A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station
By using walls, stressed skeletons and lighting panels connected to the mountain slopes in the flood discharge atomization area of the power station, the fully enclosed transparent shed tunnel structure is solved in the existing technology of large structure weight, high construction difficulty, high construction cost and poor landscape effect, and the effects of light structure, fast construction, low construction cost and beautiful landscape are achieved.
Patent Information
- Application Number
- CN202110154191.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-04
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2041-02-04
AI Technical Summary
The fully enclosed reinforced concrete structure in the flood discharge atomization area of the existing power station has problems such as large weight, high construction cost, long construction period, high foundation requirements, poor lighting, difficulty in maintenance and maintenance, low protection efficiency, poor economy and poor landscape effect.
The wall, stressed skeleton and daylighting plate connected to the mountain slope are adopted. The stressed skeleton includes longitudinal and transverse strip skeletons. These skeletons form a fully enclosed transparent shed hole structure, and the daylighting plate is fixed to achieve closure and lighting needs.
It has achieved the reduction of structural weight, the shortening of construction difficulty and construction period, the reduction of project cost, the improvement of waterproofing effect and the improvement of landscape effect, ensuring the safety and beauty of the power station.
Smart Images

Figure CN112796287B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of power station engineering, and in particular to a fully enclosed transparent shed tunnel in a flood discharge atomization area of a power station. Background Art
[0002] Flood discharge atomization refers to an unnatural heavy rainfall process and water mist diffusion phenomenon caused by the discharge of water from a discharge structure. Flood discharge atomization produces large-scale, high-intensity atomized rainfall, and the air humidity and temperature in the atomization affected area change significantly, interfering with traffic operations in the atomization affected area. In particular, high-dam and large-reservoir water conservancy and hydropower projects have large flood discharge flows and large flood discharge powers, and the downstream flood discharge atomization problem is prominent. When flood discharge structures discharge flood, there are large-scale strong splashing areas and high-intensity atomized rainfall areas in the flood discharge atomization area. Highways within the range of heavy rain with a heavy rainfall intensity exceeding 50mm / h need to be subject to traffic control or even traffic interruption to avoid traffic safety accidents.
[0003] Further exploration and optimization of the structure adopted in the flood discharge atomization area of a power station so that it has better performance when serving the field of power station engineering technology is a technical problem that needs to be solved urgently by those skilled in the art. Summary of the invention
[0004] The shortcomings of existing technologies: the atomization area often adopts a fully enclosed reinforced concrete structure, which has a large cave volume, high cost, long construction period, high requirements on the foundation geology, poor lighting in the cave, and generally requires the installation of mechanical and electrical lighting devices, which is difficult to maintain and repair. Although the reinforced concrete protective shed cave has strong protection capabilities, its protection efficiency is not high for areas without slope geological disasters, and its economic efficiency is poor. In addition, the landscape effect is poor, which affects the overall landscape effect of the power station.
[0005] Further exploration and optimization of the structure of the power station flood discharge atomization area proposed above, so that it has better performance when serving the power station engineering technology field, is a technical problem to be solved urgently by those skilled in the art. The present invention provides a fully enclosed transparent shed tunnel in the power station flood discharge atomization area, which can greatly reduce the weight of the structure, reduce the construction difficulty, shorten the construction period, and reduce the project cost in the power station flood discharge atomization area without obvious slope geological disasters.
[0006] The technical means of this scheme are as follows: a fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station, comprising: a wall connected to the mountain slope, a load-bearing frame, and a lighting panel, wherein the load-bearing frame is connected to the wall to form a fully enclosed shed tunnel structure;
[0007] The force-bearing skeleton includes: a first skeleton and a second skeleton, both of which are strip-shaped, the first skeleton is arranged at intervals in the vertical direction, and the second skeleton is arranged at intervals in the horizontal direction, and the first skeleton is connected to the second skeleton to form a plurality of rectangular frames;
[0008] The lighting panel is fixed by the force-bearing frame.
[0009] In this scheme, during the specific construction, a wall is set on one side of the mountain slope in the flood discharge atomization area of the power station, and a drainage ditch is set on the wall for drainage. The force-bearing frame is connected to the wall to form a fully enclosed shed hole structure. The crossbeam at the top of the fully enclosed shed hole structure has the same structure as the side wall, wherein the force-bearing frame is formed by connecting strip frames, the first frames are arranged at intervals in the horizontal direction, and the second frames are arranged at intervals in the vertical direction, and the first frames are connected at the overlapping parts of the second frames, and the skylight panel is fixed by the force-bearing frame.
