A simulation system for water pressure regulation and leakage control in residential areas
By adjusting the community water supply pressure through simulation system, the problem of mismatch between the water supply pressure and actual water use in the existing technology is solved, and the precise adjustment of the community water supply pressure and the reduction of leakage are achieved, which improves the benefits of water supply enterprises.
Patent Information
- Application Number
- CN202110479414.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-04-30
AI Technical Summary
In the prior art, the water supply pressure regulation scheme of urban water plants does not match the actual water use and leakage conditions, resulting in waste of resources, unable to minimize the leakage and improve the efficiency of water supply enterprises.
A community water pressure regulation and leakage control simulation system was designed, including water pump unit, rear pump main pipe, horizontal pipe, riser pipe and control system. By simulating different water supply volumes, leakage volume and user water use, pressure sensors are used, The flow meter and adjustable pressure reducing valve regulate the water supply pressure in the community and formulate a reasonable pressure regulating and reducing difference plan.
Accurate adjustment of the water supply pressure of the community is achieved, the leakage amount is reduced, and the benefits of water supply enterprises are improved. By simulating the water use and leakage situation of different communities, the optimal pressure adjustment plan is formulated to avoid resource waste.
Smart Images

Figure CN113093825B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water supply, and in particular relates to a residential water pressure regulation and leakage control simulation system. Background Art
[0002] Since each community is at a different distance from the water plant, and considering the large water supply radius of the urban water plant, the pressure is generally designed based on the water demand at the most unfavorable point. Although some cities have carried out plant-level day and night pressure regulation and scheduling, the pressure in communities and streets closer to the water plant is still relatively high; especially at night when water use is low, water leakage dominates, and pressure will only increase the amount of water leakage, resulting in a waste of resources. In the existing technology, most of the pressure regulation plans are formulated based on experience or historical data, resulting in a mismatch between the pressure regulation plan and the actual water use and leakage situation, and it is impossible to minimize the leakage and improve the efficiency of the water supply company. Summary of the invention
[0003] The purpose of the present invention is to provide a community water pressure regulation and leakage control simulation system, which is conducive to simulating community water supply with different water supply, leakage, and production and sales gap, and then formulating a reasonable pressure regulation and gap reduction plan.
[0004] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a community water pressure regulation and leakage control simulation system, characterized in that it includes a water pump unit, a main pipe after the pump, a horizontal pipe, a riser and a control system, the water pump unit is connected to the horizontal pipe through the main pipe after the pump, and the horizontal pipe is connected to the riser; the water pump unit is used to simulate the municipal water supply source, the horizontal pipe is used to simulate the ground pipe of the community, different electric valves and flow meters are connected to the horizontal pipe to simulate the leakage of different communities, the riser is used to simulate the user water supply riser, and different electric valves and flow meters are connected to the riser to simulate the water use of multiple layers of users in the community; the main pipe after the pump and the user ends of each floor are provided with pressure sensors for collecting the pressure data changes of the user ends of the community as the basis for the pressure regulation of the community, the main pipe after the pump is also provided with an electric valve, a flow meter and an adjustable pressure reducing valve, and the pressure of the community water supply during high and low peaks is adjusted by the adjustable pressure reducing valve, and the pressure range is adjusted by fitting the actual monitoring data to propose a pressure regulation plan.
[0005] Furthermore, the control system includes a monitoring computer and a PLC controller, the PLC controller is connected to the measuring equipment and the actuator, and is connected to the monitoring computer through a communication network to receive instructions from the monitoring computer, control the measuring equipment to collect flow and pressure data, and control the operation of the actuator, the measuring equipment includes various flow meters and various pressure sensors, and the actuator includes a water pump unit, an adjustable pressure reducing valve and various electric valves; the PLC controller sends alarm setting parameters to the measuring equipment on the one hand, and obtains pressure data, flow data, status and switch variables at each point, and on the other hand uploads the obtained pressure data, flow data, status and switch variables to the monitoring computer; the monitoring computer displays the time, the collected pressure, flow data and the working status of each device, can continuously set the flow control value, and automatically control the operation of the actuator through the PLC controller through control instructions; the monitoring computer can remotely display and detect each device in real time, store and analyze the historical data of each device, and perform corresponding processing, and can set and control various measurement and control parameters of the system.
