Method for evaluating stability of pile foundation in karst area

By obtaining geographical information of pile foundations in karst areas, establishing a cave model and using FLAC3D simulation analysis, calculating the correlation of each influencing factor, solving the problem of single analysis angle and low accuracy of traditional methods, and achieving more accurate pile foundation stability Evaluate and predict.

CN119026369APending Publication Date: 2024-11-26CHINA MERCHANTS CHONGQING COMM RES & DESIGN INST +1
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411217178.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Traditional engineering analysis methods have a single analysis angle in the pile foundation stability analysis in karst areas, a small scope of application and low accuracy, and cannot effectively evaluate the stability and critical load value of pile foundation under various influencing factors.

Method used

By obtaining geographical information of pile foundation location, establishing a cave model, setting up monitoring points to analyze the pile foundation stability change trend and critical load value using FLAC3D simulation, and calculate the correlation degree of each influencing factor, assign different weights, and perform weighted summing to evaluate Pile foundation stability.

Benefits of technology

It improves the accuracy and scope of application of pile foundation stability analysis, can more accurately predict the stability and potential damage factors of underground projects, and expands the multi-dimensionality and information volume of analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026369A_ABST
    Figure CN119026369A_ABST
Patent Text Reader

Abstract

The invention provides a karst area pile foundation stability evaluation method which comprises the following steps: acquiring geographic information of a pile foundation position, and modeling according to the geographic information to obtain a karst cave model; a plurality of monitoring points are arranged on the karst cave model, and FLAC3D simulation analysis is carried out on the change trend and the critical load value of the pile foundation stability of the karst cave model under various influence factors; and the correlation degree between the influence factors and the critical load value is calculated, different weight coefficients are given to all the influence factors, weighted summation is conducted on the correlation degree of all the influence factors, and a pile foundation stability evaluation value is obtained. The problems that in the prior art, a pile foundation stability analysis method is single in analysis angle, small in application range and low in accuracy are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation bearing, and in particular to a method for evaluating pile foundation stability in karst areas. Background Art

[0002] During the construction of a bridge, it is necessary to cross obstacles while meeting linear requirements, so it is possible that the bridge is built on a karst area. The size and distribution of caves are irregular, and some pile foundations may even pass through beaded caves. The presence of caves may cause the pile foundation to be unstable, affecting the stability of the bridge. Traditional engineering analysis methods usually use relatively bulky instruments to explore underground caves, and analyze the stability of pile foundations based on empirical formulas and numerical analysis models. However, due to the small detectable depth of the exploration equipment, these methods have a single analysis angle, a small scope of application, and low accuracy. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention provides a method for evaluating the stability of pile foundations in karst areas, which solves the problems of the prior art pile foundation stability analysis method having a single analysis angle, a small scope of application and low accuracy.

[0004] According to an embodiment of the present invention, a method for evaluating pile foundation stability in karst areas comprises:

[0005] Obtain geographic information of the pile foundation location, and perform modeling based on the geographic information to obtain a karst cave model;

[0006] Multiple monitoring points were set up on the cave model, and FLAC3D was used to simulate and analyze the changing trend and critical load value of the pile foundation stability under various influencing factors of the cave model;

[0007] The correlation between the influencing factors and the critical load value is calculated, a different weight coefficient is assigned to each influencing factor, and the correlation of all influencing factors is weighted and summed to obtain the pile foundation stability evaluation value.

[0008] Preferably, the geographic information includes cave structure information and soil layer physical properties.

[0009] The steps of obtaining soil layer information at the pile foundation location include:

[0010] The scattered wave method is used to collect the mechanical properties and hydrogeological properties of the rock and soil layer below the pile foundation;

[0011] Using seismic scattering method, the distribution of loose layer, weathered layer, loose area, karst, cavity, fault zone, bedrock, isolated rock and grouting body is collected;

[0012] Preprocess and extract features of mechanical properties, hydrogeological properties and distribution to obtain characteristic parameters;

[0013] Carry out seismic imaging and wave velocity imaging based on characteristic parameters to delineate the karst development range at the pile foundation location;

[0014] Conduct drilling tests at the pile foundation location and obtain cave structure information based on the karst development range;

[0015] The rock and soil samples at the pile foundation location were collected for physical and mechanical tests to obtain the physical properties of the soil layer.

