A method for evaluating the economic efficiency of unit transformation
By combining financial and SCADA system data in wind turbine renovation, the power generation difference and operation and maintenance costs before and after the transformation are calculated, the problem of large evaluation errors in the existing technology is solved, more accurate economic evaluation is achieved, and the evaluation is improved. Objectivity and efficiency.
Patent Information
- Application Number
- CN202111144355.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-28
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-09-28
AI Technical Summary
In the economic evaluation of wind turbine transformation, the existing technology cannot accurately distinguish the impact of the increase in power generation and the change in wind speed caused by technological transformation, and the failure rate, personnel and spare parts costs are not taken into account, resulting in large evaluation errors and cannot be achieved. Comprehensively evaluate the benefits of transformation.
A method of economic evaluation of unit transformation is adopted. By collecting financial and SCADA system data, the difference in power generation before and after the transformation is calculated, wind speed, failure rate, personnel and spare parts costs are taken into account, and the actual increase and transportation of power generation after the transformation is calculated using the formula. Maintenance cost changes, assess the total rate of return of the transformation.
It improves the accuracy and objectivity of the evaluation, reduces the impact of wind conditions differences on the evaluation, can judge the economics of the transformation more accurately, reduces manual calculations, and improves work efficiency.
Smart Images

Figure CN113887928B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of wind power generation, and in particular to a method for evaluating the economic efficiency of unit transformation. Background Art
[0002] In recent years, the installed capacity of wind turbines in my country has continued to rise, wind power technology has developed rapidly, and new technologies and methods in the field of wind power have continued to emerge. In order to improve the performance of wind turbines, reduce operation and maintenance costs, and increase the power generation of units, wind power operators have an increasingly urgent need to carry out technical transformation of wind turbines that have been put into operation earlier.
[0003] At present, when wind farms conduct economic evaluation on unit transformation projects, they usually adopt the method of comparing investment costs with benefits obtained. When calculating the annual increased income obtained through technical transformation, they simply compare the annual increased income of power generation after the technical transformation with the annual power generation before the technical transformation. This prediction method has large errors. The wind speed of the wind farm is different in each year. It is difficult to determine whether the change in power generation is caused by the technical transformation, or the increase or decrease in power generation caused by the change in wind speed in each year. In other words, it is impossible to evaluate the increase in power generation in each year based on the actual wind conditions in each year. Factors such as the reduction or increase in failure rate caused by technical transformation, increase or decrease in personnel, and inventory cost of spare parts are not considered, and the benefits brought by technical transformation cannot be fully evaluated. Summary of the invention
[0004] The purpose of the present invention is to propose a method for evaluating the economic feasibility of unit transformation in order to solve the above-mentioned problem. While fully considering the impact of differences in wind conditions in different years on the power generation of the unit, it also comprehensively considers factors such as failure rate, personnel, and spare parts consumption costs, making the evaluation more objective and accurate.
[0005] The object of the present invention can be achieved by the following technical solution: A method for evaluating the economic efficiency of unit transformation, comprising the following steps:
[0006] Step 1: Collect data from the financial system. The data is the total cost of transformation within period T. The total cost of transformation is represented by Q1.
[0007] Step 2: Calculate the benefits of increased power generation after the transformation within period T, including:
[0008] When calculating the power generation of each unit before and after the transformation, the power generation difference after normalization before and after the transformation of the wind turbine is calculated;
[0009] When the engine room transfer function is known, the power generation data of the modified unit recorded in the SCADA system can be directly used for analysis. The power generation before and after the modification can be calculated according to the following formula:
[0010] Q T =QSCADA +Q Wind +Q Net +Q People (Formula 1)
[0011] Where: Q SCADA To evaluate the power generation of the unit recorded in the SCADA system during period T;
[0012] Q Wind It is the difference in power generation of the unit caused by the difference in local average wind speed within the evaluation period T;
[0013] Q Net To evaluate the power generation loss caused by the failure of the unit to be connected to the grid during the period T;
[0014] Q People To evaluate the power generation loss of the unit caused by human factors during the period T;
[0015] Q Wind The calculation uses the measured power curve of the unit before or after the transformation and the free stream wind speed V corrected by the transfer function. C-Wind (t) is calculated using the modified dynamic power curve P B When , the wind frequency distribution function is obtained by using the corrected free stream wind speed data before transformation:
[0016]
[0017] Where v represents the 10-minute average wind speed;
[0018] A represents the scale factor;
[0019] k represents the shape factor;
