Navigation method and device for photovoltaic power station operation and maintenance path

By constructing the operation and maintenance path map of the photovoltaic power station, combined with the traffic requirements of the operation and maintenance tasks, and selecting the traffic sections that meet the traffic requirements, the complexity and safety issues of the operation and maintenance path planning in the photovoltaic power station are solved, and the safety and efficiency of the operation and maintenance personnel are achieved. Passage.

CN112556693BActive Publication Date: 2024-10-25BEIJING ETECHWIN ELECTRIC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910911551.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-25
Publication Date
2024-10-25
Estimated Expiration
2039-09-25

AI Technical Summary

Technical Problem

Existing technology makes it difficult to effectively plan operation and maintenance paths in photovoltaic power plants, especially in complex three-dimensional spaces and environments with high safety risks. Moreover, traffic restrictions are different under different operation and maintenance tasks, resulting in operation and maintenance personnel passing through the photovoltaic power plant area. There are security risks and inefficiencies.

Method used

Construct the operation and maintenance path map of the photovoltaic power station, including multiple traffic sections and their traffic restriction capabilities, obtain the traffic requirements of the pending operation and maintenance tasks, select the traffic sections that meet the traffic requirements to determine the optimal operation and maintenance path, and use the edges of the road map attributes (length, through capacity and carrying capacity) for path planning.

Benefits of technology

It enables operation and maintenance personnel to pass safely and efficiently within the photovoltaic power plant area, reduces the safety risks of operation and maintenance personnel, and improves the efficiency of operation and maintenance work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112556693B_ABST
    Figure CN112556693B_ABST
Patent Text Reader

Abstract

The present invention provides a navigation method and device for an operation and maintenance path of a photovoltaic power station, the navigation method comprising: constructing an operation and maintenance path map of a photovoltaic power station, wherein the operation and maintenance path map includes a plurality of passable road sections and the traffic restriction capabilities of each passable road section; obtaining a pending operation and maintenance task, and determining the traffic requirements of the acquired pending operation and maintenance task; selecting a passable road section whose traffic restriction capabilities meet the traffic requirements from the operation and maintenance path map, so as to determine the optimal operation and maintenance path for executing the pending operation and maintenance task. The operation and maintenance path planned by the navigation method and device for the operation and maintenance path of a photovoltaic power station according to the exemplary embodiment of the present invention can enable the operation and maintenance personnel to pass through the photovoltaic power station plant area smoothly, and reduce the safety risks of the operation and maintenance personnel passing through the photovoltaic power station plant area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention generally relates to the technical field of photovoltaic power station operation and maintenance, and more specifically, to a navigation method and device for a photovoltaic power station operation and maintenance path. Background Art

[0002] The operation and maintenance of photovoltaic power stations (hereinafter referred to as O&M) has become the main concern of photovoltaic power station owners and professional O&M companies, with ensuring power generation and reducing O&M costs as the two core goals. As the number of photovoltaic power station owners and professional O&M companies managing power stations increases, power station O&M work has become more complicated.

[0003] The operation and maintenance of photovoltaic power stations generally include regular inspections of all equipment and facilities, troubleshooting and handling of abnormal power generation and other fault causes, inspection and replacement of components and other equipment, and dust removal and cleaning of photovoltaic components and cabinets. Although in terms of hardware principles, the equipment used in photovoltaic power stations is limited to photovoltaic components, junction boxes, inverters, transformers, environmental collectors, etc., the photovoltaic power station plant occupies a large area and has a relatively complex layout, and the number of equipment used is large. For example, taking a 6MW (megawatt) photovoltaic power station as an example, the number of photovoltaic components, junction boxes, inverters, box transformers and other equipment installed is about 20,000. When walking in a large area of ​​photovoltaic power station plant, operation and maintenance personnel must not only quickly reach the designated location, but also pay attention to complying with various safety regulations to prevent going wrong or entering dangerous areas and causing power system accidents or personal harm.

[0004] With the development and continuous improvement of remote monitoring technology, more and more photovoltaic power stations adopt a less-manned or unmanned operation mode, that is, the operation and maintenance personnel spend most of their time remotely monitoring the operation of the photovoltaic power station, and only enter the photovoltaic power station plant to carry out operation and maintenance work when necessary. This management method makes only a small number of operation and maintenance personnel familiar with the environment of the photovoltaic power station plant. For new operation and maintenance personnel, it may take a day or even several days to become familiar with the environment of the power station plant. For the operation and maintenance tasks that need to be handled, it is necessary to continuously explore the appropriate operation and maintenance path, which will cause greater safety risks in the operation and maintenance work and also affect the efficiency of the operation and maintenance work.

[0005] At present, in response to the above situation, the existing technology has proposed a substation operation and maintenance path planning and navigation method based on Beidou positioning, which obtains the user's real-time location through the Beidou positioning module, and cooperates with the optimal path calculated by the path planning module to provide the user with voice prompts in four directions of travel: forward, backward, left turn, and right turn. When there is a live area within 50 meters around the user or the user passes through a live area, the path navigation module issues a voice warning prompt and guides the user to move safely, thereby solving the problem of power system accidents and personal accidents caused by substation operation and maintenance personnel walking into the wrong interval or mistakenly entering the live area.

[0006] Although the existing disclosures have noted the necessity of planning the work paths of operation and maintenance personnel in power station operation and maintenance work, the existing methods are not proposed for photovoltaic power stations. Photovoltaic power stations are mostly built in open areas such as barren mountains and slopes, or on the roofs of factory buildings or residential buildings in industrial parks, making it difficult to obtain satisfactory results for the planning of photovoltaic power station operation and maintenance paths using existing methods. For example, the existing technology does not consider the operation and maintenance path planning problem in three-dimensional space, nor does it fully consider the traffic safety of the operation and maintenance path, as well as the problem of different traffic restrictions on the operation and maintenance path under different operation and maintenance tasks. Summary of the invention

[0007] An exemplary embodiment of the present invention aims to provide a navigation method and device for an operation and maintenance path of a photovoltaic power station to overcome at least one of the above-mentioned drawbacks.

[0008] In one general aspect, a navigation method for an operation and maintenance path of a photovoltaic power station is provided, the navigation method comprising: constructing an operation and maintenance path map of the photovoltaic power station, wherein the operation and maintenance path map includes a plurality of pass sections and the traffic restriction capabilities of each pass section; obtaining pending operation and maintenance tasks, and determining the traffic requirements of the acquired pending operation and maintenance tasks; selecting a pass section whose traffic restriction capabilities meet the traffic requirements from the operation and maintenance path map, so as to determine an optimal operation and maintenance path for executing the pending operation and maintenance tasks.

[0009] In another general aspect, a navigation device for an operation and maintenance path of a photovoltaic power station is provided, the navigation device comprising: a path map construction module, which constructs an operation and maintenance path map of the photovoltaic power station, wherein the operation and maintenance path map includes multiple pass sections and the traffic restriction capabilities of each pass section; an operation and maintenance task acquisition module, which acquires pending operation and maintenance tasks and determines the traffic requirements of the acquired pending operation and maintenance tasks; and an optimal path determination module, which selects a pass section whose traffic restriction capabilities meet the traffic requirements from the operation and maintenance path map, so as to determine an optimal operation and maintenance path for executing the pending operation and maintenance tasks.

[0010] In another general aspect, a controller is provided, comprising: a processor; an input / output interface; and a memory for storing a computer program, wherein the computer program implements the above-mentioned navigation method for the photovoltaic power station operation and maintenance path when executed by the processor.

[0011] In another general aspect, a portable electronic terminal is provided, comprising the above-mentioned controller.

[0012] In another general aspect, a computer-readable storage medium storing a computer program is provided, and when the computer program is executed by a processor, the above-mentioned navigation method of the photovoltaic power station operation and maintenance path is implemented.

[0013] The operation and maintenance path planned by the navigation method and device for the photovoltaic power station operation and maintenance path of the exemplary embodiment of the present invention can enable operation and maintenance personnel to pass through the photovoltaic power station plant area smoothly and reduce the safety risks of operation and maintenance personnel passing through the photovoltaic power station plant area. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The above and other objects and features of the present invention will become more apparent through the following description in conjunction with the accompanying drawings, in which:

[0015] Figure 1 A flow chart showing a method for navigating a photovoltaic power plant operation and maintenance path according to an exemplary embodiment of the present invention;

[0016] Figure 2 An example diagram showing an operation and maintenance path diagram of a photovoltaic power station according to an exemplary embodiment of the present invention;

[0017] Figure 3 An example diagram showing a singly linked list of any node according to an exemplary embodiment of the present invention;

[0018] Figure 4 A first example diagram showing a restricted subgraph of an operation and maintenance path graph according to an exemplary embodiment of the present invention;

[0019] Figure 5 A second example diagram showing a restricted subgraph of an operation and maintenance path graph according to an exemplary embodiment of the present invention;

[0020] Figure 6 A flow chart showing the steps of determining the passing capacity and the carrying capacity of any passing road section according to an exemplary embodiment of the present invention;

[0021] Figure 7 A flow chart showing steps for determining an optimal operation and maintenance path for multiple point task situations according to an exemplary embodiment of the present invention;

[0022] Figure 8 A block diagram showing a navigation device for a photovoltaic power station operation and maintenance path according to an exemplary embodiment of the present invention;

[0023] Fig. 9 A block diagram showing an optimal path determination module according to an exemplary embodiment of the present invention is shown;

[0024] Fig.10 A block diagram of a controller according to an exemplary embodiment of the present invention is shown. DETAILED DESCRIPTION

[0025] Various example embodiments will now be described more fully with reference to the accompanying drawings, in which some example embodiments are shown.

