Prediction Method of Tunnel Ground Settlement
By introducing the settlement velocity coefficient C and the three-dimensional mirroring method, combined with soil quality and construction parameters, the problem of difficulty in accurately predicting the velocity and amount of stratum settlement caused by tunnel excavation was solved, and accurate prediction and assessment of stratum settlement was achieved.
Patent Information
- Application Number
- CN202110943194.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-17
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-08-17
AI Technical Summary
It is difficult to accurately predict the ground settlement velocity and amount caused by tunnel excavation with existing technology, resulting in inaccurate assessment of tilt and cracking of surface buildings.
The settlement velocity coefficient C is introduced, combined with the three-dimensional mirror method and random medium theory, and by analyzing soil quality and construction parameters such as permeability coefficient, compression coefficient, excavation speed, etc., a calculation formula is proposed to quantitatively consider the influence of formation settlement velocity and settlement amount.
It achieves accurate prediction of tunnel formation settlement speed and amount, can reflect the time effect of formation settlement under different soil quality and construction conditions, and improves the accuracy and reliability of prediction.
Smart Images

Figure CN113705870B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a tunnel stratum settlement, in particular to a tunnel stratum settlement prediction method. Background Art
[0002] The ground deformation induced by subway tunnel construction is mainly manifested as surface settlement. Uneven ground settlement is the main reason for the tilt and cracking of surface buildings (structures), so ground settlement is an important indicator for evaluating the impact of tunnel excavation on the surrounding environment.
[0003] There are generally several methods for studying ground deformation caused by tunnel excavation: empirical method, numerical simulation method and analytical method, and the analytical method is commonly used. The analytical method based on strict mathematical derivation can quantitatively consider the influence of geological parameters and geometric parameters, and is a practical method for predicting surface deformation caused by tunnel construction; however, the ground settlement obtained from the current research on ground deformation caused by tunnel excavation is the final ground settlement value, which cannot accurately predict the influence of ground settlement speed and settlement amount. Summary of the invention
[0004] In order to solve the above problems, the present invention provides a method for predicting tunnel stratum settlement, which can accurately reflect the influence of different soil conditions and construction conditions on stratum settlement speed and settlement amount. The specific technical solution is as follows:
[0005] The prediction method of tunnel stratum settlement includes evaluating the settlement rate of tunnel stratum based on the consolidation of the stratum and the construction parameters of the tunnel excavation.
[0006] Preferably, the consolidation of the stratum includes permeability coefficient, compression coefficient, void ratio and drainage distance of the soil.
[0007] Preferably, the construction parameters include ground settlement and ground loss rate, excavation speed, and tunnel burial depth.
[0008] Furthermore, the calculation method of the sedimentation velocity is:
[0009]
[0010] Where:
[0011] h is the tunnel depth;
[0012] r is the tunnel excavation radius;
[0013] v is the tunneling speed;
[0014] t is the time before and after the tunnel passes through the calculation section;
[0015] c y is the vertical consolidation coefficient of soil;
[0016] α and β are coefficients, and their values can be determined through monitoring measurement results or experience;
[0017] d is the mileage of the excavation surface, t is the time to pass through the excavation section, d = vt;
[0018] d0 is the mileage of the monitoring section, t0 is the time of passing through the monitoring section, d0=vt0.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] The method for predicting tunnel stratum settlement provided by the present invention introduces the settlement velocity coefficient C into the three-dimensional mirror method, and proposes a calculation formula that can quantitatively consider the construction and geological conditions and the geometric parameters of the tunnel section. By using this method, the calculation parameters are analyzed to obtain the influence of different soil conditions and construction conditions on the stratum settlement velocity and settlement amount. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the initial state of soil displacement caused by a unit hole;
[0022] Figure 2 It is a schematic diagram of the moment when the void is generated when the unit hole causes soil displacement;
[0023] Figure 3 It is a schematic diagram of the displacement process of soil caused by a unit hole;
[0024] Figure 4 It is a schematic diagram of the displacement completion of the soil displacement caused by the unit hole;
[0025] Figure 5 is a schematic diagram of the gap coordinates;
