Power system transmission congestion management method, system, device and storage medium

By obtaining several operating states of the power system and calculating the transmission congestion management cost and local power shortage probability, combined with the artificial fish swarm algorithm and probabilistic neural network, the optimal operating state is selected for power system transmission congestion management, which solves the problem of transmission line problems in the existing technology. The problem of reduced reliability is achieved to achieve economical and reliable operation of the power system.

CN112580868BActive Publication Date: 2024-10-22CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011497562.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-17
Publication Date
2024-10-22
Estimated Expiration
2040-12-17

AI Technical Summary

Technical Problem

Existing power system transmission congestion management methods do not consider the reliability of transmission line operation, resulting in reduced stability and reliability of transmission lines after optimal power flow.

Method used

By obtaining several operating states of the power system, calculating the cost of transmission congestion management and the probability of local power shortage, combined with the artificial fish swarm algorithm and probabilistic neural network, the optimal operating state is selected to achieve transmission congestion management of the power system and ensure the economy of the power system. , reliable operation.

Benefits of technology

It effectively takes into account the optimal power flow of the power system and the stability and reliability of the transmission line, avoids the problem of reduced reliability when transmission is blocked, and ensures the economic and safe operation of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112580868B_ABST
    Figure CN112580868B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of power system transmission management, and discloses a power system transmission congestion management method, system, equipment and storage medium, including: obtaining several operating states of the power system; obtaining the transmission congestion management cost of the power system under each operating state; obtaining the probability of local power shortage of the power system under each operating state; taking the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, selecting the optimal operating state from several operating states, and performing power system transmission congestion management according to the optimal operating state. By taking the combination of the transmission congestion management cost and the probability of local power shortage that characterizes the reliability of the power system as comprehensive evaluation indicators, the power system transmission congestion management is performed, which can take into account the optimal power flow of the power system and the stability and reliability of the operation of the transmission line, and the obtained power system transmission congestion management transmission management strategy can ensure the economical and reliable operation of the power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power system transmission management, and relates to a power system transmission congestion management method, system, equipment and storage medium. Background Art

[0002] With the deepening of power system reform and the gradual opening of the power market, cross-regional transactions aimed at absorbing clean energy are playing an extremely important role. The current power system is still based on provinces. When realizing cross-regional and inter-provincial power market transactions, the transmission congestion problem in some regions is still an urgent problem to be solved. The cross-regional and inter-provincial transmission congestion is mainly due to the fact that the output of the generator sets makes the absolute value of the active power flow of the transmission line exceed its safety limit and safety margin, and the active power flow of the transmission line depends on the grid structure and the output of the generator sets. With the massive increase in distributed energy connected to the power grid and the differences in power systems across regions and provinces, the direction of the power flow in the power grid has gradually developed from a one-way flow from the power grid to the user side to a two-way flow, which affects the realization of the power market transaction plan, threatens the safe operation of the power system, restricts the development of the inter-provincial power market, is not conducive to the optimal allocation of resources, and affects the efficiency and economic benefits of the power market to a certain extent. The management of transmission congestion in the cross-regional and inter-provincial power market is a complex problem involving many nonlinear factors. On the one hand, it is necessary to ensure the economic efficiency of the power system operation, and on the other hand, it must ensure its safe and reliable operation.

[0003] At present, the congestion management strategy is generally determined by solving the optimal power flow problem. For example, CN108960485A discloses an online dictionary learning probability optimal power flow method under the source-load interactive power market, which uses a learning method to train a large number of Monte Carlo simulation sampling samples to obtain the results with the highest frequency, effectively avoiding a large number of repetitive calculations of DC optimal power flow; CN106208048A discloses a congestion management method based on graph theory, which proposes to map the topology of the power grid structure into a graph, map the electrical quantity into the graph and become the weight, and use the graph theory method to find a path with the minimum cost and the maximum flow for reference by the dispatching department to avoid power flow congestion; CN104158188A discloses a transmission congestion elimination method with the participation of interruptible loads, which takes the minimum social cost caused by congestion as the goal, constructs a DC optimal power flow model that coordinates the output adjustment of the unit and the dispatch of the interruptible load, and uses the sensitivity method to eliminate the blocked lines.

