Gripping assembly for electrode plates

By designing the grabbing components for electrode plates, and automatically grasping and lifting the cathode plates with the boom and grab hook, the problems of low human grasping efficiency and safety hazards are solved, and a more efficient and safe electrolysis process is achieved.

CN113044558BActive Publication Date: 2024-12-06HANGZHOU SANAL ENVIRONMENTAL TECH
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202110370119.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-06
Publication Date
2024-12-06
Estimated Expiration
2041-04-06

AI Technical Summary

Technical Problem

During the electrolysis process, human grasping electrode plates is inefficient and harmful to health, and can easily lead to electrolyte leakage and affect workers' health.

Method used

A gripping assembly consisting of a crane arm arranged in the X direction and a drooping gripper is designed. The crane arm can be moved up and down and cooperate with the positioning hole of the cathode plate to replace human gripping through automated mechanical operation to ensure the cathode plate. Safety enhancement and smooth polishing.

Benefits of technology

Improve work efficiency, reduce labor intensity, and prevent electrolyte from harming workers' health through automation, ensuring stable operation of the production line.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113044558B_ABST
    Figure CN113044558B_ABST
Patent Text Reader

Abstract

The present invention discloses a grabbing assembly for an electrode plate, comprising a suspension arm arranged along the X direction, a downwardly hanging grabbing hook arranged on the suspension arm, the suspension arm being able to move up and down, and the grabbing hook being able to cooperate with a positioning hole on a cathode plate. The present invention can automatically grab a single cathode plate and lift it upward from an electrolytic cell, making it easy to process the cathode plates one by one, and can reduce labor difficulty and improve efficiency by replacing manpower with automated mechanical processing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electrolysis, in particular to a grabbing assembly for an electrode plate. Background Art

[0002] The electrolytic cell consists of a cell body, an anode and a cathode, and most of them use a diaphragm to separate the anode chamber from the cathode chamber. When direct current passes through the electrolytic cell, an oxidation reaction occurs at the interface between the anode and the solution, and a reduction reaction occurs at the interface between the cathode and the solution to produce the desired product. When a metal or alloy is used as the cathode, it often plays a cathodic protection role because it works at a relatively negative potential and has low corrosiveness, so the cathode material is easier to choose.

[0003] During the electrolysis process, a reduction reaction occurs on the surface of the electrode plate, especially the surface of the cathode plate, and metal elements will adhere to it. After the electrolysis is completed, the cathode plate needs to be polished to make its surface smooth and free of impurities, so that the effective area of ​​the cathode plate can be guaranteed when it is used again, thereby ensuring the electrolysis efficiency.

[0004] When the electrolytic plates are extracted manually, the labor intensity is high and the efficiency is low. In addition, during the process of lifting the electrolytic plates, the electrolyte will be brought out by the electrode plates, which will endanger the health of the workers. Summary of the invention

[0005] The present invention provides a grabbing assembly for an electrode plate, which can solve one or more of the above-mentioned problems in the prior art.

[0006] According to one aspect of the present invention, a grabbing assembly for an electrode plate is provided, comprising a suspension arm arranged along the X direction, with a downwardly hanging grabbing hook on the suspension arm, the suspension arm can move up and down, and the grabbing hook can cooperate with a positioning hole on the cathode plate.

[0007] Thus, the grab hook can be driven to move up and down in the vertical direction through the boom. The grab hook can move downward to grab the cathode plate inside the cell body of the electrolytic cell. After the grab hook grabs the cathode plate, it can be lifted upward along with the boom to separate the cathode plate from the electrolytic cell. The grab assembly can replace manpower to grab and lift the cathode plate, thereby improving work efficiency. The automated process can also be connected with other processes to improve the work efficiency of the entire production line. On the other hand, automated mechanical operation can effectively prevent the electrolyte from harming the health of workers.

[0008] In some embodiments, the boom is connected to the output end of the crane, thereby providing reliable power for the lifting of the boom through the crane.