[0026] Figure 6 It is a schematic diagram of tunnel excavation;
[0027] Figure 7 It is a time history curve of stratum subsidence;
[0028] Figure 8 It is a graph of the stratum settlement trough;
[0029] Fig. 9 It is the vertical settlement curve of the stratum;
[0030] Fig.10 It is the relationship between the downtime and the maximum slope of the vertical settlement of the stratum;
[0031] Fig.11 It is a curve diagram showing the effect of tunnel excavation speed on ground settlement speed;
[0032] Fig.12 It is a graph of the relationship between tunnel excavation speed and maximum surface settlement speed;
[0033] Fig.13 It is a curve chart showing the effect of tunnel excavation speed on ground settlement;
[0034] Fig.14 It is a curve diagram showing the influence of the sedimentation velocity coefficient on the sedimentation velocity of the formation;
[0035] Fig.15 is a graph of the relationship between the sedimentation velocity coefficient and the maximum sedimentation velocity at the surface;
[0036] Fig.16 It is a curve diagram showing the influence of the sedimentation velocity system on the sedimentation amount of the formation;
[0037] Fig.17 It is a curve diagram showing the effect of formation loss on formation settlement velocity;
[0038] Fig.18 It is a curve diagram showing the effect of formation loss on formation settlement;
[0039] Fig.19 It is a graph showing the relationship between the formation loss rate, the maximum surface settlement velocity, and the maximum formation settlement amount. DETAILED DESCRIPTION
[0040] The present invention will be further described with reference to the accompanying drawings.
[0041] The ground settlements obtained from the current studies on ground deformation caused by tunnel excavation are all final ground settlement values. However, in reality, the final settlement values are affected by many factors, so the accuracy of the final ground settlement values obtained is not high.
[0042] In view of the above situation, the embodiment of the present application introduces the settlement velocity coefficient C into the three-dimensional mirror method, and proposes a calculation formula that can quantitatively consider the construction and geological conditions and the geometric parameters of the tunnel section. By using this method to analyze the calculation parameters, the influence of different soil conditions and construction conditions on the settlement velocity and settlement amount of the formation is obtained, which can reflect the change process of the formation settlement over time and obtain the change law of the formation settlement velocity over time.
[0043] The prediction method of tunnel stratum settlement includes evaluating the settlement rate of tunnel stratum based on the consolidation of the stratum and the construction parameters of the tunnel excavation.
[0044] The consolidation of the stratum includes the permeability, compressibility, void ratio and drainage distance of the soil.
[0045] Construction parameters include ground settlement and ground loss rate, excavation speed, and tunnel burial depth.
[0046] Calculation method of sedimentation velocity:
[0047]
[0048] In the formula:
[0049] h is the buried depth of the tunnel;
[0050] r is the excavation radius of the tunnel;
[0051] v is the tunneling speed of the tunnel;
[0052] t is the time before and after the tunnel passes through the calculated cross-section;
[0053] c y is the vertical consolidation coefficient of the soil;
[0054] α and β are coefficients, and their values can be determined by the results of monitoring measurements or experience;
[0055] d is the mileage of the excavation face, t is the time to pass through the excavation cross-section, d = vt;
[0056] d0 is the mileage of the monitoring cross-section, t0 is the time to pass through the monitoring cross-section, d0 = vt0.
[0057] The soil displacement caused by a unit cavity is divided into four processes, and the settlement velocity coefficient is introduced into the three-dimensional mirror method to obtain a calculation formula considering the time effect of ground settlement.
[0058] The time process of the soil displacement caused by a unit cavity is divided into 4 stages. Assume that there is a spherical void with a radius of a in an infinite body, and its time process of causing soil displacement is as Figure 1 shown. As Figure 1 shown, the first stage: the initial state, at this time the void has not been generated, the soil has not generated displacement, and it is in a static state. As Figure 2 shown, the second stage: the moment when the void is generated, the moment when the spherical void with a radius of a is generated is defined as the 0 moment, that is, t = 0. At this time, the surrounding soil has not generated displacement. As Figure 3 shown, the third stage: the displacement development stage, the time period experienced by the whole process is 0 < t < ∞. At this time, the volume of the spherical void gradually compresses and decreases, the soil displacement is transmitted from the inside to the outside, and the soil at a distance of r from the center of the void sphere gradually moves towards the center of the sphere. As Figure 4 shown, the fourth stage: the displacement completion stage. At this time, t = ∞. The volume of the spherical void is filled with soil, and the displacement is completed.