[0004] However, when solving the transmission congestion problem, the above solutions are all based on the calculation of the optimal power flow, with the minimum congestion management cost as the objective function, without considering the reliability of the operation of each transmission line when the power market is congested. This may easily result in the realization of the optimal power flow, but the stability and reliability of the operation of each transmission line will be reduced after the power flow is transferred. Summary of the invention

[0005] The purpose of the present invention is to overcome the disadvantages of the prior art that the existing transmission congestion management method does not take into account the reliability of the operation of each transmission line when the power market is congested, which easily leads to the reduction of the stability and reliability of the operation of each transmission line after the power flow is transferred despite the optimal power flow. A method, system, device and storage medium for power system transmission congestion management are provided.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] In a first aspect of the present invention, a method for managing transmission congestion in a power system comprises the following steps:

[0008] Obtaining several operating states of the power system;

[0009] Obtain the transmission congestion management cost of the power system under various operating conditions;

[0010] Obtain the probability of local power shortage of the power system under various operating conditions;

[0011] Taking the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, the optimal operating state is selected from several operating states, and the power system transmission congestion management is carried out according to the optimal operating state.

[0012] The power system transmission congestion management method of the present invention is further improved in that:

[0013] The operating status includes the output of each unit in the power system. The specific method of obtaining several operating statuses of the power system is:

[0014] According to the load demand of the power system, based on the power system operation constraints and the output range of each unit in the power system, and according to the output of each unit in the power system on the previous day, several operating states of the power system are obtained.

[0015] The power system operation constraints include power system balance constraints, generator set output constraints, transmission channel capacity constraints and bus voltage phase angle offset constraints.

[0016] The specific method for obtaining the transmission congestion management cost of the power system under each operating state is as follows:

[0017] The minimum dispatching cost of the power system is obtained based on the load demand of the power system and the quotation information of each unit in the power system. The congestion dispatching cost of the power system in each operating state is obtained based on the quotation information of each unit in the power system and the operating state of the power system. The difference between the congestion dispatching cost of the power system in each operating state and the minimum dispatching cost of the power system is used as the transmission congestion management cost of the power system in each operating state.

[0018] The specific method for obtaining the probability of local power shortage of the power system in each operating state is as follows:

[0019] The artificial fish swarm algorithm is used to obtain the probability of local power shortage in the power system under various operating conditions.

[0020] The specific method of obtaining the probability of local power shortage of the power system under each operating state by the artificial fish swarm algorithm is as follows:

[0021] Take each operating state as the current operating state and perform the following steps to obtain the local power shortage probability of the power system in each operating state: for each transmission line in the power system in the current operating state, a random initial local power shortage probability is generated by adopting the random number principle; based on the initial local power shortage probability of each transmission line, the load that each transmission line may operate, and the rated capacity of each unit included in each transmission line, the loaded unit capacity and the forced shutdown probability, an update objective function of the artificial fish school algorithm is constructed; according to the updated objective function, the initial local power shortage probability of each transmission line is iteratively updated through the foraging behavior, clustering behavior and tail-end behavior of the artificial fish school algorithm, the local power shortage probability of each transmission line is obtained and combined, and the local power shortage probability of the power system in the current state is obtained.

[0022] The specific method of selecting the optimal operating state from a plurality of operating states is:

[0023] The transmission congestion management cost and the probability of local power shortage in each operating state are combined to obtain the characteristic samples of each operating state. The characteristic samples of each operating state are input into the congestion management strategy decision model based on probabilistic neural network. The lowest transmission congestion management cost and the lowest probability of local power shortage are taken as comprehensive evaluation indicators. The operating state with the largest posterior probability is obtained as the optimal operating state.

[0024] In a second aspect of the present invention, a power system transmission congestion management system includes:

[0025] A first acquisition module is used to acquire several operating states of the power system;

[0026] The second acquisition module is used to acquire the transmission congestion management cost of each operating state;

[0027] A third acquisition module is used to acquire the probability of local power shortage of the power system in each operating state; and

[0028] The transmission congestion management module is used to select the optimal operating state from several operating states based on the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, and perform power system transmission congestion management according to the optimal operating state.

[0029] In a third aspect of the present invention, a computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned power system transmission congestion management method when executing the computer program.

[0030] A fourth aspect of the present invention is a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned power system transmission congestion management method are implemented.

