component.

[0115] According to the maintenance process, within a given K working days, the i corresponding to the node_i reported by the maintenance report can be randomly selected from 1 to K during initialization to form the maintenance schedule shown in Table 1.

[0116] Table 1

[0117]

[0118] Step 3.1, establish the solution form:

[0119] Assume that the fitness function is defined as: f(x) = min(I(i));

[0120] A genetic algorithm is selected to optimize the maintenance schedule in order to find a schedule with lower risks in K operating modes within K periods.

[0121] Step 3.2, optimization iteration step, such as Figure 4 As shown:

[0122] Step 3.2.1, randomly generate a batch of component maintenance plans, that is, randomly generate a set of integers in the 1-K interval for the values ​​of the second column of Plan_I, randomly generate a set of initial solutions; and arrange the maintenance plan table in the form of Table 1 according to the corresponding ternary array.

[0123] Step 3.2.2, according to the maintenance schedule formed in step 3.2.1, generate K maintenance state operation modes vertically and map them to the table of all topological expressions in step "step 2".

[0124] Step 3.2.3, perform risk rating for K operating modes according to the steps in Section 2.3, and form K sub-fitness functions of this solution. Take the average value to form the total fitness value.

[0125] Step 3.2.4, use genetic algorithm selection, crossover, and mutation operators to adjust the solution population and form the fitness of each solution in the new population.

[0126] Step 3.2.5, determine whether the termination condition of the genetic algorithm is met. If so, enter the termination step and determine the optimal fitness solution as the maintenance plan. If not, enter Step 3.2.3 for iteration.

[0127] Step 4: Time domain simulation transient fault scanning using historical statistical disturbance injection

[0128] Based on the planned maintenance table determined in step 4, perform a typical fault scan for each mode.

[0129] The disturbances recorded by the WAMS system in the past month and similar months of the year are injected by means of excitation injection. The advantage is that it is closer to reality. And the operation mode with higher adaptability (higher risk) is selected for special simulation.

[0130] Based on time domain simulation, maintenance power flow calculation is carried out.

[0131] The present invention also proposes an evaluation system 200 for a wiring busbar electrical network maintenance plan, such as Figure 5 As shown, including:

[0132] The model building module 201 models each 3 / 2 busbar in the busbar electrical network using a preset node modeling method to determine a topological model of the electrical network;

[0133] The risk level classification module 202 is used to classify the topological risk of the topological model of the electric network and determine the risk level of the topological model;

[0134] The maintenance plan generation module 203 establishes a maintenance plan arrangement fitness function according to the risk level, and determines the maintenance plan table of the topology model according to the maintenance plan arrangement fitness function;

[0135] Evaluation module 204 obtains disturbances recorded by the WAMS system of the busbar network in the previous month and similar months of the year, injects them into the topology model by means of excitation injection, selects an operation mode with high adaptability, performs time domain simulation on the topology model according to the maintenance schedule, carries out maintenance state power flow calculation, obtains fault scanning results, and evaluates the maintenance plan based on the fault scanning results.

[0136] Conduct topological risk assessment, including:

[0137] Enter the node number of the outage busbar and disconnect all branches connected to the node number of the outage busbar;

[0138] The non-shutdown busbar nodes are invalidated, and all the connected branches are invalidated;

[0139] Control the line, main transformer element or the same tower to trip, invalidate the connected nodes in the power network, and invalidate all the connected branches;

[0140] Perform topological risk rating.

[0141] Risk levels include: Level 1, Level 2, and Level 3;

[0142] Level 1 is unacceptable risk, and the criteria for Level 1 are:

[0143] Together with the maintenance element, the trip element and the trip element exceed the preset first integer threshold; or

[0144] Together with the repair elements, trip elements and tripped elements, the loss of elements in a given 500 kV cut-off set exceeds 50% of the original number of sections;

[0145] Level 2 is high-level risk, and the criteria for judging level 2 are:

[0146] Together with the maintenance element, the trip element and the trip element exceed the preset second integer threshold; or

[0147] Together with the repair elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 30% of the original number of sections;

[0148] Level 3 is medium risk, and the criteria for judging level 3 are:

[0149] Together with the maintenance element, the trip element and the trip element exceed the preset third integer threshold;

[0150] Together with the maintenance elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 10% of the original number of sections.

[0151] When the first level of risk occurs, it will be fed back to the initial maintenance schedule to adjust the maintenance period.