[0026] With the development of remote monitoring technology, PV power station owners or professional operation and maintenance companies have been able to remotely monitor and manage multiple PV power stations distributed in various places. However, with the increase in the number of PV power stations being monitored and managed, and the addition of new employees, the familiarity of operation and maintenance personnel with each PV power station has gradually weakened. Especially for PV power stations built in complex areas such as residential buildings or factory roofs, the operation and maintenance personnel are not familiar with the PV power station plant area, which not only affects work efficiency, but also poses certain safety risks.

[0027] Considering the restrictions of terrain and buildings in the photovoltaic power station, the particularity of operation and maintenance path planning is mainly reflected in the following aspects:

[0028] First, existing methods do not consider the operation and maintenance path planning problem in three-dimensional space.

[0029] Photovoltaic power stations are not restricted by geographical areas and can make full use of various open sunny surfaces, such as barren hills and slopes or roofs of buildings. This brings certain difficulties to the operation and maintenance personnel of photovoltaic power stations. When the operation and maintenance personnel arrive at a certain operation and maintenance location, they may not only need to climb over hills and ridges, but also need to climb the roof and even cross multiple obstacles. Therefore, the planning of the operation and maintenance path of photovoltaic power stations is definitely not a simple selection of the path between two points on the plane map, but a path that meets various constraints in a complex three-dimensional space.

[0030] Second, existing methods do not fully consider the safety of traffic on operation and maintenance paths.

[0031] In the above-mentioned operation and maintenance path planning and navigation method developed based on Beidou positioning technology, only all live dangerous areas are highlighted in the electronic map to guide the operation and maintenance personnel to the location of the faulty equipment quickly, safely and accurately, thereby solving the problem of substation operation and maintenance personnel walking into the wrong interval and mistakenly entering the live area. However, the situation of photovoltaic power stations is sometimes very complicated. The operation and maintenance path may pass through dense obstacles or be close to the top of the building or the edge of the skylight. Therefore, when planning the operation and maintenance path of a photovoltaic power station, the safety issues of the operation and maintenance path must be fully considered, not only to avoid the risk of electric shock to the operation and maintenance personnel, but also to consider other safety risks such as scratches on narrow aisles and falling from heights.

[0032] Third, existing methods do not consider the problem of different access restrictions on operation and maintenance paths under different operation and maintenance tasks.

[0033] When the maintenance personnel walk in the photovoltaic power station, the maintenance tasks they perform may be routine inspections or maintenance and renovation. When performing routine inspections, the maintenance personnel only need to carry a small number of tools, or even nothing special. When performing maintenance and renovation work, the maintenance personnel need to transport equipment or spare parts of a certain size and weight to the task execution site of the maintenance task. Taking the photovoltaic module that directly converts solar energy into electrical energy as an example, the size of a conventional photovoltaic module is 1 meter by 1.6 meters, composed of 60 cells, and weighs about 18.2 kilograms. When the maintenance personnel carry the photovoltaic module to the task execution site, they must consider the passage space of the road section they pass through and whether it can bear the weight of the maintenance personnel and items. If the maintenance personnel and items are too large or too heavy, it will not only be difficult to pass, but also there will be inevitable safety risks.

[0034] In an exemplary embodiment of the present invention, in response to the above situation, a navigation method for the operation and maintenance path of a photovoltaic power station is proposed for planning the work path for the operation and maintenance personnel. The method can not only prompt the operation and maintenance personnel to pass the corresponding road sections smoothly without carrying any items or with any items, but also minimize the safety risks of the operation and maintenance personnel.

[0035] Figure 1 A flow chart showing a method for navigating an operation and maintenance path of a photovoltaic power station according to an exemplary embodiment of the present invention.

[0036] Reference Figure 1 , in step S10, an operation and maintenance path map of the photovoltaic power station is constructed.

[0037] Here, the set of work paths that operation and maintenance personnel are allowed to pass through in the photovoltaic power station plant can be mathematically represented by a graph, which is the operation and maintenance path graph of the photovoltaic power station.

[0038] The constructed operation and maintenance path graph includes a plurality of passable road segments and the passable restriction capacity of each passable road segment. As an example, the operation and maintenance path graph may include a node set, an edge set and edge attributes.

[0039] For example, each node in the node set can be the location of each device included in the photovoltaic power station. Two nodes with a passable section are connected by an edge. When the locations of two devices are connected by an edge, it means that there is a passable section between the locations of the two devices connected by the edge. The attributes of the edge can indicate the traffic restriction capacity of the passable section corresponding to the edge.

[0040] As an example, the traffic restriction capacity of each pass section may include but is not limited to the passing capacity of the pass section and the carrying capacity of the pass section.

[0041] The capacity of a road section is used to describe the ability of a road section to allow people and / or objects to pass through in space. For example, the capacity of a road section on the operation and maintenance path map can represent the pass level of the spatial capacity of the road section, which can be represented by λ.

[0042] The above-mentioned spatial capacity can refer to whether the passage section meets the passage requirements of a single operation and maintenance personnel, or whether the passage section can meet the passage requirements of the operation and maintenance personnel carrying spare parts and / or tools. For photovoltaic power plants, there are two main factors that affect the spatial capacity of the passage section: one is the small space, and the other is that the passage section has certain safety risks, so there are certain requirements for the weight and size of the operation and maintenance personnel and spare parts and tools.

[0043] The pass level λ of the spatial pass capacity of the pass section can be obtained by experimental or comparative methods. For example, the experimental method may refer to the operation and maintenance personnel carrying spare parts, spare parts and / or tools to a certain pass section to measure the pass level of the pass section in person. The comparative method may refer to judging the pass level of the to-be-determined pass section based on the spatial pass capacity of similar objects or similar sections. Since the vast majority of devices in photovoltaic power stations are photovoltaic modules, there are many passage sections with high similarity between the various plant areas. Therefore, in practice, the pass levels of a few passage sections can be directly measured by experimental methods, and the pass levels of most passage sections can be indirectly obtained by comparative methods.

[0044] As an example, the pass level λ may be represented by a non-negative integer. For example, a pass level λ of 1 may indicate that only maintenance personnel can pass through the road section alone. A pass level λ of 2 may indicate that maintenance personnel can carry items (such as a photovoltaic module) on the road section, and a pass level λ of 0 may indicate that maintenance personnel cannot pass through the road section.

[0045] The carrying capacity of a road section is used to describe the carrying capacity of the road section. For example, the carrying capacity of a road section on the operation and maintenance path map can represent the weight of the operation and maintenance personnel and / or items that the road section is allowed to carry, that is, the carrying capacity of the road section can be represented by w.

[0046] The load capacity of the above-mentioned passage sections is an important indicator related to safety. Especially when the photovoltaic power station is built on the roof of a factory or residential building, some special operation and maintenance passage sections are prone to appear. These operation and maintenance passage sections may include ordinary stairs, roof maintenance ladders and steel grilles, etc. The danger lies in that there may be pools, ditches or ventilation skylights under the steel grilles. If people or objects fall, it may affect normal production or cause personal injury to operation and maintenance personnel.

[0047] The carrying capacity w of the passable section can be obtained by experimental or comparative methods. Here, unlike the method of testing the passing capacity of the passable section, the experimental method of the carrying capacity needs to be carried out in a safe area outside the actual passable section to avoid damage to the passable section and harm to the operation and maintenance personnel. In addition, preferably, when marking the carrying capacity of the passable section, it is necessary to consider reserving sufficient safety margins, and regularly update the carrying capacity of the passable section according to the service life and degree of damage of the passable section, such as gradually reducing the carrying capacity of the passable section.

[0048] As an example, the load capacity w can be a non-negative real number representing the weight allowed to be carried by the road section. If the load capacity w of a road section is 0, it means that operation and maintenance personnel are prohibited from passing through the road section.

[0049] In a preferred embodiment, the attributes of an edge may include not only the passing capacity and the carrying capacity of the passage segment corresponding to the edge, but also the length of the passage segment.

[0050] In an exemplary embodiment of the present invention, the throughput capacity, carrying capacity and length of each passage section within the photovoltaic power station plant can be determined in advance in the manner described above, and an operation and maintenance path map of the photovoltaic power station can be constructed based on the above three parameters.

