Virtual power plant control device

By using the estimation unit and the control unit in the virtual power plant, the possibility of the vehicle participating in the virtual power plant is estimated based on the vehicle action mode and parking rate, which solves the problem of vehicle group charge and discharge action control, achieves high-precision adaptability of power supply and demand balance, and reduces fuel costs and carbon emissions.

CN113765094BActive Publication Date: 2024-10-18TOYOTA JIDOSHA KK
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110569389.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-25
Publication Date
2024-10-18
Estimated Expiration
2041-05-25

AI Technical Summary

Technical Problem

Existing virtual power plant technology is difficult to appropriately control the charging and discharging actions of the vehicle group according to the vehicle status, resulting in insufficient balance between power supply and demand.

Method used

The estimation unit estimates the possibility of the vehicle participating in the virtual power plant when charging and discharging action requests are made based on the vehicle's past behavior patterns and parking rates, and the control unit controls the vehicle's charging and discharging actions based on the estimation results to ensure the charging and discharging actions of the entire vehicle group. Balanced with electricity supply and demand.

Benefits of technology

It achieves high-precision control of the charging and discharging actions of the virtual power plant vehicle group according to the vehicle status, improves the adaptability and accuracy of power supply and demand balance, and reduces the use of fossil fuels and carbon dioxide emissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113765094B_ABST
    Figure CN113765094B_ABST
Patent Text Reader

Abstract

The control device of a virtual power plant according to the present invention is a control device for a virtual power plant that adjusts the supply and demand balance of power in a distribution network by controlling the charging and discharging actions of a storage battery mounted on a vehicle, and is characterized by comprising: an estimation unit that estimates the possibility of a vehicle participating in a virtual power plant when a charging and discharging action is requested based on the past behavior pattern of the vehicle; and a control unit that controls the charging and discharging actions of the storage battery mounted on the vehicle based on the estimation result of the estimation unit. Thus, a control device for a virtual power plant is provided that can appropriately control the charging and discharging actions of the entire vehicle group constituting the virtual power plant according to the state of the vehicle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a control device of a virtual power plant (VPP: Virtual Power Plant, virtual power device). Background Art

[0002] Patent Document 1 describes a method of estimating the travel route and charging location of an electric vehicle based on the past travel history and charging history of the electric vehicle, and reminding the driver to connect the charging plug to the electric vehicle based on the estimation result.

[0003] Prior art literature

[0004] Patent Document 1: Japanese Patent Application Publication No. 2019-91433 Summary of the invention

[0005] Problems to be solved by the invention

[0006] In recent years, the development of virtual power plants (VPPs) that adjust the supply and demand balance of electricity in a distribution network by controlling the charging and discharging actions of batteries mounted on vehicles such as electric vehicles is underway. In order to properly operate the virtual power plant, it is necessary to properly control the charging and discharging actions of the entire vehicle group that constitutes the virtual power plant. Therefore, it is desirable to provide a technology that can properly control the charging and discharging actions of the entire vehicle group that constitutes the virtual power plant according to the state of the vehicle.

[0007] The present invention has been made in view of the above, and an object of the present invention is to provide a control device for a virtual power plant that can appropriately control the charging and discharging operations of the entire vehicle group constituting the virtual power plant according to the state of the vehicle.

[0008] Technical solutions to solve problems

[0009] The control device of the virtual power plant involved in the present invention is a control device of a virtual power plant that adjusts the supply and demand balance of electricity in a distribution network by controlling the charging and discharging actions of a battery mounted on a vehicle, and comprises: an estimation unit that estimates the possibility of the vehicle joining (participating) in the virtual power plant when a charging and discharging action is requested based on the past behavior pattern of the vehicle; and a control unit that controls the charging and discharging actions of the battery mounted on the vehicle based on the estimation result of the estimation unit.

[0010] According to this virtual power plant control device, the charging and discharging actions of the batteries mounted on the vehicles are controlled by considering the possibility of the vehicles participating in the virtual power plant when charging and discharging actions are requested. Therefore, the charging and discharging actions of the entire vehicle group constituting the virtual power plant can be appropriately controlled according to the status of the vehicles.

