Oil pipeline damage risk assessment method and device
The method and device use surveillance cameras to assess oil pipeline damage risk by analyzing images and incorporating various factors, ensuring accurate and timely maintenance to prevent accidents.
Patent Information
- Application Number
- CN202011228554.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-06
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-11-06
AI Technical Summary
Existing methods for assessing oil pipeline damage risk rely on manual patrols, which are inaccurate and cannot provide 24-hour monitoring, leading to potential safety hazards due to delayed maintenance.
A method and device utilizing surveillance cameras to capture oil pipeline images, identify damage types, and calculate damage risk by combining image analysis with pre-stored correlations to assess damage occurrence probability, protection effectiveness, and failure possibility, incorporating factors like culvert presence, alarm response, and public awareness.
Enables 24-hour accurate and automatic monitoring of oil pipelines, improving assessment accuracy by considering multiple objective conditions, thereby reducing the likelihood of safety accidents through timely maintenance.
Smart Images

Figure CN113204985B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of oil pipeline safety, and in particular to an oil pipeline damage risk assessment method and device. Background Art
[0002] The oil pipeline system refers to the pipeline system used to transport oil and petroleum products. It is mainly composed of oil pipelines, oil stations and other auxiliary related equipment. It is one of the main equipment in the oil storage and transportation industry, and it is also the most important transportation equipment for crude oil and petroleum products. Compared with railway and road oil transportation, which are also land transportation methods, pipeline oil transportation has the characteristics of large transportation volume, good airtightness, low cost and high safety factor.
[0003] With the acceleration of the construction of oil pipelines, oil pipelines have gradually been laid around cities and even into urban areas. Since the population is relatively dense where the oil pipelines are located, once the oil pipelines are damaged and leaks occur, it will cause very serious consequences and great risks. Therefore, it is particularly important to conduct real-time assessment of the damage risk of the oil pipelines and to perform timely maintenance of the oil pipelines.
[0004] The inventors have found that there are at least the following problems in the prior art: the prior art generally adopts the method of staff patrol to assess the damage risk of the oil pipeline, which cannot be combined with other objective conditions other than the situation of the oil pipeline, the recognition accuracy is low, and manual patrol cannot achieve 24-hour accurate monitoring and assessment. In short, the oil pipeline cannot be maintained in time, which increases the possibility of safety accidents. Summary of the invention
[0005] In view of this, the present invention provides a method and an apparatus.
[0006] Specifically, the following technical solutions are included:
[0007] In one aspect, the present invention provides a method for assessing oil pipeline damage risk, the method comprising:
[0008] Get the oil pipeline image captured by the surveillance camera.
[0009] Identify the oil pipeline image and obtain the damage type.
[0010] The damage type is substituted into the pre-stored correspondence between the damage type and the damage occurrence probability to obtain the damage occurrence probability.
[0011] Get protection effectiveness.
[0012] The damage occurrence possibility and the protection effectiveness are substituted into the pre-stored corresponding relationship among the damage occurrence possibility, the protection effectiveness and the damage failure possibility to obtain the damage failure possibility.
[0013] Gets the severity of the consequences of failure.
[0014] The damage failure possibility and the severity of the failure consequence are substituted into the pre-stored corresponding relationship between the damage failure possibility, the severity of the failure consequence and the damage risk to obtain the damage risk.
[0015] Optionally, the oil pipeline image is identified to obtain damage types, including:
[0016] The oil pipeline image is identified to determine whether the oil pipeline image contains saboteurs.
[0017] When the oil pipeline image contains a saboteur, the type of the saboteur is determined, and the action, stay position, stay time and occurrence frequency of the saboteur are recorded.
[0018] The type, action, stop position, stop time and occurrence frequency of the sabotage executor are substituted into the pre-stored correspondence between the type, action, stop position, stop time and occurrence frequency of the sabotage executor and the damage type to obtain the damage type.
[0019] Optionally, obtain protection effectiveness, including:
[0020] Get the pipeline depth value D.
[0021] Determine the culvert or casing parameter T based on whether there is a culvert or casing outside the pipeline.
[0022] Determine the alarm response parameter S based on the average alarm response time.
[0023] Determine the identification parameter Z according to the ground identification conditions.
[0024] Determine the early warning system parameter Y according to the pipeline early warning system situation.
[0025] Determine the warning zone parameter J based on whether there is a warning zone.
[0026] According to the survey results of public protection awareness, the protection awareness parameter P is determined.
[0027] Determine the protection publicity parameter C based on the pipeline protection publicity frequency.
[0028] Substitute the pipeline depth value D, culvert casing parameter T, alarm response parameter S, identification parameter Z, early warning system parameter Y, warning tape parameter J, protection awareness parameter P and protection publicity parameter C into the following formula:
[0029]
[0030] Thus, the protection effectiveness M is obtained.
[0031] Optionally, obtaining protection effectiveness includes:
[0032] When there is a culvert or casing outside the pipeline, the culvert casing parameter T is determined to be 3.5.
[0033] When there is no culvert or casing outside the pipeline, the culvert casing parameter T is determined to be 0.
[0034] When the average alarm response time is less than the first preset alarm threshold, the alarm response parameter S is determined to be 2.
[0035] When the average alarm response time is greater than the first preset alarm threshold and less than the second preset alarm threshold, the alarm response parameter S is determined to be 1.5.
[0036] When the average alarm response time is greater than the second preset alarm threshold, the alarm response parameter S is determined to be 0.
[0037] When the ground marking is intact, the marking parameter Z is determined to be 2.5.
[0038] When the ground sign is damaged, the sign parameter Z is determined to be 1.5.
[0039] When the ground mark is missing, the mark parameter Z is determined to be 0.
[0040] When the pipeline early warning system is installed, the early warning system parameter Y is determined to be 1.
[0041] When the pipeline early warning system is not installed, the early warning system parameter Y is determined to be 0.
[0042] When a warning band is provided, the warning band parameter J is determined to be 1.
[0043] When no warning band is set, the warning band parameter J is determined to be 0.
[0044] When the survey results of public protection awareness are excellent, the protection awareness parameter P is determined to be 2.
[0045] When the survey result of public protection awareness is good, the protection awareness parameter P is determined to be 1.
[0046] When the survey result of the public protection awareness is poor, the protection awareness parameter P is determined to be 0.
