A method for evaluating leakage of asphalt concrete core dam in narrow river valleys

Through the calculation of the three-dimensional nonlinear finite element method and the critical leakage coefficient, the problem of leakage assessment of asphalt concrete core dams in narrow valleys is solved, the leakage risk is accurately quantified and evaluated, and the safety of design and operation is improved. .

CN112507423BActive Publication Date: 2024-10-29XINJIANG WATER CONSERVANCY & HYDROPOWER PLANNING & DESIGN ADMINISTRATION +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202011314776.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-20
Publication Date
2024-10-29
Estimated Expiration
2040-11-20

AI Technical Summary

Technical Problem

Existing technology cannot effectively quantify and judge the leakage possibility of asphalt concrete core dams in narrow valleys under the combined influence of topography and dam body, resulting in the inability to accurately evaluate and predict water leakage risks.

Method used

The three-dimensional nonlinear finite element method is used to calculate the stress and strain of the asphalt concrete core dam, and the bottom leakage possibility is judged through the critical leakage coefficient, including determining the critical leakage coefficient, calculating stress and strain, extracting the vertical stress ratio and soil stress. Calculate the leakage coefficient and plot the leakage coefficient distribution through a graph.

Benefits of technology

It provides a fast and intuitive method to quantify the impact of asphalt concrete core dams on narrow valley terrain and dam body, accurately determine the possibility of bottom leakage, and more realistically reflect the stress state of the core wall and the risk of leakage than traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112507423B_ABST
    Figure CN112507423B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of dam construction technology, and in particular to a method for evaluating leakage of asphalt concrete core dams in narrow river valleys. The present invention can quickly and intuitively quantify the magnitude of the impact of the asphalt concrete core dam on the dam body, the bank slopes on both sides and the narrow river valley terrain. At the same time, the present invention proposes a critical leakage coefficient for judging the possibility of leakage between the asphalt concrete at the bottom of the core wall and the riverbed and the bases on both sides. Compared with the traditional two-dimensional discrimination method that cannot consider the impact of the narrow river valley on the stress of the core wall, it more truly reflects the stress state of the core wall and the possibility of leakage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dam construction, and in particular to a method for evaluating leakage of an asphalt concrete core wall dam in a narrow river valley. Background Art

[0002] At present, with the continuous development of dam construction technology in my country, asphalt concrete core wall dams have made breakthroughs in both height and number. For example, the Storglomvatn Dam in Norway is 128m high, and the Niya Reservoir Dam under construction in Xinjiang, my country is 131.8m high. In the construction of high asphalt concrete core wall dams, the leakage problem caused by the hydraulic fracturing of the asphalt concrete core wall has often attracted the attention of water conservancy experts and scholars. The core wall asphalt concrete is different from clay impermeable materials. Since the porosity of asphalt concrete materials is very small and the internal pore water pressure is discontinuous, the possibility of hydraulic fracturing of this type of dam can generally be ignored.

[0003] Due to the steep terrain and complex topography on both sides of the river, the deformation gradient of the contact part of the dam shoulder is large. The stress distribution of the dam body shows that the vertical stress of the asphalt core wall is less than the theoretical earth pressure. This phenomenon is caused by the dam body and the narrow river valley. At the same time, according to the stress monitoring and calculation analysis of some existing dam bodies, it is also shown that the vertical pressure value of the asphalt concrete core wall dam in the narrow river valley will be less than the vertical pressure at the same height. Due to the large cohesion of the core wall itself, the possibility of hydraulic splitting of the wall itself is small. However, there is no cohesion at the contact part between the bottom of the asphalt concrete core wall and the base. If the vertical transmission pressure at this part is less than the corresponding water pressure at this part, then the possibility of hydraulic splitting at this part is greater. For the sake of engineering safety, it is very necessary to evaluate the degree of influence of the asphalt core wall dam under the joint action of the dam body and the terrain and the possibility of leakage at the design stage. However, there is currently no quantification of the extent to which the asphalt concrete core wall is affected by the narrow river valley topography and dam shell materials, nor a standard for judging leakage. Therefore, it is very meaningful to propose corresponding standards and evaluate the possibility of leakage of the asphalt concrete core wall of this type of dam, which is also very meaningful for the early design and later operation prediction of whether the asphalt concrete core wall will leak.

