A method and system for accurately detecting underground construction channels of electric power
Through the BIM three-dimensional model and inspection system, the problems of high construction costs and landslide risks in the underground power construction channels are solved, accurate detection and risk warning are achieved, construction costs and risks are reduced, and construction safety and efficiency are improved.
Patent Information
- Application Number
- CN202011635053.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-31
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2040-12-31
AI Technical Summary
In the power underground construction channel, due to the large size, high cost and easy landslide accidents during the construction of long-distance cable tunnels, the existing technology is difficult to effectively detect and early warning, which increases construction risks and costs.
The risk assessment system is established by using BIM three-dimensional model. By setting risk impact parameters and detection cycle parameters, the risk assessment level is generated and early warning signals are output, the number of sensor settings and monitoring frequency is reduced, the support structure design is optimized, and the detection module and signal acquisition module are combined. The signal transmission module and the central processing module realize real-time monitoring and risk warning.
It reduces construction costs and risks, improves construction safety and efficiency, reduces the frequency of unnecessary reinforcement and monitoring of the support structure, and ensures the safety of construction personnel and property.
Smart Images

Figure CN112668904B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of underground power construction passages, and in particular to a method and system for accurately detecting underground power construction passages. Background Art
[0002] In order to solve the problems of line planning and power supply safety, beautify the city and coordinate with the surrounding environment during the construction and transformation of the power grid, cable power supply has been widely used in my country's medium and low voltage distribution networks. Cable tunnel refers to a corridor or tunnel-type structure used to accommodate a large number of cables laid on cable supports, and the cross-section is set in an arched shape. There are multiple groups of supports inside the tunnel, and various horizontal supports are set on the supports to carry various power or control cables. In addition to allowing the tunnel to better protect the cables, the cable tunnel also facilitates maintenance personnel to inspect and repair the cables.
[0003] During the construction of underground tunnels, it is necessary to first dig underground cable tunnels, and then provide support in the excavated tunnels to strengthen the structure of the tunnel. During the digging of underground cable channels, a combination of vertical cable shafts and horizontal cable tunnels is usually used to dig cable tunnels and lay cables. When opening cable tunnels in the horizontal direction, landslides are prone to occur. Therefore, sensors need to be laid in the tunnel during the entire construction process to detect changes in parameters in the tunnel and reduce the possibility of tunnel landslides.
[0004] With respect to the above-mentioned related technologies, the inventors believe that the following defects exist: the cable tunnel is usually long in length, large in width and height, and more sensors need to be installed in the cable tunnel, which results in high cost. Summary of the invention
[0005] In order to save construction costs, the present application provides a method for accurately detecting underground power construction passages.
[0006] In the first aspect, the present application provides a method for accurately detecting underground power construction channels using the following technical solutions:
[0007] A method for accurately detecting underground power construction channels, comprising:
[0008] Setting risk occurrence influencing parameters, wherein the influencing parameters include the diameter of the tunnel arc top wall, the load force of the surrounding rock of the tunnel arc top wall, and the convergence force of the tunnel side wall; establishing a BIM three-dimensional model of the tunnel based on the risk occurrence influencing parameters; performing risk assessment based on the BIM three-dimensional model and generating a risk assessment level; and outputting a risk warning signal based on the risk assessment level;
[0009] Set the inspection cycle parameters, implement periodic supervision along with the tunnel based on the BIM 3D model, obtain the supervision results, and judge and eliminate the possibility of risk based on the supervision results;
[0010] Based on the BIM three-dimensional model, the diameter of the curved top wall of the tunnel, the load force of the surrounding rock of the curved top wall of the tunnel, and the convergence force of the tunnel side wall are analyzed to obtain the correlation between the three. The correlation includes: if the diameter of the curved top wall remains unchanged, the load force of the surrounding rock of the curved top wall of the tunnel and the convergence force of the tunnel side wall are in a linear relationship with each other.
