A pre-assembled box-type casting formwork

By using pre-assembled box-type casting formwork, the problem of difficult formwork erection for irregular structures was solved, enabling an efficient and safe casting process, avoiding high-altitude operations, and improving construction accuracy and efficiency.

CN113685020BActive Publication Date: 2024-11-01CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111025837.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-02
Publication Date
2024-11-01
Estimated Expiration
2041-09-02

AI Technical Summary

Technical Problem

In current building construction, it is difficult to erect formwork for irregular structures, which is prone to misalignment and gaps in splicing, resulting in low construction efficiency and safety hazards.

Method used

Pre-assembled box-type casting formwork is adopted, which consists of bottom formwork and side formwork to form a box structure. It is fixed to the casting position by hoisting to avoid high-altitude work. The accuracy and stability of the formwork are improved by using uprights, diagonal braces and counter bracing structures.

Benefits of technology

It improved the convenience and accuracy of formwork erection, reduced construction costs, eliminated safety hazards, and achieved rapid and precise pouring results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113685020B_ABST
    Figure CN113685020B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building construction technology, and specifically to a preassembled box-type casting formwork, including a bottom formwork and a plurality of side formworks arranged at the edge of the bottom formwork, the side formworks enclose a closed side wall structure at the edge of the bottom formwork, and the side formworks and the bottom formwork form a box structure with an upper opening; a bottom frame fitted to the bottom formwork is arranged in the box structure, and a vertical frame longitudinally fitted to the side formwork is also arranged; a bracing structure is arranged between the relative vertical frames for tight support, and an oblique bracing structure is arranged between the vertical frame and the bottom frame for tight support. The present invention arranges a preassembled box structure, and then hoists and fixes the box structure at a set position, and after pouring, a reserved sump, elevator shaft and other structures are formed; the convenience and efficiency of template erection are greatly improved, and the accuracy of template erection is also improved, so that the structure after casting is more accurate and meets the design requirements; it avoids high-altitude operations for personnel and eliminates safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a preassembled box-type casting template. Background Art

[0002] At present, the domestic construction industry is developing rapidly, and large-scale buildings are also constantly innovating with people's needs. They must not only meet the rapid development of information technology, but also keep up with the rapid development of economic globalization. At present, construction is generally carried out efficiently by setting up steel cages and pouring on-site with formwork, which has shown good results for large-area and large-span construction. However, when carrying out complex structural construction in some comprehensive parts, it is difficult to accurately set the formwork structure. The set formwork structure is prone to misalignment, splicing leaks, etc., and it is difficult and inefficient to set up special structure formwork on site, which increases the overall cost of the project; it even requires staff to perform high-altitude operations, which poses a safety hazard.

[0003] Therefore, the existing on-site special-shaped structure casting process needs to be improved urgently. It is necessary to optimize and improve the construction process, improve the efficiency of the template erection at the construction site, reduce the construction cost, and avoid dangerous operations during the construction process to ensure the safety of personnel. Therefore, it is necessary to propose a more reasonable technical solution to solve the shortcomings of the existing technology. Summary of the invention

[0004] In order to solve the defects of the prior art mentioned above, the present invention provides a preassembled box-type casting formwork, which is assembled in advance by setting a bottom formwork and a side formwork to enclose a box-type structure, and then is lifted and moved to the position where casting is required and fixed. This not only greatly improves the accuracy of the formwork setting, but also improves the efficiency of assembly, avoids high-altitude operations for personnel, and eliminates safety hazards.

[0005] In order to achieve the above object, the technical solution specifically adopted by the present invention is:

[0006] A preassembled box-type casting formwork comprises a bottom formwork and a plurality of side formworks arranged at the edge of the bottom formwork, wherein the side formworks form a closed side wall structure at the edge of the bottom formwork, and the side formworks and the bottom formwork form a box structure with an upper opening; a bottom frame fitted to the bottom formwork is arranged in the box structure, and a vertical frame longitudinally fitted to the side formwork is also arranged; a supporting structure is arranged between the opposite vertical frames for tight support, and an oblique supporting structure is arranged between the vertical frame and the bottom frame for tight support.