[0059] From a spatial perspective, in an infinite body, based on the assumption that the soil is incompressible, the displacement of a point P caused by a spherical void is only related to the distance from point P to the center of the void. When the distance r from the center is the same, the displacement is also the same, that is, the displacement of any point on the spherical surface with the center of the void O as the center is the same. We call this spherical surface an equal-displacement sphere, and the final contracted volume of the equal-displacement sphere is equal to the volume of the spherical void. From the perspective of displacement direction, the displacement direction of a point P is always toward the center of the void.
[0060] It is assumed that the volume of the unit subsidence basin should be a function of time, and that the volume growth rate of the unit subsidence basin is proportional to the difference between the final volume of the unit subsidence basin and the volume of the unit subsidence basin at that time. Based on the similarities in basic assumptions and application methods between the three-dimensional mirror method and the random medium theory, the following assumptions are made: Assume that the rate of change of the volume of a certain displacement sphere in an infinite body caused by a unit volume void at time t is proportional to the difference between the final volume change and the volume change of the soil at time t, that is:
[0061] dV(t) / dt=C[V0-V(t)] (1)
[0062] Where: t is time; V0 is the void volume; V(t) is the soil volume change; C is the settlement velocity coefficient, which reflects both the time process of the surrounding rock and soil moving to the excavation space after the excavation of the unit rock and soil, and the time process of the rock and soil movement and deformation transmitting to the surface. It is a comprehensive time parameter reflecting the deformation of the stratum after the excavation of the unit soil.
[0063] According to the initial conditions, the relationship between the sinking volume and time can be obtained. According to the initial conditions, when t=0, V(0)=0, t→∞, V(∞)=V0, and the solution is:
[0064] V(t)=V0-e -Ct (2)
[0065] V(t) = 4π[r 3 -[rS r (t)] 3 ] / 3Substitute into the above formula and we get:
[0066] 3r 2 S r (t)+3rS r (t) 2 -S r (t) 3 =3(V0-e -Ct ) / 4π (3)
[0067] Where: r is the radius of the equal displacement sphere; S r (t) is the displacement distance of any point on the equal displacement sphere at time t.
[0068] Because S r The value of (t) is generally much smaller than the value of r, so S r The higher-order terms of (t) can be ignored. Simplifying (3) yields r (t) is:
[0069] S r (t) = (V0-e -Ct ) / 4πr 2 (4)
[0070] Formula (4) can be used to quantitatively analyze the spatial distribution of soil displacement caused by the voids in the infinite body and its change over time.
[0071] The three-dimensional mirror method divides the ground settlement caused by a unit hole in a semi-infinite soil into three parts, namely: the settlement caused by shear stress S z0 , the displacement S caused by the actual hole z1 and the settlement S caused by the virtual volume expansion z2 Compared with the ground settlement caused by the change of soil volume, the ground settlement caused by shear stress can be ignored, so the total ground settlement caused by unit hole S z Can be S z1 , S z2 The two parts are superimposed.
[0072] For a spherical void at point Q(x0y0,z0) in the Cartesian coordinate system, Figure 5 As shown in Figure 2, the vertical displacement of any point P (x, y, z) at time t is:
[0073]
[0074] In the formula:
[0075]
[0076]
[0077] exist Figure 5 In the coordinate system shown, let the coordinate of P when it is on the surface be P(x, y, 0). Substituting into equation (5), we get:
[0078] S z (t) = S z1 (t)+S z2 (t) = (V0-e -Ct )z0 / 2πr0 3 (6)
[0079] In the formula:
[0080]
[0081] When the pore volume is unit volume, that is, when V0 = 1, equation (6) can be transformed into:
[0082] S z (t) = S z1 (t)+S z2 (t) = (1-e -Ct )z0 / 2πr0 3 (7)
[0083] The ground settlement caused by soil loss can be obtained by integrating the ground settlement caused by unit volume of voids. Assuming that the shapes of the sections along the length are the same after the tunnel is deformed, the volume of ground loss is the difference between the volumes of two cylinders of the same length. Assuming that the tunnel excavation volume over a certain length is Ω and the volume after deformation is w, the ground settlement caused by ground loss is:
[0084]
[0085] The specific value of C can be calculated based on the monitoring results of ground settlement. Assume that the tunnel excavation construction is stopped at a certain time t0, and the ground settlement increment measured at the moment t1 is S t1 At the instant t2, the measured surface subsidence increment is S t2 , then:
[0086]
[0087] S t1 With S t1 Dividing them, we get:
[0088]
[0089] The formation settlement velocity coefficient C can be obtained by solving formula (10).