[0047] When the pipeline protection publicity frequency is greater than the preset publicity threshold, the protection publicity parameter C is determined to be 1.
[0048] When the pipeline protection publicity frequency is less than the preset publicity threshold and greater than zero, the protection publicity parameter C is determined to be 0.5.
[0049] When the pipeline protection publicity frequency is zero, the protection publicity parameter C is determined to be 0.
[0050] Optionally, the damage occurrence probability and the protection effectiveness are substituted into the pre-stored correspondence between the damage occurrence probability, the protection effectiveness and the damage failure probability to obtain the damage failure probability, including:
[0051] The probability of damage occurring P 1 and protection effectiveness M are substituted into the pre-stored corresponding relationship P between the possibility of damage occurrence, protection effectiveness, and possibility of damage failure 2 =P 1 ×(1-M).
[0052] Optionally, obtain the severity of the consequences of failure, including:
[0053] Get the casualty consequence value C 1 , casualty consequence value C 1 It represents the severity of casualties that may occur when pipeline damage occurs.
[0054] Obtain environmental pollution consequence value C 2 , environmental pollution consequence value C 2 It characterizes the severity of environmental pollution that may be caused when pipelines are damaged.
[0055] Set the casualty consequence value C 1 and environmental pollution consequence value C 2 The larger one is determined as the failure consequence severity C.
[0056] Optionally, obtain the casualty consequence value C 1 ,include:
[0057] Obtain population distribution levels, vertical distances between population and pipelines, possibility of forming confined spaces, media types, and media pressures.
[0058] The population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type are respectively substituted into the pre-stored correspondence between the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type and the respective parameters to obtain the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type.
[0059] Multiply the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type, and multiply the result by the 0.1 power of the medium pressure to obtain the casualty consequence value C. 1 .
[0060] Optionally, obtain the environmental pollution consequence value C 2 ,include:
[0061] Get environmental impact rating, media type, block valve status, and maintenance force coverage status.
[0062] The environmental impact level, medium type, shut-off valve status and maintenance force coverage status are substituted into the pre-stored correspondence between the environmental impact level, medium type, shut-off valve status and maintenance force coverage status and the parameters, and the parameters corresponding to the environmental impact level, medium type, shut-off valve status and maintenance force coverage status are obtained.
[0063] Multiply the parameters corresponding to the environmental impact level, medium type, cut-off valve status, and maintenance force coverage status to obtain the environmental pollution consequence value C 2 .
[0064] Optionally, the damage failure possibility and the severity of the failure consequence are substituted into the pre-stored correspondence between the damage failure possibility, the severity of the failure consequence and the damage risk to obtain the damage risk, including:
[0065] The probability of damage failure P 2 Substitute the failure consequence severity C into the pre-stored damage failure probability P 2 The corresponding relationship between the severity of failure consequences C and the risk of damage R is R = P 2 In ×C, the damage risk R is obtained.
[0066] In another aspect, the present invention provides an oil pipeline damage risk assessment device, the device comprising:
[0067] The first acquisition module is configured to acquire the oil pipeline image captured by the monitoring camera.
[0068] The recognition module is configured to recognize the oil pipeline image and obtain the damage type.
[0069] The first calculation module is configured to substitute the damage type into the pre-stored correspondence between the damage type and the possibility of damage occurrence to obtain the possibility of damage occurrence.
[0070] The second acquisition module is configured to acquire protection effectiveness.
[0071] The second calculation module is configured to substitute the damage occurrence possibility and the protection effectiveness into the pre-stored correspondence between the damage occurrence possibility, the protection effectiveness and the damage failure possibility to obtain the damage failure possibility.
[0072] The third acquisition module is configured to acquire the severity of the failure consequence.
[0073] The third calculation module is configured to substitute the damage failure possibility and the failure consequence severity into the pre-stored corresponding relationship between the damage failure possibility, the failure consequence severity and the damage risk to obtain the damage risk.
[0074] The beneficial effects of the technical solution provided by the embodiment of the present invention include at least:
[0075] The present embodiment provides a method for assessing the risk of oil pipeline damage, the method comprising: obtaining an image of the oil pipeline acquired by a surveillance camera; identifying the image of the oil pipeline to obtain the type of damage; substituting the damage type into the pre-stored correspondence between the damage type and the possibility of damage to obtain the possibility of damage; obtaining the effectiveness of protection; substituting the possibility of damage and the effectiveness of protection into the pre-stored correspondence between the possibility of damage, the effectiveness of protection and the possibility of damage failure to obtain the possibility of damage failure; obtaining the severity of failure consequences; substituting the possibility of damage failure and the severity of failure consequences into the pre-stored correspondence between the possibility of damage failure, the severity of failure consequences and the risk of damage to obtain the risk of damage. Since the camera is used instead of manual monitoring, 24-hour accurate and automatic monitoring is achieved, and the damage risk is assessed in combination with other objective conditions other than the oil pipeline's own situation, the accuracy of the assessment is improved, so that the oil pipeline can be maintained in time, reducing the possibility of safety accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0077] Figure 1 A flow chart of the oil pipeline damage risk assessment method provided by the present invention;
[0078] Figure 2 A block diagram of an oil pipeline damage risk assessment device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0079] To make the technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
[0080] Embodiment 1
[0081] This embodiment provides a method for assessing the risk of oil pipeline damage. Figure 1 As shown, it includes steps S101, S102, S103, S104, S105, S106 and S107, and each step will be specifically introduced below.
[0082] In step S101, an image of the oil pipeline captured by a surveillance camera is obtained.
[0083] In an optional manner, surveillance cameras can be arranged on the side of the oil pipeline, with the shooting range covering the area between 500 meters upstream and 500 meters downstream of the oil pipeline, as well as the areas on both sides of the oil pipeline and the line valve room, where the line valve room refers to a structure where valves are placed along a long-distance oil pipeline.
[0084] Two surveillance cameras can be set up to capture the oil pipeline from two angles to avoid being blocked by obstacles.
[0085] In step S102, the oil pipeline image is identified to obtain the damage type.
[0086] In an optional manner, the oil pipeline image is identified to obtain damage types, including:
[0087] The oil pipeline image is identified to determine whether the oil pipeline image contains saboteurs.
[0088] When the oil pipeline image contains a saboteur, the type of the saboteur is determined, and the action, stay position, stay time and occurrence frequency of the saboteur are recorded.
