Feeding device and method for preventing blockage of high-pressure coal slurry pump
By designing the feeding device of the coal slurry filter and high-level collection tank, the blockage problem caused by large particles and hard precipitation of high-pressure coal slurry pumps is solved, ensuring the safe and stable operation of the coal gasifier, reducing investment costs, and realizing the Automated and efficient feeding system.
Patent Information
- Application Number
- CN202110915316.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-08-10
AI Technical Summary
High-pressure coal slurry pumps are prone to blocking the inlet and outlet check valve due to large particles and hard precipitation, which affects the safe and stable operation of the gasifier. In addition, in traditional design, the coal slurry feed buffer tank is set at a high place, resulting in high investment costs.
A feeding device including a coal slurry filter, a collection tank and a conveying pump was designed to filter large particles and hard precipitates through a coal slurry filter, and an automated slag discharge and reflow mechanism was used for high-level collection tank and control system to ensure high-pressure coal The stable operation of the slurry pump also reduces the design elevation of the coal slurry feed buffer tank.
It effectively avoids the blockage problem of high-pressure coal slurry pumps, ensures the safe and stable operation of the coal gasifier, reduces investment costs, improves the degree of automation, and reduces the labor intensity of personnel.
Smart Images

Figure CN113481031B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of high-pressure coal slurry pump operation, in particular to a feeding device and method for preventing a high-pressure coal slurry pump from being blocked. Background Art
[0002] Coal gasification plays an important role in coal chemical industry and is an important way and means to cleanly utilize coal resources. The gasifier is the core equipment of the coal gasification device. There are many factors that affect the safe and stable operation of the gasifier. In order to ensure the safe and stable operation of the gasifier, the process package provider has designed a series of control schemes for it. Among them, the safe and stable operation of the high-pressure coal slurry pump directly affects the normal operation of the gasifier. In severe cases, it will lead to fire and explosion, causing casualties and property losses. Therefore, it is necessary to propose a better control scheme for the safe and stable operation of the high-pressure coal slurry pump to avoid serious consequences.
[0003] It is inevitable that there are large particles that escape the screen or long and thin particles that fall under the sieve holes, as well as hard precipitates formed in the coal slurry feed buffer tank in the coal gasification. These large particles and hard precipitates directly enter the high-pressure coal slurry pump, which will cause the inlet check valve or outlet check valve of the high-pressure coal slurry pump with a small gap to get stuck, and the high-pressure coal slurry pump will lose its function, resulting in the failure of the single cylinder of the high-pressure coal slurry pump to pump, the pump outlet flow rate to decrease, the pressure difference of the gasifier burner to fluctuate, or the high-pressure coal slurry pump to fail to pump up the coal slurry. Although the coal slurry flow rate at the outlet of the high-pressure coal slurry pump decreases, the coal slurry flowmeter reacts slowly and does not trigger the shutdown interlock due to low coal slurry flow or high oxygen-coal ratio, which may cause local overoxygenation in the gasifier, intensified reaction, and high temperature of the gasifier, resulting in the shutdown of the gasifier and property loss.
[0004] In addition, in order to ensure the stable operation of the high-pressure coal slurry pump and the stability of the high-pressure coal slurry pump outlet flow, the traditional process design uses the high-pressure coal slurry pump as the elevation reference, sets the coal slurry feed buffer tank at a certain elevation, and ensures the pressure at the inlet of the high-pressure coal slurry pump through the height difference. However, the coal slurry feed buffer tank with a large storage capacity is set at a high place, and the investment cost is huge. Summary of the invention
[0005] Based on the existing technical problems, the present invention provides a high-pressure coal slurry pump with good anti-blocking performance and a coal slurry feed buffer tank.
[0006] A feeding device and method for preventing high-pressure coal slurry pump from being blocked have low capital cost, high degree of automation and low labor intensity.
[0007] In order to achieve the above, the technical solution of the present invention is as follows:
[0008] A feeding device for preventing high-pressure coal slurry pump from being blocked, comprising a coal slurry feeding buffer tank, a high-pressure coal slurry pump, a coal slurry filtering feeding pump, a coal slurry filter, a coal slurry collecting tank, a high-position coal slurry collecting tank, and a coal slurry delivery pump, wherein the coal slurry feeding port of the coal slurry filter is connected to the outlet of the coal slurry filtering feeding pump through a pipeline, the inlet of the coal slurry filtering feeding pump is connected to the coal slurry outlet of the coal slurry feeding buffer tank through a pipeline, the coal slurry discharge port of the coal slurry filter is connected to the coal slurry inlet of the high-pressure coal slurry pump through a pipeline; the coal slurry feeding port of the coal slurry filter A flow meter a is arranged on the pipeline connected to the outlet of the coal slurry filter feed pump, and a flow meter b is arranged on the pipeline connected to the coal slurry outlet of the coal slurry filter and the coal slurry inlet of the high-pressure coal slurry pump; a coal slurry reflux port is also arranged on the pipeline connected to the coal slurry outlet of the coal slurry filter and the coal slurry inlet of the high-pressure coal slurry pump or on the top of the coal slurry filter, and the coal slurry reflux port is connected to the top of the coal slurry feed buffer tank through a coal slurry reflux pipe, and the coal slurry reflux pipe is set at 20m with the inlet of the high-pressure coal slurry pump as the elevation reference. ~ 50m in elevation; the slag discharge port of the coal slurry filter is connected to the inlet of the coal slurry collecting tank and the inlet of the high-position coal slurry collecting tank through two pipelines, the outlet of the coal slurry collecting tank is connected to the inlet of the coal slurry delivery pump through a pipeline, the outlet of the coal slurry delivery pump is connected to the rod mill through a pipeline, and the outlet of the high-position coal slurry collecting tank is connected to the inlet of the coal slurry collecting tank through a pipeline; a first slag discharge valve is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter and the inlet of the coal slurry collecting tank, a second slag discharge valve is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter and the inlet of the high-position coal slurry collecting tank, a third slag discharge valve is arranged on the pipeline connecting the outlet of the high-position coal slurry collecting tank and the inlet of the coal slurry collecting tank, a driving device c arranged on the top of the high-position coal slurry collecting tank is connected to the stirring device a in the high-position coal slurry collecting tank, the coal slurry delivery pump and the coal slurry filtration feed pump are centrifugal delivery pumps, and the impellers of the coal slurry delivery pump and the coal slurry filtration feed pump are open impellers or semi-open impellers.
[0009] Furthermore, the coal slurry filter is composed of an elliptical head, a cylindrical barrel, and a conical barrel connected in sequence from top to bottom. A filter screen mesh perpendicular to the cylindrical barrel wall is arranged in the coal slurry filter. The aperture of the filter screen mesh is 0.8 mm to 1.2 mm. The circumferential edge of the filter screen mesh is sealed and connected to the inner wall of the cylindrical barrel. A screen mesh scraper is arranged close to the bottom of the filter screen mesh. The screen mesh scraper is connected to the driving device a on the top of the coal slurry filter by penetrating the rotating shaft a of the filter screen mesh and the elliptical head. A number of stirring blades are arranged on the rotating shaft a. The coal slurry feed port of the coal slurry filter is arranged on the cylindrical barrel wall below the filter screen mesh, and the coal slurry feed port is in the tangential direction of the cylindrical barrel circumference. The coal slurry discharge port of the coal slurry filter is arranged on the cylindrical barrel wall above the filter screen mesh. The slag discharge port of the coal slurry filter is arranged at the lower end of the conical barrel of the coal slurry filter. The coal slurry reflux port on the coal slurry filter is arranged on the top of the elliptical head.
[0010] Furthermore, a stirring device b is arranged in the coal slurry collecting tank, and the stirring device b is connected to the driving device b at the top of the coal slurry collecting tank through a rotating shaft b. A dilution water inlet is arranged on the top of the coal slurry collecting tank and the top of the high-position coal slurry collecting tank, and is connected to a dilution water pipeline. A level meter is arranged on the top of the coal slurry collecting tank and the top of the high-position coal slurry collecting tank.
[0011] Furthermore, the first slag discharge valve, the second slag discharge valve, the third slag discharge valve, the level meter, the drive device a, the drive device b, the drive device c, the flow meter a, the flow meter b and the coal slurry conveying pump and the coal slurry filtration feed pump are all connected to the control system.
