A tunnel anti-floating structure with a long-short pile combined pile foundation

By using the alternating arrangement of long and short pile combined pile foundations in the subway tunnel, the problems of waste of material and poor anti-floating effect of existing anti-uplift piles are solved, achieving more efficient anti-floating performance and resource utilization, and is suitable for highly permeable buildings. Characteristic stratum and lake (sea) section tunnel project.

CN113389215BActive Publication Date: 2024-10-25NANCHANG RAIL TRANSIT GRP LTD CORP +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110847180.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-07-27
Publication Date
2024-10-25
Estimated Expiration
2041-07-27

AI Technical Summary

Technical Problem

Among the existing anti-floating measures for subway tunnels, research on uplift-resistant piles is mostly based on equal-length piles, ignoring the synergy between piles, resulting in material waste and poor anti-floating effects, especially in areas with highly permeable foundations and high groundwater levels. Under certain conditions, long and large-span main structures are prone to floating.

Method used

A combined pile foundation of long and short piles is used. Long and short piles are alternately arranged under the main structure floor of the tunnel. The lengths of the long piles and short piles are calculated according to the parabolic change curve. The arrangement is long in the middle and short in the periphery, forming longitudinal and transverse pull-out piles. The combined structure gives full play to the synergy between piles.

Benefits of technology

It improves the anti-floating performance of the tunnel, reduces anti-floating costs, and saves disease control costs during the operation period. It is suitable for tunnel projects in highly permeable strata and lake (sea) sections. It has high resource utilization and ensures the long-term operation safety of the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113389215B_ABST
    Figure CN113389215B_ABST
Patent Text Reader

Abstract

A tunnel anti-floating structure of a long-short pile combination pile foundation comprises a tunnel main structure and a long-short pile combination pile foundation located below the bottom plate of the main structure. The tunnel main structure comprises a top plate (2) and a bottom plate (4), two side walls (1) and a middle partition wall (3). The top plate and the bottom plate are parallel to each other and have equal widths, and the two side walls are respectively vertically connected to the top plate and the bottom plate on both sides in the width direction; the middle partition wall is vertically installed between the top plate and the bottom plate; the long-short pile combination pile foundation comprises long piles (6) and short piles (5), which are arranged longitudinally and transversely under the bottom plate of the main structure; the longitudinal piles are arranged in a form of long in the middle and short at the periphery. Compared with traditional anti-floating measures, the present invention can make full use of the stratum conditions, so that the anti-floating potential of the piles can be further exerted. The structure is simple, safe and reliable, can ensure the long-term operation safety of the tunnel, save operating costs, and is suitable for open-cut tunnels passing through highly permeable strata with high anti-floating requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a tunnel anti-floating structure of a long-short pile combined pile foundation, belonging to the technical field of tunnel construction. Background Art

[0002] At present, the anti-floating measures for subway tunnels are to use the weight of the soil buried deep below the subway and above the top of the subway tunnel to resist the buoyancy that the tunnel may experience above the ground. When a tunnel with a large burial depth is located in a highly permeable foundation and the groundwater level is high, the long and large-span main structure is at great risk of floating under the action of water buoyancy. At this time, the anti-floating capacity of the tunnel can be increased by increasing the deadweight of the structure, grouting reinforcement around the tunnel, and setting up pull-out piles. Among them, pull-out piles are widely used because of their good effect and relatively low cost.

[0003] However, most of the current research on pull-out piles focuses on equal-length piles, ignoring the synergistic effect between piles, which in turn causes a waste of materials. Summary of the invention

[0004] The purpose of the present invention is to solve the problems existing in the anti-floating measures of existing subway tunnels and to propose a tunnel anti-floating structure of a long-short pile combined pile foundation.

[0005] The technical solution implemented by the present invention is as follows: a tunnel anti-floating structure of a long-short pile combination pile foundation, comprising a tunnel main structure and a long-short pile combination pile foundation located below the bottom plate of the main structure; the tunnel main structure comprises a top plate and a bottom plate, two side walls and a middle partition wall, the top plate and the bottom plate are parallel to each other and have equal widths, and the two side walls are vertically connected to the top plate and the bottom plate on both sides in the width direction; the middle partition wall is vertically installed between the top plate and the bottom plate and is located in the center of the bottom plate; the long-short pile combination pile foundation comprises long piles and short piles, which are arranged longitudinally and transversely under the bottom plate of the main structure; the transverse arrangement form of the combined piles under the bottom plate of the main structure is a middle long pile, and the long and short piles are arranged alternately with the middle as the axis; the longitudinal arrangement form of the piles is a middle long pile and a peripheral short pile.