[0089] The type, action, stop position, stop time and occurrence frequency of the sabotage executor are substituted into the pre-stored correspondence between the type, action, stop position, stop time and occurrence frequency of the sabotage executor and the damage type to obtain the damage type.
[0090] Specifically, the correspondence between the type, action, stay position, stay time and occurrence frequency of the sabotage executor and the damage type is represented by a pre-stored damage type table. The type, action, stay position, stay time and occurrence frequency of the sabotage executor are substituted into the pre-stored correspondence between the type, action, stay position, stay time and occurrence frequency of the sabotage executor and the damage type to obtain the damage type, including:
[0091] The first step is to substitute the type of destroyer into the damage type table. The types of destroyers include excavators, dredgers, tankers, other heavy-loading vehicles, other light-loading vehicles, and construction workers.
[0092] The second step is to substitute the action of the destroyer into the damage type table. The actions include staying, digging and crushing. If the damage type has been determined after executing the second step, stop the following steps.
[0093] The third step is to substitute the location of the destroyer into the damage type table. The location includes both sides of the pipeline, directly above the pipeline, upstream and downstream of the pipeline, and the valve room. If the damage type has been determined after executing the third step, stop the following steps.
[0094] Step 4: Substitute the stay time of the destroyer into the damage type table. If the damage type has been determined after executing step 4, stop the following steps.
[0095] The fifth step is to substitute the occurrence frequency of the destruction executor into the damage type table.
[0096] Specifically, in an optional manner, when the type of the destroyer is an excavator, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, and the stay time is greater than 30 minutes, the damage type is determined to be the first type of excavator stay.
[0097] When the type of the destroyer is an excavator, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, the stay time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second type of excavator stay.
[0098] When the type of the executor of the damage is an excavator, the action is to stay, the staying position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, the staying time is less than 30 minutes, and the frequency of occurrence is less than 10 times, the damage type is determined to be the third type of excavator stay.
[0099] When the type of the destruction executor is an excavator, the action is a stop, and the stop position is a valve chamber, it is determined that the damage type is the fourth type of excavator stop.
[0100] When the type of the destruction performer is an excavator and the action is digging, it is determined that the damage type is the excavator digging type.
[0101] Specifically, in an optional manner, when the type of the destruction executor is a dredging ship, the action is to stay, the stay position is upstream or downstream of the pipeline, and the stay time is greater than 30 minutes, the damage type is determined to be the first type of dredging ship stay.
[0102] When the type of the destruction executor is a dredging ship, the action is to stop, the stop position is upstream and downstream of the pipeline, the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, it is determined that the damage type is the second type of dredging ship stop.
[0103] Specifically, in an optional manner, when the type of the executor of the damage is a tank truck, the action is to stop, the stop position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, it is determined that the damage type is the tank truck stop type.
[0104] Specifically, in an optional manner, when the type of the destroyer is other heavy-duty loading vehicles, the action is crushing, the stop position is directly above the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, it is determined that the damage type is the first crushing type.
[0105] In an optional manner, when the type of the destroyer is other light-loaded vehicles, the action is crushing, the stop position is directly above the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second crushing type.
[0106] In an optional manner, the damage type is determined to be the first compaction type or the second compaction type only when the road surface is an unhardened road surface and there is no culvert or casing protection outside the pipeline.
[0107] Specifically, in an optional manner, when the type of the destroyer is a construction worker, the action is digging, and the staying position is one of the two sides of the pipeline, directly above the pipeline, upstream and downstream of the pipeline, and the valve chamber, the damage type is determined to be the construction worker digging type.
[0108] In an optional manner, when the type of the destroyer is a construction worker, the action is to stay, the staying position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, and the staying time is greater than 60 minutes, the damage type is determined to be the first stay type of the construction worker.
[0109] In an optional manner, when the type of the destroyer is a construction worker, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, the stay time is less than 60 minutes, and the frequency of occurrence is greater than 10 times, it is determined that the damage type is the second stay type of the construction worker.
[0110] In an optional manner, when the type of the destruction executor is a construction worker, the action is staying, and the staying position is the valve chamber, the damage type is determined to be the third stay type of the construction worker.
[0111] In an optional manner, the actions of the destroyer also include breaking into a security protection area, destroying a warning sign, or destroying a warning tape.
[0112] In step S103, the damage type is substituted into the pre-stored correspondence between the damage type and the damage occurrence possibility to obtain the damage occurrence possibility.
[0113] The correspondence between the pre-stored damage types and the probability of damage occurrence is:
[0114] When the damage type is the first type of excavator stop, the corresponding damage occurrence possibility is the first possibility threshold.
[0115] When the damage type is the second type of excavator stopping, the corresponding damage occurrence possibility is the second possibility threshold.
[0116] When the damage type is the third type of excavator stop, the corresponding damage occurrence possibility is the third possibility threshold.
[0117] When the damage type is the fourth type of excavator stop, the corresponding possibility of damage occurrence is the first possibility threshold.
[0118] When the damage type is an excavator excavation type, the corresponding damage occurrence possibility is a first possibility threshold.
[0119] When the damage type is the first type of the dredging vessel staying, the corresponding possibility of damage occurrence is the first possibility threshold.
[0120] When the damage type is the second type of the dredging vessel staying, the corresponding possibility of damage occurrence is the second possibility threshold.
[0121] When the damage type is the tanker truck stop type, the corresponding damage occurrence possibility is the first possibility threshold.
[0122] When the damage type is the first crushing type, the corresponding possibility of damage occurrence is the second possibility threshold.
[0123] When the damage type is the second crushing type, the corresponding possibility of damage occurrence is the third possibility threshold.
[0124] When the damage type is the digging type by construction workers, the corresponding possibility of damage occurrence is the first possibility threshold.
[0125] When the damage type is the first stay type of the construction personnel, the corresponding possibility of damage occurrence is the second possibility threshold.
[0126] When the damage type is the second stay type of the construction personnel, the corresponding possibility of damage occurrence is the third possibility threshold.
[0127] When the damage type is the third stay type of the construction personnel, the corresponding possibility of damage occurrence is the first possibility threshold.
[0128] Specifically, in an optional manner, the first possibility threshold is 0.9, the second possibility threshold is 0.5, and the third possibility threshold is 0.2.