[0090] The ground settlement velocity coefficient C obtained by formula (10) is relatively accurate and reasonable. However, in actual engineering, the losses caused by tunnel suspension are huge, and forced tunnel suspension may cause serious engineering problems. Therefore, solving the ground settlement velocity coefficient by formula (10) is costly and difficult.
[0091] To solve the above problems, based on the statistical analysis of field measured data, the physical meaning of C was clarified and the general calculation method of C was determined.
[0092] The influence of strata on the time effect of stratum settlement is fundamentally due to the consolidation of strata, which is related to stratum parameters such as soil permeability, compression coefficient, void ratio and drainage distance. During tunnel excavation, stratum settlement caused by excavation is related to construction parameters such as stratum loss rate, excavation speed, and tunnel burial depth. The significance of the settlement velocity coefficient C lies in that it comprehensively considers the influence of both construction technology and stratum conditions, and is the product of the above-mentioned soil mechanics mechanism.
[0093] By calculating the vertical consolidation coefficient C of the soil y , tunnel depth h, excavation radius r, and excavation speed v are introduced into the calculation process of C to comprehensively consider the influence of stratum characteristics and construction technology on the stratum settlement time effect. The influence of h and r on the stratum settlement time effect is reflected in the distance of rock and soil movement and deformation transmitted to the surface; the influence of excavation speed v on the stratum settlement time effect is mainly reflected in the amount of stratum loss generated per unit time; the vertical consolidation coefficient C y It mainly reflects the influence of formation characteristics on the time effect of formation settlement. The specific calculation method of C is as follows:
[0094]
[0095] In the formula: h is the tunnel depth; r is the tunnel excavation radius; v is the tunnel excavation speed; t is the time before and after the tunnel passes through the calculation section; c y is the vertical consolidation coefficient of soil; α and β are coefficients, and their values can be determined through monitoring measurement results or experience; d is the excavation face mileage, t is the time of passing through the excavation section, d=vt; d0 is the monitoring section mileage, t0 is the time of passing through the monitoring section, d0=vt0.
[0096] In order to verify the rationality of the prediction method of tunnel stratum settlement, the field monitoring data of a section tunnel project of Shenzhen Metro was selected for comparative analysis. The net width of the excavation section was 6.3m, the net height was 6.6m, and the mining method was used for construction. For the convenience of calculation, the excavation section was simplified to a circle for calculation (R = 3.3m). During the construction process, the measured arch convergence was 30mm (r = 3.27m). The stratum where the tunnel is located is mainly composed of plain fill, clay and fully-weathered granite from top to bottom. The tunnel is in the highly weathered granite. The buried depth of the tunnel arch to the surface is h = 10.5m. According to the stratum composition and the previous measured data, the comprehensive parameters of the stratum can be obtained by deduction and calculation: α = 0.1703, β = 15.3236; the compression coefficient of the soil is 0.29 / MPa, the initial porosity is 0.71, and the permeability coefficient is empirically taken as 0.0578×10-4cm / s. After the tunnel is constructed at a speed of 2.0 m / d for 50 days, construction is stopped for 20 days, and then construction is continued at a speed of 2.0 m / d. Figure 6 shown.
