A method and device for efficiently replacing railway sleepers
Through the combination of the ballast recovery and backfilling mechanism and the sleeper extraction mechanism, the existing technology solves the heavy manual labor and safety hazards of replacing railway sleepers, achieves efficient and safe sleeper replacement, reduces time and improves work efficiency. efficiency.
Patent Information
- Application Number
- CN202110088306.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-01-22
AI Technical Summary
The existing method of replacing railway sleepers requires a lot of labor, takes a long time, and has safety risks. The working space is limited, and it cannot effectively solve the problem of combining heavy manual labor and precision technology.
A method including a ballast recycling and backfilling mechanism and a sleeper pumping and releasing mechanism is adopted. Stone ballast is recovered and backfilled through an electric shovel, a horizontal conveyor belt, and an upper conveyor belt. The extraction and installation of sleepers is achieved by using a rotating boom and a winch, which simplifies the operation process. Reduce manual involvement.
An efficient method of replacing railway sleepers has been realized, with reduced labor intensity and single-person operation, reducing the time required by more than half. It can be used independently as a portable mechanism or combined with a work vehicle to achieve semi-automatic operations.
Smart Images

Figure CN113152174B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of railway line maintenance, in particular to a method and a device for efficiently replacing railway line sleepers. Background Art
[0002] Railways are the main arteries of the national economy, key infrastructure and major people's livelihood projects. They are the backbone of the comprehensive transportation system and one of the main modes of transportation. Their status and role in economic and social development are crucial.
[0003] Replacing sleepers damaged by vehicle rolling or ballast friction (including turnout sleepers in the throat area of the station) is a regular task in the daily maintenance of railway lines. The common operation method now is to manually remove ballast, take out damaged sleepers, put in new sleepers, fill ballast, and tamp. This operation method requires a lot of manpower and takes a long time. A single sleeper is 2.5m long and weighs about 400kg. The length and weight of sleepers in the turnout area are even greater than those of line sleepers. Therefore, removing ballast and replacing sleepers are a combination of heavy physical labor and precision technology in the current line maintenance methods. Moreover, the throat area is densely populated with lines, and the working space is limited. In addition, the operating personnel are concentrated. As the traffic density increases, the operating time is strictly limited, and there are potential risks to the personal safety of the operating personnel.
[0004] So far, there is no effective method for replacing railway line sleepers. Based on this, we have invented a method for efficiently replacing railway line sleepers. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a method for efficiently replacing railway sleepers.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is as follows:
[0007] A method for efficiently replacing railway sleepers, the method comprising the following steps:
[0008] S1 Ballast recovery: The ballast recovery and backfilling mechanism is fixed on the base rail. The electric shovel moves forward along the guide rail under the drive of the stepping device to shovel out the ballast. The shoveled ballast is transported to the ballast storage frame through the horizontal conveyor belt and the upper conveyor belt.
[0009] S2 sleeper extraction: The sleeper extraction mechanism is fixed on the base rail, and the sling of the winch under the rotating boom is connected to the sleeper to be replaced. Driven by motor 2, the winch mounting seat moves along the rotating boom perpendicular to the base rail to extract the sleeper;
[0010] S3: Lifting the sleepers to the installation position: The sling of the hoist under the rotating boom is connected to the sleepers to be installed. Driven by the motor 1, the rotating boom rotates around the rotating axis 1 to transport the sleepers to be installed to the installation position;
[0011] S4 passes the sleeper under the stock rail to complete the sleeper replacement;
[0012] S5 ballast backfill: The horizontal conveyor belt and the upper conveyor belt transport ballast in reverse direction for ballast backfill.
[0013] Furthermore, the sleeper passing under the stock rail specifically comprises the following steps:
[0014] S401: The hook 1 and hook 3 on the sleeper to be installed are connected to the slings at the corresponding positions, and the motor 2 drives the hoisting machine mounting seat to move along the boom in a direction perpendicular to the horizontal base rail. When the upper plane of the sleeper is lower than the bottom surface of the base rail from the initial position, the hoisting machine mounting seat drives the sleeper to move toward the center of the track under the drive of the motor;
[0015] S402 When hook three moves to the outside of the left stock rail, the winch lowers the sleeper, removes hook three, connects hook four to the sling, and the winch continues to operate to lift the sleeper and move it toward the center of the track;
[0016] S403 When hook four moves to the inner side close to the right basic rail, the sleeper is lowered and the operation of step S402 is repeated, that is, hook four is removed, hook three is connected to the sling, and the operation is continued to lift the sleeper and move it to the desired position to complete the replacement of the sleeper.
