A mobile pressure regulating integrated gas supply equipment
By designing a mobile pressure regulating integrated gas supply equipment, the existing biogas pressure reducing equipment is solved, the problems of inconvenience of movement, large resource consumption and air pollution are achieved, and the equipment is conveniently moved, resource conservation and environmental protection are achieved.
Patent Information
- Application Number
- CN202011405997.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-02
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2040-12-02
AI Technical Summary
The existing biogas pressure reduction equipment is not convenient to move, and requires the construction of a separate factory, which consumes a lot of resources and manpower. The discharged biogas will cause air pollution and affect the environment and ecological balance.
A mobile pressure regulating integrated gas supply equipment is designed, including a cylinder group, hose, ball valve, filter, pressure regulating part, electric heater, desulfurization tower, flowmeter and three-stage pressure regulating part. Through the combination of these components, the pressure regulating, desulfurization and safe emission of biogas are achieved.
The equipment can move at any time, reducing the consumption of resources and manpower, avoiding air pollution through combustion and extending the service life of gas pipelines and combustion equipment through desulfurization towers.
Smart Images

Figure CN112413405B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to mobile pressure-regulating integrated gas supply equipment, belonging to the field of gas supply equipment. Background Art
[0002] At present, there is a lack of integrated decompression equipment for biogas in China. The existing decompression equipment is generally designed for natural gas, and there are few decompression equipment for biogas. In addition, the existing biogas decompression equipment has the following defects that need to be improved:
[0003] 1. The existing biogas decompression equipment does not have the desulfurization link of biogas. The long-term use of sulfur-containing biogas is not conducive to the service life of the back-end gas pipeline and combustion equipment, and is likely to cause damage to the gas pipeline and combustion equipment, and even endanger personal safety;
[0004] 2. The existing biogas decompression equipment requires a separate equipment plant, which occupies a large area and requires a large amount of construction work, consuming a lot of resources and manpower;
[0005] 3. The existing biogas decompression equipment is not easy to move. When some places need to use biogas temporarily, the existing biogas decompression equipment cannot be provided at any time;
[0006] 4. When the existing biogas pressure reducing equipment is reducing the pressure of biogas, if the pressure in the pipeline is too high, the safety pressure relief valve will directly discharge the biogas into the atmosphere. The biogas will cause great pollution to the atmosphere, and long-term use will affect the environment and ecological balance.
[0007] In summary, there is an urgent need for a gas supply device that can be moved at any time, can promptly process and release biogas, does not require the construction of a separate plant, and will not cause damage to the back-end gas pipelines and combustion equipment during long-term use to solve the above problems. Summary of the invention
[0008] The present invention solves the problems of the existing biogas pressure reducing equipment, such as being inconvenient to move, requiring a separate plant to be built, consuming a large amount of manpower and material resources, and the released biogas causing air pollution. In view of the deficiencies in the prior art, the present invention discloses "a mobile pressure regulating integrated gas supply device". A brief overview of the present invention is given below in order to provide a basic understanding of certain aspects of the present invention. It should be understood that this overview is not an exhaustive overview of the present invention. It is not intended to identify the key or important parts of the present invention, nor is it intended to limit the scope of the present invention.
[0009] The technical solution of the present invention:
[0010] A mobile pressure-regulating integrated gas supply device comprises a gas cylinder group, a hose, a first ball valve, a filter, a first-level pressure regulating part, an electric heater, a second-level pressure regulating part, a desulfurization tower, a first flowmeter, a second flowmeter and a third-level pressure regulating part, wherein the output end of the gas cylinder group is connected to the input end of the first ball valve through a hose, the output end of the first ball valve is connected to the input end of the filter, the output end of the filter is connected to the input end of the electric heater, the output end of the electric heater is connected to the input end of the first-level pressure regulating part, the output end of the first-level pressure regulating part is connected to the input end of the electric heater, the output end of the electric heater is connected to the input end of the second-level pressure regulating part, the output end of the second-level pressure regulating part is connected to the input end of the desulfurization tower, the output end of the desulfurization tower is respectively connected to the input ends of the third-level pressure regulating part and the second flowmeter, and the output end of the third-level pressure regulating part is connected with the first flowmeter.
