A method, system and device for optimizing configuration of regional high-quality power supply scheme

By introducing the total governance deflating index and distribution network operating parameter constraints in the optimized configuration of high-quality power supply solutions, the objective function is established to maximize net income, and the problem of difficult to balance governance effects and investment costs in the existing technology is solved, and the problem of achieving the problem of The coordinated configuration of high-quality power supply equipment and the optimal balance of economic benefits.

CN113869610BActive Publication Date: 2024-11-05GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111290375.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-02
Publication Date
2024-11-05
Estimated Expiration
2041-11-02

AI Technical Summary

Technical Problem

The existing high-quality power supply solution optimization configuration methods are difficult to balance the governance effect and investment costs, resulting in high total investment costs or poor governance results.

Method used

By determining the constraint relationship of the total deduction index of the governance and the constraint relationship of the distribution network operating parameters of the target area, an objective function is established to maximize net income and optimize the configuration model to realize the installation location and equipment parameters of each high-quality power supply equipment.

Benefits of technology

The best balance between governance effect and investment cost is achieved, a reasonable basis for decision-making of governance plans is provided, and the differences in economic returns before and after governance are quantified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113869610B_ABST
    Figure CN113869610B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of power quality management, and discloses a method, system and device for optimizing the configuration of a regional high-quality power supply plan. The method, system and device of the present invention take the maximum net benefit of the target area management as the objective function, and on the basis of setting the corresponding constraint relationship group according to the distribution network operation parameters of the target area, further add the management total value deflator constraint to quantify the degree of change in the total level of economic benefits of the target area before and after the management, and then solve the optimization model to achieve the coordinated configuration of high-quality power supply equipment in the distribution network; the present invention quantifies the difference in benefits before and after the management, can achieve the best balance between the management effect and the investment cost, and provide users with a reasonable management plan decision-making basis.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power quality management, and in particular to a method, system and device for optimizing configuration of a regional high-quality power supply plan. Background Art

[0002] When addressing and sizing high-quality power supply equipment, in addition to considering network topology, equipment voltage requirements, load capacity, and fault characteristics, it is also necessary to analyze factors such as the improvement in load voltage quality caused by connecting to high-quality power supply equipment, investment costs, etc., in order to objectively determine the optimal configuration plan.

[0003] In the prior art, when studying the optimal configuration modeling of high-quality power supply equipment, the following optimization objectives are usually set: (1) optimal economic performance, which is mainly expressed by calculating the economic benefit after comprehensively considering the installation investment cost and maintenance cost of the dynamic voltage restorer and the reduced power outage losses of users after treatment; (2) optimal voltage quality, which is mainly expressed by calculating and comparing the user voltage before and after compensation.

[0004] It can be seen that the optimization objectives of the existing high-quality power supply solution optimization configuration method mainly focus on the economy of the solution and the improvement of the node voltage level.

[0005] In terms of optimal configuration constraints, existing solutions mainly establish constraints by power supply classification, proposing power quality or economic indicators, and using process immune time to map users' operating status requirements into short-term voltage quality requirements or energy storage configuration requirements. For example, Xiao Xianyong's team at Sichuan University took the minimum investment in DVR (dynamic voltage restorer) as the goal and met the user's electricity requirements as the constraint condition, and proposed a DVR optimization configuration method based on the Tabu search algorithm. This method uses process immune time to map the voltage requirements of power users, classifies users, and implements hierarchical configuration of DVR to manage voltage sags. However, this method relies on subjective human classification. If the user classification interval is too small, the guidance significance is insufficient. If the classification interval is too large, it is easy to lead to excessive compensation capacity and excessive investment. Kan Lifeng of Sichuan University optimizes the configuration capacity of DVR with the goal of maximizing governance benefits. However, in the decision-making of governance solutions, governance effects and economic benefits are equally important. This document mainly conducts governance from the perspective of economic benefits, lacks discussion on governance effects, and does not intuitively quantify users' technical governance needs. Arup Kumar Goswami proposed configuring DVR capacity to meet the power demand in the most severe case of all voltage sag events. However, the frequency of voltage sag events with deeper sag depths is often very low, but the cost of governance is high. This configuration method will result in a higher total investment cost and cannot better respond to users' needs to balance governance effects and investment costs. Summary of the invention

[0006] The present invention provides a method, system and device for optimizing the configuration of a regional high-quality power supply plan, which solves the technical problem that the existing method for optimizing the configuration of a high-quality power supply plan cannot balance the governance effect and the investment cost well.