[0051] As an example, the operation and maintenance path graph G can be an undirected graph, which can be expressed as: G = (V, E, L, Λ, W), where V represents a node set, E represents an edge set, L, Λ, and W indicate edge attributes, L represents a set of edge lengths, Λ represents a set of edge throughput capacities, and W represents a set of edge carrying capacities, and each element satisfies the following conditions:

[0052] (1) The i-th node v i ∈V, 1≤i≤m, |V|=m, m is the number of nodes in the node set V;

[0053] (2) The jth edge ej ∈E, 1≤j≤n, |E|=n, n is the number of edges in the edge set E;

[0054] (3) The length of the jth edge l j =l(e j )∈L,l j >0;

[0055] (4) The capacity of the jth edge λ j =λ(e j )∈Λ,λ j ≥0;

[0056] (5) The load capacity w of the jth edge j =w(e j )∈W,w j ≥0.

[0057] In an exemplary embodiment of the present invention, considering that the operation and maintenance personnel can move in both directions on any road section in the photovoltaic power plant area, the operation and maintenance path diagram of the photovoltaic power plant is defined as an undirected graph. Each edge in the operation and maintenance path diagram has three attributes, namely, length, throughput capacity and carrying capacity. If an edge of the operation and maintenance path diagram is deleted, the length, throughput capacity and carrying capacity associated with it will be deleted.

[0058] It should be understood that in the exemplary embodiment of the present invention, constructing an operation and maintenance path map of a photovoltaic power station based on the three attributes of edge length, pass level and carrying capacity is only a preferred example, and the present invention is not limited to this. Those skilled in the art can also increase or delete the number of attributes as needed.

[0059] In the operation and maintenance path diagram, if the capacity of an edge is not specified, the default value of λ is 0, indicating that the operation and maintenance personnel are not allowed to pass through the passage section. If the carrying capacity of an edge is not specified, the default value of w is also 0, which also means that the operation and maintenance personnel are not allowed to pass through the passage section. Therefore, as long as one of the length, capacity and carrying capacity of the edge is 0, the values ​​of the other items can be automatically 0 without affecting the determination of the optimal operation and maintenance path.

[0060] Figure 2 An exemplary diagram showing an operation and maintenance path diagram of a photovoltaic power station according to an exemplary embodiment of the present invention.

[0061] Figure 2 The operation and maintenance path map of a part of a photovoltaic power station built on the roof of a factory building is shown. It is necessary to record in advance the various passage sections within the photovoltaic power station area that are allowed for operation and maintenance personnel to pass through, and determine the length, capacity and carrying capacity of each passage section, based on which the operation and maintenance path map of the photovoltaic power station is constructed.

[0062] like Figure 2As shown, there are 10 nodes and 12 edges in the operation and maintenance path diagram, and the attributes of each edge are expressed in the form of (length, pass level, load capacity). As an example, in the operation and maintenance path diagram, the type of edge can be used to represent the type of the corresponding access section. For example, node 1 to node 3 are connected by a dotted line to indicate that the access section contains a roof maintenance ladder perpendicular to the horizontal plane. The length of the access section is 10 meters, the pass level is level 1, and the load capacity is 100 kilograms. The access sections between nodes 2 and 10 are connected by solid lines to indicate that these access sections are all within the horizontal plane of the roof. The length of the access section between nodes 2 and 3 is 15 meters, which is 10 meters longer than the length of the access section between nodes 3 and 6, but the former has a pass level one level lower than the latter, and the load capacity is only half of the latter. There is a ventilated skylight between nodes 4 and 7, and the operation and maintenance personnel obviously cannot pass through it, so this section is not marked in the operation and maintenance path diagram. The steel grille and the junction box below of the passage section between node 5 and node 8 are damaged. There is a risk of further damage to the steel grille and the junction box by the operation and maintenance personnel. Therefore, the load capacity of the passage section can be set to 0 manually, and accordingly the length and capacity of the passage section can also be set to 0.

[0063] The finite non-empty sequence of edges on the operation and maintenance path graph G can be expressed as (e i ,…,e k ,e k+1 ,…,e q ), if any two adjacent edges e k and edge k+1 There are common nodes, i≤k≤q, then (e i ,…,e k ,e k+1 ,…,e q ) is a pass path on the operation and maintenance path graph G. The sum of the lengths of all edges in the pass path is called the length of the pass path. The calculation formula is:

[0064] If the node v i and v q Respectively with edge e i and e q associated (i.e., node v i and v q The edge e i and e q as an endpoint of a non-public node), then (e i ,…,e k ,e k+1 ,…,e q ) is the slave node v on the operation and maintenance path graph G i To node v q A pass path from node vi To node v q The path of the node can also be expressed as a sequence of nodes (v i ,v i+1 ,…,v q ) to indicate.

[0065] In the exemplary embodiment of the present invention, it is not required that the edge k Different from other edges, that is, there may be repeated edges in the edge sequences that make up different paths. The selection of paths for photovoltaic power plants is aimed at supporting operation and maintenance personnel to complete operation and maintenance tasks. For some operation and maintenance tasks (such as photovoltaic module cleaning), over-emphasizing the distance that operation and maintenance personnel have to walk while ignoring the convenience of performing operation and maintenance tasks is a constraint for operation and maintenance personnel. Therefore, containing repeated edges in the path is more in line with the operation and maintenance needs of photovoltaic power plants.

[0066] In a preferred embodiment, the operation and maintenance path graph can be stored in the form of an adjacency list. This is a storage method that combines sequential storage with chain storage, and has the characteristics of flexible representation and small storage space. However, it should be understood that the present invention is not limited to this, and other data structures such as adjacency matrix, association matrix and arc table can also be used to store the operation and maintenance path graph.

[0067] As an example, the adjacency list may include multiple single linked lists established for multiple nodes in the operation and maintenance path graph, for example, a single linked list is established for a node in the operation and maintenance path graph G.

[0068] Combine the following Figure 3 To introduce the composition of the single linked list of any node in each node.

[0069] Figure 3 An example diagram showing a singly linked list of any node according to an exemplary embodiment of the present invention.

[0070] Each node in the single linked list of any node may include table nodes, any node v i The table nodes in the singly linked list can be connected to any node v i The associated edges.

[0071] For example, a table node may include an adjacency field (adjvex), a length field (length), a level field (level), a weight field (weight), and a first link field (nextedge). The adjacency field is used to store nodes that have a pass section with any node in the operation and maintenance path diagram, the length field is used to store the length of the pass section from any node to the above nodes, the level field is used to store the pass level indicating the pass capacity of the pass section from any node to the above nodes, the weight field is used to store the weight indicating the carry capacity of the pass section from any node to the above nodes, and the first link field is used to point to the next node of any node.

[0072] In addition, the adjacency list may also include a head node, which may include a data field (data) and a second link field (firstedge), the data field is used to store all nodes included in the operation and maintenance path graph, and the second link field is used to point to the first table node in the single linked list.

[0073] In an exemplary embodiment of the present invention, a suitable mathematical model is established for the operation and maintenance path map of a photovoltaic power station so that it can be stored efficiently and support the search operation for the optimal operation and maintenance path on the operation and maintenance path map when there are multiple operation and maintenance tasks.

[0074] return Figure 1 In step S20, the pending operation and maintenance tasks are obtained, and the passage requirements of the obtained pending operation and maintenance tasks are determined.

[0075] In step S30, a traffic section whose traffic restriction capacity meets the traffic requirements of the operation and maintenance task to be processed is selected from the constructed operation and maintenance path map to determine the optimal operation and maintenance path for executing the operation and maintenance task to be processed.

[0076] In an exemplary embodiment of the present invention, after determining the optimal operation and maintenance path for executing the pending operation and maintenance task, the determined optimal operation and maintenance path can be recommended to the operation and maintenance personnel who execute the pending operation and maintenance task, so that the operation and maintenance personnel can process the pending operation and maintenance task based on the recommended optimal operation and maintenance path.

[0077] In one example, the travel requirements of the pending operation and maintenance task may include the current location of the operation and maintenance personnel who will perform the pending operation and maintenance task and the task execution location of the pending operation and maintenance task.

[0078] In this case, the optimal operation and maintenance path for executing the pending operation and maintenance tasks can be determined in the following way: select the traffic sections whose traffic restriction capacity meets the traffic requirements from the operation and maintenance path map to form a restricted subgraph of the operation and maintenance path map, and determine the shortest path from the current position of the operation and maintenance personnel to the task execution location of the pending operation and maintenance tasks in the restricted subgraph as the optimal operation and maintenance path.

[0079] Here, the restricted subgraph includes at least one passage path from the current location of the operation and maintenance personnel to the task execution location of the operation and maintenance task to be processed. Since different passage sections have different passing capacities and carrying capacities, the restricted subgraphs of the operation and maintenance path graph corresponding to the passage requirements of different operation and maintenance tasks are also different.

[0080] Taking the above operation and maintenance path diagram G=(V,E,L,Λ,W) as an example, if there is and represents the upper bound of the passing level λ, represents the upper bound of the carrying capacity w, then the edge set E 1 ∩E 2 The graph H = (V', E', L', Λ', W') composed of its associated node set is called the restricted subgraph of the operation and maintenance path graph G.

[0081] The operation and maintenance path graph H = (V', E', L', Λ', W') is a restricted subgraph of the operation and maintenance path graph G = (V, E, L, Λ, W). For the set of nodes, the set of edges, the set of edge lengths, the set of throughput capabilities and the set of carrying capacity, we have and Established.