[0012] A feeding method using a high-pressure coal slurry pump anti-blocking feeding device is adopted. The coal slurry in the coal slurry feeding buffer tank is pressurized by the coal slurry filter feeding pump and enters the coal slurry filter from the coal slurry feeding port of the coal slurry filter. The coal slurry rotates in the coal slurry filter cavity below the filter screen. Some large particles and hard sediments in the coal slurry settle to the bottom of the coal slurry filter after rotation. The unsettled large particles and hard sediments are filtered by the filter screen. The filtered coal slurry is divided into two parts. One part flows out from the coal slurry reflux port and flows back to the coal slurry feeding buffer tank through the coal slurry reflux pipe, and the other part flows into the high-pressure coal slurry pump. The large particles and hard sediments adhering to the filter screen are driven by a driving device a. The sieve mesh scraper is driven to scrape it down to the bottom of the coal slurry filter. The large particles of coal slurry and hard sediment at the bottom of the coal slurry filter are discharged to the coal slurry collecting tank through the control system to open the first slag discharge valve. The coal slurry in the coal slurry collecting tank is sent to the rod mill by the coal slurry conveying pump for re-grinding and slurrying. If the real-time liquid level of the coal slurry collecting tank reaches a high value during the slag discharge process and cannot meet the slag discharge of the coal slurry filter, the control system controls the first slag discharge valve to close and the second slag discharge valve to open, and the coal slurry filter discharges slag to the high-level coal slurry collecting tank. After the liquid level in the coal slurry collecting tank is lowered, the coal slurry in the high-level coal slurry collecting tank flows into the coal slurry collecting tank, and then is sent to the rod mill by the coal slurry conveying pump.
[0013] Furthermore, the liquid level of the coal slurry collecting tank is set with a high-high value, a high value, a low value, and a low-low value, and the high-high value>high value>low value>low value, the level meter transmits the real-time liquid level of the coal slurry collecting tank to the control system, and the control system compares the real-time liquid level with the high-high value, high value, low value, and low-low value. If the high-high value>real-time liquid level≥high value or the low value≥real-time liquid level>low-low value, the control system sends a high value alarm signal or a low value alarm signal every 3 minutes to 5 minutes; if the real-time liquid level≥high-high value or the real-time liquid level≤low-low value, the control system sends a high-high value continuous alarm signal or a low-low value continuous alarm signal.
[0014] Furthermore, the coal slurry filter is set with manual control slag discharge and automatic control slag discharge. The automatic control slag discharge sets a slag sedimentation time and a slag discharge time. After the automatic control slag discharge is put into use, the slag sedimentation time starts to countdown. When the slag sedimentation time countdown is zero, the control system controls the first slag discharge valve to open, the coal slurry filter starts to discharge slag, and the slag discharge time starts to countdown at the same time. When the slag sedimentation time countdown is zero, the coal slurry filter stops discharging slag, and the slag sedimentation time starts to countdown again, and so on. If the real-time liquid level of the coal slurry collecting tank of the coal slurry filter reaches a high value during the slag discharge process, the control system controls the first slag discharge valve to close, and at the same time the control system controls the second slag discharge valve to open, the coal slurry filter starts to discharge slag to the high-position coal slurry collecting tank, and the slag discharge time continues to countdown until the slag discharge time countdown is zero, the control system controls the second slag discharge valve to close, the coal slurry filter stops discharging slag, and the slag sedimentation time starts to countdown again.
[0015] Furthermore, when the countdown of the sedimentation time is zero, the control system controls the coal slurry filter feed pump to increase the coal slurry flow rate entering the coal slurry filter by 5m³ / h ~ 10m³ / h; after the countdown of the slag discharge time is zero, the coal slurry filter stops discharging slag, and the control system controls the coal slurry filter feed pump to restore the coal slurry flow rate entering the coal slurry filter to the flow rate before slag discharge, and the slag discharge flow rate of the coal slurry filter shall not be greater than 5m³ / h.
[0016] Furthermore, the flowmeter a and the flowmeter b set a low flow interlocking value. When the flow of the flowmeter a or the flowmeter b touches the low flow interlocking value, the gasifier is interlocked and stopped, and at the same time, the control system controls the high-pressure coal slurry pump and the coal slurry filter feed pump to stop.
[0017] Furthermore, when the coal slurry collecting tank and the high-position coal slurry collecting tank are in operation, dilution water is injected into the dilution water inlets on the coal slurry collecting tank and the high-position coal slurry collecting tank. Beneficial Effects
[0018] 1. The present invention filters large particles and hard precipitates in the coal slurry by setting a coal slurry filter, thereby avoiding the jamming of the inlet and outlet check valves of the high-pressure coal slurry pump, ensuring the safe and stable operation of the high-pressure coal slurry pump, thereby ensuring the safe and stable operation of the coal gasifier.
[0019] 2. The coal slurry filter of the present invention is provided with a coal slurry feed port and a filter screen mesh in the square of the cylindrical cylinder circumference tangent line. Large particles and hard precipitates in the coal slurry are separated by centrifugal sedimentation and filtration, and the separation effect is good.
[0020] 3. The present invention sets a coal slurry collecting tank and a high-position coal slurry collecting tank to collect the coal slurry containing large particles and hard precipitates discharged from the bottom of the coal slurry filter, and then sends them to the rod mill through a coal slurry delivery pump for re-grinding and slurrying, so that the coal slurry containing large particles and hard precipitates can be recycled.
[0021] 4. The slag discharge process of the coal slurry filter of the present invention is automatically controlled by a control system, with a high degree of automation and low labor intensity.
[0022] 5. The present invention ensures the pressure at the inlet of the high-pressure coal slurry pump by setting a coal slurry reflux pipeline with an elevation difference. Compared with the traditional process design, the design elevation of the coal slurry feed buffer tank is reduced, which greatly reduces the investment cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram a of the present invention;
[0024] Figure 2 It is a structural schematic diagram b of the present invention;
[0025] Figure 3 It is the automatic control flow chart of the control system of the present invention;
[0026] Figure 4 It is a manual control flow chart of the control system of the present invention;
[0027] In the figure, 1-coal slurry feed buffer tank; 2-coal slurry filter; 3-high-pressure coal slurry pump; 4-coal slurry collecting tank; 5-coal slurry delivery pump; 6-first slag discharge valve; 7-dilution water pipeline; 8-filter screen mesh; 9-screen mesh scraper; 10-second slag discharge valve; 11-drive device a; 12-drive device b; 13-coal slurry filter feed pump; 14-high-level coal slurry collecting tank; 15-drive device c; 16-third slag discharge valve; 17-coal slurry reflux pipeline. DETAILED DESCRIPTION Example 1
[0028] Reference Figure 1 , Figure 3 and Figure 4In the traditional process design, the coal slurry feed buffer tank 1 is set at a high place with the high-pressure coal slurry pump 3 as the elevation reference, with a certain elevation difference. The bottom of the coal slurry feed buffer tank 1 is directly connected to the inlet of the high-pressure coal slurry pump 3 through a pipeline. This process design allows large particles that have missed the screen in the coal slurry or long and slender particles that have been screened under the sieve holes, as well as hard precipitates formed in the coal slurry feed buffer tank 1, to directly enter the high-pressure coal slurry pump 3 through the pipeline, causing the inlet check valve or outlet check valve of the high-pressure coal slurry pump 3 with a small gap to get stuck, causing the single cylinder of the high-pressure coal slurry pump 3 to fail to work, the outlet flow of the high-pressure coal slurry pump 3 to decrease, and the high-pressure coal slurry pump 3 to lose its function. In addition, the coal slurry feed buffer tank 1 is set at a high place with a large investment cost. In order to avoid the inlet and outlet check valves of the high-pressure coal slurry pump 3 In order to prevent valve sticking phenomenon, ensure the safe and stable operation of the coal gasification furnace, and reduce investment costs, a feeding device for preventing the high-pressure coal slurry pump 3 from being blocked is provided, comprising a coal slurry feeding buffer tank 1, a high-pressure coal slurry pump 3, a coal slurry filtering feeding pump 13, a coal slurry filter 2, a coal slurry collecting tank 4, a high-position coal slurry collecting tank 14, and a coal slurry conveying pump 5. The coal slurry feeding port of the coal slurry filter 2 is connected to the outlet of the coal slurry filtering feeding pump 13 through a pipeline, the inlet of the coal slurry