[0009] In some embodiments, the grab assembly further includes a slide rail vertically arranged along the Z direction, and the end of the boom can cooperate with the slide rail. Thus, the boom can be guided to move in the Z direction through the slide rail to prevent the boom from deviating in the Y direction or the X direction during the up and down movement, thereby providing stability.

[0010] In some embodiments, a roller is provided at the end of the boom, and the roller can be connected to the slide rail in a rolling manner. Thus, the boom and the slide rail are connected in a rolling manner, which can improve the smoothness of the up and down movement of the boom.

[0011] In some embodiments, each end of the boom is provided with two transverse rollers that roll in the X direction and are symmetrical along the boom, and one longitudinal roller that rolls in the Y direction;

[0012] The slide rail includes two support rods arranged in parallel, and a slider is connected to the side of the longitudinal roller away from the boom. The opposite side surfaces of the two support rods are slidably connected to the slider and are simultaneously rollingly connected to the longitudinal roller; the side surfaces of the two support rods close to the boom are rollingly connected to the two transverse rollers respectively.

[0013] Thus, the coordination between the boom and the slide rail is improved by the coordination of two transverse rollers and one longitudinal roller with the slide rail, which can effectively prevent the boom from derailing and ensure smooth movement of the boom. The slider can improve stability and further prevent the boom from shaking during the up and down movement.

[0014] In some embodiments, two support rods are provided with symmetrical grooves on opposite sides, and the outer side of the slider is provided with two symmetrical flanges protruding outwards, which can be engaged with the grooves. Thus, through the cooperation between the flanges and the grooves, the arm can be effectively prevented from shaking during the up and down movement, thereby enhancing stability.

[0015] In some embodiments, the grab hook includes a first hook and a second hook that are arranged opposite to each other, and the end of the first hook and the end of the second hook can approach or move away from each other; the first hook can cooperate with the positioning hole in the process of approaching or moving away from the second hook.

[0016] Generally, a positioning hole is provided at the top of the cathode plate, so that when the end of the first hook and the end of the second hook are close to each other, the first hook can pass through the positioning hole at the top of the cathode plate, thereby grabbing the cathode plate. When the end of the first hook and the end of the second hook are away from each other, the positioning hole at the top of the cathode plate is disengaged from the first hook, thereby releasing the cathode plate from the grab.

[0017] In some embodiments, the first hook and the second hook are connected to a relay. Thus, the operation of the first hook and the second hook is controlled by the relay, thereby improving the automation level of the grappling hook and ensuring the accuracy of the operation.

[0018] In some embodiments, a baffle is provided on the outer side of the grab hook, thereby strengthening the protection of the first hook buckle and the second hook buckle. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A schematic diagram of the three-dimensional structure of a double-span truss robot for inspecting electrode plates using the gripping assembly for electrode plates of the present invention;

[0020] Figure 2 for Figure 1 A top view of a double-span truss robot for inspecting electrode plates is shown;

[0021] Figure 3 for Figure 1 The schematic diagram of the structure of the traverse trolley of the double-span truss robot used for inspecting electrode plates is shown;

[0022] Figure 4 for Figure 3 A partial structural schematic diagram of the transverse trolley shown;

[0023] Figure 5 for Figure 3 A schematic diagram of the structure of the grabbing assembly of the transverse moving trolley shown;

[0024] Figure 6 for Figure 5 A schematic top view of a portion of the structure of the grab assembly shown;

[0025] Figure 7 for Figure 6 A partial enlarged view of the middle A part;

[0026] Figure 8 for Figure 5 A schematic diagram of the structure of the boom and the grab hook of the grab assembly shown;

[0027] Fig. 9 for Figure 5 A schematic structural diagram of the cathode plate of the grabbing assembly shown;

[0028] Fig.10 for Figure 3 The structural schematic diagram of the grinding assembly of the transverse trolley shown;

[0029] Fig.11 for Fig.10 A partial enlarged view of the middle B part;

[0030] Fig.12 for Fig.10 A schematic diagram of the translation frame and related structures of the grinding assembly shown in another angle;

[0031] Fig.13 for Fig.12 A schematic structural diagram of the first connecting frame is shown. DETAILED DESCRIPTION

[0032] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0033] Figures 1 to 13 A gripping assembly according to an embodiment of the present invention and a double-span truss robot using the present invention are schematically shown, and the double-span truss robot can be used for inspection and polishing of multiple cathode plates 300 in different electrolytic cells.

