The utility model provides a high-pressure jet grouting
pile for foundation
pit water stopping, and relates to the technical field of jet grouting water stopping
pile construction. The high-pressure jet grouting
pile for foundation
pit water stopping comprises a ground, and a guide hole is formed in the outer surface of the ground. According to the high-pressure jet grouting pile for foundation
pit water stopping, through cooperation of a guide hole, a clamping block, a telescopic rod and a spring, a sleeve is inserted into the guide hole, two clamping plates are manually close to each other, a
drill rod is placed on the inner wall of the sleeve, the clamping block is loosened, the clamping block makes contact with the inner wall of the sleeve, the
drill rod is moved downwards, and the clamping block moves downwards in a sliding mode on the inner wall of the sleeve; the clamping block is located on the bottom face of the sleeve and can drive the sleeve to move, the sleeve rod moves upwards along with upward movement of the
drill rod, the sleeve rod is taken out of the guide hole by the drill rod, and the problems that after hole guide is conducted in existing construction, soil is loosened, soil on the side wall of the guide hole falls easily, the guide hole is blocked, and therefore the drill rod and a
sprayer make contact with the soil in the falling process, and construction efficiency is improved are solved. And a drill rod is difficult to descend to a set position.