A method and system for evaluating the carrying capacity of new energy sources based on multi-level transmission section stability constraints
By evaluating the active power demand and grid frequency response factor of the provincial power grid, combined with the stable transmission capacity limit and load current, the problem of new energy carrying capacity evaluation under the stability constraints of multi-stage transmission sections is solved, and the comprehensive operation of the power grid is achieved Evaluation and effective assessment of new energy carrying capacity.
Patent Information
- Application Number
- CN202110638080.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-08
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-06-08
AI Technical Summary
It is difficult for the existing technology to comprehensively evaluate the bearing capacity of new energy, especially under the stability constraints of multi-stage transmission sections, and it is impossible to effectively present the safe and stable operation of the power grid.
By determining the active power requirements, trusted maximum power shortage, supporting severable load volume and external grid load level of the provincial power grid, evaluating the stable transmission capacity limit and load current, combining the grid frequency response factor and generator frequency modulation backup capacity, the new calculation is calculated Energy carrying capacity, consider whether the new energy unit is connected to adjust the frequency modulation backup capacity of conventional units.
Established a new energy bearing capacity assessment method and system under the stability constraints of multi-stage transmission sections, and the evaluation system can effectively evaluate the capacity limits of provincial power grids and external and internal interconnected AC channels, improving the safety and stability of the power grid and new energy. carrying capacity.
Smart Images

Figure CN113705950B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of new energy technologies for power systems, and more specifically, to a method and system for evaluating new energy carrying capacity based on multi-level transmission section stability constraints. Background Art
[0002] With the continuous advancement of power system reform, power transactions between power grids are becoming increasingly long-distance and large-capacity, and multi-level cross-section power exchanges are becoming increasingly frequent. In short, as the power grid continues to reduce the output of conventional units and the penetration rate of renewable energy continues to increase, the equivalent inertia of the power grid continues to decrease. Single transmission section transient stability and static stability constraints are no longer sufficient to fully reflect the safe and stable operation of the actual power grid.
[0003] Therefore, a technology is needed to evaluate the renewable energy carrying capacity based on a multi-level transmission section stability constraint method. Summary of the Invention
[0004] The technical solution of the present invention provides a method and system for evaluating the carrying capacity of renewable energy based on multi-level transmission section stability constraints, so as to solve the problem of how to evaluate the carrying capacity of renewable energy based on multi-level transmission section stability constraints.
[0005] In order to solve the above problems, the present invention provides a method for evaluating the new energy carrying capacity based on multi-level transmission section stability constraints, the method comprising:
[0006] Determine the active power demand P of the provincial power grid load-int ;
[0007] Determine the credible maximum power shortfall P loss-max ;
[0008] Based on the credible maximum power shortage P loss-max Determine the matching shelving load capacity P load-cut ;
[0009] Based on the active power demand P load-int , the credible maximum power shortage, the matching shelving load P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext ;
[0010] Determine the transmission capacity stability limit P of the provincial power grid and external interconnection channels limit-ext , based on the power shortage P shared by the external grid loss-ext Determine the load flow P between the provincial power grid and the external interconnection communication channel ext Whether it exceeds the stable limit of transport capacity Plimit-ext ;
[0011] When the load flow P ext Less than the stable limit of transport capacity P limit-ext When determining the transmission capacity stability limit P of the interconnection communication channel between each sub-grid in the provincial power grid, limit-int , based on the power shortage P shared by the external grid loss-ext Determine the load flow P of the interconnection communication channel between each sub-grid in the provincial power grid int Whether the stable limit of transport capacity exceeds the stable limit P limit-int ;
[0012] When the load flow P int Less than the stable limit transport capacity stable limit P limit-int When , determine the load frequency response factor of the provincial power grid;
[0013] Based on the load frequency response factor and the credible maximum power shortage P loss-max , determine the load level reduction P caused by the reduction in grid frequency load-f ;
[0014] Based on the credible maximum power shortage P loss-max , the load level reduction amount P load-f And the power shortage P loss-ext , determine the primary frequency regulation reserve capacity P undertaken by the generator G-res ;
[0015] Based on whether the new energy unit is connected or not, determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of new energy unit connection or not. G-res ;
[0016] Based on the output P of conventional generator sets before the new energy units are connected G , Credible Maximum Power Shortage P loss-max , the load level reduction caused by the reduction of grid frequency P load-f , the power shortage P loss-ext The proportion of the primary frequency regulation standby of conventional generators to the actual output of the generators determines the provincial power grid's new energy carrying capacity P. G-new .