[0010] The skylight panels are fixed by connecting the vertical and horizontal strip frames in this scheme. The skylight panels make the shed hole into a closed structure on all sides, which can block heavy rainfall and prevent water mist from seeping into the shed hole, thereby ensuring the safety of the power station. Moreover, the weight of each structure is lighter than that of the reinforced concrete shed hole in the prior art, the construction difficulty is low, the construction period is short, the electromechanical lighting facilities are eliminated, the project cost is reduced, and the spectacular scene of the power station discharging floods can be appreciated from the shed hole.
[0011] The preferred solution is set as follows: the first frame is an I-beam column; the second frame is a rectangular tube; the intersection of the first frame and the second frame is a first node, the first node includes: a first bolt, a first shock-absorbing strip, a first waterproof rubber strip, and a first aluminum alloy strip, and the first node connects the first frame, the first shock-absorbing strip, the skylight, the first waterproof rubber strip, the aluminum alloy strip and the second frame through the first bolt;
[0012] A plurality of second nodes are arranged at intervals on the first frame, and the second nodes include: a second bolt, a second shock absorbing strip, a second waterproof glue, and a second aluminum alloy strip, and the second nodes connect the first frame, the second shock absorbing strip, the skylight board, the second waterproof glue strip, and the second aluminum alloy strip through the second bolt;
[0013] A plurality of third nodes are arranged at intervals on the second frame, and the third nodes include: a third bolt, a third shock absorbing strip, a third waterproof glue, and a third aluminum alloy strip. The third nodes connect the second frame, the third shock absorbing strip, the lighting board, the third waterproof glue strip, and the third aluminum alloy strip through the third bolt;
[0014] The ends of the I-beam columns are provided with flange covers, and stiffening plates are also provided at intervals on the columns;
[0015] A base is provided at the lower end of the I-beam column, and the base is connected to the I-beam column by an embedded part, wherein the bent end of the embedded part is arranged inside the base, and one end provided with a thread is arranged outside the base;
[0016] One end of the embedded part extending out of the base is provided with a flange cover matched with its thread, a nut is sleeved on the thread of the embedded part, and an auxiliary support is provided on the flange cover;
[0017] A micro-expansion concrete layer and a concrete layer are provided at the connection between the I-beam column and the base.
[0018] Further technical solutions are:
[0019] Aluminum alloy is used to seal the frame between the top and side of the shed structure. The length of the edge should meet the fixing requirements and should not be less than 10cm. Adhesive should be applied under the aluminum alloy strip and then fixed with screws to ensure waterproof durability.
[0020] A base is provided at the lower end of the I-beam column and is connected by the embedded part. The embedded part is two anchor bolts, one end of the embedded part is bent, and the bending direction is different, and the two anchor bolts are connected by steel bars; the bent end of the embedded part is arranged inside the base, and the threaded end of the embedded part, that is, the screw rod, extends out of the base, and a steel plate is arranged on the embedded part, and a micro-expansion concrete layer is poured above the base, and the steel plate is arranged at the upper end of the micro-expansion concrete layer. A flange cover is arranged above the micro-expansion concrete layer, and the flange cover can be sleeved on the embedded part, and then the flange cover and the embedded part are fixed by double nuts. Auxiliary support is also provided on the flange cover, and anchor bolt holes that can extend the screw rod of the embedded part are provided on the flange covers around the reinforcement support, which are used to set the embedded part to fix the I-beam column; a concrete layer is poured above the flange cover to completely fix the I-beam column on the base; the skylight extends into the expansion concrete layer;
[0021] Each node adopts a shock-absorbing strip for shock absorption, a waterproof rubber strip for waterproofing and an aluminum alloy strip. The node on the I-beam column adopts two screws to fix the left and right ends of the I-beam, so that it is fixed more firmly.
[0022] All steel components should be painted with anti-corrosion paint.