[0017] Furthermore, the step S1 also includes a screening operation before the ballast is transported to the ballast storage frame.
[0018] Another object of the present invention is to overcome the deficiencies in the prior art and provide a device for efficiently replacing railway sleepers.
[0019] A device for efficiently replacing railway sleepers, comprising a ballast recovery and backfilling mechanism and a sleeper extraction and placement mechanism.
[0020] The ballast recovery and backfilling mechanism comprises a guide rail, a stepping device is installed on the guide rail, the stepping device is connected to an electric shovel, a horizontal conveyor belt and an upper conveyor belt, the electric shovel, the horizontal conveyor belt and the upper conveyor belt are connected in sequence through flanges, the discharge end of the upper conveyor belt is connected to a ballast storage frame, the ballast storage frame and the upper conveyor belt are connected through a connecting rod, and a pulley is arranged at the bottom of the ballast storage frame;
[0021] The sleeper extraction and release mechanism includes a bracket, a transverse guide rail is connected to the top of the bracket, a rotating boom is connected to the transverse guide rail, a winch mounting seat is connected to the bottom of the rotating boom, the rotating boom and the winch mounting seat are connected by a slider or a pulley, the slider or the pulley is connected to a motor 2, the winch mounting seat is connected to a winch, the winch is connected to a sling, and a hook is connected to the end of the sling.
[0022] Furthermore, the transverse guide rail is connected to the rotating boom via a rotating shaft 1, the rotating shaft 1 is connected to a motor 1, and the pulley or slider is connected to the sling installation via a rotating shaft 2.
[0023] Furthermore, the guide rail and the basic rail are connected via a basic rail fixing structure, the basic rail fixing structure includes a pressure plate and bolts, the pressure plate includes two symmetrically arranged clamping plates, the contact surfaces of the two clamping plates and the basic rail are respectively provided with an inverted L-shaped groove, the upper and lower ends of the two pressure plates are respectively clamped by bolts, wedge blocks or hydraulic mechanisms, the lower surface of the guide rail is connected to a pressure plate guide block, the pressure plate guide block is provided with a pressure plate guide groove, and the upper section of the pressure plate is inserted into the guide groove.
[0024] Furthermore, the electric shovel, horizontal conveyor belt and upper conveyor belt are connected to the guide rails via sliders and locking nuts respectively, the horizontal conveyor belt, upper conveyor belt and slider are connected via connecting rods, the electric shovel and horizontal conveyor belt are connected via flanges, the horizontal conveyor belt and upper conveyor belt are connected via flanges, and a conveyor belt connecting mechanism is provided in the gap between the horizontal conveyor belt and the upper conveyor belt.
[0025] Furthermore, the upper conveyor belt includes an independently arranged cleaning section and an upper conveyor belt 2, the cleaning section includes an upper conveyor belt 1 and a vibrating screen located below the upper conveyor belt, the upper conveyor belt 1 is provided with cleaning holes, the vibrating screen drives the upper conveyor belt to vibrate together, the upper conveyor belt 1 and the upper conveyor belt 2 are connected by a flange, and a conveyor belt connecting mechanism is provided in the gap between the upper conveyor belt 1 and the upper conveyor belt 2.
[0026] Furthermore, the lower surface of the bracket is connected with a bracket column, and the bracket column is connected to the basic rail through a basic rail fixing structure, and the basic rail fixing structure includes a pressure plate and a bolt, and the pressure plate includes two symmetrically arranged clamping plates, and the contact surfaces of the two clamping plates and the basic rail are respectively provided with an inverted L-shaped groove, and the upper and lower ends of the two pressure plates are respectively clamped by a clamping mechanism, and a pressure plate guide groove is opened at the lower end of the bracket column, and the upper section of the pressure plate is inserted into the guide groove;
[0027] The clamping mechanism is selected from bolts, wedge blocks or hydraulic mechanisms.
[0028] Furthermore, there are basic rail protection pads symmetrically arranged between the two clamping plates and the basic rail, and the basic rail protection pads are in an inverted L shape.