[0004] The information disclosed in this background technology section is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to those skilled in the art. Summary of the invention

[0005] The purpose of the present invention is to provide a method for evaluating leakage of an asphalt concrete core wall dam in a narrow river valley, so as to solve the technical problems existing in the prior art.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] The present invention provides a method for evaluating leakage of an asphalt concrete core wall dam in a narrow river valley, comprising the following steps:

[0008] S1. Determine the critical leakage coefficient as the standard for judging the leakage of asphalt concrete core wall. The calculation formula of the critical leakage coefficient is as follows:

[0009]

[0010] In the formula, ρ 水 is the water density; ρ 沥 is the average density of asphalt concrete; g is the acceleration of gravity; h is the height from the asphalt concrete core wall to the concrete base, and the height from the water surface at the same elevation to the concrete base;

[0011] S2. Calculate the stress and strain of the asphalt concrete core dam affected by the narrow valley terrain and the dam body by using the three-dimensional nonlinear finite element method;

[0012] S3. Extract the vertical stress of each node of the asphalt concrete core wall after being constrained by the dam body and the bank slopes on both sides, and convert the extracted core wall vertical stress σ zi Divide by the stress generated by the vertical soil at the same node to obtain the leakage coefficient of all nodes on the upstream surface of the core wall. Compare the extracted node leakage coefficient with the critical leakage coefficient to determine the possibility of leakage between the asphalt concrete at the bottom of the core wall and the riverbed and the bases on both sides: If the extracted node leakage coefficient is less than the critical leakage coefficient, it is determined that the asphalt concrete at the bottom of the core wall has the possibility of leakage.

[0013] Preferably, step S1 comprises:

[0014] The calculation formula of the critical leakage coefficient is as follows:

[0015]

[0016] In the formula, ρ 水 is the water density, which is 1.0 g / cm 3 ρ 沥 is the average density of asphalt concrete, which is 2.35 g / cm 3 , g is the acceleration due to gravity, the value is 9.81m / s 2 .

[0017] Preferably, step S2 comprises:

[0018] According to the actual on-site cross-sectional view and the cross-sectional and longitudinal views of the dam body, a three-dimensional finite element model of the dam and the narrow valley is established and discretized. The material properties of each attribute area are enriched to fully constrain the degrees of freedom of all nodes at the bottom of the foundation of the narrow valley model. The normal deformation is constrained on all sides. The dam body is filled according to the filling standard during the construction period, and the water storage loading process is simulated. The Duncan-EB elastic nonlinear model is used to calculate the stress-strain characteristics of the dam body, thereby calculating the stress and strain of the asphalt concrete core wall dam affected by the narrow valley terrain and the dam body.

[0019] Preferably, step S3 comprises:

[0020] According to step S2, the stress calculation results of the concrete core wall under the operating condition are obtained, and the vertical stress σ of each node of the upstream concrete core wall is calculated. zi With spatial coordinate x i ,y i 、h i , node number i is exported to the EXCEL table, and the extracted core wall vertical stress σ zi The leakage coefficient of all nodes on the upstream surface of the core wall is obtained by dividing the stress generated by the vertical soil at the same node. The leakage coefficient, corresponding node number and coordinates in the EXCEL table are plotted in the figure using drawing software for quantification.

[0021] Preferably, step S3 includes: the calculation formula of the vertical soil stress generated by the same node is: ρ 沥 gh i , where since the stress generated by the vertical soil at the dam crest is 0, the node leakage coefficient at this location is infinite, so the node leakage coefficient is required to be 1 when it is 1-∞.

[0022] By adopting the above technical solution, the present invention has the following beneficial effects:

[0023] The present invention provides an evaluation method for leakage of asphalt concrete core dams in narrow river valleys, which can quickly and intuitively quantify the impact of the dam body, bank slopes on both sides and narrow river valley terrain on the asphalt concrete core dam. At the same time, the present invention proposes a critical leakage coefficient for judging the possibility of leakage between the asphalt concrete at the bottom of the core wall and the riverbed and the bases on both sides, which more realistically reflects the stress state of the core wall and the possibility of leakage than the traditional two-dimensional discrimination method. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0025] Figure 1 A simplified diagram of the stress analysis of the asphalt concrete core wall during normal operation provided by an embodiment of the present invention;

[0026] Figure 2 An asphalt core wall and concrete base diagram provided for an embodiment of the present invention;

[0027] Figure 3 An enlarged view of an asphalt core wall and a concrete base provided in an embodiment of the present invention;

[0028] Figure 4 A cross-sectional view of a narrow river valley in an actual on-site project provided by an embodiment of the present invention;

[0029] Figure 5 A schematic cross-sectional view of an actual engineering dam provided by an embodiment of the present invention;

[0030] Figure 6 A schematic longitudinal section diagram of an actual engineering dam provided by an embodiment of the present invention;

[0031] Figure 7 A three-dimensional finite element mesh diagram of a narrow river valley and a core wall dam in an actual project provided by an embodiment of the present invention;

[0032] Figure 8 A schematic diagram of asphalt core wall mesh division provided by an embodiment of the present invention;