[0011] In addition, the estimation unit may also estimate the parking rate of the vehicle when the charging and discharging action is requested, and estimate the possibility of the vehicle participating in the virtual power plant based on the estimated parking rate. Thus, the charging and discharging action of the entire vehicle group constituting the virtual power plant can be controlled with high accuracy according to the state of the vehicle.

[0012] Furthermore, the estimation unit may estimate the number of vehicles that can perform charge and discharge operations when a charge and discharge operation request is made based on the parking rate. Thus, the charge and discharge operations of the entire vehicle group constituting the virtual power plant can be controlled with high accuracy according to the state of the vehicle.

[0013] Furthermore, the estimating unit may estimate the possibility of participating in the virtual power plant when the charging and discharging operation is requested for each vehicle group.

[0014] Effects of the Invention

[0015] According to the control device of the virtual power plant involved in the present invention, since the charging and discharging actions of the batteries mounted on the vehicles are controlled by taking into account the possibility of the vehicles participating in the virtual power plant when charging and discharging actions are requested, the charging and discharging actions of the entire vehicle group constituting the virtual power plant can be appropriately controlled according to the state of the vehicles. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram showing the structure of a virtual power plant according to one embodiment of the present invention.

[0017] Figure 2 This is a flowchart showing the flow of a behavior pattern model creation process according to one embodiment of the present invention.

[0018] Figure 3 This is a diagram showing an example of temporal changes in the average value of the parking rate.

[0019] Figure 4 This is a diagram showing an example of the time change of the average value of the number of parking spaces for each residence and each workplace (workplace).

[0020] Figure 5 This is a diagram showing an example of time changes in the average value and standard deviation of the parking rate for each weekday (weekday) and each holiday.

[0021] Figure 6 This is a flowchart showing the flow of a charge and discharge control process according to one embodiment of the present invention.

[0022] Description of symbols

[0023] 1. Virtual power plant; 2. Vehicle; 3. Power company; 4. Database server; 5. Data processing server; 6. Control server; 7. Telecommunication line; 8. Charging station. DETAILED DESCRIPTION

[0024] Hereinafter, a virtual power plant according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

[0025] 〔constitute〕

[0026] First, refer to Figure 1 , the structure of a virtual power plant involved in one embodiment of the present invention is described.

[0027] Figure 1 Schematic diagram showing the structure of a virtual power plant according to an embodiment of the present invention. Figure 1 As shown, a virtual power plant 1 according to one embodiment of the present invention is a system for adjusting the balance of supply and demand of electric power in a distribution grid by controlling the charging and discharging actions of batteries mounted on vehicles 2. In this embodiment, the virtual power plant 1 includes a plurality of vehicles 2, a power company 3, a database server 4, a data processing server 5, and a control server 6 as main components, and each component is configured to be able to communicate information with each other via a telecommunication (electrical communication) line 7 such as an Internet line or a power line.

[0028] The vehicle 2 is composed of a hybrid vehicle (HV), an electric vehicle (EV), a fuel cell electric vehicle (FCEV), and the like. The vehicle 2 is equipped with a battery that can be charged and discharged via a power distribution network, and is configured to be able to transmit various vehicle data via a telecommunication line 7. The vehicle data includes information such as the identification number of the vehicle 2 (vehicle number (VIN) etc.), the date and time of acquisition of the vehicle data, information that can determine the on / off state of the ignition switch (trip counter etc.), the location information of the vehicle 2 (the identification number of the charging station 8 and / or the longitude / latitude information of the GPS (Global Positioning System) of the vehicle 2), the travel distance (odometer etc.), and the SOC (State Of Charge) of the battery. When the vehicle 2 is connected to the charging station 8 for charging the battery, it can also be connected to the telecommunication line 7 via the charging station 8 to transmit the vehicle data.

[0029] The power company 3 supplies power generated at well-known power plants such as hydroelectric power plants, thermal power plants, and nuclear power plants to consumers and consumption facilities via the distribution network, and purchases surplus power supplied from consumers and consumption facilities via the distribution network.

