Integrated house for water-using equipment and manufacturing method of integrated house for water-using equipment
By forming a watertight adhesive layer that is re-adhesive and non-destructible at the joints of building materials in the integrated bathroom or shower room, it solves the problems of high construction skills and difficulty in filling seals, and achieves efficient watertight management and assembly workability.
Patent Information
- Application Number
- CN202080005456.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-12-04
- Filing Date
- 2020-12-04
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2040-12-04
AI Technical Summary
It is difficult to ensure the watertightness of the existing integrated bathroom or shower room, especially in the sealing of building material joints. The skills of the constructor are high and it is difficult to manage the watertightness. In addition, when using seals or butyl rubber, dimensional and shape errors may occur. Difficulty filling gaps.
A linear watertight adhesive layer is formed at the joints of building materials. A watertight adhesive layer is formed through liquefied adhesive. It maintains elasticity and shape recovery after the temperature drops, making it re-adhesive without damage, ensuring watertightness and Automatically fills gaps on contact.
It realizes watertightness management that does not rely on construction skills, reduces the need for compression margin of seals or adhesives, improves assembly workability and watertightness, and can maintain watertightness when the position of building materials is adjusted.
Smart Images

Figure CN113227516B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an integral house for water-using equipment, and in particular to an integral house for water-using equipment assembled by mutually watertightly joining a plurality of building materials. Background Art
[0002] Integrated houses for water-using equipment such as integrated bathrooms or integrated shower rooms are usually manufactured in a disassembled production method, that is, building materials such as floor panels, wall materials, and ceiling panels are pre-manufactured in the factory, and these building materials are brought to the construction site and assembled at the construction site. Unlike ordinary living rooms, such integrated houses for water-using equipment require reliable waterproofness, and watertightness must be ensured at the joints between floor panels and wall materials. Usually, in existing integrated houses for water-using equipment such as integrated bathrooms, in order to ensure the watertightness of the joints between floor panels and wall materials, etc., the building materials are joined to each other at the construction site, and then silicone adhesive is applied to the joints to ensure the watertightness of the joints.
[0003] Japanese Patent Application Laid-Open No. 10-317502 (Patent Document 1) describes a method for installing an equipment unit and an entire building in which the equipment unit is installed. In the method for installing the equipment unit, a hot-melt sealant that is softened by heating is applied between the equipment unit and surrounding building components, and the sealant is used to seal the equipment unit and surrounding building components.
[0004] Japanese Patent Publication No. 2016-50431 (Patent Document 2) describes a method for sealing between a floor portion and a wall portion in a bathroom bathing area. In this method, a sealing material is injected into a gap between a groove portion provided in a floor portion of a bathroom bathing area by a sealing material supply nozzle while a wall portion forming a vertical wall surface of the bathroom is inserted therein. The sealing material is cured to seal between the floor portion and the wall portion, thereby ensuring water tightness.
[0005] Patent Literature
[0006] Patent Document 1: Japanese Patent Application Laid-Open No. 10-317502
[0007] Patent Document 2: Japanese Patent Application Publication No. 2016-50431 Summary of the invention
[0008] However, it is difficult to conduct complete quality management in the sealing based on the sealant applied at the assembly site, and there is a problem that watertightness cannot be ensured reliably. For example, in the sealing based on the sealant at the assembly site, sufficient watertightness may not be ensured due to forgetting to apply the sealant or insufficient amount of sealant applied, or insufficient skills of the constructor. In addition, in the assembly of the whole house for water-using equipment, in order to ensure reliable watertightness, the constructor who performs the sealing and other construction is required to have higher skills, and there is also a problem that there is a shortage of constructors with sufficient skills.
[0009] On the other hand, in order to ensure the water tightness of the joints of the building materials constituting the integral housing for water-using equipment, it is possible to use seals. By manufacturing the seals in advance in the factory, water tightness can be achieved by simply clamping them in the gaps between the building materials at the assembly site, and the part that depends less on the skills of the constructors.
[0010] However, in order to obtain watertightness through the seal, the seal is pressed against the building material to be joined with sufficient force, so it is necessary to ensure sufficient compression margin on the seal. However, since there are relatively large size errors and shape errors in the building where the integral house for water-using equipment is to be constructed, the gaps between the building materials that constitute the integral house are usually large and uneven. It is difficult to ensure sufficient compression margin on the seal while filling such a large deviation gap. Therefore, the current situation is that it is impossible to directly use a seal in the sealing of the part of the integral house for water-using equipment that requires higher watertightness.
[0011] In addition, in order to ensure the water tightness of the joints of the building materials constituting the integral house for water equipment, it is possible to consider using adhesives such as butyl rubber. When sealing with adhesive materials such as butyl rubber, it is not necessary to ensure a large compression margin as in the seal to ensure water tightness, but it is possible to easily fill the gap to ensure water tightness. For example, it is possible to consider sticking a butyl rubber tape to the joints of the building materials, peeling off the release paper of the butyl rubber tape at the assembly site of the integral house for water equipment, and sticking the building materials to each other through the butyl rubber.
[0012] However, in the assembly of building materials at the assembly site, it is rare that the positioning can be completed in one time. Usually, the positions are adjusted while the building materials are trial-assembled, and the building materials are finally joined together on this basis. However, when butyl rubber is used to adhere building materials to each other, it is difficult to peel off the components that have been adhered to each other, and it is impossible to adjust the position after the trial assembly. In addition, if the components that have been adhered are forcibly peeled off, the adhesive layer of butyl rubber may be damaged and sufficient watertightness cannot be ensured when they are adhered again. Therefore, adhesives such as butyl rubber are rarely used in the mutual sealing of building materials constituting the integral house for water equipment.
[0013] Therefore, the technical problem to be solved by the present invention is to provide a watertight integral house for water-using equipment and a manufacturing method thereof, which does not require special skills of the constructor and can ensure reliable watertightness.
[0014] In order to solve the above-mentioned problems, the present invention is an integrated house for water-using equipment, which is assembled by mutually watertightly joining a plurality of building materials, and is characterized in that it comprises: a first building material, at a joint portion where it joins with other building materials, a linear watertight adhesive layer is formed; and a second building material, having a joint portion to which the first building material is watertightly and re-adhesively bonded, the watertight adhesive layer being constructed so that once the first building material and the second building material are bonded via the watertight adhesive layer, when the bonding between the first building material and the second building material is peeled off, the watertight adhesive layer as a whole remains on the first building material side.
[0015] In the present invention thus constituted, a linear watertight adhesive layer is formed at the joint portion of the first building material. The joint portion of the second building material is watertightly and re-adhesively adhered to the joint portion of the first building material via the watertight adhesive layer. The watertight adhesive layer is configured so that when the first building material and the second building material are peeled off after being adhered, the entire watertight adhesive layer remains on the first building material side.
[0016] According to the present invention thus constituted, since the first building material and the second building material are watertightly joined by the watertight adhesive layer formed at the joint of the first building material, the watertightness between the building materials can be reliably managed without relying on the construction at the assembly site. In addition, since the first building material and the second building material are adhered by the watertight adhesive layer, the watertightness can be ensured as long as the joint of the watertight adhesive layer and the second building material is in contact, and it is not necessary to make the watertight adhesive layer have a large compression margin. Therefore, the watertightness can be reliably ensured.
[0017] Furthermore, since the joint between the watertight adhesive layer and the second building material is watertightly and re-adhesively adhered, the second building material once adhered can be peeled off from the watertight adhesive layer and the position can be adjusted during the assembly of the integrated house for water-using equipment. That is, the watertight adhesive layer formed on the joint of the first building material does not break even when the joint between the first building material and the second building material is peeled off after the watertight adhesive layer is adhered to the joint of the second building material, but remains on the first building material side and can be adhered again. Therefore, when assembling the integrated house for water-using equipment, the position of the building materials can be adjusted even after the first building material and the second building material are once adhered.
[0018] In the present invention, it is preferable that the adhesive force between the water-tight adhesive layer and the first building material is set to be stronger than the adhesive force between the water-tight adhesive layer and the second building material.
[0019] According to the present invention thus constituted, the adhesive force between the watertight adhesive layer and the first building material is set to be stronger than the adhesive force between the watertight adhesive layer and the second building material. Therefore, when the first building material and the second building material that have been joined are peeled off, the entire watertight adhesive layer can be surely left on the first building material side, and even when re-adhering, sufficient watertightness can be ensured.
[0020] In the present invention, the watertight adhesive layer preferably comprises: a strong adhesive layer adhered to the joint of the first building material; and a weak adhesive layer formed on the strong adhesive layer and adhered to the joint of the second building material, wherein the strong adhesive layer has a stronger adhesive force than the weak adhesive layer.
[0021] According to the present invention thus constituted, since the watertight adhesive layer includes a strong adhesive layer with a strong adhesive force and a weak adhesive layer with a weak adhesive force, the adhesive force of the watertight adhesive layer to the first building material can be surely stronger than the adhesive force to the second building material, and when the adhesive is peeled off, the watertight adhesive layer can surely remain on the first building material side. In addition, since the watertight adhesive layer includes a strong adhesive layer and a weak adhesive layer, the adhesive force of the watertight adhesive layer to the first building material and the adhesive force to the second building material can be easily set.
[0022] The present invention is preferably characterized in that the watertight adhesive layer is formed by applying a liquefied adhesive by heating in a continuous linear manner on the joint portion of the first building material, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature drops to room temperature, and the bonding force between the first building material and the watertight adhesive layer is stronger than the bonding force between the second building material and the watertight adhesive layer.
[0023] In the present invention thus constituted, a watertight adhesive layer is formed by applying a heated and liquefied adhesive to the joint portion of the first building material. After the temperature of the watertight adhesive layer thus formed drops to room temperature, the joint portion of the second building material is watertightly adhered to the watertight adhesive layer, thereby the first building material and the second building material are joined. In addition, the watertight adhesive layer is constituted so that once the first building material and the second building material are adhered via the watertight adhesive layer, when the adhesion between the first building material and the second building material is peeled off, the entire watertight adhesive layer remains on the first building material side.
[0024] According to the present invention thus constituted, since the first building material and the second building material are watertightly joined by the watertight adhesive layer formed at the joint of the first building material, the watertightness between the building materials can be reliably managed without relying on the construction at the assembly site. In addition, since the first building material and the second building material are adhered by the watertight adhesive layer, the watertightness can be ensured as long as the joint of the watertight adhesive layer and the second building material is in contact, and it is not necessary to make the watertight adhesive layer have a large compression margin. Therefore, the watertightness can be reliably ensured.
[0025] Furthermore, since the joint between the watertight adhesive layer and the second building material is watertightly and re-adhesively adhered, the second building material once adhered can be peeled off from the watertight adhesive layer and the position can be adjusted during the assembly of the integrated house for water-using equipment. That is, the watertight adhesive layer formed on the joint of the first building material does not break even when the joint between the first building material and the second building material is peeled off after the watertight adhesive layer is adhered to the joint of the second building material, but remains on the first building material side and can be adhered again. Therefore, when assembling the integrated house for water-using equipment, the position of the building materials can be adjusted even after the first building material and the second building material are once adhered.
[0026] The present invention is preferably characterized in that a watertight adhesive layer is formed by applying a liquefied adhesive by heating to the joint portion of the first building material in a continuous linear manner, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature drops to room temperature, and a first contact area between the joint portion of the first building material and the watertight adhesive layer is set to be larger than a second contact area between the joint portion of the second building material and the watertight adhesive layer.
[0027] In the present invention thus constituted, the watertight adhesive layer formed by applying the heated and liquefied adhesive in a continuous linear form on the joint portion of the first building material has a characteristic that the larger the area of the joint portion in contact with the first building material or the second building material, the stronger the adhesive force.
[0028] Therefore, by utilizing the characteristics of such a watertight adhesive layer, the first contact area between the joint portion of the first building material and the watertight adhesive layer is set to be larger than the second contact area between the joint portion of the second building material and the watertight adhesive layer, thereby making it possible to make the adhesive force of the first contact area stronger than the adhesive force of the second contact area, and thus making it easier to peel off the second building material relative to the watertight adhesive layer than the first building material.
[0029] Therefore, once the first building material and the second building material are adhered via the watertight adhesive layer, when the first building material and the second building material are peeled off, the watertight adhesive layer can be kept on the first building material side without being broken, and can be prevented from being separated together with the second building material.
[0030] Therefore, when assembling building materials for integrated houses for water-using equipment, even if it is necessary to shift the relative positions of the first building material and the second building material that have been adhered via the water-tight adhesive layer, it is not necessary to re-apply the water-tight adhesive layer to the respective joints of the building materials, thereby improving workability.
[0031] In addition, for example, there is no need to readjust the first building material on which the watertight adhesive layer has been applied in the factory. Instead, the second building material on which the adhesive has been peeled off from the first building material can be assembled in the correct position. Therefore, the integrated house for water-using equipment can be easily assembled, which can improve assemblability.
[0032] As a result, it is possible to provide a monolithic house for water-using equipment that can ensure reliable watertightness without requiring special skills of a constructor.
[0033] The present invention is preferably characterized in that a watertight adhesive layer is formed by applying a liquefied adhesive by heating in a continuous linear manner on the joint portion of the first building material, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature drops to room temperature, a strong adhesive region is provided on the joint portion of the first building material for maintaining adhesion to the watertight adhesive layer, and a weak adhesive region is provided on the joint portion of the second building material for allowing it to be peeled off from the watertight adhesive layer.
[0034] In the present invention thus constituted, a strong adhesive region for maintaining adhesion to the watertight adhesive layer is provided at the joint portion of the first building material, and a weak adhesive region that can be peeled off from the watertight adhesive layer is provided at the joint portion of the second building material, thereby making it possible to set a difference (strong or weak) in the adhesion between the watertight adhesive layer and the two building materials.
[0035] Thus, once the first building material and the second building material are adhered via the watertight adhesive layer, when the first building material and the second building material are peeled off, the strong adhesive region of the joint portion of the first building material can maintain the adhesion between the first building material and the watertight adhesive layer, while the weak adhesive region of the joint portion of the second building material allows the second building material to be peeled off from the watertight adhesive layer, so that the watertight adhesive layer as a whole does not break and remains on the first building material side, and can be prevented from being separated together with the second building material.
[0036] Therefore, when assembling building materials for integrated houses for water-using equipment, even if it is necessary to shift the relative positions of the first building material and the second building material that have been adhered via the water-tight adhesive layer, it is not necessary to re-apply the water-tight adhesive layer to the respective joints of the building materials, thereby improving workability.
[0037] In addition, for example, there is no need to readjust the first building material on which the watertight adhesive layer has been applied in the factory. Instead, the second building material on which the adhesive has been peeled off from the first building material can be assembled in the correct position. Therefore, the integrated house for water-using equipment can be easily assembled, which can improve assemblability.
[0038] Furthermore, due to the weak adhesive region of the second building material, only a weak force is required to peel the watertight adhesive layer from the second building material, thereby widening the range of choices for the adhesive constituting the watertight adhesive layer.
[0039] As a result, it is possible to provide a monolithic house for water-using equipment that can ensure reliable watertightness without requiring special skills of a constructor.
