A main and branch drainage system for karst tunnels and its design method
By designing a vertical and horizontal drainage system with a central drainage ditch, a sluice tunnel and a transverse branch tunnel in the karst tunnel, the water damage problem caused by the long drainage section of the tunnel in the karst area was solved, effective groundwater collection and removal was achieved, and the tunnel was ensured to be dry. and operational safety.
Patent Information
- Application Number
- CN202110399497.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-14
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2041-04-14
AI Technical Summary
When mountainous road tunnels pass through karst areas, due to the long drainage section, each section has a greater influence on each other, resulting in more water damage problems during the construction, operation and maintenance of the road tunnel.
A drainage system for the main branch line of karst tunnels is designed, which includes setting up a central drainage ditch, a weep tunnel and a transverse branch tunnel under the tunnel road surface. The vertical and horizontal drainage pipe system adopts a segmented drainage mode to collect and remove groundwater around the tunnel. , make sure the roadway is dry.
It effectively overcomes the problems of too long longitudinal drainage section of the tunnel and excessive pressure on the downstream drainage facilities, giving full play to the water passing capacity of the longitudinal drainage facilities, reducing the scale of the project, keeping the tunnel dry, and improving operational safety.
Smart Images

Figure CN112989479B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering, and in particular to a main and branch drainage system for a karst tunnel and a design method thereof. Background Art
[0002] With the rapid development of my country's transportation industry, tunnel construction areas are becoming wider and wider, and the longitudinal length of tunnels is getting longer and longer. When mountain highway tunnels pass through karst areas, they often encounter underground rivers, karst funnels, fault fracture zones with rich groundwater, and other adverse geological diseases. Adverse geological diseases will not only accelerate the aging of the tunnel system, but also pose a threat to the safety of tunnel pavement operations.
[0003] Existing technologies generally adopt measures such as increasing the longitudinal drainage slope of the tunnel, increasing the cross-sectional area of the drainage facilities, and setting up parallel drainage tunnels to prevent groundwater from intruding on the tunnel structure and ensure tunnel driving safety during the operation period. Due to the long drainage section and the great influence of each section on each other, many water disasters still occur during the construction and operation and maintenance of highway tunnels.
[0004] In view of this, it is necessary to propose a main and branch drainage system for karst tunnels and a design method thereof to solve the above problems. Summary of the invention
[0005] The main purpose of the present invention is to provide a main and branch drainage system for a karst tunnel and a design method thereof, so as to solve the problem that when existing mountain highway tunnels pass through karst areas, the drainage sections are long and the sections have a great influence on each other, resulting in many water disasters in the process of highway tunnel construction and operation and maintenance.
[0006] To achieve the above object, the present invention provides a design method for a main and branch drainage system of a karst tunnel, comprising the steps of:
[0007] Step S1, calculating the water-passing cross-section of the drainage tunnel: calculating the economic cross-section size of the drainage tunnel, and determining the water-passing cross-section size of the drainage tunnel according to the economic cross-section size of the drainage tunnel and the requirements of the drainage safety factor;
[0008] Step S2, calculating the water-passing section of the transverse branch tunnel: inversely calculating the designed water discharge of the transverse branch tunnel according to the sum of the water discharge of multiple central drainage ditches of the tunnel and the surplus coefficient, and calculating the water-passing section size of the transverse branch tunnel according to the designed water discharge and the section size;
[0009] Step S3, determining the layout position of the drainage hole: determining the plane and vertical position of the drainage hole according to the safety distance between the tunnel main hole and the drainage hole, the radius of the precipitation funnel, and the requirement of the tunnel main hole being pressure-free or under low pressure of less than 300 kPa;
[0010] Step S4, determining the layout position of the transverse branch tunnel: calculating the maximum distance of the transverse branch tunnel that maintains low-pressure excavation along the longitudinal direction of the main tunnel of the tunnel as the layout position of the transverse branch tunnel.