[0030] The database server 4 is constituted by a well-known information processing device such as a workstation, and has a database capable of writing and reading electronic information via the telecommunication line 7. The database stores vehicle data acquired from the vehicle 2 via the telecommunication line 7 at any timing such as a predetermined control cycle.

[0031] The data processing server 5 is constituted by a well-known information processing device such as a workstation. The data processing server 5 creates a behavior pattern model for estimating the behavior pattern of the vehicle 2 for each vehicle group (for each vehicle group) by executing a behavior pattern model creation process described below.

[0032] The control server 6 is composed of a well-known information processing device such as a workstation. The control server 6 performs the charge and discharge control process described later, estimates the behavior patterns of the plurality of vehicles 2 using the behavior pattern model created by the data processing server 5, and controls the charge and discharge actions of the plurality of vehicles 2 based on the estimation results. The control server 6 functions as an estimation unit and a control unit according to the present invention.

[0033] The virtual power plant 1 having such a configuration executes the action pattern modeling process and the charge and discharge control process shown below, thereby appropriately controlling the charge and discharge actions of the entire vehicle group constituting the virtual power plant 1 according to the vehicle 2. The following describes the actions of the virtual power plant 1 when executing the action pattern modeling process and the charge and discharge control process.

[0034] [Action mode model production and processing]

[0035] Figure 2 This is a flowchart showing the flow of action pattern model creation processing according to one embodiment of the present invention. Figure 2 The flowchart shown starts at a predetermined timing, such as when vehicle data stored in the database of the database server 4 is updated and / or when an execution instruction for the behavior pattern model creation process is input to the data processing server 5, and the behavior pattern model creation process proceeds to the process of step S1.

[0036] In the process of step S1, the data processing server 5 obtains the vehicle data stored in the database provided in the database server 4 via the telecommunication line 7. Thus, the process of step S1 is completed, and the action pattern model creation process proceeds to the process of step S2.

[0037] In the processing of step S2, the data processing server 5 uses the vehicle data obtained through the processing of step S1 to calculate the time variation of the average parking rate (the state of the ignition switch being off) of vehicle 2 for each day of the week (Monday to Sunday) and each parking location (residence, company, etc.) for each vehicle 2. Specifically, the data processing server 5 classifies the information that can determine the on / off state of the ignition switch by day of the week and parking location based on the date and time when the vehicle data is obtained and the location information of the vehicle 2. Then, the data processing server 5 uses the classified information to calculate the time variation (for example, in units of 1 day) of the average parking rate of vehicle 2 by day of the week and parking location. Through this processing, for example, it is possible to calculate the parking rate by day of the week and parking location. Figure 3 As shown in FIG. 1 , a curve L1 showing the average value of the parking rate of the vehicle 2 at each time of the day is shown. In addition, when the action plan data of the vehicle 2 can be used, the data processing server 5 can also calculate the time change of the difference value between the planned value and the actual value of the parking rate included in the action plan data and use it for the processing described later. Thus, the processing of step S2 is completed, and the action pattern model making processing proceeds to the processing of step S3.

[0038] In the process of step S3, the data processing server 5 approximates the curve representing the time variation of the average value of the parking rate of the vehicle 2 calculated by the process of step S2 with the feature quantity. Figure 3 As shown, the data processing server 5 uses a well-known method such as the least square method and the maximum likelihood estimation method to calculate an approximate curve L2 that approximates the curve L1 that represents the time variation of the average value of the parking rate. Then, the data processing server 5 calculates the time of the representative peaks included in the approximate curve L2, the variance value, and the average value of the parking rate as feature quantities. For example, in Figure 3 In the example shown, the data processing server 5 calculates the variance values ​​of the three peaks appearing at time T1, T2, and T3 and the average value of the parking rate as feature quantities. Thus, the processing of step S3 is completed, and the action pattern model creation processing proceeds to the processing of step S4.

