A method, device, equipment and medium for clearing electricity market containing cascade hydropower
By obtaining the operating parameters of the cascade hydropower unit and combining multiple constraints, a power market cleaning model was established, which solved the problem of failure to effectively consider hydraulic constraints and complex characteristics of hydropower units in the existing technology, and achieved a more refined power The market is cleared and is suitable for water and electricity-enriched areas.
Patent Information
- Application Number
- CN202111104634.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-09-22
AI Technical Summary
The prior art failed to effectively consider detailed hydraulic constraints and complex characteristics of hydropower units in the electric spot market containing cascade hydropower, resulting in the inability to make further breakthroughs in the clearance of the power market.
By obtaining the operating parameters of the cascade hydropower unit, a power market cleaning model is established with the optimization goal of the lowest total power generation cost, and combining the power system-related constraints, safety constraints, unit characteristic constraints and hydropower station reservoir constraints, the power market cleaning calculation is carried out.
It has achieved more refined cleaning in the spot power market with cascade hydropower, taking into account the complexity of optimized scheduling of hydropower and the complexity of the spot power market, and provided a more effective cleaning solution for hydropower enriched areas. .
Smart Images

Figure CN113919657B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of electric power technology, and in particular to a method, device, equipment and medium for clearing a power market containing cascade hydropower. Background Art
[0002] With the advancement of the market-oriented reform of electricity, many provinces in China have initially established medium- and long-term trading markets, and the construction of provincial electricity spot markets has also been continuously promoted. As the second largest conventional energy source, hydropower occupies an extremely important position in the power system structure. In actual operation, the high proportion of hydropower installed capacity, the great differences in the principles of power generation during flood and drought, the complex grid structure and many constraints, the complex coupling of river basin cascade relationships, and the great differences in the competitive capabilities of various market players have brought huge challenges to the construction of the electricity spot market.
[0003] At present, in the construction of electricity spot markets for power grids containing cascade hydropower, the clearing technology of conventional electricity spot markets is generally used to implement it. Cascade hydropower is only simplified and detailed hydraulic constraints and complex characteristics of hydropower units are not considered. It is impossible to make further breakthroughs in the key clearing technologies of the electricity spot market containing cascade hydropower. Summary of the invention
[0004] The present invention provides a method, device, equipment and medium for clearing the electricity market containing cascade hydropower, so as to solve the problem that the prior art only simplifies the consideration of cascade hydropower without considering detailed hydraulic constraints and complex characteristics of hydropower units, and cannot make further breakthroughs in the key technology of clearing the electricity spot market containing cascade hydropower.
[0005] To achieve the above object, an embodiment of the present invention provides a method for clearing a power market containing cascade hydropower, comprising the following steps:
[0006] Obtaining operating parameters of a unit; wherein the unit includes a cascade hydropower unit;
[0007] Obtaining unit constraints according to the operating parameters; wherein the unit constraints include power system related constraints, safety constraints, unit characteristic constraints, and hydropower station reservoir constraints;
[0008] An objective function is established with the minimum total power generation cost of the power system generator set as the optimization goal, and a power market clearing model is constructed based on the objective function and the unit constraint conditions;
[0009] The power market model is subjected to power market clearing calculation to obtain a power market clearing result.
[0010] As one optional embodiment, the power system related constraints include active power balance constraints and reserve capacity constraints;
[0011] The active power balance constraint is:
[0012]
[0013] The spare capacity constraint is:
[0014]
[0015] Among them, D n,t is the system load of province n, α n,i,t is the start / stop status of the i-th unit in province n during period t, is the maximum output of the i-th unit in province n during period t, is the positive reserve demand of province n during period t.
[0016] As an optional embodiment, the safety constraint includes line flow constraint and section flow constraint;
[0017] The line power flow constraint is:
[0018]
[0019] The cross-sectional flow constraint is:
[0020]
[0021] in, are the generation transfer distribution factors of node m in province n to the l1th line and s1th section in province n, is the power transmission limit of line l1 in province n, is the power flow transmission limit of section s1 in province n, P n,m,t is the injected power of node m in province n at time t, N m is the number of nodes in province n.
