A 5G seamless switching method based on CU plane separation and beamforming
Collect and process train data through the management platform, build virtual maps and road loss models, calculate Doppler frequency shift and signal switching frequency in real time, design automated switching algorithms, solve base station switching problems in 5G high-speed rail wireless communication systems, and improve switching solutions The diversity and management efficiency reduce manual intervention and achieve seamless switching under high-speed movement.
Patent Information
- Application Number
- CN202111020577.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-01
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-09-01
Smart Images

Figure CN113727360B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data security, and in particular to a 5G seamless switching method based on CU plane separation and beamforming. Background Art
[0002] With the development of science and technology and economy, high-speed trains are developing in the direction of being greener, safer, and having a larger carrying capacity, becoming the preferred means of transportation for more and more people. At the same time, with the increasing popularity of mobile Internet, in the 5G high-speed rail wireless communication system, users' demand for high-quality communication anytime and anywhere is growing. The existing high-speed rail wireless mobile communication network will be increasingly unable to meet the needs of passengers. The mobile network services along the high-speed railway are far from meeting people's needs. The network service quality is poor and even dropped calls often occur. The wireless communication network built for high-speed railways faces more severe challenges than ordinary networks. One of the most serious impacts is the problem of base station switching under high-speed mobile conditions; therefore, it is particularly important to invent a 5G seamless switching method based on CU plane separation and beamforming;
[0003] After searching, the Chinese patent number CN113162981A discloses a seamless switching method for vehicle network formation based on vehicle-road collaboration. Although it can enable the vehicles in the formation to switch seamlessly and realize more efficient formation control, it can only collect data for a single train, which easily leads to the singleness of the solution and great limitations in use, reducing the popularity of the switching solution and increasing the workload of staff; when the existing 5G seamless switching method based on CU plane separation and beamforming has an abnormality, the management personnel need to manually repair and update it, which wastes the management personnel's time and reduces the management personnel's work quality; for this reason, we propose a 5G seamless switching method based on CU plane separation and beamforming. Summary of the invention
[0004] The purpose of the present invention is to solve the defects in the prior art and propose a 5G seamless switching method based on CU plane separation and beamforming.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A 5G seamless switching method based on CU plane separation and beamforming, the specific steps of the switching method are as follows:
[0007] (1.1) Train data collection and base station information collection: The management personnel log in to the management platform and retrieve and collect train data. They also collect the base station information of the corresponding train route through GPS satellites and classify and process it;
[0008] (1.2) Collect train speed in real time and calculate the corresponding Doppler frequency shift: The real-time speed of the train is collected through the speed measuring radar, and the Doppler frequency shift generated by the train passing through each base station is calculated and recorded;
[0009] (1.3) Constructing a road damage model and classifying algorithms based on train speed: Calculate the signal loss generated during the train running process and start to construct the corresponding road damage model. At the same time, classify algorithms based on the train running speed collected in real time;
[0010] (1.4) Calculate the base station switching frequency and perform simulation optimization: Calculate the base station switching frequency during train operation and feed the switching frequency back to the management personnel. At the same time, build a simulation model to simulate and optimize each algorithm.
[0011] Furthermore, the specific steps of the retrieval and collection described in step (1.1) are as follows:
[0012] Step 1: The manager inputs the train number into the management platform, and the management platform counts the number of train numbers and starts to call the corresponding train data;
[0013] Step 2: Generate a train record sheet by yourself, and classify the train data according to speed, travel time, travel direction and carriage material, and enter each data into the record sheet.
[0014] Furthermore, the specific steps of the classification process described in step (1.1) are as follows:
[0015] Step 1: Build a virtual map based on the images transmitted by GPS satellites, and intelligently draw the routes of each train on the virtual map;
[0016] Step 2: Collect the number of signal base stations around the driving route, and classify the collected signal base stations according to different businesses. At the same time, generate a base station record table and enter the number of signal base stations of each business into the table;
[0017] Step 3: Collect the coverage data of each group of base stations, divide them into coverage areas, and enter the coverage data into the base station record table.