[0007] A first aspect of the present invention provides a method for optimizing and configuring a regional high-quality power supply solution, the method comprising:

[0008] Determine the constraint relationship between the deflator index of the total value of governance and the degree of change in the total level of economic benefits before and after governance;

[0009] Determine a group of constraint relations related to the distribution network operation parameters of the target area, wherein the distribution network operation parameters include sensitive load voltage, DVR installation capacity, and DVR output current, and the group of constraint relations includes at least one constraint relation;

[0010] Taking the maximization of net income in the target area as the optimization goal, the objective function is established;

[0011] Solve the objective function to obtain an optimization configuration model that satisfies the constraint relationship group and the governance total value deflator constraint relationship, wherein the optimization configuration model includes the installation location of each high-quality power supply equipment in the target area and the equipment parameters of each high-quality power supply equipment.

[0012] According to an achievable manner of the first aspect of the present invention, the objective function is established with maximizing the net benefit of the target area as the optimization goal, including:

[0013] The total cost of installing treatment equipment in the target area evaluated by the current equipment price is the nominal total treatment value;

[0014] The total cost of installing treatment equipment in the target area evaluated by the loss cost of the untreated area is the total value to be treated;

[0015] The objective function is set according to the nominal total governance value and the total value to be governed:

[0016] max F=F2-F1

[0017] In the formula, F1 represents the nominal total governance value, and F2 represents the total value to be governed.

[0018] According to an achievable manner of the first aspect of the present invention, the constraint relation of the governance total value deflator is determined as:

[0019] CGD≤W

[0020] in

[0021]

[0022] In the formula, CGD is the deflator of total governance value, F 1,r represents the total nominal governance value per year, F 2,r represents the total value to be managed each year, W is the preset threshold, and its value range is (80, 90).

[0023] According to an achievable manner of the first aspect of the present invention, the determining a group of constraint relationship expressions related to the power supply operation parameters of the target area includes:

[0024] According to the voltage balance constraint condition, the first constraint relation related to the sensitive load voltage is determined as:

[0025] U tmin ≤U Lt ≤U tmax

[0026] Where U tmin is the voltage lower limit at which the tth sensitive load can maintain normal operation, U tmax is the upper voltage limit for the tth sensitive load to maintain normal operation, U Lt is the voltage of the tth sensitive load after DVR compensation;

[0027] According to the power constraint balance condition, the second constraint relational expression related to the DVR installation capacity is determined as:

[0028] S n ≥U DVRn I DVRn

[0029] Where Sn represents the installed capacity of the nth DVR, U DVRn is the maximum compensation voltage of the nth DVR, I DVRn is the output current of the nth DVR;

[0030] The third constraint relation related to the DVR output current is determined as:

[0031]

[0032] Where, T is the total number of loads in the target area; S Lt is the power consumed by the tth load, U nont is the rated voltage of the tth load, a tn is the correlation coefficient between the nth DVR and the tth load. tn =1 means that the output voltage of the nth DVR can compensate the voltage of the tth load. tn =0 means that the output voltage of the nth DVR cannot compensate the voltage of the tth load.

[0033] A second aspect of the present invention provides a regional high-quality power supply solution optimization configuration system, comprising:

[0034] The first determination module is used to determine the constraint relationship between the deflator index of the total value of governance and the degree of change in the total level of economic benefits before and after the governance;

[0035] A second determination module is used to determine a group of constraint relations related to the distribution network operation parameters of the target area, wherein the distribution network operation parameters include sensitive load voltage, DVR installation capacity and DVR output current, and the group of constraint relations includes at least one constraint relation;

[0036] An objective function establishment module is used to establish an objective function with the maximization of the net benefit of the target area as the optimization goal;

[0037] The optimization module is used to solve the objective function to obtain an optimization configuration model that satisfies the constraint relationship group and the governance total value deflator constraint relationship, wherein the optimization configuration model includes the installation location of each high-quality power supply equipment in the target area and the equipment parameters of each high-quality power supply equipment.