[0023] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0024] A wall connected to the mountain slope, a load-bearing frame and a skylight are arranged. The load-bearing frame is connected to the wall to form a fully enclosed shed structure. The structure can prevent heavy rainfall loads, wind loads and air pressure characteristics in the atomized area. The skylight is fixed by the load-bearing frame. The skylight can save the cost of additional lighting facilities while forming a closed space. The difference between the light inside the shed and the external light is small, and the spectacular scene of flood discharge can be appreciated from the shed. The composite fixed connection method between the load-bearing frames can save materials, reduce construction difficulty and reduce project cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0026] Figure 1 A schematic cross-sectional view of a fully enclosed transparent shed tunnel in a flood discharge atomization area of a power station in a specific implementation of the following embodiments;
[0027] Figure 2 A schematic elevation diagram of a fully enclosed transparent shed tunnel in a flood discharge atomization area of a power station in a specific implementation of the following embodiments;
[0028] Figure 3 A schematic diagram of the structure of the fourth node in a specific implementation of the following embodiment;
[0029] Figure 4 A schematic diagram of the structure of the embedded parts in a specific implementation of the following embodiment;
[0030] Figure 5 FIG. 1 is a schematic diagram of a partial cross-section of a fully enclosed transparent shed tunnel in a power station flood discharge atomization area in a specific implementation of the following embodiment, wherein A—A is Figure 1 Sectional view at A-A in the middle;
[0031] Figure 6 FIG. 1 is a schematic diagram of a partial cross-section of a fully enclosed transparent shed tunnel in a power station flood discharge atomization area in a specific implementation of the following embodiment; wherein B—B is Figure 1 The cross-sectional view at B-B in the middle;
[0032] Figure 7 A schematic diagram of the skeleton structure of a fully enclosed transparent shed tunnel in a flood discharge atomization area of a power station in a specific implementation of the following embodiments;
[0033] Figure 8 A schematic diagram of the front view structure of a first node in a specific implementation manner of the following embodiment;
[0034] Fig. 9A schematic diagram of a top view structure of a first node in a specific implementation manner of the following embodiment;
[0035] Fig.10 A schematic diagram of the front view structure of the second node in a specific implementation manner of the following embodiment;
[0036] Fig.11 A schematic diagram of a top view structure of a second node in a specific implementation manner of the following embodiment;
[0037] Fig.12 It is a schematic diagram of the front view structure of the third node in a specific implementation manner of the following embodiment;
[0038] Fig.13 A schematic diagram of a top view structure of a third node in a specific implementation manner of the following embodiment;
[0039] Fig.14 This is a structural schematic diagram of an I-beam column in a specific implementation manner of the following embodiment;
[0040] Fig.15 A schematic diagram of the structure of a flange cover in a specific implementation manner of the following embodiment;
[0041] Fig.16 This is a schematic diagram of the position of the stiffening plate in a specific implementation manner of the following embodiment.
[0042] The reference numerals in the figure are: 1-slope; 2-drainage trough; 3-wall; 4-aluminum alloy connection; 6-lighting board; 7-base; 8-fourth node; 9-first node; 10-second node; 11-flange cover; 13-stiffening plate; 14-I-steel column; 15-third node; 16-rectangular tube; 81-embedded parts; 82-micro-expansion concrete layer; 83-concrete layer; 84-flange cover; 85-bolt; 86-auxiliary support; 1 11-anchor hole; 811-screw rod; 812-steel plate; 813-anchor bolt; 814-rebar; 91-first bolt; 93-first shock-absorbing strip; 95-first waterproof rubber strip; 96-first aluminum alloy strip; 101-second bolt; 103-second shock-absorbing strip; 105-second waterproof rubber strip; 106-second aluminum alloy strip; 151-third bolt; 153-third shock-absorbing strip; 155-third waterproof rubber strip; 156-third aluminum alloy strip. DETAILED DESCRIPTION
[0043] With reference to the accompanying drawings of the specification, a fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station of the present invention is described in detail below.
[0044] Embodiment 1:
[0045] like Figures 1 to 16As shown, a fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station comprises: a wall 3 connected to a mountain slope 1, a force-bearing frame, and a lighting panel 6, wherein the force-bearing frame is connected to the wall 3 to form a fully enclosed shed tunnel structure;
[0046] The force-bearing skeleton includes: a first skeleton and a second skeleton, both of which are strip-shaped, the first skeleton is arranged at intervals in the vertical direction, and the second skeleton is arranged at intervals in the horizontal direction, and the first skeleton is connected to the second skeleton to form a plurality of rectangular frames;
[0047] The lighting panel 6 is fixed by the force-bearing frame.