[0031] Compared with the prior art, the present invention has the following beneficial effects:

[0032] The power system transmission congestion management method of the present invention obtains several operating states of the power system in advance, then obtains the transmission congestion management cost of the power system under each operating state, and on this basis, takes the probability of local power shortage as an indicator of the reliability of the power system, and obtains the probability of local power shortage of the power system under each operating state. According to the analysis of the operating state of the power transmission line of the power system, when the probability of local power shortage is the smallest, the reliability of the power system is the highest. Finally, the combination of the transmission congestion management cost and the probability of local power shortage that characterizes the reliability of the power system is used as a comprehensive evaluation index to perform power system transmission congestion management, which can take into account the optimal power flow of the power system and the stability and reliability of the operation of the transmission line, and effectively overcomes the problem that the reliability of the operation of each transmission line is not considered when the power system is congested, which easily causes the problem that although the optimal power flow is achieved, the stability and reliability of the operation of each transmission line after the power flow is transferred are reduced. The obtained power system transmission congestion management transmission management strategy can ensure the economical and reliable operation of the power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A flowchart of a method for managing power system transmission congestion according to an embodiment of the present invention;

[0034] Figure 2 It is a flowchart of a method for determining the probability of local power shortage in an electric power system based on an artificial fish swarm algorithm according to an embodiment of the present invention;

[0035] Figure 3 A schematic diagram of the structure of a congestion management strategy decision model according to an embodiment of the present invention;

[0036] Figure 4 The figure is a structural block diagram of a power system transmission congestion management system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0037] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0038] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0039] First, several technical terms involved in the embodiments of the present invention are further explained here.

[0040] Power congestion: Congestion means that the demand for power transmission is greater than the actual physical transmission capacity of the transmission network. Depending on the location where the congestion occurs, it can be divided into transmission congestion within the region and transmission congestion between regions. The fundamental cause of the congestion is the imbalance of power generation and transmission in different regions.

[0041] Transmission congestion management: Congestion management refers to the measures and methods taken when network congestion occurs. The main purpose of transmission congestion management is to coordinate the users of transmission interconnection lines between various regions and effectively manage the transmission plan of interconnection lines in order to maximize the use of system resources and achieve social and economic benefits.

[0042] Artificial fish school algorithm: The artificial fish school algorithm is a bionic optimization scheme proposed by Li Xiaolei, an associate professor at Shandong University in 2002, who was inspired by the various mobile and searching characteristics of fish in search of food. The algorithm achieves optimization by constructing artificial fish to imitate the foraging, clustering and chasing behaviors of fish schools.

[0043] The present invention is further described in detail below in conjunction with the accompanying drawings:

[0044] See also Figure 1 In one embodiment of the present invention, a method for managing transmission congestion in a power system is provided, by obtaining the transmission congestion management cost and reliability index of the power system in each operating state, and taking the probability of local power shortage as the reliability index. In order to determine the optimal transmission congestion management strategy, the circuit system operation cost is the lowest and the power system operation reliability is the highest as the comprehensive evaluation index, and the optimized power flow operation mode is determined to achieve safe and reliable operation of the power system. Specifically, the power system transmission congestion management method includes the following steps.

[0045] S1: Obtain several operating states of the power system.

[0046] Specifically, in this embodiment, the several operating states of the power system mainly refer to the set of outputs of each unit in the power system under the load requirements of the power system. By making each unit assume different outputs, several operating states of the power system can be obtained.

[0047] In this embodiment, the specific method for obtaining several operating states of the power system is: according to the load demand of the power system, based on the operating constraints of the power system and the output range of each unit in the power system, the output of each unit in the power system is randomly set to obtain several operating states of the power system.

[0048] Preferably, the power system operation constraints include power system balance constraints, generator set output constraints, transmission channel capacity constraints and bus voltage phase angle offset constraints.

[0049] Among them, the power system balance constraint includes active and reactive power balance, and its mathematical model can be expressed as:

[0050]

[0051] Where i = 1, 2, 3...n, n represents the total number of power transmission lines in the power system, γ is the load margin, P G,i , Q G,i is the active power and reactive power of the i-th unit, P L,i , Q L,i is the active power and reactive power of the ith bus, Ui, U j represents the voltage of busbars i and j, G ij is the conductance of line ij, B ij is the admittance of line ij, (δ i -δ j )The phase angle difference of line ij.