[0038] According to an achievable manner of the second aspect of the present invention, the objective function establishment module includes:

[0039] The first setting unit is used to use the total cost of installing treatment equipment in the target area evaluated by the current equipment price as the nominal treatment total value;

[0040] The second setting unit is used to evaluate the total cost of installing treatment equipment in the target area with the loss cost of the untreated area as the total value to be treated;

[0041] The third setting unit is used to set the objective function according to the nominal total governance value and the total value to be governed as:

[0042] max F=F2-F1

[0043] In the formula, F1 represents the nominal total governance value, and F2 represents the total value to be governed.

[0044] According to an achievable manner of the second aspect of the present invention, the first determining module is specifically used to determine the constraint relationship of the governance total value deflator as:

[0045] CGD≤W

[0046] in

[0047]

[0048] In the formula, CGD is the deflator of total governance value, F 1,r represents the total nominal governance value per year, F 2,rrepresents the total value to be managed each year, W is the preset threshold, and its value range is (80, 90).

[0049] According to an achievable manner of the second aspect of the present invention, the second determining module includes:

[0050] The first constraint relationship determination unit is used to determine the first constraint relationship related to the sensitive load voltage as follows according to the voltage balance constraint condition:

[0051] U tmin ≤U Lt ≤U tmax

[0052] Where U tmin is the voltage lower limit at which the tth sensitive load can maintain normal operation, U tmax is the upper voltage limit for the tth sensitive load to maintain normal operation, U Lt is the voltage of the tth sensitive load after DVR compensation;

[0053] The second constraint relationship determination unit is used to determine the second constraint relationship related to the DVR installation capacity according to the power constraint balance condition as follows:

[0054] S n ≥U DVRn I DVRn

[0055] In the formula, S n represents the installed capacity of the nth DVR, U DVRn is the maximum compensation voltage of the nth DVR, I DVRn is the output current of the nth DVR;

[0056] The third constraint relationship determination unit is used to determine a third constraint relationship related to the DVR output current as:

[0057]

[0058] Where, T is the total number of loads in the target area; S Lt is the power consumed by the tth load, U nont is the rated voltage of the tth load, a tn is the correlation coefficient between the nth DVR and the tth load. tn =1 means that the output voltage of the nth DVR can compensate the voltage of the tth load. tn =0 means that the output voltage of the nth DVR cannot compensate the voltage of the tth load.

[0059] A third aspect of the present invention provides a device for optimizing and configuring a regional high-quality power supply solution, comprising:

[0060] A memory for storing instructions; wherein the instructions are instructions that can implement the steps of the method for optimizing the configuration of a regional high-quality power supply scheme as described in any one of the above-mentioned implementation methods;

[0061] A processor is used to execute instructions in the memory.

[0062] A fourth aspect of the present invention is a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method for optimizing configuration of a regional high-quality power supply scheme as described in any of the above-mentioned achievable methods.

[0063] It can be seen from the above technical solutions that the present invention has the following advantages:

[0064] The present invention takes the maximum net benefit of the target area governance as the objective function, and on the basis of setting the corresponding constraint relationship group according to the distribution network operation parameters of the target area, further adds the governance total value deflator constraint to quantify the degree of change in the total level of economic benefits of the target area before and after the governance, and then solves the optimization model to achieve the coordinated configuration of high-quality power supply equipment in the distribution network; the present invention quantifies the difference in benefits before and after governance, can achieve the best balance between governance effect and investment cost, and provide users with a reasonable decision-making basis for governance plans. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0066] Figure 1 A flowchart of a method for optimizing configuration of a regional high-quality power supply solution provided by an optional embodiment of the present invention;

[0067] Figure 2 A schematic diagram of the structural connection of a regional high-quality power supply scheme optimization configuration system provided as an optional embodiment of the present invention. Description of the drawings:

[0069] 1-First determination module; 2-Second determination module; 3-Objective function establishment module; 4-Optimization module. DETAILED DESCRIPTION

[0070] The embodiments of the present invention provide a method, system and device for optimizing and configuring a regional high-quality power supply scheme, which are used to solve the technical problem that the existing method for optimizing and configuring a high-quality power supply scheme cannot balance the governance effect and investment cost well.

[0071] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0072] See also Figure 1 , Figure 1 A flow chart of a method for optimizing configuration of a regional high-quality power supply solution provided by an embodiment of the present invention is shown.