[0018] Furthermore, the specific steps of calculating the record in step (1.2) are as follows:
[0019] S1: Construct a train model on the virtual map based on the information collected from the train record sheet, and synchronize the real-time train speed collected by the speed radar to the train model;
[0020] S2: When the train passes through the base station coverage area, the corresponding Doppler frequency shift is calculated. The specific calculation formula is as follows:
[0021]
[0022] Among them, f d represents the Doppler frequency shift value, f represents the frequency of the electromagnetic wave emitted by the base station, c represents the propagation rate of the electromagnetic wave, v represents the speed of the train, θ represents the angle between the direction of the train and the direction of the received signal, and λ represents the wavelength of the electromagnetic wave;
[0023] S3: Enter the Doppler frequency shift values generated when the train passes through each group of base stations into the base station record table.
[0024] Furthermore, the specific steps of constructing the road loss model in step (1.3) are as follows:
[0025] SS1: Measures a large number of wireless channels in various scenarios and performs statistical analysis based on the information extracted from the measurements;
[0026] SS2: Separate the fading parameters from the antenna parameters, and generate the statistical distribution of the channel characteristic parameters by itself. At the same time, the train path loss is calculated. The specific calculation formula is as follows:
[0027]
[0028] Where PL represents the train path loss, d represents the distance between the train antenna and the base station, A represents the path loss exponent, B represents the intercept, C represents the frequency dependence of the path loss, and f c represents the carrier frequency, and X represents an environment-specific term;
[0029] SS3: Build the path loss model table and feed it back to the management.
[0030] Furthermore, the specific steps of the algorithm classification described in step (1.3) are as follows:
[0031] P1: Mark the collected real-time train speed as X and classify it. The specific steps of speed classification are as follows:
[0032] PP1: If 200km / h≤X<250km / h, the train is judged to be traveling at a low speed;
[0033] PP2: If 250km / h≤X<290km / h, the train speed is judged to be medium speed;
[0034] PP3: If 290km / h≤X≤310km / h, the train is judged to be traveling at high speed;
[0035] P2: If the train is running at a low speed, the switching judgment will begin. The specific judgment conditions are as follows:
[0036] Mn+Ofn+Ocn-Hys>Mp+Ofp+Ocp+off (3)
[0037] Mn+Ofn+Ocn+Hys<Mp+Ofp+Ocp+off (4)
[0038] Wherein, Mn represents the special value of the adjacent coverage area, Ofn represents the special area offset measurement value of the adjacent coverage area, Ocn represents the special sector offset of the adjacent coverage area, Hys represents the corresponding event hysteresis parameter, Mp represents the measurement value of the service area, Ofp represents the special frequency offset of the service area, Ocp represents the special area offset of the service area, off represents the offset of the event, (3) is the condition for entering the event, and (4) is the condition for leaving the event;
[0039] P3: When a train departure event is determined, the train signal is switched to the next base station area;
[0040] P4: If the train is traveling at a medium speed, the signal quality received by the train from the target micro base station is compared with the signal quality received from the original micro base station. If it is higher than the signal quality received from the original micro base station, the macro base station sends a cooperation request to the target micro base station, and the target micro base station receives the cooperation request. At the same time, the macro base station sends a cooperation set update instruction to the mobile management entity. The mobile management entity receives the cooperation set update instruction and controls the service gateway to copy and simultaneously transmit user plane data to the original micro base station and the target micro base station. The original micro base station and the target micro base station enable the two adjacent micro base stations to communicate with the train TRS at the same time, and merge the adjacent micro base station coverage areas into a larger coverage area. When the train leaves the original micro base station coverage area, the original micro base station releases train-related resources;
[0041] P5: If the train is traveling at a high speed, the macro base station sends a collaboration set update instruction to the mobile management entity. The mobile management entity receives the collaboration set update instruction and controls the service gateway to copy and simultaneously transmit the user plane data to the original micro base station and the target micro base station. The original micro base station and the target micro base station enable the two adjacent micro base stations to communicate with the train TRS at the same time, and merge the coverage areas of multiple adjacent micro base stations into a larger coverage area. When the train leaves the coverage areas of each group of micro base stations, the relevant micro base stations release the train-related resources.