[0017] Preferably, the active power requirement P load-int , the credible maximum power shortage, the matching shelving load P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext , the calculation formula is:
[0018]
[0019] Preferably, it also includes:
[0020] When the load flow P ext Not less than the stable limit of transport capacity P limit-ext When, or
[0021] When the load flow P int Not less than the stable limit of transport capacity P limit-int hour,
[0022] Increase the matching shear load capacity P load-cut .
[0023] Preferably, the primary frequency regulation reserve capacity P of the generator is determined G-res include:
[0024] P G-res =P loss-max -P loss-f -P loss-ext .
[0025] Preferably, the frequency regulation reserve capacity P of the conventional unit borne by the new energy unit is determined based on whether the new energy unit is connected or not. G-res ,include:
[0026]
[0027] P G =P load-int -P ext-0
[0028] Among them, k is the ratio of the primary frequency regulation standby of the conventional generator set to the actual output of the generator, P G-new For the new energy carrying capacity.
[0029] Preferably, the determination of the provincial power grid's new energy carrying capacity P G-new , the calculation formula is:
[0030] New energy is connected but frequency regulation capability is not considered.
[0031] According to another aspect of the present invention, the present invention provides a system for evaluating the carrying capacity of new energy sources based on multi-level transmission section stability constraints, the system comprising:
[0032] Initial unit, used to determine the active power demand P of the provincial power grid load-int ; Determine the credible maximum power shortage P loss-max Based on the credible maximum power shortage Ploss-max Determine the matching shelving load capacity P load-cut Based on the active power demand P load-int , the credible maximum power shortage, the matching shelving load P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext ;
[0033] Judgment unit, used to determine the transmission capacity stability limit P of the provincial power grid and external interconnection communication channels limit-ext , based on the power shortage P shared by the external grid loss-ext Determine the load flow P between the provincial power grid and the external interconnection communication channel ext Whether it exceeds the stable limit of transport capacity P limit-ext ;
[0034] When the load flow P ext Less than the stable limit of transport capacity P limit-ext When determining the transmission capacity stability limit P of the interconnection communication channel between each sub-grid in the provincial power grid, limit-int , based on the power shortage P shared by the external grid loss-ext Determine the load flow P of the interconnection communication channel between each sub-grid in the provincial power grid int Whether the stable limit of transport capacity exceeds the stable limit P limit-int ;
[0035] When the load flow P int Less than the stable limit transport capacity stable limit P limit-int When , determine the load frequency response factor of the provincial power grid;
[0036] The result unit is used to generate a result based on the load frequency response factor and the credible maximum power shortage P loss-max , determine the load level reduction P caused by the reduction in grid frequency load-f ;
[0037] Based on the credible maximum power shortage P loss-max , the load level reduction amount P load-f And the power shortage P loss-ext , determine the primary frequency regulation reserve capacity P undertaken by the generator G-res ;
[0038] Based on whether the new energy unit is connected or not, determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of new energy unit connection or not. G-res ;
[0039] Based on the output P of conventional generator sets before the new energy units are connected G , Credible Maximum Power Shortage P loss-max , the load level reduction caused by the reduction of grid frequency P load-f , the power shortage P loss-ext The proportion of the primary frequency regulation standby of conventional generators to the actual output of the generators determines the provincial power grid's new energy carrying capacity P. G-new .