[0020] According to the power curve before or after the transformation and the wind frequency distribution function before the transformation, the power generation of the wind turbine in the period T under the same wind conditions before and after the transformation is calculated by the formula, which is specifically expressed as follows:
[0021]
[0022] Among them, Q C-F It is the power generation under the same wind conditions before the transformation;
[0023] P is the power curve of the wind turbine before transformation within the assessment period T;
[0024] T is the evaluation period T;
[0025] f(v) represents the wind frequency distribution function before transformation;
[0026] The difference in power generation caused by the difference in local average wind speed during the evaluation period T is:
[0027] Q Wind =Q F -Q C-F (Formula 4)
[0028] Among them, Q F The wind frequency distribution function before transformation and the power curve after transformation are the power generation of the wind turbine in the evaluation period T, Q C-F It is the power generation under the same wind conditions before the transformation;
[0029] When the nacelle transfer function is unknown, the normalized power generation before and after the transformation is recalculated using the wind turbine power curve before or after the transformation, and the nacelle wind speed before and after the transformation, and a comparison is made. When the power curve after the transformation is used, the specific processing steps are as follows:
[0030] 1) Obtain the modified wind turbine power curve P from the existing operating data of the SCADA system B ;
[0031] 2) Calculate the wind frequency distribution of the wind farm before and after the transformation within the evaluation period T, and use the wind speed data of the wind turbine SCADA cabin to calculate the wind frequency distribution of the wind farm;
[0032]
[0033] 3) According to the modified power curve P B And the wind frequency distribution function before and after the transformation, the power generation before and after the transformation within the evaluation period T can be calculated, and the formula is expressed as:
[0034]
[0035] Among them, Qi is the wind frequency distribution function fitted by the cabin wind measurement data to calculate the power generation Q of the wind turbine before the transformation within the evaluation period T F Or the power generation Q of the wind turbine after transformation within the evaluation period T B ;
[0036] P B To evaluate the power curve of wind turbines after transformation within the evaluation period T;
[0037] T is the evaluation period;
[0038] f(v) is the wind frequency distribution function before or after the transformation;
[0039] By Q Net , Q People , Q B , Q F Change in power generation before and after the computer group transformation ΔQ T , when ΔQ Tis positive, it means that the power generation has been improved after the transformation. T If negative, it means that the power generation has not been improved, ΔQ T The calculation formula is:
[0040] ΔQ T =Q B -Q F +ΔQ Net +ΔQ People (Formula 7)
[0041] According to the on-grid electricity price (p), the profit Q2 brought by the increase in power generation after the transformation can be calculated:
[0042] Q2=ΔQ T ×p.
[0043] 4) Calculate the power generation loss income Q3 during the transformation period;
[0044] The calculation of the power generation loss income Q3 during the transformation period can be based on the average power generation of the same type of wind turbines in the wind farm during the same period Q AV And the on-grid electricity price (p) is calculated using the following formula:
[0045] Q3=Q AV ×p;
[0046] 5) Calculate the change in operation and maintenance costs Q4 for each unit within the evaluation period T, with an increase being positive and a decrease being negative. The calculation formula is:
[0047] Q4=Q 4F -Q 4B
[0048] Q 4F Including the personnel costs used in daily operation and maintenance before the transformation, the spare parts consumed, and the cost of consumables;
[0049] Q 4B Including the personnel costs used in daily operation and maintenance after the transformation, the spare parts consumed, and the cost of consumables;
[0050] 6) Calculate the change in other costs Q5 of each unit within the evaluation period before and after;
[0051] 7) Calculate the total benefit Q brought by the transformation during the period;
[0052] Q=Q2-Q1-Q3-Q4-Q5
[0053] 8) Judge the rate of return;
[0054] When the rate of return after transformation within the evaluation period Greater than or equal to the preset transformation rate of return When Less than the pre-set transformation rate of return If , it is judged as invalid transformation.
[0055] Further, the transformation rate of return The total benefit Q brought by the transformation within the period is the percentage of the total transformation cost Q1 within period T.
[0056] Compared with the prior art, the present invention has the following beneficial effects:
[0057] 1. Directly obtain data from the financial system and SCADA system, and automatically calculate and store the data, eliminating the manual calculation process and improving work efficiency.
[0058] 2. It reduces the impact of wind conditions from year to year on the power generation of the units, and solves the problem of large errors in traditional evaluation methods. The wind speeds in wind farms are different from year to year, and it is difficult to determine whether the change in power generation is caused by technical transformation, or whether the change in wind speed from year to year brings about an increase or decrease in power generation.
[0059] 3. The impact of failure rate, personnel, spare parts consumption and inventory cost factors on the costs before and after the transformation is fully considered, and the analysis is more objective and accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0061] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0062] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0063] See also Figure 1 As shown, a method for evaluating the economic efficiency of unit transformation includes the following steps:
[0064] Step 1: Collect data from the financial system. The data is the total cost of transformation within period T. The total cost of transformation is represented by Q1.