[0011] Furthermore, the first-stage voltage regulating part includes four voltage regulators, which are connected in parallel, and the second-stage voltage regulating part and the third-stage voltage regulating part are each composed of one voltage regulator.
[0012] Furthermore, the input end of the first-stage pressure regulating part is connected to a first temperature sensor and a first pressure gauge, and the output end of the first-stage pressure regulating part is connected to a second pressure sensor.
[0013] Furthermore, a quick connector is installed between the output end of the hose and the input end of the first ball valve.
[0014] Furthermore, a first safety valve is installed between the first ball valve and the filter, a second safety valve is installed between the output end of the electric heater and the input end of the first-level pressure regulating part, a third safety valve is installed between the input end of the electric heater and the output end of the first-level pressure regulating part, a fourth safety valve is installed between the second-level pressure regulating part and the desulfurization tower, a fourth pressure sensor is installed between the third-level pressure regulating part and the first flowmeter, and a fifth safety valve is installed at the output end of the first flowmeter.
[0015] Furthermore, the first safety valve, the second safety valve, the third safety valve, the fourth safety valve and the fifth safety valve are brought together through a first pipeline and connected to the torch, and a flow sensor is installed between the torch and the first pipeline.
[0016] Furthermore, an odorizer is installed at the output end of the desulfurization tower, and the output end of the odorizer is connected to the input end of the three-stage pressure regulating part. A hydrogen sulfide sensor and a second emergency shut-off valve are installed between the odorizer and the three-stage pressure regulating part.
[0017] Furthermore, a first emergency shut-off valve and a first pressure sensor are installed between the output end of the first ball valve and the input end of the electric heater.
[0018] Furthermore, a second temperature sensor is installed between the output end of the electric heater and the input end of the secondary voltage regulator, and a third pressure sensor and a second pressure gauge are installed between the output end of the secondary voltage regulator and the input end of the desulfurization tower.
[0019] Beneficial effects of the present invention:
[0020] 1. The mobile pressure-regulating integrated gas supply equipment of the present invention effectively solves the demand for biogas in some areas, and can be supplied at any time without the need to build a factory building;
[0021] 2. Through the mobile pressure-regulating integrated gas supply equipment of the present invention, the biogas released in the pipeline can be discharged after being burned through the torch of the gas supply equipment, which will not pollute the atmosphere compared with the direct discharge of biogas;
[0022] 3. Install a desulfurization tower in the gas supply equipment to effectively remove sulfur from biogas, avoid the impact of sulfur-containing biogas on the back-end gas pipelines and combustion equipment, increase the service life of gas pipelines and combustion equipment, and avoid the danger of damage to gas pipelines and combustion equipment due to long-term use. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of a mobile pressure regulating integrated gas supply equipment;
[0024] Figure 2 It is a structural diagram of the first-stage voltage regulating unit;
[0025] In the figure, 1-gas cylinder group, 2-unloading hose, 3-first ball valve, 4-first emergency shut-off valve, 5-first safety valve, 6-filter, 7-first pressure sensor, 8-quick connector, 9-first pressure regulating part, 10-first temperature sensor, 11-first pressure gauge, 12-electric heater, 13-second safety valve, 14-third safety valve, 15-second pressure sensor, 16-pressure regulator, 17-second temperature sensor, 18-secondary pressure regulating part, 19-third pressure sensor, 20-second pressure gauge, 21-fourth safety valve, 22-desulfurization tower, 23-odorizer, 24-hydrogen sulfide sensor, 25-second emergency shut-off valve, 26-first flow meter, 27-second flow meter, 28-third pressure regulating part, 29-fifth safety valve, 30-fourth pressure sensor, 31-torch, 32-flow sensor, 34-first pipeline. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0027] Specific implementation method 1: Combination Figure 1-Figure 2 The mobile pressure regulating integrated gas supply device of the present embodiment includes a gas cylinder group 1, a hose 2, a first ball valve 3, a filter 6, a primary pressure regulating part 9, an electric heater 12, a secondary pressure regulating part 18, a desulfurization tower 22, a first flow meter 26, a second flow meter 27 and a tertiary pressure regulating part 28. The output end of the gas cylinder group 1 is connected to the input end of the first ball valve 3 through the hose 2, the output end of the first ball valve 3 is connected to the input end of the filter 6, the output end of the filter 6 is connected to the input end of the electric heater 12, and the output end of the electric heater 12 is connected to the input end of the filter 6. The end is connected to the input end of the first-stage pressure regulating part 9, the output end of the first-stage pressure regulating part 9 is connected to the input end of the electric heater 12, the output end of the electric heater 12 is connected to the input end of the second-stage pressure regulating part 18, the output end of the second-stage pressure regulating part 18 is connected to the input end of the desulfurization tower 22, the output end of the desulfurization tower 22 is respectively connected to the input ends of the third-stage pressure regulating part 28 and the second flowmeter 27, the output end of the third-stage pressure regulating part 28 is connected with the first flowmeter 26, and the gas cylinder group 1 is a group of nine gas cylinders in each group, which compresses the produced biogas into the gas cylinder group 1 through a compressor at the biogas engineering site. The volume of each bottle is 205L, and the filling pressure is 20Mpa. The gas cylinder group 1 is connected to the first ball valve 3 through the hose 2. The first ball valve 3 is opened, and the biogas in the gas cylinder group 1 flows into the filter 6. The filter 6 filters the solid impurities in the biogas. The filtered biogas enters the electric heater 12. The power of the electric heater 12 is 8kw. The electric heater 12 is used to keep the temperature of the biogas constant. Then the biogas enters the first-level pressure regulating part 9 through the pipeline. The first-level pressure regulating part 9 regulates the pressure value of the biogas from 20Mpa to 2-4Mpa. The biogas after pressure regulation enters the electric heater 12 to keep the temperature of the biogas constant. The biogas flows out of the electric heater 12 and flows into the second-level pressure regulating part 18. The secondary pressure regulating part 18 regulates the biogas pressure from 2-4Mpa to 0.2-0.4Mpa, and the biogas after pressure regulation enters the desulfurization tower 22 for desulfurization treatment. The biogas after desulfurization treatment enters the tertiary pressure regulating part 28 and the second flow meter 27 through pipelines respectively, and enters the tertiary pressure regulating part 28 for three-stage pressure regulation. The tertiary pressure regulating part 28 presses the biogas from 0.2-0.4Mpa to 2-6Kpa. After the three-stage pressure regulation, the biogas enters the first flow meter 16 and is divided into two outflows, one is connected to the biogas boiler for heating, and the other is connected to the biogas generator for power generation. The biogas passing through the second flow meter 27 is connected to the gas supply pressure regulating box, and the gas supply pressure regulating box regulates the pressure to 2-4Kpa for farmers' cooking gas.
[0028] Specific implementation method 2: Combination Figure 1-Figure 2 The present embodiment is described as a mobile pressure regulating integrated gas supply equipment, wherein the first-stage pressure regulating part 9 includes four-way pressure regulators 16, and the four-way pressure regulators 16 are connected in parallel. The second-stage pressure regulating part 18 and the third-stage pressure regulating part 28 are respectively composed of one-way pressure regulator 16. The first-stage pressure regulating part 9 has a larger regulating pressure value for biogas, so four-way pressure regulators 16 are used in parallel for regulation.
[0029] Specific implementation method three: Combination Figure 1-Figure 2 The present embodiment is described as a mobile pressure regulating integrated gas supply equipment, wherein the input end of the first-stage pressure regulating part 9 is connected with a first temperature sensor 10 and a first pressure gauge 11, and the output end of the first-stage pressure regulating part 9 is connected with a second pressure sensor 15. The first temperature sensor 10 and the first pressure gauge 11 are installed at the input end of the first-stage pressure regulating part 9 to detect the temperature and pressure of the biogas before pressure regulation, and the second pressure sensor 15 is installed at the output end of the first-stage pressure regulating part 9 to detect whether the pressure value of the output biogas after pressure regulation is greater than 2Mpa.
[0030] Specific implementation method four: Combination Figure 1-Figure 2 Describing this embodiment, this embodiment is a mobile pressure-regulating integrated gas supply device, a quick connector 8 is installed between the output end of the hose 2 and the input end of the first ball valve 3, and a quick connector 8 is installed at the end of the hose 2 to facilitate the quick connection of the gas cylinder group 1 and the gas supply device.