[0011] Preferably, the step S1 comprises:
[0012] Step S11, obtaining the predicted daily water inflow Q1 of the main tunnel of the tunnel; wherein the obtaining method includes directly obtaining according to the geological exploration report, obtaining according to the formula One or more of; where F is the catchment area of the recharge zone where the tunnel passes through the karst aquifer, and M is the groundwater runoff modulus;
[0013] Step S12, according to the predicted daily water inflow Q1 and the conversion formula Calculating the predicted spillway flow;
[0014] Step S13, according to the formula Obtain the economic cross-sectional dimensions of the drainage tunnel; wherein Q2 is the predicted drainage tunnel flow, b2 is the drainage tunnel height and / or width, n2 is the drainage tunnel wall roughness, and i2 is the drainage tunnel bottom slope;
[0015] Step S14, obtaining the water-passing section size according to the economic section size and the constructible section size of the drainage tunnel in accordance with the drainage safety factor requirement.
[0016] Preferably, step S2 comprises:
[0017] Step S21, according to the formula Get the flow of a single central drain; where Q c is the discharge of a single central drainage ditch, n1 is the roughness rate of the central drainage ditch wall, A is the area of the central drainage ditch, ρ is the wetted perimeter of the central drainage ditch, and i1 is the longitudinal slope of the main tunnel of the tunnel;
[0018] Step S22, based on the sum of the discharge volumes of the plurality of central drainage ditches and the surplus coefficient of 1.5 to 3, reversely calculating the design discharge volume of the transverse branch tunnel;
[0019] Step S23, according to the design discharge volume and cross-sectional size calculation formula Obtain the water-passing cross-sectional dimensions of the transverse branch tunnel; wherein n3 is the roughness of the transverse branch tunnel wall, b3 is the height and / or width of the transverse branch tunnel, and i3 is the bottom slope of the transverse branch tunnel;
[0020] Preferably, the step S3 comprises:
[0021] Step S31, determining that the safety distance between the tunnel main hole and the drainage hole is greater than 1 times the hole diameter of the tunnel main hole;
[0022] Step S32, according to the formula , calculate the effective radius of the precipitation funnel, and then use the formula , calculate the water head of the distance between the main tunnel and the drainage hole, so as to obtain the relative position of the main tunnel and the drainage hole; where R is the influence radius of the drainage hole, S is the water level drop, H is the water head height, k is the water permeability, x is the distance between the main tunnel and the drainage hole, y is the water level depth corresponding to the main tunnel position, r w is the radius of the drainage hole;
[0023] Step S33, determining the plane and vertical position of the drainage hole according to the safety distance, the precipitation funnel radius, and the maximum value of the relative position.
[0024] Preferably, step S4 comprises:
[0025] Step S41, according to the formula Calculate the reference radius of the rectangular section; where r0 is the reference radius, a is the width of the tunnel system, is the coefficient related to b / a;
[0026] Step S42: according to the precipitation funnel curve equation Calculate the position head of the transverse branch tunnel; where x is the longitudinal distance from the branch tunnel, y is the head depth at the corresponding position, H1 is the maximum head of the main tunnel, The distance from the top of the main cave to the bottom of the branch cave, h f The safe construction water pressure at the top of the main tunnel during construction;
[0027] Step S43, according to the formula The maximum distance of the transverse branch tunnels that maintain low-pressure excavation along the longitudinal direction of the main tunnel of the tunnel is calculated as the layout position of the transverse branch tunnels.
[0028] The present invention provides a main-branch drainage system for a karst tunnel, comprising a central drainage ditch arranged below the tunnel pavement and extending along the extension direction of the main tunnel hole, characterized in that it also comprises a drainage hole for draining groundwater around the tunnel, a transverse branch hole for collecting groundwater in the main tunnel hole, and a vertical shaft for connecting the central drainage ditch and the transverse branch hole; wherein,
[0029] The drainage hole is arranged outside the tunnel and extends in the direction in which the tunnel extends. The safety distance between the drainage hole and the tunnel meets the following conditions: the safety distance between the main tunnel and the drainage hole is greater than 1 times the diameter of the main tunnel, and according to the formula Calculate the position head of the tunnel main hole from the drainage hole;
[0030] The transverse branch hole is arranged horizontally below the tunnel pavement and communicates with the drainage hole. A preset drainage slope is formed between the transverse branch hole and the tunnel transversely, so that the groundwater collected by the transverse branch hole is discharged to the drainage hole. The water-passing section of the transverse branch hole meets the formula ;
[0031] The vertical shaft is vertically arranged between the central drainage ditch and the transverse branch hole, the upper end of the vertical shaft is communicated with the central drainage ditch, and the lower end of the vertical shaft is communicated with the transverse drainage hole.