[0011] By adopting the above technical solution, the risk of the entire construction process is assessed through the BIM three-dimensional model. In the process of tunnel construction, the life and property safety of construction personnel and supervisors can be guaranteed. The BIM model is used to periodically judge and eliminate risks in the construction tunnel, and the sampling and detection frequency of the positions that have met the safety standards is reduced to achieve the purpose of reducing monitoring costs. If the diameter of the curved top wall of the tunnel remains unchanged, the load force of the surrounding rock of the curved top wall of the tunnel and the convergence force of the tunnel side wall are linearly related to each other, indicating that when the convergence force of the tunnel side wall changes, the load force of the surrounding rock of the curved top wall of the tunnel will change. According to the above conclusion, by setting a measuring device on the curved top wall of the tunnel, measuring the change amount and change rate of the curved top wall force, the change rate of the curved top wall load force can be deduced. By measuring one of the two, the risk assessment of the tunnel can be carried out to reduce the types and number of measuring devices, so as to achieve the purpose of reducing costs. The BIM three-dimensional model can also calculate the load force on the curved top wall and the convergence force of the tunnel side walls, so as to determine the supporting force of the supporting structure required for the curved top wall and tunnel side walls in the tunnel, so as to reduce the cost of the supporting structure.
[0012] Preferably, the tunnel is divided into a plurality of construction sections along the length direction of the tunnel, and the plurality of construction sections are coded based on the BIM three-dimensional model, and the coded construction sections are monitored in real time based on the BIM three-dimensional model.
[0013] By adopting the above technical solution, the tunnel can be monitored in sections, which facilitates the supervision and control of the tunnel and facilitates the location of risky areas.
[0014] Preferably, the detection cycle parameters include early stage, middle stage and late stage, and the supervision frequency of early stage>the supervision frequency of middle stage>the supervision frequency of late stage.
[0015] By adopting the above technical solution, as time goes by, the frequency of supervision on construction piles can be reduced, thereby reducing the frequency of data collection and processing and reducing the memory consumed by data calculations.
[0016] In the second aspect, the present application also provides a precise detection system for underground power construction channels using the following technical solutions:
[0017] A precise detection system for underground power construction channels, comprising a detection module, a signal acquisition module, a signal transmission module, a central processing module and a user terminal, wherein the detection module is used to sample the pressure of surrounding rock in the tunnel on a supporting structure and transmit the sampling result to the signal acquisition module, the signal acquisition module processes the sampled signal and transmits the sampled signal to the central processing module via the signal transmission module, and the central processing module is used to generate a risk warning signal and transmit the risk warning signal to the user terminal via the signal transmission module.
[0018] By adopting the above technical solution, the detection module is used to sample the pressure of the surrounding rock and support structure in the tunnel, the signal acquisition module is used to process the sampled signal and then output it to the central processing module, the central processing module calculates the sampled signal and generates a risk warning signal, and the risk warning signal is transmitted to the user terminal through the transmission module.
[0019] Preferably, the signal acquisition module includes an amplifying unit, a filtering unit, a storage unit and an encryption unit, the amplifying unit is used to increase the signal strength of the sampling signal, the filtering unit is used to improve the stability of the sampling signal, the storage unit is used to store the sampling signal, and the encryption unit is used to encrypt the transmitted sampling signal.
[0020] By adopting the above technical solution, since most of the signals need to pass through the horizontal tunnel to the vertical shaft when being output from the tunnel to the central processing unit, and then pass through the vertical shaft, the amplification unit is used to increase the signal strength of the sampled signal during the transmission process to reduce the attenuation of the signal caused by passing through objects. The filtering unit is used to separate the sampled signal from the noise to improve the signal's anti-interference ability and signal-to-noise ratio, so that the signal output to the central processing module is more stable. The storage unit is used to store the data of the sampled signal for the convenience of the central processing module to retrieve and facilitate the viewing of later data. The encryption unit is used to reduce the occurrence of data leakage to improve the anti-interference ability of the signal during transmission.
[0021] Preferably, the user terminal includes a field terminal and a remote terminal, the field terminal communicates with the central processing module through a signal transmission module to receive a warning signal issued by the central processing module, and the remote terminal communicates with the central processing module through a signal transmission module to remotely receive data transmitted by the central processing module.
[0022] By adopting the above technical solution, the on-site terminal can view data at the construction site and receive risk warning signals, so that construction personnel and supervisors can promptly discover problems and locations of support structures during construction and promptly protect the support structures. The remote terminal can receive tunnel conditions inside the construction site outside the construction site.
[0023] Preferably, a shelter is provided in the tunnel, and a plurality of the shelters are provided and evenly distributed in each section of the tunnel. There is at least one shelter in each section of the tunnel, and a positioning device is provided in the shelter.
[0024] By adopting the above technical solution, multiple shelters are arranged at intervals in the tunnel, which reduces the escape distance of construction workers in the event of a safety accident and protects the lives and property of users to a greater extent.