[0031] Specific implementation method five: Combination Figure 1-Figure 2 To illustrate the present embodiment, a mobile pressure-regulating integrated gas supply device is provided in the present embodiment, wherein a first safety valve 5 is installed between the first ball valve 3 and the filter 6, a second safety valve 13 is installed between the output end of the electric heater 12 and the input end of the first-stage pressure regulating part 9, a third safety valve 14 is installed between the input end of the electric heater 12 and the output end of the first-stage pressure regulating part 9, a fourth safety valve 21 is installed between the second-stage pressure regulating part 18 and the desulfurization tower 22, a fourth pressure sensor 30 is installed between the third-stage pressure regulating part 28 and the first flowmeter 26, and a fifth safety valve 29 is installed at the output end of the first flowmeter 26.
[0032] Specific implementation method six: Combination Figure 1-Figure 2The present embodiment is described. The present embodiment is a mobile pressure-regulating integrated gas supply device. The first safety valve 5, the second safety valve 13, the third safety valve 14, the fourth safety valve 21 and the fifth safety valve 29 are brought together through a first pipeline 34 and connected to a torch 31. A flow sensor 32 is installed between the torch 31 and the first pipeline 34. The five safety valves on the gas supply device are brought together and lead to the torch 31 through the first pipeline 34. When the flow sensor 32 at the torch 31 detects that the gas flow reaches the ignition requirement, the torch 31 automatically ignites to prevent biogas from being directly discharged into the atmosphere.
[0033] Specific implementation method seven: Combination Figure 1-Figure 2 The present embodiment is described. The present embodiment is a mobile pressure-regulating integrated gas supply equipment. An odorizer 23 is installed at the output end of the desulfurization tower 22. The output end of the odorizer 23 is connected to the input end of the three-stage pressure regulating part 28. A hydrogen sulfide sensor 24 and a second emergency shut-off valve 25 are installed between the odorizer 23 and the three-stage pressure regulating part 28. The desulfurized biogas enters the odorizer 23 for odorization. The main component in the odorizer 23 is a tetrahydrothiophene mixture. When natural gas leaks, in order to be easily discovered by people, the natural gas is odorized. The odorization standard is that it can be detected when the lower explosion limit concentration is reached. The odorized gas flows into the three-stage pressure regulating part 28 and passes through the hydrogen sulfide sensor 24 for detecting the hydrogen sulfide concentration in the gas. At the same time, a second emergency shut-off valve 25 is installed between the odorizer 23 and the three-stage pressure regulating part 28, so that it can be shut off urgently when the gas leaks or does not meet the standard.
[0034] Specific implementation method eight: Combination Figure 1-Figure 2 To illustrate this embodiment, a mobile pressure-regulating integrated gas supply device is provided in which a first emergency shut-off valve 4 and a first pressure sensor 7 are installed between the output end of the first ball valve 3 and the input end of the electric heater 12. The first emergency shut-off valve 4 is used to prevent the newly entered gas from being dangerous due to excessive pressure or leakage, and is used to shut off the gas in an emergency. The first pressure sensor 7 is used to monitor the pressure of the newly entered gas.
[0035] Specific implementation method eight: Combination Figure 1-Figure 2 The present embodiment is described. The present embodiment is a mobile pressure-regulating integrated gas supply equipment. A second temperature sensor 17 is installed between the output end of the electric heater 12 and the input end of the secondary pressure regulating part 18. A third pressure sensor 19 and a second pressure gauge 20 are installed between the output end of the secondary pressure regulating part 18 and the input end of the desulfurization tower 22. The second temperature sensor 17 is used to detect the temperature of the gas passing through the electric heater 12 after pressure regulation to avoid the danger of excessively high or low temperature. The third pressure sensor 19 is used to monitor the gas pressure value after the secondary pressure regulation. The second pressure gauge 20 detects the gas pressure value after the secondary pressure regulation.