[0040] The present invention is preferably characterized in that a watertight adhesive layer is formed by applying a liquefied adhesive by heating to the joint portion of the first building material in a continuous linear manner, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature drops to room temperature, and a detachment prevention portion is provided to prevent the watertight adhesive layer from detaching from the joint portion of the first building material.
[0041] In the present invention thus constituted, once the first building material and the second building material are adhered to each other via the watertight adhesive layer, when the adhesion between the first building material and the second building material is peeled off, the detachment prevention portion provided at the joint portion of the first building material can prevent the watertight adhesive layer from detaching from the joint portion of the first building material, so that the watertight adhesive layer as a whole does not break and remains on the first building material side, and can be prevented from detaching together with the second building material.
[0042] Therefore, when assembling building materials for integrated houses for water-using equipment, even if it is necessary to shift the relative positions of the first building material and the second building material that have been adhered via the water-tight adhesive layer, it is not necessary to re-apply the water-tight adhesive layer to the respective joints of the building materials, thereby improving workability.
[0043] In addition, for example, there is no need to readjust the first building material on which the watertight adhesive layer has been applied in the factory. Instead, the second building material on which the adhesive has been peeled off from the first building material can be assembled in the correct position. Therefore, the integrated house for water-using equipment can be easily assembled, which can improve assemblability.
[0044] As a result, it is possible to provide a monolithic house for water-using equipment that can ensure reliable watertightness without requiring special skills of a constructor.
[0045] In the present invention, it is preferred that one of the first and second building materials is a floor material constituting an integral house for water-using equipment, and the other of the first and second building materials is a plurality of wall materials adhered to the floor material, wherein the wall materials are adhered to a watertight adhesive layer continuously formed on the floor material.
[0046] In the integrated house for water-using equipment, the joint between the floor material and the wall material is the part that is most likely to be splashed with water and requires high water tightness. According to the present invention constructed as described above, since the floor material and the wall material are watertightly joined by the watertight adhesive layer, the watertightness of the integrated house for water-using equipment can be reliably ensured.
[0047] In addition, since a plurality of wall materials are adhered to the continuous watertight adhesive layer formed on the floor material, when one attempts to peel off one wall material from the watertight adhesive layer of the floor material, the watertight adhesive layer is pressed by the weight of other adjacent wall materials. Therefore, when peeling off the wall material from the floor material, the risk of the watertight adhesive layer being peeled off from the floor material can be further reduced.
[0048] In the present invention, it is preferred that the first building material is a frame material erected from a floor plate of the integral house for water equipment, and the second building material is a plurality of wall materials, and these wall materials are connected to each other via the frame material.
[0049] According to the present invention thus constituted, since the watertight adhesive layer is formed on the first building material, namely the frame material side, the building material can be handled more easily than when the watertight adhesive layer is formed on the wall material side, and the assembly workability of the monobloc house for water equipment can be improved.
[0050] In addition, the present invention is a method for manufacturing an integral house for water-using equipment, wherein a plurality of building materials are watertightly joined to each other to assemble the integral house for water-using equipment, and the method is characterized by comprising: a watertight adhesive layer forming step, wherein an adhesive that is heated and liquefied is applied in a continuous linear manner to a joint portion of a first building material joined to other building materials, thereby forming a watertight adhesive layer at the joint portion of the first building material; a curing step, wherein the watertight adhesive layer formed in the watertight adhesive layer forming step is cooled to room temperature, thereby stabilizing the shape of the watertight adhesive layer in a manner that the watertight adhesive layer exhibits elasticity and shape recovery; and an assembling step, wherein at the site of assembling the integral house for water-using equipment, the watertight adhesive layer formed at the joint portion of the first building material is bonded to the joint portion of the second building material in a watertight and re-bondable manner, thereby bonding the first building material and the second building material to assemble the integral house for water-using equipment.
[0051] In the present invention constructed as described above, in the watertight adhesive layer forming step, the adhesive that is heated and liquefied is applied in a continuous linear form on the joint portion of the first building material to form the watertight adhesive layer. Next, in the curing step, the temperature of the watertight adhesive layer formed in the watertight adhesive layer forming step is reduced to room temperature, whereby the morphology of the watertight adhesive layer tends to be stable, and the watertight adhesive layer exhibits elasticity and shape recovery. Furthermore, in the assembling step, the joint portion of the watertight adhesive layer formed on the first building material and the second building material is adhered watertightly and re-adhesively, thereby joining the first building material and the second building material.
[0052] According to the present invention constructed as described above, since a watertight adhesive layer is formed in advance at the joint portion of the first building material in the watertight adhesive layer forming step, the first building material and the second building material are watertightly joined by the watertight adhesive layer, so the watertightness between the building materials can be managed reliably. In addition, since the first building material and the second building material are adhered by the watertight adhesive layer, the watertightness can be ensured as long as the joint portion of the watertight adhesive layer and the second building material is in contact, and it is not necessary to make the watertight adhesive layer have a large compression margin. Therefore, the watertightness can be reliably ensured.
[0053] Furthermore, since the joint between the watertight adhesive layer and the second building material is watertightly and re-adhesively adhered, the second building material once adhered can be peeled off from the watertight adhesive layer and the position can be adjusted during the assembly of the integrated house for water-using equipment. That is, the watertight adhesive layer formed on the joint of the first building material due to the application of the liquefied adhesive is more strongly adhered to the first building material, and is more strongly adhered than the joint of the second building material adhered after the curing process. Therefore, even if the joint between the first building material and the second building material is peeled off after the watertight adhesive layer is adhered to the joint of the second building material, the watertight adhesive layer will not be damaged, but will remain on the first building material side and can be adhered again.
[0054] In addition, it is preferable to perform the watertight adhesive layer forming step at a manufacturing factory of the integral house for water-using equipment.
[0055] Thus, since the water-tight adhesive layer forming step is performed in the manufacturing factory of the integral house for water-using equipment, the water-tight adhesive layer can be formed on the first building material under sufficient quality control, and watertightness can be reliably ensured.
[0056] According to the integral house for water-using equipment and the method for manufacturing the integral house for water-using equipment of the present invention, it is possible to ensure reliable watertightness without requiring special skills of the constructor. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 It is a perspective view schematically showing the integrated house for water-using equipment according to the first embodiment of the present invention.
[0058] Figure 2 This is a three-dimensional diagram schematically showing a floor material used in a monolithic house for water-using equipment.
[0059] Figure 3 It is in the direction of the whole house used for water equipment Figure 2 sectional view of the floor material 2 taken along line III-III.
[0060] Figure 4 This is a perspective view schematically showing the lower end portion of a frame of a monolithic house for water-using equipment.
[0061] Figure 5 It is a side view schematically showing the lower end portion of the frame of the integral house for water-using equipment.
[0062] Figure 6 This is a perspective view schematically showing a roof plate material used for a monolithic house for water-using equipment.
[0063] Figure 7 It is used for the top plate of the integral house for water equipment. Figure 6 A cross-sectional view taken along line VII-VII.
[0064] Figure 8 It is a flowchart which shows the manufacturing method of the integral house for water-using equipments of this embodiment.
[0065] Fig. 9 It is a schematic diagram schematically showing each step of the method for manufacturing the monolithic house for water-using equipment according to the present embodiment.
[0066] Fig.10 This is a schematic diagram schematically showing the formation and protection procedures of the adhesive layer in the method for manufacturing the monolithic house for water equipment according to the present embodiment.
[0067] Fig.11 This is a perspective view for explaining the assembly procedure of the integrated house for water equipment.
[0068] Fig.12 A perspective view for explaining the assembly sequence of a monolithic house for water equipment.
[0069] Fig.13 This is an enlarged cross-sectional view showing the connection portion between the floor plate and the frame during the assembly of the integrated house for water equipment.
[0070] Fig.14 It means that in the assembly of the whole house for water equipment, Fig.13 A three-dimensional diagram showing the state where the XIV-XIV line is disconnected.
[0071] Fig.15 This is a perspective view for explaining the assembly procedure of the integrated house for water equipment.
[0072] Fig.16 This is a perspective view for explaining the assembly procedure of the integrated house for water equipment.
[0073] Fig.17 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material and a wall material during assembly of a monobloc house for water equipment.
[0074] Fig.18 This is a cross-sectional view schematically showing the behavior of the first adhesive layer when the wall material once adhered to the floor material is re-adhered during the assembly of the integrated house for water equipment.
[0075] Fig.19 This is an enlarged cross-sectional view schematically showing a connection portion between a wall material and a frame during assembly of a monolithic house for water equipment.
[0076] Fig. 20 This is an enlarged cross-sectional view schematically showing a connection portion between a wall material and a frame during assembly of a monolithic house for water equipment.
[0077] Fig.21This is a perspective view for explaining the assembly procedure of the integrated house for water equipment.
[0078] Fig. 22 This is an enlarged cross-sectional view schematically showing a connection portion between a frame and a ceiling plate in the assembly of a monolithic house for water equipment.
[0079] Fig.23 This is an enlarged cross-sectional view schematically showing a connection portion between a wall material and a ceiling plate in assembling a monolithic house for water equipment.
[0080] Fig.24 It is a cross-sectional view of a floor material 2 in the integrated house for water equipment according to the second embodiment of the present invention.
[0081] Fig.25 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material and a wall material during assembly of a water equipment system house according to a second embodiment of the present invention.
[0082] Fig.26A It is a cross-sectional view of a floor material in the integrated house for water equipment according to the third embodiment of the present invention.
[0083] Fig.26B It is an enlarged view of a joint portion in which a floor material and a wall material are joined in a monolithic house for water equipment according to a third embodiment of the present invention.
[0084] Fig. 27 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material and a wall material during assembly of a water equipment unit house according to a third embodiment of the present invention.
[0085] Fig.28 It is a cross-sectional view of a floor material in the integrated house for water equipment according to the fourth embodiment of the present invention.
[0086] Fig.29 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material and a wall material during assembly of a monoblock house for water equipment according to a fourth embodiment of the present invention.
[0087] Fig.30 This is a cross-sectional view schematically showing the behavior of the first adhesive layer when the wall material once adhered to the floor material is re-adhered during the assembly of the water equipment system house according to the fourth embodiment of the present invention.
[0088] Fig.31 It is a cross-sectional view of a floor material in the integrated house for water equipment according to the fifth embodiment of the present invention.
[0089] Fig.32This is a partially enlarged cross-sectional view showing an enlarged groove portion of a floor material for a monolithic house for water equipment according to a sixth embodiment of the present invention.
[0090] Fig.33 It is a partially enlarged cross-sectional view showing an enlarged groove portion of a floor material for a monolithic house for water equipment according to a seventh embodiment of the present invention.
[0091] Fig.34 It is a partially enlarged cross-sectional view showing an enlarged groove portion of a floor material for a monolithic house for water equipment according to an eighth embodiment of the present invention.
[0092] Fig.35 It is a partially enlarged cross-sectional view showing an enlarged groove portion of a floor material for an integral house for water equipment according to a ninth embodiment of the present invention.
[0093] Fig.36 This is a perspective view schematically showing a shower room which is an integrated house for water-using equipment according to a modified example of the embodiment of the present invention.
[0094] Explanation of symbols
[0095] 1-Integral house for water-using equipment; 2-Floor material (first building material); 2a-Outer periphery; 4-Wall material (second building material); 6-Frame (first building material, frame material); 8-Top plate (first building material); 10-Bathtub; 10a-Outer periphery; 10b-Bathtub guard; 12-Supporting feet; 14-Floor material body; 14a-Floor surface; 16-First adhesive layer (watertight adhesive layer); 16a-Strong adhesive layer; 16b-Weak adhesive layer; 18-Groove (joining part); 18a-First inner side; 18b-Second inner side; 18c-Inner bottom; 18d-Concave-convex part; 20-Frame body; 20a-First connecting piece; 20b-Second connecting piece (joining part); 22-Second adhesive layer (watertight Adhesive layer); 22a-lower end; 24-top plate body; 26-third adhesive layer (watertight adhesive layer); 28-connecting member; 28a-first receiving portion; 28b-second receiving portion (joining portion); 30-protective film (protective layer); 32-parent material; 34-steel plate; 34a-folded portion; 36-frame (first building material, frame material); 36a-first connecting member; 36b-second connecting member; 118-groove; 118c-inner bottom surface; 119-supporting member (joining portion); 119a-recess; 218-groove; 218a-first inner side surface; 218b-second inner side surface; 218c-inner bottom surface; 218d-convex and concave portion; 318-groove; 318c-inner bottom surface; 41 8-groove; 418a-1st inner side; 418b-2nd inner side; 418c-inner bottom; 419-support member; 419a-inner bottom; 419b-1st inner side; 419c-2nd inner side; 419d-rivet; 518-groove; 519-support member; 519a-inner bottom; 519b-1st inner side; 519c-2nd inner side; 519d-rivet; 618-groove; 618a-1st inner side; 618b-2nd inner side; 618c-inner bottom; 619-screw; 718-groove; 718a-1st inner side; 718b-2nd inner side; 718c-inner bottom; 719-screw; 719a-head; 818-groove; 818c-inner bottom surface; 819-supporting member; 819a-first inner side surface; 819b-second inner side surface; 819c-inner bottom surface; 820-screw; 820a-head; 900-shower room; 902-floor material (first building material); 904-wall material (second building material); 904a-door; 906-frame (first building material); 908-top plate material (first building material); 916-first adhesive layer (watertight adhesive layer); 922-second adhesive layer (watertight adhesive layer); 926-third adhesive layer (watertight adhesive layer); A1-contact area (first contact area); A2-contact area (second contact area); A3-strong adhesive area; A4-weak adhesive area; C1-peeling agent. DETAILED DESCRIPTION
[0096] Next, a water equipment integrated house according to an embodiment of the present invention will be described with reference to the drawings.
[0097] Figure 1 It is a perspective view schematically showing the integrated house for water-using equipment according to the first embodiment of the present invention.
[0098] like Figure 1 As shown, the integrated house 1 for water equipment includes a floor plate 2, a plurality of wall materials 4, a frame 6, and a ceiling plate 8. Figure 1 In the example shown, the integrated house 1 for water-using equipment is an integrated bathroom further provided with a bathtub 10. In addition, the integrated house 1 for water-using equipment may also be a shower room without a bathtub 10. In the present embodiment, the integrated house 1 for water-using equipment is in the shape of a substantially cubic box. In addition, the floor material 2, the wall material 4, the frame 6, and the top material 8 are all building materials for forming the integrated house 1 for water-using equipment, and the integrated house 1 for water-using equipment is formed by assembling these building materials.
[0099] The floor material 2 is a member constituting the bottom of the integrated water equipment house 1. The floor material 2 is installed on the bathroom installation surface (for example, the floor of a building) via a plurality of support legs 12 having a height-adjustable structure. Figure 1 The illustrated integrated water-using house 1 is provided with a bathtub 10, so the floor material 2 is provided in a portion of the bottom of the integrated water-using house 1 where the bathtub 10 is not provided. In addition, in the case of the integrated water-using house 1 without a bathtub 10, the floor material is provided in the entire bottom of the integrated water-using house 1.