[0052] The output constraint of the generator set is that the active power, reactive power and voltage amplitude of each generator set in the power system need to be constrained within the specified limit. Its mathematical model can be expressed as:

[0053]

[0054] Among them, U G,i is the voltage amplitude of the i-th generator set.

[0055] The transmission channel capacity constraint takes into account the line voltage and thermal stability constraints, and its mathematical model can be expressed as:

[0056]

[0057] Among them, S ij is the line flow, is the thermal stability constraint of the connecting line between busbar i and busbar j; β L is the state of line L. When the line is open, no power is transmitted on the line.

[0058] The bus voltage phase angle offset constraint is constrained by considering the voltage phase angle to limit the phase angle offset of each bus voltage, as described in the following formula:

[0059]

[0060] Among them, δ k is the voltage phase angle of the kth bus, and the voltage phase angle offset of each bus is limited to ±10°.

[0061] S2: Obtain the transmission congestion management cost of the power system under each operating state.

[0062] Specifically, in this embodiment, the minimum dispatching cost of the power system is obtained based on the load demand of the power system and the quotation information of each unit in the power system; the dispatching cost of the power system in each operating state is obtained based on the quotation information of each unit in the power system and the operating state of the power system; the difference between the dispatching cost of the power system in each operating state and the minimum dispatching cost of the power system is used as the transmission congestion management cost of the power system in each operating state.

[0063] Assuming that the power system does not reduce load during power dispatch, the transmission congestion management cost of the power system under each operating state is obtained as follows:

[0064] ΔC=C1-C0

[0065] Among them, △C represents the transmission congestion management cost of the power system, C0 and C1 are the dispatching costs before and after congestion respectively. When the transmission congestion management cost is minimized, the system operating cost can be minimized.

[0066] The minimum dispatch cost of the power system is obtained as follows: without considering the line transmission restrictions, a mathematical model is established with the minimum clearing price as the objective function:

[0067] f=Minλ0

[0068] The constraints are:

[0069]

[0070] Among them, λ0 represents the clearing price without considering the congestion situation, P j,0 is the net injected power at node j; P loss is the total active power loss of the transmission line; c i (·) is the power generation cost function of unit i; P i,0 is the output of unit i, P i,min , P i,max are the upper and lower limits of the output of unit i.

[0071] Therefore, the pre-blocking scheduling cost is obtained C 0, that is, the minimum dispatch cost of the power system is:

[0072] C0=∑ i c i (P i,0 )

[0073] When the output of the units involved in power generation causes the power transmitted by each line to exceed the limit, it is necessary to re-arrange the dispatch under the premise of considering the operation constraints of the power system, and establish a mathematical model with the lowest difference between the dispatch cost of the power system under each operating state and the minimum dispatch cost of the power system as the objective function:

[0074] f=minC=∑ i ΔC i

[0075] The constraints are:

[0076]

[0077] Among them, △C i is the dispatch cost of unit i, P L is the active power transmitted by line L, and its upper limit is P L,max express.

[0078] By solving the model, the output P of each generator set is obtained. i,1After that, the congestion dispatching cost can be solved according to the objective function model. Therefore, after obtaining several operating states of the power system, the congestion dispatching cost of the power system in each operating state can be obtained according to the above model.

[0079] S3: Obtain the probability of local power shortage in the power system under each operating state.

[0080] When considering the reliability of the power system as the goal, the power system reliability indicator - the local power shortage probability (Loss of Load Probability, LOLP) is used as the evaluation benchmark. According to the analysis of the operating status of the power system transmission line, each transmission line may have a power outage. When the probability of local power shortage is the smallest, the power system reliability is the highest. Here, the local power shortage probability is represented by κ. According to the distribution of power system transmission lines, a system operation reliability operation strategy with the highest system operation reliability based on the local power shortage probability κ is constructed. κ i Refers to the reliability indicator of the i-th line.

[0081] Specifically, in this embodiment, the probability of local power shortage of the power system under each operating state is obtained through the artificial fish school algorithm. The artificial fish school algorithm is a bionic optimization scheme elaborated by Li Xiaolei, an associate professor of Shandong University, in 2002, inspired by the various mobile and searching characteristics of fish in the phenomenon of searching for food. The algorithm constructs artificial fish to imitate the foraging, clustering and tail-chasing behaviors of fish schools, thereby achieving optimization.