[0033] Fig. 9 A schematic diagram of the material partitioning of an actual engineering dam provided by an embodiment of the present invention;

[0034] Fig.10 A vertical stress cloud diagram of an asphalt core wall during normal operation provided by an embodiment of the present invention;

[0035] Fig.11 A schematic diagram of the numbering of each node of the asphalt core wall provided by an embodiment of the present invention;

[0036] Fig.12 A diagram of a post-processing data process provided by an embodiment of the present invention;

[0037] Fig.13 This is a leakage coefficient distribution diagram of the entire core wall provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0038] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0041] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0042] The impact of narrow valleys on the anti-seepage system of asphalt concrete core dams has been a topic for a long time. However, there is currently no method to quantify the impact of the narrow valley and the dam body on the asphalt concrete core and evaluate the possibility of leakage.

[0043] The purpose of this embodiment is to propose a standard value for judging water leakage and an evaluation method, so as to quantify the degree to which the asphalt concrete core wall is affected by the dam body and the narrow valley terrain, and to evaluate the possibility of water leakage in the asphalt concrete core wall according to the standard value. In this way, a basis is provided for the preliminary design work, and the safety level of the asphalt core wall is improved through corresponding measures.

[0044] According to the core wall stress monitoring data and calculation and analysis results of some completed projects, the vertical stress of the core wall increases when the rheological and seismic conditions of the dam are taken into account. Therefore, the vertical stress at the bottom of the dam body of the narrow valley asphalt concrete core wall dam with normal water storage is the smallest during the entire operation period. Therefore, here we only evaluate the possibility of leakage of the core wall caused by the combined influence of the dam body and the narrow valley terrain during normal water storage.

[0045] This embodiment provides a method for evaluating the possibility of leakage in a narrow valley asphalt concrete core wall dam, comprising the following steps:

[0046] Step S1:

[0047] First, the critical leakage coefficient is proposed. From the stress analysis diagram of the asphalt concrete core wall during normal operation (such as Figure 1 As shown in the figure, in addition to the self-weight stress, the vertical self-weight stress of the asphalt concrete core wall 1 is weakened by the reverse friction force generated by the dam body on the core wall fixture and the reaction force of the narrow valley bank slope on the core wall, and the vertical stress transmitted to the bottom of the core wall is also reduced. Figure 2 As shown in the figure, it includes: asphalt concrete core wall 1, transition material 2, concrete base 3, consolidation grouting 4, curtain grouting 5, asphalt mastic 6). The cohesive force of this material is far less than that of asphalt. If the vertical pressure is less than the water pressure, the water will leak along the weakest section of the contact section between the core wall and the base (such as Figure 3 shown).

[0048] From the perspective of asphalt concrete core wall stress, it is believed that when the vertical pressure of the asphalt concrete core wall at the same elevation is less than the water pressure, there is a risk of leakage. The "critical leakage coefficient" is proposed as the standard for judging the leakage of the asphalt concrete core wall, as shown in the following formula:

[0049]

[0050] In the formula, ρ 水 is the water density, which is 1.0 g / cm 3 ρ 沥 is the average density of asphalt concrete, which is 2.35 g / cm 3 , g is the acceleration due to gravity, the value is 9.81m / s 2 . h is the height from the asphalt concrete core wall to the concrete base, and the height from the water surface at the same elevation to the concrete base.

[0051] It can be seen from the above formula that this coefficient has nothing to do with the dam height, but is only related to the density of the two medium materials. Therefore, for water and asphalt concrete materials, this value is basically a constant.

[0052] Step S2:

[0053] According to the actual cross-section diagram on site (such as Figure 4 ) and the cross-section of the dam (as shown Figure 5 ) and longitudinal section (as shown Figure 6 A three-dimensional finite element model of the dam and the narrow valley was established and discretized (as shown in Figure 7 , Figure 8 As shown), give each property region rich material properties (such as Fig. 9 As shown in the figure, all the degrees of freedom of nodes at the bottom of the narrow valley model foundation are fully constrained, and the normal deformation is constrained on all sides. The dam body is filled according to the filling standard during the construction period, and the water storage loading process is simulated. The Duncan-EB elastic nonlinear model is used to calculate the stress-strain characteristics of the dam body.

[0054] Step S3:

[0055] The stress calculation results of the concrete core wall under the operating condition are obtained, and the vertical stress σ of each node of the upstream concrete core wall is calculated. zi (like Fig.10 shown) and the spatial coordinate x i ,y i 、h i (h represents the elevation to the base, i represents the node number on the upstream side of the core wall), node number (such as Fig.11 The extracted core wall vertical stress σ zi Divided by the vertical soil stress at the same node, that is, ρ 沥 gh i , (Since h is 0 at the dam top, ρ at the dam top 沥 gh i is 0, but this value is infinite in the denominator of the leakage coefficient. Here, it is stipulated that the leakage coefficient is taken as 1 when it is between 1 and ∞. The leakage coefficient of all nodes on the upstream surface of the core wall is obtained (such as Fig.11 shown).