[0032] Preferably, the drainage hole is arranged parallel to the tunnel, the transverse branch hole is arranged perpendicular to the drainage hole, the safety distance is not less than 1.5 times the excavation diameter of the main tunnel hole, the bottom of the drainage hole is lower than the bottom of the central drainage ditch, and the height difference between the drainage hole and the arch of the main tunnel hole is greater than 10 meters; the bottom of the transverse branch hole is 0.4-0.6m lower than the bottom of the drainage hole.
[0033] Preferably, the cross-sectional shapes of the drainage hole and the transverse branch hole include one or more of rectangular, circular, straight-wall circular arch, and horseshoe.
[0034] Preferably, a plurality of water collecting pipes are connected above the drainage hole to collect groundwater near the drainage hole into the drainage hole.
[0035] Preferably, a stairwell is provided between the transverse branch tunnel and the main tunnel for workers to inspect and maintain.
[0036] Compared with the prior art, the main and branch drainage system for karst tunnels and the design method thereof provided by the present invention have the following beneficial effects:
[0037] By using parallel drainage tunnels as the main longitudinal channels and transverse branch tunnels as water collection branch channels, a segmented drainage mode is adopted to overcome the disadvantages of too long longitudinal drainage sections of tunnels and excessive pressure on downstream drainage facilities. The longitudinal and transverse drainage pipe systems can effectively collect karst groundwater around the main tunnel, especially groundwater in karst channels such as caves and underground rivers. While reducing the scale of the project, the water-passing capacity of the longitudinal drainage facilities can be fully utilized to keep the roadway dry.
[0038] In addition, the present invention also solves the problem of how to determine the engineering technical parameters of parallel drainage tunnels and transverse branch tunnels, and relies on engineering to conduct case analysis and calculations, thus realizing a design method for the joint setting of parallel drainage tunnels and transverse branch tunnels for joint precipitation. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the systems shown in these drawings without paying any creative work.
[0040] Figure 1 is a flow chart of a design method in one embodiment of the present invention;
[0041] Figure 2 It is a schematic plan view of underground engineering layout in one embodiment of the present invention;
[0042] Figure 3 It is a schematic diagram of a cross-sectional view of an arrangement in one embodiment of the present invention.
[0043] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments.
[0044] Description of Figure Numbers:
[0045] Tunnel main hole 100; central drainage ditch 110;
[0046] Sluice hole 200;
[0047] Horizontal branch hole 300;
[0048] Shaft 400;
[0049] Stairwell 500;
[0050] Water collecting pipe 600. DETAILED DESCRIPTION
[0051] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0054] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0055] See also Figure 1 In one embodiment of the present invention, a design method for a main and branch drainage system of a karst tunnel comprises the following steps:
[0056] Step S1, calculating the water flow section of the drainage hole 200: calculating the economic section size of the drainage hole 200, and determining the water flow section size of the drainage hole 200 according to the economic section size of the drainage hole 200 and the drainage safety factor requirement; wherein, step S1 specifically includes:
[0057] Step S11, obtaining the predicted daily water inflow Q1 of the main tunnel 100; wherein the obtaining method includes directly obtaining according to the geological exploration report, obtaining according to the formula It should be noted that the predicted daily water inflow Q1 generally needs to be provided by the geological survey report. If the geological survey report does not provide it, Calculate the predicted daily water inflow, F needs to be obtained through investigation, and M is generally taken as 2.5 to 3.5. Among them, Q1 is the predicted water inflow of the tunnel (m 3 / d), F is the catchment area of the tunnel through the karst aquifer (km 2 ), M is the groundwater runoff modulus (L / s·km 2 ).
[0058] Step S12, according to the predicted daily water inflow Q1 and the conversion formula Calculate the predicted flow rate of the water discharge hole 200; where Q2 is the predicted flow rate of the water discharge hole 200 (m 3 / s).