[0082] In order to achieve real-time and rapid determination of the probability of local power shortage in the power system under each operating state, a method for determining the probability of local power shortage in the power system based on an artificial fish school algorithm is proposed, including taking each operating state as the current operating state and performing the following steps to obtain the probability of local power shortage in the power system under each operating state: for each transmission line in the power system under the current operating state, a random initial probability of local power shortage is generated by adopting the random number principle; based on the initial probability of local power shortage of each transmission line, the load that each transmission line may operate, and the rated capacity of each unit included in each transmission line, the loaded unit capacity and the forced shutdown probability, an update objective function of the artificial fish school algorithm is constructed; according to the update objective function, the initial probability of local power shortage of each transmission line is iteratively updated through the foraging behavior, clustering behavior and tail-end behavior of the artificial fish school algorithm, the local power shortage probability of each transmission line is obtained and combined, and the local power shortage probability of the power system in the current state is obtained.

[0083] For details, see Figure 2, where i is the number of fish schools, m represents the size of the fish school, the larger the m, the stronger the ability to jump out of the local optimal solution, and the faster the convergence speed, but the larger the m, the greater the amount of calculation will increase the system burden, so under the premise of ensuring convergence, the size of the school must be reduced as much as possible; S represents the iteration step size, and the convergence speed of the artificial fish school is corrected by adjusting S; V represents the field of view of the artificial fish, the larger the field of view, the easier it is for the artificial fish to find the global optimal solution and converge; N represents the number of repetitions when the artificial fish forages, the larger the N, the stronger the foraging behavior ability of the artificial fish, and the higher the convergence efficiency; δ represents the crowding factor of the artificial fish school, and M and M_max represent the number of iterations of the fish school and the maximum number of iterations. The method for determining the probability of local power shortage in the power system based on the artificial fish school algorithm includes the following steps:

[0084] S301: Use the fixed parameter method to set the fish school size m, step size S, crowding factor δ, number of repetitions N, artificial fish field of view V, number of fish school iterations M, and maximum number of iterations M_max.

[0085] S302: Calculate the adaptability of the initial fish swarm individuals, use the random number principle in the range [0,1], and generate a random initial local power shortage probability κ for the transmission line L L ={κ L,1 , κ L,2 , …, κ L,i , …, κ L,m} as the initial value of the fish population, κ L,i The state of a randomly generated fish school.

[0086] S303: Evaluate each individual, and update the behavior status of each behavior by executing the artificial fish foraging behavior, flocking behavior, and tail-chasing behavior, and compare it with the billboard. If it is better than the billboard, replace it and generate a new fish school. Foraging behavior: Assume that the current state of the artificial fish school κ L,i Randomly select a state κ within its field of view L,j :

[0087]

[0088] Among them, the rand() function generates a random number between 0 and 1.

[0089] Calculate κ separately L,i , κ L,j The objective function Y i =f(κ L,i ), Y j =f(κ L,j ), where the objective function is the rated capacity P of each unit in a system max , Loading unit capacity P, Probability of forced shutdown r and the load P that the transmission line may operate LComprehensive indicators:

[0090]

[0091] If Y j >Y i , then κ L,i To κ L,j Move one step in the direction, that is:

[0092]

[0093] Otherwise, κ L,i Continue to select the next state κ within its field of view L,j . Determine whether the forward condition is met. After trying N times, if the requirement is still not met, then:

[0094]

[0095] Update the state of the school of fish generated by foraging behavior Y ne xt1 is the objective function value at the last foraging.

[0096] Group behavior:

[0097] Define the distance between individuals in the artificial fish swarm as d ij =|κ L,i -κ L,j |. Search for the artificial fish in the current field of view (d ij <V) with the number of partners n and the central position κ L,c , if Y c / n>δY i , then κ L,i Move one step toward the center:

[0098]

[0099] Update the status of the school of fish caused by the schooling behavior Y next2 is the objective function during the last foraging.

[0100] Tail-chasing behavior: Search for the current field of view of the artificial fish (d ij The Y with the largest objective function among the partners with a value less than V j Best Partner L,j , if Y j / n>δY i , then κ L,i Move one step toward the center:

[0101]

[0102] Update the status of the fish school caused by tailgating Y next3 is the objective function during the last foraging.

[0103] S304: The maximum value of the objective function obtained according to the three types of behaviors is the current optimal state κ L,next , update the fish population κ L,i =κ L,next .