[0056] Use drawing software to convert the leakage coefficient (such as Fig.12 As shown), the corresponding numbers and coordinates are drawn in the figure (as shown Fig.13 shown).

[0057] Fig.13This indicates that the stress of the core wall is indeed affected by the narrow river valley and the dam shell material, resulting in a small leakage coefficient at the bottom of the core wall and the contact area. By comparing the critical leakage coefficient, it is judged that the minimum value of the contact area between the bottom of the core wall and the two banks and the riverbed concrete base in the above calculation results is 0.678> the critical leakage coefficient of 0.43. Therefore, without considering the construction quality, the possibility of leakage at the contact area between the bottom of the core wall and the two banks and the riverbed concrete base is extremely small.

[0058] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for evaluating leakage of asphalt concrete core dam in narrow river valley, characterized in that: The steps include: S1. Determine the critical leakage coefficient as the standard for judging the leakage of asphalt concrete core wall. The calculation formula of the critical leakage coefficient is as follows: In the formula, ρ 水 is the water density; ρ 沥 is the average density of asphalt concrete; g is the acceleration of gravity; h is the height from the asphalt concrete core wall to the concrete base, and the height from the water surface at the same elevation to the concrete base; S2. Calculate the stress and strain of the asphalt concrete core dam affected by the narrow valley terrain and the dam body by using the three-dimensional nonlinear finite element method; S3. Extract the vertical stress of each node of the asphalt concrete core wall after being constrained by the dam body and the bank slopes on both sides, and convert the extracted core wall vertical stress σ zi Divide by the stress generated by the vertical soil at the same node to obtain the leakage coefficient of all nodes on the upstream surface of the core wall. Compare the extracted node leakage coefficient with the critical leakage coefficient to determine the possibility of leakage between the asphalt concrete at the bottom of the core wall and the riverbed and the bases on both sides: If the extracted node leakage coefficient is less than the critical leakage coefficient, it is determined that the asphalt concrete at the bottom of the core wall has the possibility of leakage.

2. The method for evaluating leakage of asphalt concrete core dam in narrow river valley according to claim 1, characterized in that: Step S1 includes: The calculation formula of the critical leakage coefficient is as follows: In the formula, ρ 水 is the water density, which is 1.0 g / cm 3 ρ 沥 is the average density of asphalt concrete, which is 2.35 g / cm 3 , g is the acceleration due to gravity, the value is 9.81m / s 2 .

3. The method for evaluating leakage of asphalt concrete core dam in narrow river valley according to claim 1, characterized in that: Step S2 includes: According to the actual on-site cross-sectional view and the cross-sectional and longitudinal views of the dam body, a three-dimensional finite element model of the dam and the narrow valley is established and discretized. The material properties of each attribute area are enriched to fully constrain the degrees of freedom of all nodes at the bottom of the foundation of the narrow valley model. The normal deformation is constrained on all sides. The dam body is filled according to the filling standard during the construction period, and the water storage loading process is simulated. The Duncan-EB elastic nonlinear model is used to calculate the stress-strain characteristics of the dam body, thereby calculating the stress and strain of the asphalt concrete core wall dam affected by the narrow valley terrain and the dam body.

4. The method for evaluating leakage of asphalt concrete core dam in narrow river valley according to claim 1, characterized in that: Step S3 includes: According to step S2, the stress calculation results of the concrete core wall under the operating condition are obtained, and the vertical stress σ of each node of the upstream concrete core wall is calculated. zi With spatial coordinate x i ,y i 、h i , node number i is exported to the EXCEL table, and the extracted core wall vertical stress σ zi The leakage coefficient of all nodes on the upstream surface of the core wall is obtained by dividing the stress generated by the vertical soil at the same node. The leakage coefficient, corresponding node number and coordinates in the EXCEL table are plotted in the figure using drawing software for quantification.

5. The method for evaluating leakage of asphalt concrete core dam in narrow river valley according to claim 4, characterized in that: Step S3 includes: the calculation formula of the vertical soil stress generated by the same node is: ρ 沥 gh i , where since the stress generated by the vertical soil at the dam crest is 0, the node leakage coefficient at this location is infinite, so the node leakage coefficient is required to be 1 when it is 1-∞.

Citation Information

Patent Citations

  • High-base asphalt concrete core wall dam

    CN104099903A

  • Seepage prevention structure in dam of narrow steep river valley asphalt concrete core rock -fill dam

    CN207314284U