[0100] The plurality of wall materials 4 are plate-shaped components respectively arranged on the outer periphery 2a of the floor material 2 and the outer periphery 10a of the bathtub 10, and constitute the four sides of the integral house 1 for water equipment. In addition, each wall material 4 and the floor material 2 and each wall material 4 and the bathtub 10 are joined watertightly. Moreover, in the present embodiment, although each side of the integral house 1 for water equipment is constituted by a plurality of wall materials 4, one side may be constituted by one wall material. In addition, a door frame (not shown) is installed at one place on the side of the integral house 1 for water equipment, and the integral house 1 for water equipment can be entered and exited through a door (not shown) installed on the door frame.
[0101] The frame 6 and the frame 36 are frame materials installed upright from the outer periphery 2a of the floor plate 2 and the outer periphery 10a of the bathtub 10, and are formed in a columnar shape. Each frame is set between adjacent wall materials 4, and is configured to connect the adjacent wall materials 4. That is, the frame 6 is arranged between two wall materials 4 arranged in a straight line of the integral house 1 for water equipment, and the adjacent wall materials 4 are respectively connected watertightly through these frames 6. In addition, the frame 36 is arranged between two wall materials 4 arranged in a right angle at the corner of the integral house 1 for water equipment, and these wall materials 4 are connected watertightly.
[0102] The top plate 8 is a plate-shaped member provided on each frame 6, 36 and each wall material 4, and constitutes the upper surface of the integral house for water equipment 1. That is, the top plate surface of the integral house for water equipment 1 is formed by joining the outer peripheral edge of the top plate 8 and the upper edge of each wall material 4. In addition, in the present embodiment, although the top plate surface of the integral house for water equipment 1 is constituted by two top plate materials 8, the top plate surface may also be constituted by one top plate 8.
[0103] The bathtub 10 is a component that is formed into a substantially cubic bathtub by integral molding, and is installed on a bathroom installation surface (for example, a floor of a building) via supporting legs 12. In the present embodiment, the bathtub 10 is installed on one side of the integral house 1 for water-using equipment, and is configured so that the outer edge of the bathtub 10 contacts one side wall surface of the integral house 1 for water-using equipment and approximately half of the side wall surfaces on both sides thereof. In addition, at the boundary between the bathtub 10 and the floor material 2, a bathtub guard plate 10b is provided to cover the side surface of the floor material 2 side of the bathtub 10. The outer edge of the bathtub 10 and the wall material 4 arranged along it, as well as the bathtub guard plate 10b and the wall material 4 are also watertightly joined. In addition, depending on the different structures of the bathtub 10, there are also bathtubs that do not require the bathtub guard plate 10b.
[0104] Next, refer to Figures 2 to 7 The detailed structure of the water-using equipment monolithic house 1 will be described.
[0105] Figure 2 This is a perspective view schematically showing a floor material 2 used in a monolithic house 1 for water equipment. Figure 3 It is along Figure 2 sectional view of the floor material 2 taken along line III-III. Figure 4 It is a perspective view schematically showing the lower end portion of the frame 6 used in the integrated house 1 for water equipment. Figure 5 It is a side view schematically showing the lower end portion of the frame 6 used in the monolithic house 1 for water equipment. Figure 6 It is a perspective view schematically showing a roof plate 8 used in the integrated house 1 for water equipment. Figure 7 It is used for the top plate 8 of the integral house 1 for water equipment along the Figure 6 A cross-sectional view taken along line VII-VII.
[0106] like Figure 2 and Figure 3 As shown in (a), the floor material 2 has: a floor material body 14; and a watertight adhesive layer, i.e., a first adhesive layer 16, which is provided on the outer periphery 2a of the floor material 2. In the present embodiment, the floor material body 14 has a floor surface 14a and a groove portion 18. The floor surface 14a is exposed in the space surrounded by the wall materials 4, and is the portion actually used by the user as a bathing area. The groove portion 18 is provided along the outer edge of the floor surface 14a. In other words, the groove portion 18 is provided on the outer periphery of the floor material body 14. In addition, in the present embodiment, the groove portion 18 is provided along the entirety of three of the four sides (outer peripheries) of the floor surface 14a that are not adjacent to the bathtub 10.
[0107] like Figure 3 As shown in (a), the groove portion 18 has a first inner side surface 18a, a second inner side surface 18b, and an inner bottom surface 18c. The inner bottom surface 18c is more recessed downward than the floor surface 14a. The first inner side surface 18a is provided on one end side of the inner bottom surface 18c on the side of the floor surface 14a. The first inner side surface 18a extends upward from the inner bottom surface 18c toward the floor surface 14a. In other words, the first inner side surface 18a connects one end of the inner bottom surface 18c and one end of the floor surface 14a. The second inner side surface 18b is provided on the other end side of the inner bottom surface 18c. The second inner side surface 18b extends upward from the other end of the inner bottom surface.
[0108] The first adhesive layer 16 is provided on the outer periphery of the floor material body 14. In the present embodiment, the first adhesive layer 16 is provided on the inner bottom surface 18c of the groove portion 18 in a manner that does not protrude upward from the groove portion 18. In addition, in the present embodiment, the first adhesive layer 16 is continuously provided along the groove portion 18 on the entirety of three of the four sides (outer edges) of the floor surface 14a that are not adjacent to the bathtub 10. When assembling the integrated house 1 for water equipment, the first adhesive layer 16 is provided between the floor material body 14 and the wall material 4. And, as a modified example, as Figure 3 As shown in (b), the first adhesive layer may also be composed of two layers, namely, a strong adhesive layer 16a and a weak adhesive layer 16b. The properties and formation method of the first adhesive layer will be described later.
[0109] like Figure 4 and Figure 5As shown, the frame material, i.e., the frame 6, comprises: a frame body 20; and a watertight adhesive layer, i.e., a second adhesive layer 22, provided on the side surface of the frame body 20 (the surface facing the inner side of the integral house 1 for water-using equipment). In addition, although the structure of the lower end of the frame 6 is described below, the upper end of the frame 6 is also constructed in the same manner. The frame body 20 comprises a first connecting member 20a and a second connecting member 20b. In the present embodiment, the first connecting member 20a is made of metal, and the second connecting member 20b is made of resin.
[0110] The first connecting member 20a is a slender member having a substantially gate-shaped cross section, formed by bending a thin plate, and is installed so that the open side of the gate-shaped structure faces the inner side of the water-using equipment integrated house 1 ( Fig.19 ). In addition, the legs of both sides of the gate-shaped cross section of the first connecting member 20a are folded inward. The second connecting member 20b is a slender member with a shallow gate-shaped cross section, and is installed so that the open side of the gate-shaped cross section faces the inside of the integral house 1 for water equipment. The second connecting member 20b is installed inside the hollow structure of the first connecting member 20a. Figure 5 As shown, the lower end of the second connector 20b protrudes further downward than the lower end of the first connector 20a. In addition, the lower end of the connector is not limited to the bottom of the connector, but also includes the surface of the connector within an area within 30 mm from the bottom of the connector to the top.
[0111] In addition, the frame material 36 disposed at the corner of the integral house 1 for water equipment has a shape different from the frame 6 disposed at the side ( Fig. 20 ). The frame 36 is also composed of a first metal connector 36a and a second resin connector 36b, and a second adhesive layer 22 is arranged inside the second connector 36b. The first connector 36a is formed by bending a metal thin plate and has a substantially hexagonal cross section so that the second connector 36b can be arranged opposite to the corner of the integral house 1 for water equipment. The second connector 36b is a slender member with a shallow gate-shaped cross section, and is installed so that the open side of the gate-shaped part faces the inside of the integral house 1 for water equipment.
[0112] On the frame 6, the second adhesive layer 22 is arranged on the side of the frame body 20, and the second adhesive layer 22 is arranged inside the hollow structure of the second connecting member 20b. The second adhesive layer 22 is continuously arranged along the second connecting member 20b in the entire vertical direction inside the hollow structure of the second connecting member 20b. Figure 5As shown, the lower end 22a of the second adhesive layer 22 protrudes further downward than the lower end of the second connector 20b (the lower end of the skeleton body 20). Similarly, the upper end (not shown) of the second adhesive layer 22 protrudes further upward than the upper end of the second connector 20b (the upper end of the skeleton body 20: not shown). Moreover, even on the skeleton 36, the second adhesive layer 22 is provided on the side of the skeleton body, and the second adhesive layer 22 is provided on the inner side of the hollow structure of the second connector 32b. The properties and formation method of the second adhesive layer 22 will be described later.
[0113] Furthermore, the framework 6, 36 may be constituted only by the first connectors 20a, 36a.
[0114] like Figure 6 and Figure 7 As shown, the top plate 8 comprises: a top plate body 24; and a watertight adhesive layer, i.e., a third adhesive layer 26, provided on the outer periphery of the top plate body 24. In the present embodiment, the top plate 8 is formed by two top plate bodies 24, and the third adhesive layer 26 is provided on three sides of these top plate bodies 24 that are joined to the wall material 4.
[0115] In addition, if Figure 7 As shown, a connecting member 28 is installed on the periphery of the top plate body 24. The connecting member 28 is provided with a first receiving portion 28a and a second receiving portion 28b. The first receiving portion 28a is a recessed portion that is recessed in the front-back direction or the left-right direction, and is configured to receive and engage with the peripheral end portion of the top plate body 24. The second receiving portion 28b is a recessed portion that is formed in a downwardly open manner, and is configured to receive and engage with the upper end portion of the wall material 4 and the upper end portion of the frame 6.
[0116] The third adhesive layer 26 is provided on the outer periphery of the roof plate body 24. In the present embodiment, the third adhesive layer 26 is provided on the downwardly facing surface of the second receiving portion 28b. The third adhesive layer 26 is provided continuously on the entire upper surface of the second receiving portion 28b along the outer periphery of the roof plate body 24. The third adhesive layer 26 is provided so as to be located between the roof plate body 24 and the wall material 4 and between the roof plate body 24 and the frame 6 when the integral house 1 for water-using equipment is assembled.
[0117] Furthermore, in this embodiment, although the third adhesive layer 26 is provided on the top plate 8, the third adhesive layer 26 is provided as required and can be omitted. When the third adhesive layer 26 is not provided on the top plate 8, other watertight components such as a sealant may also be provided on the top plate 8.
[0118] Next, refer to Figures 8 to 10A method for manufacturing a monolithic house for water equipment according to an embodiment of the present invention will be described.
[0119] Figure 8 It is a flowchart which shows the manufacturing method of the integral house for water-using equipments of this embodiment. Fig. 9 It is a schematic diagram schematically showing each step of the method for manufacturing the monolithic house for water-using equipment according to the present embodiment. Fig.10 This is a schematic diagram schematically showing the formation and protection procedures of the adhesive layer in the method for manufacturing the monolithic house for water equipment according to the present embodiment.
[0120] In the method for manufacturing a water-using integrated house according to an embodiment of the present invention, first, the floor material 2, wall material 4, frame 6, ceiling material 8 and other building materials and the bathtub 10 constituting the integrated house described above are manufactured in a manufacturing plant. Next, the manufactured building materials are transported to a construction site of a residence, etc., and the building materials are assembled at the construction site to complete the water-using integrated house.
[0121] exist Figure 8 In step S1 of the flowchart shown in FIG. 1 , as a building material preparation step, building materials such as floor material 2, wall material 4, frame 6, and ceiling material 8 are assembled. Fig. 9 As shown in the column (A) of FIG. 1 , the floor surface 14 a and the like are attached to the floor material body 14 , thereby assembling and preparing the floor material 2 .
[0122] Next, in step S2, as a watertight adhesive layer forming process, a watertight adhesive layer is formed at the joint portion of the building material to be joined with another building material by applying a heated and liquefied adhesive in a continuous linear form. Fig. 9 As shown in column (B) of FIG. 1 , in a manufacturing plant, a robot arm is used to move a nozzle that continuously extrude a liquefied adhesive along a joint of a building material, thereby applying the adhesive. Fig.10 The groove 18 of the floor material 2 produced as shown in the column (A) is coated with a liquefied adhesive in a continuous line shape, thereby Fig.10 As shown in the column (B) of FIG. 1 , a watertight adhesive layer, namely, a first adhesive layer 16 is formed. Fig.10 As shown in the column (B), the adhesive is applied in a continuous line shape also at the corners of the building material such as the flooring material 2. That is, the first adhesive layer 16 is formed by continuously applying the adhesive along the multiple sides of the flooring material separated by the corners, so that a continuous watertight adhesive layer without a seam is formed even at the corners.
[0123] In this embodiment, for example, at the joint between the floor material 2 and the wall material 4, the adhesive that is heated and liquefied is applied to the groove 18 of the first building material, that is, the joint of the floor material 2 to form the first adhesive layer 16 ( Figure 3 ). At this time, the first adhesive layer 16 is applied so as not to protrude from the groove 18. When the integrated house 1 for water-using equipment is assembled, the lower end of the second building material, i.e., the wall material 4, is adhered to the first adhesive layer 16 provided in the groove 18 of the floor material 2, and the floor material 2 and the wall material 4 are joined.
[0124] Similarly, on the inner side of the second connecting member 20b of the frame 6, the adhesive that is heated and liquefied is applied in a continuous linear manner, thereby forming a watertight adhesive layer, namely the second adhesive layer 22, on the joint portion, namely the second connecting member 20b. Moreover, in the joint between the frame 6 and the wall material 4, the frame 6 formed with the second adhesive layer 22 functions as the first building material, and the wall material 4 joined thereto functions as the second building material. Similarly, the second adhesive layer 22 is also formed on the frame 36. Moreover, on the inner side of the second receiving portion 28b of the top plate material 8, the adhesive that is heated and liquefied is applied in a continuous linear manner, thereby forming a watertight adhesive layer, namely the third adhesive layer 26, on the joint portion, namely the second receiving portion 28b. In the joining of the top plate material 8 and the wall material 4 , the top plate material 8 on which the third adhesive layer 26 is formed functions as a first building material, and the wall material 4 joined thereto functions as a second building material.
[0125] Furthermore, in step S3, as a curing process, the temperature of each adhesive layer formed in the watertight adhesive layer forming process of step S2 is reduced to room temperature, for example, about 20 to 25°C. Through this curing process, each adhesive layer exhibits elasticity and shape recovery, and the shape of the adhesive layer tends to be stable. In addition, in this embodiment, the time required for the temperature of the liquefied adhesive applied to the building material such as the floor material 2 to drop to room temperature is relatively short. Therefore, Fig. 9 As shown in the column (C), the temperature of the adhesive layer drops to room temperature during the storage period or transportation period of the building material such as the flooring material 2 after the adhesive coating is completed and transferred to the next process in the manufacturing plant. Therefore, in this embodiment, the storage period or transportation period of the building material after the watertight adhesive layer forming process functions as a curing process.
[0126] Next, the watertight adhesive layer, that is, the adhesive layer formed by the watertight adhesive layer forming step and the curing step will be described.
[0127] The first adhesive layer 16 formed by the watertight adhesive layer forming step and the curing step adheres to the floor material 2 coated with the heated adhesive, and also adheres to the wall material 4 when it contacts the wall material 4 during assembly. Similarly, the second adhesive layer 22 and the third adhesive layer 26 also adhere to the frames 6, 36 and the top material 8, respectively, and also adhere to the wall material 4 during assembly.