[0006] The pile arrangement form of long in the middle and short around the periphery adopts a longer pile length in the middle section of the lake or sea, and a shorter pile length in the non-lake or sea section. The variation curve of the long pile and the short pile length is a parabola, and the calculation formula of the pile length is as follows;

[0007] Long pile calculation formula, unit is m:

[0008] Y1=4.33×10 -5 X 2 -0.067X+L 01

[0009] Where Y1 is the length of the long pile, X is the distance from the middle of the tunnel, and L 01The length of the long pile in the middle of the tunnel;

[0010] Short pile calculation formula, unit is m:

[0011] Y2=2.86×10 -5 X 2 -0.049X+L 02

[0012] Where Y2 is the length of the short pile, X is the distance from the middle of the tunnel, and L 02 The length of the short pile in the middle of the tunnel;

[0013] When Y1 is less than L1, L1 is selected, where L1 is the minimum pile length designed for the project;

[0014] When Y2 is less than L2, take L2, where L2 is the minimum short pile length designed for the project.

[0015] The middle partition wall divides the main structure of the tunnel into two parts, namely the left line and the right line of the subway.

[0016] The longitudinal spacing of the combined piles under the bottom plate of the main structure is 9 to 10 m, and the lateral spacing is 5 to 6 m.

[0017] The long and short piles are all pull-out piles.

[0018] The beneficial effect of the present invention is that, compared with traditional anti-floating measures, the present invention can make full use of the formation conditions, so that the anti-floating potential of the piles can be further exerted. As a tunnel anti-floating structure, the structure is simple, safe and reliable, can ensure the long-term operation safety of the tunnel, greatly reduce the anti-floating cost, save the cost of disease control during the operation period, and is suitable for the high anti-floating requirements of open-cut tunnels crossing highly permeable formations, with obvious social and economic benefits. Under the premise of considering the stress and deformation changes of the tunnel structure, the present invention reasonably allocates the layout of long and short piles, gives full play to the anti-floating potential of the pull-out piles and the synergistic effect of the piles, and improves the overall anti-floating performance of the tunnel main structure; the present invention is suitable for projects where the entire tunnel is long and partially crosses a lake (sea), and the resource utilization rate is high. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a cross-sectional schematic diagram of a tunnel anti-floating structure of a long-short pile combined pile foundation of the present invention;

[0020] Figure 2 It is a longitudinal cross-sectional schematic diagram of a tunnel anti-floating structure of a long-short pile combined pile foundation of the present invention;

[0021] In the figure, 1 is the side wall; 2 is the top plate; 3 is the middle partition wall; 4 is the bottom plate; 5 is the short pile; and 6 is the long pile. DETAILED DESCRIPTION

[0022] The specific implementation of the present invention is shown in the accompanying drawings.

[0023] A tunnel anti-floating structure of a long-short pile combination pile foundation comprises a tunnel main structure and a long-short pile combination pile foundation located below the main structure bottom plate; the tunnel main structure comprises a top plate 2 and a bottom plate 4, two side walls 1 and a middle partition wall 3. The top plate 2 and the bottom plate 4 are parallel to each other and have equal widths, and the two side walls 1 are respectively vertically connected to the top plate 2 and the two sides of the bottom plate 4 in the width direction; the middle partition wall 3 is vertically installed between the top plate 2 and the bottom plate 4, and is located in the middle of the bottom plate 4; the long-short pile combination pile foundation comprises long piles 6 and short piles 5, which are arranged longitudinally and transversely under the main structure bottom plate 4; the combined piles under the main structure bottom plate 4 are arranged transversely in the form of long piles 6 in the middle, and the long piles 6 and short piles 5 are arranged alternately with the middle as the axis; the longitudinal arrangement of the piles is long in the middle and short at the periphery.