filtering feeding pump 13 is connected to the coal slurry outlet of the coal slurry feeding buffer tank 1 through a pipeline, and the coal slurry discharge port of the coal slurry filter 2 is connected to the coal slurry inlet of the high-pressure coal slurry pump 3 through a pipeline; a pipe connecting the coal slurry feeding port of the coal slurry filter 2 and the outlet of the coal slurry filtering feeding pump 13 is provided. A flow meter a is arranged, and a flow meter b is arranged on the pipeline connecting the coal slurry outlet of the coal slurry filter 2 and the coal slurry inlet of the high-pressure coal slurry pump 3; a coal slurry reflux port is arranged on the pipeline connecting the coal slurry outlet of the coal slurry filter 2 and the coal slurry inlet of the high-pressure coal slurry pump 3, and the coal slurry reflux port is connected to the top of the coal slurry feed buffer tank 1 through a coal slurry reflux pipe 17, and the coal slurry reflux pipe 17 is set at an elevation of 20m based on the inlet of the high-pressure coal slurry pump 3, the purpose of which is to ensure a stable pressure at the inlet of the high-pressure coal slurry pump 3, so that the coal slurry can stably enter the high-pressure coal slurry pump 3; the slag discharge port of the coal slurry filter 2 is connected to the inlet of the coal slurry collecting tank 4 and the inlet of the high-position coal slurry collecting tank 14 respectively through pipes. The outlet of the coal slurry collecting tank 4 is connected to the inlet of the coal slurry delivery pump 5 through a pipeline, the outlet of the coal slurry delivery pump 5 is connected to the rod mill through a pipeline, and the outlet of the high-position coal slurry collecting tank 14 is connected to the inlet of the coal slurry collecting tank 4 through a pipeline; a first slag discharge valve 6 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the coal slurry collecting tank 4, a second slag discharge valve 10 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the high-position coal slurry collecting tank 14, and a third slag discharge valve 16 is arranged on the pipeline connecting the outlet of the high-position coal slurry collecting tank 14 and the inlet of the coal slurry collecting tank 4; the driving device c15 arranged on the top of the high-position coal slurry collecting tank 14 is connected to the stirring device a in the high-position coal slurry collecting tank 14;The coal slurry delivery pump 5 and the coal slurry filter feed pump 13 are centrifugal delivery pumps, and the impellers of the coal slurry delivery pump 5 and the coal slurry filter feed pump 13 are open impellers. ;
[0029] The coal slurry filter 2 is composed of an elliptical head, a cylindrical barrel and a conical barrel connected in sequence from top to bottom. A filter screen mesh 8 perpendicular to the cylindrical barrel wall is arranged in the coal slurry filter 2. The aperture of the filter screen mesh 8 is 1.2 mm. The circumferential edge of the filter screen mesh 8 is sealed and connected to the inner wall of the cylindrical barrel. A screen mesh scraper 9 is arranged close to the bottom of the filter screen mesh 8. The screen mesh scraper 9 is connected to the driving device a11 on the top of the coal slurry filter 2 by penetrating the filter screen mesh 8 and the rotating shaft a of the elliptical head. A plurality of stirring blades are arranged on the rotating shaft a. The coal slurry feed port of the coal slurry filter 2 is arranged on the cylindrical barrel wall below the filter screen mesh 8, and the coal slurry feed port is in the tangential direction of the cylindrical barrel circumference. The coal slurry discharge port of the coal slurry filter 2 is arranged on the cylindrical barrel wall 10 cm above the filter screen mesh 8. The slag discharge port of the coal slurry filter 2 is arranged at the lower end of the conical barrel of the coal slurry filter 2.
[0030] A stirring device b is arranged in the coal slurry collecting tank 4, and the stirring device b is connected to the top driving device b12 of the coal slurry collecting tank 4 through a rotating shaft b. A dilution water outlet is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14 and is connected to the dilution water pipeline 7. A level meter is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14.
[0031] The first slag discharge valve 6, the second slag discharge valve 10, the third slag discharge valve 16, the level meter, the driving device a11, the driving device b12, the driving device c15, the flow meter a, the flow meter b and the coal slurry conveying pump 5, the coal slurry filtering feed pump 13 are all connected to the control system.
[0032] A feeding method using a high-pressure coal slurry pump to prevent clogging of the feeding device is adopted. The coal slurry in the coal slurry feeding buffer tank 1 is pressurized by the coal slurry filtering feed pump 13 and then enters the coal slurry filter 2 from the coal slurry feeding port of the coal slurry filter 2. The coal slurry rotates in the cavity of the coal slurry filter 2 below the filter screen mesh 8. Some large particles and hard precipitates in the coal slurry settle to the bottom of the coal slurry filter 2 after rotation, and the unsettled large particles and hard precipitates are filtered by the filter screen mesh 8. The filtered coal slurry is divided into two parts, one part flows out from the coal slurry reflux port and flows back to the coal slurry feeding buffer tank 1 through the coal slurry reflux pipe 17, and the other part flows into the high-pressure coal slurry pump 3; the large particles and hard precipitates adhering to the filter screen mesh 8 are driven by the driving device a11 to drive the screen plate The mesh scraper 9 scrapes it down and sinks it to the bottom of the coal slurry filter 2. The large particles of coal slurry and hard sediment at the bottom of the coal slurry filter 2 are discharged to the coal slurry collecting tank 4 through the control system to open the first slag discharge valve 6. The coal slurry in the coal slurry collecting tank 4 is sent to the rod mill through the coal slurry delivery pump 5 for re-grinding and slurrying. If the real-time liquid level of the coal slurry collecting tank 4 reaches a high value during the slag discharge process and cannot meet the slag discharge of the coal slurry filter 2, the control system controls the first slag discharge valve 6 to close and the second slag discharge valve 10 to open, and the coal slurry filter 2 discharges slag to the high-level coal slurry collecting tank 14. After the liquid level in the coal slurry collecting tank 4 is lowered, the coal slurry in the high-level coal slurry collecting tank 14 flows to the coal slurry collecting tank 4 by gravity, and then is sent to the rod mill by the coal slurry delivery pump 5.
[0033] The liquid level of the coal slurry collecting tank 4 is set to a high-high value, a high value, a low value, and a low-low value, and the high-high value>high value>low value>low value, preferably the high-high value is 180㎝, the high value is 160㎝, the low value is 40, and the low-low value is 20㎝. The level meter transmits the real-time liquid level of the coal slurry collecting tank 4 to the control system, and the control system compares the real-time liquid level with the high-high value, the high value, the low value, and the low-low value. If the high-high value>real-time liquid level≥high value or the low value≥real-time liquid level>low-low value, the control system sends a high value alarm signal or a low value alarm signal every 3 minutes to remind the technician to adjust the liquid level of the coal slurry collecting tank 4; if the real-time liquid level≥high-high value or the real-time liquid level≤low-low value, the control system sends a high-high value continuous alarm signal or a low-low value continuous alarm signal to remind the technician to adjust the liquid level of the coal slurry collecting tank 4.
[0034] The coal slurry filter 2 is set to automatically control slag discharge, and the automatic control slag discharge sets a slag set time and a slag discharge time. The preferred slag set time is 60 minutes and the slag discharge time is 30 seconds. After the automatic control slag discharge is put into use, the slag set time starts to count down. When the slag set time countdown is zero, the control system controls the first slag discharge valve 6 to open, the coal slurry filter 2 starts to discharge slag, and the slag discharge time starts to count down. When the slag set time countdown is zero, the coal slurry filter 2 stops discharging slag, and the slag set time starts to count down again, and so on. The cycle is repeated periodically. If the real-time liquid level of the coal slurry collecting tank 4 of the coal slurry filter 2 reaches a high value during the slag discharge process, the control system controls the first slag discharge valve 6 to close, and the control system controls the second slag discharge valve 10 to open, the coal slurry filter 2 starts to discharge slag to the high-position coal slurry collecting tank 14, and the slag discharge time continues to count down until the slag discharge time countdown is zero. The control system controls the second slag discharge valve 10 to close, the coal slurry filter 2 stops discharging slag, and the slag set time starts to count down again.
[0035] When the countdown of the sedimentation time is zero, the control system controls the coal slurry filter feed pump 13 to increase the coal slurry flow rate entering the coal slurry filter 2 by 5m³ / h; when the countdown of the slag discharge time is zero, the coal slurry filter 2 stops discharging slag, and the control system controls the coal slurry filter feed pump 13 to restore the coal slurry flow rate entering the coal slurry filter 2 to the flow rate before slag discharge, and the slag discharge flow rate of the coal slurry filter is 2m³ / h.