[0097] The surface point directly above the suspended working surface (50 days after construction) of the project was selected as the characteristic point, and the settlement time history curve of the characteristic point was calculated by the mirror method considering the time effect established by the prediction method of tunnel stratum settlement. Figure 7 As shown. It can be seen that before 45 days of tunnel excavation, the ground settlement was small (<2mm). When the excavation time exceeded 45 days, the tunnel excavation working face was close to the measuring point, and the ground settlement rate began to increase. When the tunnel excavation working face was in a shutdown state and no longer excavated forward, the ground settlement value continued to increase, but the settlement rate gradually decreased. After 10 days of shutdown, the settlement rate was basically 0, and the ground surface basically no longer settled. When the tunnel resumed construction and continued excavation, the ground settlement continued to increase, and the settlement rate when the construction was resumed was basically equal to the settlement rate before the shutdown. The calculation results of the prediction method for tunnel ground settlement are consistent with the actual measurement results, which verifies the correctness of the prediction method for tunnel ground settlement.
[0098] The prediction method of tunnel ground settlement is applied to further analyze the temporal variation of the horizontal and vertical settlement of the ground surface when the tunnel construction is stopped. Figure 8 , Fig. 9 The horizontal and vertical stratum settlement curves of the characteristic point positions during the shutdown period are given respectively. At t=0, that is, at the beginning of the shutdown, the maximum stratum settlement above the excavation working face is 5mm, accounting for about 1 / 2 of the final settlement; in the later settlement process, with the increase of time, the settlement value gradually increases, the settlement trough gradually widens, and the settlement rate gradually decreases. Around the 10th day of the shutdown, the stratum settlement is basically stable. From a spatial point of view, during the 10-day shutdown, the surface within the range of 40m behind the shutdown working face and 20m in front of the shutdown working face has obvious settlement, and the stratum settlement values at other positions have hardly increased; the position with the largest increase in stratum settlement is 4m behind the working face. From a temporal point of view, the stratum settlement at each position gradually stabilizes with the increase of time; Fig.10 The curve of the maximum slope of the longitudinal settlement of the surface with the downtime is given. It can be seen that with the increase of downtime, the position where the maximum slope of the longitudinal settlement of the surface gradually approaches the downtime working face. In the 0-4 days after the downtime, the maximum slope of the longitudinal settlement of the surface appears behind the tunnel face, and in the 6-10 days, it appears at the face. The maximum slope of the longitudinal settlement of the surface gradually increases with the increase of downtime, and gradually stabilizes at about 1mm / m on the 10th day.
[0099] In order to further clarify the influence of various calculation parameters on the ground settlement caused by tunnel excavation, a tunnel model with a burial depth of 20m and an excavation radius of 5.1m was established. The control variable method was used to discuss the influence of important engineering parameters such as tunnel excavation speed, ground settlement velocity coefficient and ground loss on the ground settlement velocity and amount.
[0100] Tunnel excavation speed
[0101] Fig.11 The curve of the change of stratum settlement velocity with time under different tunnel excavation speed conditions is given. It can be seen that the greater the tunnel excavation speed, the greater the peak value of the stratum settlement velocity, and the earlier the peak value appears, and the farther the distance between the excavation surface and the monitoring point when the peak value appears. For example, when the tunnel excavation speed is 1m / d, 2m / d, 4m / d and 8m / d, the maximum values of the stratum settlement velocity are 0.55mm / d, 0.87mm / d, 1.24mm / d and 1.59mm / d respectively, and the time when the maximum value appears is 6 days, 5 days, 3 days and 2 days after passing the measuring point, and the distance between the excavation surface and the measuring point when the maximum value appears is 6m, 10m, 12m and 16m respectively. Fig.12 The relationship curve between tunnel excavation speed and maximum surface settlement velocity is given. It can be seen that the maximum surface settlement velocity and excavation speed are in a logarithmic function relationship, that is, as the tunnel excavation speed increases, the maximum surface settlement velocity continues to increase, but the growth rate gradually slows down. Therefore, in actual engineering, the tunnel excavation speed should not be too high, which will cause a sudden increase in stratum settlement, nor should it be too low, which will cause excessive acceleration of stratum settlement and make the surface unstable for a long time.
[0102] Fig.13 The curves of ground settlement changing with time at different excavation speeds are given. It can be seen that before and after passing the measuring point, the greater the tunnel excavation speed, the smaller the ground settlement; about 5 days after passing the measuring point, the ground settlement gradually increases with the increase of excavation speed; as time goes by, the curves gradually converge to one point, indicating that the tunnel excavation speed will only affect the ground settlement in the short term, and has little effect on the final settlement of the surface.