[0007] The shape of the box structure of the above-disclosed assembled box casting template is the shape of the space that needs to be reserved before casting, and it is formed after the casting is completed and the template is removed. For some structures such as sump pits and elevator shafts, quick and accurate casting construction can be carried out. Due to the use of pre-assembly, the inconvenience of setting up the template in a narrow space is avoided; it can also make the template setting more accurate, and avoid the need for personnel to set up the template at high altitude, eliminating safety hazards.

[0008] Furthermore, in the present invention, the bottom template is used to fix and connect the side templates. The bottom template sets its own situation according to the structure reserved for the required casting. The structure of the bottom template is not limited to a single one. Here, it is optimized and one of the feasible options is given: the bottom template is a polygonal plate, and the upper surface of the bottom template is provided with a splicing direction connecting strip extending along the edge. When such a scheme is adopted, the bottom template can be set to a variety of structures such as triangle, quadrilateral, pentagon, etc. according to the shape of the actual casting structure; the height of the side template can also be set according to the required casting depth.

[0009] Furthermore, the splicing direction connecting strip is used to fix the side template to the bottom template. The structure of the splicing direction connecting strip in the present invention is not limited to a single one. A plurality of feasible structures can be adopted and selected from them. Here, optimization is performed and one feasible option is given: the splicing direction connecting strip is made of wooden material. When such a scheme is adopted, the splicing direction connecting strip can be constructed as a square wooden strip, and the two vertical adjacent surfaces of the square wooden strip are used to fit the bottom template and the side template respectively, so as to realize the vertical connection between the side template and the bottom template; when the side template and the bottom template are connected at an angle, two adjacent surfaces of the splicing direction connecting strip can also be set as inclined surfaces, and the inclined connection can be realized after the bottom template and the side template are fitted respectively.

[0010] Furthermore, when the side template is connected to the bottom template, the side template is connected and fixed to the splicing direction connecting strip. Specifically, an optimization setting is performed here: the lower edge of the side template is connected and fixed to the splicing direction connecting strip. When such a solution is adopted, the splicing direction connecting strip is fixed to the upper surface of the bottom template, and a certain distance is reserved from the edge of the bottom template. The distance is equal to the thickness of the side template or the width of the splicing surface of the side template. When the side template is connected to the bottom template, the inner side surface of the side template is in contact with the splicing direction connecting strip, and the outer side edge of the side template is flush with the edge of the bottom template.

[0011] Furthermore, in the process of splicing the side formwork, the edges of the side formwork are closely spliced ​​to improve the surface effect of the pouring. Specifically, an optimization is made here and one of the feasible options is given: the side edges of adjacent side formworks are spliced ​​together, and a reinforcing strip is provided on the inner side of the splicing, and the reinforcing strip includes a bonding surface that is respectively bonded to the two side formworks. When such a solution is adopted, the reinforcing strip can be made of wooden material, and according to the different angles between the two adjacent side formworks, the two bonding surfaces of the reinforcing strip can be adjusted and set accordingly, so that the two adjacent side formworks can maintain a precise angle after splicing.

[0012] Furthermore, in order to further improve the connection stability between adjacent side templates, an optimization is made here and one of the feasible options is given: a triangular reinforcement is provided on the upper part of the adjacent side templates. When such a solution is adopted, the adjacent two sides of the triangular reinforcement are respectively attached to the two side templates and connected and fastened, and the other side of the triangular reinforcement provides inclined support. The triangular reinforcement can be set as a triangular plate or a triangular frame.

[0013] Furthermore, in order to improve the relative stability of adjacent side templates, a stabilizing structure is further provided to make the templates more stable after splicing. There are many methods and they are not limited to the only one. Here, we optimize and give one feasible option: a horizontal stabilizing bar is provided between adjacent side templates, and the two ends of the horizontal stabilizing bar are respectively connected and fixed to a side template. When such a solution is adopted, the horizontal stabilizing bar and the two adjacent side templates together form a triangular stabilizing structure.

[0014] Furthermore, in order to prevent the side formwork from being deformed by force during the pouring process, the present invention provides positive support for the side formwork. The specific structure is not limited to a single one, and a variety of feasible options can be adopted. Here, optimization is performed and one of the feasible options is cited: the support structure includes a horizontally arranged support rod, and the two ends of the support rod are respectively connected and fixed to a stand. When such a solution is adopted, there are a number of support rods, which are distributed in multiple places from top to bottom in the box structure, and the support points are evenly spaced on the side formwork, so that the side formwork is evenly stressed.