[0129] When the first possibility threshold is 0.9, the second possibility threshold is 0.5, and the third possibility threshold is 0.2, the correspondence between the pre-stored damage types and the possibility of damage occurrence is shown in the following table:
[0130]
[0131]
[0132] In step S104, the protection effectiveness is obtained.
[0133] In an optional manner, obtaining protection effectiveness includes:
[0134] Get the pipeline depth value D.
[0135] Determine the culvert or casing parameter T based on whether there is a culvert or casing outside the pipeline.
[0136] Determine the alarm response parameter S based on the average alarm response time.
[0137] Determine the identification parameter Z according to the ground identification conditions.
[0138] Determine the early warning system parameter Y according to the pipeline early warning system situation.
[0139] Determine the warning zone parameter J based on whether there is a warning zone.
[0140] According to the survey results of public protection awareness, the protection awareness parameter P is determined.
[0141] Determine the protection publicity parameter C based on the pipeline protection publicity frequency.
[0142] Substitute the pipeline depth value D, culvert casing parameter T, alarm response parameter S, identification parameter Z, early warning system parameter Y, warning tape parameter J, protection awareness parameter P and protection publicity parameter C into the following formula:
[0143]
[0144] Thus, the protection effectiveness M is obtained.
[0145] When there is a culvert or casing outside the pipeline, the culvert casing parameter T is determined to be 3.5.
[0146] When there is no culvert or casing outside the pipeline, the culvert casing parameter T is determined to be 0.
[0147] When the average alarm response time is less than the first preset alarm threshold, the alarm response parameter S is determined to be 2.
[0148] When the average alarm response time is greater than the first preset alarm threshold and less than the second preset alarm threshold, the alarm response parameter S is determined to be 1.5.
[0149] When the average alarm response time is greater than the second preset alarm threshold, the alarm response parameter S is determined to be 0.
[0150] When the ground marking is intact, the marking parameter Z is determined to be 2.5.
[0151] When the ground sign is damaged, the sign parameter Z is determined to be 1.5.
[0152] When the ground mark is missing, the mark parameter Z is determined to be 0.
[0153] When the pipeline early warning system is installed, the early warning system parameter Y is determined to be 1.
[0154] When the pipeline early warning system is not installed, the early warning system parameter Y is determined to be 0.
[0155] When a warning band is provided, the warning band parameter J is determined to be 1.
[0156] When no warning band is set, the warning band parameter J is determined to be 0.
[0157] When the survey results of public protection awareness are excellent, the protection awareness parameter P is determined to be 2.
[0158] When the survey result of public protection awareness is good, the protection awareness parameter P is determined to be 1.
[0159] When the survey result of the public protection awareness is poor, the protection awareness parameter P is determined to be 0.
[0160] When the pipeline protection publicity frequency is greater than the preset publicity threshold, the protection publicity parameter C is determined to be 1.
[0161] When the pipeline protection publicity frequency is less than the preset publicity threshold and greater than zero, the protection publicity parameter C is determined to be 0.5.
[0162] When the pipeline protection publicity frequency is zero, the protection publicity parameter C is determined to be 0.
[0163] Among them, the results of the public protection awareness survey and the frequency of pipeline protection publicity can be manually obtained in advance.
[0164] The value table of each parameter of protection effectiveness is shown in the following table:
[0165]
[0166]
[0167] In step S105, the damage occurrence possibility and the protection effectiveness are substituted into the pre-stored correspondence between the damage occurrence possibility, the protection effectiveness and the damage failure possibility to obtain the damage failure possibility.
[0168] In an optional manner, the damage occurrence probability and the protection effectiveness are substituted into the pre-stored correspondence between the damage occurrence probability, the protection effectiveness and the damage failure probability to obtain the damage failure probability, including:
[0169] The probability of damage occurring P 1 and protection effectiveness M are substituted into the pre-stored corresponding relationship P between the possibility of damage occurrence, protection effectiveness, and possibility of damage failure 2 =P 1 ×(1-M).
[0170] In step S106, the severity of the failure consequence is obtained.
[0171] In an optional manner, the severity of the failure consequence is obtained, including:
[0172] Get the casualty consequence value C 1 , casualty consequence value C 1 It represents the severity of casualties that may occur when pipeline damage occurs.
[0173] Obtain environmental pollution consequence value C 2 , environmental pollution consequence value C 2 It characterizes the severity of environmental pollution that may be caused when pipelines are damaged.
[0174] Set the casualty consequence value C 1 and environmental pollution consequence value C 2 The larger one is determined as the failure consequence severity C.
[0175] In an optional manner, obtaining the casualty consequence value C 1 ,include:
[0176] Obtain population distribution levels, vertical distances between population and pipelines, possibility of forming confined spaces, media types, and media pressures.
[0177] The population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type are respectively substituted into the pre-stored correspondence between the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type and the respective parameters to obtain the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type.
[0178] Multiply the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type, and multiply the result by the 0.1 power of the medium pressure to obtain the casualty consequence value C. 1 .
[0179] Specifically, in an optional manner, the pre-stored correspondence between the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, and the medium type and the parameters is:
[0180] When the population distribution level is level one, the corresponding parameter is 5, and the population distribution level is level one, which means that the pipeline passes through the city.
[0181] When the population distribution level is level two, the corresponding parameter is 4, and the population distribution level is level two, which means that the pipeline passes through towns and villages.
[0182] When the population distribution level is level three, the corresponding parameter is 3, and the population distribution level is level one, which means that the pipeline passes through the village.
[0183] When the population distribution level is level four, the corresponding parameter is 2, and the population distribution level is level one, which means that the pipeline passes through the farmland area.
[0184] When the population distribution level is level five, the corresponding parameter is 1, and the population distribution level is level one, indicating that the pipeline passes through an uninhabited area.
[0185] When the vertical distance between the population and the pipeline is less than 15 meters, the corresponding parameter is 1.2.
[0186] When the vertical distance between the population and the pipeline is greater than 15 meters and less than 200 meters, the corresponding parameter is 1.
[0187] When the vertical distance between the population and the pipeline is greater than 200 meters, the corresponding parameter is 0.6.
[0188] When the possibility of forming a confined space is large, the corresponding parameter is 1.1.
[0189] When the possibility of forming a confined space is medium, the corresponding parameter is 1.05.