[0059] Step S13, according to the formula Obtain the economic cross-sectional dimensions of the drainage tunnel; wherein Q2 is the predicted drainage tunnel flow, b2 is the drainage tunnel height and / or width, n2 is the drainage tunnel wall roughness, and i2 is the drainage tunnel bottom slope;
[0060] Step S14, according to the economic cross-sectional dimensions and the constructable cross-sectional dimensions of the drainage tunnel 200, and in accordance with the requirements of the drainage safety factor, the water-passing cross-sectional dimensions are obtained. It should be understood by those skilled in the art that after calculating the economic cross-sectional dimensions of the drainage tunnel 200, it is necessary to compare the constructable cross-sectional dimensions of the drainage tunnel 200 and reserve sufficient drainage safety factors. According to research, the cross-sectional dimensions of tunnels constructed by the drilling and blasting method should generally not be less than 3.5 m, otherwise the construction will be very difficult, the utilization rate of mechanical equipment will be low, and the engineering cost will be high.
[0061] The cross-sectional dimensions of the parallel drainage tunnel 200 of Yuanguping Tunnel in Zhangjiajie to Guanzhuang section of G59 Hubei Expressway using the present invention are 4.8m in bottom width and 5m in height, and the cross-sectional form is a straight wall circular arc arch.
[0062] Step S2, calculating the water-passing section of the transverse branch tunnel 300: inversely calculating the designed water discharge of the transverse branch tunnel 300 according to the sum of the water discharge of the multiple central drainage ditches 110 of the tunnel and the surplus coefficient, and calculating the water-passing section size of the transverse branch tunnel 300 according to the designed water discharge and the section size. Specifically, the water-passing section of the transverse branch tunnel 300 is determined according to the water-passing capacity of the longitudinal central drainage ditch 110 that bears the main drainage function of the main tunnel 100 of the tunnel, and its main function is to collect groundwater in the main tunnel 100 of the tunnel and reduce the water head of the main tunnel 100 of the tunnel.
[0063] Wherein, the step S2 specifically includes:
[0064] Step S21, according to the formula Get the flow of a single central drain 110; where Q c The discharge volume of a single central drainage ditch 110 (m 3 / s), n1 is the roughness rate of the wall of the central drainage ditch 110, and the concrete structure is 0.013, A is the area of the central drainage ditch 110 (m 2 ), ρ is the wetted perimeter of the central drainage ditch 110 (m), i1 is the longitudinal slope of the main tunnel 100;
[0065] Step S22, based on the sum of the discharge volumes of the plurality of central drainage ditches 110 and the surplus coefficient of 1.5-3, reversely calculate the design discharge volume of the transverse branch hole 300.
[0066] Step S23, according to the design discharge volume and cross-sectional size calculation formula The cross-sectional dimensions of the transverse branch tunnel are obtained; wherein n3 is the roughness of the wall of the transverse branch tunnel, b3 is the height and / or width of the transverse branch tunnel, and i3 is the bottom slope of the transverse branch tunnel; it is worth noting that the water discharge of the transverse branch tunnel 300 can be calculated by inverse calculation based on the sum of the water discharge of multiple central ditches, and the water discharge of the transverse branch tunnel 300 can be obtained by considering the surplus coefficient of 1.5 to 3. The cross-sectional dimensions of the transverse branch tunnel 300 refer to Q c The calculation formula is used. After considering the feasibility of construction, the minimum section width and height are not less than 2.2m, and the section shape can adopt a semicircular straight wall arch.
[0067] The cross-branch tunnel 300 of the Yuanguping Tunnel of the Zhangjiajie to Guanzhuang section of the G59 Hubei Expressway to which the present invention is applied has a cross-sectional dimension of 2.4m in bottom width and 2.4m in height, and a straight-wall circular-arc arch cross-sectional form.
[0068] Step S3, determining the layout position of the drainage hole 200: determining the plane and vertical position of the drainage hole 200 according to the safety distance between the tunnel main hole 100 and the drainage hole 200, the radius of the precipitation funnel, and the requirement of the tunnel main hole 100 being pressure-free or under low pressure of less than 300 kPa;
[0069] The step S3 specifically includes:
[0070] Step S31, determining that the safety distance between the tunnel main hole 100 and the drainage hole 200 is greater than 1 times the hole diameter of the tunnel main hole 100; since the structural safety distance between the tunnel main hole 100 and the drainage hole 200 is generally 1 to 2 times the excavation hole diameter of the tunnel main hole 100 according to the current requirements of the tunnel structure profession, the plane safety distance required by the structure needs to be greater than 1 times the hole diameter.