[0104] S305: The number of fish schools is increased by 1 each time through the cycle, and it is determined whether the current number of fish schools reaches the total number of artificial fish schools m or whether the error meets the requirements. If not, the artificial fish foraging behavior, grouping behavior, and tail-chasing behavior are re-executed; if the requirements are met, the number of iterations is updated.

[0105] S306: gradually increase the number of iterations of the fish school, and determine whether the number of iterations of the fish school has reached the maximum limit. If it has reached the maximum limit, output the last updated state of the fish school as the optimal solution; otherwise, re-update the initial number of the fish school to 1, and repeat the above steps.

[0106] Through the above steps, the probability of local power shortage of the power system under various operating conditions can be obtained in real time and quickly.

[0107] S4: Taking the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, select the optimal operating state from a number of operating states, and perform power system transmission congestion management according to the optimal operating state. In this embodiment, the transmission congestion management cost and the probability of local power shortage of each operating state are combined to obtain feature samples of each operating state, and the feature samples of each operating state are input into the congestion management strategy decision model based on the probabilistic neural network. Taking the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, the operating state with the largest posterior probability is obtained as the optimal operating state.

[0108] Specifically, the above-mentioned system operation cost and power system operation reliability index are used as characteristic parameters to construct a sample feature vector X = [x1, x2, ..., x i , ..., x n ], where x i ={transmission congestion management cost, local power shortage probability}, map it to the state space, build a congestion management strategy decision model based on probabilistic neural network, and realize the optimization of power flow distribution.

[0109] Among them, see Figure 3 ,The blocking management strategy decision model based on probabilistic neural network is composed of input layer, pattern layer, summation layer and output layer.

[0110] Among them, the input layer is the first layer of the network, and its task is to pass the sample vector to the pattern layer. This layer takes each input vector as a node and performs weighted summation. The second pattern layer is the radial base layer, which uses the value of the input layer as the input value of the next layer after calculating the activation function. The activation function uses the Gaussian function, and the probability of the output of the jth neuron of the i-th class in this layer is:

[0111]

[0112] Where d represents the dimension of the sample vector, which is 2 here; σ is the smoothing factor, which is the width of the bell-shaped curve at the midpoint of the sample point, X ij is the j-th center vector of the ith class.

[0113] The third layer is the summation layer, which performs weighted average on the probability density of neurons with similar input vectors in the pattern layer to obtain the estimated probability density of each type of input vector:

[0114]

[0115] Among them, L i Represents the number of sample vectors of the i-th category.

[0116] The last layer is the output layer, which is a decision layer based on the Bayes decision criterion. It selects the category with the largest posterior probability as the actual classification result of the sample.

[0117] Without considering the sample error judgment condition, the Bayes decision criterion is for all i≠j:

[0118] P(y i |X)>P(y j |X)X∈y i

[0119] That is, the output result is the category with the maximum posterior probability, that is, the output result Y = y i ; On the contrary, Y = y j .

[0120] For a sample vector X = [x1, x2...x n ], assuming that the state type is Y = [y1, y2...y m According to probability theory, the posterior probability P(y i |X) is:

[0121]

[0122] Among them, P(X|y i )、P(y i) are the class conditional probability density function and prior probability, respectively. For unknown classification decisions, the prior probability is determined by past experience, and the class conditional probability density function can be estimated with the help of the following Parzen function:

[0123]

[0124] First, the sample feature vector X = [x1, x2, ..., x i , ..., x n ], randomly select the first 100 groups of calculated system operating costs and power system operating reliability indicators as training samples of the decision model, and input them into the congestion management strategy decision model based on probabilistic neural network to train the model, thereby correcting the smoothing factor and obtaining the final congestion management strategy decision model based on probabilistic neural network; then, according to the real-time operation of the system, randomly calculate several groups of sample feature vectors as test samples and input them into the congestion management strategy decision model based on probabilistic neural network for solution and test model performance. Finally, input the feature samples of each operating state into the congestion management strategy decision model based on probabilistic neural network, and take the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators to obtain the operating state with the largest posterior probability as the optimal operating state.

