A test device and method for simulating blasting excavation unloading
By designing the high-speed impact device of Hopkinson rod and brittle rod, the transient unloading simulation of rock mass is realized, which solves the problem of slow unloading in the existing technology, improves the accuracy and efficiency of simulation, and is in line with actual engineering. unloading state.
Patent Information
- Application Number
- CN202011493477.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-17
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2040-12-17
AI Technical Summary
The existing excavation unloading simulation device cannot unload quickly, resulting in simulation results that are very different from the actual transient unloading process, and cannot accurately describe the stress and strain state of the formation and development of new openings in the rock mass.
A test device is designed to simulate blasting excavation unloading, including coaxially arranged Hopkinson rods, strain gauges, ultra-dynamic strain gauges, transient waveform storage and data processing centers, and achieves high speed through bullet barrels and brittle rods. Unloading, using hydraulic jacks and pneumatic control to simulate different stress conditions.
It achieves high-rate release of excavation load, and the measured changes in strain state during the unloading process are more accurate, consistent with the unloading state in actual engineering, and can quickly simulate the transient unloading process. It has a simple structure, easy operation, and has research capabilities. value.
Smart Images

Figure CN112665991B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rock mass blasting, and in particular to a test device and method for simulating blasting excavation unloading. Background Art
[0002] Due to the complexity of crack expansion and the gas movement and high-speed escape generated during blasting, it is quite difficult to accurately describe the mode, starting position and spatial evolution law of the transient release of excavation loads accompanying the formation and development of the new excavation surface of the rock mass with stress boundary conditions and initial stress conditions. Most of the previous methods for studying excavation unloading were carried out through numerical simulation and theoretical analysis, which could not analyze the stress-strain state of the transient unloading process. The existing excavation unloading simulation device also has the disadvantage of slow unloading and inability to achieve instantaneous unloading, resulting in the simulation results being very different from the transient unloading process in actual conditions. Summary of the invention
[0003] Aiming at the problem that previous excavation unloading simulation devices cannot unload quickly, the present invention proposes a test device and method for simulating blasting excavation unloading, which realizes the high-rate release of excavation load, makes the test closer to the actual project and more consistent with the unloading state in the actual project.
[0004] To achieve the above-mentioned purpose, the present invention is designed to simulate the blasting excavation unloading test device, which is special in that it includes two coaxially arranged Hopkinson bars and a rock sample fixed between the two Hopkinson bars, the end of the Hopkinson bar located at the front end is fixed, and the end of the Hopkinson bar located at the rear end is provided with an unloading assembly, and the Hopkinson bar is provided with a strain gauge, which is sequentially connected to an ultra-dynamic strain gauge, a transient waveform storage and a data processing center;
[0005] The unloading assembly includes a rectangular steel frame with one side abutting against the Hopkinson bar, and the other side of the rectangular steel frame abutting against the brittle bar. The inner space of the rectangular steel frame is provided with a bullet barrel and a bullet. The bullet is at the same horizontal height as the rectangular steel frame and faces the direction of the brittle bar; the other side of the brittle bar abuts against the loading assembly.
[0006] Furthermore, the bullet barrel is fixed inside the rectangular steel frame through a bullet barrel fixing ring arranged outside, and the air inlet of the bullet barrel is connected to the air pressure control box and the air compressor through a gas pipeline.
[0007] Furthermore, the loading assembly includes a jack, a liquid pipeline and a hydraulic station, the jack is in contact with the brittle rod, and the loading assembly generates a horizontal load on the brittle rod.
[0008] Furthermore, the test device also includes a support assembly for supporting the test device, and the support assembly includes fixed supports arranged on both sides, concrete pillars arranged below the Hopkinson bar, and concrete pillars with slots arranged below the unloading assembly and the loading assembly.
[0009] Furthermore, the Hopkinson bar is fixedly connected to the concrete pillar via a long steel plate, and the Hopkinson bar is fixed to the long steel plate below via a steel bracket.