[0071] Step S32, according to the formula , calculate the effective radius of the precipitation funnel, and then use the formula , the position head of the tunnel main hole 100 from the drainage hole 200 is calculated, so as to obtain the relative position of the tunnel main hole 100 and the drainage hole 200, and the effective radius of the precipitation funnel is calculated using the Kusakin formula.
[0072] Among them, R is the impact radius of the drainage hole 200 (m), S is the water level drop (m), H is the head height (m), k is the water permeability (m / d), x is the distance between the main hole and the drainage hole 200 (m), y is the water level depth corresponding to the main hole position (m), r w The radius of the drainage hole is 200 (m);
[0073] Step S33, determining the plane and vertical position of the drainage hole 200 according to the safety distance, the precipitation funnel radius, and the maximum value of the relative position.
[0074] The parameters of the Yuanguping Tunnel of the Zhangjiajie to Guanzhuang section of the G59 Hubei Expressway using the present invention are as follows: H=180m, S=180m, k=0.25m / d, and the calculated influence radius of the drainage hole 200 is R=2420m. The excavation diameter of the main tunnel 100 of the tunnel is 13m. From the perspective of structural safety, the construction safety clearance between the drainage hole 200 and the main tunnel is 19m according to 1.5 times the tunnel diameter. The parallel drainage hole 200 is arranged in the upstream direction of the groundwater flow of the main tunnel. The main tunnel is arranged in an up-and-down separation manner. The distances between the near and far main tunnels and the drainage hole 200 are 25m and 68m respectively. The water head heights of the near and far main tunnels during the construction period are 60m and 87m respectively. If the requirements of the main tunnel without pressure or low pressure construction are to be met, the parallel drainage hole 200 needs to be arranged 70m below the top of the main tunnel. The layout depth of the drainage tunnel 200 is much lower than that of the main tunnel, which is not convenient for construction. Therefore, a transverse branch tunnel 300 needs to be set up for auxiliary precipitation.
[0075] Step S4, determining the layout position of the transverse branch tunnel 300: calculating the maximum distance of the transverse branch tunnel 300 that maintains low-pressure excavation along the longitudinal direction of the main tunnel 100 of the tunnel as the layout position of the transverse branch tunnel 300.
[0076] The step S4 specifically includes:
[0077] Step S41, according to the formula Calculate the reference radius of the rectangular section; it should be noted that the transverse branch tunnel 300 and the main tunnel 100 form a joint drainage system, that is, the drainage system of the transverse branch tunnel 300 and the main tunnel 100 form a "big well". In essence, the area occupied by all drainage systems is simplified into a circular well, and then the formula for calculating the precipitation funnel is used to calculate the water head, but the radius r of the drainage hole 200 needs to be calculated. w In other words, the reference radius of the rectangular section is calculated. Among them, r0 is the reference radius (m), a is the width of the tunnel system (m), is a coefficient related to b / a. It takes 1 when b / a is 0 and takes 1.18 when b / a is 0.08, with interpolation in between.
[0078] Step S42: according to the precipitation funnel curve equation Calculate the position head of the transverse branch tunnel 300; where x is the longitudinal distance from the branch tunnel (m), y is the head depth at the corresponding position (m), H1 is the maximum head of the main tunnel (m), is the distance from the top of the main cave to the bottom of the branch cave (m), h f The safe construction water pressure at the top of the main tunnel during construction (m);
[0079] Step S43, according to the formula The maximum distance of the transverse branch tunnel 300 excavated at low pressure along the longitudinal direction of the main tunnel 100 is calculated as the layout position of the transverse branch tunnel 300. Since the drainage of the sump has axial symmetry, the maximum distance of the branch tunnel excavated at low pressure along the longitudinal direction of the main tunnel 100 can be calculated according to the following precipitation funnel curve equation in both the transverse and longitudinal directions.
[0080] The parameters of the Yuanguping Tunnel of the Zhangjiajie to Guanzhuang section of the G59 Hubei Expressway to which the present invention is applied are as follows: a=85m, b=15m, S=87m, H1=87m, △h=14m, h f =30m, then the reference radius r0=1.12×(85+15)÷4=28m, the maximum x is 260m, and the maximum clear distance of the transverse branch tunnel 300 is 576m. Considering the 95% guarantee factor, the longitudinal spacing of the transverse branch tunnel 300 is approximately controlled within 600m, and it is arranged as close to the fault and karst development section as possible.