[0073] The present invention provides a method for optimizing and configuring a regional high-quality power supply solution, including steps S1-S4.

[0074] Step S1, determining a constraint relationship of the governance total value deflator index related to the degree of change in the total level of economic benefits before and after the governance.

[0075] Step S2, determining a group of constraint relations related to the distribution network operating parameters of the target area, wherein the distribution network operating parameters include sensitive load voltage, DVR installation capacity and DVR output current, and the group of constraint relations includes at least one constraint relation.

[0076] Step S3, establishing an objective function with maximizing the net benefit of the target area as the optimization goal.

[0077] Step S4, solving the objective function to obtain an optimization configuration model that satisfies the constraint relationship group and the governance total value deflator constraint relationship, wherein the optimization configuration model includes the installation location of each high-quality power supply equipment in the target area and the equipment parameters of each high-quality power supply equipment.

[0078] Among them, the total value of governance refers to the total cost required to install governance equipment at a certain node or even a certain area in order to improve the power supply quality, including purchase costs and maintenance costs.

[0079] In one achievable manner, the objective function is established with maximizing the net benefit of the target area as the optimization goal, including:

[0080] The total cost of installing treatment equipment in the target area evaluated by the current equipment price is the nominal total treatment value;

[0081] The total cost of installing treatment equipment in the target area evaluated by the loss cost of the untreated area is the total value to be treated;

[0082] The objective function is set according to the nominal total governance value and the total value to be governed:

[0083] max F=F2-F1

[0084] In the formula, F1 represents the nominal total governance value, and F2 represents the total value to be governed.

[0085] The current equipment price refers to the current price of the treatment equipment in the target area when the method of the present invention is executed.

[0086] In one embodiment, the nominal total management value is the sum of the purchase cost and the operation and maintenance cost of the DVR.

[0087] In specific implementation, set the purchase cost C1 and the operation and maintenance cost C2, and calculate the nominal governance total value according to the following formula:

[0088] F1=C1+C2

[0089] in,

[0090]

[0091] C2=λ1 C1

[0092] Where N is the total number of DVRs in the distribution network, C D (S n ) is the investment cost of a single DVR, and λ1 is the operation and maintenance cost ratio of the DVR per unit capacity.

[0093] Preferably, in this embodiment, λ1 is set to 5%.

[0094] As a preferred method, the investment cost is calculated according to the following formula:

[0095] C D (S n )=P D (S n )×S n

[0096] In the formula, S n Indicates the installed capacity of DVR, P D (S n ) represents the unit capacity cost function of a single DVR.

[0097] Among them, the unit capacity cost function of a single DVR can be obtained by fitting statistical data.

[0098] In the prior art, when calculating the cost of DVR, the unit capacity cost is regarded as a constant, that is, the DVR cost is calculated by a constant unit price. According to engineering experience, the unit capacity cost of a large-capacity DVR decreases as the DVR capacity increases. If the unit capacity cost of a single DVR is regarded as a constant, it will not truly reflect the investment cost of DVRs of different capacities, and will not reflect the advantages of centralized compensation, which will weaken the rationality of the resulting power supply plan.

[0099] The embodiment of the present invention is different from the prior art. It uses the unit capacity cost function to express the trend that the unit capacity cost of the DVR decreases with the increasing capacity. Compared with using a constant unit price, it can more reasonably reflect the current market situation that the capacity design of management equipment based on power electronics technology is flexible and the customization capability is strong, which helps power users to obtain a more practical configuration plan.

[0100] In one implementation, the total value to be managed is mainly the power quality disturbance loss cost. The specific calculation formula of the total value to be managed is:

[0101]

[0102] Where: N m is the number of voltage sag events occurring in a year; P ij is the probability of occurrence of a steady-state disturbance of the level corresponding to the i-th duration and the j-th voltage amplitude; P Loss Represents the economic loss of a single disturbance of a single type in the target area.

[0103] The embodiment of the present invention classifies all voltage sag events according to two important characteristic quantities: voltage amplitude and duration.

[0104] Among them, voltage sag events can be divided into 20 levels according to severity, and the corresponding occurrence probability P can be calculated. ij ,The division method is shown in Table 1, where “s” is the time unit and “pu” is the voltage amplitude unit.