[0034] As shown in the figure, the device includes a truss 100, the length direction of the truss 100 extends along the Y direction, and a traverse trolley 200 is provided on the truss 100. The entire device is connected to the PLC system, and its operating status is also monitored by the PLC system. The PLC system and the PC can realize Ethernet communication, and the PC is the host computer.

[0035] The truss 100 includes two cross beams 101 symmetrically arranged along the Y direction, and the front and rear ends of the two cross beams 101 are respectively connected by short cross bars 102. A first servo motor 41 is respectively arranged at the front and rear ends of the truss 100, and the two oppositely arranged first servo motors 41 can drive the truss 100 to move forward or backward. Both first servo motors 41 are connected to the PLC system and are controlled by the PLC system.

[0036] Tracks are arranged above the tank bodies of the multiple electrolytic tanks, and the truss 100 cooperates with the tracks through a slide plate, so that the truss 100 can move along the tracks under the drive of the two first servo motors 41 .

[0037] The cell position information of multiple electrolytic cells is preset in the PC. In this way, the target electrolytic cell can be specified to the PLC system through the PC. When the cell body of the electrolytic cell located at the front end completes electrolysis and the electrode plate needs to be inspected and polished, the electrolytic cell becomes the target electrolytic cell. The PC transmits its position information to the PLC system. The PLC system specifies the first servo motor 41 located at the rear end of the truss 100 as the main motor and the first servo motor 41 located at the front end of the truss 100 as the slave motor, and controls the two first servo motors 41 to start, driving the truss 100 to move along the track toward the target electrolytic cell.

[0038] When electrolysis is completed in the electrolytic cell at the rear end, the PLC system designates the first servo motor 41 at the front end of the truss 100 as the master motor, and the first servo motor 41 at the rear end of the truss 100 as the slave motor. In this way, when the truss 100 moves forward or backward, the entire truss 100 is balanced in force and moves smoothly, which can ensure that the truss 100 can be accurately positioned when moving in different directions.

[0039] A positioning plate is provided on the track, and the positioning plate corresponds to the electrolytic cell one by one. A positioning sensor connected to the PLC system is provided on the crossbeam 101 of the truss 100, and the positioning sensor can sense the positioning plate provided on the track, and upload the information sensed by the positioning plate to the PLC system, and the PLC system controls the two first servo motors 41 to stop operating according to the received information, and the truss 100 stops.

[0040] The positioning sensor includes a brake start limit sensor and a brake end limit sensor, which are arranged at a certain distance on the same crossbeam 101 of the truss 100. During the movement of the truss 100, the brake start limit sensor first senses the positioning plate, at which time the truss 100 gradually decelerates and starts braking under the control of the PLC system; then the brake end limit sensor senses the positioning plate, at which time the truss 100 reaches the preset parking position, and the PLC system controls the truss 100 to stop. In this way, through the cooperation of the brake start limit sensor and the brake end limit sensor, the truss 100 can be smoothly stopped above the target electrolytic cell, thereby improving the accuracy of positioning.

[0041] In addition, an over-displacement power-off sensor is also provided on the crossbeam 101 of the truss 100, and the brake end limit sensor is located between the brake start limit sensor and the over-displacement power-off sensor. Thus, when the over-displacement power-off sensor senses the positioning plate, the truss 100 has exceeded the preset parking position. At this time, the PLC system receives the feedback information from the over-displacement power-off sensor and can shut down the power supply in an emergency to ensure safety.