[0048] In this scheme, in the specific construction, a wall 3 is set on one side of the mountain slope in the flood discharge atomization area of the power station, and a drainage ditch 2 for drainage is set on the wall 3. The force-bearing frame is connected to the wall 3 to form a fully enclosed shed hole structure. The crossbeam at the top of the fully enclosed shed hole structure has the same structure as the side wall, wherein the force-bearing frame is formed by connecting strip frames, the first frame is arranged at intervals in the horizontal direction, and the second frame is arranged at intervals in the vertical direction. The first frame is connected to the second frame at the overlapping point, and the lighting panel 6 is fixed by the force-bearing frame.
[0049] The skylight panel 6 is fixed by connecting the vertical and horizontal strip frames in this scheme. The skylight panel 6 makes the shed hole into a closed structure on all sides, which can block heavy rainfall and prevent water mist from penetrating into the shed hole, thereby ensuring the safety of the power station. Moreover, the weight of each structure is lighter than that of the reinforced concrete shed hole in the prior art, the construction difficulty is low, the construction period is short, the electromechanical lighting facilities are eliminated, the project cost is reduced, and the spectacular scene of the power station discharging flood can be appreciated from the shed hole.
[0050] Embodiment 2:
[0051] Example 2 is a further limitation provided on the basis of Example 1, such as Figures 1 to 16 As shown:
[0052] The first frame is an I-beam column 14; the second frame is a rectangular tube 16; the intersection of the first frame and the second frame is a first node 9, the first node 9 includes: a first bolt 91, a first damping strip 93, a first waterproof rubber strip 95, and a first aluminum alloy strip 96, and the first node 9 connects the first frame, the first damping strip 93, the lighting board 6, the first waterproof rubber strip 95, the first aluminum alloy strip 96 and the second frame through the first bolt 91;
[0053] A plurality of second nodes 10 are arranged at intervals on the first frame, and the second nodes 10 include: a second bolt 101, a second shock absorbing strip 103, a second waterproof glue 105, and a second aluminum alloy strip 106. The second nodes 10 connect the first frame, the second shock absorbing strip 103, the lighting board 6, the second waterproof glue strip 105, and the second aluminum alloy strip 106 through the second bolt 101;
[0054] A plurality of third nodes 15 are arranged at intervals on the second frame, and the third nodes 15 include: a third bolt 151, a third shock absorbing strip 153, a third waterproof rubber strip 155, and a third aluminum alloy bead 156. The third nodes 15 connect the second frame, the third shock absorbing strip 153, the lighting board 6, the third waterproof rubber strip 155, and the third aluminum alloy bead 156 through the third bolt 151;
[0055] The end of the I-beam column 14 is provided with a flange cover 11, and the column body is also provided with a stiffening plate 13 at intervals;
[0056] The lower end of the I-beam column 14 is provided with a base 7, and the base 7 and the I-beam column 14 are connected by an embedded part 81, the bent end of the embedded part 81 is arranged inside the base 7, and the end provided with a thread is arranged outside the base 7;
[0057] The end of the embedded part 81 extending out of the base 7 is provided with a flange cover 11, a bolt is sleeved on the thread of the embedded part 81, and an auxiliary support 86 is provided on the flange cover 11;
[0058] A micro-expansion concrete layer 82 and a concrete layer 83 are provided at the connection between the I-beam column 14 and the base 7 .
[0059] Further technical solutions are:
[0060] Aluminum alloy is used to seal the frame between the top and side of the shed structure. The length of the edge should meet the fixing requirements and should not be less than 10cm. Adhesive should be applied under the aluminum alloy strip and then fixed with screws to ensure waterproof durability.