[0036] The flowmeter a and the flowmeter b are set with low flow interlocking values. When the flow of the flowmeter a or the flowmeter b touches the low flow interlocking value, the gasifier is interlocked and stopped. At the same time, the control system controls the high-pressure coal slurry pump 3 and the coal slurry filter feed pump 13 to stop.
[0037] When the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 are in operation, dilution water is injected into the dilution water inlets on the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 . Example 2
[0038] Figure 1 , Figure 3 and Figure 4In the traditional process design, the coal slurry feed buffer tank 1 is set at a high place with the high-pressure coal slurry pump 3 as the elevation reference, with a certain elevation difference. The bottom of the coal slurry feed buffer tank 1 is directly connected to the inlet of the high-pressure coal slurry pump 3 through a pipeline. This process design allows large particles that have missed the screen in the coal slurry or long and slender particles that have been screened under the sieve holes, as well as hard precipitates formed in the coal slurry feed buffer tank 1, to directly enter the high-pressure coal slurry pump 3 through the pipeline, causing the inlet check valve or outlet check valve of the high-pressure coal slurry pump 3 with a small gap to get stuck, causing the single cylinder of the high-pressure coal slurry pump 3 to fail to work, the outlet flow of the high-pressure coal slurry pump 3 to decrease, and the high-pressure coal slurry pump 3 to lose its function. In addition, the coal slurry feed buffer tank 1 is set at a high place with a large investment cost. In order to avoid the inlet and outlet check valves of the high-pressure coal slurry pump 3 In order to prevent valve sticking phenomenon, ensure the safe and stable operation of the coal gasification furnace, and reduce investment costs, a feeding device for preventing high-pressure coal slurry pump 3 from being blocked is provided, including a coal slurry feeding buffer tank 1, a high-pressure coal slurry pump 3, a coal slurry filtering feeding pump 13, a coal slurry filter 2, a coal slurry collecting tank 4, a high-position coal slurry collecting tank 14, and a coal slurry delivery pump 5. The coal slurry feeding port of the coal slurry filter 2 is connected to the outlet of the coal slurry filtering feeding pump 13 through a pipeline, the inlet of the coal slurry filtering feeding pump 13 is connected to the coal slurry outlet of the coal slurry feeding buffer tank 1 through a pipeline, and the coal slurry discharge port of the coal slurry filter 2 is connected to the coal slurry inlet of the high-pressure coal slurry pump 3 through a pipeline; the coal slurry feeding port of the coal slurry filter 2 is connected to the outlet of the coal slurry filtering feeding pump 13 through a pipeline. A flow meter a is provided, and a flow meter b is provided on the pipeline connecting the coal slurry discharge port of the coal slurry filter 2 and the coal slurry inlet of the high-pressure coal slurry pump 3; a coal slurry reflux port is provided on the pipeline connecting the coal slurry discharge port of the coal slurry filter 2 and the coal slurry inlet of the high-pressure coal slurry pump 3, and the coal slurry reflux port is connected to the top of the coal slurry feed buffer tank 1 through a coal slurry reflux pipe 17, and the coal slurry reflux pipe 17 is set at an elevation of 20m based on the inlet of the high-pressure coal slurry pump, in order to ensure a stable pressure at the inlet of the high-pressure coal slurry pump 3, so as to facilitate the coal slurry to stably enter the high-pressure coal slurry pump 3; the slag discharge port of the coal slurry filter 2 is connected to the inlet of the coal slurry collecting tank 4 and the inlet of the high-position coal slurry collecting tank 14 respectively through pipes. The outlet of the coal slurry collecting tank 4 is connected to the inlet of the coal slurry delivery pump 5 through a pipeline, the outlet of the coal slurry delivery pump 5 is connected to the rod mill through a pipeline, and the outlet of the high-position coal slurry collecting tank 14 is connected to the inlet of the coal slurry collecting tank 4 through a pipeline; a first slag discharge valve 6 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the coal slurry collecting tank 4, a second slag discharge valve 10 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the high-position coal slurry collecting tank 14, and a third slag discharge valve 16 is arranged on the pipeline connecting the outlet of the high-position coal slurry collecting tank 14 and the inlet of the coal slurry collecting tank 4; the driving device c15 arranged on the top of the high-position coal slurry collecting tank 14 is connected to the stirring device a in the high-position coal slurry collecting tank 14;The coal slurry delivery pump 5 and the coal slurry filter feed pump 13 are centrifugal delivery pumps, and the impellers of the coal slurry delivery pump 5 and the coal slurry filter feed pump 13 are semi-open impellers. ;
[0039] The coal slurry filter 2 is composed of an elliptical head, a cylindrical barrel, and a conical barrel connected in sequence from top to bottom. A filter screen mesh 8 perpendicular to the cylindrical barrel wall is arranged in the coal slurry filter 2. The aperture of the filter screen mesh 8 is 0.8 mm. The circumferential edge of the filter screen mesh 8 is sealed and connected to the inner wall of the cylindrical barrel. A screen mesh scraper 9 is arranged close to the bottom of the filter screen mesh 8. The screen mesh scraper 9 is connected to the driving device a11 on the top of the coal slurry filter 2 by penetrating the filter screen mesh 8 and the rotating shaft a of the elliptical head. A plurality of stirring blades are arranged on the rotating shaft a. The coal slurry feed port of the coal slurry filter 2 is arranged on the cylindrical barrel wall below the filter screen mesh 8, and the coal slurry feed port is in the tangential direction of the cylindrical barrel circumference. The coal slurry discharge port of the coal slurry filter 2 is arranged on the cylindrical barrel wall 10 cm above the filter screen mesh 8. The slag discharge port of the coal slurry filter 2 is arranged at the lower end of the conical barrel of the coal slurry filter 2.
[0040] A stirring device b is arranged in the coal slurry collecting tank 4, and the stirring device b is connected to the top driving device b12 of the coal slurry collecting tank 4 through a rotating shaft b. A dilution water outlet is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14 and is connected to the dilution water pipeline 7. A level meter is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14.
[0041] The first slag discharge valve 6, the second slag discharge valve 10, the third slag discharge valve 16, the level meter, the driving device a11, the driving device b12, the driving device c15, the flow meter a, the flow meter b and the coal slurry conveying pump 5, the coal slurry filtering feed pump 13 are all connected to the control system.
[0042] A feeding method using a high-pressure coal slurry pump to prevent clogging of the feeding device is adopted. The coal slurry in the coal slurry feeding buffer tank 1 is pressurized by the coal slurry filtering feed pump 13 and then enters the coal slurry filter 2 from the coal slurry feeding port of the coal slurry filter 2. The coal slurry rotates in the cavity of the coal slurry filter 2 below the filter screen mesh 8. Some large particles and hard precipitates in the coal slurry settle to the bottom of the coal slurry filter 2 after rotation, and the unsettled large particles and hard precipitates are filtered by the filter screen mesh 8. The filtered coal slurry is divided into two parts, one part flows out from the coal slurry reflux port and flows back to the coal slurry feeding buffer tank 1 through the coal slurry reflux pipe 17, and the other part flows into the high-pressure coal slurry pump 3; the large particles and hard precipitates adhering to the filter screen mesh 8 are driven by the driving device a11 to drive the screen plate The mesh scraper 9 scrapes it down and sinks it to the bottom of the coal slurry filter 2. The large particles of coal slurry and hard sediment at the bottom of the coal slurry filter 2 are discharged to the coal slurry collecting tank 4 through the control system to open the first slag discharge valve 6. The coal slurry in the coal slurry collecting tank 4 is sent to the rod mill through the coal slurry delivery pump 5 for re-grinding and slurrying. If the real-time liquid level of the coal slurry collecting tank 4 reaches a high value during the slag discharge process and cannot meet the slag discharge of the coal slurry filter 2, the control system controls the first slag discharge valve 6 to close and the second slag discharge valve 10 to open, and the coal slurry filter 2 discharges slag to the high-level coal slurry collecting tank 14. After the liquid level in the coal slurry collecting tank 4 is lowered, the coal slurry in the high-level coal slurry collecting tank 14 flows to the coal slurry collecting tank 4 by gravity, and then is sent to the rod mill by the coal slurry delivery pump 5.