[0015] Furthermore, the present invention also uses a diagonal brace structure to reinforce the connection between the side formwork and the bottom formwork. The diagonal brace structure is not limited to the only one. Here, the optimization is made and the following feasible option is given: the diagonal brace structure includes a diagonal brace rod arranged obliquely, and the two ends of the diagonal brace rod are respectively connected and fixed to the vertical frame and the bottom frame. When such a solution is adopted, the diagonal brace rod is inclined at 45 degrees, the lower end is connected to the bottom frame, and the upper end is connected to the vertical frame.

[0016] Furthermore, in order to facilitate hoisting, the present invention optimizes the box structure, and provides the following feasible options: including a hoisting structure, and the hoisting structure is arranged on the stand. When such a solution is adopted, the hoisting structure includes a lifting ring, the number of the lifting rings is at least three, and the lifting rings are arranged on the stand at positions that are convenient for force bearing and balance.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] The present invention provides a preassembled box structure, and then hoist and fix the box structure at a set position, and after pouring, a reserved sump, elevator shaft and other structures are formed; the convenience and efficiency of template erection are greatly improved, and the accuracy of template erection is also improved, so that the structure after pouring is more accurate and meets the design requirements; it avoids high-altitude operations for personnel and eliminates safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only represent some embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0020] Figure 1 This is a schematic diagram of the front view structure of the bottom template.

[0021] Figure 2 It is a schematic diagram of the front view structure of the side formwork.

[0022] Figure 3 Schematic diagram of the internal structure of the box structure.

[0023] Figure 4 It is a schematic diagram of the top view of the box structure.

[0024] In the above drawings, the meanings of the various marks are: 1. bottom template; 2. splicing direction connecting strip; 3. base frame; 4. side template; 5. vertical frame; 6. diagonal bracing structure; 7. bracing structure; 8. horizontal stabilizer bar; 9. triangular reinforcement; 10. lifting structure. DETAILED DESCRIPTION

[0025] The present invention will be further explained below in conjunction with the accompanying drawings and specific embodiments.

[0026] It should be noted that the description of these embodiments is intended to help understand the present invention, but does not constitute a limitation of the present invention. The specific structures and functional details disclosed herein are only intended to describe exemplary embodiments of the present invention. However, the present invention can be embodied in a number of alternative forms, and should not be construed as being limited to the embodiments set forth herein.

[0027] Example

[0028] The existing casting formwork is erected and fixed one by one, which makes it difficult to erect the formwork when casting special-shaped structural surfaces. In addition, the accuracy of erecting the formwork in a narrow space is not high, which affects the effect of the casting construction. There are also safety hazards when personnel are required to work at high altitudes. This embodiment is optimized to solve the problems in the prior art.

[0029] Specifically, Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, this embodiment provides a preassembled box-type casting formwork, including a bottom formwork 1 and a plurality of side formworks 4 arranged at the edge of the bottom formwork 1, the side formworks 4 forming a closed side wall structure at the edge of the bottom formwork 1, and the side formworks 4 and the bottom formwork 1 forming a box structure with an upper opening; a bottom frame 3 fitted to the bottom formwork 1 is arranged in the box structure, and a vertical frame 5 longitudinally fitted to the side formwork 4 is also arranged; a supporting structure 7 is arranged between the opposite vertical frames 5 for tight support, and a diagonal supporting structure 6 is arranged between the vertical frame 5 and the bottom frame 3 for tight support.

[0030] The shape of the box structure of the above-disclosed assembled box casting template is the shape of the space that needs to be reserved before casting, and it is formed after the casting is completed and the template is removed. For some structures such as sump pits and elevator shafts, quick and accurate casting construction can be carried out. Due to the use of pre-assembly, the inconvenience of setting up the template in a narrow space is avoided; it can also make the template setting more accurate, and avoid the need for personnel to set up the template at high altitude, eliminating safety hazards.

[0031] In this embodiment, the bottom template 1 is used to fix and connect the side template 4. The bottom template 1 sets its own situation according to the structure reserved for the required casting. The structure of the bottom template 1 is not limited to a single one. This embodiment optimizes and adopts one of the feasible options: the bottom template 1 is a polygonal plate, and the upper surface of the bottom template 1 is provided with a splicing direction connecting strip 2 extending along the edge. When such a scheme is adopted, the bottom template 1 can be set according to the shape of the actual casting structure, and various structures such as triangle, quadrilateral, pentagon, etc. can be set; the height of the side template 4 can also be set according to the required casting depth.