[0065] Step 2: Calculate the benefits of increased power generation after the transformation within period T, including:
[0066] When calculating the power generation of each unit before and after the transformation, the power generation difference after normalization before and after the transformation of the wind turbine is calculated;
[0067] When the engine room transfer function is known, the power generation data of the modified unit recorded in the SCADA system can be directly used for analysis. The power generation before and after the modification can be calculated according to the following formula:
[0068] Q T =Q SCADA +Q Wind +Q Net +Q People
[0069] Where: Q SCADA To evaluate the power generation of the unit recorded in the SCADA system during period T;
[0070] Q Wind It is the difference in power generation of the unit caused by the difference in local average wind speed within the evaluation period T;
[0071] Q Net To evaluate the power generation loss caused by the failure of the unit to be connected to the grid during the period T;
[0072] Q People To evaluate the power generation loss of the unit caused by human factors during the period T;
[0073] Q Wind The calculation uses the measured power curve of the unit before or after the transformation and the free stream wind speed V corrected by the transfer function. C-Wind (t) is calculated using the modified dynamic power curve P B When , the wind frequency distribution function is obtained by using the corrected free stream wind speed data before transformation:
[0074]
[0075] Where v represents the 10-minute average wind speed;
[0076] A represents the scale factor;
[0077] k represents the shape factor;
[0078] According to the power curve before or after the transformation and the wind frequency distribution function before the transformation, the power generation of the wind turbine in the period T under the same wind conditions before and after the transformation is calculated by the formula, which is specifically expressed as follows:
[0079]
[0080] Among them, Q C-F It is the power generation under the same wind conditions before the transformation;
[0081] P is the power curve of the wind turbine before transformation within the assessment period T;
[0082] T is the evaluation period T;
[0083] f(v) represents the wind frequency distribution function before transformation;
[0084] The difference in power generation caused by the difference in local average wind speed during the evaluation period T is:
[0085] Q Wind =Q F -Q C-F
[0086] Among them, Q F The wind frequency distribution function before transformation and the power curve after transformation are the power generation of the wind turbine in the evaluation period T, Q C-F It is the power generation under the same wind conditions before the transformation;
[0087] When the nacelle transfer function is unknown, the normalized power generation before and after the transformation is recalculated using the wind turbine power curve before or after the transformation, and the nacelle wind speed before and after the transformation, and a comparison is made. When the power curve after the transformation is used, the specific processing steps are as follows:
[0088] 1) Obtain the modified wind turbine power curve P from the existing operating data of the SCADA system B ;
[0089] 2) Calculate the wind frequency distribution of the wind farm before and after the transformation within the evaluation period T, and use the wind speed data of the wind turbine SCADA cabin to calculate the wind frequency distribution of the wind farm;
[0090]
[0091] 3) According to the modified power curve P B And the wind frequency distribution function before and after the transformation, the power generation before and after the transformation within the evaluation period T can be calculated, and the formula is expressed as:
[0092]
[0093] Among them, Qi is the wind frequency distribution function fitted by the cabin wind measurement data to calculate the power generation Q of the wind turbine before the transformation within the evaluation period T F Or the power generation Q of the wind turbine after transformation within the evaluation period T B ;
[0094] P B To evaluate the power curve of wind turbines after transformation within the evaluation period T;
[0095] T is the evaluation period;
[0096] f(v) is the wind frequency distribution function before or after the transformation;
[0097] By Q Net , QPeople , Q B , Q F Change in power generation before and after the computer group transformation ΔQ T , when ΔQ T is positive, it means that the power generation has been improved after the transformation. T If negative, it means that the power generation has not been improved, ΔQ T The calculation formula is:
[0098] ΔQ T =Q B -Q F +ΔQ Net +ΔQ People
[0099] According to the on-grid electricity price (p), the profit Q2 brought by the increase in power generation after the transformation can be calculated:
[0100] Q2=ΔQ T ×p.
[0101] 4) Calculate the power generation loss income Q3 during the transformation period;
[0102] The calculation of the power generation loss income Q3 during the transformation period can be based on the average power generation of the same type of wind turbines in the wind farm during the same period Q AV And the on-grid electricity price (p) is calculated using the following formula:
[0103] Q3=Q AV ×p;
[0104] 5) Calculate the change in operation and maintenance costs Q4 for each unit within the evaluation period T, with an increase being positive and a decrease being negative. The calculation formula is:
[0105] Q4=Q 4F -Q 4B
[0106] Q 4F Including the personnel costs used in daily operation and maintenance before the transformation, the spare parts consumed, and the cost of consumables;
[0107] Q 4B Including the personnel costs used in daily operation and maintenance after the transformation, the spare parts consumed, and the cost of consumables;
[0108] 6) Calculate the change in other costs Q5 of each unit within the evaluation period before and after;
[0109] 7) Calculate the total benefit Q brought by the transformation during the period;
[0110] Q=Q2-Q1-Q3-Q4-Q5
[0111] 8) Judge the rate of return;
[0112] When the rate of return after transformation within the evaluation period Greater than or equal to the preset transformation rate of return When Less than the pre-set transformation rate of return When the transformation is invalid, the transformation rate is The total benefit Q brought by the transformation within the period accounts for the percentage of the total transformation cost Q1 within the period T, and the pre-set transformation rate of return is 20%.