[0081] Please see attached Figure 2 and 3 The present invention also provides a main-branch drainage system for a karst tunnel, comprising a central drainage ditch 110 arranged below the tunnel pavement and extending along the extension direction of the tunnel main hole 100, a drainage hole 200 for draining groundwater around the tunnel, a transverse branch hole 300 for collecting groundwater from the tunnel main hole 100, and a vertical shaft 400 for connecting the central drainage ditch 110 and the transverse branch hole 300; wherein,
[0082] The drainage hole 200 is arranged outside the tunnel and extends in the direction in which the tunnel extends. The safety distance between the drainage hole 200 and the tunnel meets the following conditions: the safety distance between the main tunnel 100 and the drainage hole 200 is greater than 1 times the diameter of the main tunnel, and according to the formula , calculate the position head of the tunnel main hole 100 from the drainage hole 200;
[0083] The transverse branch hole 300 is disposed transversely below the tunnel pavement and communicates with the drainage hole 200. A preset drainage slope is formed between the transverse branch hole 300 and the tunnel transversely, so that the groundwater collected by the transverse branch hole 300 is discharged to the drainage hole 200. The water-passing section of the transverse branch hole 300 meets the formula ;
[0084] The vertical shaft 400 is vertically disposed between the central drainage ditch 110 and the transverse branch hole 300 , the upper end of the vertical shaft 400 is communicated with the central drainage ditch 110 , and the lower end of the vertical shaft 400 is communicated with the transverse drainage hole 200 .
[0085] As a preferred embodiment of the present invention, the drainage hole 200 is arranged parallel to the tunnel, the transverse branch hole 300 is arranged perpendicular to the drainage hole 200, the safety distance is not less than 1.5 times the excavation diameter of the main tunnel 100, the bottom of the drainage hole 200 is lower than the bottom of the central drainage ditch 110, and the height difference between the drainage hole 200 and the arch of the main tunnel 100 is greater than 10 meters; the bottom of the transverse branch hole 300 is 0.4-0.6m lower than the bottom of the drainage hole 200.
[0086] Furthermore, the cross-sectional shapes of the drainage hole 200 and the transverse branch hole 300 include one or more of a rectangular shape, a circular shape, a straight-wall circular arc shape, and a horseshoe shape.
[0087] As a preferred embodiment of the present invention, a plurality of water collecting pipes 600 are connected above the drainage hole 200 to collect groundwater near the drainage hole 200 into the drainage hole 200 .
[0088] Furthermore, a staircase 500 is provided between the transverse branch hole 300 and the main tunnel 100 for workers to inspect and maintain. Specifically, staircases 500 are provided on the left and right outer sides of the main tunnel 100, respectively, and the staircases 500 are connected to the transverse branch hole 300, so as to facilitate workers to inspect and maintain.