[0016] Preferably, the geographic information is modeled using a finite difference method.

[0017] Preferably, the monitoring points are arranged at the pile top, pile end, cave roof, pile side and soil around the pile.

[0018] Preferably, the influencing factors include cave span, bearing layer rock mass characteristics, cave roof thickness, pile hole horizontal spacing, pile body characteristics, cave height, cave filling material characteristics, cave filling method and cave vertical spacing.

[0019] Preferably, the step of calculating the correlation between the influencing factors and the critical load value comprises:

[0020] According to the influencing factors and the corresponding critical load values, a reference matrix and a variation matrix are constructed respectively;

[0021] The reference matrix and the change matrix are dimensionless processed by using the mean method;

[0022] Calculate the correlation coefficient between the reference matrix and the change matrix to obtain the correlation matrix;

[0023] Calculate the mean of each row of the correlation matrix to obtain the correlation between each influencing factor and the corresponding critical load value.

[0024] Preferably, the calculation formula of the correlation coefficient is as follows:

[0025]

[0026] Among them, Δ ij is the difference sequence, ρ is the resolution coefficient, b i ′(j) is the value of the i-th row and j-th column of the change matrix after dimensionless processing, a i ′(j) is the value of the i-th row and j-th column of the reference matrix after dimensionless processing.

[0027] Preferably, after the correlation is obtained, the correlation is sorted from high to low, and the corresponding influencing factors are divided into primary indicators, secondary indicators and tertiary indicators, and different weight coefficients are assigned to each level of indicators.

[0028] Compared with the prior art, the present invention has the following beneficial effects:

[0029] By obtaining the geographic information of the pile foundation location, the karst cave at the pile foundation location is modeled, multi-dimensional soil information is collected, the information dimension and quantity are increased, the single analysis angle is avoided, and the scope of application is expanded. The model is simulated and analyzed by FLAC3D software, and the changing trend and critical load value of the pile foundation stability of the karst cave model under various influencing factors are analyzed. Then, by calculating the correlation between various influencing factors and critical load values, the influence of various influencing factors on the bearing capacity of the pile foundation is analyzed and compared, and the stability of the pile foundation is evaluated. Through numerical simulation and calculation of pile foundation stability evaluation values, the influencing factors of stability, destruction and instability of underground engineering can be more accurately revealed and predicted, which can be used to predict the evolution process of engineering destruction and instability. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 The present invention is a flowchart of a pile foundation stability evaluation method according to an embodiment of the present invention.

[0031] Figure 2 This is a finite difference method grid modeling diagram of an embodiment of the present invention.

[0032] Figure 3 This is a graph showing the change in pile top settlement and ultimate bearing capacity under different spans of a karst cave according to an embodiment of the present invention.

[0033] Figure 4 This is a graph showing the change in pile top settlement and ultimate bearing capacity under different elastic moduli of the bearing layer according to an embodiment of the present invention.

[0034] Figure 5 This is a graph showing the change in pile top settlement and ultimate bearing capacity under different cave roof thicknesses according to an embodiment of the present invention.

[0035] Figure 6 This is a graph showing the change in pile top settlement and ultimate bearing capacity at different cave heights according to an embodiment of the present invention.

[0036] Figure 7 This is a graph showing the variation of the axial force of the pile body with the pile length at different cave heights according to an embodiment of the present invention.

[0037] Figure 8 This is a graph showing the change in pile top settlement and ultimate bearing capacity under different elastic moduli of the cave filling material according to an embodiment of the present invention.

[0038] Fig. 9 This is a diagram showing the variation of the axial force of the pile body under different elastic moduli of the cave filling material according to an embodiment of the present invention.