[0040] Preferably, the initial unit is used to determine the active power requirement P load-int , the credible maximum power shortage, the matching shelving load P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext , the calculation formula is:
[0041]
[0042] Preferably, the judging unit is further configured to:
[0043] When the load flow P ext Not less than the stable limit of transport capacity P limit-ext When, or
[0044] When the load flow P int Not less than the stable limit of transport capacity P limit-int hour,
[0045] Increase the matching shear load capacity P load-cut .
[0046] Preferably, the result unit is used to determine the primary frequency regulation reserve capacity P undertaken by the generator. G-res ,include:
[0047] P G-res =P loss-max -P loss-f -P loss-ext .
[0048] Preferably, the result unit is used to determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of the new energy unit being connected or not being connected, respectively, based on whether the new energy unit is connected or not. G-res ,include:
[0049]
[0050] P G =P load-int -P ext-0
[0051] Among them, k is the ratio of the primary frequency regulation standby of the conventional generator set to the actual output of the generator, P G-new For the new energy carrying capacity.
[0052] Preferably, the result unit is used to determine the provincial power grid's new energy carrying capacity P G-new , the calculation formula is:
[0053] New energy is connected but frequency regulation capability is not considered.
[0054] The technical solution of the present invention provides a method and system for evaluating the new energy carrying capacity of interconnected provincial power grids based on multi-level transmission section stability constraints. It proposes several concepts of power shortage in multi-level transmission sections, establishes an evaluation system for the stability limit of the transmission capacity of interconnected communication channels between provincial power grids and external power grids, and between various sub-power grids within the provincial power grid, takes into account the evaluation index of the power grid frequency response factor, and constructs a method for evaluating the new energy carrying capacity of interconnected provincial power grids based on multi-level transmission section stability constraints by considering whether new energy units are connected and the primary frequency regulation backup capacity borne by conventional units. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0056] Figure 1 Flowchart of a method for evaluating new energy carrying capacity based on multi-level transmission section stability constraints according to a preferred embodiment of the present invention;
[0057] Figure 2 A flowchart of a program for the provincial power grid and external interconnected new energy carrying capacity according to a preferred embodiment of the present invention;
[0058] Figure 3 A flowchart of a program for interconnecting new energy carrying capacity between sub-grids within a provincial power grid according to a preferred embodiment of the present invention;
[0059] Figure 4 Schematic diagram of the Henan power grid structure according to a preferred embodiment of the present invention;
[0060] Figure 5 A schematic diagram of simulation calculation results according to a preferred embodiment of the present invention; and
[0061] Figure 6 4 is a system structure diagram of a new energy carrying capacity assessment based on multi-level transmission section stability constraints according to a preferred embodiment of the present invention. DETAILED DESCRIPTION
[0062] Exemplary embodiments of the present invention will now be described with reference to the accompanying drawings. However, the present invention may be embodied in many different forms and is not limited to the embodiments described herein. These embodiments are provided to provide a thorough and complete disclosure of the present invention and to fully convey the scope of the present invention to those skilled in the art. The terminology used in the exemplary embodiments shown in the accompanying drawings is not intended to limit the present invention. In the accompanying drawings, identical elements are denoted by the same reference numerals.
[0063] Unless otherwise specified, the terms used herein (including technical terms) have the meanings commonly understood by those skilled in the art. In addition, it is understood that terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0064] Figure 1 The present invention is a flowchart of a method for evaluating the new energy carrying capacity based on multi-level transmission section stability constraints according to a preferred embodiment of the present invention.