[0082] The value range of the pass level λ (the pass capacity required by the operation and maintenance task for the passable road section) can be [0, +∞). If the upper bound of the pass level is not specified The default upper bound The value is ∞, at this time, E 1 =E, since E∩E 1 =E 1 , then E 1 ∩E 2 =E∩E 2 =E 2 This indicates that when obtaining the restricted subgraph of the operation and maintenance path graph, if the upper bound of the passing level is not specified, the upper bound of the passing level can be ignored without affecting the result.

[0083] Upper bound for a specified pass level If That is, for any edge, its passing level is greater than the specified upper bound At this time, no edge that meets the upper bound specified by the level can be found on the operation and maintenance path graph. Therefore, the operation and maintenance path graph G is The restricted subgraph does not exist.

[0084] The value range of the carrying capacity w (the carrying capacity required by the operation and maintenance task for the passable road section) can be [0, +∞). If the upper bound of the carrying capacity is not specified The default upper bound The value is ∞, at this time, E 2 =E, due to E 2 ∩E=E 2 , so E 1 ∩E 2 =E 1 ∩E=E 1 This shows that when obtaining the restricted subgraph of the operation and maintenance path graph, if the upper bound of the load capacity is not specified, the upper bound of the load capacity can be ignored without affecting the result.

[0085] Upper bound for a specified load If That is, for any edge, its carrying capacity is greater than the specified upper bound At this time, it is impossible to find an edge on the operation and maintenance path graph that meets the upper limit of the load. Therefore, the operation and maintenance path graph G specifies the upper limit for the load The restricted subgraph does not exist.

[0086] If neither the upper bound of the level nor the upper bound of the capacity is specified, then the restricted subgraph of the operation and maintenance path graph is the operation and maintenance path graph itself. In addition, if the restricted subgraph of the operation and maintenance path graph does not exist for the upper bound of the level or capacity, then the restricted subgraph of the operation and maintenance path graph does not exist.

[0087] In addition, changes in the traffic requirements of pending maintenance tasks can also be considered. For example, the traffic paths in the restricted subgraph may have different traffic requirements on different traffic sections. For example, maintenance personnel perform multiple maintenance tasks along a traffic path, and the traffic level and load required for the previous traffic section are higher. As some maintenance tasks are completed, spare parts are replaced, and the items that maintenance personnel need to carry are gradually reduced, so the traffic level and load required for the subsequent traffic sections will be reduced accordingly.

[0088] Figure 4 A first example diagram showing a restricted subgraph of an operation and maintenance path graph according to an exemplary embodiment of the present invention is shown.

[0089] Figure 4 What is shown is a restricted sub-graph in which the roof of the factory building in the operation and maintenance path map is determined as the target area, and the traffic requirements indicate that the required pass level of the pass section is 1 and the load capacity is 75 kg.

[0090] Figure 5 A second example diagram showing a restricted subgraph of an operation and maintenance path graph according to an exemplary embodiment of the present invention.

[0091] Figure 5What is shown is a restricted sub-graph in which the roof of the factory building in the operation and maintenance path map is determined as the target area, and the traffic requirements indicate that the required pass level of the pass section is 2 and the load capacity is 300 kg.

[0092] If the operation and maintenance path graph G starts from node v i To node v j If there are multiple paths between them, the path with the shortest length can be called the path from node v i To node v j The shortest path.

[0093] If there are multiple task execution locations for the pending operation and maintenance task, that is, there are multiple target nodes, then the set they form is {v j ,…,v k}, now from node v i Set out through the set {v j ,…,v k The shortest path among all nodes in} is called the path from node v i Departure and arrival at target node v j ,…,v k The shortest path.

[0094] A photovoltaic power station may have multiple locations with maintenance requirements at the same time. If maintenance personnel can reach multiple locations, perform multiple maintenance tasks, and then exit the power station once, it can reduce the physical exertion of maintenance personnel repeatedly entering the power station and improve work efficiency. However, the shortest path to multiple locations is not necessarily equal to the sum of the shortest paths to each location. The present invention will subsequently introduce the process of determining the shortest path in the case of multiple locations.

[0095] Since the restricted subgraph of the operation and maintenance path graph comes from the operation and maintenance path graph, the pass path and the shortest operation and maintenance path of the operation and maintenance path graph are the pass path and the shortest operation and maintenance path of the restricted subgraph in the restricted subgraph of the operation and maintenance path graph.

[0096] It should be understood that whether the photovoltaic power station is built in an open area on the ground or on the roof of a factory or residential building, the access paths available for operation and maintenance personnel to walk have good connectivity. Relative to a certain task execution location, operation and maintenance personnel often have multiple access paths to choose from. Finding the shortest access path can not only enable operation and maintenance personnel to quickly reach the task execution location to improve the efficiency of operation and maintenance work, but also reduce the physical consumption of operation and maintenance personnel and reduce the labor intensity of operation and maintenance work. Especially when the photovoltaic power station is located on the roof of a building, a safe, convenient and shortest access path is particularly important for operation and maintenance personnel.

[0097] In an exemplary embodiment of the present invention, the shortest path can be determined based on the attributes of the edges in the following manner: for each pass path in at least one pass path in the restricted subgraph, determine the pass sections included in the pass path, and obtain the length of each pass section from the attributes of the edges corresponding to each pass section, calculate the length of each pass path according to the length of each pass section included in each pass path, and determine the pass path with the shortest length as the shortest path.

[0098] Since photovoltaic power stations can be built on barren hills and slopes, residential buildings or factory roofs, the roads that maintenance personnel need to walk on may be on the horizontal plane, at a certain angle to the horizontal plane, or even perpendicular to the horizontal plane, such as the roof maintenance ladder on the side of the building. Therefore, maintenance personnel can record each road in three-dimensional space, or clearly mark each road in different planes in two-dimensional space, so as to determine the length of each path.

[0099] That is, the length of the passage segment included in the edge attribute may refer to the path length of the passage path in a two-dimensional plane. In a preferred embodiment, the length of each passage path may also refer to the path length in a three-dimensional space layout. For example, the length of any passage path taken by the operation and maintenance personnel in the three-dimensional space may be determined in combination with the three-dimensional space layout of the locations of the various devices included in the photovoltaic power station.

[0100] It should be understood that the passage requirements for the pending operation and maintenance tasks may include not only the current location of the operation and maintenance personnel performing the pending operation and maintenance tasks and the task execution location of the pending operation and maintenance tasks, but also the items that the operation and maintenance personnel need to carry to perform the pending operation and maintenance tasks.

[0101] In this case, the step of selecting a traffic section from the operation and maintenance path map whose traffic restriction capacity meets the traffic requirements of the operation and maintenance task to be processed may include: selecting a traffic section from the operation and maintenance path map that can allow operation and maintenance personnel and / or the items they carry to pass through, and can bear the weight of the operation and maintenance personnel and / or the items they carry.

[0102] Refer to the following Figure 6 This chapter introduces the process of determining the capacity and carrying capacity of any road segment.

[0103] Figure 6 A flow chart showing steps of determining the throughput capacity and the carrying capacity of any traffic section according to an exemplary embodiment of the present invention.

[0104] Reference Figure 6 In step S601, the throughput capacity and carrying capacity of multiple typical road sections are determined in advance through experiments.

[0105] Here, various existing experimental testing methods can be used to obtain the throughput capacity and carrying capacity of each typical road section for multiple typical road sections.

[0106] In step S602, a typical road section matching any passable road section is determined from a plurality of typical road sections.

[0107] In step S603, the throughput capacity and the carrying capacity of the matched typical road section are determined as the throughput capacity and the carrying capacity of any passable road section.

[0108] In an exemplary embodiment of the present invention, a navigation method is proposed for planning work paths for operation and maintenance personnel of a photovoltaic power station. An optimal operation and maintenance path can be recommended to the operation and maintenance personnel based only on the current location of the operation and maintenance personnel, the task execution location of the operation and maintenance tasks to be processed, and the size and weight of the items carried. The optimal operation and maintenance path can enable the operation and maintenance personnel to pass smoothly while carrying items, and can also reduce the safety risks of the operation and maintenance personnel when passing through the photovoltaic power station plant.

[0109] There are many equipment and facilities used in photovoltaic power plants, and most locations in the plant may have operation and maintenance requirements. Due to different operation and maintenance requirements, the task types of photovoltaic power plant operation and maintenance tasks are also different, and the operation and maintenance paths required by operation and maintenance personnel for operation and maintenance tasks of different task types may also be quite different. As an example, task types may include but are not limited to point tasks and regional tasks.

[0110] For example, a point task may mean that the operation and maintenance personnel only need to move around a certain location in the photovoltaic power station to complete the operation and maintenance task. As an example, a point task may include but is not limited to fault handling (such as the tripping of a circuit breaker in a combiner box). The operation and maintenance personnel only need one passage from the current location to the fault location to handle the fault.