[0128] Here, "adhesion" is a phenomenon commonly observed in high-viscosity liquids. It is a phenomenon that does not cause a change in shape but only causes a slight force to stick tightly to block or fill the gap (exert sealing properties) in a short period of time. In addition, adhesives are also called pressure-sensitive adhesives. In addition, adhesives are materials that always have adhesive properties and will not completely dry even after a period of time, which is completely different from so-called adhesives that completely dry after a period of time and essentially lose their adhesiveness (adhesion is infinitely close to zero). For example, silicone sealants commonly used for bathroom sealing lose their adhesiveness when they are dry (cured), so they are classified as adhesives.
[0129] Furthermore, the first, second, and third adhesive layers formed through the watertight adhesive layer forming step and the curing step have elasticity and shape recovery. That is, having elasticity and shape recovery means that the compression permanent strain after compressing and deforming each adhesive layer and removing the load is, for example, 20% or less (Japanese Industrial Standard JIS K 6254: 2016). The compression permanent strain of each adhesive layer may be the same or different.
[0130] In addition, in the present specification, "compression permanent strain" is a value obtained, for example, by the following method. A sample shaped into a cylinder with a diameter of 27 mm and a thickness of 20 mm is prepared, and the sample is compressed to a thickness of 50% (10 mm) and placed at a high temperature (about 80° C.) for a predetermined time. After that, the compression is released and the dimension of the sample in the thickness direction is measured. The change rate of the dimension of the sample in the thickness direction can be obtained as the compression permanent strain.
[0131] In addition, in the present embodiment, the building materials such as the floor material 2, the wall material 4, the frame 6, and the ceiling material 8 are watertightly and re-adhesively bonded by the first, second, and third adhesive layers. Here, "re-adhesively bondable" means that, for example, after the floor material 2 and the wall material 4 having the first adhesive layer 16 are once bonded via the first adhesive layer 16, when the wall material 4 is peeled off from the floor material 2, the first adhesive layer 16 is not damaged and remains on the floor material 2 (the building material on the side where the adhesive is first applied), and the first adhesive layer 16 remaining on the floor material 2 still has adhesiveness. Therefore, even if the wall material 4 is peeled off from the floor material 2 to adjust the position of the wall material 4 after the floor material 2 and the wall material 4 are bonded via the first adhesive layer 16, the wall material 4 can be bonded and bonded to the floor material 2 again.
[0132] In this way, in order to "re-adhesively" bond the floor material 2 and the wall material 4 through the first adhesive layer 16, the adhesion between the first adhesive layer 16 and the floor material 2 needs to be stronger than the adhesion between the first adhesive layer 16 and the wall material 4. In addition, the tensile strength of the first adhesive layer 16 itself needs to be greater than these adhesion forces. By satisfying these conditions, when the floor material 2 and the wall material 4 bonded by the first adhesive layer 16 are peeled off, the interface between the first adhesive layer 16 and the wall material 4 is peeled off, and the first adhesive layer 16 is not damaged but remains on the floor material 2, so that re-adhesion can be achieved. On the other hand, when building materials bonded by silicone sealants commonly used for bathroom sealing are peeled off from each other, generally, the building materials and the sealant do not peel off, but the silicone sealant layer is damaged.
[0133] In this embodiment, in the step of forming the watertight adhesive layer, the adhesive that is heated and liquefied is applied to the flooring material 2. Therefore, the adhesive force between the first adhesive layer 16 and the flooring material 2 is stronger than the adhesive force between the first adhesive layer 16 and the wall material 4 that are adhered after the temperature drops to room temperature in the curing step. In addition, by forming the surface of the joint part of the building material where the adhesive layer is formed, such as the groove part 18 of the flooring material 2, with a material with a relatively low melting point, the adhesive applied in a state of being heated and liquefied is fused to the surface of the building material, and the adhesive force between the adhesive layer and the building material can be further improved.
[0134] Similarly, when the floor material 2 and the frame 6 are joined via the first adhesive layer 16, when these are peeled off, the first adhesive layer 16 remains on the floor material 2 side and can be re-adhered. In addition, the second adhesive layer 22 is formed by applying the liquefied adhesive to the frame 6. Therefore, when the wall material 4 and the frame 6 are joined via the second adhesive layer 22, when these are peeled off, the second adhesive layer 22 remains on the frame 6 side and can be re-adhered. Moreover, the third adhesive layer 26 is formed by applying the liquefied adhesive to the top material 8. Therefore, when the wall material 4 and the top material 8 are joined via the third adhesive layer 26, when these are peeled off, the third adhesive layer 26 remains on the top material 8 side and can be re-adhered. In addition, when the frame 6 and the top material 8 are joined via the third adhesive layer 26, when these are peeled off, the third adhesive layer 26 remains on the top material 8 side and can be re-adhered.
[0135] In this embodiment, the first adhesive layer 16, the second adhesive layer 22, and the third adhesive layer 26 are composed of, for example, an elastic hot melt adhesive manufactured by AIK Industries, Ltd. Since the elastic hot melt adhesive is used as the adhesive, the elastic hot melt adhesive is heated and liquefied in the manufacturing plant and then applied, and then cooled and formed, and the construction workers on site can connect the components to each other through the adhesive layer. That is, on site or during transportation to the site, while suppressing the shape change of the adhesive, the building materials can be connected to each other on site through the adhesive layer. As a result, watertightness can be easily ensured on site, and construction performance can be improved.
[0136] Furthermore, the first adhesive layer 16, the second adhesive layer 22, and the third adhesive layer 26 may be composed of a gel (gel-like substance) having adhesiveness and elasticity. The compositions of the first adhesive layer 16, the second adhesive layer 22, and the third adhesive layer 26 may be the same or different.
[0137] In this embodiment, a hot melt adhesive composition containing hydrogenated paraffin process oil, high molecular weight styrene block copolymer, polyphenylene ether resin or modified polyphenylene ether resin is used as an adhesive by adding a tackifier resin and an antioxidant. The adhesive is heated and liquefied, and then applied to the building material in a continuous line to form the first, second, and third adhesive layers.
[0138] As the tackifier resin, terpene resin, terpene phenol resin, rosin and hydrogenated rosin resin, petroleum resin and hydrogenated petroleum resin can be used. In addition, as the antioxidant, a substance selected from copper antioxidants, copper salt antioxidants, copper halide antioxidants, phosphorus antioxidants, phenol antioxidants, hindered amine antioxidants, hindered phenol antioxidants, sulfur antioxidants, lactone antioxidants, aromatic amines, metal deactivators composed of chelating agents, etc. can be used. Moreover, the tackifier resin is preferably added in an amount of about 2.5 to 30 parts by weight to 100 parts by weight of the hot melt adhesive composition. By adjusting the content of the tackifier resin, the adhesion of each adhesive layer can be adjusted.
[0139] Furthermore, in this embodiment, by applying the heated and liquefied adhesive to the first building material such as the floor material 2, the adhesive layer has a stronger adhesive force to the first building material than to the second building material such as the wall material 4. Figure 3As shown in (b), the adhesive layer can also be formed of two layers, a strong adhesive layer 16a and a weak adhesive layer 16b, so that the adhesive force to the first building material is stronger than the adhesive force to the second building material. That is, the adhesive for forming the strong adhesive layer 16a is first applied to the first building material such as the floor material 2, and after the adhesive layer is cured to a certain extent, the adhesive for forming the weak adhesive layer 16b is applied to the layer. As a result, the strong adhesive layer 16a with a stronger adhesive force adheres to the first building material, and the weak adhesive layer 16b with a weaker adhesive force formed on the strong adhesive layer 16a adheres to the second building material during assembly.
[0140] As such, by forming the adhesive layer with two layers, a strong adhesive layer 16a and a weak adhesive layer 16b, the adhesive force for the first building material can be stronger than the adhesive force for the second building material. In addition, since the adhesive force between the strong adhesive layer 16a and the weak adhesive layer 16b is stronger than the adhesive force between the strong adhesive layer 16a and the first building material, the two adhesive layers will not break even when the first building material and the second building material that have been joined are peeled off. In addition, by changing the amount of the adhesive imparting resin added to the hot melt adhesive composition constituting the adhesive, the adhesive force of the strong adhesive layer 16a and the weak adhesive layer 16b can be set respectively. As such, since the adhesive layer is constituted by two layers, the adhesive force for the first building material and the adhesive force for the second building material can be easily set. In addition, the second adhesive layer 22 and the third adhesive layer 26 can also be constituted by two layers, a strong adhesive layer and a weak adhesive layer.
[0141] Next, in Figure 8 In step S4, as a watertight adhesive layer protection step, a protective layer, that is, a protective film 30, which covers the adhesive layer formed in the watertight adhesive layer forming step S3, is installed on the building material. Fig.10 As shown in the column (C) of FIG. 1 , the protective film 30 is affixed to the groove 18 of the floor material 2 coated with the liquefied adhesive. This prevents dust and the like from adhering to the surface of the first adhesive layer 16 formed in the groove 18 and reducing the adhesive force of the first adhesive layer 16. In addition, by affixing the protective film 30, it is possible to prevent the first adhesive layer 16 from being damaged by accidental contact with the first adhesive layer 16 during transportation. Similarly, the protective film 30 is affixed to the frame 6 in a manner covering the second adhesive layer 22 formed on the frame 6, and the protective film 30 is affixed to the top plate 8 in a manner covering the third adhesive layer 26 formed on the top plate 8.
[0142] Furthermore, in the present embodiment, although the watertight adhesive layer protection process is performed after the curing process of step S3, the watertight adhesive layer protection process can also be performed before the curing process (i.e., before the temperature of the adhesive drops to room temperature) or simultaneously with the curing process. Furthermore, the watertight adhesive layer protection process can be performed at any time as long as it is after the watertight adhesive layer forming process and before the assembly process of step S5. Alternatively, the watertight adhesive layer protection process can also be omitted. In addition, in the present embodiment, although the protective film 30 is used as a protective layer covering the adhesive layer, any member that can cover the adhesive layer can also be used as a protective layer.
[0143] Next, in step S5, as an assembly process, the building material having the adhesive layer formed at the joint portion and the joint portion of the other building material are adhered to each other in a watertight and re-adhesive manner, thereby joining the building materials to each other and assembling the integrated house for water equipment 1. That is, first, the floor material 2 and the frame 6 are adhered via the second adhesive layer 22, thereby being joined. And, before joining the floor material 2 and the frame 6, as shown in FIG. Fig.10 As shown in the column (D) of , the protective film 30 pasted in the watertight adhesive layer protection step of step S4 is peeled off to expose the first adhesive layer 16. Next, the frame 6 and the wall material 4 are adhered via the second adhesive layer 22, and at the same time, the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, thereby being joined. Finally, the top plate 8 and the wall material 4 and the top plate 8 and the frame 6 are adhered via the second adhesive layer 22, respectively, thereby being joined and the manufacture of the integrated house 1 for water equipment is completed.
[0144] Next, refer to Figures 11 to 23 The assembly process is described in detail.
[0145] Fig.11 and Fig.12 This is a perspective view for explaining the assembly procedure of the integrated house 1 for water equipment. Fig.13 This is an enlarged cross-sectional view showing a connection portion between a floor material 2 and a frame 6 during assembly of the integrated water equipment house 1. Fig.14 It means along Fig.13 A three-dimensional diagram showing the state where the XIV-XIV line is disconnected. Fig.15 and Fig.16 This is a perspective view for explaining the assembly procedure of the integrated house 1 for water equipment. Fig.17 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material 2 and a wall material 4 of a monolithic house 1 for water equipment.
[0146] Fig.18 This is a cross-sectional view schematically showing the behavior of the first adhesive layer 16 when the wall material 4 once adhered to the floor material 2 is re-adhered. Fig.19 and Fig. 20This is an enlarged cross-sectional view schematically showing a connection portion between a wall material 4 and a frame 6 of a monolithic house 1 for water equipment. Fig.21 This is a perspective view for explaining the assembly procedure of the integrated house 1 for water equipment. Fig. 22 This is an enlarged cross-sectional view schematically showing a connection portion between the frame 6 and the ceiling plate 8 of the integral building for water equipment 1. Fig.23 This is an enlarged cross-sectional view schematically showing a connection portion between a wall material 4 and a ceiling plate material 8 of a monolithic house 1 for water equipment.
[0147] First, if Fig.11 As shown, a flooring material 2 is installed on a bathroom installation surface via support legs 12 having a height-adjustable structure. The flooring material 2 has: a flooring material body 14; and a first adhesive layer 16 provided on the outer periphery of the flooring material body 14. In addition, a protective film 30 for protecting the first adhesive layer 16 of the flooring material 2 is removed when the first adhesive layer 16 is adhered to other building materials. In addition, a bathtub 10 is installed on the bathroom installation surface via the support legs 12. In this example, the first adhesive layer 16 is also provided on the outer periphery 10a of the bathtub 10. In addition, a bathtub guard plate 10b is installed on the boundary between the bathtub 10 and the flooring material 2.
[0148] Next, if Fig.12 As shown, the frames 6 and 36 are installed on the peripheral end of the floor material 2 and the outer peripheral edge 10a of the bathtub 10. Each frame 6 and 36 has: a frame body 20; and a second adhesive layer 22 provided on the side of the frame body 20. When the frames 6 and 36 are installed, the lower end of the second adhesive layer 22 provided on the frames 6 and 36 is adhered to the first adhesive layer 16 provided on the floor material 2.
[0149] like Fig.13 and Fig.14As shown, first, if the frame 6 is arranged at a predetermined position on the floor material 2, the lower end of the second adhesive layer 22 provided on the frame 6 contacts the first adhesive layer 16 of the floor material 2, and the second adhesive layer 22 and the first adhesive layer 16 are adhered. Similarly, if the frame 36 is arranged at the corner of the floor material 2, the lower end of the second adhesive layer 22 provided on the frame 36 contacts the first adhesive layer 16 of the floor material 2, and the second adhesive layer 22 and the first adhesive layer 16 are adhered. By these first adhesive layer 16 and second adhesive layer 22, the gap between the floor material body 14 and the frame body 20 is blocked, and watertightness is achieved. That is, at the portion where the first adhesive layer 16 provided on the floor material 2 and the second adhesive layer 22 provided on the frames 6 and 36 intersect, these adhesive layers are self-fused to each other, so that watertightness between them is automatically ensured. On the other hand, when a sealant is used instead of the first adhesive layer and the second adhesive layer, watertightness cannot be ensured at the intersection of the sealants, so it is necessary to apply a silicone sealant. In this way, in the integrated house 1 for water-using equipment of this embodiment, the application of a silicone sealant or the like at the assembly site can be omitted.
[0150] Next, if Fig.15 As shown, the wall material 4 is installed on the floor material 2, the bathtub 10 and the frame 6. At this time, the first adhesive layer 16 provided on the floor material 2 is adhered to the lower end of the wall material 4, and the second adhesive layer 22 provided on the frame 6 is adhered to the side end of the wall material 4. At this time, as shown in FIG. Fig.16 As shown, the lower end of the wall material 4 is fitted into the groove 18 provided on the outer periphery of the floor material body 14. Thus, the first adhesive layer 16 provided in the groove 18 is adhered to the lower end of the wall material 4.
[0151] In addition, if Fig.16 As shown, the side end of the wall material 4 is embedded in the first connector 20a of the frame 6, thereby connecting the wall material 4 to the frame 6. Similarly, the side end of the wall material 4 is embedded in the first connector 36a ( Fig.16 (not shown in the figure), thereby connecting the wall material 4 to the frame 36. Thus, the second adhesive layer 22 of the second connecting member 20b and the second connecting member 36b of the frame 36, which are respectively provided on the frame 6, is adhered to the side end of the wall material 4.