[0042] A first synchronous belt 11 is provided on the cross beam 101 of the truss 100 along the Y direction, and the traverse trolley 200 is connected to the first synchronous belt 11 through a traverse pulley 12, so that the traverse trolley 200 can be driven to move back and forth along the Y direction on the truss 100 through the cooperation between the traverse pulley 12 and the first synchronous belt 11. The traverse pulleys 12 on the outside of the traverse trolley 200 are symmetrically arranged on the left and right sides of the traverse trolley 200.

[0043] A fixing rod 14 is provided at the upper front end of the traverse trolley 200, and the fixing rod 14 is provided at the top of the traverse trolley 200. The length direction of the fixing rod 14 is arranged along the X direction, perpendicular to the cross beam 101, and the two ends of the fixing rod 14 are respectively suspended above the two cross beams 101. A first transmission pulley 15 is sleeved on the two ends of the fixing rod 14, and a second transmission pulley 14 is provided directly below each first transmission pulley 15. The first transmission pulley 15 and the second transmission pulley 14 arranged opposite to each other are connected by a second synchronous belt 13. One of the first transmission pulleys 15 is connected to the output end of the second servo motor 17, so that under the drive of the second servo motor 17, through the cooperation of the fixing rod 14, the two sets of vertically arranged first transmission pulleys 15 and second transmission pulleys 14 can rotate synchronously under the transmission action of the second synchronous belt 13. The second servo motor 17 is connected to the PLC system and is controlled by the PLC system.

[0044] The two second transmission pulleys 14 are respectively arranged on the inner sides of the two crossbeams 101, and each second transmission pulley 14 is connected to a transverse shift pulley 12 located at the front end of the transverse shift trolley 200 through a fixed shaft 18 arranged along the X direction. The transverse shift pulley 12 and the second transmission pulley 14 are arranged in the same direction, so that the transverse shift pulley 12 and the second transmission pulley 14 are transmission-connected through the fixed shaft 18. When the second servo motor 17 drives the first transmission pulley 15 and the second transmission pulley 14 to rotate, the transverse shift pulley 12 also rotates synchronously. In this way, through the cooperation of the fixed rod 14, the first transmission pulley 15, the second transmission pulley 14 and the second synchronous belt 13, it can be ensured that the force on the top and bottom of the transverse shift trolley 200 is balanced during the movement, and the synchronous movement is ensured to prevent the rollover and improve the safety.

[0045] Driven by the second servo motor 17, the traverse trolley 200 can move forward and backward along the Y direction. In this way, after the truss 100 reaches the top of the target electrolytic cell, the traverse trolley 200 can move between multiple electrode plates along the length direction of the cell body above the electrolytic cell.

[0046] A grabbing assembly is also provided in the transverse moving carriage 200. When the transverse moving carriage 200 moves to the first cathode plate 300 in the body of the target electrolytic cell, the grabbing assembly can grab the cathode plate 300 in the electrolytic cell and take it out from the body of the electrolytic cell.

[0047] The grabbing assembly includes a crane 23, a boom 21 and a grab hook 22. The crane 23 is arranged on the top of the transverse trolley 200, and the output end of the crane 23 is connected to the boom 21, so that the boom 21 can be driven to move up and down by the crane 23. The length direction of the boom 21 is arranged along the X direction. The boom 21 is also provided with a downwardly hanging grab hook 22, and the grab hook 22 can grab the top of the cathode plate 300. The PLC system can control the operating state of the crane 23, including the start, stop and output power of the crane 23.

[0048] The PLC system can control the arm 21 to move up and down by controlling the crane 23, and then control the hook 22 to move up and down, so as to use the hook 22 to hook the electrolytic plate in the electrolytic cell. Generally, when the PLC system controls the arm 21 to move downward, it first moves at a slightly faster speed. When the hook 22 passes through the preset working position, that is, the matching position of the hook 22 and the electrolytic plate, the speed of the arm 21 is switched to a slow speed, so that time can be saved and the accuracy of the matching between the hook 22 and the electrode plate can be ensured.