[0010] Furthermore, the rectangular steel frame is connected to the slotted concrete pillar by a steel chain, a through hole for the steel chain to pass through is provided below the rectangular steel frame, fixing bolts are provided on the slotted concrete pillar, and the steel chain connects the bottom of the rectangular steel frame with the slotted concrete pillar.
[0011] Furthermore, a rectangular groove for fixing a jack is provided on the concrete pillar with slotted holes.
[0012] Furthermore, the two Hopkinson bars are respectively configured as an incident rod and a projection rod, and strain gauges are respectively provided on the incident rod and the projection rod.
[0013] Based on the above test device for simulating blasting excavation unloading, the present invention also provides a test method, which includes an installation step and a test step;
[0014] The installation steps include:
[0015] a1) Arrange two Hopkinson bars coaxially and fix them on the support assembly, fix the rock sample between the two Hopkinson bars, and make the two ends of the rock sample close to the Hopkinson bars;
[0016] a2) Install the bullet on the cartridge case and fix the cartridge case;
[0017] a3) attach two strain gauges to two Hopkinson bars respectively, and connect the strain gauges to the ultra-dynamic strain gauge, transient waveform storage and data processing center in sequence;
[0018] a4) Place the rectangular steel frame close to the right end of the Hopkinson bar and fix the rectangular steel frame;
[0019] a5) Fix the brittle rod between the rectangular steel frame and the jack of the loading assembly;
[0020] The test steps include:
[0021] b1) Start the strain gauge, ultra-dynamic strain gauge, transient waveform storage and data processing center;
[0022] b2) The loading assembly applies leftward pressure to the brittle rod, and the brittle rod is close to the rectangular steel frame, and pressure is applied to the right end of the Hopkinson rod through the rectangular steel frame. At this time, both ends of the rock sample are loaded;
[0023] b3) Control the bullet to shoot out and hit the rectangular steel frame, generating an impact load that causes the brittle rods close to the rectangular steel frame to be crushed by the impact, and the pressure is released instantly;
[0024] b4) When the brittle rod breaks, the right end of the Hopkinson rod separates from the contact surface of the rectangular steel frame and is no longer subject to horizontal constraint stress to the left. At this time, the rock sample is in a transient unloading state, and a one-dimensional rarefaction wave propagates from right to left. The wave is transmitted to the ultra-dynamic strain gauge, transient waveform storage and data processing center through the strain gauge for data processing.
[0025] Preferably, in the step b4), when the brittle rod is broken, the rectangular steel frame is displaced to the right by the impact load, and the movement of the rectangular steel frame is restricted by a steel chain arranged at the bottom of the rectangular steel frame.
[0026] Compared with the prior art, the present invention has the following advantages and positive effects:
[0027] 1. The present invention uses a Hopkinson bar device to simulate the transient unloading process. The device has a simple structure and is easy to operate. It can measure the changes in the strain state and the transmission mode of the stress wave during the unloading process more accurately. In the process of studying transient unloading, the bullet hits the brittle bar at high speed to destroy it, which greatly improves the unloading efficiency.
[0028] 2. Traditional brittle materials such as concrete blocks and ceramics have a low rate of crushing when impacted, and the material deformation and destruction time is long, which cannot accurately simulate the transient unloading process. Take a cross-sectional area of 8cm 2 , 10cm long gypsum is used as the brittle rod material. After actual measurement and analysis of photographic data, the fracture failure process lasts less than 40ms, which fully realizes the simulation of rapid unloading. The impact load generated by the bullet destroys the circular brittle rod and drives the steel frame to move to the right, separating the steel frame from the right end contact surface of the Hopkinson steel rod. This process occurs almost instantly. The present invention aims at the deficiency that the previous test device cannot achieve rapid unloading, and realizes the high-rate release of excavation load, which is more in line with actual engineering and has more research value and significance.