[0042] Furthermore, the specific steps of the simulation optimization in step (1.4) are as follows:
[0043] M1: Calculate the frequency of zone switching for each group of trains during travel. The specific calculation formula is as follows:
[0044]
[0045] Among them, F ho Represents the train signal switching frequency, Ns_ho Represents the total number of handovers between micro base stations in each area, N m_ho Represents the total number of switching between regions, N s Represents the total number of micro base stations;
[0046] M2: After the switching frequency calculation is completed, the switching rate is calculated. The specific calculation formula is as follows:
[0047]
[0048] Among them, V ho represents the switching rate, L represents the total length of the train operation, and v represents the train speed;
[0049] M2: Count the number of signal switching times that occur during normal train travel, and mark the number of switching times as Z1. Count the number of signal switching times that occur during train travel after the micro base station coverage areas are merged, and mark the number of switching times as Z2.
[0050] M3: Generate a switching plan and compare Z1 and Z2. If Z1>Z2, it is determined that there is an abnormality in the switching plan. At the same time, the switching plan is repaired and updated, and a simulation test is performed on the updated switching plan. At the same time, the test results and the switching plan are fed back to the management personnel. If Z1<Z2, the comparison results and the switching plan are fed back to the management personnel.
[0051] Compared with the prior art, the present invention has the following beneficial effects:
[0052] 1. Compared with the previous scheme design for a single train, the 5G seamless switching method based on CU plane separation and beamforming requires the management personnel to input the train number into the management platform, which will count the number of train numbers and start to call the corresponding train data, generate a train record table by itself, and classify the train data according to speed, travel time, travel direction and carriage material. At the same time, the various data are entered into the record table to build a virtual map. At the same time, the number of signal base stations around the travel routes of each group of trains is collected, and the collected signal base stations are classified according to different merchants. At the same time, a base station record table is generated by itself, and the number of signal base stations of each merchant is entered into the table. Algorithms are designed for each group of trains based on the collected data, and data extraction and algorithm design can be performed on multiple groups of trains at the same time, ensuring the diversity of schemes, reducing usage limitations, improving the popularity of switching schemes, and reducing the workload of staff.
[0053] 2. The 5G seamless switching method based on CU plane separation and beamforming calculates the frequency of area switching of each group of trains during driving. After the switching frequency calculation is completed, the switching rate is calculated, and the number of signal switching that occurs during normal driving of the train and the number of signal switching that occurs during driving of the train after the micro base station coverage area is merged are counted and marked respectively. At the same time, a switching plan is generated and the two groups of switching times are compared. At the same time, the switching plan is repaired and updated according to the comparison results, which can save management personnel time and improve the work quality of management personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.
[0055] Figure 1 This is a flowchart of a 5G seamless switching method based on CU plane separation and beamforming proposed by the present invention. DETAILED DESCRIPTION
[0056] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0057] Example 1
[0058] Reference Figure 1 , a 5G seamless switching method based on CU plane separation and beamforming, this embodiment specifically discloses a classification processing method:
[0059] Train data collection, base station information collection: managers log in to the management platform, retrieve and collect train data, and collect base station information corresponding to the train route through GPS satellites and classify it.
[0060] Specifically, first, the management personnel inputs the train number into the management platform, the management platform counts the number of train numbers, and starts to call the corresponding train data. At the same time, the management platform generates a train record table by itself, and classifies the train data according to speed, travel time, travel direction and carriage material, and enters each data into the record table.
[0061] Specifically, a virtual map is constructed based on images transmitted by GPS satellites, and each train route is intelligently drawn on the virtual map. The number of signal base stations around the routes is collected, and the collected signal base stations are classified according to different businesses. At the same time, a base station record table is generated by itself, and the number of signal base stations of each business is entered into the table. The coverage data of each group of base stations is collected and divided into coverage areas, and the coverage data is entered into the base station record table.
[0062] Collect train speed in real time and calculate the corresponding Doppler frequency shift: collect the real-time speed of the train through the speed measuring radar, and calculate and record the Doppler frequency shift generated by the train passing through each base station.
[0063] Specifically, a train model is constructed on a virtual map based on the information collected in the train record table, and the real-time speed of the train collected by the speed measuring radar is synchronized to the train model. When the train passes through the base station coverage area, its corresponding Doppler frequency shift is calculated, and the Doppler frequency shift values generated by the train passing through each group of base stations are entered into the base station record table.
