A water resources ecological flow scheduling model
Through the water resource ecological flow scheduling model, the problem of lack of ecological flow scheduling model in the existing technology is solved, and the river ecological flow guarantee and water environment quality recovery under drought conditions is achieved, providing multi-water source scheduling and water environment quality recovery is provided. decision support.
Patent Information
- Application Number
- CN202110989249.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-26
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-08-26
AI Technical Summary
The existing water resource models are mainly concentrated in water environment quality and flood prediction analysis. The lack of ecological flow scheduling models has led to the inability to accurately control the effective water volume and estimate the recovery time and change trends of ecological flow and water environment quality under drought conditions.
Adopt the water resource ecological flow scheduling model, through standardized processing of basin data, constructing spatial topology models, generalization of river channels and lakes, establishing hydrodynamic models, generating water resource scheduling schemes, calculating the ecological flow recovery time and the water environment quality compliance time, providing multiple Water source scheduling function.
It has achieved river ecological flow guarantee under drought conditions and reduced water environment pollution index, provided a data-supported scheduling plan, ensured the recovery time of reservoir water storage and water environment quality, and supported water conservancy and water resource scheduling decisions.
Smart Images

Figure CN113657052B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy, and in particular to a water resource ecological flow scheduling model. Background Art
[0002] At present, water resource models are mainly focused on water environment quality and flood prediction and analysis, and there are relatively few models based on ecological flow scheduling. Ecological flow scheduling in most areas mainly relies on experience, lacks effective data support, cannot accurately control effective water volume, and cannot predict the recovery time and change trend of ecological flow and water environment quality. Summary of the invention
[0003] In view of this, the purpose of the present invention is to provide a water resource ecological flow scheduling model that can be applied to water source scheduling in tributary environments, used to ensure river ecological flow under drought conditions, provide live water circulation, clean water replenishment, and reduce water environment pollution index. The model is supported by data and provides a water resource scheduling plan, which combines the water storage capacity maintenance and multi-water source scheduling functions, calculates the ecological flow recovery time and the water environment quality reaching standard time, and provides decision support for water conservancy and water resource scheduling.
[0004] A water resource ecological flow scheduling model of the present invention, the model establishment steps include:
[0005] Standardize the acquired watershed data and assign values to the relevant parameters of the rivers in the watershed data sink;
[0006] Extract the center line of the river, the midpoint of the reservoir and the location of water conservancy facilities, and use the directionality of water flow to construct a spatial topological model;
[0007] River channel generalization: divide the river channel into sections, with each section of length L, obtain the average flow velocity of each section, and take the average value of the width of each section to establish a two-dimensional river channel generalization grid;
[0008] Lake generalization, naturalizing the water surface to the node, the default node is a zero-dimensional generalized storage point, the water volume regulation balance formula of the storage point is:
[0009]
[0010] Among them, △Q is the water volume at the regulating point, Aj is the water surface area at the regulating point, Zj is the water depth at the regulating point, and t is the time;
[0011] A hydrodynamic model is established based on a two-dimensional generalized river model and a generalized zero-dimensional lake model to obtain the relationship between flow, velocity and time;
[0012] Based on the spatial network dataset and lake generalization model, the spatial network analysis method is used to generate a water resource dispatching plan, which includes the available storage capacity, dispatching flow and dispatching time of each storage point.
[0013] Scheduling simulation, specifying the scheduling water source, using the hydrodynamic model to calculate the arrival time of recharge and the time when water environment pollution reaches the standard.
[0014] Furthermore, the relevant parameters of the river include a spatial range field, a river name, an average river slope, a river length, an average flow rate and an average flow rate.
[0015] Furthermore, the river generalization network includes the river spatial range, river length, river average width and river flow velocity.
[0016] Furthermore, the step of establishing the spatial topological model includes:
[0017] (1) Create a NetworkFeatureDataSet feature set for storing and managing spatial data;
[0018] (2) Import the river centerline, reservoir center point and water conservancy facility points into the NetworkFeatureDataSet feature set to generate a topological map of the watershed;
[0019] (3) Establish a network dataset, set the connectivity of endpoints, and set network direction attributes to complete the establishment of the spatial topology model;
[0020] (4) Check the spatial topology model. If there are isolated lines or surfaces, check the NetworkFeatureDataSet feature set and network data and rebuild the spatial topology model.
[0021] Furthermore, the length L of each river section does not exceed 500 meters.