[0113] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for evaluating the economic efficiency of unit transformation, characterized in that: The steps include: Step 1: Collect data from the financial system. The data is the total cost of transformation within period T. express; Step 2: Calculate the benefits of increased power generation after the transformation within period T, including: When calculating the power generation of each unit before and after the transformation, the power generation difference after normalization before and after the transformation of the wind turbine is calculated; When the engine room transfer function is known, the power generation data of the modified unit recorded in the SCADA system can be directly used for analysis. The power generation before and after the modification can be calculated according to the following formula: (Formula 1) in: To evaluate the power generation of the unit recorded in the SCADA system during period T; It is the difference in power generation of the unit caused by the difference in local average wind speed within the evaluation period T; To evaluate the power generation loss caused by the failure of the unit to be connected to the grid during the period T; To evaluate the power generation loss of the unit caused by human factors during the period T; The calculation uses the measured power curve of the unit before or after the transformation and the free stream wind speed corrected by the transfer function. Calculations were performed using the modified dynamic power curve When , the wind frequency distribution function is obtained by using the corrected free stream wind speed data before transformation: (Formula 2) Where v represents the 10-minute average wind speed; A represents the scale factor; k represents the shape factor; According to the power curve before or after the transformation and the wind frequency distribution function before the transformation, the power generation of the wind turbine in the period T under the same wind conditions before and after the transformation is calculated by the formula, which is specifically expressed as follows: (Formula 3) in, It is the power generation under the same wind conditions before the transformation; P is the power curve of the wind turbine before transformation within the assessment period T; T is the evaluation period; represents the wind frequency distribution function before transformation; The difference in power generation caused by the difference in local average wind speed during the evaluation period T is: (Formula 4) in, The wind frequency distribution function before transformation and the power curve after transformation are the power generation of the wind turbine in the evaluation period T. It is the power generation under the same wind conditions before the transformation; When the nacelle transfer function is unknown, the normalized power generation before and after the transformation is recalculated using the wind turbine power curve before or after the transformation, and the nacelle wind speed before and after the transformation, and a comparison is made. When the power curve after the transformation is used, the specific processing steps are as follows: 1) Obtain the modified wind turbine power curve from the existing operating data of the SCADA system ; 2) Calculate the wind frequency distribution of the wind farm before and after the transformation within the evaluation period T, and use the wind speed data of the wind turbine SCADA cabin to calculate the wind frequency distribution of the wind farm; (Formula 5) 3) According to the power curve after transformation And the wind frequency distribution function before and after the transformation, the power generation before and after the transformation within the evaluation period T can be calculated, and the formula is expressed as: (Formula 6) in, To calculate the power generation of the wind turbine before transformation within the evaluation period T using the wind frequency distribution function fitted by the cabin wind measurement data Or the power generation of the wind turbine after transformation within the evaluation period T ; To evaluate the power curve of wind turbines after transformation within the period T; T is the evaluation period; is the wind frequency distribution function before or after the transformation; pass , , , Change in power generation before and after computer group transformation ,when If it is positive, it means that the power generation has been improved after the transformation. If it is negative, it means that the power generation has not been improved. The calculation formula is: (Formula 7) According to the on-grid electricity price ( ) can calculate the benefits of increased power generation after the transformation : ; 4) Calculate the loss of power generation during the transformation period ; Loss of power generation during the transformation period The calculation can use the average power generation of wind turbines of the same type in the wind farm during the same period and on-grid tariff ( ) is calculated, and the calculation formula is: ; 5) Calculate the change in operation and maintenance costs of each unit within the evaluation period T , increase is positive, decrease is negative, The calculation formula is: , Including the personnel costs used in daily operation and maintenance before the transformation, the spare parts consumed, and the cost of consumables; Including the personnel costs used in daily operation and maintenance after the transformation, the spare parts consumed, and the cost of consumables; 6) Calculate the changes in other costs of each unit during the evaluation period before and after ; 7) Calculate the total benefits of the transformation within the period ; ; 8) Judge the rate of return; When the rate of return after transformation within the evaluation period Greater than or equal to the preset transformation rate of return When Less than the pre-set transformation rate of return When the transformation is invalid, the transformation rate is Total benefits of transformation within the cycle Total cost of transformation within period T percentage.