[0029] 3. The present invention can simulate the transient unloading process under different ground stress conditions by adjusting the hydraulic jack to apply prestress of different magnitudes.
[0030] 4. The steel chain connected to the steel frame designed in the present invention plays a role in limiting the displacement of the steel frame. When the bullet drives the steel frame to move to the right, it will constrain its movement and stop it, thereby preventing the devices from colliding with each other or rushing out of the test area.
[0031] 5. Different from the previous simulated transient unloading test devices, this test device has an intuitive and uncomplicated structure, and is easy to install, use and operate.
[0032] 6. The supporting structure proposed by the present invention is solid and reliable, and the pillars for placing the jacks are provided with shallow grooves, making the fixing of the jacks more convenient and reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is a front view of the device of the present invention;
[0034] Figure 2 Figure 1 A top view of
[0035] Figure 3 yes Figure 1 Detailed top view of the central support structure;
[0036] Figure 4 yes Figure 1 Figure 2 is a structural diagram of a rectangular steel frame, wherein Figure (a) is a front view of the rectangular steel frame, and Figure (b) is an AA section view of Figure (a);
[0037] Figure 5 yes Figure 1 A structural diagram of a neutron barrel fixing ring, wherein (a) is a front view of the neutron barrel fixing ring, and (b) is a BB cross-sectional view of (a);
[0038] Figure 6 yes Figure 2 Top view of the concrete pillar with slots in the middle;
[0039] Figure 7 yes Figure 1 Front view of the concrete pillar with slotted holes in the middle;
[0040] Figure 8 yes Figure 1 Schematic diagram of the monitoring components.
[0041] In the figure: 1- rock sample; 2- Hopkinson steel rod; 3- long steel plate; 4- steel support; 5- concrete pillar; 6- bullet fixing ring; 7- bullet tube; 8- bullet; 9- steel chain; 10- rectangular steel frame; 11- brittle rod; 12- jack; 13- fixing bolt; 14- air compressor; 15- air pressure control box; 16- gas pipeline; 17- liquid pipeline; 18- hydraulic station; 19- fixed support; 20- concrete pillar with slotted hole; 21- strain gauge; 22- ultra-dynamic strain gauge; 23- transient waveform storage; 24- data processing system; 25- infrared tachometer. DETAILED DESCRIPTION
[0042] In order to make the technical solution and beneficial effects of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0043] The present invention proposes a test device for simulating blasting excavation unloading, such as Figure 1 , Figure 2 As shown, the device mainly includes a rock sample 1, a Hopkinson bar 2, a support assembly, a loading assembly, an unloading assembly, a fixing assembly and a monitoring assembly.
[0044] Two Hopkinson bars 2 are coaxially arranged, the end of the Hopkinson bar 2 at the front end is fixed and is set as a projection bar, and the end of the Hopkinson bar 2 at the rear end is provided with a load-relief assembly and is set as an incident projection bar. Strain gauges 21 are respectively provided on the two Hopkinson bars 2. A rock sample 1 is fixed between the two Hopkinson bars 2. The projection bar of the Hopkinson bar 2 is connected to a fixed support 19, and the incident bar of the Hopkinson bar 2 is connected to the load-relief assembly.
[0045] like Figure 4 As shown, the unloading assembly includes a rectangular steel frame 10 with one side abutting against the Hopkinson bar 2, and the other side of the rectangular steel frame 10 abutting against the cylindrical brittle rod 11. The inner space of the rectangular steel frame 10 is provided with a bullet barrel 7 and a bullet 8, and the air inlet of the bullet barrel 7 is connected to the air pressure control box 15 and the air compressor 14 through a gas pipeline 16; the bullet 8 is at the same horizontal height as the rectangular steel frame 10 and faces the brittle rod 11; the other side of the brittle rod 11 abuts against the loading assembly.