[0022] The beneficial effects of the present invention are as follows: a water resource ecological flow scheduling model of the present invention is used for spatial operations by constructing a spatial network topological relationship. The reservoir is generalized to facilitate the calculation of the relationship between water storage and water output. The river channel is generalized to calculate the relationship between flow and flow velocity. The hydrodynamic model is used to calculate the relationship between the scheduling water volume and time. Finally, the ecological flow scheduling model is constructed through the integration of data resources and algorithms. It can accurately schedule multiple water resources to ensure the water storage requirements of upstream reservoirs. When a reservoir reaches the minimum water storage capacity, it switches to other water sources. It can calculate the water output of dams, hydropower stations, and river-lake interconnection projects on the waterway, and the operating power of lifting stations. It can model the scheduling operation process and calculate the time for ecological flow recovery and water environment quality recovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present application and should not be regarded as limiting the scope. For those of ordinary skill in the art, other related drawings can be obtained based on these drawings without creative work:
[0024] Figure 1 It is a schematic diagram of the model generation process of the present invention. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0026] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0027] like Figure 1 As shown in the figure: a water resource ecological flow scheduling model of this embodiment, the steps of establishing the model include:
[0028] Step 1: Standardize the watershed data. Standardize the watershed data and digitize or convert the watershed data into a standard GIS file format to facilitate model building and data processing. The watershed data mainly includes river data and water source data.
[0029] Specifically, river data assign values to the spatial range fields, river name, river average slope, river length, average flow velocity, and average flow;
[0030] Water source data are the location data, water surface area and water depth data of lakes / reservoirs, etc.;
[0031] In addition, the location data of water conservancy facilities should also be included;
[0032] Step 2: Establishment of spatial topological model: using the river centerline, reservoir midpoint and water conservancy facility location extracted from the watershed data obtained in step (1), and using the directionality of the water flow in series with the reservoir and water conservancy equipment, a spatial topological model is constructed;
[0033] Specifically include:
[0034] (1) Create a NetworkFeatureDataSet feature set for storing and managing spatial data;
[0035] (2) Import the river centerline, reservoir center point and water conservancy facility points into the NetworkFeatureDataSet feature set to generate a topological map of the watershed;
[0036] (3) Create a network dataset, enter the name of the network dataset Network_ND, set the connectivity of each endpoint, ignore the elevation field, set the Distance attribute to the river length field, and set the network direction attribute to complete the establishment of the spatial topology model;
[0037] (4) Check the spatial topology model. If there are isolated lines or surfaces, they cannot participate in the scheduling calculation and are invalid and unreasonable. It is necessary to check the NetworkFeatureDataSet feature set and network data and rebuild the spatial topology model.
[0038] Step 3: river channel generalization and lake generalization;
[0039] River channel generalization: divide the river channel into sections, with each section of the river channel not exceeding 500 meters in length, obtain the average flow velocity of each section of the river channel, and take the average value of the width of each section of the river channel. The average flow velocity of each section of the river channel is used as the global flow velocity of the section of the river channel, and the average width of each section of the river channel is used as the global width of the section of the river channel to obtain a two-dimensional model of the river channel, thereby establishing a two-dimensional river channel generalization grid;
[0040] Lake generalization, naturalizing the water surface to a node. The default node is a zero-dimensional generalized storage point. The water volume regulation balance formula of the storage point is:
[0041]
[0042] Among them, △Q is the water volume at the regulating storage point, Aj is the water surface area of the regulating storage point, Zj is the water depth at the regulating storage point, and t is time.
[0043] Step 4: Establish a hydrodynamic model based on the two-dimensional river channel generalization model and the generalized lake zero-dimensional model to obtain the relationship between flow, flow velocity and time;
[0044] Specifically, hydrodynamic models can be divided into one-dimensional hydrodynamic models, two-dimensional hydrodynamic models and three-dimensional hydrodynamic models in terms of dimension.
[0045] In urban flood simulation, the one-dimensional model has the advantages of high computational efficiency and less basic data required, but its application scope is relatively limited. It is mainly used to simulate the evolution of floods in urban underground pipe networks, river networks, and streets, but is not suitable for areas such as street intersections and squares.
[0046] The two-dimensional hydrodynamic model is mainly used to simulate areas with obvious two-dimensional flow characteristics, such as street intersections, squares, and lakes. Due to the difficulty in algorithm implementation and the workload of simulation calculations, the three-dimensional hydrodynamic model is rarely used in urban flood simulation.
[0047] From many research results, it can be found that two-dimensional hydrodynamic models are mainly used in urban surface flood simulation. In order to solve the problems of spatial resolution, calculation accuracy, and calculation time that are often encountered when using one-dimensional and two-dimensional models separately, their respective characteristics and advantages are brought into play. According to the needs of water resource scheduling scenarios, a zero-dimensional-two-dimensional coupled hydrodynamic model is established based on a two-dimensional river generalization model and a zero-dimensional reservoir generalization model.