[0022] As one optional embodiment, the unit characteristic constraints include unit output upper and lower limit constraints, unit climbing constraints, and unit minimum continuous start-stop time constraints;
[0023] The upper and lower limits of the unit output constraints include:
[0024]
[0025] The unit climbing constraints include:
[0026]
[0027]
[0028] The minimum continuous start-stop time constraints of the unit include:
[0029]
[0030]
[0031]
[0032]
[0033] Among them, α n,i,t , α n,i,t-1 , α n,i,k are the start and stop states of the i-th unit in province n at time periods t, t-1, and k, respectively. are the minimum and maximum output of the i-th unit in period t, P n,i,t , P n,i,t-1 are the power of the i-th unit in province n at time periods t and t-1, are the minimum output and maximum output of the i-th unit in province n during period t, are the maximum ramp-up rate limit and the maximum ramp-down limit of the i-th unit in province n, are the continuous start-up time and continuous shutdown time of the i-th unit in province n during period t, T n,i,U 、T n,i,D are the minimum continuous start-up time and minimum continuous shutdown time of the i-th unit in province n, respectively.
[0034] As one of the optional embodiments, the reservoir constraints of the hydropower station include a water balance equation, a relationship between the power generation flow of the hydropower station and the power generation flow of the hydropower unit, a relationship between the output of the hydropower station and the output of the hydropower unit, a power generation flow limit of the hydropower unit, a reservoir abandonment flow limit, a reservoir outflow flow limit, a reservoir capacity limit, an initial reservoir capacity limit, a reservoir capacity limit at the end of the scheduling period, a power generation head of the hydropower unit, a relationship between the reservoir water level and capacity, a relationship between the reservoir tail water level and discharge, and a dynamic characteristic curve of the hydropower unit.
[0035] As an optional embodiment, the expression of the objective function is specifically:
[0036]
[0037]
[0038] Where n is the province number, N is the total number of provinces, and f n is the power generation cost of the unit in province n, i is the unit number, N n is the number of units in province n, t is the time period number, T is the total number of time periods, P n,i,t represents the power of the i-th unit in province n during period t, C n,i,t(P n,i,t ), They represent the operating cost and startup cost of unit i in province n during period t respectively.
[0039] Another embodiment of the present invention provides a power market clearing device including cascade hydropower, comprising:
[0040] An operating parameter acquisition module, used to acquire the operating parameters of the unit; wherein the unit includes a cascade hydropower unit;
[0041] A constraint condition acquisition module, used to obtain unit constraint conditions according to the operating parameters; wherein the unit constraint conditions include power system related constraints, safety constraints, unit characteristic constraints, and hydropower station reservoir constraints;
[0042] A clearing model building module is used to establish an objective function with the lowest total power generation cost of the power system generator set as the optimization goal, and to build an electricity market clearing model based on the objective function and the unit constraint conditions;
[0043] The clearing result calculation module is used to perform power market clearing calculation on the power market model to obtain the power market clearing result.
[0044] Another embodiment of the present invention provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, the method for clearing the electricity market containing cascade hydropower described in the above-mentioned embodiment of the invention is implemented.
[0045] Another embodiment of the present invention provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the electricity market clearing method containing cascade hydropower as described in the above-mentioned embodiment of the invention.
[0046] Compared with the prior art, the embodiments of the present invention provide a method, device, equipment and medium for clearing the electricity market containing cascade hydropower. By adding hydropower optimization scheduling constraints to the electricity market clearing model, it takes into account the complexity of hydropower optimization scheduling and the complexity of clearing the electricity spot market. It solves the problem that the prior art only simplifies cascade hydropower, does not consider detailed hydraulic constraints and complex characteristics of hydropower units, and cannot make further breakthroughs in key technologies for clearing the electricity spot market containing cascade hydropower. It provides a further technical solution for clearing the electricity spot market in various regions of my country, especially in hydropower-rich regions. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1It is a flow chart of a method for clearing a power market containing cascade hydropower provided by an embodiment of the present invention;
[0048] Figure 2 It is a structural schematic diagram of a power market clearing device including cascade hydropower provided by an embodiment of the present invention;
[0049] Figure 3 It is a structural diagram of a terminal device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0051] See also Figure 1 , is a flow chart of a method for clearing a power market containing cascade hydropower provided by an embodiment of the present invention, the method comprising steps S11 to S14:
[0052] S11. Obtaining operating parameters of a unit; wherein the unit comprises a cascade hydropower unit.
[0053] S12. Obtain unit constraints according to the operating parameters; wherein the unit constraints include power system related constraints, safety constraints, unit characteristic constraints, and hydropower station reservoir constraints.