[0039] Fig.10 This is a graph showing the changes in pile top settlement under different filling methods for the cave according to an embodiment of the present invention. DETAILED DESCRIPTION

[0040] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0041] like Figure 1 As shown, an embodiment of the present invention proposes a method for evaluating the stability of pile foundations in karst areas, obtains geographic information at the location of the pile foundation, and models it based on the geographic information to obtain a karst cave model.

[0042] Geographic information includes cave structure information and soil physical properties. The steps of obtaining the above two types of geographic information include:

[0043] (1) The scattered wave method is used to collect the mechanical properties and hydrogeological properties of the rock and soil layer below the pile foundation. The length and spacing of the survey line and the point spacing of the detectors are determined based on the task requirements, the spatial structure, size and burial depth of the detection target, site conditions and other factors.

[0044] (2) Using the seismic scattering method, the distribution of loose layers, weathered layers, loose areas, karst, cavities, fault zones, bedrock, boulders and grouting bodies is collected to facilitate modeling and analysis using the collected stratigraphic structure information;

[0045] (3) Preprocess the mechanical properties, hydrogeological properties and distribution by removing direct waves and surface waves, filtering (such as bandpass filtering), removing instrument response and static correction, and then performing data enhancement, wave field separation, velocity modeling, Kirchhoff migration and other processing to improve data quality and reduce noise interference. Feature extraction is then performed to extract effective parameters and obtain characteristic parameters.

[0046] (3) Seismic imaging and wave velocity imaging are performed based on characteristic parameters to delineate the karst development range at the pile foundation location.

[0047] (4) Conduct drilling tests at the location of the pile foundation, and conduct detailed surveys and verifications of the karst caves at the location of the pile foundation in combination with the karst development range to obtain information on the karst cave structure, including: the location of the karst caves within the influence range of the pile foundation, the thickness and integrity of the roof, the shape, size, filling condition, and the hydraulic connection between the karst water and the upper water body.

[0048] (5) Collect rock and soil samples at the pile foundation location for physical and mechanical tests to obtain the physical properties of the soil layer, including: elastic modulus, compression modulus, Poisson's ratio, shear modulus and other data of the soil.

[0049] Integrate multi-dimensional soil information, increase the dimension and quantity of information, avoid a single analysis angle, and expand the scope of application.

[0050] After obtaining the cave structure information and soil physical properties, a concrete pile with a diameter of 1 m was selected, of which the length in the X direction was 60 m, the length in the Z direction was 55 m, and the length in the Y direction was 40 m. The soil layer and the cave at the pile foundation location were modeled using the finite difference method using modeling software (such as Rhino Modeling) to obtain a cave model, such as Figure 2 shown.

[0051] Multiple monitoring points were set up on the pile top, pile end, cave roof, pile side and soil around the pile of the cave model. FLAC3D was used to simulate and analyze the changing trend and critical load value of the pile foundation stability of the cave model under various influencing factors.

[0052] The simulation analysis includes the following two working conditions: ① the pile end is placed on the top plate of the cave; ② the pile foundation passes through the cave.

[0053] For the first working condition, this embodiment selects the changing trend of pile foundation stability and the change of critical load value under the three influencing factors of cave span, bearing layer rock mass characteristics and cave roof thickness. The simulation analysis of other influencing factors is similar and will not be repeated here.

[0054] (1) Effect of cave span on pile foundation bearing capacity

[0055] like Figure 3 As shown in the figure, when other factors remain unchanged, as the span of the cave increases, the settlement of the pile top also gradually increases. In the early stage of loading, the vertical displacement of the pile top and the load on the pile top basically change linearly. When the loading reaches a certain stage, nonlinear characteristics appear. When the load is below 30000kN, the settlement values ​​of different spans are slightly different. As the load increases, this difference becomes increasingly obvious, especially at the end of loading, the larger the span of the cave, the more obvious the nonlinear characteristics.