[0049] A positioning hole 301 is provided on the top of the electrode plate, and the positioning hole 301 can cooperate with the grab hook 22 .

[0050] The grab hook 22 includes a first hook 221, a second hook 222 and a relay that are arranged opposite to each other. A baffle 223 is also arranged on the outer side of the first hook 221 and the second hook 222 to enhance the protection of the relevant structures of the grab hook 22. The relay can control the end of the first hook 221 and the end of the second hook 222 to be close to or close to each other, thereby realizing the attraction or separation of the grab hook 22, and the operation of the relay is controlled by the PLC system.

[0051] The traverse trolley 200 is also provided with a slide rail 24 vertically arranged along the Z direction, and three rollers are arranged at both ends of the boom 21, and the rollers are slidably connected to the slide rail 24. The three rollers at the end of the boom 21 include two transverse rollers 211 rolling along the X direction, and a longitudinal roller 212 rolling along the Y direction, wherein the two transverse rollers 211 are symmetrically arranged along the length direction of the boom 21, and the longitudinal roller 212 is arranged at the end far away from the center of the boom 21.

[0052] The slide rail 24 includes two support rods 241 arranged in parallel, and grooves 243 are arranged on opposite sides of the support rods 241. The grooves 243 on the two support rods 241 arranged in parallel are symmetrically arranged. A slider 242 is connected to the side of the longitudinal roller 212 away from the boom 21. Outwardly protruding flanges 244 are symmetrically arranged on two opposite sides of the slider 242. The flanges 244 can be embedded in the grooves 243 on the upper side of the support rods 241.

[0053] The opposite sides of the two support rods 241 arranged in parallel are slidably connected to the slider 242, and are simultaneously rollingly connected to the longitudinal roller 212. The sides of the two support rods 241 arranged in parallel close to the suspension arm 21 are rollingly connected to a transverse roller 211 respectively.

[0054] In this way, when the crane 23 drives the boom 21 and the structures such as the hook 22 to move up and down, the cooperation between the roller and the slide rail 24 can ensure that the boom 21 always moves along the Z direction to prevent deviation; on the other hand, the rolling of the roller can convert the surface contact into rolling contact to ensure that the boom 21 is stable and smooth during the movement. The slide rail 24 and the roller can play a guiding and smooth role. The cooperation between the slider 242, the longitudinal roller 212 and the two support rods 241 can improve stability and prevent the boom 21 from shaking.

[0055] When the arm 21 moves down to a suitable position, the first hook 221 and the second hook 222 are respectively located on both sides of the cathode plate 300 , and the heights of the first hook 221 and the second hook 222 can be aligned with the positioning hole 301 at the top of the cathode plate 300 .

[0056] Generally, a positioning sensor connected to the PLC system is provided at the positioning hole 301 of the cathode plate 300. After the positioning sensor senses the first hook 221 and the second hook 222, the position information of the first hook 221 and the second hook 222 is fed back to the PLC system. At this time, the PLC system controls the relay to bring the ends of the first hook 221 and the second hook 222 closer to each other. In this process, the first hook 221 passes through the positioning hole 301 at the top of the cathode plate 300. The grab 22 is attracted, so that the cathode plate 300 is firmly grasped in the grab 22. Then, the PLC system controls the crane 23 to drive the boom 21 to move upward, so that the cathode plate 300 grabbed by the grab 22 can be lifted upward from the electrolytic cell to the inside of the transverse trolley 200.

[0057] Two sets of grinding assemblies arranged opposite to each other are also provided in the traverse trolley 200, and the grabbing assembly can drive the electrode plate to move up and down between the two sets of grinding assemblies. After the grabbing assembly lifts the cathode plate 300 from the target electrolytic cell to the inside of the traverse trolley 200, the grinding assembly can start to inspect and grind the electrode plate.