[0152] Determine the maintenance schedule for the topology model, including:

[0153] According to the topology model, a periodic maintenance sequence is given and the operation mode is determined;

[0154] Determine the number of components to be shut down for maintenance, number them, and determine the start date and duration of the shutdown within the defined time zone;

[0155] Generate a maintenance schedule based on the outage start date and outage duration within a given time zone.

[0156] The present invention realizes intelligent analysis, evaluation and optimization of a 3 / 2 bus node network maintenance and outage plan.

[0157] Those skilled in the art will appreciate that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the present application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.

[0158] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0159] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0160] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0161] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0162] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A method for evaluating a maintenance plan for a busbar electrical network, the method comprising: Modeling is performed for each 3 / 2 busbar in the busbar electrical network using a preset node modeling method to determine a topological model of the electrical network; Carry out topological risk grading for the topological model of the electric network and determine the risk level of the topological model; According to the risk level, a maintenance plan scheduling fitness function is established, and the maintenance schedule of the topology model is determined according to the maintenance plan scheduling fitness function; Obtain disturbances recorded by the WAMS system of the last month and similar months of the year on the busbar network, inject them into the topology model by means of excitation injection, select the operation mode with high adaptability, perform time domain simulation on the topology model according to the maintenance schedule, carry out maintenance state power flow calculation, obtain fault scanning results, and evaluate the maintenance plan based on the fault scanning results; The topological risk grading includes: Enter the outage bus node number and disconnect all branches connected to the outage bus node number; invalidate the non-outage bus node and all its connected branches; Control the line, main transformer element or the same tower to trip, invalidate the connected nodes in the power network, and invalidate all the connected branches; Conduct topological risk rating; The step of establishing a maintenance plan scheduling fitness function includes: Assuming that the number of components to be repaired and shut down is I, a ternary array is established, and the ternary array is as follows: Plan_I=(node_i,i,i_day); Among them, node_i is the number of the component to be repaired and shut down, i is a natural number and takes a value between 1 and K, K is the type of power grid operation mode, and i_day is the shutdown duration of the component to be repaired and shut down; Based on the three-dimensional array, the maintenance plan scheduling fitness function is established as follows: f(x)=min(I(i)); The maintenance schedule for determining the topology model includes: According to the topology model, a periodic maintenance sequence is given and the operation mode is determined; Determine the number of components to be shut down for maintenance, number them, and determine the start date and duration of the shutdown within the defined time zone; Generate a maintenance schedule based on the outage start date and outage duration in a given time zone, including: Step 3.2.1, randomly generate a batch of component maintenance plans, that is, randomly generate a set of integers in the 1-K interval for the values ​​of the second column of Plan_I, randomly generate a set of initial solutions, and arrange the maintenance plan table according to the corresponding ternary array; Step 3.2.2, according to the maintenance schedule formed in step 3.2.1, generate K maintenance operation modes vertically and map them to all topology tables; Step 3.2.3, perform risk rating of K operating modes, form K sub-fitness functions of this solution, take the average value, and form the total fitness value; Step 3.2.4, use genetic algorithm selection, crossover, and mutation operators to adjust the solution population and form the fitness of each solution in the new population; Step 3.2.5, determine whether the termination condition of the genetic algorithm is met. If so, enter the termination step and determine the optimal fitness solution as the maintenance plan. If not, enter Step 3.2.3 for iteration to generate a maintenance plan table.

2. The method according to claim 1, wherein the risk level comprises: Level 1, Level 2 and Level 3; The first level is unacceptable risk, and the criteria for judging the first level are: Together with the repair components, the trip components and the trip components, the loss exceeds the preset first integer threshold; or together with the repair components, the trip components and the trip components, the loss causes the loss of components in the 500 kV given cut set to exceed 50% of the original number of sections; The second level is a high-level risk, and the criteria for judging the second level are: Together with the repair components, the trip components and the jump components, the loss exceeds the preset second integer threshold; or together with the repair components, the trip components and the jump components, the loss of components in the 500 kV given cut set exceeds 30% of the original number of sections; The third level is a medium risk, and the criteria for judging the third level are: Together with the maintenance element, the trip element and the trip element exceed the preset third integer threshold; Together with the maintenance elements, trip elements and tripping elements, the loss of elements in a given 500 kV cut-off set exceeds 10% of the original number of sections.

3. According to the method of claim 2, when the first level of risk occurs, it is fed back to the initial maintenance plan schedule to adjust the maintenance period.