[0103] Sedimentation velocity coefficient
[0104] Fig.14 The curve of the change of formation settlement velocity with time under different settlement velocity coefficient conditions is given. It can be seen that the larger the settlement velocity coefficient, the greater the maximum surface settlement velocity, and the earlier the maximum value appears. For example, when C = 0.1, C = 0.3, C = 0.6 and C = 0.9, the maximum formation settlement velocity is 1.24mm / d, 2.0mm / d, 2.36mm / d and 2.46mm / d, respectively, and the time of the maximum value is 3 days after passing the measuring point, 2 days after, 1 day after and 0 days after. The relationship between the maximum surface settlement velocity and the settlement velocity coefficient is shown in Fig.15 As shown in Figure 2, it can be seen that the maximum surface settlement velocity and the settlement velocity coefficient are basically in a logarithmic function relationship. As the formation settlement velocity coefficient increases, the maximum surface settlement velocity continues to increase, but the growth rate gradually slows down.
[0105] Fig.16 The curves of the change of formation settlement with time when the settlement velocity coefficient is different are given. It can be seen that in the short period of time before and after passing the measuring point, the larger the formation settlement velocity coefficient, the greater the formation settlement, and as time goes by, the curves gradually tend to one point, indicating that the formation settlement velocity coefficient has no effect on the final settlement of the surface; as the formation settlement velocity coefficient decreases, the curve gradually flattens, indicating that when the formation settlement velocity coefficient is large, the formation settlement will be completed in a short time before and after passing the measuring point, and when the formation settlement velocity coefficient is small, the time to complete the surface settlement will be extended.
[0106] Formation loss
[0107] The influence of formation loss on formation settlement rate is as follows: Fig.17 It can be seen that the greater the formation loss, the greater the final settlement of the surface and the greater the maximum settlement velocity of the surface, but the magnitude of the formation loss does not affect the time when the maximum settlement velocity of the surface occurs. Fig.18 The curves of formation settlement changing with time under different formation loss conditions are given. It can be seen that as the formation loss increases, the formation settlement gradually increases. The relationship between the formation loss rate and the maximum formation settlement and the maximum surface settlement velocity is as follows: Fig.19 As shown in Figure 2, it can be seen that the maximum surface settlement velocity and the maximum surface settlement increase linearly with the increase of the formation loss rate. Therefore, in actual engineering, the quality of initial support should be strictly controlled to reduce the formation loss.
[0108] The prediction method of tunnel stratum settlement introduces the stratum settlement velocity coefficient into the mirror method, derives the tunnel stratum settlement calculation formula considering the time effect, and verifies the rationality of the calculation formula with engineering examples.
[0109] The technical principle of the present invention is described above in conjunction with specific embodiments. These descriptions are only for explaining the principle of the present invention and cannot be interpreted as limiting the protection scope of the present invention in any way. Based on the explanations herein, those skilled in the art can associate other specific implementations of the present invention without paying creative labor, and these methods will fall within the protection scope of the claims of the present invention.
Claims
1. A method for predicting tunnel ground settlement, characterized in that: The method includes evaluating the settlement velocity of the tunnel stratum according to the consolidation of the stratum and the construction parameters of the tunnel excavation, wherein the settlement velocity is calculated by: ; Where: h is the tunnel depth; r is the tunnel excavation radius; v is the tunneling speed; t is the time to pass through the excavation section; c y is the vertical consolidation coefficient of soil; α and β are coefficients, and their values can be determined through monitoring measurement results or experience; d is the mileage of the excavation surface, d=vt; d0 is the mileage of the monitoring section, t0 is the time of passing through the monitoring section, d0=vt0.
2. The method for predicting tunnel stratum settlement according to claim 1, characterized in that: The consolidation of the stratum includes the permeability coefficient, compression coefficient, void ratio and drainage distance of the soil.
Citation Information
Patent Citations
Early-warning and prediction method for sedimentation nearby tunnel construction working face
CN103628920A
Determining and estimating method for surface subsidence characteristic parameters caused by subway tunnel construction
CN104965994A