[0006] Furthermore, the water pump unit operates within the rated flow range, and is adjusted by frequency conversion control to simulate the pressure change of the municipal pipe network outside the community.
[0007] Furthermore, several horizontal branch pipes of different calibers are connected to different positions of the horizontal pipe, and each horizontal branch pipe is provided with an electric valve and a flow meter of corresponding caliber. By switching the electric valves of different positions and calibers, different leakage point distributions, different leakage forms and different leakage amounts in different communities are simulated; the leakage amount is fitted according to the production and sales difference of different communities.
[0008] Furthermore, a number of layered branch pipes are connected at different heights of the riser, each layered branch pipe is connected to a number of user branch pipes, each layered branch pipe is provided with an electric regulating valve of corresponding caliber, each user branch pipe is provided with an electric valve and a flow meter of corresponding caliber, which are used to simulate water use by multiple layers of users in a community, and the water consumption curve of the community is fitted by a program to simulate the water use change curves of different communities.
[0009] Furthermore, the electric valve and flow meter connected to the riser simulate the total water consumption of community users. The cumulative number of units opened in different time periods is fitted according to the 5-minute water supply curve of the community total meter. The actual water supply is scaled according to a certain proportion and does not exceed the rated water supply of the water pump.
[0010] Furthermore, the pressure sensors are respectively installed on the main pipe after the pump and each layered branch pipe to collect the front and rear pressure values of the adjustable pressure reducing valve and use them as a basis for pressure regulation.
[0011] Furthermore, through the adjustable pressure reducing valve, combined with the changes in external network pressure, internal network water supply and pressure in different communities, a community pressure simulation adjustment plan is formulated.
[0012] Furthermore, through pressure regulation, the losses caused by pipeline leakage and the costs of pressure regulating facilities in different communities before renovation are analyzed to obtain the economic rationality of pressure regulation in different communities.
[0013] Furthermore, by simulating the data statistics of each flow meter, the comprehensive impact of external network pressure regulation on the water company's water sales and leakage under different time periods, different production and sales gaps and leakage rates of community users is analyzed, and the optimal pressure regulation plan is formulated.
[0014] Compared with the prior art, the present invention has the following beneficial effects: a water pressure regulation and leakage control simulation system for a residential area of the present invention is provided, which uses a water pump unit to simulate a municipal water supply source, a horizontal pipe to simulate a residential area ground pipe, an electric valve and a flow meter connected to the horizontal pipe to simulate a residential area leakage point, a vertical pipe to simulate a user water supply vertical pipe, and an electric valve and a flow meter connected to the vertical pipe to simulate the water use of residential area users. By simulating the statistics of the data of each flow meter, the comprehensive impact of external network pressure regulation on the water company's water sales and leakage volume under different time periods, different production and sales gaps and leakage rates of residential area users is analyzed, and different pressure regulation plans are formulated. This system can be used to compare different regulation plans, determine a reasonable residential area pressure scheduling plan, and serve as a supplement to water plant pressure regulation and pump station pressure regulation. At the same time, since residential area pressure regulation has not yet been implemented, the present invention can first formulate a preliminary implementation plan, and verify it through a test device to avoid the pressure regulation energy saving and consumption reduction not meeting the expected economic expectations. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 Schematic diagram of the system structure of an embodiment of the present invention.
[0016] Figure 2 Schematic diagram of a system plane according to an embodiment of the present invention.
[0017] Figure 3 Schematic diagram of a control system in an embodiment of the present invention.