[0190] When the possibility of forming a confined space is small, the corresponding parameter is 1.
[0191] When the medium type is natural gas, the corresponding parameter is 1.25.
[0192] When the medium type is gasoline, the corresponding parameter is 1.1.
[0193] When the medium type is crude oil, the corresponding parameter is 1.
[0194] Among them, the possibility of forming a confined space can be obtained through preliminary manual evaluation.
[0195] The parameters corresponding to each item in the casualty consequence value are shown in the following table:
[0196]
[0197] In an optional manner, the environmental pollution consequence value C is obtained 2 ,include:
[0198] Get environmental impact rating, media type, block valve status, and maintenance force coverage status.
[0199] The environmental impact level, medium type, shut-off valve status and maintenance force coverage status are substituted into the pre-stored correspondence between the environmental impact level, medium type, shut-off valve status and maintenance force coverage status and the parameters, and the parameters corresponding to the environmental impact level, medium type, shut-off valve status and maintenance force coverage status are obtained.
[0200] Multiply the parameters corresponding to the environmental impact level, medium type, cut-off valve status, and maintenance force coverage status to obtain the environmental pollution consequence value C 2 .
[0201] In an optional manner, the pre-stored corresponding relationships between the environmental impact level, medium type, cut-off valve status, and maintenance force coverage status and the parameters are as follows:
[0202] When the environmental impact level is level one, the corresponding parameter is 4. Level one means that the pipeline crosses a large national river or there is a nature reserve near the pipeline.
[0203] When the environmental impact level is level 2, the corresponding parameter is 3. Level 2 means that the pipeline crosses a small river, or there are lakes or ponds near the pipeline.
[0204] When the environmental impact level is level three, the corresponding parameter is 2, and the environmental impact level is level three, which means that the pipeline crosses a seasonal river.
[0205] When the environmental impact level is level four, the corresponding parameter is 1. The environmental impact level is level four, which means there is no environmentally sensitive area around the pipeline.
[0206] When the medium type is gasoline, the corresponding parameter is 1.1.
[0207] When the medium type is crude oil, the corresponding parameter is 1.
[0208] When the shut-off valve is in the state of being able to shut off automatically, the corresponding parameter is 0.9.
[0209] When the shut-off valve is in the state of being able to be shut off manually, the corresponding parameter is 1.
[0210] When the shut-off valve cannot be shut off normally, the corresponding parameter is 1.2.
[0211] When the maintenance force coverage status is within the effective coverage range, the corresponding parameter is 1.
[0212] When the maintenance force coverage status is not within the effective coverage range, the corresponding parameter is 1.05.
[0213] The parameters corresponding to each item in the environmental pollution consequence value are shown in the following table:
[0214]
[0215]
[0216] In step S107, the damage failure possibility and the severity of the failure consequence are substituted into the pre-stored correspondence between the damage failure possibility, the severity of the failure consequence and the damage risk to obtain the damage risk.
[0217] In an optional manner, the damage failure possibility and the severity of the failure consequence are substituted into the pre-stored correspondence between the damage failure possibility, the severity of the failure consequence and the damage risk to obtain the damage risk, including:
[0218] The probability of damage failure P 2 Substitute the failure consequence severity C into the pre-stored damage failure probability P 2 The corresponding relationship between the severity of failure consequences C and the risk of damage R is R = P 2 In ×C, the damage risk R is obtained.
[0219] It is understandable that the greater the value of the damage risk R, the greater the possibility of serious consequences due to damage to the oil pipeline.
[0220] In an optional manner, after obtaining the damage risk R, it can be determined whether the oil pipeline needs to be immediately maintained and repaired based on the value of R. The larger the R value, the more urgent the maintenance need.
[0221] The beneficial effects of the technical solution provided by the embodiment of the present invention include at least:
[0222] The present embodiment provides a method for assessing the risk of oil pipeline damage, the method comprising: obtaining an image of the oil pipeline acquired by a surveillance camera; identifying the image of the oil pipeline to obtain the type of damage; substituting the damage type into the pre-stored correspondence between the damage type and the possibility of damage to obtain the possibility of damage; obtaining the effectiveness of protection; substituting the possibility of damage and the effectiveness of protection into the pre-stored correspondence between the possibility of damage, the effectiveness of protection and the possibility of damage failure to obtain the possibility of damage failure; obtaining the severity of failure consequences; substituting the possibility of damage failure and the severity of failure consequences into the pre-stored correspondence between the possibility of damage failure, the severity of failure consequences and the risk of damage to obtain the risk of damage. Since the camera is used instead of manual monitoring, 24-hour accurate and automatic monitoring is achieved, and the damage risk is assessed in combination with other objective conditions other than the situation of the oil pipeline itself, the accuracy of the assessment is improved, so that the oil pipeline can be maintained in time, reducing the possibility of safety accidents.
[0223] Embodiment 2
[0224] The embodiment of the present invention provides a device for assessing the risk of oil pipeline damage. Figure 2 As shown, the device comprises:
[0225] The first acquisition module 201 is configured to acquire the oil pipeline image captured by the monitoring camera.
[0226] The identification module 202 is configured to identify the oil pipeline image and obtain the damage type.
[0227] The first calculation module 203 is configured to substitute the damage type into the pre-stored correspondence between the damage type and the damage occurrence possibility to obtain the damage occurrence possibility.
[0228] The second acquisition module 204 is configured to acquire protection effectiveness.
[0229] The second calculation module 205 is configured to substitute the damage occurrence possibility and the protection effectiveness into the pre-stored correspondence between the damage occurrence possibility, the protection effectiveness and the damage failure possibility to obtain the damage failure possibility.
[0230] The third acquisition module 206 is configured to acquire the severity of the failure consequence.
[0231] The third calculation module 207 is configured to substitute the damage failure possibility and the failure consequence severity into the pre-stored correspondence between the damage failure possibility, the failure consequence severity and the damage risk to obtain the damage risk.