[0056] In addition, compared with the cave span of 4D, the increases in its ultimate bearing capacity are -1.8%, -3.23%, -3.71%, -3.95%, and -4.1%, respectively.

[0057] In general, the increase in the span of the cave will lead to a gradual increase in the vertical displacement of the pile top under the same load, and with the increase in the span of the cave, the ultimate bearing capacity of the single pile decreases accordingly, but the magnitude of the decrease slows down.

[0058] (2) Influence of rock mass characteristics on pile foundation bearing capacity

[0059] from Figure 4 It can be seen that at a lower elastic modulus, the nonlinear characteristics of the rock mass are more obvious, and the ultimate bearing capacity of the pile foundation increases significantly with the increase of the elastic modulus of the rock mass.

[0060] Specifically, when the elastic modulus of the rock mass increases from 2GPa to 4GPa, the ultimate bearing capacity of the pile foundation increases from 33762kN to 39009kN, an increase of 15.5%; when it increases from 4GPa to 6GPa, the ultimate bearing capacity reaches 41403kN, an increase of 6.1%; when it increases from 6GPa to 8GPa, the ultimate bearing capacity reaches 42942kN, an increase of 3.7%; and when it increases from 8GPa to 10GPa, the ultimate bearing capacity reaches 44033kN, an increase of only 2.5%. Compared with the working condition with an elastic modulus of 2GPa, the increases in the ultimate bearing capacity are 15.5%, 22.6%, 27.2%, and 30.4%, respectively. This shows that with the increase of the elastic modulus of the bearing layer rock mass, the compression of the rock mass under the same load decreases, resulting in a corresponding decrease in the settlement of the pile top.

[0061] (3) Influence of cave roof thickness on pile foundation bearing capacity

[0062] Through the data analysis of the ultimate bearing capacity of pile foundations, such as Figure 5 As shown, it can be seen that there is a positive correlation between the ultimate bearing capacity of the foundation pile and the thickness of the cave roof. When other conditions remain unchanged, the increase in the thickness of the roof will lead to a decrease in the settlement value of the pile foundation. In the initial stage of loading, there is basically a linear relationship between the vertical displacement of the pile top and the pile top load. When the loading reaches a certain stage, nonlinear characteristics appear. When the load is below 20000kN, the settlement values ​​of different roof thicknesses are slightly different. As the load increases, this difference becomes increasingly obvious, especially in the later stage of loading, when the thinner cave roof exhibits more significant nonlinear characteristics.

[0063] In addition, from Figure 5 It can also be seen that as the thickness of the top plate increases, the ultimate bearing capacity of the pile foundation also increases. Especially when 1D<H<3D (D represents the pile diameter, H represents the thickness of the top plate), the ultimate bearing capacity increases rapidly with the increase of the thickness of the top plate. However, when H>3D, the growth rate of the ultimate bearing capacity gradually slows down.

[0064] For the second working condition, the present invention selects the change trend of pile foundation stability and the change of critical load value under the three influencing factors of cave height, cave filling material characteristics and cave filling method. The simulation analysis of other influencing factors is similar and will not be repeated here.

[0065] (1) Impact of cave height on pile foundation bearing capacity

[0066] ① Bearing capacity of pile foundation

[0067] like Figure 6As shown in the figure, the variation of the ultimate bearing capacity of the foundation pile and the cave height shows a negative correlation. When the pile top load is within 15000 kN, the settlement difference of the pile top at different cave heights is not obvious. As the pile top load gradually increases, the settlement value difference at different cave heights expands.

[0068] ② Pile axial force

[0069] like Figure 7 The curve of the pile axial force changing with pile length at different heights of the cave reflects the change of the soil layer on the pile side. Taking the cave height 10D as an example, within the pile length of 18m~19m and 29m~30m, it is the rock-embedded section, and the axial force changes greatly; within the pile length of 19m~29m, the pile body is in the cave section, there is no friction contact, and the axial force changes horizontally.