[0032] In some embodiments, the splicing connecting strip 2 may also be an angle steel strip, which can be reused and reduce material loss.

[0033] The splicing direction connecting strip 2 is used to fix the side template 4 to the bottom template 1. In this embodiment, the structure of the splicing direction connecting strip 2 is not limited to a single one. Multiple feasible structures can be adopted and selected from them. This embodiment is optimized and one of the feasible options is adopted: the splicing direction connecting strip 2 is made of wooden material. When such a scheme is adopted, the splicing direction connecting strip 2 can be constructed as a square wooden strip, and the two vertical adjacent surfaces of the square wooden strip are used to fit the bottom template 1 and the side template 4 respectively, so as to realize the vertical connection between the side template 4 and the bottom template 1; when the side template 4 is connected to the bottom template 1 at an angle, two adjacent surfaces of the splicing direction connecting strip 2 can also be set as inclined surfaces, and the inclined connection can be realized after the bottom template 1 and the side template 4 are fitted respectively.

[0034] When the side template 4 is connected to the bottom template 1, the side template 4 is connected and fixed to the splicing direction connecting strip 2. Specifically, this embodiment is optimized: the lower edge of the side template 4 is connected and fixed to the splicing direction connecting strip 2. When such a solution is adopted, the splicing direction connecting strip 2 is fixed to the upper surface of the bottom template 1, and a certain distance is reserved from the edge of the bottom template 1. The distance is equal to the thickness of the side template 4 or the width of the splicing surface of the side template 4. When the side template 4 is connected to the bottom template 1, the inner side surface of the side template 4 is in contact with the splicing direction connecting strip 2, and the outer side edge of the side template 4 is flush with the edge of the bottom template 1.

[0035] In the process of splicing the side formwork 4, the edges of the side formwork 4 are closely spliced, which can improve the surface effect of pouring. Specifically, this embodiment is optimized and adopts one of the feasible options: the side edges of adjacent side formworks 4 are spliced, and a reinforcing strip is provided on the inner side of the splicing, and the reinforcing strip includes affixed surfaces respectively affixed to the two side formworks 4. When such a solution is adopted, the reinforcing strip can be made of wooden material, and according to the different angles between the two adjacent side formworks 4, the two affixed surfaces of the reinforcing strip can be adjusted and set accordingly, so that the two adjacent side formworks 4 can maintain a precise angle after splicing.

[0036] Preferably, in this embodiment, the reinforcing strips are made of wooden strips, which are connected and fixed to the side formwork 4 in the longitudinal direction by bolts or nails.

[0037] In order to further improve the connection stability between adjacent side formworks 4, this embodiment is optimized and adopts one of the feasible options: a triangular reinforcement member 9 is provided on the upper part of the adjacent side formworks 4. When such a solution is adopted, the adjacent two sides of the triangular reinforcement member 9 are respectively attached to the two side formworks 4 and connected and fastened, and the other side of the triangular reinforcement member 9 provides inclined support. The triangular reinforcement member 9 can be set as a triangular plate or a triangular frame.

[0038] Preferably, the triangular reinforcement member 9 used in this embodiment is in the shape of a triangular plate, and the triangular plate is an isosceles triangular plate. At the same time, it is also possible to consider using a wooden board to make the triangular plate.

[0039] In some other embodiments, a triangular frame may be made of metal rods, and the side formwork 4 may be stably supported by the metal triangular frame.

[0040] Similarly, in order to improve the relative stability of adjacent side templates 4, a stabilizing structure is further provided to make the templates more stable after splicing. There are many methods and they are not limited to the only one. In this embodiment, optimization is performed and one feasible option is adopted: a horizontal stabilizing rod 8 is provided between adjacent side templates 4, and both ends of the horizontal stabilizing rod 8 are respectively connected and fixed to one side template 4. When such a solution is adopted, the horizontal stabilizing rod 8 and the two adjacent side templates 4 together form a triangular stabilizing structure.

[0041] Preferably, in this embodiment, wooden strips are used as the horizontal stabilizing rods 8 .