[0111] For example, a regional task may mean that the operation and maintenance personnel need to move within a larger area of ​​the photovoltaic power plant to complete the operation and maintenance task. As an example, the regional task may include but is not limited to photovoltaic module cleaning. For photovoltaic module cleaning, the operation and maintenance personnel not only need to reach the area where the photovoltaic module to be cleaned is located from the current location, but also need to walk along multiple paths in the designated area to complete the cleaning work.

[0112] For the problem of selecting the optimal operation and maintenance path for point tasks, the operation and maintenance personnel are concerned about how to reach the point task execution location along the shortest path from the current location. For the case of multiple point tasks, the optimal operation and maintenance path can refer to the path with the smallest sum of the path lengths for the operation and maintenance personnel to reach the task execution locations of multiple point tasks. For the problem of selecting the optimal operation and maintenance path for regional tasks, the operation and maintenance personnel are concerned about how to reach the location closest to the operation and maintenance personnel in the target area of ​​the regional task from the current location, and can obtain feasible paths in the target area.

[0113] Based on this, in a preferred embodiment, the navigation method of the photovoltaic power station operation and maintenance path according to the exemplary embodiment of the present invention can formulate the optimal operation and maintenance path for the pending operation and maintenance tasks of different task types. In this way, the navigation method can solve the search problem of a single pass path and the search problem of multiple pass paths with loops.

[0114] For example, the task type of the acquired pending operation and maintenance task is determined. If the task type of the acquired pending operation and maintenance task is a regional task, the shortest path from the current location of the operation and maintenance personnel to the predetermined location and the feasible path of the operation and maintenance personnel in the target area for performing the regional task are determined, and the determined shortest path and feasible path are determined as the optimal operation and maintenance path. Here, the predetermined location may refer to the location closest to the current location of the operation and maintenance personnel in the target area for performing the regional task.

[0115] That is to say, the determination of the optimal operation and maintenance path for the regional task involves two parts: the shortest path from the current position to the predetermined location and the feasible path within the target area. To determine the shortest path from the current position to the predetermined location, the restricted subgraph of the above-mentioned operation and maintenance path graph can be used to select the node closest to the current position in the target area, and then the Dijkstra algorithm is applied to calculate the shortest path from the current position to the selected node. For the feasible path within the target area, all the accessible paths that the operation and maintenance personnel can walk in the target area can be displayed to the operation and maintenance personnel.

[0116] If the task type of the acquired operation and maintenance task to be processed is a point task, the shortest path from the current location of the operation and maintenance personnel to the task execution location of the point task is determined as the optimal operation and maintenance path.

[0117] In one case, the task execution location of the point task is the location of the predetermined node in the operation and maintenance path diagram.

[0118] In this case, the shortest path from the current location of the operation and maintenance personnel to the location of the predetermined node can be determined as the shortest path from the current location of the operation and maintenance personnel to the task execution location of the point task. In other words, the shortest path determined is a passable path between two nodes on the operation and maintenance path graph. Here, the above shortest path can be determined based on the restricted subgraph and edge attributes of the operation and maintenance path graph, and the present invention will not repeat this part of the content.

[0119] In another case, the task execution location of the point task is the location of a point on a predetermined edge in the operation and maintenance path diagram.

[0120] In this case, the travel paths from the current location of the operation and maintenance personnel to the two endpoints of the predetermined edge where the task execution location of the point task is located can be determined, and the path with the shorter length among the travel paths from the current location of the operation and maintenance personnel to the two endpoints of the predetermined edge can be determined as the shortest path.

[0121] For example, the Dijkstra algorithm may be used to calculate the shortest paths from the current position to the two end points of the predetermined edge where the task execution location of the point task is located. However, the present invention is not limited thereto, and other methods may also be used to determine the shortest path.

[0122] by Figure 2 As an example, assume that the current location of the maintenance personnel is Figure 2 At node 1 in the figure, the pending operation and maintenance task is to remove the obstructions on the photovoltaic panels. The task execution location of the pending operation and maintenance task is located at the midpoint between nodes 5 and 6. Assuming that the weight of the operation and maintenance personnel is 75 kg and they do not need to carry tools or spare parts with them, the required pass level for the passage section of the pending operation and maintenance task is 1, and the carrying capacity of all passage sections can meet the requirements.

[0123] In view of the above traffic requirements, the restricted subgraph of the operation and maintenance path diagram is itself. Using the above method to determine the shortest path of a single point task, the optimal operation and maintenance path is (1,3,6). Among them, the length from node 1 to node 3 is l(1,3)=10, and the length from node 3 to node 6 is l(3,6)=5. In addition, the operation and maintenance personnel also need to pass through half of the passage section between nodes 5 and 6, that is, Therefore, the operation and maintenance personnel need to walk a total of

[0124] In a preferred example, the acquired operation and maintenance tasks to be processed may include multiple point tasks.

[0125] Due to the complexity of photovoltaic power stations, the locations of multiple point tasks may be scattered, dense, or even in the same location. When the execution locations of multiple point tasks are in the same location, they can be treated as a single point task, and the optimal operation and maintenance path of multiple point tasks can be determined by the method of finding the shortest path for a single point task. When the execution locations of multiple point tasks indicate the same node on the operation and maintenance path diagram, or the edges where the task execution locations are located share the same endpoint, they can also be treated as a single point task.

[0126] When the execution locations of multiple point tasks are relatively dispersed, the optimal operation and maintenance path for the multiple point tasks can be determined in the following way.

[0127] For example, in the case where the operation and maintenance tasks to be processed include multiple dispersed point tasks, the optimal operation and maintenance path may be a path with the smallest sum of the path lengths required for the operation and maintenance personnel to reach the task execution locations of the multiple point tasks.

[0128] A photovoltaic power plant may have operation and maintenance requirements at multiple locations at the same time. If the operation and maintenance personnel can perform multiple operation and maintenance tasks at one time, it can not only reduce the physical exertion of repeatedly entering the plant area, but also improve work efficiency. Figure 7 Let’s introduce the steps to determine the optimal operation and maintenance path for multiple point task situations.

[0129] Figure 7 A flow chart showing steps of determining an optimal operation and maintenance path for multiple point task situations according to an exemplary embodiment of the present invention.

[0130] Reference Figure 7 In step S701, multiple point tasks are grouped according to the traffic requirements of each point task to obtain multiple task sets.

[0131] Here, all point tasks in any task set have the same required throughput and / or carrying capacity for the passable road section. That is to say, multiple point tasks are grouped according to the required throughput and / or carrying capacity of each point task for the passable road section, and each point task in a task set may have the same required throughput for the passable road section, or the same required carrying capacity for the passable road section, or the same required throughput and carrying capacity for the passable road section.

[0132] In step S702, a travel path that satisfies the required passing capacity and / or carrying capacity of each point task in the ath task set is selected from the operation and maintenance path graph to form a restricted subgraph.

[0133] For example, when the execution locations of multiple point tasks are relatively dispersed, assume that these point tasks are divided into two task sets T 11 ,T 12 ,…,T 1r and T 21 ,T 22 ,…,T 2s The tasks T of each point in the first task set 11 ,T 12 ,…,T 1r There are r task execution locations in total, and the required passing level of each task on the passable road section is λ 1 , the load capacity is w 1 , the restricted subgraph of the operation and maintenance path graph G corresponding to the first task set is H 1 The tasks T of each point in the second task set 21 ,T 22,…,T 2s There are s task execution locations in total, and the required passing level for each task on the passable road section is λ 2 , the load capacity is w 2 , and λ 1 <λ 2 , w 1 <w 2 , the restricted subgraph H of the operation and maintenance path graph G corresponding to the second task set 2 .

[0134] In step S703, the shortest path from the current location of the operation and maintenance personnel to the task execution location of the to-be-determined point task in the ath task set is determined.

[0135] Here, the point task to be determined may be a point task other than the determined point tasks in all point tasks included in the current task set, and the determined point task may be a point task whose task execution location is within the shortest path determined for the processed task set.

[0136] For example, take the two task sets T listed above 11 ,T 12 ,…,T 1r and T 21 ,T 22 ,…,T 2s For example, assuming that the ath task set is the first task set, the second task set T 21 ,T 22 ,…,T 2s After the search is completed, the shortest paths to the s task execution locations are obtained. If the obtained shortest path passes through t task execution locations in the first task set (i.e., the t task execution locations in the a-th task set are in the shortest path obtained for the second task set), then in step S703, the path from the current location of the operation and maintenance personnel to the first task set T is determined. 11 ,T 12 ,…,T 1r The shortest path to the rt task execution locations in .

[0137] In step S704 , it is determined whether a is equal to A. Here, A refers to the number of the plurality of task sets, and A is a natural number greater than zero.

[0138] If a is not equal to A, execute step S705: make a=a+1, and return to execute step S702.

[0139] If a is equal to A, then step S706 is executed: the shortest paths determined for all task sets are connected to obtain the optimal operation and maintenance path from the current location of the operation and maintenance personnel to the task execution locations of the multiple point tasks.