[0152] That is, Fig.17 As shown, if the wall material 4 is arranged on the groove portion 18 of the floor material 2, the first adhesive layer 16 provided on the floor material 2 contacts the lower end of the wall material 4. As a result, the upper surface of the first adhesive layer 16 is elastically deformed along the lower end surface of the wall material 4 due to the load of the wall material 4, and the first adhesive layer 16 and the wall material 4 are tightly adhered. The gap between the floor material body 14 and the wall material 4 is blocked by the first adhesive layer 16, achieving watertightness.
[0153] Furthermore, after the wall material 4 is adhered to the floor material 2 , in order to correct the position of the wall material 4 , the first adhesive layer 16 and the wall material 4 that have been adhered once can be peeled off and re-adhered. Fig.18 1 is a diagram schematically showing the behavior of the first adhesive layer 16 at this time. Fig.18 As shown in the column (A) of FIG. 1 , if the wall material 4 is arranged on the groove 18 of the floor material 2, as shown in the column (B), the first adhesive layer 16 undergoes elastic deformation, and the lower end surface of the wall material 4 is adhered to the first adhesive layer 16 without a gap. At this time, the first adhesive layer 16 changes thickness due to elastic deformation, so even if there is a deviation in the floor material 2 or the wall material 4, the gap between them is filled. Next, if the wall material 4 is lifted from the floor material 2 to correct its position, as shown in the column (B) of FIG. Fig.18 As shown in the column (C), the first adhesive layer 16 is stretched while being adhered to the wall material 4. As described above, since the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, even if the floor material 2 is bent due to the load, no gap is formed between the floor material 2 and the wall material 4, and water tightness is maintained. In contrast, if a sealant is used instead of the adhesive layer, when the compression margin of the sealant is lost due to the bending of the floor material, a gap may be formed between the sealant and the wall material, thereby impairing water tightness.
[0154] When the wall material 4 is further raised, as Fig.18 As shown in column (D), the interface between the wall material 4 and the first adhesive layer 16 is peeled off, and the first adhesive layer 16 is almost restored to the shape before adhesion to the wall material 4 due to its shape recovery property. As described above, the adhesion between the first adhesive layer 16 and the floor material 2 is stronger than the adhesion between the first adhesive layer 16 and the wall material 4. Therefore, when the wall material 4 is lifted, the interface between the first adhesive layer 16 and the wall material 4 is peeled off, and the first adhesive layer 16 remains on the floor material 2 side. In addition, the breaking strength of the first adhesive layer 16 itself is greater than the adhesion between the first adhesive layer 16 and the wall material 4 and the adhesion between the first adhesive layer 16 and the floor material 2. Therefore, as Fig.18 As shown in the column (C), when the first adhesive layer 16 is stretched, the first adhesive layer 16 itself will not break. In addition, since the first adhesive layer 16 maintains adhesiveness even after the wall material 4 is peeled off, the wall material 4 can be adhered again.
[0155] As described above, in the present embodiment, the first adhesive layer 16 for adhering the floor material 2 and the wall material 4 is formed on the floor material 2 side, and the assembly workability is better than when the first adhesive layer is formed on the wall material side. That is, if the first adhesive layer is formed on the lower end of the wall material, it is easy to mistakenly adhere the first adhesive layer of the wall material to an unexpected position of the floor material during assembly, and the handling of the wall material becomes difficult. In addition, once adhered, when the wall material is peeled off from the floor material, if the first adhesive layer remains on the wall material side, the handling of the wall material becomes difficult. Moreover, when peeling off one of the multiple wall materials 4 adhered to the floor material 2 from the floor material 2, the first adhesive layer 16 is pressed by the wall material 4 adjacent to the wall material 4 to be peeled off. Therefore, the risk of the first adhesive layer 16 being peeled off from the floor material 2 can be further reduced.
[0156] When the wall material 4 is arranged on the floor material 2, the side edges of the wall material 4 are respectively adhered and joined to the frame 6 and the frame 36 via the second adhesive layer 22. That is, two wall materials 4 arranged side by side on one side of the floor material 2 are connected via the frame 6 provided therebetween. In addition, two wall materials 4 arranged adjacent to each other across the corner of the floor material 2 are connected via the frame 36 provided therebetween.
[0157] As such, in this embodiment, the second adhesive layer 22 for adhering the frame 6, 36 to the wall material 4 is formed on the frame 6, 36 side, and the assembly workability is also more excellent than when the second adhesive layer is formed on the wall material side. That is, the frame is a slender columnar member, which is easier to handle than the larger plate-like member, i.e., the wall material 4. Therefore, even if the second adhesive layer 22 is formed on the frame 6, 36, the workability will not be significantly deteriorated. On the other hand, if the second adhesive layer is formed on the wall material side, it is more difficult to handle the wall material.
[0158] Fig.19 4 is a cross-sectional view showing a state where two wall materials 4 arranged in parallel are connected via a frame 6. Fig.19 As shown, the wall material 4 includes: a base material 32; and a steel plate 34 provided inside the integral water-use house 1 relative to the base material 32. The base material 32 is formed of a gypsum board or the like, and the steel plate 34 is adhered to the surface of the base material 32 inside the integral water-use house 1 for reinforcement. In addition, the ends of the steel plate 34 protrude from the base material 32 on both sides, and are provided with folded portions 34a directed inward. The folded portions 34a of the two adjacently arranged wall materials 4 are butted against each other, and these folded portions 34a are received inside the frame 6.
[0159] That is, each folded portion 34a of the two wall materials 4 is embedded in the first connector 20a in the manner of the first connector 20a of the expansion frame 6. The top of each embedded folded portion 34a is opposite to the second connector 20b arranged on the inner side of the first connector 20a, and contacts the second adhesive layer 22 arranged on the inner side of the second connector 20b. As a result, the second adhesive layer 22 is elastically deformed, the top of each folded portion 34a is adhered to the second adhesive layer 22 without a gap, and each wall material 4 is watertightly joined to the second adhesive layer 22. That is, even if water penetrates between the two butted wall materials 4, the water is blocked by the watertight joining of the top of each folded portion 34a and the second adhesive layer 22, and water leakage to the outside of the integrated house 1 for water-using equipment will not occur. Furthermore, the two wall materials 4 attached to the frame 6 are adhered to the second adhesive layer 22 and are also fixed by the folded portions 34a being embedded inside the first connector 20a, thereby preventing the wall materials 4 from falling off.
[0160] Fig. 20 1 is a cross-sectional view showing a state where two wall materials 4 arranged adjacent to each other across a corner of a water-using integrated house 1 are connected via a frame 36. As described above, the wall material 4 includes: a base material 32; and a steel plate 34 adhered to the base material 32, and a folded portion 34a is provided at the end of the steel plate 34. The shape of the folded portion 34a is the same as that of the wall materials 4 arranged in a straight line and joined together. Fig.19 On the other hand, the frame arranged at the corner of the integral house 1 for water equipment has a shape different from that of Fig.19 The corners of the shape shown are provided with a skeleton 36 .
[0161] The frame 36 for the corner is also composed of a first connecting member 36a and a second connecting member 20b provided inside the first connecting member 36a, and a watertight adhesive layer, that is, a second adhesive layer 22 is adhered to the inside of the second connecting member 36b. The second connecting member 36b faces the direction opposite to the corner of the integral house 1 for water-using equipment, and a second adhesive layer 22 is provided inside the second connecting member 36b opposite to the corner.
[0162] The folded portion 34a of each wall material 4 is embedded in the first connector 36a, and the embedded folded portion 34a contacts and adheres to the second adhesive layer 22, thereby ensuring water tightness between each wall material 4 and the second adhesive layer 22. In addition, on the corner frame 36, the surface of the folded portion 34a bent at a right angle relative to the surface of the steel plate 34 abuts against the second adhesive layer 22, thereby ensuring water tightness between the surface and the second adhesive layer 22.
[0163] Next, if Fig.21As shown, a top plate 8 is installed on each frame 6, 36 and each wall material 4. The top plate 8 has: a top plate body 24; and a third adhesive layer 26 provided on the outer periphery of the top plate body 24. When the top plate 8 is installed, the upper end of the second adhesive layer 22 provided on the frames 6, 36 is adhered to the third adhesive layer 26 provided on the top plate 8, and the third adhesive layer 26 is adhered to the upper end of the wall material 4. The gap between the top plate body 24 and the frame body 20 is blocked by the second adhesive layer 22 and the third adhesive layer 26, and watertightness is achieved. In addition, the gap between the top plate body 24 and the upper end of the wall material 4 is blocked by the third adhesive layer 26, and watertightness is achieved.
[0164] That is, Fig. 22 As shown, when the top plate 8 is installed on the frame 6, the upper end of the frame 6 is received by the second receiving portion 28b of the connecting member 28 installed on the top plate body 24. In this state, the upper end of the second adhesive layer 22 provided on the frame 6 is adhered to the third adhesive layer 26 provided on the top plate 8. The gap between the top plate body 24 and the frame body 20 is blocked by the second adhesive layer 22 and the third adhesive layer 26 to achieve watertightness. At this time, at least a portion of the frame body 20 can also abut against the top plate 8.
[0165] In addition, if Fig.23 As shown, at the joint between the wall material 4 and the top plate 8, the third adhesive layer 26 provided on the top plate 8 is adhered to the upper end of the wall material 4. That is, when the top plate 8 is installed on the wall material 4, the upper end of the wall material 4 is received by the second receiving portion 28b of the connecting member 28 installed on the top plate body 24. The gap between the top plate 8 and the upper end of the wall material 4 is blocked by the third adhesive layer 26, achieving watertightness.
[0166] By installing the top plate 8 in this manner, the assembly of the system house 1 for water equipment is completed.
[0167] According to the integrated house 1 for water equipment of the first embodiment of the present invention, the floor material 2 and the second building material, that is, the wall material 4, are watertightly joined by the first adhesive layer 16 formed at the joint of the first building material, that is, the floor material 2, so that the watertightness between the building materials can be reliably managed without relying on the construction at the assembly site. In addition, since the wall material 4 of the floor material 2 is adhered by the first adhesive layer 16 ( Fig.17 ), so as long as the first adhesive layer 16 and the joint of the wall material 4 are in contact, watertightness can be ensured, and there is no need to make the first adhesive layer 16 have a large compression margin. Therefore, watertightness can be reliably ensured.
[0168] Furthermore, according to the integrated house 1 for water-using equipment of the present embodiment, since the joint between the first adhesive layer 16 and the wall material 4 is watertightly and re-adhesively adhered, during the assembly of the integrated house 1 for water-using equipment, the wall material 4 once adhered can be peeled off from the first adhesive layer 16 to adjust the position. That is, the first adhesive layer 16 formed on the joint of the floor material 2 will not be damaged even if the joint between the floor material 2 and the wall material 4 is peeled off after the first adhesive layer 16 is adhered to the joint with the wall material 4, but will remain on the floor material 2 side and can be re-adhesively adhered ( Fig.18 Therefore, when assembling the integrated house 1 for water equipment, the position of the building materials can be adjusted even after the floor material 2 and the wall material 4 are once adhered.
[0169] In addition, according to the integrated house 1 for water-using equipment of the present embodiment, the adhesive force between the first adhesive layer 16 and the floor material 2 is set to be stronger than the adhesive force between the first adhesive layer 16 and the wall material 4. Therefore, when the floor material 2 and the wall material 4 that have been joined once are peeled off, the first adhesive layer 16 can be surely left on the floor material 2 side, and even when re-adhesion is performed, sufficient watertightness can be ensured.
[0170] Furthermore, according to the integrated house 1 for water equipment of this embodiment, the floor material 2 and the wall material 4 are watertightly joined by the first adhesive layer 16 ( Fig.17 In the integrated house 1 for water-using equipment, the joint between the floor material 2 and the wall material 4 is the part that is most likely to be splashed with water and requires high water tightness. According to the integrated house 1 for water-using equipment of this embodiment, since the floor material 2 and the wall material 4 are joined by the first adhesive layer 16, the water tightness of the integrated house for water-using equipment can be reliably ensured.
[0171] In addition, according to the integrated house 1 for water equipment of the present embodiment, since the first adhesive layer 16 is formed on the floor material 2, even when the wall material 4 is peeled off from the floor material after being adhered, the first adhesive layer 16 will not remain on the wall material 4 side. Therefore, the wall material 4 peeled off from the floor material 2 will not adhere to unexpected building materials, and the assembly workability of the integrated house 1 for water equipment can be improved. In addition, since a plurality of wall materials 4 are adhered to the continuous first adhesive layer 16 formed on the floor material 2, when one wall material 4 is to be peeled off from the first adhesive layer 16 of the floor material 2, the first adhesive layer 16 is pressed by the self-weight of other adjacent wall materials 4. Therefore, when peeling off the wall material 4 from the floor material 2, the risk of the first adhesive layer 16 being peeled off from the floor material 2 can be further reduced.
[0172] Furthermore, according to the integrated water equipment house 1 of this embodiment, since the second adhesive layer 22 is formed on the frame material, that is, the frame 6, 36 side ( Fig.14), therefore, it is easier to handle the building material than when the second adhesive layer 22 is formed on the wall material 4 side, and the assembly workability of the integral house 1 for water equipment tends to be good.
[0173] In addition, according to the integrated house 1 for water equipment of this embodiment, since the protective layer covering the first adhesive layer 16, that is, the protective film 30 ( Fig.10 Column (C)), it is possible to prevent dust and the like from adhering to the surface of the first adhesive layer 16 and causing the adhesiveness to decrease, or to prevent the first adhesive layer 16 from accidentally deforming before its shape is stabilized.
[0174] Furthermore, according to the integrated house 1 for water equipment of this embodiment, the first adhesive layer 16 ( Figure 3 ), thereby preventing the watertight adhesive layer from being accidentally damaged during the transportation of the floor material 2.
[0175] Furthermore, according to the method for manufacturing the integral house for water equipment of the present embodiment, in the watertight adhesive layer forming step ( Figure 8 In step S2), since a watertight adhesive layer, i.e., the first adhesive layer 16, is formed in advance at the joint of the first building material, i.e., the floor material 2, and the second building material, i.e., the wall material 4, are watertightly joined by the first adhesive layer 16, the watertightness between the building materials can be managed reliably. In addition, since the floor material 2 and the wall material 4 are bonded by the first adhesive layer 16, the watertightness can be ensured as long as the joint of the first adhesive layer 16 and the wall material 4 is in contact, and it is not necessary to make the first adhesive layer 16 have a large compression margin. Therefore, the watertightness can be ensured reliably.