[0105] Table 1 Probability distribution of grid voltage sag in target area

[0106]

[0107] In one achievable manner, the constraint relationship of the governance total value deflator is determined as:

[0108] CGD≤W

[0109] in

[0110]

[0111] In the formula, CGD is the deflator of total governance value, F 1,rrepresents the total nominal governance value per year, F 2,r represents the total value to be managed each year, W is the preset threshold, and its value range is (80, 90).

[0112] The initial investment cost is a one-time cost. Considering the time value of money, operation and maintenance costs and temporary loss costs need to be converted. This model uses the method of converting to present value, and calculates F according to the following formula 1,r and F 2,r :

[0113]

[0114]

[0115] In the formula, r represents the depreciation rate and t represents the service life of the treatment equipment.

[0116] The economic benefits of the target area can be divided into multiple levels according to the governance total value deflator. In one embodiment, the economic benefits of the region are divided into three levels according to CGD, namely: level one (30-50), level two (50-85), and level three (85-100). Level one means that the governance significance is great; level two means that the governance significance is relatively large; level three means that the governance significance is relatively small. That is, when CGD is less than 85, the governance significance of the region is relatively large. Therefore, in this embodiment, W=85 is set.

[0117] In an achievable manner, the determining a group of constraint relationship expressions related to the power supply operation parameters of the target area includes:

[0118] According to the voltage balance constraint condition, the first constraint relation related to the sensitive load voltage is determined as:

[0119] U tmin ≤U Lt ≤U tmax

[0120] Where U tmin is the voltage lower limit at which the tth sensitive load can maintain normal operation, U tmax is the upper voltage limit for the tth sensitive load to maintain normal operation, U Lt is the voltage of the tth sensitive load after DVR compensation;

[0121] According to the power constraint balance condition, the second constraint relational expression related to the DVR installation capacity is determined as:

[0122] S n ≥U DVRn I DVRn

[0123] In the formula, S nrepresents the installed capacity of the nth DVR, U DVRn is the maximum compensation voltage of the nth DVR, I DVRn is the output current of the nth DVR;

[0124] The third constraint relation related to the DVR output current is determined as:

[0125]

[0126] Where, T is the total number of loads in the target area; S Lt is the power consumed by the tth load, U nont is the rated voltage of the tth load, a tn is the correlation coefficient between the nth DVR and the tth load. tn =1 means that the output voltage of the nth DVR can compensate the voltage of the tth load. tn =0 means that the output voltage of the nth DVR cannot compensate the voltage of the tth load.

[0127] The DVR of the above embodiment of the present invention adopts a same-phase compensation strategy, and can be equivalent to an ideal voltage source when performing voltage compensation. When the line loss is ignored and the optimal configuration is performed according to the node residual voltage, the voltage of the sensitive load after DVR compensation can be expressed as:

[0128]

[0129] Where U t It is the residual voltage on the bus side supplying power to load t when a voltage sag occurs.

[0130] To ensure the normal operation of the power load, when a voltage sag occurs, the voltage of the sensitive load must be maintained within the allowable range after compensation by the DVR. Therefore, according to the voltage balance constraint, the embodiment of the present invention sets the first constraint relationship; the installation capacity of the DVR is related to its maximum output compensation voltage. The embodiment of the present invention ignores the DVR power loss and further sets the second constraint relationship; according to Kirchhoff's current law, the output current of the DVR should meet the needs of the downstream load. Therefore, the embodiment of the present invention also sets the third constraint relationship. Through the above constraint relationship, the optimization configuration model solved by the embodiment of the present invention can meet the user's governance needs.

[0131] The present invention also provides a regional high-quality power supply scheme optimization configuration system.

[0132] See also Figure 2 , Figure 2 A schematic diagram of the structural connection of a regional high-quality power supply solution optimization configuration system provided by an embodiment of the present invention is shown.

[0133] The system comprises:

[0134] The first determination module 1 is used to determine the constraint relationship of the governance total value deflator index related to the degree of change in the total level of economic benefits before and after the governance;

[0135] A second determination module 2 is used to determine a group of constraint relations related to the distribution network operation parameters of the target area, wherein the distribution network operation parameters include sensitive load voltage, DVR installation capacity and DVR output current, and the group of constraint relations includes at least one constraint relation;

[0136] The objective function establishment module 3 is used to establish the objective function with the maximization of the net benefit of the target area as the optimization goal;

[0137] Optimization module 4 is used to solve the objective function to obtain an optimization configuration model that satisfies the constraint relationship group and the governance total value deflator constraint relationship, and the optimization configuration model includes the installation location of each high-quality power supply equipment in the target area and the equipment parameters of each high-quality power supply equipment.