[0140] It should be understood that the above-mentioned method for obtaining the shortest path assumes that all point tasks can be completed at one time. However, considering the urgency of point tasks, the mutual impact between point tasks, the need to transport original components after the installation of new spare parts, etc., the operation and maintenance personnel may not be able to complete all operation and maintenance tasks at one time. At this time, the operation and maintenance personnel can select some point tasks that can be completed at one time from all point tasks based on experience, and calculate the shortest path for the selected some point tasks.

[0141] Figure 8 A block diagram showing a navigation device for an operation and maintenance path of a photovoltaic power station according to an exemplary embodiment of the present invention.

[0142] like Figure 8 As shown, the navigation device for the operation and maintenance path of a photovoltaic power station according to an exemplary embodiment of the present invention includes: a path map construction module 10, an operation and maintenance task acquisition module 20 and an optimal path determination module 30.

[0143] Specifically, the path map construction module 10 constructs an operation and maintenance path map of the photovoltaic power station.

[0144] Here, the operation and maintenance path map may be a collection of work paths that the operation and maintenance personnel are allowed to pass through within the photovoltaic power station plant area, and the operation and maintenance path map includes multiple pass sections and the pass restriction capabilities of each pass section.

[0145] As an example, the operation and maintenance path graph may include a node set, an edge set, and attributes of the edges.

[0146] For example, each node in the node set can be the location of each device included in the photovoltaic power station. Two nodes with a passable road section are connected by an edge, indicating that there is a passable road section between the locations of the two devices connected by the edge. The attributes of the edge can indicate the traffic restriction capacity of the passable road section corresponding to the edge.

[0147] As an example, the traffic restriction capacity of each pass section may include but is not limited to the passing capacity of the pass section and the carrying capacity of the pass section.

[0148] The capacity of a road section is used to describe the ability of a road section to allow people and / or objects to pass through in space. For example, the capacity of a road section on the operation and maintenance path map can represent the pass level of the spatial capacity of the road section.

[0149] The carrying capacity of a road section is used to describe the carrying capacity of the road section. For example, the carrying capacity of a road section on the operation and maintenance path map may represent the weight of the operation and maintenance personnel and / or items that the road section is allowed to carry, that is, the carrying capacity of the road section.

[0150] In a preferred embodiment, the attributes of an edge may include not only the passing capacity and the carrying capacity of the passage segment corresponding to the edge, but also the length of the passage segment.

[0151] In an exemplary embodiment of the present invention, the above method can be adopted to pre-determine the throughput capacity, carrying capacity and length of each passage section within the photovoltaic power station plant area, and the path map construction module 10 constructs the operation and maintenance path map of the photovoltaic power station based on the above three parameters determined.

[0152] In a preferred embodiment, the navigation device for the operation and maintenance path of a photovoltaic power station according to an exemplary embodiment of the present invention may further include: a storage module (not shown in the figure) for storing the operation and maintenance path map in the form of an adjacency list.

[0153] As an example, the adjacency list may include multiple single linked lists established for multiple nodes in the operation and maintenance path graph.

[0154] For example, the single linked list of any node in each node may include a table node, and the table node may include an adjacent point field, a length field, a level field, a carrying capacity field and a first link field. The adjacent point field is used to store each node that has a pass section with any node in the operation and maintenance path diagram, the length field is used to store the length of the pass section from any node to the above-mentioned nodes, the level field is used to store the pass level indicating the passing capacity of the pass section from any node to the above-mentioned nodes, the carrying capacity field is used to store the carrying capacity indicating the carrying capacity of the pass section from any node to the above-mentioned nodes, and the first link field is used to point to the next node of any node.

[0155] The adjacency list may also include a head node, which may include a data field and a second link field, the data field is used to store all nodes included in the operation and maintenance path graph, and the second link field is used to point to the first table node in the single linked list.

[0156] The operation and maintenance task acquisition module 20 acquires the pending operation and maintenance tasks, and determines the passage requirements of the acquired pending operation and maintenance tasks.

[0157] The optimal path determination module 30 selects a passable road section whose traffic restriction capacity meets the traffic requirements of the pending operation and maintenance task from the operation and maintenance path diagram to determine the optimal operation and maintenance path for executing the pending operation and maintenance task.

[0158] In one example, the travel requirements of the pending operation and maintenance task may include the current location of the operation and maintenance personnel who will perform the pending operation and maintenance task and the task execution location of the pending operation and maintenance task.

[0159] In this case, the optimal path determination module 30 can select a traffic section whose traffic restriction capacity meets the traffic requirements of the operation and maintenance task to be processed from the operation and maintenance path map to form a restricted subgraph of the operation and maintenance path map, and determine the shortest path from the current location of the operation and maintenance personnel to the task execution location of the operation and maintenance task to be processed in the restricted subgraph as the optimal operation and maintenance path.

[0160] Here, the restricted subgraph may include at least one pass path from the current location of the operation and maintenance personnel to the task execution location of the operation and maintenance task to be processed.

[0161] As an example, the optimal path determination module 30 may determine the shortest path in the following manner based on the attributes of the edges.

[0162] For each pass path in at least one pass path, determine the pass sections included in the pass path, and obtain the length of each pass section from the attributes of the edges corresponding to each pass section. According to the length of each pass section included in each pass path, calculate the length of each pass path respectively, and determine the pass path with the shortest length as the shortest path.

[0163] Here, the length of the passable path included in the edge attribute may refer to the path length of the passable path in a two-dimensional plane or the path length of the passable path in a three-dimensional space layout. In a preferred embodiment, the optimal path determination module 30 may determine the length of any passable path by combining the three-dimensional space layout of the locations of the various devices included in the photovoltaic power station to determine the length of any passable path that the operation and maintenance personnel pass through in the three-dimensional space.

[0164] It should be understood that the passage requirements for the pending operation and maintenance tasks may include not only the current location of the operation and maintenance personnel who perform the pending operation and maintenance tasks and the task execution location of the pending operation and maintenance tasks, but also the items that the operation and maintenance personnel need to carry to perform the pending operation and maintenance tasks.

[0165] In this case, the optimal path determination module 30 selects a passage section from the operation and maintenance path map that allows the operation and maintenance personnel and / or the items they carry to pass through and can bear the weight of the operation and maintenance personnel and / or the items they carry, and determines the selected passage path as a passage section whose traffic restriction capacity meets the traffic requirements.

[0166] Preferably, the optimal path determination module 30 can determine the throughput capacity and carrying capacity of any passable road section in the following manner.

[0167] Determine the throughput and carrying capacity of multiple typical road sections in advance through experiments, determine the typical road section that matches any passable road section from the multiple typical road sections, and determine the throughput and carrying capacity of the matching typical road section as the throughput and carrying capacity of any passable road section.

[0168] Fig. 9 A block diagram of the optimal path determination module 30 according to an exemplary embodiment of the present invention is shown.

[0169] like Fig. 9 As shown, the optimal path determination module 30 according to an exemplary embodiment of the present invention may include: a task type determination submodule 301, a regional task operation and maintenance path determination submodule 302 and a point task operation and maintenance path determination submodule 303.

[0170] Specifically, the task type determination submodule 301 determines the task type of the acquired operation and maintenance task to be processed. As an example, the task type may include but is not limited to a point task and an area task.

[0171] If the task type of the acquired operation and maintenance task to be processed is a regional task, the regional task operation and maintenance path determination submodule 302 determines the shortest path from the current location of the operation and maintenance personnel to the predetermined location and the feasible path of the operation and maintenance personnel in the target area for performing the regional task, and determines the determined shortest path and feasible path as the optimal operation and maintenance path. Here, the predetermined location can be the location closest to the current location of the operation and maintenance personnel in the target area for performing the regional task.

[0172] If the task type of the acquired maintenance task to be processed is a point task, the point task maintenance path determination submodule 303 determines the shortest path from the current location of the maintenance personnel to the task execution location of the point task as the optimal maintenance path.

[0173] In one case, the task execution location of the point task is the location of the predetermined node in the operation and maintenance path diagram.

[0174] In this case, the point task maintenance path determination submodule 303 determines the shortest path from the current location of the maintenance personnel to the location of the predetermined node as the shortest path from the current location of the maintenance personnel to the task execution location of the point task.

[0175] In another case, the task execution location of the point task is the location of a point on a predetermined edge in the operation and maintenance path diagram.

[0176] In this case, the point task maintenance path determination submodule 303 determines the path with the shorter length among the paths from the current position of the maintenance personnel to the two end points of the predetermined edge as the shortest path.

[0177] In a preferred embodiment, the acquired operation and maintenance tasks to be processed may include multiple point tasks. In this case, the optimal operation and maintenance path may be a path with the smallest sum of the path lengths for the operation and maintenance personnel to reach the task execution locations of the multiple point tasks.

[0178] In the previous case, the point task operation and maintenance path determination submodule 303 can determine the optimal operation and maintenance path from the current location of the operation and maintenance personnel to the task execution locations of the multiple point tasks in the following manner.