[0029] The beneficial effects of the technical solution of the present invention are:
[0030] 1. The method for efficiently replacing railway sleepers in the present invention has the advantages of low labor intensity and no need for lifting or carrying. During the operation, only one person is needed to operate the equipment and two people are needed to cooperate in the operation, which reduces the time by more than half compared with traditional operations; the time for replacing a sleeper can be controlled within 30 minutes (excluding material transportation time).
[0031] 2. The ballast recovery and backfilling mechanism and the sleeper extraction and placement mechanism in the present invention are both independent working units and can be used as portable mechanisms, either alone or simultaneously, according to the needs of line maintenance operations, making them more convenient to use.
[0032] 3. The ballast recovery and backfilling mechanism and the sleeper extraction and placement mechanism in the present invention can be installed on the stock rail or fixed on the working vehicle for use, forming a track maintenance working vehicle, realizing semi-automatic operation and having diversified use forms. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a structural schematic diagram of the ballast recovery and backfilling mechanism in the present invention.
[0034] Figure 2 It is a structural schematic diagram of the basic rail fixing structure in the present invention.
[0035] Figure 3 It is a top view of the sleeper extraction and release mechanism in the present invention.
[0036] Figure 4. Figure 5 , Figure 6 and Figure 7 This is a schematic diagram of the principle of the sleepers passing under the stock rails.
[0037] in, Figure 4 The schematic diagram of the structure in the initial position is shown in the figure.
[0038] Figure 5 This is a schematic diagram of the structure when the hook 3 moves to the outside of the left basic rail.
[0039] Figure 6 This is a structural diagram of the hook 4 close to the right basic rail.
[0040] Figure 7 This is a structural diagram of the sleepers installed in place.
[0041] In the figure: 1 guide rail, 2 electric shovel, 3 basic rail fixing structure, 4 horizontal conveyor belt, 5 upper conveyor belt, 6 ballast storage frame, 7 flange, 8 basic rail, 9 bracket column, 10 clamping plate, 11 clamping mechanism, 12 basic rail protection pad, 13 bracket, 14 rotating shaft one, 15 rotating boom, 16 sleeper, 17 sling, 18 hook one, 19 hook two, 20 hook three, 21 hook four, 22 cross guide rail, 23 winch mounting seat. DETAILED DESCRIPTION
[0042] The present invention will be further described below in conjunction with specific implementations and accompanying drawings.
[0043] See also Figure 1 and Figure 4-Figure 7 The method for efficiently replacing railway sleepers in the present invention comprises the following steps:
[0044] S1 Ballast recovery: The ballast recovery and backfilling mechanism is fixed on the basic rail 8. The electric shovel 2 moves forward along the guide rail 1 under the drive of the stepping device to shovel out the ballast. The shoveled ballast is transported to the ballast storage frame 6 through the horizontal conveyor belt 4 and the upper conveyor belt 5. Before the ballast is transported to the ballast storage frame 6, it is first screened to remove fine particles and dust. This can increase the porosity between adjacent ballasts after ballast backfilling and avoid fine particles filling the gaps between the ballasts, thereby improving the noise reduction, heat absorption, shock absorption and water permeability of the laid ballast.
[0045] S2: Extracting the sleeper 16: The sleeper 16 extraction mechanism is fixed on the base rail 8, and the sling 17 of the winch under the rotating boom 15 is connected to the sleeper 16 to be replaced. Under the drive of the second motor, the winch mounting seat 23 moves along the rotating boom 15 in a direction perpendicular to the base rail 8 to extract the sleeper 16;
[0046] S3: hoisting the sleeper 16 to the installation position: the sling 17 of the hoist under the rotating boom 15 is connected to the sleeper 16 to be installed, and under the drive of the motor 1, the rotating boom 15 rotates around the rotating shaft 14 to transport the sleeper 16 to be installed to the installation position;
[0047] S4 passes the sleeper 16 through the bottom of the stock rail 8 to complete the replacement of the sleeper 16; specifically, the following steps are included:
[0048] S401: The hook 18 and the hook 3 20 on the sleeper 16 to be installed are connected to the sling 17 at the corresponding position, and the motor 2 drives the hoisting machine mounting seat 23 to move along the boom in a direction perpendicular to the horizontal basic rail 8. When the upper plane of the sleeper 16 is lower than the bottom surface of the basic rail 8 from the initial position, the hoisting machine mounting seat 23 drives the sleeper 16 to move toward the center of the track under the drive of the motor;
[0049] S402 When the hook 3 20 moves to the outside of the left stock rail 8, the winch lowers the sleeper 16, removes the hook 3 20, and the hook 4 21 is connected to the sling 17, and the winch continues to operate to lift the sleeper 16 and move it toward the center of the track;
[0050] S403 When the hook four 21 moves to the inner side close to the right basic rail 8, the sleeper 16 is lowered and the operation of step S402 is repeated, that is, the hook four 21 is removed, the hook three 20 is connected to the sling 17, and the operation is continued to lift the sleeper 16 and move it to the desired position to complete the replacement of the sleeper 16.