[0065] like Figure 1 As shown, the present invention provides a method for evaluating the new energy carrying capacity based on multi-level transmission section stability constraints, the method comprising:
[0066] Preferably, step 101: determining the active power demand P of the provincial power grid load-int ; Determine the credible maximum power shortage P loss-max ; Based on the credible maximum power shortage P loss-max Determine the matching shelving load capacity P load-cut ; Based on active power demand P load-int , reliable maximum power shortage, matching cut-off load capacity P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext ;
[0067] Preferably, based on the active power demand P load-int , reliable maximum power shortage, matching cut-off load capacity P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext , the calculation formula is:
[0068]
[0069] Step 101-1 of the present invention is to determine the maximum load level of the provincial power grid, that is, the active power demand P load-int ;
[0070] 101-2 Determine the credible maximum power shortage P loss-max Usually, it is the maximum value among the power shortages such as DC single-pole blocking, loss of a single unit with the largest capacity, and short-term power fluctuation of new energy sources;
[0071] 101-3 Determine the matching shelving load capacity P corresponding to the fault in step 101-2 load-cut ;
[0072] 101-4 Determine the power deficit P shared by the external grid under the power deficit in step 101-2 loss-ext ;
[0073]
[0074] Among them, P load-ext is the load level of the external power grid connected to the provincial power grid under study through the AC channel;
[0075] Preferably, step 102: determining the transmission capacity stability limit P of the provincial power grid and each external interconnection communication channel limit-ext , based on the power shortage P shared by the external grid loss-ext Determine the load flow P between the provincial power grid and the external interconnection communication channel ext Whether it exceeds the stable limit of transport capacity P limit-ext ;
[0076] When the load flow P ext Less than the stable limit of transport capacity P limit-ext When determining the transmission capacity stability limit P of the interconnection communication channel between each sub-grid in the provincial power grid, limit-int , based on the power shortage P shared by the external grid loss-ext Determine the load flow P of the interconnection communication channel between each sub-grid in the provincial power grid int Whether the stable limit of transport capacity exceeds the stable limit P limit-int ;
[0077] When the load flow P int Less than the stable limit of transport capacity P limit-int When , determine the load frequency response factor of the provincial power grid;
[0078] like Figure 2 As shown, the present invention determines the stable limit P of the transmission capacity of the provincial power grid and each external interconnection communication channel at 102-1. limit-ext , which is usually the minimum value of the static stability limit, temporary stability limit, dynamic stability limit, etc. of the AC channel; under the power impact of step 101-4, the load flow P of the provincial power grid and the external interconnection channel extWhether it exceeds the stability limit; if not, go to step 102-2; if it exceeds, go to step 101-3 and increase the matching shedding load;
[0079] P ext =P ext-0 +P loss-ext
[0080] Among them, P ext-0 is the initial active power flow of the provincial power grid and the external interconnection communication channel before the fault in step 2 occurs.
[0081] 102-2 Determine the stable transmission capacity limit P of the interconnection communication channels between the sub-grids within the provincial power grid limit-int , which is usually the minimum value of the static stability limit, temporary stability limit, dynamic stability limit, etc. of the AC channel; under the power impact of step 101-4, the load flow P of the AC channel interconnected between the various sub-grids within the provincial power grid int Whether it exceeds the stability limit; if not, go to step 103-1; if it exceeds, go to step 101-3 and increase the matching shedding load capacity;
[0082] P int =P int-0 +P loss-ext
[0083] Among them, P int-0 It is the initial active power flow of the interconnection communication channel between the various sub-grids within the provincial power grid studied before the fault in step 101-2 occurs.
[0084] Preferably, step 103: based on the load frequency response factor and the credible maximum power shortage P loss-max , determine the load level reduction P caused by the reduction in grid frequency load-f ;
[0085] Based on the credible maximum power shortage P loss-max , load level reduction P load-f and power deficit P loss-ext , determine the primary frequency regulation reserve capacity P undertaken by the generator G-res Preferably, determine the primary frequency regulation reserve capacity P undertaken by the generator G-res include:
[0086] P G-res =P loss-max -P loss-f -P loss-ext .
[0087] Based on whether the new energy unit is connected or not, determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of new energy unit connection or not. G-res ;
[0088] Preferably, the primary frequency regulation reserve capacity P of the conventional unit under the condition of whether the new energy unit is connected or not is determined respectively. G-res ,include:
[0089]
[0090] P G =P load-int -P ext-0
[0091] Among them, k is the ratio of the primary frequency regulation standby of the conventional generator set to the actual output of the generator, P G-new For the new energy carrying capacity.