[0179] According to the traffic requirements of each point task, multiple point tasks are grouped to obtain multiple task sets, where all point tasks in any task set have the same required throughput and / or carrying capacity for the pass section; the following operations are performed on each task set in turn: a traffic path that meets the required throughput and / or carrying capacity of each point task in the current task set is selected from the operation and maintenance path diagram to form a restricted subgraph, and the shortest path from the current position of the operation and maintenance personnel to the task execution location of the to-be-determined point task in the current task set is determined respectively, where the to-be-determined point task is a point task among all point tasks included in the current task set except the determined point task, and the determined point task is a point task whose task execution location is in the shortest path determined for the processed task set; the shortest paths determined for all task sets are connected to obtain the optimal operation and maintenance path from the current position of the operation and maintenance personnel to the task execution locations of multiple point tasks.

[0180] Fig.10 A block diagram of a controller according to an exemplary embodiment of the present invention is shown.

[0181] like Fig.10 As shown, the controller according to an exemplary embodiment of the present invention includes: a processor 100 , an input / output interface 200 , and a memory 300 .

[0182] Specifically, the memory 300 is used to store a computer program, and the computer program implements the above-mentioned navigation method of the photovoltaic power station operation and maintenance path when executed by the processor 100. The input / output interface 200 is used to connect various input / output devices.

[0183] here, Figure 1 The navigation method of the photovoltaic power station operation and maintenance path shown in Fig.10 That is, the above modules or units can be implemented by general hardware processors such as digital signal processors and field programmable gate arrays, or by dedicated hardware processors such as dedicated chips, or completely implemented in software through computer programs, for example, can be implemented as Fig.10 The various modules in the processor 100 are shown in FIG.

[0184] According to an exemplary embodiment of the present invention, there is also provided a portable electronic terminal, which includes the above-mentioned controller. As an example, the portable electronic terminal may include but is not limited to handheld devices such as smart phones and tablet computers.

[0185] For example, after the maintenance personnel input the current location, the task execution location of the pending maintenance task, and the size and weight of the items carried on the portable electronic terminal, an optimal maintenance path for executing the pending maintenance task can be automatically obtained based on the above navigation method, which can not only prompt the maintenance personnel to smoothly pass through the corresponding road section while carrying items, but also minimize the safety risks of the maintenance personnel. Based on this, the portable electronic terminal according to the exemplary embodiment of the present invention may also include an input interface and a display for receiving the input of the maintenance personnel and displaying the determined optimal maintenance path to the maintenance personnel. As an example, the portable electronic terminal may include but is not limited to a touch screen.

[0186] In this way, the operation and maintenance personnel can search for an operation and maintenance path that meets the requirements before executing the operation and maintenance task, and can also find the operation and maintenance path to the task execution location of other operation and maintenance tasks at any time at the task execution location of a certain operation and maintenance task.

[0187] In addition, the operation and maintenance path information between multiple portable electronic terminals can be shared, so that the modification of the operation and maintenance path information within a photovoltaic power station by some operation and maintenance personnel can be obtained and used by other colleagues. Here, the operation and maintenance path information may include but is not limited to information indicating whether a passable road section exists, the length of the passable road section, the pass level of the passable road section, and the carrying capacity of the passable road section.

[0188] According to an exemplary embodiment of the present invention, there is also provided a computer-readable storage medium storing a computer program. The computer-readable storage medium stores a computer program that, when executed by a processor, causes the processor to execute the navigation method of the photovoltaic power plant operation and maintenance path described above. The computer-readable recording medium is any data storage device that can store data read out by a computer system. Examples of computer-readable recording media include: read-only memory, random access memory, read-only optical disk, magnetic tape, floppy disk, optical data storage device, and carrier wave (such as data transmission through the Internet via a wired or wireless transmission path).

[0189] The navigation method and device for the photovoltaic power station operation and maintenance path of the exemplary embodiment of the present invention can provide the optimal operation and maintenance path for the operation and maintenance personnel when their work locations are in multiple photovoltaic power stations or when new employees join the operation and maintenance of multiple photovoltaic power stations.

[0190] With the increase in the number of managed photovoltaic power stations and the addition of new employees, the familiarity of operation and maintenance personnel with each power station has gradually weakened, especially when the photovoltaic power station is built in a complex area such as the roof of a residential building or a factory building. The unfamiliarity of the operation and maintenance personnel with the power station area will not only affect work efficiency, but also pose certain safety hazards. The navigation method and device of the operation and maintenance path according to the exemplary embodiment of the present invention can not only prompt the operation and maintenance personnel to smoothly pass through the complex passage section while carrying items, but also minimize the safety risks of the operation and maintenance personnel.

[0191] Based on the operation and maintenance path navigation method and device of the exemplary embodiment of the present invention, the operation and maintenance personnel only need to provide the current location, the task execution location, and the size and weight of the items carried to obtain an optimal operation and maintenance path, which increases the operation and maintenance personnel's familiarity with the photovoltaic power station plant area, improves work efficiency, and reduces safety risks.

[0192] In addition, according to the navigation method and device of the operation and maintenance path of the photovoltaic power station according to the exemplary embodiment of the present invention, the operation and maintenance tasks in the photovoltaic power station are divided into single-point tasks, multiple-point tasks and regional tasks, and a corresponding operation and maintenance path obtaining method is given for each operation and maintenance task. This enables operation and maintenance personnel, especially newly employed operation and maintenance personnel, to find the most suitable operation and maintenance path for one or more operation and maintenance tasks in a complex photovoltaic power station plant more quickly.

[0193] While the invention has been shown and described with reference to the preferred embodiments, it will be understood by those skilled in the art that various modifications and variations may be made to these embodiments without departing from the spirit and scope of the invention as defined by the appended claims.

Claims

1. A navigation method for a photovoltaic power station operation and maintenance path, characterized in that: The navigation method comprises: Constructing an operation and maintenance path map of the photovoltaic power station, wherein the operation and maintenance path map includes a plurality of passable sections and the pass restriction capacity of each passable section; Obtain pending operation and maintenance tasks, and determine the passing requirements of the acquired pending operation and maintenance tasks; Selecting a passage section whose traffic restriction capacity meets the traffic requirements from the operation and maintenance path map to determine the optimal operation and maintenance path for executing the operation and maintenance task to be processed, The operation and maintenance tasks to be processed include multiple point tasks, and the step of determining the optimal operation and maintenance path for the multiple point tasks includes: According to the traffic requirements of each point task, the plurality of point tasks are grouped to obtain a plurality of task sets, wherein all the point tasks in any task set have the same required passing capacity and / or carrying capacity for the traffic section; Selecting a travel path that satisfies the required passing capacity and / or carrying capacity of each point task in the ath task set from the operation and maintenance path diagram, and when the task set is selected for the first time, a is 1; Determine the shortest path from the current position of the operation and maintenance personnel to the task execution location of the undetermined point task in the a-th task set, wherein the undetermined point task is a point task other than the determined point tasks among all the point tasks included in the a-th task set, and the determined point task is a point task whose task execution location is within the shortest path determined for the processed task set; In response to a not being equal to A, make a=a+1, and return to execute the step of determining the shortest path, wherein A is the number of the multiple task sets; in response to a being equal to A, connect the shortest paths determined for all task sets to obtain the optimal operation and maintenance path from the current location of the operation and maintenance personnel to the task execution locations of the multiple point tasks.

2. The navigation method according to claim 1, characterized in that: The operation and maintenance path graph includes a node set, an edge set and edge attributes. Among them, each node in the node set is the location of each device included in the photovoltaic power station. Two nodes with a passable section are connected by an edge, indicating that there is a passable section between the locations of the two devices connected by the edge, and the attribute of the edge indicates the pass restriction capacity of the passable section corresponding to the edge.

3. The navigation method according to claim 2, characterized in that: The operation and maintenance path graph is stored in the form of an adjacency list; The adjacency list includes a plurality of single linked lists established for a plurality of nodes in the operation and maintenance path graph, Among them, the single linked list of any node in each node includes a table node, and the table node includes an adjacent point field, a length field, a level field, a carrying capacity field and a first link field. The adjacent point field is used to store each node that has a pass section with the any node in the operation and maintenance path diagram, the length field is used to store the length of the pass section from the any node to the each node, the level field is used to store the pass level indicating the passing capacity of the pass section from the any node to the each node, the carrying capacity field is used to store the carrying capacity indicating the carrying capacity of the pass section from the any node to the each node, and the first link field is used to point to the next node of the any node. The adjacency list also includes a head node, which includes a data field and a second link field. The data field is used to store all nodes included in the operation and maintenance path diagram, and the second link field is used to point to the first table node in the single linked list.

4. The navigation method according to claim 2, characterized in that: The passage requirements include the current location of the operation and maintenance personnel who will perform the pending operation and maintenance task and the task execution location of the pending operation and maintenance task. The step of selecting a passage section whose restricted capacity meets the passage requirement from the operation and maintenance path map to determine the optimal operation and maintenance path for executing the operation and maintenance task to be processed includes: Selecting a traffic section whose traffic restriction capacity meets the traffic requirement from the operation and maintenance path map to form a restricted subgraph of the operation and maintenance path map; The shortest path from the current position of the operation and maintenance personnel to the task execution location of the pending operation and maintenance task in the restricted subgraph is determined as the optimal operation and maintenance path.