[0176] In addition, according to the method for manufacturing the integrated house for water equipment of the present embodiment, since the joint between the first adhesive layer 16 and the wall material 4 is watertight and re-adhesive, the wall material 4 once adhered can be peeled off from the first adhesive layer 16 during the assembly of the integrated house for water equipment 1 to adjust the position. That is, the first adhesive layer 16 formed at the joint of the floor material 2 by applying the liquefied adhesive is strongly adhered to the floor material 2, and the curing process ( Figure 8 The joint between the first building material, i.e., the frame 6 and the second building material, i.e., the wall material 4, is also adhered to the joint more strongly than the joint between the first building material, i.e., the frame 6 and the second building material, i.e., the wall material 4, after the step S3). Therefore, even when the floor material 2 and the wall material 4 are peeled off after the first adhesive layer 16 is adhered to the joint between the wall material 4, the first adhesive layer 16 will not be damaged, but will remain on the floor material 2 side and can be adhered again. Similarly, the joint between the first building material, i.e., the frame 6 and the second building material, i.e., the wall material 4, is also adhered to the joint between the first building material, i.e., the top board 8 and the second building material, i.e., the wall material 4, is also adhered to the joint between the third adhesive layer 26 in a watertight and re-adhesive manner.
[0177] Furthermore, according to the method for manufacturing the integral house for water equipment of the present embodiment, since the watertight adhesive layer forming step ( Figure 8 Therefore, the first to third adhesive layers can be formed on the floor material 2, the frame 6, and the top material 8 under sufficient quality control, and water tightness can be ensured reliably.
[0178] In addition, according to the method for manufacturing the integral house for water equipment of the present embodiment, in the watertight adhesive layer protection step ( Figure 8 In step S4), the protective layer covering each adhesive layer, that is, the protective film 30 is installed on the floor material 2, etc. Therefore, it is possible to prevent dust and the like from adhering to the surface of the adhesive layer formed in the watertight adhesive layer forming step to reduce the adhesiveness, or prevent the adhesive layer from being deformed by mistake before the shape is stabilized.
[0179] Furthermore, according to the method for manufacturing an integrated house for water equipment of this embodiment, in the groove portion 18 of the floor material 2, the adhesive is applied so as not to protrude from the groove portion 18 ( Figure 3 ), thus preventing the first adhesive layer 16 from being accidentally damaged during transportation of the floor material 2.
[0180] Next, a water-using equipment integrated house according to a second embodiment of the present invention will be described. The same reference numerals are given to the same parts as those in the above embodiment, and description thereof will be omitted.
[0181] Fig.24 It is a cross-sectional view showing an enlarged end portion of a floor material for a monolithic house for water equipment according to a second embodiment of the present invention.
[0182] like Fig.24 As shown, in this embodiment, the floor material body 14 has a floor surface 14 a and a groove portion 118 , and a supporting member 119 is installed in the groove portion 118 .
[0183] The support member 119 is a thin and elongated resin member installed in the groove 118 along the groove 118. The support member 119 has a bottom portion arranged on the inner bottom surface 118c of the groove 118 and side portions extending upward from both ends of the bottom portion, thereby forming a recessed portion 119a opened upward on the support member 119. In addition, the bottom portion of the support member 119 is bonded to the inner bottom surface 118c of the groove 118, and the first adhesive layer 16 is formed inside the recessed portion 119a. The first adhesive layer 16 is formed so as not to protrude upward from the groove 118 receiving the support member 119. In addition, when assembling the integral house for water-using equipment, the lower end of the wall material 4 is inserted into the groove 118, and the lower end of the inserted wall material 4 is received in the recessed portion 119a of the support member 119. Since the first adhesive layer 16 is formed in the recess 119a of the support member 119, the lower end of the wall material 4 is adhered to the first adhesive layer 16, and the floor material 2 and the wall material 4 are joined. Therefore, the support member 119 constitutes a joint portion of the floor material 2.
[0184] In this embodiment, although the same manufacturing method as the first embodiment is used, in the step of forming the watertight adhesive layer, the resin support member 119 ( Fig.24 Therefore, the adhesion between the first adhesive layer 16 and the floor material 2 (the supporting member 119) is stronger than the adhesion between the first adhesive layer 16 and the wall material 4 after the temperature drops to room temperature through the curing process.
[0185] Fig.25 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material 2 and a wall material 4 of a water equipment integrated house according to the present embodiment.
[0186] like Fig.25 As shown, if the wall material 4 is inserted into the groove 118 of the floor material 2, the first adhesive layer 16 on the support member 119 provided in the groove 118 contacts the lower end of the wall material 4. As a result, the upper surface of the first adhesive layer 16 is elastically deformed along the lower end surface of the wall material 4 due to the load of the wall material 4, and the first adhesive layer 16 and the wall material 4 are tightly adhered. The gap between the floor material body 14 and the wall material 4 is blocked by the first adhesive layer 16, achieving watertightness.
[0187] According to the integrated house for water-using equipment of the second embodiment of the present invention, the floor material 2 and the wall material 4 are watertightly joined by the first adhesive layer 16 formed on the joint portion of the first building material, the floor material 2, i.e., the supporting member 119, so that the watertightness between the building materials can be reliably managed without relying on the construction at the assembly site. In addition, since the floor material 2 and the wall material 4 are adhered by the first adhesive layer 16, the watertightness can be ensured as long as the joint portion of the first adhesive layer 16 and the wall material 4 is in contact, and it is not necessary to make the first adhesive layer 16 have a large compression margin. Therefore, the watertightness can be reliably ensured.
[0188] In addition, according to the integrated house for water-using equipment of the present embodiment, since the joint portion between the first adhesive layer 16 and the wall material 4 is adhered watertightly and re-adhesively, during the assembly of the integrated house for water-using equipment, the wall material 4 once adhered can be peeled off from the first adhesive layer 16 to adjust the position. That is, the first adhesive layer 16 formed on the joint portion of the floor material 2 does not break even when the joint between the floor material 2 and the wall material 4 is peeled off after the first adhesive layer 16 is adhered to the joint portion with the wall material 4, but remains on the floor material 2 side and can be adhered again. Therefore, during the assembly of the integrated house for water-using equipment, even after the floor material 2 and the wall material 4 are once adhered, the position of the building material can be adjusted.
[0189] Furthermore, according to the integrated house for water-using equipment of the present embodiment, since the first adhesive layer 16 and the supporting member 119 of the floor material 2 are welded, the first adhesive layer 16 and the floor material 2 joint portion, i.e., the supporting member 119, are firmly joined. Thus, when the joint portion of the first adhesive layer 16 and the building material of the wall material 4 is peeled off after the first adhesive layer 16 and the building material of the wall material 4 are once adhered, the first adhesive layer 16 can be securely left on the floor material 2 side as a whole.
[0190] In addition, according to the integrated house for water-using equipment in this embodiment, since the joint part of the floor material 2 is composed of the supporting member 119 installed on the main body of the building material, that is, the floor material body 14, the material of the floor material body 14 and the material of the supporting member 119 constituting the joint part can be freely selected, and the first adhesive layer 16 can be more firmly joined to the joint part of the floor material 2.
[0191] In addition, according to the integrated house for water equipment of this embodiment, since the protective layer covering the first adhesive layer 16, that is, the protective film 30 ( Fig.10 ), thereby preventing dust and the like from adhering to the surface of the first adhesive layer 16 and causing the adhesiveness to decrease, or preventing the first adhesive layer 16 from accidentally deforming before its shape is stabilized.
[0192] Furthermore, according to the integrated house for water equipment of this embodiment, the first adhesive layer 16 is provided in the groove 118 of the floor material 2 so as not to protrude from the groove 118 , thereby preventing the watertight adhesive layer from being accidentally damaged during the transportation of the floor material 2 .
[0193] Next, a water equipment integrated house according to a third embodiment of the present invention will be described. The description of the same structure, function, and effect as those of the above embodiment will be omitted.
[0194] Fig.26A It is a cross-sectional view showing an enlarged end portion of a floor material for a monolithic house for water equipment according to a third embodiment of the present invention. Fig.26B This is a cross-sectional view showing an enlarged view of a joint portion of a floor material 2 and a wall material 4 in a monolithic house for water equipment.
[0195] like Fig.26A As shown, the recessed portion for placing the wall material, i.e., the groove portion 218, has a first inner side surface 218a, a second inner side surface 218b, and an inner bottom surface 218c. The inner bottom surface 218c is more recessed downward than the floor surface 14a. The first inner side surface 218a is disposed on one end side of the inner bottom surface 218c on the side of the floor surface 14a. The first inner side surface 218a extends upward from the inner bottom surface 218c toward the floor surface 14a. In other words, the first inner side surface 218a connects one end of the inner bottom surface 218c and one end of the floor surface 14a. The second inner side surface 218b is disposed on the other end side of the inner bottom surface 218c. The second inner side surface 218b extends upward from the other end of the inner bottom surface 218c.
[0196] The first adhesive layer 16 is provided on the outer periphery of the floor material body 14. In this embodiment, the first adhesive layer 16 is provided on the inner bottom surface 218c of the groove portion 218 so as not to protrude upward from the groove portion 218. In addition, in this embodiment, the first adhesive layer 16 is provided continuously along the groove portion 218 on the entirety of three of the four sides (outer edges) of the floor surface 14a that are not adjacent to the bathtub 10. When assembling the integrated house for water-using equipment, the first adhesive layer 16 is provided so as to be located between the floor material body 14 and the wall material 4.
[0197] In addition, if Fig.26A and Fig.26B As shown, a concave-convex portion 218d is provided on the inner bottom surface 218c of the groove portion 218, that is, on the surface of the joint portion of the flooring material body 14 where the first adhesive layer 16 is formed.
[0198] In addition, if Fig.26BAs shown, when the floor material 2 and the wall material 4 are joined to each other, the first contact area between the concave-convex portion 218d of the inner bottom surface 218c of the groove portion 218 and the first adhesive layer 16, i.e., the contact area A1, is set to be larger than the second contact area between the joint portion, i.e., the lower end surface 4a of the wall material 4, and the first adhesive layer 16, i.e., the contact area A2 (A1>A2).
[0199] That is, due to the uneven portion 218 d of the inner bottom surface 218 c of the groove 218 , a contact area A1 between the inner bottom surface 218 c of the groove 218 and the first adhesive layer 16 is larger than a contact area A2 between the lower end surface 4 a of the wall material 4 and the first adhesive layer 16 .
[0200] Furthermore, in this embodiment, although the concave-convex portion 218d of the inner bottom surface 218c of the groove portion 218 is processed into a concave-convex shape with a surface roughness greater than that of the lower end surface 4a of the wall material 4, it is not limited to this method, and other methods can also be applied.
[0201] For example, as another form of the concavo-convex portion 218d, a method of making the concavo-convex portion into a wedge shape or a method of performing etching or coating treatment to increase the surface roughness of the inner bottom surface 218c of the groove portion 218 may be adopted.
[0202] Fig. 27 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material 2 and a wall material 4 of the integrated house for water equipment according to the present embodiment.
[0203] like Fig. 27 As shown, if the wall material 4 is arranged on the groove portion 218 of the floor material 2, the first adhesive layer 16 provided on the floor material 2 contacts the lower end of the wall material 4. As a result, the upper surface of the first adhesive layer 16 is elastically deformed along the lower end surface of the wall material 4 due to the load of the wall material 4, and the first adhesive layer 16 and the wall material 4 are tightly adhered. The gap between the floor material body 14 and the wall material 4 is blocked by the first adhesive layer 16, achieving watertightness.
[0204] According to the integrated house for water-using equipment involved in the third embodiment of the present invention mentioned above, at the joint part of the floor material 2 (the inner bottom surface 218c of the groove part 218), a watertight adhesive layer (the first adhesive layer 16) is formed by continuously applying a linear coating on the joint part of the floor material 2 (the inner bottom surface 218c of the groove part 218) and heating and liquefying the adhesive, and the watertight adhesive layer (the first adhesive layer 16) has the characteristic that the larger the area of the joint part in contact with the floor material 2 or the wall material 4, the stronger the adhesive force.
[0205] Therefore, by utilizing the characteristics of the first adhesive layer 16, the contact area A1 between the concavo-convex portion 218d of the inner bottom surface 218c of the groove portion 218 of the floor material 2 and the first adhesive layer 16 is set to be larger than the contact area A2 between the lower end surface 4a of the wall material 4 and the first adhesive layer 16, thereby making it possible to make the adhesive force of the contact area A1 stronger than the adhesive force of the contact area A2. As a result, the wall material 4 can be more easily peeled off from the first adhesive layer 16 than the floor material 2.
[0206] Therefore, once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the first adhesive layer 16 can remain on the floor material 2 side without being broken, and can be prevented from being separated together with the wall material 4.
[0207] Therefore, when assembling the floor material 2 and the wall material 4 of the integrated house for water equipment, even if it is necessary to shift the relative positions of the floor material 2 and the wall material 4 once adhered via the first adhesive layer 16, it is not necessary to re-apply the first adhesive layer 16 to the respective joints of the floor material 2 and the wall material 4, thereby improving workability.
[0208] In addition, for example, there is no need to readjust the floor material 2 coated with the first adhesive layer 16 in the factory. It is only necessary to assemble the wall material 4 whose adhesion to the floor material 2 has been peeled off in the correct position. Therefore, the assembly of the integrated house for water equipment can be easily performed, which can improve the assemblability.
[0209] As a result, it is possible to provide a monolithic house for water-using equipment that can ensure reliable watertightness without requiring special skills of a constructor.
[0210] In addition, according to the integrated house for water-using equipment involved in this embodiment, by simply providing a concave-convex portion 218d on the surface (inner bottom surface 218c) of the groove portion 218 of the floor material 2 where the first adhesive layer 16 is formed, it is possible to make the contact area A1 between the inner bottom surface 218c of the groove portion 218 of the floor material 2 and the first adhesive layer 16 larger than the contact area A2 between the lower end surface 4a of the wall material 4 and the first adhesive layer 16.
[0211] Thus, by simply adding a simple structure to the groove portion 218 of the floor material 2, the workability and assembly efficiency when assembling the floor material 2 and the wall material 4 of the integrated house for water equipment can be improved.
[0212] Furthermore, even the same concave-convex portion 218d as the concave-convex portion 218d of the joint portion of the floor plate 2 (the inner bottom surface 218c of the groove portion 218) can be provided at the joint portion of the frame 6 (the second connecting member 20b) or the joint portion of the top plate 8 (the second receiving portion 28b).
[0213] Thus, by simply adding a simple structure to the joint portion of the frame 6 (the second connecting piece 20b) or the joint portion of the top plate 8 (the second receiving portion 28b), the operability and assembly performance when assembling the frame 6 or the top plate 8 and the wall material 4 of the integral house for water-using equipment can be improved.
[0214] Next, a water-using equipment integrated house according to a fourth embodiment of the present invention will be described. In addition, descriptions of some of the same structures, functions, and effects as those of the above-mentioned embodiment will be omitted.
[0215] Fig.28 It is a cross-sectional view showing an enlarged end portion of a floor material for a monolithic house for water equipment according to a fourth embodiment of the present invention.
[0216] like Fig.28 As shown, a release agent C1 (for example, silicone coating, Teflon (registered trademark) coating, etc.) is applied to the joint portion of the wall material 4 joined to the floor material 2, namely, the groove portion 318, namely, on the bottom surface (lower end surface 4a) of the wall material 4 and on the surface of the side wall surface 4b extending upward from the lower end surface 4a.
[0217] Thus, a strong adhesion region A3 to which the first adhesive layer 16 is adhered with a relatively large adhesive force is provided on the surface of the inner bottom surface 318c of the groove portion 318 of the flooring material 2.