[0061] The lower end of the I-beam column 14 is provided with a base 7, and is connected by the embedded part 81. The embedded part 81 is two anchor bolts 813, one end of the embedded part is bent, and the bending direction is different. The two anchor bolts 813 are connected by a steel bar 814; the bent end of the embedded part 81 is arranged inside the base 7, and the threaded end of the embedded part 81, that is, the screw rod 811, extends out of the base 7, and a steel plate 812 is arranged on the embedded part 81, and a micro-expansion concrete layer 82 is cast above the base 7. The steel plate 812 is arranged at the upper end of the micro-expansion concrete layer 82. A flange cover 11 is arranged above the expansive concrete layer 82. The flange cover 11 can be sleeved on the embedded part 81, and then the flange cover 11 and the embedded part 81 are fixed by double bolts 813. An auxiliary support 86 is also arranged on the flange cover 11. An anchor hole 111 through which the screw rod 811 of the embedded part 81 can extend is arranged on the flange cover 11 around the auxiliary support 86, and is used to arrange the embedded part 81 to fix the I-beam column 14; a concrete layer 83 is poured above the flange cover 11 to completely fix the I-beam column 14 on the base 7; the lighting board 6 extends into the expansive concrete layer 82;
[0062] Each node adopts a shock-absorbing strip for shock absorption, a waterproof rubber strip for waterproofing and an aluminum alloy strip. The node on the I-beam column 14 adopts two screws to fix the left and right ends of the I-beam, so that it is fixed more firmly.
[0063] All steel components should be painted with anti-corrosion paint.
[0064] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station, comprising: A wall (3), a load-bearing frame, and a lighting panel (6), wherein the load-bearing frame is connected to the wall (3) to form a fully enclosed shed structure; The force-bearing skeleton includes: a first skeleton and a second skeleton, both of which are strip-shaped, the first skeleton is arranged at intervals in the vertical direction, and the second skeleton is arranged at intervals in the horizontal direction, and the first skeleton is connected to the second skeleton to form a plurality of rectangular frames; The lighting panel (6) is fixed by the force-bearing frame; The intersection of the first frame and the second frame is a first node (9), the first node (9) comprises: a first bolt (91), a first shock absorbing strip (93), a first waterproof rubber strip (95), and a first aluminum alloy bead (96), and the first node (9) connects the first frame, the first shock absorbing strip (93), the lighting board (6), the first waterproof rubber strip (95), the first aluminum alloy bead (96), and the second frame through the first bolt (91); A plurality of second nodes (10) are arranged at intervals on the first frame, and the second nodes (10) include: a second bolt (101), a second shock-absorbing strip (103), a second waterproof rubber strip (105), and a second aluminum alloy strip (106); the second nodes (10) connect the first frame, the second shock-absorbing strip (103), the skylight board (6), the second waterproof rubber strip (105), and the second aluminum alloy strip (106) through the second bolt (101).
2. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station according to claim 1, characterized in that: The first framework is an I-beam column (14).
3. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station according to claim 1, characterized in that: The second skeleton is a rectangular tube (16).
4. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station according to claim 1, characterized in that: A plurality of third nodes (15) are arranged at intervals on the second frame, and the third nodes (15) include: a third bolt (151), a third shock absorbing strip (153), a third waterproof rubber strip (155), and a third aluminum alloy bead strip (156). The third node (15) connects the second frame, the third shock absorbing strip (153), the skylight board (6), the third waterproof rubber strip (155), and the third aluminum alloy bead strip (156) through the third bolt (151).
5. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station according to claim 1, characterized in that: The wall (3) is provided with a drainage ditch (2) for drainage.
6. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station according to claim 2, characterized in that: The end of the I-beam column (14) is provided with a flange cover (11) for connection, and a stiffening plate (13) is also arranged at intervals on the column body.
7. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station according to claim 6, characterized in that: A base (7) is provided at the lower end of the I-beam column (14), and the base (7) and the I-beam column (14) are connected by an embedded part (81); The bent end of the embedded part (81) is arranged inside the base (7), and the end provided with a thread is arranged outside the base (7).
8. A fully enclosed transparent shed tunnel in the flood discharge atomization area of a power station according to claim 7, characterized in that: One end of the embedded part (81) extending out of the base (7) can pass through the anchor hole (111) of the flange cover (11), a bolt (85) is sleeved on the threaded part of the embedded part (81), and an auxiliary support (86) is also provided on the flange cover (11); A micro-expansion concrete layer (82) and a concrete layer (83) are provided at the connection between the I-beam column (14) and the base (7).
Citation Information
Patent Citations
Totally-closed transparent shed tunnel for flood discharge atomization area of power station
CN215105162U