[0018] In the figure: 1. water pump unit, 2. DN50 electric valve, 3. DN50 flow meter, 4. adjustable pressure reducing valve, 5. pressure sensor, 6. DN50 ordinary valve, 7. DN15 electric valve, 8. DN20 electric valve, 9. DN25 electric valve, 10. DN32 electric valve, 11. DN15 flow meter, 12. DN20 flow meter, 13. DN25 flow meter, 14. DN32 flow meter, 15. automatic exhaust valve, 16. DN50 electric regulating valve, 17. pipe plug, 18. open ditch rainwater outlet. DETAILED DESCRIPTION
[0019] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0020] like Figure 1 , 2 As shown, this embodiment provides a community water pressure regulation and leakage control simulation system, including a water pump unit 1, a main pipe after the pump, a horizontal pipe and a riser, the water pump unit is connected to the horizontal pipe through the main pipe after the pump, and the horizontal pipe is connected to the riser; the water pump unit is used to simulate the municipal water supply source, the horizontal pipe is used to simulate the community ground pipe, different electric valves 7-10 and flow meters 11-14 are connected to the horizontal pipe to simulate the leakage of different communities, the riser is used to simulate the user water supply riser, and different electric valves 7 and flow meters 11 are connected to the riser to simulate the water use of multiple layers of users in the community; the main pipe after the pump and the user ends of each layer are provided with a pressure sensor 5 for collecting the pressure data change of the user end of the community as the basis for the community pressure regulation, the main pipe after the pump is also provided with an electric valve 2, a flow meter 3 and an adjustable pressure reducing valve 4, and the pressure of the community water supply during high and low peaks is adjusted by the adjustable pressure reducing valve, and the pressure range is adjusted by fitting the actual monitoring data to propose a pressure regulation plan, including a pressure regulation period, a pressure regulation range, etc.
[0021] The control system includes a monitoring computer and a PLC controller. The PLC controller is connected to the measuring device and the actuator, and is connected to the monitoring computer through a communication network to receive instructions from the monitoring computer, control the measuring device to collect flow and pressure data, and control the actuator to work. The measuring device includes various flow meters and various pressure sensors, and the actuator includes a water pump unit, an adjustable pressure reducing valve and various electric valves; the PLC controller sends alarm setting parameters to the measuring device on the one hand, and obtains pressure data, flow data, status and switch variables at each point, and on the other hand uploads the obtained pressure data, flow data, status and switch variables to the monitoring computer; the monitoring computer displays the time, the collected pressure and flow data and the working status of each device, can continuously set the flow control value, and automatically control the actuator to work through the PLC controller through control instructions; the monitoring computer can remotely display and detect each device in real time, store and analyze the historical data of each device, and perform corresponding processing, and can set and control various measurement and control parameters of the system.
[0022] The control system is the control center of the water pressure regulation and leakage control simulation system of the entire community, and mainly completes the following functions: Data acquisition: The monitoring computer automatically issues various query commands to collect the history and current status of each device and the data sent; Data processing: Analyze and compare the collected data, make judgments, and send them to the execution agency according to the set execution command; Display: Centrally display the total water flow, leakage flow, and related information of the flow and pressure of each floor. The industrial control PC is used as the monitoring computer, with large storage capacity, fast working speed, and a friendly human-computer dialogue interface.
[0023] From the overall control point of view, the functions of the PLC controller include water pump frequency conversion control, valve switch control, alarm control and fault feedback; the operation modes mainly include: manual operation and automatic operation mode. In any mode, the system must have pressure alarm and liquid level alarm functions. When the pressure signal is too large or the water tank liquid level is too low (exceeding the alarm value set by the system), the system automatically simulates the system to enter the shutdown procedure (the highest level).
[0024] During simulation adjustment, the PLC controller controls the opening of the electric valve on each floor to simulate the random water usage of users. The control modes are: manual control and intelligent random control. The remote server can monitor the valve status and the pressure and flow of each floor in real time to provide relevant parameters for module operation.