[0054] S13. Establish an objective function with the minimum total power generation cost of the power system generator set as the optimization goal, and construct an electricity market clearing model based on the objective function and the unit constraints.
[0055] S14. Performing power market clearing calculation on the power market model to obtain a power market clearing result.
[0056] It is understandable that in the electricity spot market environment, the daily power generation and power generation curve of each power plant will be obtained through bidding and clearing in the electricity spot market. Among them, large-scale hydropower-rich areas have the following significant characteristics: (1) large hydropower scale and a large number of hydropower bases; (2) many cascade levels of the main stream and close upstream and downstream hydraulic connections; (3) complex power connections and close interweaving of power and hydropower connections; (4) many comprehensive utilization requirements and complex and diverse coordination relationships. Due to the above characteristics, large-scale cascade hydropower systems are different from small-scale hydropower systems that can be consumed and balanced locally, and also different from thermal power systems. The electricity spot market clearing of large-scale cascade hydropower is much more complicated than that of hydropower and thermal power systems containing small-scale hydropower. In the existing centralized optimization and clearing methods of the electricity spot market, cascade hydropower is not considered enough. Most studies simplify the consideration of cascade hydropower, only considering the power constraints of the power station, without considering the detailed hydraulic constraints and the complex characteristics of the hydropower units. Although some studies consider hydraulic constraints, they use simplified hydropower unit characteristics.
[0057] Compared with the prior art, the method for clearing the electricity market containing cascade hydropower provided in the embodiment of the present invention takes into account both the complexity of hydropower optimization scheduling and the complexity of clearing the electricity spot market by adding hydropower optimization scheduling constraints to the electricity market clearing model. It solves the problem that the prior art only simplifies the consideration of cascade hydropower without considering detailed hydraulic constraints and complex characteristics of hydropower units, and is unable to make further breakthroughs in the key technologies for clearing the electricity spot market containing cascade hydropower. It provides a further technical solution for clearing the electricity spot market in various regions of my country, especially in hydropower-rich regions.
[0058] As one optional embodiment, the power system related constraints include active power balance constraints and reserve capacity constraints;
[0059] The active power balance constraint is:
[0060]
[0061] The spare capacity constraint is:
[0062]
[0063] Among them, D n,t is the system load of province n, α n,i,t is the start / stop status of the i-th unit in province n during period t, is the maximum output of the i-th unit in province n during period t, is the positive reserve demand of province n during period t.
[0064] As an optional embodiment, the safety constraint includes line flow constraint and section flow constraint;
[0065] The line power flow constraint is:
[0066]
[0067] The cross-sectional flow constraint is:
[0068]
[0069] in, are the generation transfer distribution factors of node m in province n to the l1th line and s1th section in province n, is the power transmission limit of line l1 in province n, is the power flow transmission limit of section s1 in province n, P n,m,t is the injected power of node m in province n at time t, N m is the number of nodes in province n.
[0070] As one optional embodiment, the unit characteristic constraints include unit output upper and lower limit constraints, unit climbing constraints, and unit minimum continuous start-stop time constraints;
[0071] The upper and lower limits of the unit output constraints include:
[0072]
[0073] The unit climbing constraints include:
[0074]
[0075]
[0076] The minimum continuous start-stop time constraints of the unit include:
[0077]
[0078]
[0079]
[0080]
[0081] Among them, α n,i,t , α n,i,t-1 , α n,i,k are the start and stop states of the i-th unit in province n at time periods t, t-1, and k, respectively. are the minimum and maximum output of the i-th unit in period t, P n,i,t , P n,i,t-1 are the power of the i-th unit in province n at time periods t and t-1, are the minimum output and maximum output of the i-th unit in province n during period t, are the maximum ramp-up rate limit and the maximum ramp-down limit of the i-th unit in province n, are the continuous start-up time and continuous shutdown time of the i-th unit in province n during period t, T n,i,U 、T n,i,D are the minimum continuous start-up time and minimum continuous shutdown time of the i-th unit in province n, respectively.
[0082] As one of the optional embodiments, the reservoir constraints of the hydropower station include a water balance equation, a relationship between the power generation flow of the hydropower station and the power generation flow of the hydropower unit, a relationship between the output of the hydropower station and the output of the hydropower unit, a power generation flow limit of the hydropower unit, a reservoir abandonment flow limit, a reservoir outflow flow limit, a reservoir capacity limit, an initial reservoir capacity limit, a reservoir capacity limit at the end of the scheduling period, a power generation head of the hydropower unit, a relationship between the reservoir water level and capacity, a relationship between the reservoir tail water level and discharge, and a dynamic characteristic curve of the hydropower unit.