[0046] The loading assembly includes a jack 12 , a liquid pipeline 17 and a hydraulic station 18 . The jack 12 is in contact with the brittle rod 11 , and the loading assembly generates a horizontal load on the brittle rod 11 .
[0047] like Figure 3 As shown, the support assembly includes fixed supports 19 arranged on both sides of the test device, a concrete support 5 arranged below the Hopkinson bar 2, and a slotted concrete support 20 arranged below the unloading assembly and the loading assembly. The slotted concrete support 20 is provided with a rectangular groove for fixing the jack 12, as shown in FIG. Figure 6 , Figure 7 shown.
[0048] like Figure 5As shown, the Hopkinson bar and the unloading assembly are fixed to the support assembly through a fixing assembly. The fixing assembly includes a steel support 4, a long steel plate 3, a cartridge fixing ring 6, and a steel chain 9. The cartridge 7 is fixed to the slotted concrete pillar 20 by a fixing bolt 13A through the cartridge fixing ring 6 arranged outside. The Hopkinson bar 2 is fixedly connected to the concrete pillar 5 through the long steel plate 3, and the Hopkinson bar 2 is fixed to the long steel plate 3 below through the steel support 4. The rectangular steel frame 10 is connected to the slotted concrete pillar 20 through the steel chain 9, and a through hole for the steel chain 9 to pass through is provided below the rectangular steel frame 10. The steel chain 9 connects the bottom of the rectangular steel frame 10 to the slotted concrete pillar 20 through the fixing bolt 13B.
[0049] like Figure 8 As shown, the monitoring component includes strain gauges 21 respectively attached to the incident rod and the transmission rod of the Hopkinson steel rod, an ultra-dynamic strain gauge 22 that converts the resistance change of the strain gauge into an electrical signal, a transient waveform storage 23 that can store transient strain waveforms in real time, an infrared speed meter 25 for monitoring the speed of the bullet, and a data processing system 24 for processing the final data.
[0050] Based on the above test device, the present invention also proposes a test method for simulating blasting excavation unloading, including an installation step and a test step.
[0051] Installation steps:
[0052] a1. Two Hopkinson steel rods 2 are coaxially arranged and fixed on a long steel plate 3 through a steel support 4. Two steel supports 4 are provided on each steel rod, and a concrete support 5 is used to support the device under each Hopkinson rod 2; the left end of the front Hopkinson rod 2 is close to the fixed support 19; the rock sample 1 is fixed between the two Hopkinson rods 2, and the rear Hopkinson rod 2 is in contact with the rectangular steel frame 10, so that the left and right ends of the rock sample 1 are close to the two Hopkinson rods 2.
[0053] a2. Install the bullet 8 on the bullet barrel 7, and pass the bullet barrel 7 through two bullet barrel fixing rings 6 with the same diameter as the bullet barrel. Each bullet barrel fixing ring 6 is then installed on the concrete pillar 20 with slots through four fixing bolts 13A. After the bullet barrel 7 is installed, connect the two gas pipelines 16 to the air inlet of the bullet barrel 7, and connect them to the air pressure control box 15 and the air compressor 14.
[0054] a3. Two strain gauges 21 are respectively attached to the Hopkinson steel rods at both ends of the rock sample 1, and are sequentially connected to the ultra-dynamic strain gauge 22, the transient waveform storage 23, the infrared velocimeter 25, and the data processing center 24.
[0055] a4. The rectangular steel frame 10 is placed on the slotted concrete pillar 20 so that it is close to the right end of the Hopkinson bar 2; the three pairs of steel chains 9 are passed through the slots on the rectangular steel frame 10 and tied together with the fixing bolts 13B fixed to the slotted concrete pillar 20.
[0056] a5. Fix the brittle rod 11 between the rectangular steel frame 10 and the jack 12, and try to make it contact with the right end of the steel frame and the jack 12.
[0057] Test steps:
[0058] b1. Turn on the ultra-dynamic strain gauge 22, the transient waveform storage 23, and the infrared velocimeter 25 and connect them to the data processing center 24 to record data for the entire test.