[0025] During the simulation operation, the water pump unit works within the rated flow range, and the pressure change of the municipal pipe network outside the simulated community is adjusted by frequency conversion control. Several horizontal branches with different calibers are connected to the horizontal pipe at different positions, and each horizontal branch is provided with an electric valve and flow meter of corresponding caliber. By switching the electric valves of different positions and calibers, the distribution of different leakage points, different leakage forms and different leakage amounts in different communities are simulated; the leakage amount is fitted according to the production and sales difference of different communities. Several layered branches are connected to different heights of the vertical pipe, and each layered branch is connected to several user branches. Each layered branch is provided with an electric regulating valve 16 of corresponding caliber, and each user branch is provided with an electric valve 7 and flow meter 11 of corresponding caliber, which are used to simulate the water use of multiple users in the community. The water consumption curve of the community is fitted by the program to simulate the water use change curve of different communities. The electric valve and flow meter connected to the riser simulate the total water consumption of the community users. The cumulative number of valves opened in different periods is fitted according to the 5-minute water supply curve of the community master meter. The actual water supply is scaled according to a certain proportion and does not exceed the rated water supply of the water pump. The pressure sensors are installed on the main pipe after the pump and each layered branch pipe to collect the front and rear pressure values of the adjustable pressure reducing valve as a basis for pressure regulation.
[0026] Through the adjustable pressure reducing valve, combined with the changes in external network pressure, internal network water supply and pressure in different communities, a community pressure simulation adjustment plan is formulated.
[0027] Through pressure regulation, the losses caused by pipeline leakage and the costs of pressure regulating facilities (including pressure measuring devices) in different communities before renovation are analyzed to determine the economic rationality of pressure regulation in different communities.
[0028] By simulating the data statistics of each flow meter, the comprehensive impact of external network pressure regulation on the water company's water sales and leakage under different time periods, different production and sales gaps and leakage rates of community users is analyzed, and the optimal pressure regulation plan is formulated.
[0029] Through the control system of the community water pressure regulation and leakage control simulation system provided, the pressure information and flow information fed back by the leakage and floor sensors are obtained, so as to formulate a community pressure simulation regulation plan based on the feedback information, so as to achieve real-time and accurate control of the community water pressure regulation and leakage control simulation system, analyze the comprehensive impact of external network pressure regulation on the water company's water sales and leakage under different time periods, different production and sales gaps and leakage rates of community users, and formulate different pressure regulation plans. This system can be used to compare different regulation plans and determine a reasonable community pressure scheduling plan.
[0030] The following is combined with Figure 1 The implementation process of formulating a pipeline network pressure regulation plan based on the present invention is explained.
[0031] Step 101: After the water pump, valve and flow meter are debugged and run normally, the water supply mode of the community and the measured data are combined to perform item-by-item fitting, and collect the household water consumption data (5 minutes), the total meter flow change data (5 minutes), the leakage change data, the most unfavorable point pressure data, and the external network pressure data.
[0032] Step 102: When the community direct supply users are on the 1st floor, close the electric regulating valves numbered 16 on the 2nd to 5th floors, and simulate the water use conditions of the users on the 1st floor of the community by controlling the opening degree of one electric regulating valve numbered 16 in front of the user terminal on the 1st floor and the switches of three electric valves numbered 7 in front of the user terminal on the 1st floor, and measure the actual outflow of each outlet pipe through three flow meters numbered 11; when the community direct supply users are on the 2nd floor, close the electric regulating valves numbered 16 on the 3rd to 5th floors, and control the opening degree of two electric regulating valves numbered 16 in front of the user terminals on the 1st to 2nd floors. The water use conditions of users on the 1st to 2nd floors of the community are simulated by controlling the opening degree of the 5 electric regulating valves numbered 16 in front of the user terminals on the 1st to 5th floors and the 15 electric valve switches numbered 7 in front of the user terminals on the 1st to 2nd floors, and the actual outflow of each water outlet pipe is measured through 6 flow meters numbered 11; by analogy, when there are 5 floors of direct supply users in the community, the water use conditions of users on the 1st to 5th floors of the community are simulated by controlling the opening degree of the 5 electric regulating valves numbered 16 in front of the user terminals on the 1st to 5th floors and the 15 electric valve switches numbered 7 in front of the user terminals on the 1st to 5th floors, and the actual outflow of each water outlet pipe is measured through 15 flow meters numbered 11. Limited by the office building where the device is located, the experimental device can simulate users directly supplied on the 5th floor, and other devices similar to the design of this principle should also be within the scope of protection of the present invention.