[0051] S5 ballast backfilling: the horizontal conveyor belt 4 and the upper conveyor belt 5 transport ballast in reverse direction for ballast backfilling. During backfilling, the ballast in the ballast storage frame 6 can be manually transferred to the upper conveyor belt 5 or the ballast storage frame 6 can be tilted so that the ballast in the ballast storage frame 6 can smoothly enter the upper conveyor belt 5, thereby realizing the ballast backfilling.
[0052] It should be noted that: the above is that the sleeper 16 is inserted from the left side to the right side. When the sleeper 16 is inserted from the right side to the left side, the hook 2 19 and the hook 4 21 are switched. The extraction of the sleeper 16 in step S2 and the placement of the sleeper 16 in step S4 are reverse operations.
[0053] See also Figure 1 and Figure 4 , a device for efficiently replacing 16 sleepers on a railway line, comprising a ballast recovery and backfilling mechanism and a sleeper 16 extraction and placement mechanism, the ballast recovery and backfilling mechanism comprising a guide rail 1, a stepping device is installed on the guide rail 1, the stepping device is connected to an electric shovel 2, a horizontal conveyor belt 4 and an upper conveyor belt 5, the stepping device comprises a driving mechanism and a walking wheel installed on the guide rail 1, the walking wheel is connected to the electric shovel 2, the electric shovel 2, the horizontal conveyor belt 4 and the upper conveyor belt 5 are connected in turn through a flange 7, adopting this structural design, the installation and disassembly efficiency between the electric shovel 2, the horizontal conveyor belt 4 and the upper conveyor belt 5 is high, and they are connected into a whole, so that the electric shovel 2, the horizontal conveyor belt 4 and the upper conveyor belt 5 are connected to each other. The flat conveyor belt 4 and the upper conveyor belt 5 can move forward along the guide rail 1 as a whole. The discharge end of the upper conveyor belt 5 is connected with a ballast storage frame 6. The ballast storage frame 6 is connected to the upper conveyor belt 5 through a connecting rod. A pulley is arranged at the bottom of the ballast storage frame 6. The electric shovel 2, the horizontal conveyor belt 4 and the upper conveyor belt 5 are connected to the guide rail 1 through a slider and a locking nut respectively. The horizontal conveyor belt 4, the upper conveyor belt 5 and the slider are connected through a connecting rod. The electric shovel 2 is connected to the horizontal conveyor belt 4 through a flange 7. The horizontal conveyor belt 4 and the upper conveyor belt 5 are connected through a flange 7. A conveyor belt connecting mechanism is arranged in the gap between the horizontal conveyor belt 4 and the upper conveyor belt 5. The conveyor belt connecting mechanism is a conveyor belt with plug connectors at both ends. The plug connectors at both ends are plug-connected with the conveyor belts on both sides, so as to realize the continuous transportation of ballast without missing between the two conveyor belts.