[0043] The liquid level of the coal slurry collecting tank 4 is set to a high-high value, a high value, a low value, and a low-low value, and the high-high value>high value>low value>low value, preferably the high-high value is 180㎝, the high value is 160㎝, the low value is 40, and the low-low value is 20㎝. The level meter transmits the real-time liquid level of the coal slurry collecting tank 4 to the control system, and the control system compares the real-time liquid level with the high-high value, the high value, the low value, and the low-low value. If the high-high value>real-time liquid level≥high value or the low value≥real-time liquid level>low-low value, the control system sends a high value alarm signal or a low value alarm signal every 5 minutes to remind the technician to adjust the liquid level of the coal slurry collecting tank 4; if the real-time liquid level≥high-high value or the real-time liquid level≤low-low value, the control system sends a high-high value continuous alarm signal or a low-low value continuous alarm signal to remind the technician to adjust the liquid level of the coal slurry collecting tank 4.
[0044] The coal slurry filter 2 is set to automatically control slag discharge, and the automatic control slag discharge sets a slag set time and a slag discharge time. The preferred slag set time is 60 minutes and the slag discharge time is 20 seconds. After the automatic control slag discharge is put into use, the slag set time starts to count down. When the slag set time countdown is zero, the control system controls the first slag discharge valve 6 to open, the coal slurry filter 2 starts to discharge slag, and the slag discharge time starts to count down. When the slag set time countdown is zero, the coal slurry filter 2 stops discharging slag, and the slag set time starts to count down again, and so on. The cycle is repeated periodically. If the real-time liquid level of the coal slurry collecting tank 4 reaches a high value during the slag discharge process of the coal slurry filter 2, the control system controls the first slag discharge valve 6 to close, and the control system controls the second slag discharge valve 6 to close. The second slag discharge valve 10 is opened, and the coal slurry filter 2 starts to discharge slag to the high-level coal slurry collecting tank 14, and the slag discharge time continues to countdown until the slag discharge time countdown reaches zero, and the control system controls the second slag discharge valve 10 to close, the coal slurry filter 2 stops discharging slag, and the sedimentation time starts to countdown again; when the sedimentation time countdown reaches zero, the control system controls the coal slurry filter feed pump 13 to increase the coal slurry flow rate entering the coal slurry filter 2 by 10m³ / h; when the slag discharge time countdown reaches zero, the coal slurry filter 2 stops discharging slag, and the control system controls the coal slurry filter feed pump 13 to restore the coal slurry flow rate entering the coal slurry filter 2 to the flow rate before slag discharge, and the coal slurry filter slag discharge flow rate is 5m³ / h.
[0045] The flowmeter a and the flowmeter b are set with low flow interlocking values. When the flow of the flowmeter a or the flowmeter b touches the low flow interlocking value, the gasifier is interlocked and stopped. At the same time, the control system controls the high-pressure coal slurry pump 3 and the coal slurry filter feed pump 13 to stop.
[0046] When the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 are in operation, dilution water is injected into the dilution water inlets on the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 . Example 3
[0047] Reference Figure 2 , Figure 3 and Figure 4In the traditional process design, the coal slurry feed buffer tank 1 is set at a high place with the high-pressure coal slurry pump 3 as the elevation reference, with a certain elevation difference. The bottom of the coal slurry feed buffer tank 1 is directly connected to the inlet of the high-pressure coal slurry pump 3 through a pipeline. This process design allows large particles that have escaped the screen in the coal slurry or long and thin particles that have been screened under the sieve holes, as well as hard precipitates formed in the coal slurry feed buffer tank 1, to directly enter the high-pressure coal slurry pump 3 through the pipeline, causing the inlet check valve or outlet check valve of the high-pressure coal slurry pump 3 with a small gap to get stuck, causing the single cylinder of the high-pressure coal slurry pump 3 to fail to work, the outlet flow of the high-pressure coal slurry pump 3 to decrease, and the high-pressure coal slurry pump 3 to lose its function. In addition, the coal slurry feed buffer tank 1 is set at a high place with a large investment cost. In order to avoid the valve jamming phenomenon of the inlet and outlet check valves of the high-pressure coal slurry pump 3, ensure the coal gasification In order to ensure the safe and stable operation of the furnace and reduce the investment cost, a feeding device for preventing the high-pressure coal slurry pump 3 from being blocked is provided, comprising a coal slurry feeding buffer tank 1, a high-pressure coal slurry pump 3, a coal slurry filtering feeding pump 13, a coal slurry filter 2, a coal slurry collecting tank 4, a high-position coal slurry collecting tank 14, and a coal slurry conveying pump 5. The coal slurry feeding port of the coal slurry filter 2 is connected to the outlet of the coal slurry filtering feeding pump 13 through a pipeline, the inlet of the coal slurry filtering feeding pump 13 is connected to the coal slurry outlet of the coal slurry feeding buffer tank 1 through a pipeline, and the coal slurry discharge port of the coal slurry filter 2 is connected to the coal slurry inlet of the high-pressure coal slurry pump 3 through a pipeline; a flow meter a is arranged on the pipeline connecting the coal slurry feeding port of the coal slurry filter 2 and the outlet of the coal slurry filtering feeding pump 13, and the coal slurry discharge port of the coal slurry filter 2 is connected to the coal slurry inlet of the high-pressure coal slurry pump 3. A flowmeter b is arranged on the pipe connected to the coal slurry inlet of the high-pressure coal slurry pump 3; a coal slurry reflux port is also arranged on the top of the coal slurry filter 2, and the coal slurry reflux port is connected to the top of the coal slurry feed buffer tank 1 through a coal slurry reflux pipe 17, and the coal slurry reflux pipe 17 is set at an elevation of 40m based on the high-pressure coal slurry pump inlet, the purpose of which is to ensure a stable pressure at the inlet of the high-pressure coal slurry pump 3, so as to facilitate the coal slurry to stably enter the high-pressure coal slurry pump 3; the slag discharge port of the coal slurry filter 2 is connected to the inlet of the coal slurry collecting tank 4 and the inlet of the high-position coal slurry collecting tank 14 in two ways through pipes, the outlet of the coal slurry collecting tank 4 is connected to the inlet of the coal slurry delivery pump 5 through a pipe, and the outlet of the coal slurry delivery pump 5 is connected to the rod mill through a pipe, and the high-position coal slurry collection The outlet of the tank 14 is connected to the inlet of the coal slurry collecting tank 4 through a pipeline; a first slag discharge valve 6 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the coal slurry collecting tank 4, a second slag discharge valve 10 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the high-position coal slurry collecting tank 14, and a third slag discharge valve 16 and a coal slurry pump are arranged on the pipeline connecting the outlet of the high-position coal slurry collecting tank 14 and the inlet of the coal slurry collecting tank 4; a driving device c15 arranged on the top of the high-position coal slurry collecting tank 14 is connected to a stirring device a in the high-position coal slurry collecting tank 14; the coal slurry conveying pump 5 and the coal slurry filtration feed pump 13 are centrifugal conveying pumps, and the impellers of the coal slurry conveying pump 5 and the coal slurry filtration feed pump 13 are semi-open impellers.
[0048] The coal slurry filter 2 is composed of an elliptical head, a cylindrical barrel, and a conical barrel connected in sequence from top to bottom. A filter screen mesh 8 perpendicular to the barrel wall of the cylindrical barrel is arranged in the coal slurry filter 2. The aperture of the filter screen mesh 8 is 1 .0㎜, the circumferential edge of the filter screen mesh 8 is sealed and connected to the inner wall of the cylindrical tube, and a screen mesh scraper 9 is arranged close to the bottom of the filter screen mesh 8, and the screen mesh scraper 9 is connected to the driving device a11 on the top of the coal slurry filter 2 by penetrating the filter screen mesh 8 and the rotating shaft a of the elliptical head. A number of stirring blades are arranged on the rotating shaft a, and the coal slurry feed port of the coal slurry filter 2 is arranged on the cylindrical tube wall below the filter screen mesh 8, and the coal slurry feed port is in the tangential direction of the cylindrical tube circumference, and the coal slurry discharge port of the coal slurry filter 2 is arranged on the cylindrical tube wall 10㎝ above the filter screen mesh 8, the slag discharge port of the coal slurry filter 2 is arranged at the lower end of the conical tube of the coal slurry filter 2, and the coal slurry reflux port on the coal slurry filter 2 is arranged on the top of the elliptical head.
[0049] A stirring device b is arranged in the coal slurry collecting tank 4, and the stirring device b is connected to the top driving device b12 of the coal slurry collecting tank 4 through a rotating shaft b. A dilution water outlet is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14 and is connected to the dilution water pipeline 7. A level meter is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14.