[0138] In one achievable manner, the objective function establishment module 3 includes:

[0139] The first setting unit is used to use the total cost of installing treatment equipment in the target area evaluated by the current equipment price as the nominal treatment total value;

[0140] The second setting unit is used to evaluate the total cost of installing treatment equipment in the target area with the loss cost of the untreated area as the total value to be treated;

[0141] The third setting unit is used to set the objective function according to the nominal total governance value and the total value to be governed as:

[0142] max F=F2-F1

[0143] In the formula, F1 represents the nominal total governance value, and F2 represents the total value to be governed.

[0144] In one achievable manner, the first determination module 1 is specifically used to determine the constraint relationship of the governance total value deflator as:

[0145] CGD≤W

[0146] in

[0147]

[0148] In the formula, CGD is the deflator of total governance value, F 1,r represents the total nominal governance value per year, F 2,rrepresents the total value to be managed each year, W is the preset threshold, and its value range is (80, 90).

[0149] In one achievable manner, the second determining module 2 includes:

[0150] The first constraint relationship determination unit is used to determine the first constraint relationship related to the sensitive load voltage as follows according to the voltage balance constraint condition:

[0151] U tmin ≤U Lt ≤U tmax

[0152] Where U tmin is the voltage lower limit at which the tth sensitive load can maintain normal operation, U tmax is the upper voltage limit for the tth sensitive load to maintain normal operation, U Lt is the voltage of the tth sensitive load after DVR compensation;

[0153] The second constraint relationship determination unit is used to determine the second constraint relationship related to the DVR installation capacity according to the power constraint balance condition as follows:

[0154] S n ≥U DVRn I DVRn

[0155] In the formula, S n represents the installed capacity of the nth DVR, U DVRn is the maximum compensation voltage of the nth DVR, I DVRn is the output current of the nth DVR;

[0156] The third constraint relationship determination unit is used to determine a third constraint relationship related to the DVR output current as:

[0157]

[0158] Where, T is the total number of loads in the target area; S Lt is the power consumed by the tth load, U nont is the rated voltage of the tth load, a tn is the correlation coefficient between the nth DVR and the tth load. tn =1 means that the output voltage of the nth DVR can compensate the voltage of the tth load. tn =0 means that the output voltage of the nth DVR cannot compensate the voltage of the tth load.

[0159] The present invention also provides a regional high-quality power supply scheme optimization configuration device, comprising:

[0160] A memory, used to store instructions; wherein the instructions are instructions that can implement the steps of the method for optimizing the configuration of a regional high-quality power supply solution as described in any one of the above embodiments;

[0161] A processor is used to execute instructions in the memory.

[0162] The present invention also provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the method for optimizing configuration of a regional high-quality power supply scheme as described in any one of the above embodiments are implemented.

[0163] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices, modules and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0164] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0165] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0166] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0167] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0168] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for optimizing the configuration of regional high-quality power supply solutions. It is characterized in that include: Determine the constraint relationship between the deflator index of the total value of governance and the degree of change in the total level of economic benefits before and after governance; Determine a group of constraint relations related to the distribution network operation parameters of the target area, wherein the distribution network operation parameters include sensitive load voltage, DVR installation capacity, and DVR output current, and the group of constraint relations includes at least one constraint relation; Taking the maximization of net income in the target area as the optimization goal, the objective function is established; Solving the objective function to obtain an optimization configuration model that satisfies the constraint relationship group and the governance total value deflator constraint relationship, wherein the optimization configuration model includes the installation location of each high-quality power supply device in the target area and the equipment parameters of each high-quality power supply device; The constraint relationship of the governance total value deflator index is determined as: ; in ; In the formula, is the governance deflator, represents the total nominal governance value per year, represents the total value to be governed each year, is the preset threshold, and its value range is ; The step of determining a group of constraint relationship expressions related to the power supply operation parameters of the target area includes: According to the voltage balance constraint condition, the first constraint relation related to the sensitive load voltage is determined as: ; In the formula, For the The voltage lower limit at which a sensitive load can maintain normal operation is For the The voltage upper limit that a sensitive load can maintain normal operation is After DVR compensation The voltage of a sensitive load; According to the power constraint balance condition, the second constraint relational expression related to the DVR installation capacity is determined as: ; In the formula, Indicates The installed capacity of DVRs For the The maximum compensation voltage of a DVR, For the Output current of DVR; The third constraint relation related to the DVR output current is determined as: ; In the formula, is the total number of loads in the target area; For the The power consumed by a load, For the The rated voltage of a load, It means DVR and The correlation coefficient of the load is Indicates The output voltage of the first DVR can compensate The voltage of a load, on the contrary, when Indicates The output voltage of the first DVR cannot compensate The voltage of a load.