[0059] b2. Operate the hydraulic station 18 to provide hydraulic power to the jack 12 of the loading device, slowly load it, and make the jack 12 pressurize the cylindrical brittle rod 11 to provide initial stress in the horizontal direction, so that it is close to the rectangular steel frame 10, and apply a specified pressure to the right end of the Hopkinson bar 2 until it reaches stability. At this time, both ends of the rock sample are loaded, and the state is similar to that of the excavation load applied to the rock mass.
[0060] b3. Adjust the extrusion control box 15 to pressurize the bullet barrel 7, so that the bullet 8 connected to the bullet barrel 7 is ejected at high speed and hits the rectangular steel frame 10, generating a sufficiently large impact load, so that the cylindrical brittle rod 11 close to the rectangular steel frame 10 is impacted and broken, and the pressure is released instantly. This process is similar to explosive rock breaking.
[0061] b4. When the brittle rod 11 is broken, the rectangular steel frame 10 will be displaced to the right due to the impact load, and the steel chain 9 limits the movement of the steel frame to prevent the test devices from colliding with each other and causing losses.
[0062] b5. When the brittle rod 11 is broken, the right end of the Hopkinson steel rod 2 is separated from the contact surface of the rectangular steel frame 10 and is no longer subject to the horizontal leftward constraint stress. At this time, the rock sample 1 is in a transient unloading state, and a one-dimensional rarefaction wave propagates from right to left, which is transmitted to the ultra-dynamic strain gauge 22, the transient waveform storage 23, and the data processing center 24 through the strain gauge 21 for data processing.
[0063] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
[0064] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
Claims
1. A test device for simulating blasting excavation unloading, characterized in that: The invention comprises two coaxially arranged Hopkinson bars (2) and a rock sample (1) fixed between the two Hopkinson bars (2), wherein the end of the Hopkinson bar (2) located at the front end is fixed, and the end of the Hopkinson bar (2) located at the rear end is provided with a load-relief assembly, and a strain gauge (21) is provided on the Hopkinson bar (2), and the strain gauge (21) is connected to an ultra-dynamic strain gauge (22), a transient waveform storage (23), and a data processing center (24) in sequence; The unloading assembly comprises a rectangular steel frame (10) with one side abutting against the Hopkinson rod (2); the other side of the rectangular steel frame (10) abutting against a brittle rod (11); the brittle rod (11) is made of gypsum; a bullet barrel (7) and a bullet (8) are arranged in the inner space of the rectangular steel frame (10); the bullet (8) is at the same level as the rectangular steel frame (10) and faces the brittle rod (11); the other side of the brittle rod (11) abuts against the loading assembly; The bullet (8) is controlled to be fired and hit the rectangular steel frame (10), generating an impact load so that the brittle rod (11) close to the rectangular steel frame (10) is crushed by the impact, and the pressure is released instantly; at the same time as the brittle rod (11) is crushed, the right end of the Hopkinson bar (2) is separated from the contact surface of the rectangular steel frame (10) and is no longer subject to horizontal leftward constraint stress. At this time, the rock sample (1) is in a transient unloading state, and a one-dimensional rarefaction wave is propagated from right to left, which is transmitted to the ultra-dynamic strain gauge (22), the transient waveform storage (23) and the data processing center (24) through the strain gauge (21) for data processing.
2. A test device for simulating blasting excavation unloading according to claim 1, characterized in that: The bullet barrel (7) is fixed inside the rectangular steel frame (10) via a bullet barrel fixing ring (6) arranged outside, and the air inlet of the bullet barrel (7) is connected to the air pressure control box (15) and the air compressor (14) via a gas pipeline (16).
3. The test device for simulating blasting excavation unloading according to claim 1, characterized in that: The loading assembly comprises a jack (12), a liquid pipeline (17) and a hydraulic station (18); the jack (12) is in contact with the brittle rod (11); and the loading assembly generates a horizontal load on the brittle rod (11).