[0092] Based on the output P of conventional generator sets before the new energy units are connected G , Credible Maximum Power Shortage P loss-max , the load level reduction caused by the reduction of grid frequency P load-f , power shortage P loss-ext The proportion of the primary frequency regulation standby of conventional generators to the actual output of the generators determines the provincial power grid's new energy carrying capacity P. G-new .
[0093] Preferably, determine the provincial power grid's new energy carrying capacity P G-new , the calculation formula is:
[0094] New energy is connected but frequency regulation capability is not considered.
[0095] Preferably, it also includes:
[0096] When the load flow P ext Not less than the stable limit of transportation capacity P limit-ext When, or
[0097] When the load flow P int Not less than the stable limit of transportation capacity P limit-int hour,
[0098] Increase the matching shear load capacity P load-cut .
[0099] The present invention determines the load frequency response factor of the power grid in step 103-1; analyzes the load level reduction amount P caused by the reduction of the power grid frequency under power shortage in step 101-2. load-f ;
[0100] 103-2 After determining the balance in the above steps, the share of power shortage that needs to be addressed by the primary frequency regulation capacity of the generator, that is, the primary frequency regulation reserve capacity borne by the generator;
[0101] P G-res =P loss-max -P loss-f -P loss-ext
[0102] 103-3 usually reduces the output of conventional units to accommodate the output of new energy units. Based on whether the new energy units are connected, the primary frequency regulation reserve capacity P of the conventional units is G-res Calculate according to the following formula:
[0103]
[0104] P G =P load-int -P ext-0
[0105] Among them, P G is the output of conventional generator sets before new energy is connected; k is the ratio of primary frequency regulation standby of conventional generator sets to actual generator output, usually 6%; P G-new The maximum output of renewable energy units that can be connected, i.e., renewable energy carrying capacity;
[0106] 103-4 According to formula 103-3, the provincial power grid's new energy carrying capacity P can be obtained. G-new for:
[0107] New energy is connected but frequency regulation capability is not considered.
[0108] 103-5 Based on the above-mentioned grid load level, external power capacity, conventional generator capacity, and new energy unit capacity, build simulation data to check the stability level of the grid under the credible power shortage in step 101-2, and determine whether the load flow of external and internal interconnected communication channels exceeds the stability limit; if not, the process stops; if exceeded, go to step 103-4 to reduce the new energy carrying capacity. Figure 3 shown.
[0109] This example uses the Henan power grid in a certain year as the research object to evaluate the new energy carrying capacity of the interconnected provincial power grid based on the stability constraints of multi-level transmission sections. Figure 4 shown.
[0110] Henan power grid maximum load level P load-int The maximum credible power shortage is 70 million kilowatts. loss-max The loss of 4 million kilowatts of power is due to DC monopole interlocking (the power shortage of DC monopole interlocking is 4 million, the loss of the maximum single-machine capacity is 1 million, and the short-term power fluctuation of new energy is 2 million).
[0111] According to the Guidelines for Power System Safety and Stability, there should be no load loss in the event of N-1 fault, so the corresponding load that can be cut off for DC single-pole blocking fault is P load-cut The communication channels between Henan Power Grid and the external grid mainly include the UHV Changnan Line and the 1000kV / 500kV electromagnetic ring network section between Henan and Hubei (4 UHV lines + 4 500kV lines, with Nanyang Station and Zhumadian Station considered as 2*3 million main transformers). Based on this, the power shortage shared by the external grid through the above AC communication channels is:
[0112] The total load of the other three provinces in Central China, excluding Henan, is about 100 million kilowatts); the transmission capacity of the UHV Changnan Line, the interconnection channel between Henan Power Grid and the external power grid, is subject to the static stability limit constraint. Its stability limit P limit-ext 6 million kilowatts; considering the initial power P of the UHV Changnan Line before the fault ext-0 If 2 million kilowatts are sent to the south, the power of the ultra-high voltage long south line after the fault will be 2 million + 3.24 million = 5.24 million kilowatts, which does not exceed the stability limit and does not require additional load shedding measures.