[0033] Step 103: Through the control program, adjust the opening degree of the first five electric regulating valves numbered 16 at the user end of the 1st to 5th floors, and randomly open the first 15 electric valves numbered 7 at the user end of the 1st to 5th floors, so that the total water supply curve is consistent with the household meter water consumption data curve of the simulated community. The water consumption of the community is Q1, the water consumption of the simulated user is Q1', and K1=Q1 / Q1'.
[0034] Step 104: By counting the total flow rate Q of the community and comparing it with the difference between the total and sub-meters, the water loss Q2 of the community is obtained, and the water loss Q2' is calculated by combining the total flow rate Q2 of the community and the coefficient K1, Q2'= Q2 / K1. By controlling the switch of the electric valves numbered 7 to 10, the leakage point is simulated, and the water loss is measured by the flow meters numbered 11 to 14, and the water loss is Q2'.
[0035] Step 105: Run the pump unit numbered 1, and the pump flow rate Q' = Q1' + Q2', where Q' should be within the rated flow range of the pump unit. The pump operating pressure matches the measured external network pressure of the community. The water supply and operating time of the pump are determined by the number and duration of opening of the first 15 electric valves numbered 7 on the user end of the 1st to 5th floors and the 8 electric valves numbered 7 to 10 on the horizontal pipe.
[0036] Step 106: Record the water supply volume, leakage volume, pressure after the pump, pressure at the most unfavorable point for direct supply users and other data under the simulated working conditions of the community, and perform fitting and comparison with the measured data of the community. After the fitting is completed, the running time shall be no less than 24 hours.
[0037] Step 107: By analyzing the pressure data of the pressure sensor No. 5 at the most unfavorable point (select the most unfavorable point of direct supply according to different direct supply floors), determine the pressure regulation space during peak water supply, average time, and low peak water supply in the community, and formulate a pressure regulation plan for no more than three periods according to the total water volume curve of the flow meter No. 3. And use the adjustable pressure reducing valve No. 4 to perform three-stage pressure regulation, two-stage pressure regulation, and one-stage pressure regulation respectively and run for no less than 24 hours. By collecting the water supply volume, leakage volume, pressure after the pump, and the pressure at the most unfavorable point of the direct supply user after pressure regulation, compare with the original plan, and obtain the optimal pressure regulation plan.
[0038] Step 108: The measured data of different cells can be combined and fitted accordingly to formulate voltage regulation plans for different cells, and then compared and selected to determine a relatively better plan.
[0039] Step 109: Run the water pump unit numbered 1, adopt the constant pressure water supply mode, and set the high and low peak water consumption by controlling the 15 electric valves numbered 7 in front of the user end of the 1st to 5th floors and the 8 electric valves numbered 7 to 10 on the horizontal pipes, so that the leakage rate of the community is 10%, 30%, and 50% respectively. And record the water supply volume, leakage volume, pressure after the pump, and the pressure at the most unfavorable point of the direct supply user under the above three working conditions.
[0040] Step 110: Based on the above three working conditions, the pressure is adjusted through the adjustable pressure reducing valve No. 4, and the data such as water supply, leakage, pressure after the pump, and the most unfavorable point pressure of the direct supply user are recorded. Combined with the engineering cost of the adjustable pressure reducing valve and the pressure measuring device, a technical and economic analysis and comparison of pressure regulation in the communities with different leakage rates and leakage amounts are conducted.
[0041] The above are preferred embodiments of the present invention. Any changes made according to the technical solution of the present invention, as long as the resulting functions do not exceed the scope of the technical solution of the present invention, belong to the protection scope of the present invention.