[0054] The sleeper 16 extraction and release mechanism includes a bracket 13 for connecting with the basic rail 8 during installation, a transverse guide rail 22 is connected above the bracket 13, a rotating arm 15 is connected to the transverse guide rail 22, the transverse guide rail 22 is connected to the rotating arm 15, the transverse guide rail 22 and the rotating arm 15 are connected through a rotating shaft 14, the rotating shaft 14 is connected to a motor 1, the motor 1 drives the arm to perform horizontal rotation around the rotating shaft 14, so as to move the extracted sleeper 16 to a storage position or move the sleeper 16 to a position where it needs to be installed, a winch mounting seat 23 is connected below the rotating arm 15, a pulley or a slider is passed between the rotating arm 15 and the winch mounting seat 23, the pulley or the slider is connected to a motor 2, the motor 2 drives the winch mounting seat 23 to move vertically along the rotating arm 15 to the basic rail 8, a winch is connected to the winch mounting seat 23, a sling 17 is connected to the winch, and a hook is connected to the end of the sling 17, such as Figure 4 and Figure 5 As shown, there are four slings 17 in this embodiment, and the fixed positions correspond to the positions of the four hooks on the sleepers 16. During the process of drawing and releasing the sleepers 16, hook 18, hook 2 19, hook 3 20 and hook 4 21 are arranged in sequence perpendicular to the direction of the basic rail 8 and from far to near the basic rail 8; in this embodiment, there can be one or four winches, and four slings 17 can be controlled by one winch (one winch controls the lifting and lowering of four slings 17 at the same time. According to the technical solution in the present invention, only two slings 17 are subjected to force during the actual lifting process), or one winch can be configured for each sling 17. The specific connection relationship and control relationship belong to the prior art and will not be repeated in this application. The pulley or slider is connected to the installation of the sling 17 through a rotating shaft 2. The rotating shaft 2 is mainly used to adjust the winch mounting seat 23 to be perpendicular to the direction of the basic rail 8, so that the drawing and releasing of the sleepers 16 can be carried out smoothly. In this embodiment, the direction of the sleepers 16 is manually adjusted to be perpendicular to the direction of the basic rail 8.
[0055] The working principle is the same as the replacement method.
[0056] It should be noted that the conveyor belt in the present invention comprises a conveyor belt, a belt mounting bracket 13 and a transmission motor. The conveyor belt in the present invention is a belt with a concave-convex surface.
[0057] In order to improve the installation stability and installation and disassembly efficiency between the guide rail 1 and the basic rail 8, the guide rail 1 in this embodiment is connected to the basic rail 8 through a basic rail fixing structure 3, the basic rail fixing structure 3 includes a pressure plate and a bolt, the pressure plate includes two symmetrically arranged clamping plates 10, the contact surfaces of the two clamping plates 10 and the basic rail 8 are respectively provided with an inverted L-shaped groove, the upper and lower ends of the two pressure plates are respectively clamped by bolts, wedge blocks or hydraulic mechanisms, the lower surface of the guide rail 1 is connected with a pressure plate guide block, the pressure plate guide block is provided with a pressure plate guide groove, and the upper section of the pressure plate is inserted into the guide groove, in order to avoid the guide rail 1 from causing damage to the basic rail 8 during the installation process or during use, there are symmetrically arranged basic rail protection pads 12 between the two clamping plates 10 and the basic rail 8 in this embodiment, and the basic rail protection pads 12 are inverted L-shaped, and this structural design improves the compactness of the structural installation. Specifically, the clamping mechanism 11 uses bolts, wedge blocks or hydraulic mechanisms.
[0058] In order to screen out the fine particles and dust between the ballast, the upper conveyor belt 5 in this embodiment includes an independently set cleaning section and an upper conveyor belt 52. The cleaning section includes an upper conveyor belt 51 and a vibrating screen located below the upper conveyor belt 5. The upper conveyor belt 51 and the upper conveyor belt 52 are arranged in contact with each other. The upper conveyor belt 51 is provided with cleaning holes. The vibrating screen drives the upper conveyor belt 5 to vibrate together. The upper conveyor belt 51 and the upper conveyor belt 52 are connected by flange 7. The gap between the upper conveyor belt 51 and the upper conveyor belt 52 is provided with a conveyor belt connection mechanism. This structural design can improve the screening efficiency of fine particles and dust in the ballast. The conveyor belt connection mechanism is a conveyor belt with plug connectors at both ends. The plug connectors at both ends are plug-connected with the conveyor belts on both sides, so as to realize the continuous transportation of the ballast without missing between the two conveyor belts.