[0070] (2) Effect of cave filling properties on pile foundation bearing capacity

[0071] ① Bearing capacity of pile foundation

[0072] like Figure 8 As shown in the figure, the change law of the ultimate bearing capacity of the pile foundation and the elastic modulus of the filler shows a positive correlation. When other factors are constant, with the increase of the elastic modulus of the filler, the settlement value of the pile foundation gradually increases. Before reaching the ultimate load, the vertical displacement of the pile top and the load on the pile top basically change linearly, and the difference between the elastic modulus curves is small. The ultimate bearing capacity of the pile foundation increases with the increase of the elastic modulus of the filler, but the increase is small, and it gradually decreases with the increase of the elastic modulus.

[0073] When other material parameters of the filler remain unchanged and the elastic modulus varies within 5 GPa to 25 GPa, the effect on the ultimate bearing capacity of the pile foundation is not significant.

[0074] ②Axial force analysis

[0075] Depend on Fig. 9 The comparison of the axial force of the pile body with different elastic moduli as the pile length shows that the axial force curves under different elastic moduli are basically the same. The difference lies in the different elastic moduli of the fillers, which exert different frictional resistance. The elastic modulus of the filler increases from 5GPa to 25GPa, and the axial force at the pile end accounts for 27.05%, 24.34%, 23.13%, 22.46%, and 22.03% of the pile top load under each elastic modulus. As the elastic modulus of the filler increases, the axial force at the pile top increases, and the axial force at the pile end decreases, and the filler contributes more to the ultimate bearing capacity of the pile foundation.

[0076] (3) Effect of cave filling method on bearing capacity of rock-embedded piles

[0077] The changes of pile top settlement with applied load under three working conditions of the cave are as follows Fig.10 As shown:

[0078] The ultimate bearing capacity of ordinary filled caves is 4.8% higher than that of hollow caves, while the ultimate bearing capacity of reinforced filled caves is 47.6% higher than that of hollow caves, which is an increase of nearly half, and the reinforcement effect is obvious.

[0079] The correlation between the influencing factors and the critical load value is calculated, a different weight coefficient is assigned to each influencing factor, and the correlation of all influencing factors is weighted and summed to obtain the pile foundation stability evaluation value.

[0080] The influencing factors are taken as the reference matrix A, and the critical load values ​​corresponding to each influencing factor are taken as the variation matrix B, as follows:

[0081]

[0082] Each factor affecting pile foundation stability has its physical meaning, and therefore has its corresponding dimension. Due to the difference in dimensions and the inconsistency of parameter variation range, the analysis results may lose the basis for comparison. Therefore, it is necessary to perform dimensionless processing on the influencing factors and the corresponding critical load values. The present invention will use the mean method to achieve dimensionless processing, and the specific calculation formula is as follows:

[0083]

[0084] Among them, a i ′(j) is the value of the i-th row and j-th column of the reference matrix after dimensionless processing. The dimensionless processing of the change matrix is ​​similar.

[0085] Then the correlation between the influencing factors and the critical load value is calculated, and the formula is as follows:

[0086]

[0087] Among them, Δ ij is the difference sequence, and ρ is the resolution coefficient.

[0088] The correlation is a value in the interval [0,1]. When the correlation is close to 1, it means that the sensitivity of the change matrix B to the reference matrix A is higher. When the correlation is close to 0, the sensitivity of the change matrix B to the reference matrix A is lower. The correlation can be calculated by the following formula:

[0089]

[0090] After obtaining the correlation, the correlation is sorted from high to low, and the corresponding influencing factors are divided into three levels: primary indicators, secondary indicators and tertiary indicators, and different weight coefficients are assigned to each level of indicators, such as 0.2<primary indicator weight coefficient<0.3, 0.1<secondary indicator weight coefficient<0.2, 0.01<tertiary indicator weight coefficient<0.1. Then, the correlation of all influencing factors is weighted and summed to obtain the pile foundation stability evaluation value. The smaller the correlation between the influencing factor and the critical load value, the less obvious the impact, and the corresponding pile foundation stability evaluation value will be relatively smaller, and the stronger the pile foundation stability. Through numerical simulation and calculation of pile foundation stability evaluation value, the influencing factors of stability, destruction and instability of underground engineering can be more accurately revealed and predicted, which can be used to predict the evolution process of engineering destruction and instability.