[0050] The first slag discharge valve 6, the second slag discharge valve 10, the third slag discharge valve 16, the level meter, the driving device a11, the driving device b12, the driving device c15, the flow meter a, the flow meter b and the coal slurry conveying pump 5, the coal slurry filtering feed pump 13 are all connected to the control system.
[0051] A feeding method using a high-pressure coal slurry pump to prevent clogging of the feeding device is adopted. The coal slurry in the coal slurry feeding buffer tank 1 is pressurized by the coal slurry filtering feed pump 13 and then enters the coal slurry filter 2 from the coal slurry feeding port of the coal slurry filter 2. The coal slurry rotates in the cavity of the coal slurry filter 2 below the filter screen mesh 8. Some large particles and hard precipitates in the coal slurry settle to the bottom of the coal slurry filter 2 after rotation, and the unsettled large particles and hard precipitates are filtered by the filter screen mesh 8. The filtered coal slurry is divided into two parts, one part flows out from the coal slurry reflux port and flows back to the coal slurry feeding buffer tank 1 through the coal slurry reflux pipe 17, and the other part flows into the high-pressure coal slurry pump 3; the large particles and hard precipitates adhering to the filter screen mesh 8 are driven by the driving device a11 to drive the screen plate The mesh scraper 9 scrapes it down and sinks it to the bottom of the coal slurry filter 2. The large particles of coal slurry and hard sediment at the bottom of the coal slurry filter 2 are discharged to the coal slurry collecting tank 4 through the control system to open the first slag discharge valve 6. The coal slurry in the coal slurry collecting tank 4 is sent to the rod mill through the coal slurry delivery pump 5 for re-grinding and slurrying. If the real-time liquid level of the coal slurry collecting tank 4 reaches a high value during the slag discharge process and cannot meet the slag discharge of the coal slurry filter 2, the control system controls the first slag discharge valve 6 to close and the second slag discharge valve 10 to open, and the coal slurry filter 2 discharges slag to the high-level coal slurry collecting tank 14. After the liquid level in the coal slurry collecting tank 4 is lowered, the coal slurry in the high-level coal slurry collecting tank 14 is pumped to the coal slurry collecting tank 4 by the coal slurry pump, and then sent to the rod mill by the coal slurry delivery pump 5.
[0052] The liquid level of the coal slurry collecting tank 4 is set to a high-high value, a high value, a low value, and a low-low value, and the high-high value>high value>low value>low value, preferably the high-high value is 180㎝, the high value is 160㎝, the low value is 40, and the low-low value is 20㎝. The level meter transmits the real-time liquid level of the coal slurry collecting tank 4 to the control system, and the control system compares the real-time liquid level with the high-high value, the high value, the low value, and the low-low value. If the high-high value>real-time liquid level≥high value or the low value≥real-time liquid level>low-low value, the control system sends a high value alarm signal or a low value alarm signal every 4 minutes to remind the technician to adjust the liquid level of the coal slurry collecting tank 4; if the real-time liquid level≥high-high value or the real-time liquid level≤low-low value, the control system sends a high-high value continuous alarm signal or a low-low value continuous alarm signal to remind the technician to adjust the liquid level of the coal slurry collecting tank 4.
[0053] The coal slurry filter 2 is set to automatically control slag discharge, and the automatic control slag discharge sets a slag set time and a slag discharge time. The preferred slag set time is 60 minutes and the slag discharge time is 40 seconds. After the automatic control slag discharge is put into use, the slag set time starts to count down. When the slag set time countdown is zero, the control system controls the first slag discharge valve 6 to open, the coal slurry filter 2 starts to discharge slag, and the slag discharge time starts to count down. When the slag set time countdown is zero, the coal slurry filter 2 stops discharging slag, and the slag set time starts to count down again, and so on. The cycle is repeated periodically. If the real-time liquid level of the coal slurry collecting tank 4 of the coal slurry filter 2 reaches a high value during the slag discharge process, the control system controls the first slag discharge valve 6 to close, and the control system controls the second slag discharge valve 10 to open, the coal slurry filter 2 starts to discharge slag to the high-position coal slurry collecting tank 14, and the slag discharge time continues to count down until the slag discharge time countdown is zero. The control system controls the second slag discharge valve 10 to close, the coal slurry filter 2 stops discharging slag, and the slag set time starts to count down again.
[0054] When the countdown of the sedimentation time is zero, the control system controls the coal slurry filter feed pump 13 to increase the coal slurry flow entering the coal slurry filter 2 by 8m³ / h; when the countdown of the slag discharge time is zero, the coal slurry filter 2 stops discharging slag, and the control system controls the coal slurry filter feed pump 13 to restore the coal slurry flow entering the coal slurry filter 2 to the flow before slag discharge. The slag discharge flow of the coal slurry filter shall not be greater than 4m³ / h.
[0055] The flowmeter a and the flowmeter b are set with low flow interlocking values. When the flow of the flowmeter a or the flowmeter b touches the low flow interlocking value, the gasifier is interlocked and stopped. At the same time, the control system controls the high-pressure coal slurry pump 3 and the coal slurry filter feed pump 13 to stop.
[0056] When the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 are in operation, dilution water is injected into the dilution water inlets on the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 . Example 4
[0057] Reference Figure 2 , Figure 3 and Figure 4In the traditional process design, the coal slurry feed buffer tank 1 is set at a high place with the high-pressure coal slurry pump 3 as the elevation reference, with a certain elevation difference. The bottom of the coal slurry feed buffer tank 1 is directly connected to the inlet of the high-pressure coal slurry pump 3 through a pipeline. This process design allows large particles that have escaped the screen in the coal slurry or long and thin particles that have been screened under the sieve holes, as well as hard precipitates formed in the coal slurry feed buffer tank 1, to directly enter the high-pressure coal slurry pump 3 through the pipeline, causing the inlet check valve or outlet check valve of the high-pressure coal slurry pump 3 with a small gap to get stuck, causing the single cylinder of the high-pressure coal slurry pump 3 to fail to work, the outlet flow of the high-pressure coal slurry pump 3 to decrease, and the high-pressure coal slurry pump 3 to lose its function. In addition, the coal slurry feed buffer tank 1 is set at a high place with a large investment cost. In order to avoid the valve jamming phenomenon of the inlet and outlet check valves of the high-pressure coal slurry pump 3, ensure the coal gasification In order to ensure the safe and stable operation of the furnace and reduce the investment cost, a feeding device for preventing the high-pressure coal slurry pump 3 from being blocked is provided, comprising a coal slurry feeding buffer tank 1, a high-pressure coal slurry pump 3, a coal slurry filtering feeding pump 13, a coal slurry filter 2, a coal slurry collecting tank 4, a high-position coal slurry collecting tank 14, and a coal slurry conveying pump 5. The coal slurry feeding port of the coal slurry filter 2 is connected to the outlet of the coal slurry filtering feeding pump 13 through a pipeline, the inlet of the coal slurry filtering feeding pump 13 is connected to the coal slurry outlet of the coal slurry feeding buffer tank 1 through a pipeline, and the coal slurry discharge port of the coal slurry filter 2 is connected to the coal slurry inlet of the high-pressure coal slurry pump 3 through a pipeline; a flow meter a is arranged on the pipeline connecting the coal slurry feeding port of the coal slurry filter 2 and the outlet of the coal slurry filtering feeding pump 13, and the coal slurry discharge port of the coal slurry filter 2 is connected to the coal slurry inlet of the high-pressure coal slurry pump 3. A flowmeter b is arranged on the pipe connected to the coal slurry inlet of the high-pressure coal slurry pump 3; a coal slurry reflux port is also arranged on the top of the coal slurry filter 2, and the coal slurry reflux port is connected to the top of the coal slurry feed buffer tank 1 through a coal slurry reflux pipe 17, and the coal slurry reflux pipe 17 is set at an elevation of 50m based on the high-pressure coal slurry pump inlet, the purpose of which is to ensure a stable pressure at the inlet of the high-pressure coal slurry pump 3, so as to facilitate the coal slurry to stably enter the high-pressure coal slurry pump 3; the slag discharge port of the coal slurry filter 2 is connected to the inlet of the coal slurry collecting tank 4 and the inlet of the high-position coal slurry collecting tank 14 in two ways through pipes, the outlet of the coal slurry collecting tank 4 is connected to the inlet of the coal slurry delivery pump 5 through a pipe, and the outlet of the coal slurry delivery pump 5 is connected to the rod mill through a pipe, and the high-position coal slurry collection The outlet of the tank 14 is connected to the inlet of the coal slurry collecting tank 4 through a pipeline; a first slag discharge valve 6 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the coal slurry collecting tank 4, a second slag discharge valve 10 is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter 2 and the inlet of the high-position coal slurry collecting tank 14, and a third slag discharge valve 16 and a coal slurry pump are arranged on the pipeline connecting the outlet of the high-position coal slurry collecting tank 14 and the inlet of the coal slurry collecting tank 4; a driving device c15 arranged on the top of the high-position coal slurry collecting tank 14 is connected to a stirring device a in the high-position coal slurry collecting tank 14; the coal slurry conveying pump 5 and the coal slurry filtration feed pump 13 are centrifugal conveying pumps, and the impellers of the coal slurry conveying pump 5 and the coal slurry filtration feed pump 13 are semi-open impellers.