[0064] Among them, it needs to be further explained that the specific calculation formula of Doppler frequency shift is as follows:
[0065]
[0066] Among them, f d represents the Doppler frequency shift value, f represents the frequency of the electromagnetic wave emitted by the base station, c represents the propagation rate of the electromagnetic wave, v represents the speed of the train, θ represents the angle between the direction of the train and the direction of the received signal, and λ represents the wavelength of the electromagnetic wave.
[0067] Construct a road damage model and classify the algorithms based on the train speed: Calculate the signal loss generated during the train travel and start to construct the corresponding road damage model. At the same time, classify the algorithms based on the train speed collected in real time.
[0068] Specifically, first, a large number of wireless channels in various scenarios are measured, and statistical analysis is performed based on the information extracted from the measurements. The fading parameters are separated from the antenna parameters, and the statistical distribution of the channel characteristic parameters is generated independently. At the same time, the train path loss is calculated, and a path loss model table is constructed and fed back to the management personnel.
[0069] Among them, it needs to be further explained that the specific calculation formula of path loss is as follows:
[0070]
[0071] Where PL represents the train path loss, d represents the distance between the train antenna and the base station, A represents the path loss exponent, B represents the intercept, C represents the frequency dependence of the path loss, and f c represents the carrier frequency and X represents environment-specific terms.
[0072] Specifically, the collected real-time speed of the train is marked as X, and the speed is classified. If the train speed is low, the switching judgment is started. When it is judged that the train leaves the event, the train signal is switched to the next base station area. If the train speed is medium, the signal quality received by the train from the target micro base station is compared with the signal quality received from the original micro base station. If it is higher than the signal quality received from the original micro base station, the macro base station sends a collaboration request to the target micro base station, and the target micro base station receives the collaboration request. At the same time, the macro base station sends a collaboration set update instruction to the mobile management entity, and the mobile management entity receives the collaboration set update instruction and controls the service gateway to copy and simultaneously transmit the user plane data to the original micro base station and the target micro base station. The original micro base station and the target micro base station enable the two adjacent micro base stations to communicate with the train TRS at the same time, and merge the adjacent micro base station coverage areas into a larger coverage area. When the train leaves the original micro base station coverage area, the original micro base station releases train-related resources. If the train is traveling at a high speed, the macro base station sends a collaboration set update instruction to the mobile management entity. The mobile management entity receives the collaboration set update instruction and controls the service gateway to copy and simultaneously transmit user-plane data to the original micro base station and the target micro base station. The original micro base station and the target micro base station enable the two adjacent micro base stations to communicate with the train TRS at the same time, and merge the coverage areas of multiple adjacent micro base stations into a larger coverage area. When the train leaves the coverage areas of each group of micro base stations, the relevant micro base stations release train-related resources.
[0073] Among them, it needs to be further explained that the specific steps of speed classification are as follows: if 200km / h≤X<250km / h, the train speed is judged to be low speed; if 250km / h≤X<290km / h, the train speed is judged to be medium speed; if 290km / h≤X≤310km / h, the train speed is judged to be high speed.
[0074] The specific judgment conditions for the switching event are as follows:
[0075] Mn+Ofn+Ocn-Hys>Mp+Ofp+Ocp+off (3)
[0076] Mn+Ofn+Ocn+Hys<Mp+Ofp+Ocp+off (4)
[0077] Among them, Mn represents the special value of the adjacent coverage area, Ofn represents the special area offset measurement value of the adjacent coverage area, Ocn represents the special sector offset of the adjacent coverage area, Hys represents the corresponding event hysteresis parameter, Mp represents the measurement value of the service area, Ofp represents the special frequency offset of the service area, Ocp represents the special area offset of the service area, off represents the offset of the event, (3) is the condition for entering the event, and (4) is the condition for leaving the event.
[0078] Example 2
[0079] Reference Figure 1 , a 5G seamless switching method based on CU plane separation and beamforming, in addition to the same structure as above, this embodiment discloses a simulation optimization method:
[0080] Calculate the base station switching frequency and perform simulation optimization: Calculate the base station switching frequency during train travel and feed the switching frequency back to management personnel. At the same time, build a simulation model to simulate and optimize each algorithm.