[0091] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A method for evaluating pile foundation stability in karst areas. Features: include: Obtain geographic information of the pile foundation location, and perform modeling based on the geographic information to obtain a karst cave model; Multiple monitoring points were set up on the cave model, and FLAC3D was used to simulate and analyze the changing trend and critical load value of the pile foundation stability under various influencing factors of the cave model; The correlation between the influencing factors and the critical load value is calculated, a different weight coefficient is assigned to each influencing factor, and the correlation of all influencing factors is weighted and summed to obtain the pile foundation stability evaluation value.

2. A method for evaluating pile foundation stability in karst areas as claimed in claim 1, Features: The geographic information includes cave structure information and soil layer physical properties. The steps of obtaining soil layer information at the pile foundation location include: The scattered wave method is used to collect the mechanical properties and hydrogeological properties of the rock and soil layer below the pile foundation; Using seismic scattering method, the distribution of loose layer, weathered layer, loose area, karst, cavity, fault zone, bedrock, isolated rock and grouting body is collected; Preprocess and extract features of mechanical properties, hydrogeological properties and distribution to obtain characteristic parameters; Carry out seismic imaging and wave velocity imaging based on characteristic parameters to delineate the karst development range at the pile foundation location; Conduct drilling tests at the pile foundation location and obtain cave structure information based on the karst development range; The rock and soil samples at the pile foundation location were collected for physical and mechanical tests to obtain the physical properties of the soil layer.

3. A method for evaluating pile foundation stability in karst areas as claimed in claim 1, Features: Finite difference method is used to model geographic information.

4. A method for evaluating pile foundation stability in karst areas as claimed in claim 1, Features: The monitoring points are arranged at the pile top, pile end, cave roof, pile side and soil around the pile.

5. A method for evaluating pile foundation stability in karst areas as claimed in claim 1, Features: The influencing factors include the span of the cave, the characteristics of the bearing layer rock mass, the thickness of the cave roof, the horizontal spacing of the pile holes, the characteristics of the pile body, the height of the cave, the characteristics of the cave filling material, the cave filling method and the vertical spacing of the caves.

6. A method for evaluating pile foundation stability in karst areas as claimed in claim 1, Features: The steps for calculating the correlation between the influencing factors and the critical load values ​​include: According to the influencing factors and the corresponding critical load values, a reference matrix and a variation matrix are constructed respectively; The reference matrix and the change matrix are dimensionless processed by using the mean method; Calculate the correlation coefficient between the reference matrix and the change matrix to obtain the correlation matrix; Calculate the mean of each row of the correlation matrix to obtain the correlation between each influencing factor and the corresponding critical load value.

7. A method for evaluating pile foundation stability in karst areas as claimed in claim 6, Features: The calculation formula of the correlation coefficient is as follows: Among them, Δ ij is the difference sequence, ρ is the resolution coefficient, b i ′(j) is the value of the i-th row and j-th column of the change matrix after dimensionless processing, a i ′(j) is the value of the i-th row and j-th column of the reference matrix after dimensionless processing.

8. A method for evaluating pile foundation stability in karst areas as claimed in claim 1, Features: After obtaining the correlation, the correlation is sorted from high to low, and the corresponding influencing factors are divided into primary indicators, secondary indicators and tertiary indicators, and different weight coefficients are assigned to each level of indicators.

Citation Information

Cited By

  • Bridge pile foundation intelligent site selection method and system based on geological BIM model

    CN120974612A

  • CFG pile foundation stability evaluation system and method

    CN121071412A

  • CFG pile foundation stability evaluation system and method

    CN121071412B

  • Evaluation method for stability of hole wall of cast-in-situ bored pile

    CN121479913A