[0039] In the process of step S4, the data processing server 5 uses a general method such as K-means to cluster the vehicles 2 whose vehicle data has been acquired into a plurality of vehicle groups with similar feature quantities based on the feature quantities obtained by the process of step S4. According to this process, a plurality of vehicle groups with similar feature quantities can be formed. Thus, the process of step S4 is completed, and the action pattern model making process proceeds to the process of step S5.

[0040] In the process of step S5, the data processing server 5 performs grouping of a plurality of vehicle groups according to a predetermined rule such as merging one vehicle group generated in the process of step S4 into other vehicle groups, and generates vehicle group information representing a list of identification numbers of the vehicles 2 included in the vehicle group for each vehicle group. Thus, the process of step S5 is completed, and the action pattern model making process proceeds to the process of step S6.

[0041] In the process of step S6, the data processing server 5 refers to the vehicle group information generated in the process of step S5, and obtains the characteristic quantity obtained for each vehicle 2 included in the vehicle group. Then, the data processing server 5 generates a statistical model (behavior pattern model) for each vehicle group, which calculates the parking rate of the vehicle 2 at each designated time and each parking location based on the characteristic quantity of each vehicle 2 obtained using a well-known statistical method. The statistical model is a mathematical model for estimating the behavior pattern of the vehicle 2, which uses the time, the day of the week, and the parking location as input variables and the parking rate of the vehicle 2 as an output variable, and the form of the mathematical formula is not particularly limited. Thus, the process of step S6 is completed, and the behavior pattern model generation process proceeds to the process of step S7.

[0042] In the process of step S7, the data processing server 5 uses the statistical model generated in the process of step S6 to calculate the time change of the parking rate and the time change of the number of parking spaces of the vehicles 2 for each day of the week and each parking place for each vehicle group. Thus, the process of step S7 is completed, and the action pattern model generation process proceeds to the process of step S8.

[0043] In the process of step S8, the data processing server 5 uses the time changes of the parking rate and the number of parking lots of the vehicles 2 for each week and each parking spot calculated by the process of step S7 to calculate the time changes of the average value and the variance value (or standard deviation value) of the parking rate and the number of parking lots of the vehicles 2 for each week and each parking spot for each vehicle group. According to this process, for example, it is possible to calculate the time changes of the parking rate and the number of parking lots of the vehicles 2 for each week and each parking spot. Figure 4 The time variation of the average number of parking spaces per residence and per workplace as shown in (a) and (b) and / or Figure 5 The time variation of the average value and standard deviation of the parking rate for each weekday (curve group G1) and each weekend (curve group G2) as shown in (a) and (b) of FIG. Thus, the processing of step S8 is completed, and the action pattern model generation processing proceeds to the processing of step S9.

[0044] In the process of step S9, the data processing server 5 creates a parking pattern map for each vehicle group, which shows the time changes of the parking rate and the average value and the variance value (or the standard deviation value) of the number of parking spaces and the parking ratio of the vehicles 2 for each week and each parking place calculated in the process of step S8, and stores the created parking pattern map. Thus, the process of step S9 is completed, and a series of action pattern model generation processes are terminated.

[0045] 〔Charge and discharge control processing〕

[0046] Figure 6 This is a flowchart showing the flow of a charge and discharge control process according to one embodiment of the present invention. Figure 6 The flowchart shown is started at a predetermined timing such as when a charge and discharge plan for the battery of the vehicle 2 is prepared, and the charge and discharge control process proceeds to the process of step S11.

[0047] In the process of step S11, the control server 6 obtains the parking pattern map for each vehicle group from the data processing server 5 via the telecommunication line. Alternatively, the control server 6 may obtain the parking pattern map from the data processing server 5 in advance and read the parking pattern map obtained in advance. Thus, the process of step S11 is completed, and the charge and discharge control process proceeds to the process of step S12.

[0048] In the process of step S12, the control server 6 estimates the proportion or number of vehicles that can participate in the virtual power plant 1 at each time during the plan preparation period for preparing the charge and discharge plan of the battery of the vehicle 2 based on the parking pattern map obtained in the process of step S11. Specifically, the control server 6 calculates the parking proportion or number of vehicles 2 at a specified time as the proportion or number of vehicles that can participate in the virtual power plant 1 based on the parking rate and the average value and variance value of the parking number at each time specified in the parking pattern map for each vehicle group. Thus, the process of step S12 is completed, and the charge and discharge control process proceeds to the process of step S13.