[0081] Specifically, the frequency of area switching of each group of trains during driving is calculated. After the switching frequency calculation is completed, the switching rate is calculated, the number of signal switching times that occur during normal driving of the train is counted, and the number of switching times is marked as Z1. After the micro base station coverage areas are merged, the number of signal switching times that occur during the driving of the train is counted, and the number of switching times is marked as Z2. A switching plan is generated, and Z1 is compared with Z2. If Z1>Z2, it is determined that there is an abnormality in the switching plan, and the switching plan is repaired and updated at the same time. The updated switching plan is simulated and tested, and the test results and the switching plan are fed back to the management personnel. If Z1<Z2, the comparison results and the switching plan are fed back to the management personnel.
[0082] In addition, it should be further explained that the specific calculation formula of the switching frequency is as follows:
[0083]
[0084] Among them, F ho Represents the train signal switching frequency, N s_ho Represents the total number of handovers between micro base stations in each area, N m_ho Represents the total number of switching between regions, N s Represents the total number of micro base stations.
[0085] The specific calculation formula of the switching rate is as follows:
[0086]
[0087] Among them, Vho represents the switching rate, L represents the total length of the train operation, and v represents the train speed.
[0088] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A 5G seamless switching method based on CU plane separation and beamforming, characterized in that: The specific steps of the switching method are as follows: (1.1) Train data collection and base station information collection: The management personnel log in to the management platform and retrieve and collect train data. They also collect the base station information of the corresponding train route through GPS satellites and classify and process it; (1.2) Collect train speed in real time and calculate the corresponding Doppler frequency shift: The real-time speed of the train is collected through the speed measuring radar, and the Doppler frequency shift generated by the train passing through each base station is calculated and recorded; (1.3) Constructing a road damage model and classifying algorithms based on train speed: Calculate the signal loss generated during the train running process and start to construct the corresponding road damage model. At the same time, classify algorithms based on the train running speed collected in real time; (1.4) Calculate the base station switching frequency and perform simulation optimization: Calculate the base station switching frequency during train travel and feed the switching frequency back to the management personnel. At the same time, build a simulation model to simulate and optimize each algorithm. The specific steps of the retrieval and collection described in step (1.1) are as follows: Step 1: The manager inputs the train number into the management platform, and the management platform counts the number of train numbers and starts to call the corresponding train data; Step 2: Generate a train record table by yourself, and classify the train data according to speed, travel time, travel direction and carriage material, and enter each data into the record table; The specific steps of the classification process described in step (1.1) are as follows: Step 1: Build a virtual map based on the images transmitted by GPS satellites, and intelligently draw the routes of each train on the virtual map; Step 2: Collect the number of signal base stations around the driving route, and classify the collected signal base stations according to different businesses. At the same time, generate a base station record table and enter the number of signal base stations of each business into the table; Step 3: Collect the coverage data of each group of base stations, divide them into coverage areas, and enter the coverage data into the base station record table.
2. According to claim 1, a 5G seamless switching method based on CU plane separation and beamforming is characterized in that: The specific steps of calculating the record described in step (1.2) are as follows: S1: Construct a train model on the virtual map based on the information collected from the train record sheet, and synchronize the real-time train speed collected by the speed radar to the train model; S2: When the train passes through the base station coverage area, the corresponding Doppler frequency shift is calculated. The specific calculation formula is as follows: Among them, f d represents the Doppler frequency shift value, f represents the frequency of the electromagnetic wave emitted by the base station, c represents the propagation rate of the electromagnetic wave, v represents the speed of the train, θ represents the angle between the direction of the train and the direction of the received signal, and λ represents the wavelength of the electromagnetic wave; S3: Enter the Doppler frequency shift values generated when the train passes through each group of base stations into the base station record table.