[0025] Preferably, the shelter is configured as a pit body opened on a horizontal plane in a tunnel, a top cover is provided on the pit mouth of the pit body, the top cover is provided at the pit mouth, an escape hatch is provided on the top cover, and a closed door is provided on the escape hatch.
[0026] By adopting the above technical solution, construction workers in the tunnel can open the closed door and enter the base through the escape hole when escaping. When the section of the tunnel safely passes the inspection cycle, the top cover is removed and the pit is filled with soil to achieve the purpose of temporary refuge. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The present application provides a rectangular coordinate system for analyzing influencing factors in a precise detection method for underground power construction channels.
[0028] Figure 2 This is a connection block diagram of a precise detection system for underground power construction channels in the present application.
[0029] Figure 3 It is a connection frame for the amplification unit, filtering unit, storage unit and encryption unit.
[0030] Figure 4 is a schematic cross-sectional view showing a tunnel cross section.
[0031] Figure 5 It is a schematic diagram of the overall structure of the support structure.
[0032] Figure 6 This is a schematic diagram of the cross-section structure of the shelter.
[0033] Figure numerals: 1. Detection module; 2. Signal acquisition module; 20. Amplification unit; 21. Filtering unit; 22. Storage unit; 23. Encryption unit; 3. Signal transmission module; 4. Central processing module; 5. User terminal; 50. On-site terminal; 500. On-site PC terminal; 501. On-site mobile terminal; 51. Remote terminal; 510. Remote PC terminal; 511. Remote mobile terminal; 6. Support arch frame; 60. Support ribs; 600. Support arch ribs; 601. Support longitudinal ribs; 61. Connecting ribs; 7. Pit body; 8. Top cover; 80. Escape hatch; 81. Enclosed door. DETAILED DESCRIPTION
[0034] The following is combined with Figure 1-6 This application is described in further detail.
[0035] The embodiment of the present application discloses a method for accurately detecting underground power construction channels.
[0036] Reference Figure 1 , the precise detection method of underground power construction channels includes.
[0037] Create a BIM 3D model of the tunnel.
[0038] The structure of the tunnel in the present application is set as a long strip structure with an arched cross-section. A support structure is set inside the tunnel, and the support structure is used to support the curved top wall of the tunnel and the inner wall of the tunnel. At the same time, when the tunnel is excavated, a support structure is set on the excavated side wall of the tunnel, and the support structure is used to support the inner wall of the tunnel. During the excavation of each section of the tunnel, the structural parameters of the excavated tunnel are obtained by using equipment, and the changes in the surrounding rock and the structure of the support structure of the construction section are monitored.
[0039] The influencing parameters of risk occurrence are set in the BIM three-dimensional model. Specifically, the influencing parameters include the surrounding rock load force of the tunnel arc top wall, the convergence force of the tunnel side wall, and the diameter of the tunnel arc top wall. The time period is used as the independent variable. By measuring the change in the influencing factor data within the period, the risk is evaluated through the BIM three-dimensional model, and a risk assessment level is generated. According to the risk assessment level, a risk warning signal is issued.
[0040] Specifically, the risk assessment levels include level one, level two and level three. Under level three risk, the structure of the tunnel is in a stable state. Under level two risk, there are unstable structural locations in the tunnel, which means that there is a possibility of landslide and the support structure needs to be reinforced for the second time. Level one risk is an evacuation signal, and the possibility of tunnel collapse is high at this time, and construction workers in the tunnel should evacuate immediately.
[0041] In the BIM three-dimensional model, the tunnel is divided into multiple construction sections along the length of the tunnel, and each construction section is encoded using the BIM three-dimensional model. In this embodiment, the encoding is a displacement identification code of each construction section. Then, the corresponding construction section can be quickly determined by the displacement identification code. This application divides the tunnel into sections every 100 meters along the excavation direction of the tunnel. The coding values from one end of the tunnel to the other are 001, 002, 003... If the last section is less than or equal to 50 meters, the section of the tunnel is included in the code of the previous section of the tunnel. If the last section of the tunnel is greater than 50 meters, the section of the tunnel is independently encoded in sequence.
[0042] Set the inspection cycle parameters, and implement periodic supervision of the tunnel based on the BIM three-dimensional model and the tunnel segmentation to obtain the supervision structure, and judge and eliminate the possibility of risk based on the supervision structure.
[0043] The detection cycle parameters are set as early, middle and late stages. The early stage is 7 days after the excavation of the tunnel section is completed, the middle stage is 7 to 14 days, and the late stage is 14 to 21 days. Of course, the division method of early, middle and late stages can be changed arbitrarily according to actual construction needs.