4. The test device for simulating blasting excavation unloading according to claim 1, characterized in that: The test device also includes a support assembly for supporting the test device, the support assembly including fixed supports (19) arranged on both sides, a concrete support (5) arranged below the Hopkinson bar (2), and a concrete support with slots (20) arranged below the unloading assembly and the loading assembly.
5. The test device for simulating blasting excavation unloading according to claim 4, characterized in that: The Hopkinson bar (2) and the concrete pillar (5) are fixedly connected via a long steel plate (3), and the Hopkinson bar (2) is fixed to the long steel plate (3) below via a steel bracket (4).
6. The test device for simulating blasting excavation unloading according to claim 4, characterized in that: The rectangular steel frame (10) is connected to the slotted concrete pillar (20) via a steel chain (9); a through hole for the steel chain (9) to pass through is provided below the rectangular steel frame (10); a fixing bolt (13) is provided on the slotted concrete pillar (20); and the steel chain (9) connects the bottom of the rectangular steel frame (10) to the slotted concrete pillar (20).
7. The test device for simulating blasting excavation unloading according to claim 4, characterized in that: The slotted concrete pillar (20) is provided with a rectangular slot for fixing the jack (12).
8. The test device for simulating blasting excavation unloading according to claim 1, characterized in that: The Hopkinson rod (2) connected to the unloading assembly is an incident rod, and the other is a projection rod. The incident rod and the projection rod are respectively provided with strain gauges (21).
9. A test method based on the test device for simulating blasting excavation unloading according to any one of claims 1 to 8, characterized in that: The method comprises an installation step and a test step; The installation steps include: a1) two Hopkinson bars (2) are coaxially arranged and fixed on a support assembly, and a rock sample (1) is fixed between the two Hopkinson bars (2) so that both ends of the rock sample (1) are closely attached to the Hopkinson bars (2); a2) installing the bullet (8) on the bullet barrel (7) and fixing the bullet barrel (7); a3) attaching two strain gauges (21) to two Hopkinson bars (2) respectively, and connecting the strain gauges (21) to an ultra-dynamic strain gauge (22), a transient waveform storage device (23) and a data processing center (24) in sequence; a4) placing the rectangular steel frame (10) close to the right end of the Hopkinson bar (2) to fix the rectangular steel frame (10); a5) fixing the brittle rod (11) between the rectangular steel frame (10) and the jack (12) of the loading assembly; The test steps include: b1) starting the strain gauge (21), the ultra-dynamic strain gauge (22), the transient waveform storage (23) and the data processing center (24); b2) The loading assembly applies a leftward pressure to the brittle rod (11), and the brittle rod (11) is close to the rectangular steel frame (10), and applies pressure to the right end of the Hopkinson rod (2) through the rectangular steel frame (10). At this time, both ends of the rock sample (1) are loaded; b3) controlling the bullet (8) to shoot out and hit the rectangular steel frame (10), thereby generating an impact load that causes the brittle rod (11) close to the rectangular steel frame (10) to be crushed by the impact, thereby releasing the pressure instantly; b4) When the brittle rod (11) is broken, the right end of the Hopkinson rod (2) is separated from the contact surface of the rectangular steel frame (10) and is no longer subject to the horizontal leftward constraint stress. At this time, the rock sample (1) is in a transient unloading state, and a one-dimensional rarefaction wave propagates from right to left, which is transmitted to the ultra-dynamic strain gauge (22), the transient waveform storage (23) and the data processing center (24) through the strain gauge (21) for data processing.
10. The test method of the test device for simulating blasting excavation unloading according to claim 9, characterized in that: In the step b4), when the brittle rod (11) is broken, the rectangular steel frame (10) is displaced to the right by the impact load, and the movement of the rectangular steel frame (10) is restricted by the steel chain (9) arranged at the bottom of the rectangular steel frame (10).