[0083] Exemplarily, the expression of the hydropower station reservoir constraint specifically includes:
[0084] 1) Water balance equation
[0085] v j,t =v j,t-1 +(Q j,t +I j,t -u j,t )×Δt
[0086] u j,t =q j,t +s j,t
[0087] Where: v j,t is the storage capacity of reservoir j at the end of period t, Q j,t is the inflow of power station j in period t, I j,t is the interval inflow of reservoir j in period t, u j,t is the total outflow of reservoir j in period t, q j,t is the power generation flow of power station j in period t, s j,t is the water discharge of reservoir j in period t.
[0088] 2) Relationship between the power generation flow of hydropower stations and the power generation flow of hydropower units
[0089]
[0090] Where: q n,j,t is the power generation flow of hydropower unit i in province n.
[0091] 3) Relationship between hydropower station output and hydropower unit output
[0092]
[0093] Where: P j,t is the output of power station j during period t.
[0094] 2) Hydropower unit power flow limit
[0095]
[0096] Where: Q j are the upper and lower limits of the power generation flow of hydropower unit i in province n, respectively.
[0097] 3) Reservoir discharge flow limit
[0098]
[0099] Where: is the discharge flow of reservoir j.
[0100] 4) Reservoir outflow restrictions
[0101]
[0102] Where: U j are the upper and lower limits of the outflow flow of reservoir j respectively.
[0103] 5) Reservoir capacity restrictions
[0104]
[0105] Where: V j are the upper and lower limits of the storage capacity of reservoir j, in m 3 .
[0106] 6) Initial reservoir capacity limit
[0107] v j,0 =V j,0
[0108] Where: V j,0 is the initial storage capacity value of a given scheduling period.
[0109] 7) Reservoir capacity limit at the end of the dispatch period
[0110] v j,T =V j,T
[0111] Where: Vj,T is the storage capacity at the end of a given scheduling period, in m 3 .
[0112] 8) Hydropower generating head
[0113]
[0114] Where: h n,i,t is the generating head of hydropower unit i in province n during period t; z j,t is the water level in front of the dam of reservoir j at time t; j,t is the tailwater level of reservoir j at time t; is the head loss constant of power station j in period t.
[0115] 9) Relationship between reservoir water level and storage capacity
[0116] z j,t =f zv (v j,t )
[0117] Where: f zv (.) is the water level and reservoir capacity relationship function.
[0118] 10) Relationship between reservoir tailwater level and discharge
[0119] zd j,t =f zu (u j,t )
[0120] Where: f zu (.) is the tailwater level discharge relationship function.
[0121] 11) Hydropower unit power characteristic curve
[0122] p n,i,t =f pqh (q n,i,t ,h n,i,t )
[0123] Where: f pqh (.) is the three-dimensional relationship function of hydropower unit output, power generation flow and power generation head.
[0124] As an optional embodiment, the expression of the objective function is specifically:
[0125]
[0126]
[0127] Where n is the province number, N is the total number of provinces, and f n is the power generation cost of the unit in province n, i is the unit number, Nn is the number of units in province n, t is the time period number, T is the total number of time periods, P n,i,t represents the power of the i-th unit in province n during period t, C n,i,t (P n,i,t ), They represent the operating cost and startup cost of unit i in province n during period t respectively.
[0128] See also Figure 2 , is a schematic diagram of the structure of a power market clearing device including cascade hydropower provided by an embodiment of the present invention, comprising:
[0129] An operating parameter acquisition module 21 is used to acquire operating parameters of a unit; wherein the unit includes a cascade hydropower unit;
[0130] A constraint condition acquisition module 22, used to obtain unit constraint conditions according to the operating parameters; wherein the unit constraint conditions include power system related constraints, safety constraints, unit characteristic constraints, and hydropower station reservoir constraints;
[0131] A clearing model building module 23 is used to establish an objective function with the lowest total power generation cost of the power system generator set as the optimization target, and to build an electricity market clearing model based on the objective function and the unit constraint conditions;
[0132] The clearing result calculation module 24 is used to perform power market clearing calculation on the power market model to obtain a power market clearing result.