[0044] During the preliminary inspection, the data sampling frequency is three times a day, at 0:00, 8:00 and 16:00 respectively. The data is collected and recorded every half an hour, and the average of the data is input into the BIM 3D model as the inspection results at 0:00, 8:00 and 16:00;
[0045] During the mid-term inspection, the data sampling frequency is once a day, at 12 o'clock every day, and data is collected and recorded every hour. The average of the data is input into the BIM three-dimensional model as the inspection result of the day.
[0046] During the later inspection, the data sampling frequency is once every two days, starting at 0:00 on the second day, and data is collected and recorded every two hours. The average of the data is input into the BIM three-dimensional model as the inspection result of the day.
[0047] Based on the transmitted data, with time as the horizontal axis and the sampled data as the vertical axis, a curve chart of the data change rate is drawn in the BIM three-dimensional model. When the data change of the construction section is relatively stable during the detection period, the construction section is considered safe after the detection period, and the coded construction section is marked as unsafe based on the BIM three-dimensional model. When abnormal data changes are detected, the user adds a support structure to the abnormal construction section, and then re-monitors according to the detection period after adding the support structure until the data returns to normal.
[0048] Analysis of influencing factors
[0049] The supporting structure mainly provides structural support for the side walls and the curved top wall of the tunnel. The supporting structure is subjected to pressure from the side walls of the tunnel toward the interior of the tunnel, as well as horizontal convergence force from the side walls of the tunnel.
[0050] The vertex where the support structure and the arc arm of the tunnel meet is point A, and the connection points of the arc arm and the side wall are points B and C respectively, and the heights of points B and C are equal. Figure 1 , establish a rectangular coordinate system with B as the origin, and the load force on point A is F a , the force from the tunnel on the support structure at point B is F b , the lateral component of force at point B is F bx , the longitudinal force is F by , the force from the tunnel on the support structure at point C is F c , the lateral component of force at point C is F cx , the longitudinal force is F cy , set the radius of the tunnel to r,
[0051] F by +F cy =F a
[0052] because
[0053] M C =0,M C is the moment at point C;
[0054] so
[0055] F a |Xr|+F cx r+F by r=F bx r+F cy r, X is the actual F a The horizontal axis of
[0056] so
[0057]
[0058] F bx and F by The combined force is connected on AC,
[0059] so
[0060]
[0061] The uniform load on the curved top wall of the tunnel is set to q
[0062]
[0063] Conclusion
[0064] The above analysis can lead to the conclusion that if the radius of the tunnel remains constant, the lateral force F on the support structure is cx It has a positive correlation with the uniformly distributed load q on the curved top wall, indicating that the greater the convergence force on the two side surfaces, the greater the uniformly distributed load on the curved surface of the tunnel.
[0065] When deploying the detection device, it is only necessary to set up the detection device on the lateral support structure to detect the pressure of the curved top wall of the tunnel on the top support structure and the convergence force of the tunnel side wall on the support structure, thereby saving the cost of deploying multiple detection devices on the curved top wall of the tunnel.
[0066] We can also draw conclusion 2
[0067]
[0068] If the diameter of the tunnel arc wall is greater than 4 meters, the lateral force F on the supporting structure is greater than the uniformly distributed load q on the arc top wall. In this case, when setting up the supporting structure, the strength of the supporting structure on the side wall should be greater than the strength of the supporting structure on the arc wall.
[0069] If the diameter of the tunnel arc wall is less than 4 meters, the lateral force F on the supporting structure is less than the uniformly distributed load q on the arc top wall, then the strength of the supporting structure on the arc wall is greater than that on the side wall;
[0070] If the diameter of the curved wall of the tunnel is equal to 4 meters, and the lateral force F received by the supporting structure is equal to the uniformly distributed load q on the curved top wall, then the strength of the supporting structure for the side wall is equal to the strength of the supporting structure for the curved wall.
[0071] The value of the tunnel arc wall radius r input by the user into the BIM three-dimensional model is used to generate the ratio of the lateral force F exerted on the supporting structure to the uniformly distributed load q on the arc top wall, so as to determine the material used for the supporting structure.
[0072] The embodiment of the present application also discloses a precise detection system for underground power construction channels.