3. According to claim 1, a 5G seamless switching method based on CU plane separation and beamforming is characterized in that: The specific steps for constructing the road loss model in step (1.3) are as follows: SS1: Measures a large number of wireless channels in various scenarios and performs statistical analysis based on the information extracted from the measurements; SS2: Separate the fading parameters from the antenna parameters, and generate the statistical distribution of the channel characteristic parameters by itself. At the same time, the train path loss is calculated. The specific calculation formula is as follows: Where PL represents the train path loss, d represents the distance between the train antenna and the base station, A represents the path loss exponent, B represents the intercept, C represents the frequency dependence of the path loss, and f c represents the carrier frequency, and X represents an environment-specific term; SS3: Build the path loss model table and feed it back to the management.
4. According to claim 1, a 5G seamless switching method based on CU plane separation and beamforming is characterized in that: The specific steps of algorithm classification described in step (1.3) are as follows: P1: Mark the collected real-time train speed as X and classify it. The specific steps of speed classification are as follows: PP1: If 200km / h≤X<250km / h, the train is judged to be traveling at a low speed; PP2: If 250km / h≤X<290km / h, the train speed is judged to be medium speed; PP3: If 290km / h≤X≤310km / h, the train is judged to be traveling at high speed; P2: If the train is running at a low speed, the switching judgment will begin. The specific judgment conditions are as follows: Mn+Ofn+Ocn-Hys>Mp+Ofp+Ocp+off (3) Mn+Ofn+Ocn+Hys<Mp+Ofp+Ocp+off (4) Wherein, Mn represents the special value of the adjacent coverage area, Ofn represents the special area offset measurement value of the adjacent coverage area, Ocn represents the special sector offset of the adjacent coverage area, Hys represents the corresponding event hysteresis parameter, Mp represents the measurement value of the service area, Ofp represents the special frequency offset of the service area, Ocp represents the special area offset of the service area, off represents the offset of the event, (3) is the condition for entering the event, and (4) is the condition for leaving the event; P3: When a train departure event is determined, the train signal is switched to the next base station area; P4: If the train is traveling at a medium speed, the signal quality received by the train from the target micro base station is compared with the signal quality received from the original micro base station. If it is higher than the signal quality received from the original micro base station, the macro base station sends a cooperation request to the target micro base station, and the target micro base station receives the cooperation request. At the same time, the macro base station sends a cooperation set update instruction to the mobility management entity. The mobility management entity receives the cooperation set update instruction and controls the service gateway to copy and simultaneously transmit user plane data to the original micro base station and the target micro base station. The original micro base station and the target micro base station enable the two adjacent micro base stations to communicate with the train TRS at the same time, and merge the adjacent micro base station coverage areas into a larger coverage area. When the train leaves the original micro base station coverage area, the original micro base station releases train-related resources; P5: If the train is traveling at a high speed, the macro base station sends a collaboration set update instruction to the mobile management entity. The mobile management entity receives the collaboration set update instruction and controls the service gateway to copy and simultaneously transmit the user plane data to the original micro base station and the target micro base station. The original micro base station and the target micro base station enable the two adjacent micro base stations to communicate with the train TRS at the same time, and merge the coverage areas of multiple adjacent micro base stations into a larger coverage area. When the train leaves the coverage areas of each group of micro base stations, the relevant micro base stations release the train-related resources.
5. According to claim 1, a 5G seamless switching method based on CU plane separation and beamforming is characterized in that: The specific steps of simulation optimization described in step (1.4) are as follows: M1: Calculate the frequency of zone switching for each group of trains during travel. The specific calculation formula is as follows: Among them, F ho Represents the train signal switching frequency, N s_ho Represents the total number of handovers between micro base stations in each area, N m_ho Represents the total number of switching between regions, N s Represents the total number of micro base stations; M2: After the switching frequency calculation is completed, the switching rate is calculated. The specific calculation formula is as follows: Among them, V ho represents the switching rate, L represents the total length of the train operation, and v represents the train speed; M2: Count the number of signal switching times that occur during normal train travel, and mark the number of switching times as Z1. Count the number of signal switching times that occur during train travel after the micro base station coverage areas are merged, and mark the number of switching times as Z2. M3: Generate a switching plan and compare Z1 and Z2. If Z1>Z2, it is determined that there is an abnormality in the switching plan. At the same time, the switching plan is repaired and updated, and a simulation test is performed on the updated switching plan. At the same time, the test results and the switching plan are fed back to the management personnel. If Z1<Z2, the comparison results and the switching plan are fed back to the management personnel.