[0133] Compared with the prior art, the embodiment of the present invention provides a power market clearing device containing cascade hydropower, which obtains the operating parameters of the unit through the operating parameter acquisition module 21, obtains the unit constraints through the constraint condition acquisition module 22, constructs the power market clearing model through the clearing model construction module 23, and obtains the power market clearing result through the clearing result calculation module 24. By adopting the embodiment of the present invention, it is possible to consider both the complexity of hydropower optimization scheduling and the complexity of clearing the power spot market by adding the hydropower optimization scheduling constraints to the power market clearing model, solves the problem that the prior art only simplifies the consideration of cascade hydropower, does not consider the detailed hydraulic constraints and the complex characteristics of the hydropower units, and cannot make further breakthroughs in the key technology of clearing the power spot market containing cascade hydropower, and provides a further technical solution for clearing the power spot market in various regions of my country, especially in hydropower-rich regions.
[0134] See also Figure 3, is a schematic diagram of the structure of a terminal device provided in an embodiment of the present invention. The terminal device 3 of this embodiment includes: a processor 30, a memory 31, and a computer program stored in the memory 31 and executable on the processor 30. When the processor 30 executes the computer program, the steps in the above-mentioned embodiments of the power system production simulation method based on offshore wind turbines are implemented. Alternatively, when the processor 30 executes the computer program, the functions of each module in the above-mentioned device embodiments are implemented.
[0135] Exemplarily, the computer program may be divided into one or more modules, which are stored in the memory 31 and executed by the processor 30 to implement the present invention. The one or more modules may be a series of computer program instruction segments capable of implementing specific functions, and the instruction segments are used to describe the execution process of the computer program in the terminal device 3.
[0136] The terminal device 3 may be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The terminal device 3 may include, but is not limited to, a processor 30 and a memory 31. Those skilled in the art will appreciate that the schematic diagram is merely an example of a terminal device and does not constitute a limitation on the terminal device. The terminal device 3 may include more or fewer components than shown in the diagram, or may combine certain components, or different components. For example, the terminal device 3 may also include an input / output device, a network access device, a bus, etc.
[0137] The processor 30 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor 30 is the control center of the terminal device 3, and uses various interfaces and lines to connect various parts of the entire terminal device 3.
[0138] The memory 31 can be used to store the computer program and / or module. The processor 30 realizes various functions of the terminal device 3 by running or executing the computer program and / or module stored in the memory 31 and calling the data stored in the memory 31. The memory 31 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory 31 can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0139] Wherein, if the module integrated in the terminal device 3 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor 30, the steps of the above-mentioned various method embodiments can be implemented. Wherein, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0140] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.
[0141] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the electricity market clearing method containing cascade hydropower as described above.
[0142] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A method for clearing the electricity market containing cascade hydropower, characterized in that: The following steps are involved: Obtaining operating parameters of a unit; wherein the unit includes a cascade hydropower unit; Obtaining unit constraints according to the operating parameters; wherein the unit constraints include power system related constraints, safety constraints, unit characteristic constraints, and hydropower station reservoir constraints; An objective function is established with the minimum total power generation cost of the power system generator set as the optimization goal, and a power market clearing model is constructed based on the objective function and the unit constraint conditions; Performing power market clearing calculation on the power market clearing model to obtain a power market clearing result; in, The power system related constraints include active power balance constraints and reserve capacity constraints; The active power balance constraint is: The spare capacity constraint is: in, For provinces The system load, For provinces No. Unit in The start and stop status of the time period, For provinces No. Unit in The maximum output of the time period, For provinces exist Positive and standby demand during the time period; The safety constraints include line flow constraints and section flow constraints; The line power flow constraint is: The cross-sectional flow constraint is: in, , Provinces node For provinces and regions No. Line and The power generation transfer distribution factor of each section, For provinces line The power transmission limit of For provinces Section The power transmission limit of For provinces node exist The injected power at the moment, For provinces The number of nodes; The unit characteristic constraints include unit output upper and lower limit constraints, unit climbing constraints, and unit minimum continuous start and stop time constraints; The upper and lower limits of the unit output constraints include: The unit climbing constraints include: The minimum continuous start-stop time constraints of the unit include: in, Provinces No. Unit in The start and stop status of the time period, , Respectively Unit in The minimum output and maximum output of the time period, Provinces No. Unit in The power of the time period, Provinces No. Unit in The minimum output and maximum output of the time period, point Not for provinces No. The maximum ramp-up rate limit and the maximum ramp-down limit of each unit are Provinces No. Unit in The time that the machine has been on and off continuously during the time period. Provinces No. Minimum continuous start-up time and minimum continuous shutdown time of each unit; The reservoir constraints of the hydropower station include water balance equation, relationship between the power generation flow of the hydropower station and the power generation flow of the hydropower unit, relationship between the output of the hydropower station and the output of the hydropower unit, power generation flow limit of the hydropower unit, reservoir abandonment flow limit, reservoir outflow flow limit, reservoir storage capacity limit, reservoir initial storage capacity limit, reservoir storage capacity limit at the end of the dispatch period, hydropower unit power generation head, reservoir water level storage capacity relationship, reservoir tail water level discharge relationship, and hydropower unit power characteristic curve; The expression of the objective function is specifically: in, is the province code, is the total number of provinces and regions, For provinces The unit power generation cost, is the unit number, For provinces The number of units, is the time period number, is the total number of time periods, Indicates province No. Unit in The power of the time period, , Represents provinces and regions The crew exist Operating costs and startup costs for the period.