[0058] The grinding assembly includes a grinder 31, and the grinding head of the grinder 31 is arranged opposite to the cathode plate 300 lifted to the inside of the transverse moving carriage 200. In this way, the two sets of grinding assemblies can grind the two sides of the cathode plate 300 respectively.

[0059] The grinder 31 is connected to the lower surface of the translation frame 32 , and the translation frame 32 can drive the grinder 31 to move along the X direction, the Y direction, and the Z direction.

[0060] Specifically, the traverse trolley 200 is provided with a transverse guide rod 33 arranged along the X direction and a vertical guide rod 35 arranged along the Z direction, and is also provided with a third synchronous belt 34 along the X direction and a fourth synchronous belt 36 along the Z direction.

[0061] The upper surface of the translation frame 32 is connected to the first connecting member 37, and the first connecting member 37 includes a horizontally arranged first fixing plate 371. The upper surface of the first fixing plate 371 is provided with a first sleeve 372, and the first sleeve 372 is sleeved on the outer side of the transverse guide rod 33. The first connecting member 37 is slidably connected to the transverse guide rod 33 through the first sleeve 372, and the first connecting member 37 can move back and forth along the transverse guide rod 33.

[0062] A first fixing member 373 is further provided on the upper surface of the first connecting member 37, and the first fixing member 373 is fixedly connected to the third synchronous belt 34 via teeth. Thus, when the third synchronous belt 34 operates, it can drive the first connecting member 37, the translation frame 32 and the grinder 31 disposed under the translation frame 32 to move back and forth along the X direction.

[0063] The end of the transverse guide rod 33 is fixedly connected to the second connecting member 38, and the second connecting member 38 includes a vertically arranged second fixing plate 381, and a second sleeve 382 is provided on the side of the second fixing plate 381. The second sleeve 382 is sleeved on the outer side of the vertical guide rod 35, and the second connecting member 38 is slidably connected to the vertical guide rod 35 through the second sleeve 382. The second connecting member 38 and the transverse guide rod 33 connected thereto can move up and down along the vertical guide rod 35.

[0064] A second fixing member 383 is also provided on the side of the second connecting member 38, and the second fixing member 383 is fixedly connected to the fourth synchronous belt 36 through teeth. In this way, when the fourth synchronous belt 36 is in operation, it can drive the second connecting member 38, the transverse guide rod 33, the translation frame 32 and the grinder 31 provided under the translation frame 32 to move up and down along the Z direction.

[0065] The lower surface of the first fixed plate 371 is provided with a guide rail 374 extending along the Y direction, and a sliding member 375 is provided on the guide rail 374. The sliding member 375 can move back and forth along the guide rail 374, and the translation frame 32 is fixedly connected to the sliding member 375. In this way, through the cooperation between the guide rail 374 and the sliding member 375, the translation frame 32 can drive the grinder 31 to approach or move away from the cathode plate 300. The grinding head of the grinder 31 is connected to a limit sensor, so that when the distance between the grinder 31 and the cathode plate 300 is too small, it can be discovered and adjusted in time to prevent the grinding head from overshooting.

[0066] The movement of the translation frame 32 along the X, Y and Z directions is also controlled by the PLC system. The operation of the third synchronous belt 34, the operation of the fourth synchronous belt 36 and the sliding of the translation frame 32 along the guide rail 374 are also controlled by the PLC system.

[0067] The two translation racks 32 are equipped with cameras, which can be installed in a certain order along the X and Z directions with the translation racks 32. During this process, the cameras can take pictures of different areas on the cathode plate 300 and upload the captured view information to the PC. The PC can select defects for the view information received from the camera and store the location information of the selected defects in the PLC system. The PLC system can control the translation rack 32 and the grinder 31 thereon to reach the defect position for precise grinding.