[0218] On the other hand, the lower end surface 4a and the side wall surface 4b of the joint portion of the wall material 4 are provided with weakly adhesive regions A4 which are adhered with less adhesive force than the strongly adhesive regions A3 when in contact with the first adhesive layer 16 .
[0219] Furthermore, in the present embodiment, although the method of applying the release agent C1 on the lower end surface 4a and a portion of the side wall surface 4b of the wall material 4 as the weakly adhesive area A4 of the wall material 4 is described, it is not limited to such a method, and the release agent C1 only needs to be applied on at least the bottom surface (lower end surface 4a) of the wall material 4.
[0220] Fig.29 This is an enlarged cross-sectional view schematically showing a connection portion between a floor material 2 and a wall material 4 of the integrated house for water equipment according to the present embodiment. Fig.30 This is a cross-sectional view schematically showing the behavior of the first adhesive layer 16 when the wall material 4 once adhered to the floor material 2 is re-adhered.
[0221] like Fig.29As shown, if the wall material 4 is arranged on the groove portion 318 of the floor material 2, the first adhesive layer 16 provided on the floor material 2 contacts the lower end portion of the wall material 4. As a result, the upper surface of the first adhesive layer 16 is elastically deformed along the lower end surface 4a of the wall material 4 due to the load of the wall material 4, and the first adhesive layer 16 and the weak adhesive area A4 of the lower end surface 4a of the wall material 4 are adhered by the adhesive force being smaller than the adhesive force of the strong adhesive area A3, and are in tight contact and in a state where watertightness can be achieved. That is, the gap between the floor material body 14 and the wall material 4 is blocked by the first adhesive layer 16, and watertightness is achieved.
[0222] Furthermore, after the wall material 4 is adhered to the floor material 2 , in order to correct the position of the wall material 4 , the first adhesive layer 16 and the wall material 4 that have been adhered once can be peeled off and re-adhered. Fig.30 1 is a diagram schematically showing the behavior of the first adhesive layer 16 at this time. Fig.30 As shown in the column (A) of FIG. 1 , if the wall material 4 is arranged on the groove 318 of the floor material 2, as shown in the column (B), the first adhesive layer 16 undergoes elastic deformation, and the lower end surface of the wall material 4 and the first adhesive layer 16 are adhered without a gap. At this time, the first adhesive layer 16 changes thickness due to elastic deformation, so even if there is a deviation on the floor material 2 or the wall material 4, the gap between them is filled. Next, if the wall material 4 is lifted from the floor material 2 to correct the position of the wall material 4, as shown in the column (B) of FIG. Fig.30 As shown in the column (C), the first adhesive layer 16 is stretched while being adhered to the wall material 4. As described above, since the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, even if the floor material 2 is bent due to the load, no gap is formed between the floor material 2 and the wall material 4, and water tightness is maintained. In contrast, if a sealant is used instead of the adhesive layer, when the compression margin of the sealant is lost due to the bending of the floor material, a gap may be formed between the sealant and the wall material, thereby impairing water tightness.
[0223] When the wall material 4 is further raised, as Fig.30 As shown in column (D), the interface between the weakly adhesive region A4 (release agent C1) of the lower end surface 4a of the wall material 4 and the first adhesive layer 16 is peeled off, and the first adhesive layer 16 is almost restored to its shape before adhesion to the wall material 4 due to its shape recovery property.
[0224] As described above, the adhesion between the first adhesive layer 16 and the strong adhesion area A3 of the floor material 2 is stronger than the adhesion between the first adhesive layer 16 and the weak adhesion area A4 (peeling agent C1) of the wall material 4. Therefore, when the wall material 4 is lifted, the interface between the first adhesive layer 16 and the wall material 4 is peeled off, and the first adhesive layer 16 remains on the floor material 2 side. In addition, the fracture strength of the first adhesive layer 16 itself is greater than the adhesion between the first adhesive layer 16 and the wall material 4 and the adhesion between the first adhesive layer 16 and the floor material 2. Therefore, if Fig.30 As shown in the column (C), when the first adhesive layer 16 is stretched, the first adhesive layer 16 itself will not break. In addition, since the first adhesive layer 16 maintains adhesiveness even after the wall material 4 is peeled off, the wall material 4 can be adhered again.
[0225] According to the integrated house for water-using equipment involved in the fourth embodiment of the present invention mentioned above, a strong adhesion area A3 that can maintain adhesion with the first adhesive layer 16 is provided on the inner bottom surface 318c of the groove portion 318 of the floor material 2, and a weak adhesion area A4 that can be peeled off from the first adhesive layer 16 is provided on the surface of the lower end surface 4a and the side wall surface 4b of the wall material 4, thereby making it possible to set a difference in the adhesion between the first adhesive layer 16 and the two building materials 2 and 4.
[0226] Thus, once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the strong adhesive area A3 of the inner bottom surface 318c of the groove portion 18 of the floor material 2 can maintain the adhesion between the floor material 2 and the first adhesive layer 16.
[0227] On the other hand, the wall material 4 can be peeled off from the first adhesive layer 16 by the weakly adhesive region A4 of the lower end surface 4a and the side wall surface 4b of the wall material 4, so that the first adhesive layer 16 as a whole can remain on the floor material 2 side without being broken, and can be prevented from being separated together with the wall material 4. At this time, due to the weakly adhesive region A4 of the wall material 4, only a weak force is required when peeling off the first adhesive layer 16, so the range of choices of the adhesive constituting the first adhesive layer 16 becomes wider.
[0228] Therefore, when assembling the floor material 2 and the wall material 4 of the integrated house for water equipment, even if it is necessary to shift the relative positions of the floor material 2 and the wall material 4 once adhered via the first adhesive layer 16, it is not necessary to re-apply the first adhesive layer 16 to the respective joints of the floor material 2 and the wall material 4, thereby improving workability.
[0229] In addition, for example, there is no need to readjust the floor material 2 coated with the first adhesive layer 16 in the factory. It is only necessary to assemble the wall material 4 whose adhesion to the floor material 2 has been peeled off in the correct position. Therefore, the assembly of the integrated house for water equipment can be easily performed, which can improve the assemblability.
[0230] As a result, it is possible to provide a monolithic house for water-using equipment that can ensure reliable watertightness without requiring special skills of a constructor.
[0231] In addition, according to the integrated house for water equipment involved in this embodiment, for example, a release agent C1 such as silicone coating or Teflon (registered trademark) coating is applied to the lower end surface 4a and the side wall surface 4b of the wall material 4, and thus, with a simple structure in which only the weakly adhesive region A4 is provided, after the floor material 2 and the wall material 4 are once adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the strong adhesive region A3 of the inner bottom surface 318c of the groove portion 318 of the floor material 2 can maintain the adhesion between the floor material 2 and the first adhesive layer 16. On the other hand, the wall material 4 can be peeled off from the first adhesive layer 16 by the weakly adhesive region A4 of the lower end surface 4a and the side wall surface 4b of the wall material 4. As a result, the first adhesive layer 16 can be kept on the floor material 2 side without being broken, and can be prevented from being separated together with the wall material 4.
[0232] Therefore, the workability and assembly performance when assembling the floor material 2 and the wall material 4 of the integrated house for water equipment can be improved by simply adding a simple structure to the wall material 4.
[0233] Furthermore, although specific descriptions are omitted, similar to the strong adhesion area A3 of the joint portion of the floor material 2 (the inner bottom surface 318c of the groove portion 318), the joint portion of the frame 6 (the second connecting piece 20b) or the joint portion of the top material 8 (the second supporting portion 28b) can also be used as the strong adhesion area A3, and the surface of the joint portion of the wall material 4 joined to these frames 6 or top material 8 can be used as the weak adhesion area A4.
[0234] Thus, the workability and assembly efficiency when assembling the frame 6 or the ceiling plate 8 of the integral house for water-using equipment and the wall material 4 can be improved by simply adding a simple structure to the wall material 4 .
[0235] Next, a water-using equipment integrated house according to a fifth embodiment of the present invention will be described. In addition, descriptions of some of the same structures, functions, and effects as those of the above-mentioned embodiment will be omitted.
[0236] Fig.31 It is a cross-sectional view showing an enlarged end portion of a floor material for a monolithic house for water equipment according to a fifth embodiment of the present invention.
[0237] like Fig.31As shown, the groove portion 418 has a first inner side surface 418a, a second inner side surface 418b, and an inner bottom surface 418c. The inner bottom surface 418c is more recessed downward than the floor surface 14a. The first inner side surface 418a is provided on one end side of the inner bottom surface 418c on the side of the floor surface 14a. The first inner side surface 418a extends upward from the inner bottom surface 418c toward the floor surface 14a. In other words, the first inner side surface 418a connects one end of the inner bottom surface 418c and one end of the floor surface 14a. The second inner side surface 418b is provided on the other end side of the inner bottom surface 418c. The second inner side surface 418b extends upward from the other end of the inner bottom surface.
[0238] In addition, if Fig.31 As shown, in the groove 418, which is the joint portion of the floor material 2, a support member 419 for supporting the lower end of the wall material 4 is watertightly provided along the groove 418. The support member 419 is a concave member having a substantially U-shaped cross section, and forms a support concave portion having an inner bottom surface 419a and a first inner side surface 419b and a second inner side surface 419c formed at one end and the other end thereof, respectively.
[0239] The supporting member 419 further includes a rivet portion 419d which protrudes upward from an intermediate portion between the first inner side surface 419b and the second inner side surface 419c on the inner bottom surface 419a and whose tip is formed in a wedge shape.
[0240] Furthermore, the first adhesive layer 16 is formed on the inner bottom surface 419 a of the supporting member 419 with the rivet portion 419 d as the center.
[0241] Here, the rivet portion 419d of the support member 419 functions as a detachment prevention portion as follows: once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the first adhesive layer 16 as a whole will not break, but will remain on the side of the support member 419 in the groove 418 of the floor material 2, preventing the first adhesive layer 16 from detaching from the joint of the floor material 2 (the support member 419 in the groove 418).
[0242] Thus, the first adhesive layer 16 is prevented from being separated from the supporting member 419 .
[0243] According to the integrated house 1 for water-using equipment involved in the fifth embodiment of the present invention, once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the detachment prevention portion (i.e., the rivet portion 419d) provided at the joint portion (the supporting member 419 in the groove portion 418) of the floor material 2 can prevent the first adhesive layer 16 from detaching from the supporting member 419 in the groove portion 418 of the floor material 2.
[0244] This prevents the first adhesive layer 16 from being broken as a whole and remaining on the supporting member 419 side in the groove 418 of the flooring material 2 , thereby preventing the first adhesive layer 16 from being separated from the wall material 4 .
[0245] Therefore, when assembling the floor material 2 and the wall material 4 of the integrated house for water equipment, even if it is necessary to shift the relative positions of the floor material 2 and the wall material 4 once adhered via the first adhesive layer 16, it is not necessary to re-apply the first adhesive layer 16 to the respective joints of the floor material 2 and the wall material 4, thereby improving workability.
[0246] In addition, for example, there is no need to readjust the floor material 2 coated with the first adhesive layer 16 in the factory. It is only necessary to assemble the wall material 4 whose adhesion to the floor material 2 has been peeled off in the correct position. Therefore, the assembly of the integrated house for water equipment can be easily performed, which can improve the assemblability.
[0247] As a result, it is possible to provide a monolithic house for water-using equipment that can ensure reliable watertightness without requiring special skills of a constructor.
[0248] In addition, according to the integrated house for water-using equipment involved in this embodiment, as a detachment prevention portion arranged at the joint portion of the floor material 2, a simple structure of a support member 419 having a rivet portion 419d for preventing separation of the first adhesive layer 16 is simply fixed to the floor material 2 in a watertight manner. Once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the first adhesive layer 16 can be prevented from detaching from the rivet portion 419d of the support member 419 in the groove portion 418 of the floor material 2.
[0249] Thereby, the first adhesive layer 16 can be prevented from being broken as a whole and remaining on the flooring material 2 side, and can be prevented from being separated together with the wall material 4 .
[0250] Therefore, by simply adding a simple structure, namely, a disengagement prevention portion (rivet portion 419d of support member 419) to the groove portion 418 of the floor material 2, the workability and assembly performance when assembling the floor material 2 and the wall material 4 of the integral house for water-using equipment can be improved.
[0251] Next, refer to Fig.32 A water equipment integrated house 100 according to a sixth embodiment of the present invention will be described.
[0252] Fig.32 This is a partially enlarged cross-sectional view showing an enlarged view of the groove portion 518 of the floor material 2 of the integrated building for water equipment 100 according to the sixth embodiment of the present invention.
[0253] Here, in Fig.32In the water-using system house 100 according to the present embodiment shown, the same parts as those of the water-using system house 1 according to the fifth embodiment of the present invention described above are denoted by the same reference numerals, and description thereof will be omitted.
[0254] like Fig.32 As shown, in the integrated house 100 for water-using equipment according to this embodiment, the structure of the support member 519 watertightly provided in the groove portion 518 of the floor material 2 is different from the structure of the support member 119 of the integrated house 1 for water-using equipment according to the second embodiment of the present invention.
[0255] That is, Fig.32 As shown, a first adhesive layer 16 is formed on the support member 519 along the inner bottom surface 519 a thereof.
[0256] In addition, rivets 519d protruding in pairs so as to face each other in the horizontal direction are provided as separation prevention portions on the first inner side surface 519b and the second inner side surface 519c of the support member 519. The rivets 519d can prevent the first adhesive layer 16 from separating from the support member 519.
[0257] According to the integrated house 100 for water-using equipment involved in the sixth embodiment of the present invention described above, as a detachment prevention portion arranged at the joint portion of the floor material 2, a simple structure is adopted in which a supporting member 519 having a rivet portion 519d for preventing separation of the first adhesive layer 16 is watertightly fixed to the floor material 2. Once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the first adhesive layer 16 can be prevented from detaching from the rivet portion 519d of the supporting member 519 in the groove portion 18 of the floor material 2.
[0258] Thereby, the first adhesive layer 16 can be prevented from being broken as a whole and remaining on the flooring material 2 side, and can be prevented from being separated together with the wall material 4 .
[0259] Therefore, by simply adding a simple structure, namely, a disengagement prevention portion (rivet portion 519d of support member 519), to the groove portion 518 of the floor material 2, the workability and assembly performance when assembling the floor material 2 and the wall material 4 of the integrated house for water equipment can be improved.
[0260] Next, refer to Fig.33 A water equipment integrated house 200 according to a seventh embodiment of the present invention will be described.
[0261] Fig.33 This is a partially enlarged cross-sectional view showing an enlarged view of the groove portion 618 of the floor material 2 of the integrated building 200 for water equipment according to the seventh embodiment of the present invention.
[0262] Here, in Fig.33 In the integrated house 200 for water supply equipment according to the present embodiment shown, the same parts as those of the integrated house for water supply equipment according to the fifth embodiment of the present invention described above are denoted by the same reference numerals, and description thereof is omitted.
[0263] like Fig.33 As shown, in the integrated house 200 for water-using equipment according to the present embodiment, the supporting members 119 and 419 of the integrated house for water-using equipment according to the second and fifth embodiments of the present invention are not provided in the groove portion 618 of the floor material 2, and the structure is different in this respect.