[0125] Therefore, this scheme uses the Bayes minimum risk decision criterion as the feedforward network of the congestion management strategy model, establishes a decision model, trains and tests the feature samples composed of transmission congestion management cost and local power shortage probability, and uses the lowest transmission congestion management cost and the lowest local power shortage probability as comprehensive evaluation indicators to determine the optimal operating state and optimize the operation mode of the power system flow.

[0126] In summary, the power system transmission congestion management method of the present invention obtains several operating states of the power system in advance, and then obtains the minimum dispatching cost of the power system without considering the transmission restrictions of the transmission line; comprehensively considers the power system balance constraints, generator output constraints, transmission channel capacity constraints and bus voltage phase angle offset constraints of the power system. When the output of the units involved in power generation makes the power transmitted by each transmission line exceed the limit, the dispatching arrangement is re-performed under the premise of considering the transmission restrictions of each transmission line to obtain the dispatching cost of the power system under each operating state. On this basis, the probability of local power shortage is taken as an indicator of the reliability of the power system. According to the analysis of the operating state of the power system transmission line, it can be known that each transmission line may have a power outage. When the probability of local power shortage is the smallest, the reliability of the power system is the highest. Finally, the combination of the transmission congestion management cost and the probability of local power shortage that characterizes the reliability of the power system is used as a comprehensive evaluation index to manage the transmission congestion of the power system, which can take into account the optimal power flow of the power system and the stability and reliability of the operation of the transmission line. The transmission congestion management and transmission management strategy of the power system obtained can ensure the economic and reliable operation of the power system.

[0127] At the same time, in order to realize the rapid calculation of the probability of local power shortage, a scheme for determining the probability of local power shortage in the power system based on the artificial fish swarm algorithm is proposed, which effectively improves the speed of determining the probability of local power shortage.

[0128] The following are device embodiments of the present invention, which can be used to perform method embodiments of the present invention. For details not disclosed in the device embodiments, please refer to the method embodiments of the present invention.

[0129] See also Figure 4 In another embodiment of the present invention, a power system transmission congestion management system is provided, which can be used to implement the above-mentioned power system transmission congestion management method. Specifically, the power system transmission congestion management system includes a first acquisition module, a second acquisition module, a third acquisition module and a transmission congestion management module.

[0130] Among them, the first acquisition module is used to obtain several operating states of the power system; the second acquisition module is used to obtain the transmission congestion management cost of each operating state; the third acquisition module is used to obtain the probability of local power shortage of the power system under each operating state; the transmission congestion management module is used to select the optimal operating state from several operating states with the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, and perform transmission congestion management of the power system according to the optimal operating state.

[0131] The power system transmission congestion management system of the present invention obtains several operating states of the power system through a first acquisition module, then obtains the transmission congestion management cost of each operating state through a second acquisition module, obtains the local power shortage probability of the power system under each operating state through a third acquisition module, and then selects the optimal operating state from several operating states by using the transmission congestion management module with the lowest transmission congestion management cost and the lowest local power shortage probability as comprehensive evaluation indicators, and performs power system transmission congestion management according to the optimal operating state. The transmission congestion management module uses the combination of the transmission congestion management cost and the local power shortage probability characterizing the reliability of the power system as a comprehensive evaluation indicator to perform power system transmission congestion management, which can take into account the optimal power flow of the power system and the stability and reliability of the transmission line operation, and the obtained power system transmission congestion management transmission management strategy can ensure the economical and reliable operation of the power system.

[0132] In yet another embodiment of the present invention, a terminal device is provided. The terminal device includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions to implement corresponding method processes or corresponding functions; the processor described in the embodiment of the present invention can be used for the operation of the power system transmission congestion management method, including the following steps: obtaining several operating states of the power system; obtaining the transmission congestion management cost of the power system under each operating state; obtaining the local power shortage probability of the power system under each operating state; taking the lowest transmission congestion management cost and the lowest local power shortage probability as comprehensive evaluation indicators, selecting the optimal operating state from several operating states, and performing power system transmission congestion management according to the optimal operating state.

[0133] In another embodiment of the present invention, the present invention further provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It can be understood that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory, or a non-volatile memory (non-volatile memory), such as at least one disk storage.