[0068] After the grinding is completed, the PLC system controls the crane 23 to drive the arm 21 to move downward, so that the cathode plate 300 can be dropped down from the inside of the traverse trolley 200 into the tank body of the target electrolytic cell. After the cathode plate 300 enters the tank body of the electrolytic cell, the PLC system controls the control relay to separate the end of the first hook 221 and the end of the second hook 222, and the positioning hole 301 at the top of the cathode plate 300 is disengaged from the first hook 221, thereby releasing the cathode plate 300 from the grab 22. Then, the PLC system controls the crane 23 to lift the arm 21 to the starting position.

[0069] After the grab assembly is returned to its position, the PLC system controls the second servo motor 17 to drive the traverse trolley 200 to move to the position of the second cathode plate 300 in the target electrolytic cell, and starts to inspect and polish the next cathode plate 300. This process is repeated until all the cathode plates 300 in the target electrolytic cell are inspected and polished, and the traverse trolley 200 returns to the starting position under the control of the PLC system. Then, the PLC system controls the truss 100 to move along the track to the next target electrolytic cell, and starts to inspect and polish the electrode plates in the next target electrolytic cell.

[0070] The above are only some embodiments of the present invention. For those skilled in the art, several modifications and improvements can be made without departing from the creative concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A gripping assembly for an electrode plate, characterized in that: It comprises a suspension arm (21) arranged along the X direction, the suspension arm (21) being provided with a downwardly hanging catch (22), the suspension arm (21) being capable of moving up and down, and the catch (22) being capable of cooperating with a positioning hole (301) on a cathode plate (300); The grabbing assembly is arranged on a transverse trolley (200), and the transverse trolley (200) is arranged on a truss (100), the length direction of the truss (100) is the Y direction, and the truss (100) and the transverse trolley (200) are both connected to a PLC system, and the PLC system can control the truss (100) to move to the top of the electrolytic cell; the PLC system can control the transverse trolley (200) to move back and forth along the Y direction; The traverse trolley (200) also includes a grinding component; the grinding component includes a grinder (31), and the grinder (31) is capable of cooperating with the surface of the electrode plate; the grabbing component and the grinding component are both connected to the PLC system; The PLC system receives the position information of the electrolytic cell, controls the truss to move to the top of the electrolytic cell, moves the trolley to a suitable position along the Y direction, and then hooks the cathode plate in the electrolytic cell through the grabber and takes it out of the electrolytic cell, and then the grinder grinds the surface of the cathode plate; The PLC system adjusts the position of the truss according to the electrolysis completion status of multiple electrolytic cells, so that it is located above the electrolytic cells that have completed electrolysis. Under the control of the PLC system, the traverse trolley accurately moves to the top of the first cathode plate in the electrolytic cell, accurately grabs the cathode plate and grinds it; After grinding is completed, the traverse trolley continues to move to the next cathode plate under the control of the PLC system until all cathode plates in the electrolytic cell are ground. The PLC system can control the traverse trolley to return to the starting position and control the truss to move to the next electrolytic cell that has completed electrolysis; A track is provided above the electrolytic cell, the truss (100) can move along the track, a positioning plate is provided on the track, the positioning plate corresponds to the electrolytic cell one by one, a positioning sensor is arranged on the truss (100), the positioning sensor can sense the positioning plate, and the positioning sensor is connected to the PLC system; A first servo motor (41) is respectively provided at the front and rear ends of the truss (100), the first servo motor (41) being capable of driving the truss (100) to move, the PLC system being capable of controlling the operating state of the first servo motor (41), and the PLC system being capable of designating one of the first servo motors (41) as a master motor and the other first servo motor (41) as a slave motor; There are also two sets of grinding components arranged opposite to each other in the transverse trolley; The grinding assembly includes a grinder, the grinding head of the grinder is arranged opposite to the cathode plate lifted to the inside of the transverse trolley; The traverse trolley is provided with a transverse guide rod arranged along the X direction and a vertical guide rod arranged along the Z direction, and is also provided with a third synchronous belt along the X direction and a fourth synchronous belt along the Z direction; The upper surface of the translation frame is connected to the first connecting member, the first connecting member includes a horizontally arranged first fixing plate, the upper surface of the first fixing plate is provided with a first sleeve, the first sleeve is sleeved on the outer side of the transverse guide rod, and the first connecting member is slidably connected to the transverse guide rod through the first sleeve, and the first connecting member can move back and forth along the transverse guide rod; A guide rail extending along the Y direction is provided on the lower surface of the first fixed plate, a sliding member is provided on the guide rail, the sliding member can move back and forth along the guide rail, and the translation frame is fixedly connected to the sliding member; A first fixing member is also provided on the upper surface of the first connecting member, and the first fixing member is fixedly connected to the third synchronous belt (34) via teeth. The end of the transverse guide rod is fixedly connected to the second connecting member, the second connecting member includes a second fixing plate arranged vertically, a second sleeve is arranged on the side of the second fixing plate, the second sleeve is sleeved on the outer side of the vertical guide rod, and the second connecting member is slidably connected to the vertical guide rod through the second sleeve, and the second connecting member and the transverse guide rod connected thereto can move up and down along the vertical guide rod; A second fixing piece is also provided on the side surface of the second connecting piece, and the second fixing piece is fixedly connected to the fourth synchronous belt via teeth.