2. A power market clearing device containing cascade hydropower, characterized in that: include: An operating parameter acquisition module, used to acquire the operating parameters of the unit; wherein the unit includes a cascade hydropower unit; A constraint condition acquisition module, used to obtain unit constraint conditions according to the operating parameters; wherein the unit constraint conditions include power system related constraints, safety constraints, unit characteristic constraints, and hydropower station reservoir constraints; A clearing model building module is used to establish an objective function with the lowest total power generation cost of the power system generator set as the optimization goal, and to build an electricity market clearing model based on the objective function and the unit constraint conditions; A clearing result calculation module, used to perform a power market clearing calculation on the power market clearing model to obtain a power market clearing result; in, The power system related constraints include active power balance constraints and reserve capacity constraints; The active power balance constraint is: The spare capacity constraint is: in, For provinces The system load, For provinces No. Unit in The start and stop status of the time period, For provinces No. Unit in The maximum output of the time period, For provinces exist Positive and standby demand during the time period; The safety constraints include line flow constraints and section flow constraints; The line power flow constraint is: The cross-sectional flow constraint is: in, , Provinces node For provinces and regions No. Line and The power generation transfer distribution factor of each section, For provinces line The power transmission limit of For provinces Section The power transmission limit of For provinces node exist The injected power at the moment, For provinces The number of nodes; The unit characteristic constraints include unit output upper and lower limit constraints, unit climbing constraints, and unit minimum continuous start and stop time constraints; The upper and lower limits of the unit output constraints include: The unit climbing constraints include: The minimum continuous start-stop time constraints of the unit include: in, Provinces No. Unit in The start and stop status of the time period, , Respectively Unit in The minimum output and maximum output of the time period, Provinces No. Unit in The power of the time period, Provinces No. Unit in The minimum output and maximum output of the time period, point Not for provinces No. The maximum ramp-up rate limit and the maximum ramp-down limit of each unit are Provinces No. Unit in The time that the machine has been on and off continuously during the time period. Provinces No. Minimum continuous start-up time and minimum continuous shutdown time of each unit; The reservoir constraints of the hydropower station include water balance equation, relationship between the power generation flow of the hydropower station and the power generation flow of the hydropower unit, relationship between the output of the hydropower station and the output of the hydropower unit, power generation flow limit of the hydropower unit, reservoir abandonment flow limit, reservoir outflow flow limit, reservoir storage capacity limit, reservoir initial storage capacity limit, reservoir storage capacity limit at the end of the dispatch period, hydropower unit power generation head, reservoir water level storage capacity relationship, reservoir tail water level discharge relationship, and hydropower unit power characteristic curve; The expression of the objective function is specifically: in, is the province code, is the total number of provinces and regions, For provinces The unit power generation cost, is the unit number, For provinces The number of units, is the time period number, is the total number of time periods, Indicates province No. Unit in The power of the time period, , Represents provinces and regions The crew exist Operating costs and startup costs for the period.
3. A terminal device, characterized in that: The method comprises a processor, a memory and a computer program stored in the memory and configured to be executed by the processor, wherein the processor implements the method for clearing the electricity market containing cascade hydropower as claimed in claim 1 when executing the computer program.
4. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the method for clearing the electricity market containing cascade hydropower according to claim 1.