[0058] The coal slurry filter 2 is composed of an elliptical head, a cylindrical barrel, and a conical barrel connected in sequence from top to bottom. A filter screen mesh 8 perpendicular to the barrel wall of the cylindrical barrel is arranged in the coal slurry filter 2. The aperture of the filter screen mesh 8 is 1 .0㎜, the circumferential edge of the filter screen mesh 8 is sealed and connected to the inner wall of the cylindrical tube, and a screen mesh scraper 9 is arranged close to the bottom of the filter screen mesh 8, and the screen mesh scraper 9 is connected to the driving device a11 on the top of the coal slurry filter 2 by penetrating the filter screen mesh 8 and the rotating shaft a of the elliptical head. A number of stirring blades are arranged on the rotating shaft a, and the coal slurry feed port of the coal slurry filter 2 is arranged on the cylindrical tube wall below the filter screen mesh 8, and the coal slurry feed port is in the tangential direction of the cylindrical tube circumference, and the coal slurry discharge port of the coal slurry filter 2 is arranged on the cylindrical tube wall 10㎝ above the filter screen mesh 8, the slag discharge port of the coal slurry filter 2 is arranged at the lower end of the conical tube of the coal slurry filter 2, and the coal slurry reflux port on the coal slurry filter 2 is arranged on the top of the elliptical head.
[0059] A stirring device b is arranged in the coal slurry collecting tank 4, and the stirring device b is connected to the top driving device b12 of the coal slurry collecting tank 4 through a rotating shaft b. A dilution water outlet is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14 and is connected to the dilution water pipeline 7. A level meter is arranged on the top of the coal slurry collecting tank 4 and the top of the high-position coal slurry collecting tank 14.
[0060] The first slag discharge valve 6, the second slag discharge valve 10, the third slag discharge valve 16, the level meter, the driving device a11, the driving device b12, the driving device c15, the flow meter a, the flow meter b and the coal slurry conveying pump 5, the coal slurry filtering feed pump 13 are all connected to the control system.
[0061] A feeding method using a high-pressure coal slurry pump to prevent clogging of the feeding device is adopted. The coal slurry in the coal slurry feeding buffer tank 1 is pressurized by the coal slurry filtering feed pump 13 and then enters the coal slurry filter 2 from the coal slurry feeding port of the coal slurry filter 2. The coal slurry rotates in the cavity of the coal slurry filter 2 below the filter screen mesh 8. Some large particles and hard precipitates in the coal slurry settle to the bottom of the coal slurry filter 2 after rotation, and the unsettled large particles and hard precipitates are filtered by the filter screen mesh 8. The filtered coal slurry is divided into two parts, one part flows out from the coal slurry reflux port and flows back to the coal slurry feeding buffer tank 1 through the coal slurry reflux pipe 17, and the other part flows into the high-pressure coal slurry pump 3; the large particles and hard precipitates adhering to the filter screen mesh 8 are driven by the driving device a11 to drive the screen plate The mesh scraper 9 scrapes it down and sinks it to the bottom of the coal slurry filter 2. The large particles of coal slurry and hard sediment at the bottom of the coal slurry filter 2 are discharged to the coal slurry collecting tank 4 through the control system to open the first slag discharge valve 6. The coal slurry in the coal slurry collecting tank 4 is sent to the rod mill through the coal slurry delivery pump 5 for re-grinding and slurrying. If the real-time liquid level of the coal slurry collecting tank 4 reaches a high value during the slag discharge process and cannot meet the slag discharge of the coal slurry filter 2, the control system controls the first slag discharge valve 6 to close and the second slag discharge valve 10 to open, and the coal slurry filter 2 discharges slag to the high-level coal slurry collecting tank 14. After the liquid level in the coal slurry collecting tank 4 is lowered, the coal slurry in the high-level coal slurry collecting tank 14 is pumped to the coal slurry collecting tank 4 by the coal slurry pump, and then sent to the rod mill by the coal slurry delivery pump 5.
[0062] The liquid level of the coal slurry collecting tank 4 is set to a high-high value, a high value, a low value, and a low-low value, and the high-high value>high value>low value>low value, preferably the high-high value is 180㎝, the high value is 160㎝, the low value is 40, and the low-low value is 20㎝. The level meter transmits the real-time liquid level of the coal slurry collecting tank 4 to the control system, and the control system compares the real-time liquid level with the high-high value, the high value, the low value, and the low-low value. If the high-high value>real-time liquid level≥high value or the low value≥real-time liquid level>low-low value, the control system sends a high value alarm signal or a low value alarm signal every 4 minutes to remind the technician to adjust the liquid level of the coal slurry collecting tank 4; if the real-time liquid level≥high-high value or the real-time liquid level≤low-low value, the control system sends a high-high value continuous alarm signal or a low-low value continuous alarm signal to remind the technician to adjust the liquid level of the coal slurry collecting tank 4.
[0063] The coal slurry filter 2 is set to manually control slag discharge. When the coal slurry filter 2 needs to discharge slag, the technician manually controls the coal slurry filter feed pump 13 to increase the coal slurry flow entering the coal slurry filter 2 by 8m³ / h, and then manually controls to open the first slag discharge valve 6, and the coal slurry filter 2 starts to discharge slag to the coal slurry collecting tank 4. After the coal slurry filter has been discharging slag for a certain period of time, the technician manually controls to close the first slag discharge valve 6, and the coal slurry filter 2 is discharged. If the real-time liquid level of the coal slurry collecting tank 4 reaches a high value during the slag discharge process of the coal slurry filter 2, the control system sends a high value alarm signal, and the technician The personnel manually controls to close the first slag discharge valve 6, manually opens the second slag discharge valve 10, and the coal slurry filter 2 discharges slag to the high-position coal slurry collecting tank 14. After the coal slurry filter 2 discharges slag to the high-position coal slurry collecting tank 14 for a certain period of time, the technician manually closes the second slag discharge valve 10, and the slag discharge of the coal slurry filter 2 is completed; after the slag discharge is completed, the technician manually controls the coal slurry filter feed pump 13 to reduce the coal slurry flow rate entering the coal slurry filter 2 by 8m³ / h, so that the coal slurry flow rate entering the coal slurry filter 2 is restored to the flow rate before slag discharge. The slag discharge flow rate of the coal slurry filter shall not be greater than 3m³ / h.
[0064] The flowmeter a and the flowmeter b are set with low flow interlocking values. When the flow of the flowmeter a or the flowmeter b touches the low flow interlocking value, the gasifier is interlocked and stopped. At the same time, the control system controls the high-pressure coal slurry pump 3 and the coal slurry filter feed pump 13 to stop.
[0065] When the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 are in operation, dilution water is injected into the dilution water inlets on the coal slurry collecting tank 4 and the high-position coal slurry collecting tank 14 .
[0066] Modifications and changes to the present invention made by the inventors familiar with the present invention are all within the patent scope of the present invention and are not limited to the embodiments.