2. The grabbing assembly for an electrode plate according to claim 1, characterized in that: The boom (21) is connected to the output end of the crane (23).

3. The grabbing assembly for an electrode plate according to claim 1 or 2, characterized in that: It comprises a slide rail (24) vertically arranged along the Z direction, and the end of the suspension arm (21) can cooperate with the slide rail (24).

4. The grabbing assembly for an electrode plate according to claim 3, characterized in that: A roller is provided at the end of the suspension arm (21), and the roller can be rollingly connected to the slide rail (24).

5. The grabbing assembly for an electrode plate according to claim 4, characterized in that: Each end of the suspension arm (21) is provided with two transverse rollers (211) that roll along the X direction and are symmetrical along the suspension arm (21) and a longitudinal roller (212) that rolls along the Y direction; The slide rail (24) comprises two support rods (241) arranged in parallel, a side of the longitudinal roller (212) away from the suspension arm (21) is connected to a slider (242), and opposite side surfaces of the two support rods (241) are both slidably connected to the slider (242) and simultaneously rollingly connected to the longitudinal roller (212); side surfaces of the two support rods (241) close to the suspension arm (21) are respectively rollingly connected to the two transverse rollers (211).

6. The grabbing assembly for an electrode plate according to claim 5, characterized in that: A symmetrically arranged groove (243) is provided on the opposite side of the two support rods (241), and two symmetrical flanges (244) are provided on the outer side of the sliding block (242), and the flanges (244) can be engaged with the grooves (243).

7. The grabbing assembly for an electrode plate according to claim 1 or 2, characterized in that: The grab hook (22) comprises a first hook (221) and a second hook (222) arranged opposite to each other, wherein the end of the first hook (221) and the end of the second hook (222) can approach or move away from each other; the first hook (221) can cooperate with the positioning hole (301) in the process of approaching or moving away from the second hook (222).

8. The grabbing assembly for an electrode plate according to claim 7, characterized in that: The first hook (221) and the second hook (222) are connected to a relay.

9. The grabbing assembly for an electrode plate according to claim 7, characterized in that: A baffle (223) is provided on the outer side of the grab hook (22).

Citation Information

Patent Citations

  • Numerical control sheet metal profiling spinning machine

    CN101642787A

  • Sliding wheel used for groove-shaped track

    CN108312779A

  • Transfer device for cathode plate

    CN202945339U

  • Electrolytic manganese production line and negative plate crane

    CN203144540U

  • Automatic production line is electroplated to the climbing formula

    CN204507999U