[0024] like Figure 1 As shown in the figure, a tunnel project is 2664m long, mainly including a 2380m long highway tunnel (733m long across the lake) and the pre-buried structure of the eastern extension of Metro Line 3. The project is divided into three phases according to the geographical location: West Lake, Middle Lake, and East Lake, with West Lake as the starting point and East Lake as the end point.

[0025] This project adopts a combination of open-cut and concealed methods. The tunnel in the middle of the lake adopts open-cut method with cofferdam. The main structure of the tunnel is a rectangular section of 28.9m×8m (width×height) with two holes and one middle wall. The soil layers involved 1-20m below the riverbed are silty clay, fine sand, medium sand, round gravel, strongly weathered muddy siltstone, moderately weathered muddy siltstone, calcareous mudstone, etc.

[0026] This project has the following features:

[0027] (1) Highly permeable gravel layer and complex hydrogeological conditions: the groundwater is connected to the surface water system, and the lake is surrounded by water on three sides, making it inconvenient to remove slag during construction; the highly permeable coarse sand and gravel sand layer has a permeability coefficient of up to 110m / d; if the water-stopping effect is poor, engineering problems such as anti-surge, anti-floating, and anti-leakage will be encountered during construction and operation.

[0028] (2) Complex construction process: including two-stage cofferdam, segmented excavation support and casting of the main structure within the first-stage cofferdam; multiple excavation methods (open section, buried section, etc.).

[0029] The cross-sectional schematic diagram of the main structure of the tunnel in this embodiment is as follows Figure 1 As shown, the main structure is a parallel "double-hole" structure, with the left line of the subway on the left and the right line on the right.

[0030] In the main structure of the tunnel of this embodiment, the top plate 2 is 1.2 m thick, the bottom plate 4 is 1.2 m thick, the two side walls 1 are 1.2 m thick, and the middle partition wall 3 is 0.6 m thick.

[0031] The long and short combined pile foundation of the tunnel main structure of this embodiment is arranged longitudinally and transversely under the bottom plate of the main structure, with a longitudinal spacing of 7 to 8 m and a transverse spacing of 5 to 6 m. Considering that the tunnel span is large and a large bending moment is easily generated in the middle of the bottom plate, the pull-out piles are arranged transversely in the manner of "long piles in the middle, with the middle as the axis, and alternating long and short piles".

[0032] The longitudinal section diagram of the main structure of the tunnel is shown in Figure 2 As shown, the longitudinal pile arrangement adopts the form of "long in the middle and short in the periphery", that is, the pile length is longer in the middle section of the lake (sea), and the pile length is shorter in the non-lake (sea) section. According to the above parabolic equation, the length of the long pile 6 of a certain section of the anti-pulling pile is 14m below the bottom plate, and the short pile 5 is 10m.

[0033] The construction process of this example is:

[0034] 1. Construction of retaining walls on both sides of the tunnel;

[0035] 2. Construction of anti-pullout piles at the bottom of the base plate;

[0036] 3. Excavation of foundation pit;

[0037] 4. Construction of the main structure;

[0038] 5. Water outsourcing during construction.

[0039] The specific construction steps are as follows

[0040] (1) Construction of tunnel retaining structure: The retaining ground-connected wall is 0.8m thick and 20m long, and is made of C30 reinforced concrete.

[0041] (2) Construction of anti-pullout piles at the bottom of the base plate 4. The anti-pullout piles are arranged longitudinally and transversely under the base plate of the main structure, with a longitudinal spacing of 7 to 8 m and a transverse spacing of 5 to 6 m. The length of the long anti-pullout pile 6 is 14 m below the base plate 4, and the length of the short pile 5 is 10 m. The construction of the anti-pullout piles is carried out simultaneously with the construction of the retaining wall.

[0042] (3) Excavation of foundation pit. The foundation pit is excavated in layers. Each time the excavation reaches 0.5m below the steel support, the steel support is erected. The first support of the foundation pit is 800mm×800mm concrete support, and the remaining supports are Φ609×16mm steel supports.

[0043] (4) Construction of the main structure of the tunnel. The main structure of the tunnel is a rectangular cross-section with two holes and one middle wall, with a width of 28.9m and a height of 8m. The construction is divided into three pourings, pouring the bottom plate 4, side wall 1, middle wall 3, and top plate in sequence. The material used is C30 concrete.