[0059] In order to improve the installation stability and installation and disassembly efficiency between the bracket 13 and the basic rail 8, the lower surface of the bracket 13 in this embodiment is connected with a bracket column 9, and the bracket column 9 is connected to the basic rail 8 through the basic rail fixing structure 3. The basic rail fixing structure 3 includes a pressure plate and a bolt. The pressure plate includes two symmetrically arranged clamping plates 10. The contact surfaces of the two clamping plates 10 and the basic rail 8 each have an inverted L-shaped groove. The upper and lower ends of the two pressure plates are clamped by a clamping mechanism 11 respectively. The lower end of the bracket column 9 is provided with a pressure plate guide groove, and the upper section of the pressure plate is inserted into the guide groove. In order to avoid the guide rail 1 from damaging the basic rail 8 during the installation process or during use, there are symmetrically arranged basic rail protection pads 12 between the two clamping plates 10 and the basic rail 8 in this embodiment. The basic rail protection pad 12 is inverted L-shaped. Specifically, the clamping mechanism 11 uses bolts, wedge blocks or hydraulic mechanisms.
[0060] It should be noted that the ballast recovery and backfilling mechanism and the sleeper 16 extraction and placement mechanism in the present invention can be used as portable mechanisms, either alone or simultaneously, according to the needs of line maintenance operations.
[0061] The technical solution disclosed in the specific implementation manner of the present invention is to directly install the ballast recovery and backfilling mechanism and the sleeper 16 extraction and release mechanism on the basic rail 8 for operation. It should be noted that the ballast recovery and backfilling mechanism and the sleeper 16 extraction and release mechanism in the present invention can also be fixed on the work vehicle for use to form a track maintenance work vehicle to achieve semi-automatic operation.
[0062] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary experimental examples, and that the present invention can be implemented in other specific forms without departing from the spirit and essential features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any reference numerals in the claims should not be regarded as limiting the claims involved.
[0063] In addition, it should be understood that although this specification is described according to implementation methods, not every implementation method contains only one independent claim scheme. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.
Claims
1. A device for efficiently replacing railway sleepers, characterized in that: It includes ballast recovery and backfilling mechanism and sleeper extraction and placement mechanism. The ballast recovery and backfilling mechanism comprises a guide rail, a stepping device is installed on the guide rail, the stepping device is connected to an electric shovel, a horizontal conveyor belt and an upper conveyor belt, the electric shovel, the horizontal conveyor belt and the upper conveyor belt are connected in sequence through flanges, the discharge end of the upper conveyor belt is connected to a ballast storage frame, the ballast storage frame and the upper conveyor belt are connected through a connecting rod, and a pulley is arranged at the bottom of the ballast storage frame; The sleeper extraction and release mechanism comprises a bracket, a transverse guide rail is connected to the upper part of the bracket, a rotating arm is connected to the transverse guide rail, a winch mounting seat is connected to the lower part of the rotating arm, the rotating arm and the winch mounting seat are connected via a slider or a pulley, the slider or the pulley is connected to a second motor, a winch is connected to the winch mounting seat, a sling is connected to the winch, a hook is connected to the end of the sling, there are four slings, and the fixed positions correspond to the positions of the four hooks on the sleepers, and in the process of sleeper extraction and release, hook 1, hook 2, hook 3 and hook 4 are arranged in sequence perpendicular to the direction of the basic rail and from far to near the basic rail; The transverse guide rail is connected to the rotating boom via a rotating shaft 1, the rotating shaft 1 is connected to a motor 1, and the pulley or slider is connected to the sling installation via a rotating shaft 2; The lower surface of the bracket is connected with a bracket column, and the bracket column is connected to the basic rail through a basic rail fixing structure. The basic rail fixing structure includes a pressing plate and a bolt. The pressing plate includes two symmetrically arranged clamping plates, and the contact surfaces of the two clamping plates and the basic rail are respectively provided with an inverted L-shaped groove. The upper and lower ends of the two pressing plates are respectively clamped by a clamping mechanism. A pressing plate guide groove is opened at the lower end of the bracket column, and the upper section of the pressing plate is inserted into the guide groove. The clamping mechanism is selected from bolts, wedge blocks or hydraulic mechanisms.