[0073] Reference Figure 2The precise detection system for underground construction channels of electric power includes a detection module 1, a signal acquisition module 2, a signal transmission module 3, a central processing module 4 and a user terminal 5. The signal acquisition module 2 communicates with the detection module 1 and the signal transmission module 3, the signal transmission module 3 communicates with the signal acquisition module 2 and the central processing module 4, and the signal transmission module 3 also communicates with the central processing module 4 and the user terminal 5. The detection module 1 is used to detect the environmental parameters in the tunnel, the signal acquisition module 2 is used to collect the environmental parameters and process the signals, the central processing module 4 is used to calculate the collected environmental parameters and generate risk warning signals, and the user terminal 5 obtains the risk warning signals through the signal transmission module 3.
[0074] Reference Figure 3 The signal acquisition module 2 includes an amplifying unit 20, a filtering unit 21, a storage unit 22 and an encryption unit 23. The amplifying unit 20 communicates with the detection module 1, the filtering unit 21 communicates with the amplifying unit 20 and the storage unit 22, and the encryption unit 23 communicates with the storage unit 22. The amplifying unit 20 is used to increase the signal strength of the sampled signal during transmission to reduce the attenuation of the signal caused by passing through an object. The filtering unit 21 is used to separate the sampled signal from the noise to improve the signal's anti-interference and signal-to-noise ratio. The storage unit 22 is used to store the sampled signal to facilitate the retrieval of the sampled signal. The encryption unit 23 is used to improve the security of data transmission, improve the anti-interference ability during signal transmission, and reduce the occurrence of data leakage.
[0075] Reference Figure 4 and Figure 5 The support structure includes a support arch frame 6, which includes a plurality of support ribs 60 and a transversely arranged connecting rib 61. The support ribs 60 are arranged in an arch shape and are evenly spaced along the length direction of the tunnel. The connecting ribs 61 are used to connect adjacent support ribs 60. The support ribs 60 include support arch ribs 600 and support longitudinal ribs 601. The support longitudinal ribs 601 are arranged in pairs. Both ends of the support arch ribs 600 are welded to the top of the support longitudinal ribs 601. The connecting ribs 61 are arranged in parallel and spaced between the support supply ribs and the support longitudinal ribs 601. Adding support arch ribs 600 between the support ribs 60 can increase support for the top of the support structure, and adding support longitudinal ribs 601 between the support ribs 60 can increase support for the side walls of the support structure.
[0076] The detection module 1 includes a plurality of pressure sensors and a level. The pressure sensor is arranged on the supporting longitudinal reinforcement 601 and between the supporting longitudinal reinforcement 601 and the tunnel side wall. The pressure sensor is used to detect the lateral support force of the support structure. The level is arranged on the ground and is used to detect the settlement of the ground surface, so as to detect the settlement of the ground surface above the tunnel, so as to avoid engineering accidents caused by excessive surface settlement.
[0077] The signal transmission module 3 includes a WIFI unit and a GPRS unit. The WIFI unit is used to provide a short-distance data connection for the on-site user terminal 5, and the GPRS unit provides a long-distance mobile data communication for the user terminal 5. The WIFI unit is provided to facilitate the reception of data by the staff in the tunnel.
[0078] Reference Figure 2 The user terminal 5 includes a field terminal 50 and a remote terminal 51. The construction personnel on site can use the field terminal 50 to enable the construction and supervision personnel to receive the collected environmental parameters in real time. The remote terminal 51 is used to remotely monitor the construction site. The field terminal 50 includes a field PC terminal 500 and a field mobile terminal 501. The field PC terminal 500 enables the construction and supervision personnel in the tunnel to view data in real time. The field mobile terminal 501 enables the construction and supervision personnel in the tunnel to view data and receive risk warning signals through mobile phones. When the risk warning signal received by the field user terminal 5 is a second-level risk, the field user will promptly strengthen the support of the corresponding coded tunnel. When the warning signal received by the field user terminal 5 is a first-level risk, the field staff will immediately evacuate the construction site of the dangerous construction section to protect the life and property safety of the field staff. The remote terminal 51 includes a remote PC terminal 510 and a remote mobile terminal 511. The remote PC terminal 510 and the remote mobile terminal 511 are used to enable the ground staff to grasp the environmental parameters of the underground construction tunnel in real time.
[0079] Reference Figure 6 A shelter is set up in each tunnel section. The shelter is set up in the middle position of each tunnel section. A temporary shelter is set up on the horizontal plane in the tunnel. The shelter is set up as a pit body 7. A top cover 8 is set up on the pit body 7. The top cover 8 is set up at the pit mouth of the pit body 7. The top cover 8 is made of steel plate. An escape hole 80 is set up on the top cover 8. The escape hole 80 is provided with a closed door 81. The closed door 81 is hinged with the top cover 8. The closed door 81 can cover the escape hole 80. The upper surface of the closed door 81 is flush with the upper surface of the top cover 8.