4. A system for evaluating a maintenance plan for a busbar electrical network, the system comprising: The model building module models each 3 / 2 busbar in the busbar electrical network using a preset node modeling method to determine the topological model of the electrical network; The risk level classification module classifies the topological risk of the electric network topological model and determines the risk level of the topological model; The maintenance plan generation module establishes a maintenance plan scheduling fitness function according to the risk level, and determines the maintenance plan table of the topology model according to the maintenance plan scheduling fitness function; The evaluation module obtains the disturbances recorded by the WAMS system in the previous month and similar months of the year on the busbar network, injects them into the topology model by means of excitation injection, selects the operation mode with high adaptability, performs time domain simulation on the topology model according to the maintenance schedule, carries out maintenance state power flow calculation, obtains fault scanning results, and evaluates the maintenance plan based on the fault scanning results; The topological risk grading includes: Enter the node number of the outage busbar and disconnect all branches connected to the node number of the outage busbar; The non-shutdown busbar nodes are invalidated, and all the connected branches are invalidated; Control the line, main transformer element or the same tower to trip, invalidate the connected nodes in the power network, and invalidate all the connected branches; Conduct topological risk rating; The step of establishing a maintenance plan scheduling fitness function includes: Assuming that the number of components to be repaired and shut down is I, a ternary array is established, and the ternary array is as follows: Plan_I=(node_i,i,i_day); Among them, node_i is the number of the component to be repaired and shut down, i is a natural number and takes a value between 1 and K, K is the type of power grid operation mode, and i_day is the shutdown duration of the component to be repaired and shut down; Based on the three-dimensional array, the maintenance plan scheduling fitness function is established as follows: f(x)=min(I(i)); The maintenance schedule for determining the topology model includes: According to the topology model, a periodic maintenance sequence is given and the operation mode is determined; Determine the number of components to be shut down for maintenance, number them, and determine the start date and duration of the shutdown within the defined time zone; Generate a maintenance schedule based on the outage start date and outage duration in a given time zone, including: Step 3.2.1, randomly generate a batch of component maintenance plans, that is, randomly generate a set of integers in the 1-K interval for the values ​​of the second column of Plan_I, randomly generate a set of initial solutions, and arrange the maintenance plan table according to the corresponding ternary array; Step 3.2.2, according to the maintenance schedule formed in step 3.2.1, generate K maintenance operation modes vertically and map them to all topology tables; Step 3.2.3, perform risk rating of K operating modes, form K sub-fitness functions of this solution, take the average value, and form the total fitness value; Step 3.2.4, use genetic algorithm selection, crossover, and mutation operators to adjust the solution population and form the fitness of each solution in the new population; Step 3.2.5, determine whether the termination condition of the genetic algorithm is met. If so, enter the termination step and determine the optimal fitness solution as the maintenance plan. If not, enter Step 3.2.3 for iteration to generate a maintenance plan table.

5. The system according to claim 4, wherein the risk level comprises: Level 1, Level 2 and Level 3; The first level is an unacceptable risk, and the judgment criteria for the first level are: together with the maintenance components, the trip components and the jump components, the first integer threshold value is exceeded; or together with the maintenance components, the trip components and the jump components, the loss components of the 500 kV given cut set exceed 50% of the original number of the section; The second level is a high-level risk, and the criteria for judging the second level are: Together with the repair components, the trip components and the jump components, the loss exceeds the preset second integer threshold; or together with the repair components, the trip components and the jump components, the loss of components in the 500 kV given cut set exceeds 30% of the original number of sections; The third level is a medium risk, and the criteria for judging the third level are: Together with the maintenance components, the tripping components and the strap tripping components, the number exceeds the preset third integer threshold; together with the maintenance components, the tripping components and the strap tripping components, the number of components causing the loss of the 500 kV given cut set to exceed 10% of the original number of sections.

6. According to the system of claim 5, when the first level of risk occurs, it is fed back to the initial maintenance plan schedule to adjust the maintenance period.

Citation Information

Patent Citations

  • Method for configuring PMU taking regard of high risk cascading failure path

    CN101013812A

  • Power grid operation mode day-ahead risk evaluation method and system based on abnormal disturbance entropy value

    CN108336729A

  • Multi-voltage-level maintenance plan optimization method and device based on risk overlapping degree

    CN110060179A

  • Optimization method and system for power transmission equipment maintenance plan based on risk analysis

    CN111340257A

  • Full-voltage-level power grid real-time risk assessment system and method

    CN111461579A