[0049] In the process of step S13, the control server 6 obtains the supply and demand plan information of the power in the distribution network from the power company 3. Then, the control server 6 solves the mathematical programming problem, and creates a charge and discharge plan for the battery of the vehicle 2 for adjusting the supply and demand balance of the power in the distribution network based on the obtained supply and demand plan information and the ratio or number of each vehicle group that can participate in the virtual power plant 1 estimated by the process of step S12. Specifically, when the demand for power is greater than the supply, the control server 6 determines the vehicle group that discharges the power of the battery to the distribution network based on the ratio or number of the vehicles that can participate in the virtual power plant 1. On the other hand, when the demand for power is less than the supply, the vehicle group that charges the battery is determined based on the ratio or number of the vehicles that can participate in the virtual power plant 1. According to this process, by effectively utilizing the power of the battery mounted on the vehicle 2 to reduce the use of fossil fuels by the power generation company, it is possible to reduce the amount of carbon dioxide generated and reduce social costs such as fuel costs, equipment costs, and carbon taxes. Thus, the process of step S13 is completed, and the charge and discharge control process proceeds to the process of step S14.

[0050] In the process of step S14, the control server 6 controls the charge and discharge operation of the battery of the vehicle 2 based on the charge and discharge plan created in the process of step S13. Thus, the process of step S14 is completed, and a series of charge and discharge control processes are terminated.

[0051] According to the above description, in a virtual power plant 1 involved in one embodiment of the present invention, the control server 6 estimates the possibility of vehicle 2 participating in the virtual power plant 1 when a charging and discharging action is requested based on the past behavior pattern of vehicle 2, and controls the charging and discharging action of the battery mounted on vehicle 2 based on the estimated result, thereby being able to appropriately control the charging and discharging action of the entire vehicle group constituting the virtual power plant 1 according to the state of vehicle 2.

[0052] The above describes the embodiment of the invention made by the inventor, but the present invention is not limited by the description and drawings that form a part of the disclosure of the present invention based on the embodiment. That is, other embodiments, examples, and application technologies made by those skilled in the art based on the embodiment are all included in the scope of the present invention.

Claims

1. A control device for a virtual power plant, which is a control device for a virtual power plant that adjusts the supply and demand balance of power in a power distribution network by controlling the charging and discharging operations of a battery mounted on a vehicle, comprising: an estimating unit that estimates, based on a past behavior pattern of the vehicle, a possibility of the vehicle participating in a virtual power plant at the time of a charge / discharge operation request; and a control unit that controls the charging and discharging operations of a battery mounted on the vehicle based on the estimation result of the estimation unit, The estimating unit estimates a parking rate of the vehicle when the charging and discharging operation is requested, and estimates a possibility of the vehicle participating in the virtual power plant based on the estimated parking rate. The estimating unit estimates the possibility of participating in a virtual power plant when a charge / discharge operation is requested in units of vehicle groups, wherein the vehicles in each of a plurality of vehicle groups have similar feature quantities. Regarding the characteristic quantity, the time variation of the average parking rate of the vehicle for each day of the week and each parking location is calculated according to the vehicle, and a first curve representing the average parking rate of the vehicle at each time of the day is calculated according to the day of the week and the parking location. The first curve is approximated to obtain an approximate curve, and the time of the peak, the variance value of the peak and the average parking rate contained in the approximate curve are used as the characteristic quantity.

2. The control device of the virtual power plant according to claim 1, The estimating unit estimates the number of vehicles that can perform a charge / discharge operation when a charge / discharge operation is requested based on the parking rate.

Citation Information

Patent Citations

  • System and method for determining charging profile for electric vehicle

    JP2019091433A

  • Server and method for managing use of distributed energy resource and microgrid power trading system including the same

    KR102040027B1