Claims
1. A feeding device for preventing high-pressure coal slurry pump from blocking, comprising a coal slurry feeding buffer tank and a high-pressure coal slurry pump, characterized in that: It also includes a coal slurry filter feed pump, a coal slurry filter, a coal slurry collecting tank, a high-level coal slurry collecting tank, and a coal slurry delivery pump, wherein the coal slurry feed port of the coal slurry filter is connected to the outlet of the coal slurry filter feed pump through a pipeline, the inlet of the coal slurry filter feed pump is connected to the coal slurry outlet of the coal slurry feed buffer tank through a pipeline, and the coal slurry discharge port of the coal slurry filter is connected to the coal slurry inlet of the high-pressure coal slurry pump through a pipeline; a flow meter a is arranged on the pipeline connecting the coal slurry feed port of the coal slurry filter and the outlet of the coal slurry filter feed pump, and a flow meter b is arranged on the pipeline connecting the coal slurry discharge port of the coal slurry filter and the coal slurry inlet of the high-pressure coal slurry pump; a coal slurry reflux port is also arranged on the pipeline connecting the coal slurry discharge port of the coal slurry filter and the coal slurry inlet of the high-pressure coal slurry pump or on the top of the coal slurry filter, and the coal slurry reflux port is connected to the top of the coal slurry feed buffer tank through a coal slurry reflux pipeline, and the coal slurry reflux pipeline is set at 20m ~ 30m with the inlet of the high-pressure coal slurry pump as the elevation reference. The elevation of 50m; the slag discharge port of the coal slurry filter is connected to the inlet of the coal slurry collecting tank and the inlet of the high-position coal slurry collecting tank through two pipelines, the outlet of the coal slurry collecting tank is connected to the inlet of the coal slurry delivery pump through a pipeline, the outlet of the coal slurry delivery pump is connected to the rod mill through a pipeline, and the outlet of the high-position coal slurry collecting tank is connected to the inlet of the coal slurry collecting tank through a pipeline; a first slag discharge valve is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter and the inlet of the coal slurry collecting tank, a second slag discharge valve is arranged on the branch pipeline connecting the slag discharge port of the coal slurry filter and the inlet of the high-position coal slurry collecting tank, a third slag discharge valve is arranged on the pipeline connecting the outlet of the high-position coal slurry collecting tank and the inlet of the coal slurry collecting tank, a driving device c arranged on the top of the high-position coal slurry collecting tank is connected to the stirring device a in the high-position coal slurry collecting tank, the coal slurry delivery pump and the coal slurry filter feed pump are centrifugal delivery pumps, and the impellers of the coal slurry delivery pump and the coal slurry filter feed pump are open impellers or semi-open impellers; The coal slurry filter is composed of an elliptical head, a cylindrical barrel, and a conical barrel connected in sequence from top to bottom. A filter screen mesh perpendicular to the cylindrical barrel wall is arranged in the coal slurry filter. The aperture of the filter screen mesh is 0.8 mm to 1.2 mm. The circumferential edge of the filter screen mesh is sealed and connected to the inner wall of the cylindrical barrel. A screen mesh scraper is arranged close to the bottom of the filter screen mesh. The screen mesh scraper is connected to the driving device a on the top of the coal slurry filter by penetrating the rotating shaft a of the filter screen mesh and the elliptical head. A plurality of stirring blades are arranged on the rotating shaft a. The coal slurry feed port of the coal slurry filter is arranged on the cylindrical barrel wall below the filter screen mesh, and the coal slurry feed port is in the tangential direction of the cylindrical barrel circumference. The coal slurry discharge port of the coal slurry filter is arranged on the cylindrical barrel wall above the filter screen mesh. The slag discharge port of the coal slurry filter is arranged at the lower end of the conical barrel of the coal slurry filter. The coal slurry reflux port on the coal slurry filter is arranged at the top of the elliptical head. A stirring device b is arranged in the coal slurry collecting tank, and the stirring device b is connected to the driving device b at the top of the coal slurry collecting tank through a rotating shaft b. A dilution water port is arranged at the top of the coal slurry collecting tank and the top of the high-position coal slurry collecting tank, and is connected to a dilution water pipeline. A level meter is arranged at the top of the coal slurry collecting tank and the top of the high-position coal slurry collecting tank. The first slag discharge valve, the second slag discharge valve, the third slag discharge valve, the level meter, the drive device a, the drive device b, the drive device c, the flow meter a, the flow meter b and the coal slurry conveying pump and the coal slurry filtering feed pump are all connected to the control system.
2. A feeding method using the feeding device for preventing blocking of a high-pressure coal slurry pump according to claim 1, characterized in that: The coal slurry in the coal slurry feed buffer tank is pressurized by the coal slurry filter feed pump and enters the coal slurry filter from the coal slurry feed port of the coal slurry filter. The coal slurry rotates in the coal slurry filter cavity below the filter screen. Some large particles and hard precipitates in the coal slurry settle to the bottom of the coal slurry filter after rotation. The unsettled large particles and hard precipitates are filtered by the filter screen. The filtered coal slurry is divided into two parts, one part flows out from the coal slurry reflux port and flows back to the coal slurry feed buffer tank through the coal slurry reflux pipe, and the other part flows into the high-pressure coal slurry pump; The large particles and hard sediments adhering to the filter screen plate are scraped down to the bottom of the coal slurry filter by the screen plate scraper driven by the driving device a. The large particles of coal slurry and hard sediments at the bottom of the coal slurry filter are discharged to the coal slurry collecting tank through the control system to open the first slag discharge valve. The coal slurry in the coal slurry collecting tank is sent to the rod mill by the coal slurry conveying pump for re-grinding and slurrying. If the real-time liquid level of the coal slurry collecting tank reaches a high value during the slag discharge process and cannot meet the slag discharge of the coal slurry filter, the control system controls the first slag discharge valve to close and the second slag discharge valve to open, and the coal slurry filter discharges slag to the high-level coal slurry collecting tank. After the liquid level in the coal slurry collecting tank is lowered, the coal slurry in the high-level coal slurry collecting tank flows into the coal slurry collecting tank, and then is sent to the rod mill by the coal slurry conveying pump.
3. The feeding method according to claim 2, characterized in that: The liquid level of the coal slurry collecting tank is set to a high-high value, a high value, a low value, and a low-low value, and the high-high value>high value>low value>low value. The level meter transmits the real-time liquid level of the coal slurry collecting tank to the control system, and the control system compares the real-time liquid level with the high-high value, high value, low value, and low-low value. If the high-high value>real-time liquid level≥high value or the low value≥real-time liquid level>low-low value, the control system sends a high value alarm signal or a low value alarm signal every 3 minutes to 5 minutes; if the real-time liquid level≥high-high value or the real-time liquid level≤low-low value, the control system sends a high-high value continuous alarm signal or a low-low value continuous alarm signal.
4. The feeding method according to claim 2, characterized in that: The coal slurry filter is set with manual control slag discharge and automatic control slag discharge. The automatic control slag discharge sets a slag set time and a slag discharge time. After the automatic control slag discharge is put into use, the slag set time starts to count down. When the slag set time countdown is zero, the control system controls the first slag discharge valve to open, the coal slurry filter starts to discharge slag, and the slag discharge time starts to count down. When the slag set time countdown is zero, the coal slurry filter stops discharging slag, and the slag set time starts to count down again, and so on. If the real-time liquid level of the coal slurry collecting tank of the coal slurry filter reaches a high value during the slag discharge process, the control system controls the first slag discharge valve to close, and the control system controls the second slag discharge valve to open, the coal slurry filter starts to discharge slag to the high-position coal slurry collecting tank, and the slag discharge time continues to count down until the slag discharge time countdown is zero, the control system controls the second slag discharge valve to close, the coal slurry filter stops discharging slag, and the slag set time starts to count down again.
5. The feeding method according to claim 4, characterized in that: When the countdown of the sedimentation time reaches zero, the control system controls the coal slurry filter feed pump to increase the coal slurry flow rate entering the coal slurry filter by 5m³ / h ~ 10m³ / h; after the countdown of the slag discharge time reaches zero, the coal slurry filter stops discharging slag, and the control system controls the coal slurry filter feed pump to restore the coal slurry flow rate entering the coal slurry filter to the flow rate before slag discharge. The slag discharge flow rate of the coal slurry filter shall not be greater than 5m³ / h.
6. The feeding method according to claim 2, characterized in that: The flowmeter a and the flowmeter b are set with low flow interlocking values. When the flow of the flowmeter a or the flowmeter b touches the low flow interlocking value, the gasifier is interlocked and stopped, and at the same time, the control system controls the high-pressure coal slurry pump and the coal slurry filter feed pump to stop.
7. The feeding method according to claim 2, characterized in that: When the coal slurry collecting tank and the high-position coal slurry collecting tank are in operation, dilution water is injected into the dilution water inlets on the coal slurry collecting tank and the high-position coal slurry collecting tank.
Citation Information
Patent Citations
Method for preventing blockage of slurry pump
CN102734233A
Pressurized pneumatic feeding system and pressurized pneumatic feeding method for coal slurry
CN109370661A
Anti-blocking feeding device of high-pressure coal slurry pump
CN216129547U
High pressure wastewater pump system
KR102118685B1