[0232] The beneficial effects of the technical solution provided by the embodiment of the present invention include at least:
[0233] The present embodiment provides an oil pipeline damage risk assessment device, which includes: a first acquisition module 201, configured to acquire an oil pipeline image acquired by a surveillance camera; an identification module 202, configured to identify the oil pipeline image to obtain a damage type; a first calculation module 203, configured to substitute the damage type into a pre-stored correspondence between the damage type and the damage occurrence possibility to obtain the damage occurrence possibility; a second acquisition module 204, configured to acquire protection effectiveness; a second calculation module 205, configured to substitute the damage occurrence possibility and the protection effectiveness into a pre-stored correspondence between the damage occurrence possibility, the protection effectiveness and the damage failure possibility to obtain the damage failure possibility; a third acquisition module 206, configured to acquire the severity of the failure consequence; a third calculation module 207, configured to substitute the damage failure possibility and the failure consequence severity into a pre-stored correspondence between the damage failure possibility, the failure consequence severity and the damage risk to obtain the damage risk. By using cameras instead of manual monitoring, accurate and automatic monitoring is achieved 24 hours a day. In addition, the damage risk is assessed based on other objective conditions other than the situation of the oil pipeline itself, which improves the accuracy of the assessment. This allows the oil pipeline to be maintained in a timely manner, reducing the possibility of safety accidents.
[0234] This embodiment is based on the same inventive concept as the first embodiment and is a device embodiment corresponding to the first method embodiment. Therefore, those skilled in the art should understand that the description of the first embodiment is also applicable to this embodiment, and some technical details are not described in detail in this embodiment.
[0235] In the present application, it should be understood that the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features.
[0236] The above description is only for the purpose of facilitating those skilled in the art to understand the technical solution of the present invention and is not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for assessing oil pipeline damage risk, characterized in that: The method comprises: Acquire an image of the oil pipeline captured by a surveillance camera, wherein the surveillance camera is arranged on the side of the oil pipeline, and the shooting range of the surveillance camera covers the range between 500 meters upstream and 500 meters downstream of the oil pipeline, the areas on both sides of the oil pipeline, and the line valve chamber; Identify the oil pipeline image to determine whether the oil pipeline image contains a saboteur; When the oil pipeline image contains the saboteurs, the type of the saboteurs is determined, and the actions, stop positions, stop times, and occurrence frequencies of the saboteurs are recorded; the types of the saboteurs include excavators, dredgers, tank trucks, other heavy-duty loading vehicles, other light-duty loading vehicles, and construction personnel; the actions include stop, dig, and crush; the stop positions include both sides of the pipeline, directly above the pipeline, upstream and downstream of the pipeline, and the valve chamber; The type, action, stop position, stop time and occurrence frequency of the destroyer are substituted into the pre-stored correspondence between the type, action, stop position, stop time and occurrence frequency of the destroyer and the damage type to obtain the damage type; wherein, when the type of the destroyer is an excavator, the action is to stop, the stop position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, and the stop time is greater than 30 minutes, the damage type is determined to be the first type of excavator stop; when the type of the destroyer is an excavator, the action is to stop, the stop position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, and the stop time is less than 30 minutes , and the frequency of occurrence is greater than 10 times, it is determined that the damage type is the second type of excavator stay; when the type of the destruction executor is an excavator, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and the upstream and downstream of the pipeline, the stay time is less than 30 minutes, and the frequency of occurrence is less than 10 times, it is determined that the damage type is the third type of excavator stay; when the type of the destruction executor is an excavator, the action is to stay, and the stay position is the valve chamber, it is determined that the damage type is the fourth type of excavator stay; when the type of the destruction executor is an excavator, the action is to dig, it is determined that the damage type is the excavator digging type; when the type of the destruction executor is a dredging ship, the action is to stay , when the stop position is upstream and downstream of the pipeline and the stop time is greater than 30 minutes, the damage type is determined to be the first type of dredging ship stop; when the type of the destruction executor is a dredging ship, the action is to stop, the stop position is upstream and downstream of the pipeline, the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second type of dredging ship stop; when the type of the destruction executor is a tanker truck, the action is to stop, the stop position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the tanker truck stop type; when the type of the destruction executor is other When the type of the destroyer is other heavy-duty loading vehicles, the action is rolling, the stop position is directly above the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes and the frequency of occurrence is greater than 10 times, the damage type is determined to be the first rolling type; when the type of the destroyer is other light-duty loading vehicles, the action is rolling, the stop position is directly above the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second rolling type; when the type of the destroyer is a construction worker, the action is digging, and the stop position is one of the two sides of the pipeline, directly above the pipeline, upstream and downstream of the pipeline, and the valve chamber, the damage type is determined to be the construction worker digging type;When the type of the destroyer is a construction worker, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and the upstream and downstream of the pipeline, and the stay time is greater than 60 minutes, the damage type is determined to be the first stay type of the construction worker; when the type of the destroyer is a construction worker, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and the upstream and downstream of the pipeline, the stay time is less than 60 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second stay type of the construction worker; when the type of the destroyer is a construction worker, the action is to stay, and the stay position is the valve chamber, the damage type is determined to be the third stay type of the construction worker; Substitute the damage type into the pre-stored correspondence between the damage type and the possibility of damage to obtain the possibility of damage; wherein the pre-stored correspondence between the damage type and the possibility of damage is as follows: when the damage type is the first type when the excavator stays, the corresponding possibility of damage is the first possibility threshold; when the damage type is the second type when the excavator stays, the corresponding possibility of damage is the second possibility threshold; when the damage type is the third type when the excavator stays, the corresponding possibility of damage is the third possibility threshold; when the damage type is the fourth type when the excavator stays, the corresponding possibility of damage is the first possibility threshold; when the damage type is the excavator excavation type, the corresponding possibility of damage is the first possibility threshold; when the damage type is the first type when the dredging ship stays, the corresponding possibility of damage is the first possibility threshold. Possibility threshold; when the damage type is the second type of dredging ship staying, the corresponding possibility of damage is the second possibility threshold; when the damage type is the tanker staying type, the corresponding possibility of damage is the first possibility threshold; when the damage type is the first rolling type, the corresponding possibility of damage is the second possibility threshold; when the damage type is the second rolling type, the corresponding possibility of damage is the third possibility threshold; when the damage type is the construction personnel digging type, the corresponding possibility of damage is the first possibility threshold; when the damage type is the construction personnel first staying type, the corresponding possibility of damage is the second possibility threshold; when the damage type is the construction personnel second staying type, the corresponding possibility of damage is the third possibility threshold; when the damage type is the construction personnel third staying type, the corresponding possibility of damage is the first possibility threshold; Substitute the pipeline depth value D, culvert casing parameter T, alarm response parameter S, identification parameter Z, early warning system parameter Y, warning tape parameter J, protection awareness parameter P and protection publicity parameter C into the following formula: The protection effectiveness M is obtained; the alarm response parameter S is determined according to the average alarm response time; Substituting the damage occurrence probability and the protection effectiveness into the pre-stored correspondence between the damage occurrence probability, the protection effectiveness and the damage failure probability, to obtain the damage failure probability; Obtain the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, the medium type and the medium pressure; substitute the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type into the pre-stored correspondence between the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type and the parameters, respectively, to obtain the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type; multiply the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type, and multiply the result by 0.1 power of the medium pressure to obtain the casualty consequence value C1, which represents the severity of casualties that may be caused when the pipeline is damaged; Obtaining the environmental impact level, the medium type, the shutoff valve state, and the maintenance force coverage state; substituting the environmental impact level, the medium type, the shutoff valve state, and the maintenance force coverage state into the pre-stored correspondence between the environmental impact level, the medium type, the shutoff valve state, and the maintenance force coverage state and the parameters, and obtaining the parameters corresponding to the environmental impact level, the medium type, the shutoff valve state, and the maintenance force coverage state; multiplying the parameters corresponding to the environmental impact level, the medium type, the shutoff valve state, and the maintenance force coverage state, and obtaining the environmental pollution consequence value C2, wherein the environmental pollution consequence value C2 represents the severity of environmental pollution that may be caused when the pipeline is damaged; Determine the larger one of the casualty consequence value C1 and the environmental pollution consequence value C2 as the failure consequence severity C; The damage failure possibility and the failure consequence severity are substituted into the pre-stored correspondence between the damage failure possibility, the failure consequence severity and the damage risk to obtain the damage risk.