[0044] In this embodiment, the main structure of the tunnel is rigidly connected to the anti-pulling piles 5 and 6 through the bottom plate 4, forming a tunnel anti-floating structure of a long-short pile combined pile foundation. In this structure, the long piles 6 and the short piles 5 are connected through the tunnel bottom plate 4 to form a whole, which better realizes the synergy between the piles, that is, the long piles 6 transmit part of the force to the short piles 5 through the bottom plate 4, reducing the force on the long piles 6.

[0045] In the present invention, the buoyancy force on the main structure of the tunnel is transmitted to the lower anti-pullout piles 5 and 6 through the bottom plate 4 of the main structure of the tunnel, and the gravity of the anti-pullout piles themselves and the friction between the piles and the soil offset this part of the buoyancy force, thereby meeting the anti-buoyancy requirements of the tunnel.

[0046] The invention has a simple, safe and reliable structure, can ensure the long-term operation safety of the tunnel, greatly reduce the anti-floating cost, save the cost of disease control during the operation period, is suitable for the high anti-floating requirements of open-cut tunnels passing through highly permeable strata, and has obvious social and economic benefits.

Claims

1. A tunnel anti-floating structure with a long and short pile combined foundation. It is characterized in that The anti-floating structure comprises a tunnel main structure and a long-short pile combination pile foundation located below the bottom plate of the main structure; the tunnel main structure comprises a top plate and a bottom plate, two side walls and a middle partition wall, the top plate and the bottom plate are parallel to each other and have equal widths, and the two side walls are vertically connected to the top plate and the bottom plate on both sides in the width direction; the middle partition wall is vertically installed between the top plate and the bottom plate and is located in the middle of the bottom plate; the long-short pile combination pile foundation is arranged longitudinally and transversely under the bottom plate of the main structure; the combined piles under the bottom plate of the main structure are arranged transversely in the form of middle long piles, and the middle is used as the axis, and the long and short piles are arranged alternately; The piles are arranged in a long middle and short peripheral pattern. The pile arrangement form of long in the middle and short around the periphery adopts a longer pile length in the middle section of the lake or sea, and a shorter pile length in the non-lake or sea section. The variation curve of the long pile and the short pile length is a parabola, and the calculation formula of the pile length is as follows; Long pile calculation formula, unit is m: ; In the formula, Y 1 is the length of the long pile, X is the distance from the middle of the tunnel, L 01 The length of the long pile in the middle of the tunnel; Calculation formula for short piles, in m: ; In the formula, Y 2 is the length of the short pile, X is the distance from the middle of the tunnel, L 02 The length of the short pile in the middle of the tunnel; when Y 1 Less than L 1 When L 1 ,in L 1 Minimum pile length designed for the project; when Y 2 Less than L 2 When L 2 ,in L 2 Minimum short pile length designed for the project; The middle partition wall divides the main structure of the tunnel into two parts, namely the left line and the right line of the subway; The longitudinal spacing of the composite piles under the main structure bottom plate is 9-10m, and the lateral spacing is 5-6m; The long and short piles are all pull-out piles.

2. The tunnel anti-floating structure of the long-short pile combined pile foundation according to claim 1, It is characterized in that The steps of the tunnel anti-floating structure construction method are as follows: (1) Tunnel retaining structure construction: The retaining ground-connected wall is 0.8m thick and 20m long, and the material used is C30 steel concrete; (2) Construction of anti-pullout piles at the bottom of the base plate: Anti-pullout piles are arranged longitudinally and transversely under the base plate of the main structure, with a longitudinal spacing of 7 to 8 m and a transverse spacing of 5 to 6 m. The length of the long anti-pullout piles is 14 m below the base plate, and the short piles are 10 m. The construction of anti-pullout piles is carried out simultaneously with the construction of the retaining wall. (3) Excavation of foundation pit: The foundation pit is excavated in layers. Each time the excavation reaches 0.5m below the steel support, the steel support is erected. The first support of the foundation pit is 800mm×800mm concrete support, and the remaining supports are Φ 609×16mm steel support; (4) Construction of the main structure of the tunnel: The main structure of the tunnel has a rectangular cross-section of two holes and one middle wall with a width of 28.9 m and a height of 8 m. The construction is divided into three pouring steps, in which the bottom plate, side wall, middle wall and top plate are poured in sequence. The material used is C30 concrete.