2. The device for efficiently replacing railway sleepers according to claim 1, characterized in that: The guide rail and the basic rail are connected via a basic rail fixing structure, the basic rail fixing structure comprises a pressure plate and bolts, the pressure plate comprises two symmetrically arranged clamping plates, each of the two clamping plates has an inverted L-shaped groove on its contact surface with the basic rail, the upper and lower ends of the two pressure plates are clamped by bolts, wedge blocks or hydraulic mechanisms, the lower surface of the guide rail is connected to a pressure plate guide block, a pressure plate guide groove is formed on the pressure plate guide block, and the upper section of the pressure plate is inserted into the guide groove.
3. The device for efficiently replacing railway sleepers according to claim 1, characterized in that: The electric shovel, horizontal conveyor belt and upper conveyor belt are connected to the guide rails via sliders and locking nuts respectively, the horizontal conveyor belt, upper conveyor belt and slider are connected via connecting rods, the electric shovel is connected to the horizontal conveyor belt via a flange, the horizontal conveyor belt and upper conveyor belt are connected via a flange, and a conveyor belt connecting mechanism is provided in the gap between the horizontal conveyor belt and the upper conveyor belt.
4. The device for efficiently replacing railway sleepers according to claim 1, characterized in that: The upper conveyor belt includes an independently arranged cleaning section and an upper conveyor belt 2, the cleaning section includes an upper conveyor belt 1 and a vibrating screen located below the upper conveyor belt, the upper conveyor belt 1 is provided with cleaning holes, the vibrating screen drives the upper conveyor belt to vibrate together, the upper conveyor belt 1 and the upper conveyor belt 2 are connected by a flange, and a conveyor belt connecting mechanism is provided in the gap between the upper conveyor belt 1 and the upper conveyor belt 2.
5. The device for efficiently replacing railway sleepers according to claim 1, characterized in that: A basic rail protection pad is symmetrically arranged between the two clamping plates and the basic rail, and the basic rail protection pad is in an inverted L shape.
6. A method for efficiently replacing railway sleepers, characterized in that: The method adopts the device according to any one of claims 1 to 5, and the method comprises the following steps: S1 Ballast recovery: The ballast recovery and backfilling mechanism is fixed on the base rail. The electric shovel moves forward along the guide rail under the drive of the stepping device to shovel out the ballast. The shoveled ballast is transported to the ballast storage frame through the horizontal conveyor belt and the upper conveyor belt. S2 sleeper extraction: The sleeper extraction mechanism is fixed on the base rail, and the sling of the winch under the rotating boom is connected to the sleeper to be replaced. Driven by motor 2, the winch mounting seat moves along the rotating boom perpendicular to the base rail to extract the sleeper; S3: Lifting the sleepers to the installation position: The sling of the hoist under the rotating boom is connected to the sleepers to be installed. Driven by the motor 1, the rotating boom rotates around the rotating axis 1 to transport the sleepers to be installed to the installation position; S4 passes the sleeper under the stock rail to complete the sleeper replacement; S5 ballast backfill: The horizontal conveyor belt and the upper conveyor belt transport ballast in reverse direction for ballast backfill.
7. A method for efficiently replacing railway sleepers according to claim 6, characterized in that: The sleepers passing under the stock rail specifically include the following steps: S401: The hook 1 and hook 3 on the sleeper to be installed are connected to the slings at the corresponding positions, and the motor 2 drives the hoisting machine mounting seat to move along the boom in a direction perpendicular to the horizontal base rail. When the upper plane of the sleeper is lower than the bottom surface of the base rail from the initial position, the hoisting machine mounting seat drives the sleeper to move toward the center of the track under the drive of the motor; S402 When hook three moves to the outside of the left stock rail, the winch lowers the sleeper, removes hook three, connects hook four to the sling, and the winch continues to operate to lift the sleeper and move it toward the center of the track; S403 When hook four moves to the inner side close to the right basic rail, the sleeper is lowered, hook four is removed, hook three is connected to the sling, and the operation is continued to lift the sleeper and move it to the required position to complete the replacement of the sleeper.
8. The method for efficiently replacing railway sleepers according to claim 6, characterized in that: The step S1 also includes a screening operation before the ballast is transported to the ballast storage frame.
Citation Information
Patent Citations
Hydraulic sleeper replacement machine and hydraulic sleeper replacement method
CN103669133A
Sleeper hoisting device
CN104195903A
Combined excavation screen cleaning machine
CN201785684U
Novel railroad sleeper is retrieved device
CN207582200U
Ballast cleaning equipment for both road and rail
CN209537955U