2. The method according to claim 1, characterized in that The method further comprises: Get the pipeline depth value D; Determine the culvert or casing parameter T according to whether there is a culvert or casing outside the pipeline; Determine the alarm response parameter S according to the average alarm response time; Determine the marking parameter Z according to the ground marking situation; Determine the early warning system parameter Y according to the pipeline early warning system situation; Determine the warning zone parameter J according to whether there is a warning zone; According to the survey results of public protection awareness, determine the protection awareness parameter P; Determine the protection publicity parameter C based on the pipeline protection publicity frequency.
3. The method according to claim 2, characterized in that The method further comprises: When there is a culvert or casing outside the pipeline, the culvert casing parameter T is determined to be 3.5; When there is no culvert or casing outside the pipeline, the culvert casing parameter T is determined to be 0; When the average alarm response time is less than the first preset alarm threshold, determining the alarm response parameter S to be 2; When the average alarm response time is greater than the first preset alarm threshold and less than the second preset alarm threshold, determining the alarm response parameter S to be 1.5; When the average alarm response time is greater than the second preset alarm threshold, determining the alarm response parameter S to be 0; When the ground marking is intact, the marking parameter Z is determined to be 2.5; When the ground sign is damaged, the sign parameter Z is determined to be 1.5; When the ground mark is missing, the mark parameter Z is determined to be 0; When the pipeline early warning system is installed, the early warning system parameter Y is determined to be 1; When the pipeline early warning system is not installed, the early warning system parameter Y is determined to be 0; When a warning band is set, the warning band parameter J is determined to be 1; When no warning band is set, the warning band parameter J is determined to be 0; When the survey results of public protection awareness are excellent, the protection awareness parameter P is determined to be 2; When the survey result of public protection awareness is good, the protection awareness parameter P is determined to be 1; When the survey results of public protection awareness are poor, the protection awareness parameter P is determined to be 0; When the pipeline protection publicity frequency is greater than the preset publicity threshold, the protection publicity parameter C is determined to be 1; When the pipeline protection publicity frequency is less than the preset publicity threshold and greater than zero, the protection publicity parameter C is determined to be 0.5; When the pipeline protection publicity frequency is zero, the protection publicity parameter C is determined to be 0.
4. The method according to claim 1, characterized in that: Substituting the damage occurrence probability and the protection effectiveness into the pre-stored correspondence between the damage occurrence probability, the protection effectiveness and the damage failure probability to obtain the damage failure probability includes: The damage occurrence probability P1 and the protection effectiveness M are substituted into the pre-stored corresponding relationship P2=P1×(1-M) among the damage occurrence probability, protection effectiveness and damage failure probability.
5. The method according to claim 1, characterized in that Substituting the damage failure possibility and the severity of the failure consequence into the pre-stored correspondence between the damage failure possibility, the severity of the failure consequence and the damage risk to obtain the damage risk includes: The damage failure possibility P2 and the failure consequence severity C are substituted into the pre-stored corresponding relationship R=P2×C among the damage failure possibility P2, the failure consequence severity C and the damage risk R to obtain the damage risk R.