[0264] In addition, in this embodiment, the first adhesive layer 16 is directly formed on the inner bottom surface 618c of the groove portion 618 and then mechanically connected by a fastener, namely a screw 619. This structure is different from the second and fifth embodiments of the present invention described above.
[0265] That is, Fig.33 As shown, the screw 619 for mechanically connecting the first adhesive layer 16 to the inner bottom surface 618c of the groove portion 618 of the flooring material 2 is connected so as to penetrate through one side (the second inner side surface 618b side) in the lateral width direction (the same direction as the width direction between the first inner side surface 618a and the second inner side surface 618b of the groove portion 618). Thus, the screw 619 can function as a detachment prevention portion for preventing the first adhesive layer 16 from detaching from the groove portion 618 of the flooring material 2.
[0266] According to the integrated house 200 for water-using equipment involved in the seventh embodiment of the present invention mentioned above, as a detachment prevention portion arranged in the groove portion 618 of the floor material 2, the first adhesive layer 16 is mechanically connected to the inner bottom surface 618c of the groove portion 618 of the floor material 2 by screws 619. Once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the first adhesive layer 16 can be prevented from detaching from the groove portion 618 of the floor material 2.
[0267] Thereby, the first adhesive layer 16 can be prevented from being broken as a whole and remaining on the flooring material 2 side, and can be prevented from being separated together with the wall material 4 .
[0268] Therefore, by simply adding a simple structure, namely, a disengagement prevention portion (screw 619), to the groove portion 618 of the floor material 2, the workability and assembly efficiency when assembling the floor material 2 and the wall material 4 of the integrated house 200 for water equipment can be improved.
[0269] Furthermore, the process of mechanically connecting the first adhesive layer 16 to the inner bottom surface 618c of the groove portion 618 with the screw 619 is preferably performed in the factory in the watertight adhesive layer forming step S2 ( Figure 8 ) or after the curing step S3 ( Figure 8 ) afterward.
[0270] Next, refer to Fig.34 A water equipment integrated house 300 according to an eighth embodiment of the present invention will be described.
[0271] Fig.34 This is a partially enlarged cross-sectional view showing an enlarged view of the groove portion 718 of the floor material 2 of the integrated building 300 for water equipment according to the eighth embodiment of the present invention.
[0272] Here, in Fig.34 In the integrated house 300 for water supply equipment according to the present embodiment shown, the same parts as those of the integrated house for water supply equipment according to the fifth embodiment of the present invention described above are denoted by the same reference numerals, and description thereof will be omitted.
[0273] like Fig.34 As shown, in the integrated house 300 for water-using equipment according to the present embodiment, the supporting members 119 and 419 of the integrated house for water-using equipment according to the second and fifth embodiments of the present invention are not provided in the groove portion 718 of the floor material 2, and the structure is different in this respect.
[0274] In addition, in the present embodiment, the first adhesive layer 16 is directly formed on the inner bottom surface 718c of the groove portion 718 and is then mechanically connected by a connecting member, namely a screw 719. This structure is the same as the screw 619 of the seventh embodiment of the present invention described above, but the screw 719 is connected in the first adhesive layer 16 in a manner that penetrates approximately the center portion in the horizontal width direction (the same direction as the width direction between the first inner side surface 718a and the second inner side surface 718b of the groove portion 718). This is a structure that is different from the seventh embodiment of the present invention described above.
[0275] That is, Fig.34 As shown, the screw 719 that mechanically connects the first adhesive layer 16 to the inner bottom surface 718c of the groove portion 718 of the floor material 2 is connected to pass through the approximately central portion of the first adhesive layer 16 in the horizontal width direction, and can function as a detachment prevention portion that prevents the first adhesive layer 16 from detaching from the groove portion 718 of the floor material 2.
[0276] In addition, if Fig.34As shown, when the screw 719 mechanically connects the first adhesive layer 16 to the inner bottom surface 718 c of the groove 718 of the flooring material 2 , the first adhesive layer 16 is connected in a state where the head 719 a of the screw 719 is buried in the first adhesive layer 16 .
[0277] According to the integrated water equipment house 300 according to the eighth embodiment of the present invention, the first adhesive layer 16 can be fastened to the inner bottom surface 718 c of the groove 718 of the floor material 2 with the head 719 a of the screw 719 buried in the first adhesive layer 16 .
[0278] Therefore, since the adhesive portion between the first adhesive layer 16 and the inner bottom surface 718 c of the groove portion 718 of the flooring material 2 is not separated by the screw 719 , it is possible to prevent the watertightness between the first adhesive layer 16 and the flooring material 2 from being impaired.
[0279] Next, refer to Fig.35 A water equipment integrated house 400 according to a ninth embodiment of the present invention will be described.
[0280] Fig.35 This is a partially enlarged cross-sectional view showing an enlarged view of the groove portion 818 of the floor material 2 of the integrated building 400 for water equipment according to the ninth embodiment of the present invention.
[0281] Here, in Fig.35 In the integrated house 400 for water supply equipment according to the present embodiment shown, the same parts as those of the integrated house for water supply equipment according to the fifth embodiment of the present invention described above are denoted by the same reference numerals, and description thereof is omitted.
[0282] like Fig.35 As shown, in the integral house 400 for water-using equipment according to this embodiment, the structure of the support member 819 watertightly provided in the groove 818 of the floor material 2 is different from the structure of the support member 419 of the integral house for water-using equipment according to the fifth embodiment of the present invention.
[0283] In addition, in the present embodiment, a recessed portion is formed by the first inner side surface 819 a , the second inner side surface 819 b , and the inner bottom surface 819 c of the supporting member 819 .
[0284] Furthermore, in the recessed portion of the support member 819, the first adhesive layer 16 is directly formed on the inner bottom surface 819c and then mechanically fastened by a screw 820 which is a fastener. This structure is different from the structures of the fifth to eighth embodiments.
[0285] That is, Fig.35As shown, the screw 820 that mechanically connects the first adhesive layer 16 to the inner bottom surface 819c of the supporting member 819 in the groove portion 818 of the floor material 2 is connected to pass through the approximately central portion of the first adhesive layer 16 in the horizontal width direction, and can function as a detachment prevention portion that prevents the first adhesive layer 16 from detaching from the supporting member 819 in the groove portion 818 of the floor material 2.
[0286] In addition, if Fig.35 As shown, when the screw 820 mechanically fastens the first adhesive layer 16 to the inner bottom surface 818 c of the groove 818 of the flooring material 2 , the first adhesive layer 16 is fastened with the head 820 a of the screw 820 buried in the first adhesive layer 16 .
[0287] According to the integrated house 400 for water-using equipment involved in the ninth embodiment of the present invention, as a detachment prevention portion arranged in the groove 818 of the floor material 2, the first adhesive layer 16 is mechanically connected to the inner bottom surface 819c of the supporting member 819 in the groove 818 of the floor material 2 by screws 820. Once the floor material 2 and the wall material 4 are adhered via the first adhesive layer 16, when the adhesion between the floor material 2 and the wall material 4 is peeled off, the first adhesive layer 16 can be prevented from detaching from the supporting member 819 in the groove 818 of the floor material 2.
[0288] Thereby, the first adhesive layer 16 can be prevented from being broken as a whole and remaining on the flooring material 2 side, and can be prevented from being separated together with the wall material 4 .
[0289] Therefore, by simply adding a simple structure, namely, a disengagement prevention portion (support member 819, screw 820) to the groove portion 818 of the floor material 2, the workability and assembly efficiency when assembling the floor material 2 and the wall material 4 of the integrated house 400 for water equipment can be improved.
[0290] Furthermore, although the specific description is omitted, the skeleton 6 ( Figure 4 ) of the joint (second connecting member 20b) or the top plate 8 ( Figure 7 ) is provided with a disengagement prevention portion (second receiving portion 28b) which is the same as the disengagement prevention portion 119, 419d, 519, 519d, 619, 719, 820 of the joint portion (groove portion) of the floor material 2 in the second to ninth embodiments.
[0291] Therefore, by simply adding a simple structure to the joint part of the frame 6 (the second connecting piece 20b) or the joint part of the top plate 8 (the second receiving part 28b), the operability and assembly performance when assembling the frame 6 or the top plate 8 and the wall material 4 of the integral house for water-using equipment can be improved.
[0292] Although the embodiments of the present invention have been described above, various changes may be added to the above embodiments. In particular, in the above embodiments, although the joints between the floor material and the wall material, between the frame and the wall material, and between the top material and the wall material are all watertightly joined using a watertight adhesive layer, it is also possible to apply a seal based on a watertight adhesive layer to a portion of these joints, such as only between the floor material and the wall material, or between the floor material and the wall material, and between the frame and the wall material. Moreover, in the joints where watertightness is ensured by the watertight adhesive layer, a seal based on silicone or the like may also be used in combination. In addition, the groove portion may be provided on the embankment formed around the floor material. In addition, the first adhesive layer 16 may be provided in the groove portion (the recessed portion where the wall material is placed) 18 instead of providing the supporting member 19. In addition, the above-mentioned multiple embodiments may be combined to constitute the present invention.
[0293] In addition, in the above-mentioned embodiment, although the present invention is applied to the manufacture of the integral house for water equipment, that is, the integral bathroom, as a modified example, the integral house for water equipment of the present invention can also be applied to Fig.36 Shower cubicle shown.
[0294] exist Fig.36 In the modified example shown, the integrated house for water-using equipment of the present invention is applied to a shower room 900. The shower room 900 is composed of a floor material 902, a wall material 904, a frame 906 connected to the wall material 904, and a ceiling material 908. In addition, a door 904a is provided on one side of the shower room 900, so that people can enter and exit the shower room 900. In this modified example, the floor material 902, the frame 906, and the ceiling material 908 function as a first building material, and the wall material 904 functions as a second building material.
[0295] The floor material 902 is a substantially rectangular plate-shaped member, and a first adhesive layer 916, which is a watertight adhesive layer, is continuously formed on the entire periphery of the floor material 902. In addition, frames 906 are provided at the four corners of the floor material 902, and a second adhesive layer 922, which is a watertight adhesive layer, is formed on each frame 906. Furthermore, a plate-shaped wall material 904 is arranged on the periphery of the floor material 902, and the floor material 902 and the wall material 904 are adhered to each other in a watertight and re-adhesive manner via the first adhesive layer 916. In addition, frames 906 are adhered to the side edges of these wall materials 904 in a watertight and re-adhesive manner via the second adhesive layer 922. In addition, the door frame of the door 904a is also similar to the wall material 904, and is respectively adhered to the floor material 902 and the frame 906 in a watertight and re-adhesive manner via the first adhesive layer 916 and the second adhesive layer 922.
[0296] Furthermore, the top plate 908 is a substantially rectangular plate-shaped member, and a watertight adhesive layer, namely a third adhesive layer 926, is continuously formed on the entire periphery of the top plate 908. The top plate 908 is watertightly and re-adhesively adhered to the upper edge of each wall material 904 and the upper end of each frame 906 via the third adhesive layer 926.
Claims
1. A monolithic house for water-using equipment, which is assembled by mutually watertightly joining a plurality of building materials, characterized in that: The invention comprises: a first building material, wherein a linear watertight adhesive layer is formed at a joint portion where the first building material is joined with another building material; and a second building material having a joint portion to be watertightly and re-adhesively bonded to the first building material, The watertight adhesive layer is configured such that, after the first building material and the second building material are once adhered to each other via the watertight adhesive layer, when the adhesion between the first building material and the second building material is peeled off, the entire watertight adhesive layer remains on the first building material side and maintains adhesiveness.
2. The integrated house for water-using equipment according to claim 1 is characterized in that: The adhesive force between the watertight adhesive layer and the first building material is set to be stronger than the adhesive force between the watertight adhesive layer and the second building material.
3. The integrated house for water-using equipment according to claim 1 or 2, characterized in that: The watertight adhesive layer comprises: a strong adhesive layer adhered to the joint of the first building material; and a weak adhesive layer formed on the strong adhesive layer and to be adhered to the joint of the second building material, wherein the adhesive force of the strong adhesive layer is stronger than that of the weak adhesive layer.
4. The integrated house for water-using equipment according to claim 1 or 2, characterized in that: The watertight adhesive layer is formed by applying a heated and liquefied adhesive to the joint portion of the first building material in a continuous linear form, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature of the watertight adhesive layer drops to room temperature. The bonding force between the first building material and the watertight adhesive layer is stronger than the adhesive force between the second building material and the watertight adhesive layer.
5. The integrated house for water-using equipment according to claim 1 or 2, characterized in that: The watertight adhesive layer is formed by applying a heated and liquefied adhesive to the joint portion of the first building material in a continuous linear form, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature of the watertight adhesive layer drops to room temperature. A first contact area between the joint portion of the first building material and the watertight adhesive layer is set to be larger than a second contact area between the joint portion of the second building material and the watertight adhesive layer.
6. The integrated house for water-using equipment according to claim 1 or 2, characterized in that: The watertight adhesive layer is formed by applying a heated and liquefied adhesive to the joint portion of the first building material in a continuous linear form, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature of the watertight adhesive layer drops to room temperature. A strong adhesive region for maintaining adhesion to the watertight adhesive layer is provided at the joint portion of the first building material, and a weak adhesive region for allowing peeling from the watertight adhesive layer is provided at the joint portion of the second building material.
7. The integrated house for water-using equipment according to claim 1 is characterized in that: The watertight adhesive layer is formed by applying a heated and liquefied adhesive to the joint portion of the first building material in a continuous linear form, and the watertight adhesive layer is watertightly and re-adhesively adhered to the joint portion of the second building material after the temperature of the watertight adhesive layer drops to room temperature. A separation preventing portion is provided to prevent the watertight adhesive layer from being separated from the joint portion of the first building material.
8. The integrated house for water-using equipment according to claim 1 or 2, characterized in that: One of the first and second building materials is a floor material constituting the integrated house for water-using equipment, and the other of the first and second building materials is a plurality of wall materials adhered to the floor material, and these wall materials are adhered to a watertight adhesive layer continuously formed on the floor material.
9. The integrated house for water-using equipment according to claim 1 or 2, characterized in that: The first building material is a frame material erected from a floor plate of the integrated house for water equipment, and the second building material is a plurality of wall materials, and these wall materials are connected to each other via the frame material.
10. A method for manufacturing an integral house for water-using equipment, comprising assembling the integral house for water-using equipment by watertightly joining a plurality of building materials to each other, wherein: The method comprises: a step of forming a watertight adhesive layer, in which an adhesive which is heated and liquefied is applied in a continuous linear form on a joint portion of a first building material to be joined with another building material, thereby forming a watertight adhesive layer on the joint portion of the first building material; a curing step of cooling the watertight adhesive layer formed in the watertight adhesive layer forming step to room temperature, thereby stabilizing the shape of the watertight adhesive layer in such a way that the watertight adhesive layer exhibits elasticity and shape recovery; and an assembly process, in which, at the site of assembling the integrated house for water-using equipment, the watertight adhesive layer formed at the joint part of the first building material and the joint part of the second building material are adhered watertightly and re-adhesively, and once the first building material and the second building material are adhered by the watertight adhesive layer, when the adhesion between the first building material and the second building material is peeled off, the watertight adhesive layer as a whole remains on the first building material side and maintains adhesiveness, thereby joining the first building material and the second building material to assemble the integrated house for water-using equipment.