2. According to the method for optimizing the configuration of the regional high-quality power supply scheme in claim 1, It is characterized in that The objective function is established by taking the maximization of the net income of the target area as the optimization goal, including: The total cost of installing treatment equipment in the target area evaluated by the current equipment price is the nominal total treatment value; The total cost of installing treatment equipment in the target area evaluated by the loss cost of the untreated area is the total value to be treated; The objective function is set according to the nominal total governance value and the total value to be governed: ; In the formula, represents the nominal governance value, Indicates the total value to be governed.

3. A regional high-quality power supply solution optimization configuration system, It is characterized in that include: The first determination module is used to determine the constraint relationship between the deflator index of the total value of governance and the degree of change in the total level of economic benefits before and after the governance; A second determination module is used to determine a group of constraint relations related to the distribution network operation parameters of the target area, wherein the distribution network operation parameters include sensitive load voltage, DVR installation capacity and DVR output current, and the group of constraint relations includes at least one constraint relation; An objective function establishment module is used to establish an objective function with the maximization of the net benefit of the target area as the optimization goal; An optimization module, used for solving the objective function to obtain an optimization configuration model that satisfies the constraint relationship group and the governance total value deflator constraint relationship, wherein the optimization configuration model includes the installation location of each high-quality power supply device in the target area and the equipment parameters of each high-quality power supply device; The first determination module is specifically used to determine the constraint relationship of the governance total value deflator as: ; in ; In the formula, is the governance deflator, represents the total nominal governance value per year, represents the total value to be governed each year, is the preset threshold, and its value range is ; The second determining module comprises: The first constraint relationship determination unit is used to determine the first constraint relationship related to the sensitive load voltage as follows according to the voltage balance constraint condition: ; In the formula, For the The voltage lower limit at which a sensitive load can maintain normal operation is For the The voltage upper limit that a sensitive load can maintain normal operation is After DVR compensation The voltage of a sensitive load; The second constraint relationship determination unit is used to determine the second constraint relationship related to the DVR installation capacity according to the power constraint balance condition as follows: ; In the formula, Indicates The installed capacity of DVRs For the The maximum compensation voltage of a DVR, For the Output current of DVR; The third constraint relationship determination unit is used to determine a third constraint relationship related to the DVR output current as: ; In the formula, is the total number of loads in the target area; For the The power consumed by a load, For the The rated voltage of a load, It means DVR and The correlation coefficient of the load is Indicates The output voltage of the first DVR can compensate The voltage of a load, on the contrary, when Indicates The output voltage of the first DVR cannot compensate The voltage of a load.

4. According to claim 3, the regional high-quality power supply scheme optimization configuration system, It is characterized in that The objective function establishment module includes: The first setting unit is used to use the total cost of installing treatment equipment in the target area evaluated by the current equipment price as the nominal treatment total value; The second setting unit is used to evaluate the total cost of installing treatment equipment in the target area with the loss cost of the untreated area as the total value to be treated; The third setting unit is used to set the objective function according to the nominal total governance value and the total value to be governed as: ; In the formula, represents the nominal governance value, Indicates the total value to be governed.

5. A device for optimizing and configuring regional high-quality power supply solutions, It is characterized in that include: A memory for storing instructions; wherein the instructions are instructions that can implement the steps of the method for optimizing the configuration of a regional high-quality power supply scheme as described in any one of claims 1 to 2; A processor is used to execute instructions in the memory.

6. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for optimizing and configuring a regional high-quality power supply scheme as described in any one of claims 1-2 are implemented.