[0113] Similarly, the initial power of the Henan-Hubei 1000 / 500kV electromagnetic ring network section before the fault is considered to be 0. The transmission capacity of the section for sending electricity from south to north is constrained by the thermal stability of the line, and its stability limit is 3.95 million kilowatts; the transferred power under this fault does not exceed the section stability limit. Under DC single-pole blocking, the interconnected power grid structure is intact, and the frequency has not dropped significantly compared to before the fault. Therefore, the load level reduction caused by the reduction in grid frequency is P load-f Approximately 0.
[0114] Similarly, the power transmission capacity of the South-to-North section of Henan Province is subject to the thermal stability constraints of the line, and its stability limit P limit-int It is 6.7 million kilowatts. The transferred power under this fault does not exceed the section stability limit.
[0115] Therefore, the primary frequency regulation reserve capacity P undertaken by the generator is G-res =400-0-324=760,000 kilowatts; Henan power grid's new energy carrying capacity:
[0116]
[0117] In the present invention, new energy is connected but the frequency regulation capability is not considered.
[0118] According to the above estimates, with a load of 70 million kilowatts for the Henan power grid, 18 million kilowatts of external power (16 million kilowatts for 2 UHVDC lines, 2 million kilowatts for the Changnan Line, and 0 kilowatts for the Henan-Hubei section), and a conventional generator output of 52 million kilowatts, the output of renewable energy units that can be carried is 39.33 million kilowatts (excluding its frequency regulation capability). Simulation data is constructed to verify the stability of the power grid under a 4 million kilowatt power shortage of DC single-pole blocking, and to determine whether the load flow of external or internal interconnected AC channels exceeds the stability limit; if not, the process stops; if exceeded, go to step 103-4 to reduce the renewable energy carrying capacity. The schematic diagram of the simulation calculation results is shown below. Figure 5 shown.
[0119] Figure 6 FIG is a system structure diagram of a new energy carrying capacity evaluation system based on multi-level transmission section stability constraints according to a preferred embodiment of the present invention. Figure 6 As shown, the present invention provides a system for evaluating the carrying capacity of new energy sources based on multi-level transmission section stability constraints, the system comprising:
[0120] Initial unit 601 is used to determine the active power demand P of the provincial power grid load-int ; Determine the credible maximum power shortage P loss-max ; Based on the credible maximum power shortage P loss-max Determine the matching shelving load capacity P load-cut ; Based on active power demand P load-int , reliable maximum power shortage, matching cut-off load capacity P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext ;
[0121] Preferably, the initial unit 601 is used to determine the active power demand P load-int , reliable maximum power shortage, matching cut-off load capacity P load-cut And the external grid load level P between the provincial power grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext , the calculation formula is:
[0122]
[0123] The judgment unit 602 is used to determine the transmission capacity stability limit P of the provincial power grid and the external interconnection communication channels. limit-ext , based on the power shortage P shared by the external grid loss-ext Determine the load flow P between the provincial power grid and the external interconnection communication channel ext Whether it exceeds the stable limit of transport capacity P limit-ext ;
[0124] When the load flow P ext Less than the stable limit of transport capacity P limit-ext When determining the transmission capacity stability limit P of the interconnection communication channel between each sub-grid in the provincial power grid, limit-int , based on the power shortage P shared by the external grid loss-ext Determine the load flow P of the interconnection communication channel between each sub-grid in the provincial power grid int Whether the stable limit of transport capacity exceeds the stable limit P limit-int ;
[0125] When the load flow P int Less than the stable limit of transport capacity P limit-int When , determine the load frequency response factor of the provincial power grid;
[0126] Preferably, the determining unit 602 is further configured to:
[0127] When the load flow P ext Not less than the stable limit of transportation capacity P limit-ext When, or
[0128] When the load flow P int Not less than the stable limit of transportation capacity P limit-int hour,
[0129] Increase the matching shear load capacity P load-cut .