Claims
1. A community water pressure regulation and leakage control simulation system, characterized in that: It includes a water pump unit, a main pipe after the pump, a horizontal pipe, a riser and a control system. The water pump unit is connected to the horizontal pipe via the main pipe after the pump, and the horizontal pipe is connected to the riser; the water pump unit is used to simulate the municipal water supply source, the horizontal pipe is used to simulate the ground pipe of the community, different electric valves and flow meters are connected to the horizontal pipe to simulate the leakage of different communities, the riser is used to simulate the user water supply riser, and different electric valves and flow meters are connected to the riser to simulate the water use of multiple layers of users in the community; the main pipe after the pump and the user ends of each floor are provided with pressure sensors for collecting the pressure data changes of the user ends of the community as the basis for the pressure regulation of the community, the main pipe after the pump is also provided with an electric valve, a flow meter and an adjustable pressure reducing valve, and the pressure of the community water supply during high and low peaks is adjusted by the adjustable pressure reducing valve, and the pressure range is adjusted by fitting the actual monitoring data to propose a pressure regulation plan; The water pump unit works within the rated flow range and is frequency-controlled to adjust the pressure change of the municipal pipe network outside the simulated community; Several horizontal branch pipes with different diameters are connected to different positions of the horizontal pipe, and each horizontal branch pipe is provided with an electric valve and a flow meter of corresponding diameter. By switching the electric valves of different positions and diameters, the distribution of different leakage points, different leakage forms and different leakage amounts in different communities are simulated; the leakage amount is fitted according to the production and sales difference of different communities; Several layered branch pipes are connected at different heights of the riser, each layered branch pipe is connected to several user branch pipes respectively, each layered branch pipe is provided with an electric regulating valve of corresponding caliber, each user branch pipe is provided with an electric valve and a flow meter of corresponding caliber, which are used to simulate water use of multiple layers of users in a community, and the water use curve of the community is fitted by a program to simulate the water use change curve of different communities.
2. A residential water pressure regulation and leakage control simulation system according to claim 1, characterized in that: The control system includes a monitoring computer and a PLC controller. The PLC controller is connected to the measuring device and the actuator, and is connected to the monitoring computer through a communication network to receive instructions from the monitoring computer, control the measuring device to collect flow and pressure data, and control the actuator to work. The measuring device includes various flow meters and various pressure sensors, and the actuator includes a water pump unit, an adjustable pressure reducing valve and various electric valves; the PLC controller sends alarm setting parameters to the measuring device on the one hand, and obtains pressure data, flow data, status and switch variables at each point, and on the other hand uploads the obtained pressure data, flow data, status and switch variables to the monitoring computer; the monitoring computer displays the time, the collected pressure, flow data and the working status of each device, can continuously set the flow control value, and automatically control the actuator to work through the PLC controller through control instructions; the monitoring computer can remotely display and detect each device in real time, can store and analyze the historical data of each device, and perform corresponding processing, and can set and control various measurement and control parameters of the system.
3. A residential water pressure regulation and leakage control simulation system according to claim 1, characterized in that: The electric valves and flow meters connected to the riser simulate the total water consumption of the community users. The cumulative number of valves opened in different periods is fitted according to the 5-minute water supply curve of the community total meter. The actual water supply is scaled according to a certain proportion and does not exceed the rated water supply of the water pump.
4. A residential water pressure regulation and leakage control simulation system according to claim 1, characterized in that: The pressure sensors are respectively installed on the main pipe after the pump and each layered branch pipe to collect the pressure values before and after the adjustable pressure reducing valve and use them as the basis for pressure regulation.
5. A residential water pressure regulation and leakage control simulation system according to claim 1, characterized in that: Through the adjustable pressure reducing valve, combined with the changes in external network pressure, internal network water supply and pressure in different communities, a community pressure simulation adjustment plan is formulated.
6. A residential water pressure regulation and leakage control simulation system according to claim 1, characterized in that: Through pressure regulation, the losses caused by pipeline leakage and the costs of pressure regulating facilities in different communities before renovation are analyzed, and the economic rationality of pressure regulation in different communities is obtained.
7. A residential water pressure regulation and leakage control simulation system according to claim 1, characterized in that: By simulating the data statistics of each flow meter, the comprehensive impact of external network pressure regulation on the water company's water sales and leakage under different time periods, different production and sales gaps and leakage rates of community users is analyzed, and the optimal pressure regulation plan is formulated.
Citation Information
Patent Citations
Water supply region measurement and leakage control system and design method thereof
CN107422679A
Water supply pipe network leakage management system and establishment method and system application thereof
CN107767012A
Real-time leakage detection method, apparatus and system of water supply network and storage medium
CN108984873A
Water distribution pipe network leakage test device
CN110836755A
Community water pressure regulation and leakage control simulation device
CN214954705U