[0080] A GPRS positioning device is provided in the pit body 7 to locate the position of the shelter in the corresponding coded tunnel. When an accident occurs, the corresponding accident tunnel code can be located through the BIM three-dimensional model, which is convenient for rescue personnel to inquire about the position of the shelter in the accident tunnel. A variety of life-saving supplies are provided in the pit body 7, including water, food, oxygen cylinders and heating blankets, etc., to provide users with air, temperature and food for survival.
[0081] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for accurately detecting underground power construction channels, characterized in that: include Setting risk occurrence influencing parameters, wherein the influencing parameters include the diameter of the tunnel arc top wall, the load force of the surrounding rock of the tunnel arc top wall, and the convergence force of the tunnel side wall; establishing a BIM three-dimensional model of the tunnel based on the risk occurrence influencing parameters; performing risk assessment based on the BIM three-dimensional model and generating a risk assessment level; and outputting a risk warning signal based on the risk assessment level; Set detection cycle parameters, implement periodic supervision along with the tunnel based on the BIM 3D model to obtain supervision results, and judge and eliminate the possibility of risk based on the supervision results; Based on the BIM three-dimensional model, the diameter of the tunnel arc top wall, the load force of the tunnel arc top wall surrounding rock and the tunnel side wall convergence force are analyzed to obtain the correlation between the three. The correlation includes: if the diameter of the arc top wall remains unchanged, the load force of the tunnel arc top wall surrounding rock and the tunnel side wall convergence force are in a linear relationship with each other.
2. The accurate detection method for underground construction channels for electric power according to claim 1 is characterized in that: The tunnel is divided into multiple construction sections along the length direction of the tunnel, and the multiple construction sections are coded based on the BIM three-dimensional model, and the coded construction sections are monitored in real time based on the BIM three-dimensional model.
3. The accurate detection method for underground power construction channels according to claim 2 is characterized in that: The detection cycle parameters include early stage, middle stage and late stage, and the supervision frequency of early stage>the supervision frequency of middle stage>the supervision frequency of late stage.
4. A precise detection system for underground power construction channels, characterized by: A precise detection method for underground power construction channels as described in any one of claims 1 to 3 above is adopted, comprising a detection module (1), a signal acquisition module (2), a signal transmission module (3), a central processing module (4) and a user terminal (5), wherein the detection module (1) is used to sample the pressure of the surrounding rock in the tunnel on the support structure and transmit the sampled signal to the signal acquisition module (2), the signal acquisition module (2) processes the sampled signal and transmits the sampled signal to the central processing module (4) through the signal transmission module (3), and the central processing module (4) is used to generate a risk warning signal and transmit the risk warning signal to the user terminal (5) through the signal transmission module (3).
5. The precise detection system for underground power construction channels according to claim 4 is characterized in that: The signal acquisition module (2) comprises an amplifying unit (20), a filtering unit (21), a storage unit (22) and an encryption unit (23); the amplifying unit (20) is used to increase the signal strength of a sampled signal; the filtering unit (21) is used to increase the stability of the sampled signal; the storage unit (22) is used to store the sampled signal; and the encryption unit (23) is used to encrypt the transmitted sampled signal.
6. The precise detection system for underground power construction channels according to claim 5 is characterized by: The user terminal (5) includes a field terminal (50) and a remote terminal (51). The field terminal (50) communicates with the central processing module (4) via the signal transmission module (3) to receive the warning signal issued by the central processing module (4) at the construction site. The remote terminal (51) communicates with the central processing module (4) via the signal transmission module (3) to remotely receive the data transmitted by the central processing module (4).
7. The precise detection system for underground power construction channels according to claim 4 is characterized by: A shelter is arranged in the tunnel. There are a plurality of shelters evenly distributed in each section of the tunnel. There is at least one shelter in each section of the tunnel. A positioning device is arranged in the shelter.
8. The precise detection system for underground power construction channels according to claim 7 is characterized in that: The refuge is provided as a pit body (7) opened on a horizontal plane in a tunnel, a top cover (8) is provided on the pit mouth of the pit body (7), the top cover (8) is provided at the pit mouth, an escape opening (80) is provided on the top cover (8), and a closed door (81) is provided on the escape opening (80).