5. The navigation method according to claim 4, characterized in that: The attributes of the edge also include the length of the passable road segment, and the restricted subgraph includes at least one passable path from the current location of the operation and maintenance personnel to the task execution location of the operation and maintenance task to be processed. The shortest path is determined in the following manner: For each of the at least one passable path, determine each passable segment included in the passable path, and obtain the length of each passable segment from the attributes of the edge corresponding to each passable segment. According to the length of each passage section contained in each passage, the length of each passage is calculated separately. The travel path with the shortest length is determined as the shortest path.

6. The navigation method according to claim 1 or 4, characterized in that: The passage requirements for pending operation and maintenance tasks also include the items that the operation and maintenance personnel need to carry when performing the pending operation and maintenance tasks. The traffic restriction capacity of each road section includes the passing capacity and carrying capacity of the road section. The passing capacity represents the passing level of the spatial passing capacity of the road section. The passing capacity is used to describe the ability of the road section to allow people and / or objects to pass through in space. The carrying capacity is used to describe the ability of the road section to carry loads. The step of selecting a traffic section whose traffic restriction capacity meets the traffic requirements from the operation and maintenance path map includes: A passage section that allows the operation and maintenance personnel and / or the items they carry to pass through and can bear the weight of the operation and maintenance personnel and / or the items they carry is selected from the operation and maintenance path map.

7. The navigation method according to claim 6, characterized in that: The capacity and carrying capacity of any road section are determined by: Determine the throughput and load-bearing capacity of multiple typical road sections through experiments in advance; Determine a typical road section matching any one of the passable road sections from the multiple typical road sections; The throughput capacity and carrying capacity of the matching typical road section are determined as the throughput capacity and carrying capacity of any of the passable road sections.

8. The navigation method according to claim 4, characterized in that: The step of determining the optimal operation and maintenance path for executing the operation and maintenance task to be processed includes: Determine the task type of the acquired operation and maintenance task to be processed, wherein the task type includes point tasks and regional tasks; If the task type of the acquired operation and maintenance task to be processed is a point task, the shortest path from the current location of the operation and maintenance personnel to the task execution location of the point task is determined as the optimal operation and maintenance path; If the task type of the acquired operation and maintenance task to be processed is an area task, the shortest path from the current location of the operation and maintenance personnel to the predetermined location and the feasible path for the operation and maintenance personnel in the target area for performing the area task are determined, and the determined shortest path and feasible path are determined as the optimal operation and maintenance path, wherein the predetermined location is the location closest to the current location of the operation and maintenance personnel in the target area for performing the area task.

9. A navigation device for a photovoltaic power station operation and maintenance path, characterized in that: The navigation device comprises: A path map construction module is used to construct an operation and maintenance path map of the photovoltaic power station, wherein the operation and maintenance path map includes a plurality of passable sections and the pass restriction capacity of each passable section; An operation and maintenance task acquisition module is used to acquire pending operation and maintenance tasks and determine the passage requirements of the acquired pending operation and maintenance tasks; An optimal path determination module selects a passage section whose traffic restriction capacity meets the traffic requirements from the operation and maintenance path map to determine an optimal operation and maintenance path for executing the operation and maintenance task to be processed; The operation and maintenance tasks to be processed include multiple point tasks. For the multiple point tasks, the optimal path determination module determines the optimal operation and maintenance path in the following manner: According to the traffic requirements of each point task, the plurality of point tasks are grouped to obtain a plurality of task sets, wherein all the point tasks in any task set have the same required passing capacity and / or carrying capacity for the traffic section; Selecting a travel path that satisfies the required passing capacity and / or carrying capacity of each point task in the ath task set from the operation and maintenance path diagram, and when the task set is selected for the first time, a is 1; Determine the shortest path from the current position of the operation and maintenance personnel to the task execution location of the undetermined point task in the a-th task set, wherein the undetermined point task is a point task other than the determined point tasks among all the point tasks included in the a-th task set, and the determined point task is a point task whose task execution location is within the shortest path determined for the processed task set; In response to a not being equal to A, make a=a+1, and return to execute the step of determining the shortest path, wherein A is the number of the multiple task sets; in response to a being equal to A, connect the shortest paths determined for all task sets to obtain the optimal operation and maintenance path from the current location of the operation and maintenance personnel to the task execution locations of the multiple point tasks.

10. The navigation device according to claim 9, wherein: The operation and maintenance path graph includes a node set, an edge set and edge attributes. Among them, each node in the node set is the location of each device included in the photovoltaic power station. Two nodes with a passable section are connected by an edge, indicating that there is a passable section between the locations of the two devices connected by the edge, and the attribute of the edge indicates the pass restriction capacity of the passable section corresponding to the edge.

11. The navigation device according to claim 10, wherein: The navigation device further comprises a storage module for storing the operation and maintenance path map in the form of an adjacency list; The adjacency list includes a plurality of single linked lists established for a plurality of nodes in the operation and maintenance path graph, Among them, the single linked list of any node in each node includes a table node, and the table node includes an adjacent point field, a length field, a level field, a carrying capacity field and a first link field. The adjacent point field is used to store each node that has a pass section with the any node in the operation and maintenance path diagram, the length field is used to store the length of the pass section from the any node to the each node, the level field is used to store the pass level indicating the passing capacity of the pass section from the any node to the each node, the carrying capacity field is used to store the carrying capacity indicating the carrying capacity of the pass section from the any node to the each node, and the first link field is used to point to the next node of the any node. The adjacency list also includes a head node, which includes a data field and a second link field. The data field is used to store all nodes included in the operation and maintenance path diagram, and the second link field is used to point to the first table node in the single linked list.

12. The navigation device according to claim 10, wherein: The passage requirements include the current location of the operation and maintenance personnel who will perform the pending operation and maintenance task and the task execution location of the pending operation and maintenance task. Among them, the optimal path determination module selects a traffic section whose traffic restriction capacity meets the traffic requirements from the operation and maintenance path map to form a restricted subgraph of the operation and maintenance path map, and determines the shortest path from the current position of the operation and maintenance personnel to the task execution location of the operation and maintenance task to be processed in the restricted subgraph as the optimal operation and maintenance path.

13. The navigation device according to claim 12, wherein: The attributes of the edge also include the length of the passable road segment, and the restricted subgraph includes at least one passable path from the current location of the operation and maintenance personnel to the task execution location of the operation and maintenance task to be processed. The optimal path determination module determines the shortest path in the following manner: For each of the at least one passable path, determine each passable segment included in the passable path, and obtain the length of each passable segment from the attributes of the edge corresponding to each passable segment. According to the length of each passage section contained in each passage, the length of each passage is calculated separately. The travel path with the shortest length is determined as the shortest path.

14. The navigation device according to claim 9 or 12, characterized in that: The passage requirements for pending operation and maintenance tasks also include the items that the operation and maintenance personnel need to carry when performing the pending operation and maintenance tasks. The traffic restriction capacity of each road section includes the passing capacity and carrying capacity of the road section. The passing capacity represents the passing level of the spatial passing capacity of the road section. The passing capacity is used to describe the ability of the road section to allow people and / or objects to pass through in space. The carrying capacity is used to describe the ability of the road section to carry loads. Among them, the optimal path determination module selects a passage section from the operation and maintenance path map that can allow the operation and maintenance personnel and / or the items they carry to pass through and can bear the weight of the operation and maintenance personnel and / or the items they carry.

15. The navigation device according to claim 14, characterized in that: The optimal path determination module determines the throughput and carrying capacity of any road section in the following ways: Determine the throughput and load-bearing capacity of multiple typical road sections through experiments in advance; Determine a typical road section matching any one of the passable road sections from the multiple typical road sections; The throughput capacity and carrying capacity of the matching typical road section are determined as the throughput capacity and carrying capacity of any of the passable road sections.

16. The navigation device according to claim 12, wherein: The optimal path determination module includes: A task type determination submodule determines the task type of the acquired operation and maintenance task to be processed, wherein the task type includes a point task and an area task; The point task operation and maintenance path determination submodule determines the shortest path from the current location of the operation and maintenance personnel to the task execution location of the point task as the optimal operation and maintenance path if the task type of the acquired operation and maintenance task to be processed is a point task; The regional task operation and maintenance path determination submodule, if the task type of the acquired operation and maintenance task to be processed is a regional task, determines the shortest path from the current position of the operation and maintenance personnel to the predetermined location and the feasible path for the operation and maintenance personnel in the target area for performing the regional task, and determines the determined shortest path and feasible path as the optimal operation and maintenance path, wherein the predetermined location is the location closest to the current position of the operation and maintenance personnel in the target area for performing the regional task.

17. A controller, characterized in that: include: processor; Input\output interface; A memory for storing a computer program, wherein the computer program, when executed by the processor, implements the navigation method for the photovoltaic power station operation and maintenance path as described in any one of claims 1 to 8.

18. A portable electronic terminal, characterized in that: Comprising a controller as claimed in claim 17.

19. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the navigation method for the photovoltaic power station operation and maintenance path as described in any one of claims 1 to 8 is implemented.