[0134] One or more instructions stored in a computer-readable storage medium can be loaded and executed by a processor to implement the corresponding steps of the power system transmission congestion management method in the above-mentioned embodiment; one or more instructions in the computer-readable storage medium are loaded by the processor and the following steps are executed: obtaining several operating states of the power system; obtaining the transmission congestion management cost of the power system under each operating state; obtaining the local power shortage probability of the power system under each operating state; taking the lowest transmission congestion management cost and the lowest local power shortage probability as comprehensive evaluation indicators, selecting the optimal operating state from several operating states, and performing power system transmission congestion management according to the optimal operating state.

[0135] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0136] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0137] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0138] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0139] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for managing transmission congestion in a power system, characterized in that: The following steps are involved: Obtaining several operating states of the power system; Obtain the transmission congestion management cost of the power system under various operating conditions; Obtain the probability of local power shortage of the power system under various operating conditions; Taking the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, the optimal operating state is selected from several operating states, and the power system transmission congestion management is carried out according to the optimal operating state; According to the distribution of power system transmission lines, the highest system operation reliability operation strategy based on the local power shortage probability κ is constructed, which is κ = {κ1, κ2, κ3, …, κ i , …κ NL },κ i Refers to the reliability index of the ith line; The specific method for obtaining the probability of local power shortage of the power system in each operating state is as follows: The artificial fish swarm algorithm is used to obtain the probability of local power shortage in the power system under each operating state; The specific method of obtaining the probability of local power shortage of the power system under each operating state by the artificial fish swarm algorithm is as follows: Take each operating state as the current operating state and perform the following steps to obtain the probability of local power shortage of the power system in each operating state: Each transmission line in the power system under the current operating state is subjected to a random number principle to generate a random initial local power shortage probability; Based on the initial local power shortage probability of each transmission line, the possible operating load of each transmission line, and the rated capacity, loaded unit capacity and forced shutdown probability of each unit included in each transmission line, the update objective function of the artificial fish swarm algorithm is constructed; According to the updated objective function, the initial local power shortage probability of each transmission line is iteratively updated through the foraging behavior, clustering behavior and tail-chasing behavior of the artificial fish swarm algorithm, and the local power shortage probability of each transmission line is obtained and combined to obtain the local power shortage probability of the power system in the current state.

2. The method for managing power system transmission congestion according to claim 1, characterized in that: The operating status includes the output of each unit in the power system. The specific method of obtaining several operating statuses of the power system is: According to the load demand of the power system, based on the power system operation constraints and the output range of each unit in the power system, and according to the output of each unit in the power system on the previous day, several operating states of the power system are obtained.

3. The method for managing power system transmission congestion according to claim 2, characterized in that: The power system operation constraints include power system balance constraints, generator output constraints, transmission channel capacity constraints and bus voltage phase angle offset constraints.

4. The method for managing power system transmission congestion according to claim 1, characterized in that: The specific method for obtaining the transmission congestion management cost of the power system under each operating state is as follows: According to the load demand of the power system and the quotation information of each unit in the power system, the minimum dispatching cost of the power system is obtained; According to the quotation information of each unit in the power system and the operating status of the power system, the congestion dispatching cost of the power system in each operating status is obtained; The difference between the congestion dispatching cost of the power system under each operating state and the minimum dispatching cost of the power system is taken as the transmission congestion management cost of the power system under each operating state.

5. The method for managing power system transmission congestion according to claim 1, characterized in that: The specific method of selecting the optimal operating state from a plurality of operating states is: The transmission congestion management cost and the probability of local power shortage in each operating state are combined to obtain the characteristic samples of each operating state. The characteristic samples of each operating state are input into the congestion management strategy decision model based on probabilistic neural network. The lowest transmission congestion management cost and the lowest probability of local power shortage are taken as comprehensive evaluation indicators. The operating state with the largest posterior probability is obtained as the optimal operating state.

6. A power system transmission congestion management system based on the power system transmission congestion management method according to claim 1, characterized in that: include: A first acquisition module is used to acquire several operating states of the power system; The second acquisition module is used to acquire the transmission congestion management cost of each operating state; The third acquisition module is used to obtain the probability of local power shortage of the power system in each operating state; as well as The transmission congestion management module is used to select the optimal operating state from several operating states based on the lowest transmission congestion management cost and the lowest probability of local power shortage as comprehensive evaluation indicators, and perform power system transmission congestion management according to the optimal operating state.

7. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the power system transmission congestion management method according to any one of claims 1 to 5 are implemented.

8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the power system transmission congestion management method according to any one of claims 1 to 5 are implemented.