[0089] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent system or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A design method for the main and branch drainage system of a karst tunnel, It is characterized in that Includes steps: Step S1, calculating the water-passing cross-section of the drainage tunnel: calculating the economic cross-section size of the drainage tunnel, and determining the water-passing cross-section size of the drainage tunnel according to the economic cross-section size of the drainage tunnel and the requirements of the drainage safety factor; Step S2, calculating the water-passing section of the transverse branch tunnel: inversely calculating the designed water discharge of the transverse branch tunnel according to the sum of the water discharge of multiple central drainage ditches of the tunnel and the surplus coefficient, and calculating the water-passing section size of the transverse branch tunnel according to the designed water discharge and the section size; Step S3, determining the layout position of the drainage hole: determining the plane and vertical position of the drainage hole according to the safety distance between the tunnel main hole and the drainage hole, the radius of the precipitation funnel, and the requirement of the tunnel main hole being pressure-free or under low pressure of less than 300 kPa; Step S4, determining the layout position of the transverse branch tunnel: calculating the maximum distance of the transverse branch tunnel that maintains low-pressure excavation along the longitudinal direction of the main tunnel of the tunnel as the layout position of the transverse branch tunnel; The step S1 comprises: Step S11, according to the formula Get the predicted daily water inflow Q of the main tunnel of the tunnel 1 ; Where F is the catchment area of the recharge zone of the tunnel through the karst aquifer, and M is the groundwater runoff modulus; Step S12: according to the predicted daily water inflow Q 1 And the conversion formula Calculate and predict the discharge of spillway; Step S13, according to the formula Obtain the economic cross-sectional dimensions of the drainage tunnel; wherein, Q 2 To predict the flow rate of the spillway, b 2 is the height and / or width of the drainage hole, n 2 is the roughness rate of the drainage tunnel wall, i 2 It is the bottom slope of the drain hole; Step S14, obtaining the water-passing section size according to the economic section size and the constructible section size of the drainage tunnel and the drainage safety factor requirement; The step S2 comprises: Step S21, according to the formula Get the flow of a single central drain; where Q c is the discharge of a single central drainage ditch, n 1 is the roughness rate of the central drainage ditch wall, A is the area of the central drainage ditch, ρ is the wetted perimeter of the central drainage ditch, i 1 It is the longitudinal slope of the main tunnel; Step S22, based on the sum of the discharge volumes of the plurality of central drainage ditches and the surplus coefficient of 1.5 to 3, reversely calculating the design discharge volume of the transverse branch tunnel; Step S23, according to the design discharge volume and cross-sectional size calculation formula Obtain the water-passing cross-sectional dimensions of the transverse branch tunnel; where n 3 is the roughness of the wall of the transverse branch tunnel, b 3 is the height and / or width of the lateral branch hole, i 3 It is the bottom slope of the transverse branch tunnel; The step S3 comprises: Step S31, determining that the safety distance between the tunnel main hole and the drainage hole is greater than 1 times the hole diameter of the tunnel main hole; Step S32, according to the formula , calculate the effective radius of the precipitation funnel, and then use the formula , calculate the water head of the distance between the main tunnel and the drainage hole, so as to obtain the relative position of the main tunnel and the drainage hole; where R is the influence radius of the drainage hole, S is the water level drop, H is the water head height, k is the water permeability, x is the distance between the main tunnel and the drainage hole, y is the water level depth corresponding to the main tunnel position, r w is the radius of the drainage hole; Step S33, determining the plane and vertical position of the drainage hole according to the safety distance, the precipitation funnel radius, and the maximum value of the relative position; The step S4 comprises: Step S41, according to the formula Calculate the reference radius of the rectangular section; where r 0 is the reference radius, a is the width of the tunnel system, is the coefficient related to b / a; Step S42: according to the precipitation funnel curve equation Calculate the position head of the transverse branch hole; where x is the longitudinal distance from the branch hole, y is the head depth at the corresponding position, H 1 The maximum water head of the main hole. The distance from the top of the main cave to the bottom of the branch cave, h f The safe construction water pressure at the top of the main tunnel during construction; Step S43, according to the formula The maximum distance of the transverse branch tunnels that maintain low-pressure excavation along the longitudinal direction of the main tunnel of the tunnel is calculated as the layout position of the transverse branch tunnels.
2. The design method for the main and branch drainage system of a karst tunnel according to claim 1, It is characterized in that The drainage hole is arranged parallel to the tunnel, and the transverse branch hole is arranged perpendicular to the drainage hole. The safety distance is not less than 1.5 times the excavation diameter of the main tunnel hole. The bottom of the drainage hole is lower than the bottom of the central drainage ditch, and the height difference between the drainage hole and the arch of the main tunnel hole is greater than 10 meters; the bottom of the transverse branch hole is 0.4-0.6m lower than the bottom of the drainage hole.
3. The design method for the main and branch drainage system of a karst tunnel according to claim 2, It is characterized in that The cross-sectional shapes of the drainage hole and the transverse branch hole include one or more of rectangular, circular, straight-wall circular arch, and horseshoe.
4. The design method for the main and branch drainage system of a karst tunnel according to claim 3, It is characterized in that A plurality of water collecting pipes are connected above the drainage hole to collect groundwater near the drainage hole into the drainage hole.
5. The design method for the main and branch drainage system of a karst tunnel according to claim 4, It is characterized in that A stairwell is also provided between the transverse branch tunnel and the main tunnel for workers to inspect and maintain.