[0130] Result unit 603 is used to calculate the maximum power shortage P based on the load frequency response factor and the credible maximum power shortage P loss-max , determine the load level reduction P caused by the reduction in grid frequency load-f ;
[0131] Based on the credible maximum power shortage P loss-max , load level reduction P load-f and power deficit P loss-ext , determine the primary frequency regulation reserve capacity P undertaken by the generator G-res ;
[0132] Based on whether the new energy unit is connected or not, determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of new energy unit connection or not. G-res ;
[0133] Based on the output P of conventional generator sets before the new energy units are connected G , Credible Maximum Power Shortage P loss-max , the load level reduction caused by the reduction of grid frequency P load-f , power shortage P loss-extThe proportion of the primary frequency regulation standby of conventional generators to the actual output of the generators determines the provincial power grid's new energy carrying capacity P. G-new .
[0134] Preferably, the result unit 603 is used to determine the primary frequency regulation reserve capacity P undertaken by the generator. G-res ,include:
[0135] P G-res =P loss-max -P loss-f -P loss-ext .
[0136] Preferably, the result unit 603 is used to determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of the new energy unit being connected or not being connected, respectively. G-res ,include:
[0137]
[0138] P G =P load-int -P ext-0
[0139] Among them, k is the ratio of the primary frequency regulation standby of the conventional generator set to the actual output of the generator, P G-new For the new energy carrying capacity.
[0140] Preferably, the result unit 603 is used to determine the provincial power grid's new energy carrying capacity P G-new , the calculation formula is:
[0141] New energy is connected but frequency regulation capability is not considered.
[0142] The system 600 for evaluating the new energy carrying capacity based on multi-level transmission section stability constraints in the preferred embodiment of the present invention corresponds to the method 100 for evaluating the new energy carrying capacity based on multi-level transmission section stability constraints in the preferred embodiment of the present invention, and will not be repeated here.
[0143] The invention has been described above with reference to a few embodiments. However, it is readily apparent to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.
[0144] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / the [means, component, etc.]" are to be interpreted openly as referring to at least one instance of the means, component, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not necessarily need to be performed in the exact order disclosed, unless explicitly stated otherwise.
Claims
1. A method for evaluating the carrying capacity of new energy sources based on multi-level transmission section stability constraints, the method comprising: Determine the active power demand P of the provincial power grid load-int ; Determine the credible maximum power shortfall P loss-max ; Based on the credible maximum power shortage P loss-max Determine the matching shear load capacity P load-cut ; Based on the active power demand P load-int , the credible maximum power shortage, the matching shelvable load capacity P load-cut And the external grid load level P between the provincial grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext ; Determine the stable limit P of the transmission capacity between the provincial power grid and external interconnection channels limit-ext , based on the power shortage P shared by the external power grid loss-ext Determine the load flow P between the provincial power grid and the external interconnection communication channel ext Whether the stable limit of transport capacity P is exceeded limit-ext ; When the load flow P ext Less than the stable limit of transport capacity P limit-ext When determining the transmission capacity stability limit P of the interconnection communication channels between the various sub-grids within the provincial power grid, limit-int , based on the power shortage P shared by the external power grid loss-ext Determine the load flow P of the interconnection communication channel between each sub-grid in the provincial power grid int Whether the stable limit of transport capacity is exceeded? limit-int ; When the load flow P int Less than the stable limit transport capacity stable limit P limit-int When , determine the load frequency response factor of the provincial power grid; Based on the load frequency response factor and the credible maximum power shortage P loss-max , determine the load level reduction caused by the reduction in grid frequency P load-f ; Based on the credible maximum power shortage P loss-max , the load level reduction amount P load-f And the power shortage P loss-ext , determine the primary frequency regulation reserve capacity P undertaken by the generator G-res ; According to whether the new energy unit is connected or not, determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of new energy unit connection or not. G-res ,include: P G =P load-int -P ext-0 Among them, k is the ratio of the primary frequency regulation standby of the conventional generator set to the actual output of the generator, P G-new For new energy carrying capacity; Based on the output P of conventional generator sets before the new energy units are connected G , reliable maximum power shortage P loss-max , the load level reduction caused by the reduction of grid frequency P load-f , the power shortage P loss-ext The proportion of primary frequency regulation standby of conventional generators to the actual output of generators determines the new energy carrying capacity P of the provincial power grid. G-new , the calculation formula is: New energy is connected but frequency regulation capability is not considered.