[0048] This model is used in tributaries and drought environments, and does not consider rainfall and runoff. The two-dimensional hydrodynamic model is composed of the vertical average continuity equation and momentum equation. It is assumed that the water pressure is distributed as hydrostatic pressure in the vertical direction, and the fluid properties change little along the water depth. All turbulent shear stress tensor components are superimposed into two components, and the mass conservation equation is:
[0049]
[0050] Momentum equation in the X direction:
[0051]
[0052] Momentum equation in the Y direction:
[0053]
[0054] Wherein, h is the water depth below the reference surface; u and v are the flow velocities in directions X and Y, respectively; t is time; g is the acceleration of gravity; Exx, Exy, Eyx and Eyy are the eddy diffusion coefficients; a is the riverbed elevation; n is the Manning roughness coefficient; is the wind stress coefficient; Va is the wind speed; Ψ is the wind direction; ω is the angular velocity of the earth; is the local dimension. Based on this, the calculation model is constructed, and the output of the model is the relationship between flow rate, flow velocity and time.
[0055] Step 5: Water source scheduling calculation, based on the network topology dataset and the generalized model of the reservoir, using the spatial network analysis method, calculate the reservoirs that can be used as water source replenishment and the available storage capacity, as well as balance the scheduling flow and available scheduling time, and provide the optimal solution for multi-water source scheduling;
[0056] When multiple water sources are dispatched, multiple water sources release water at the same time to ensure maximum reservoir capacity and outflow flow while meeting the ecological flow dispatch requirements.
[0057] The water resources scheduling plan mainly includes the calculation of water output and water output duration under single water source scheduling; the calculation of water output and water output duration of each reservoir under multi-water source scheduling, and provides the changing relationship between reservoir capacity, water output and time.
[0058] Step 6: Scheduling simulation, specify the scheduling water source, and use the hydrodynamic model to calculate the arrival time of ecological flow replenishment and the time when water environment pollution indicators reach the standard.
[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A water resource ecological flow scheduling model, characterized by: The model building steps include: Standardize the acquired watershed data and assign values to the relevant parameters of the rivers in the watershed data sink; Extract the center line of the river, the midpoint of the reservoir and the location of water conservancy facilities, and use the directionality of water flow to construct a spatial topological model; The steps of establishing the spatial topological model include: (1) Create a NetworkFeatureDataSet feature set for storing and managing spatial data; (2) Import the river centerline, reservoir center point and water conservancy facility points into the NetworkFeatureDataSet feature set to generate a topological map of the watershed; (3) Establish a network dataset, set the connectivity of endpoints, and set network direction attributes to complete the establishment of the spatial topology model; (4) Check the spatial topology model. If there are isolated lines or surfaces, check the NetworkFeatureDataSet feature set and network data, and rebuild the spatial topology model. River channel generalization: divide the river channel into sections, with each section of length L, obtain the average flow velocity of each section, and take the average value of the width of each section to establish a two-dimensional river channel generalization grid; Lake generalization, naturalizing the water surface to the node, the default node is a zero-dimensional generalized storage point, the water volume regulation balance formula of the storage point is: Among them, △Q is the water volume at the regulating point, Aj is the water surface area at the regulating point, Zj is the water depth at the regulating point, and t is the time; A hydrodynamic model is established based on a two-dimensional generalized river model and a generalized zero-dimensional lake model to obtain the relationship between flow, velocity and time; Based on the spatial network dataset and lake generalization model, the spatial network analysis method is used to generate a water resource dispatching plan, which includes the available storage capacity, dispatching flow and dispatching time of each storage point. Scheduling simulation, specifying the scheduling water source, using the hydrodynamic model to calculate the arrival time of recharge and the time when water environment pollution reaches the standard.
2. A water resource ecological flow scheduling model according to claim 1, characterized in that: The relevant parameters of the river include spatial range field, river name, average river slope, river length, average flow rate and average flow.
3. A water resource ecological flow scheduling model according to claim 1, characterized in that: The river channel generalization network includes the river channel spatial range, river channel length, river channel average width and river channel flow velocity.
4. A water resource ecological flow scheduling model according to claim 1, characterized in that: The length L of each river section shall not exceed 500 meters.
Citation Information
Patent Citations
Coupling method of 1D and 2D hydrodynamic models based on spatial topology
AU2020101587A4
A one-two-dimensional hydrodynamic coupling method based on spatial topology
CN109284531A