[0036] This implementation is only an exemplary description of this patent and does not limit its protection scope. Those skilled in the art may also make partial changes to it, as long as they do not exceed the spirit of this patent, they are all within the protection scope of this patent.
Claims
1. A mobile pressure regulating integrated gas supply device, characterized in that: The invention comprises a gas cylinder group (1), a hose (2), a first ball valve (3), a filter (6), a primary pressure regulating part (9), an electric heater (12), a secondary pressure regulating part (18), a desulfurization tower (22), a first flow meter (26), a second flow meter (27) and a tertiary pressure regulating part (28), wherein the output end of the gas cylinder group (1) is connected to the input end of the first ball valve (3) through the hose (2), the output end of the first ball valve (3) is connected to the input end of the filter (6), and the output end of the filter (6) is connected to the input end of the electric heater (12). The output end of the electric heater (12) is connected to the input end of the first-stage pressure regulating part (9), the output end of the first-stage pressure regulating part (9) is connected to the input end of the electric heater (12), the output end of the electric heater (12) is connected to the input end of the second-stage pressure regulating part (18), the output end of the second-stage pressure regulating part (18) is connected to the input end of the desulfurization tower (22), the output end of the desulfurization tower (22) is respectively connected to the input ends of the third-stage pressure regulating part (28) and the second flowmeter (27), and the output end of the third-stage pressure regulating part (28) is connected to the first flowmeter (26).
2. The mobile pressure regulating integrated gas supply equipment according to claim 1, characterized in that: The first-stage voltage regulating part (9) comprises four-way voltage regulators (16) which are connected in parallel, and the second-stage voltage regulating part (18) and the third-stage voltage regulating part (28) are respectively composed of one-way voltage regulator (16).
3. The mobile pressure regulating integrated gas supply equipment according to claim 2, characterized in that: The input end of the primary pressure regulating part (9) is connected to a first temperature sensor (10) and a first pressure gauge (11), and the output end of the primary pressure regulating part (9) is connected to a second pressure sensor (15).
4. The mobile pressure regulating integrated gas supply equipment according to claim 3 is characterized in that: A quick connector (8) is installed between the output end of the hose (2) and the input end of the first ball valve (3).
5. The mobile pressure regulating integrated gas supply equipment according to claim 4, characterized in that: A first safety valve (5) is installed between the first ball valve (3) and the filter (6), a second safety valve (13) is installed between the output end of the electric heater (12) and the input end of the first pressure regulating part (9), a third safety valve (14) is installed between the input end of the electric heater (12) and the output end of the first pressure regulating part (9), a fourth safety valve (21) is installed between the second pressure regulating part (18) and the desulfurization tower (22), a fourth pressure sensor (30) is installed between the third pressure regulating part (28) and the first flow meter (26), and a fifth safety valve (29) is installed at the output end of the first flow meter (26).
6. The mobile pressure regulating integrated gas supply equipment according to claim 5, characterized in that: The first safety valve (5), the second safety valve (13), the third safety valve (14), the fourth safety valve (21) and the fifth safety valve (29) are connected to the torch (31) through a first pipeline (34), and a flow sensor (32) is installed between the torch (31) and the first pipeline (34).
7. The mobile pressure regulating integrated gas supply equipment according to claim 6, characterized in that: An odorizer (23) is installed at the output end of the desulfurization tower (22), and the output end of the odorizer (23) is connected to the input end of the three-stage pressure regulating part (28). A hydrogen sulfide sensor (24) and a second emergency shut-off valve (25) are installed between the odorizer (23) and the three-stage pressure regulating part (28).
8. The mobile pressure regulating integrated gas supply equipment according to claim 7, characterized in that: A first emergency shut-off valve (4) and a first pressure sensor (7) are installed between the output end of the first ball valve (3) and the input end of the electric heater (12).
9. The mobile pressure regulating integrated gas supply device according to claim 8, characterized in that: A second temperature sensor (17) is installed between the output end of the electric heater (12) and the input end of the secondary pressure regulating part (18), and a third pressure sensor (19) and a second pressure gauge (20) are installed between the output end of the secondary pressure regulating part (18) and the input end of the desulfurization tower (22).
Citation Information
Patent Citations
Movable pressure-regulating integrated gas supply equipment
CN213712656U