A decision-making aid for developing procurement strategies during the productivity recovery phase
By constructing a multi-dimensional index model and a capacity increase and fall rate index, the problem of supplier capacity prediction in the productivity recovery stage was solved, accurate warning of capacity recovery and scientific adjustment of procurement strategies were achieved, and delivery risks were reduced.
Patent Information
- Application Number
- CN202111001302.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-30
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-08-30
AI Technical Summary
In the productivity recovery phase, how to accurately predict the recovery of suppliers' capacity to guide procurement strategy adjustments to avoid the risks of insecurity and delivery, especially when suppliers may provide false information.
By constructing a multi-dimensional index model, including the capacity water level index and the capacity cumulative recovery index, combined with electricity consumption data, cross-comparison analysis is carried out to judge the supplier's capacity recovery situation, and early warning of the capacity increase and fall index and adjust procurement strategies.
Accurate prediction of supplier capacity recovery is achieved, delivery risks in order execution is reduced, procurement strategies are ensured, and the impact of power grid construction is avoided due to insufficient production capacity.
Smart Images

Figure CN113935568B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of capacity prediction, and in particular to the field of capacity prediction in the productivity recovery stage, and more specifically to an auxiliary decision-making method for formulating procurement strategies in the productivity recovery stage. Background Art
[0002] The productivity recovery stage refers to the stage when an enterprise gradually resumes normal production after the factors causing the shutdown or production reduction are eliminated after the shutdown or production reduction due to an emergency (such as an epidemic). During the productivity recovery stage, since the production capacity is gradually increasing, but at the same time the production capacity is also in constant change, how to accurately predict the supplier's production capacity, so as to adjust the procurement plan in advance and ensure that the demand is smoothly met, is the key issue that the purchaser is concerned about during the supplier's productivity recovery stage.
[0003] However, since supplier capacity assessment involves corporate privacy such as orders and production plans, and suppliers are very likely to provide false information in order to maximize their profits, it is necessary to find an objective method that can accurately evaluate the supplier's capacity during the productivity recovery phase, so as to predict the supplier's recovery level and help purchasers discover possible demand and supply problems as early as possible and adjust procurement plans.
[0004] Given that there is a certain correlation between electricity consumption and material production capacity, and that electricity consumption information is difficult to falsify, easy to verify, easy to obtain, and able to reflect actual production conditions, by analyzing the relationship between electricity consumption and production capacity, it is possible to effectively monitor and warn suppliers' production capacity and operating conditions.
[0005] At present, many scholars have used big data analysis technology to study the correlation between electricity consumption and the production and operation of power companies, proving the theoretical feasibility of monitoring supplier capacity based on supplier electricity consumption data. However, there is currently a lack of quantitative research on real-time monitoring of electricity consumption to warn suppliers of capacity and guide demand parties to formulate and adjust procurement strategies during the productivity recovery stage. Summary of the invention
[0006] The technical problem to be solved by the present invention is how to develop an accurate, effective and reliable prediction model based on power big data, so as to accurately predict the production capacity recovery of suppliers in the productivity recovery stage.
[0007] In order to solve the above technical problems, the present invention discloses an auxiliary decision-making method for formulating a procurement strategy in the productivity recovery stage, comprising the following steps:
[0008] S1: Construct a multi-dimensional index model based on basic electricity consumption;
[0009] The multi-dimensional index model includes an index model with two dimensions: a capacity level index and a capacity cumulative recovery index;
[0010] The capacity level index includes two index models: the restored power volume% (historical peak) and the restored power volume% (during the same period of the lunar calendar), which are calculated according to the following formula:
[0011] Re-production power % (historical peak) = (power consumption on the day - basic power consumption) / (historical single-day peak power consumption - basic power consumption);
[0012] Re-production electricity % (during the same period of the lunar calendar) = (electricity consumption on the day - basic electricity consumption) / (electricity consumption during the same period of the previous lunar calendar - basic electricity consumption);
[0013] The cumulative capacity recovery index is calculated by comparing the supplier's cumulative output with the electricity consumption in the same period, and is specifically calculated according to the following formula:
[0014] Supplier's cumulative output % (during the same period of the lunar calendar) = (total electricity consumption from the tenth day of the first lunar month of the current year to the evaluation date - cumulative basic electricity consumption) / (total electricity consumption from the tenth day of the first lunar month of the previous year to the evaluation date - cumulative basic electricity consumption);
[0015] S2: Obtain the electricity data of different suppliers of a certain material in the order;
[0016] S3: Substitute the electricity data of different suppliers into the index model constructed in S1 for calculation;
[0017] S4: Based on the calculation results of the index model, a cross-comparison method is used to conduct relative data analysis on the results between different suppliers.