6. An oil pipeline damage risk assessment device, characterized in that: The device comprises: A first acquisition module is configured to acquire an image of the oil pipeline acquired by a monitoring camera, wherein the monitoring camera is arranged on the side of the oil pipeline, and the shooting range of the monitoring camera covers the range between 500 meters upstream and 500 meters downstream of the oil pipeline, the areas on both sides of the oil pipeline, and the line valve chamber; The identification module is configured to identify the oil pipeline image and determine whether the oil pipeline image contains a saboteur; when the oil pipeline image contains the saboteur, determine the type of the saboteur and record the action, stop position, stop time and occurrence frequency of the saboteur; the types of saboteur include excavators, dredgers, tank trucks, other heavy-duty loading vehicles, other light-duty loading vehicles and construction personnel; the actions include stop, dig and crush; the stop positions include both sides of the pipeline, directly above the pipeline, upstream and downstream of the pipeline and the valve chamber; the type, action, stop position, stop time and occurrence frequency of the saboteur are substituted into the pre-stored correspondence between the type, action, stop position, stop time and occurrence frequency of the saboteur and the damage type to obtain the damage type, wherein when the type of the saboteur is an excavator, the action is stop, the stop position is one of both sides of the pipeline, directly above the pipeline and upstream and downstream of the pipeline, and the stop time is greater than 30 minutes, determine the type of damage. The damage type is the first type of excavator stay; when the type of the destruction executor is an excavator, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and the upstream and downstream of the pipeline, the stay time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second type of excavator stay; when the type of the destruction executor is an excavator, the action is to stay, the stay position is one of the two sides of the pipeline, directly above the pipeline, and the upstream and downstream of the pipeline, the stay time is less than 30 minutes, and the frequency of occurrence is less than 10 times, the damage type is determined to be the third type of excavator stay; when the type of the destruction executor is an excavator, the action is to stay, and the stay position is the valve chamber, the damage type is determined to be the fourth type of excavator stay; when the type of the destruction executor is an excavator, the action is to dig, the damage type is determined to be the excavator digging type; when the type of the destruction executor is a dredging ship, the action is to stay, the stay position is upstream and downstream of the pipeline, and the stay time is greater than 30 minutes, the damage type is determined to be the first type of dredging ship stay; When the type of the executor of the destruction is a dredging ship, the action is to stop, the stop position is upstream and downstream of the pipeline, the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second type of dredging ship stop; when the type of the executor of the destruction is a tanker truck, the action is to stop, the stop position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the tanker truck stop type; when the type of the executor of the destruction is other heavy-duty loading vehicles, the action is rolling, the stop position is directly above the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes and the frequency of occurrence is greater than 10 times, the damage type is determined to be the first rolling type; when the type of the executor of the destruction is other light-duty loading vehicles, the action is rolling, the stop position is directly above the pipeline, the stop time is greater than 30 minutes, or the stop time is less than 30 minutes And when the frequency of occurrence is greater than 10 times, the damage type is determined to be the second crushing type; when the type of the destroyer is a construction worker, the action is digging, and the stop position is one of the two sides of the pipeline, directly above the pipeline, upstream and downstream of the pipeline, and the valve chamber, the damage type is determined to be the construction worker digging type; when the type of the destroyer is a construction worker, the action is to stay, the stop position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, and the stop time is greater than 60 minutes, the damage type is determined to be the first stop type of the construction worker; when the type of the destroyer is a construction worker, the action is to stay, the stop position is one of the two sides of the pipeline, directly above the pipeline, and upstream and downstream of the pipeline, the stop time is less than 60 minutes, and the frequency of occurrence is greater than 10 times, the damage type is determined to be the second stop type of the construction worker; when the type of the destroyer is a construction worker, the action is to stay, and the stop position is the valve chamber, the damage type is determined to be the third stop type of the construction worker; The first calculation module is configured to substitute the damage type into the pre-stored correspondence between the damage type and the possibility of damage to obtain the possibility of damage, wherein the pre-stored correspondence between the damage type and the possibility of damage is: when the damage type is the first type when the excavator stays, the corresponding possibility of damage is the first possibility threshold; when the damage type is the second type when the excavator stays, the corresponding possibility of damage is the second possibility threshold; when the damage type is the third type when the excavator stays, the corresponding possibility of damage is the third possibility threshold; when the damage type is the fourth type when the excavator stays, the corresponding possibility of damage is the first possibility threshold; when the damage type is the excavator excavation type, the corresponding possibility of damage is the first possibility threshold; when the damage type is the first type when the dredging ship stays, the corresponding possibility of damage is The possibility of damage is the first possibility threshold; when the damage type is the second type of dredging ship staying, the corresponding possibility of damage is the second possibility threshold; when the damage type is the tanker staying type, the corresponding possibility of damage is the first possibility threshold; when the damage type is the first rolling type, the corresponding possibility of damage is the second possibility threshold; when the damage type is the second rolling type, the corresponding possibility of damage is the third possibility threshold; when the damage type is the construction personnel digging type, the corresponding possibility of damage is the first possibility threshold; when the damage type is the construction personnel first staying type, the corresponding possibility of damage is the second possibility threshold; when the damage type is the construction personnel second staying type, the corresponding possibility of damage is the third possibility threshold; when the damage type is the construction personnel third staying type, the corresponding possibility of damage is the first possibility threshold; The second acquisition module is configured to substitute the pipeline depth value D, the culvert casing parameter T, the alarm response parameter S, the identification parameter Z, the early warning system parameter Y, the warning tape parameter J, the protection awareness parameter P and the protection publicity parameter C into the following formula: The protection effectiveness M is obtained; the alarm response parameter S is determined according to the average alarm response time; A second calculation module is configured to substitute the damage occurrence probability and the protection effectiveness into a pre-stored correspondence between the damage occurrence probability, the protection effectiveness and the damage failure probability to obtain the damage failure probability; The third acquisition module is configured to obtain the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space, the medium type and the medium pressure; substitute the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type into the pre-stored correspondence between the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type and the parameters, respectively, to obtain the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type; multiply the parameters corresponding to the population distribution level, the vertical distance between the population and the pipeline, the possibility of forming a confined space and the medium type, and multiply the result by 0.1 power of the medium pressure to obtain the casualty consequence value C1, and the casualty consequence value C1 represents the probability of pipeline damage. The severity of casualties that may be caused when the pipeline is damaged; obtain the environmental impact level, medium type, shut-off valve status and maintenance force coverage status; substitute the environmental impact level, medium type, shut-off valve status and maintenance force coverage status into the pre-stored corresponding relationship between the environmental impact level, medium type, shut-off valve status and maintenance force coverage status and the parameters, and obtain the parameters corresponding to the environmental impact level, medium type, shut-off valve status and maintenance force coverage status respectively; multiply the parameters corresponding to the environmental impact level, medium type, shut-off valve status and maintenance force coverage status respectively to obtain the environmental pollution consequence value C2, and the environmental pollution consequence value C2 represents the severity of environmental pollution that may be caused when the pipeline is damaged; determine the larger one of the casualty consequence value C1 and the environmental pollution consequence value C2 as the failure consequence severity C; The third calculation module is configured to substitute the damage failure possibility and the failure consequence severity into the pre-stored correspondence between the damage failure possibility, failure consequence severity and damage risk to obtain the damage risk.
Citation Information
Patent Citations
Petroleum and gas pipeline industry equipment reliability data acquisition method and system
CN103425089A
Damage risk assessment method for oil and natural gas pipeline
CN104537574A
Video monitoring and early-warning method and system for monitoring third-party damage of gas pipeline
CN107888887A
Dynamic risk assessment method and device for long-distance oil and gas pipeline
CN108345976A
A chemical dangerous process risk intelligent monitoring method
CN109767090A