[0042] In this embodiment, in order to prevent the side formwork 4 from being deformed by force during the pouring process, the side formwork 4 is supported in a positive direction. The specific structure is not limited to a single one, and multiple feasible options can be adopted. This embodiment is optimized and adopts one of the feasible options: the supporting structure 7 includes a horizontally arranged supporting rod, and the two ends of the supporting rod are respectively connected and fixed to a stand 5. When such a scheme is adopted, there are a number of supporting rods, which are distributed in multiple places from top to bottom in the box structure, and the supporting points are evenly spaced on the side formwork 4, so that the side formwork 4 is evenly stressed.

[0043] In this embodiment, the connection between the side formwork 4 and the bottom formwork 1 is reinforced by a diagonal bracing structure 6. The diagonal bracing structure 6 is not limited to the only one. This embodiment is optimized and adopts the following feasible option: the diagonal bracing structure 6 includes an obliquely arranged diagonal bracing rod, and the two ends of the diagonal bracing rod are respectively connected and fixed to the vertical frame 5 and the bottom frame 3. When such a solution is adopted, the diagonal bracing rod is inclined at 45 degrees, the lower end is connected and arranged on the bottom frame 3, and the upper end is connected and arranged on the vertical frame 5.

[0044] Preferably, in this embodiment, wooden strips are used as diagonal bracing rods.

[0045] In order to facilitate hoisting, this embodiment optimizes the box structure and adopts the following feasible option: including a hoisting structure 10, which is arranged on the stand 5. When such a solution is adopted, the hoisting structure 10 includes three lifting rings, which are correspondingly arranged on the stand 5 at positions that are convenient for force bearing and balance. In some other embodiments, the number of lifting rings can be set as needed. For example, when the box structure is a pentagon, five lifting rings can be set, and one lifting ring is set above each side template 4.

[0046] In addition, the hanging structure 10 may also adopt structures such as hooks, rather than being limited to hanging rings.

[0047] The above are the implementation methods listed in this embodiment, but this embodiment is not limited to the above optional implementation methods. Those skilled in the art can arbitrarily combine the above methods to obtain other various implementation methods. Anyone can derive other various forms of implementation methods under the inspiration of this embodiment. The above specific implementation methods should not be understood as limiting the scope of protection of this embodiment. The scope of protection of this embodiment shall be based on the definition in the claims, and the description can be used to interpret the claims.

Claims

1. A pre-assembled box-type casting formwork, characterized in that: The invention comprises a bottom template (1) and a plurality of side templates (4) arranged at the edge of the bottom template (1), wherein the side templates (4) are surrounded by the edge of the bottom template (1) to form a closed side wall structure, and the side templates (4) and the bottom template (1) form a box structure with an upper opening; a bottom frame (3) fitted to the bottom template (1) is arranged in the box structure, and a vertical frame (5) longitudinally fitted to the side template (4) is also arranged; a supporting structure (7) is arranged between the vertical frames (5) facing each other for tight support, and an oblique supporting structure (6) is arranged between the vertical frame (5) and the bottom frame (3) for tight support; The bottom template (1) is a polygonal plate, and a connecting strip (2) is provided on the upper surface of the bottom template (1) along the edge thereof; The splicing connecting strip (2) is made of wooden material; The lower edge of the side template (4) is connected and fixed to the splicing connecting strip (2); The side edges of adjacent side templates (4) are spliced ​​together, and a reinforcing strip is provided on the inner side of the spliced ​​together side edges, wherein the reinforcing strip comprises affixed surfaces respectively affixed to the two side templates (4); A triangular reinforcement member (9) is provided on the upper portion of the adjacent side formwork (4); A horizontal stabilizing rod (8) is provided between adjacent side formworks (4), and both ends of the horizontal stabilizing rod (8) are respectively connected and fixed to one side formwork (4); The supporting structure (7) comprises a horizontally arranged supporting rod, and both ends of the supporting rod are respectively connected and fixed to a vertical frame (5); The diagonal bracing structure (6) comprises a diagonal bracing rod arranged obliquely, and two ends of the diagonal bracing rod are respectively connected and fixed to the vertical frame (5) and the bottom frame (3); It comprises a hanging structure (10), wherein the hanging structure (10) is arranged on the stand (5).