2. The method according to claim 1, wherein the active power requirement P load-int , the credible maximum power shortage, the matching shelvable load capacity P load-cut And the external grid load level P between the provincial grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext , the calculation formula is:
3. The method according to claim 1, further comprising: When the load flow P ext Not less than the stable limit of the transport capacity P limit-ext When, or When the load flow P int Not less than the stable limit of the transport capacity P limit-int hour, Increase the shear load capacity P load-cut .
4. The method according to claim 1, wherein the primary frequency regulation reserve capacity P undertaken by the generator is determined G-res include: P G-res =P loss-max -P loss-f -P loss-ext 。 5. A system for evaluating the carrying capacity of new energy sources based on multi-level transmission section stability constraints, the system comprising: Initial unit, used to determine the active power demand P of the provincial power grid load-int ; Determine the credible maximum power shortfall P loss-max Based on the credible maximum power shortage P loss-max Determine the matching shear load capacity P load-cut Based on the active power demand P load-int , the credible maximum power shortage, the matching shelvable load capacity P load-cut And the external grid load level P between the provincial grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext ; Judgment unit, used to determine the transmission capacity stability limit P of the provincial power grid and external interconnection channels limit-ext , based on the power shortage P shared by the external power grid loss-ext Determine the load flow P between the provincial power grid and the external interconnection communication channel ext Whether the stable limit of the transport capacity P is exceeded limit-ext ; When the load flow P ext Less than the stable limit of transport capacity P limit-ext When determining the transmission capacity stability limit P of the interconnection communication channels between the various sub-grids within the provincial power grid, limit-int , based on the power shortage P shared by the external power grid loss-ext Determine the load flow P of the interconnection communication channel between each sub-grid in the provincial power grid int Whether the stable limit of transport capacity is exceeded? limit-int ; When the load flow P int Less than the stable limit transport capacity stable limit P limit-int When , determine the load frequency response factor of the provincial power grid; The result unit is used to calculate the maximum power shortage P based on the load frequency response factor and the credible maximum power shortage P. loss-max , determine the load level reduction caused by the reduction in grid frequency P load-f ; Based on the credible maximum power shortage P loss-max , the load level reduction amount P load-f And the power shortage P loss-ext , determine the primary frequency regulation reserve capacity P undertaken by the generator G-res ; According to whether the new energy unit is connected or not, determine the primary frequency regulation reserve capacity P of the conventional unit under the condition of new energy unit connection or not. G-res ,include: P G =P load-int -P ext-0 Among them, k is the ratio of the primary frequency regulation standby of the conventional generator set to the actual output of the generator, P G-new For new energy carrying capacity; Based on the output P of conventional generator sets before the new energy units are connected G , reliable maximum power shortage P loss-max , the load level reduction caused by the reduction of grid frequency P load-f , the power shortage P loss-ext The proportion of primary frequency regulation standby of conventional generators to the actual output of generators determines the new energy carrying capacity P of the provincial power grid. G-new , the calculation formula is: New energy is connected but frequency regulation capability is not considered.
6. The system according to claim 5, wherein the initial unit is configured to generate a power demand P based on the active power demand P load-int , the credible maximum power shortage, the matching shelvable load capacity P load-cut And the external grid load level P between the provincial grid and the external interconnection channels load-ext Determine the power deficit P shared by the external grid loss-ext , the calculation formula is:
7. The system according to claim 6, wherein the determining unit is further configured to: When the load flow P ext Not less than the stable limit of the transport capacity P limit-ext When, or When the load flow P int Not less than the stable limit of the transport capacity P limit-int hour, Increase the shear load capacity P load-cut .
8. The system according to claim 5, wherein the result unit is used to determine the primary frequency regulation reserve capacity P undertaken by the generator. G-res ,include: P G-res =P loss-max -P loss-f -P loss-ext 。