[0018] And output the judgment results in the following way:
[0019] (1) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is also high, and the restored power % (historical peak) is high, it is considered that the supplier's cumulative production capacity meets the demand, and it is possible that the rush work has been completed and there is surplus production capacity, so the order can be placed first;
[0020] (2) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is also high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and may have surplus production capacity, so orders can be placed with priority. Based on further confirmation of the executed orders, if the order volume this year is the same as last year, the production capacity is relatively abundant; if the order volume this year is relatively large, there may be delivery risks;
[0021] (3) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification;
[0022] (4) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and does not need to be rushed, and the order can be placed first;
[0023] (5) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is high, it is considered that the supplier's cumulative production capacity does not meet demand, and the supplier is working at full capacity with no surplus production capacity. It is necessary to pay attention to the current order delivery date and it is not recommended to place an order;
[0024] (6) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and is not rushing to work at full capacity. It is not recommended to place an order, and attention should be paid to the delivery situation. Further verification based on the executed orders. If the orders this year are less than last year, there is no need to rush to work; if the orders this year are relatively large, there may be certain difficulties in restoring production capacity;
[0025] (7) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification;
[0026] (8) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and the degree of restoration is low. It is not recommended to place an order, and it is necessary to pay special attention to whether there is a delivery risk;
[0027] S5: Based on the relative data analysis results in S4, the capacity recovery status of different suppliers and order placement suggestions, select the supplier that meets the requirements and sign the order;
[0028] S6: Construct a capacity increase / decrease speed index, which is determined by the capacity recovery growth rate in the past three days and is specifically calculated according to the following formula:
[0029] The growth rate of capacity recovery in the past three days (%) = (power consumption on the current day - power consumption on the previous day) / power consumption on the previous day;
[0030] S7: Track the electricity consumption data of a supplier who has signed an order for a certain material, and judge the possibility of the supplier delivering the ordered goods on time based on the capacity increase and decrease speed index.
[0031] Vn=(Pn-Pn-1) / Pn-1, (n is a natural number ≥ 2), where Pn represents the power consumption on the nth day; Vn represents the capacity recovery growth rate in the past three days calculated on the nth day;
[0032] Calculate the supplier's daily production volume M based on Vn,
[0033] Assume that the second day's production volume M2 = M1(1+V2) = M1(1+(P2-P1) / P1);
[0034] Production on the third day M3 = M1(1+V2)(1+V3) = M1(1+(P2-P1) / P1)(1+(P3-P2) / P2);
[0035] By analogy, the daily output for any day is:
[0036] Mn=M1(1+V2)(1+V3)...(1+Vn)=M1(1+(P2-P1) / P1)(1+(P3-P2) / P2)... (1+(Pn-Pn-1) / Pn-1);
[0037] Predicted production days D 生产 =(M 总 -M1-M2-M3-……Mn) / Mn, where M 总 is the total order quantity, and then D 生产 Compared with the order delivery time Dd,
[0038] (1) If D 生产 ≤Dd-Dn, then the supplier's current production speed can meet the project demand date;
[0039] (2) If D 生产 >Dd-Dn, n≤half of the order delivery period, it is considered that the supplier is in the early stage of resuming production, and the capacity increase and decrease rate index is in the rising period, and no warning is given at this time;
[0040] (3) If D 生产 >Dd-Dn, n> half of the order delivery period, the supplier's current production speed cannot meet the project's required date, and the power company's relevant departments are warned to make relevant resource allocations;
[0041] S8: Adjust the purchasing strategy based on the supplier delivery analysis results obtained in S7.
[0042] If the supplier's current production rate can meet the project's required date, continue tracking electricity consumption data until the end of the order period;
[0043] If the supplier is in the early stage of resuming production and the capacity increase / decrease speed index is in the rising period, continue to track the power consumption data and continuously adjust the D according to the capacity increase / decrease speed index disclosed in S7. 生产Compare with the order delivery period Dd until the judgment result is (1), enter the normal tracking until the end of the order period; if the judgment result turns to (3), then proceed according to the situation (3);
[0044] If the supplier's current production speed cannot meet the project's required date, an early warning will be issued to the relevant departments of the power company to make relevant resource allocations and adjust the procurement strategy;
[0045] S9: When adjusting the purchasing strategy,
[0046] First, the power data of suppliers that can produce the material is obtained according to the method in S2, and it is brought into the multi-dimensional index model in S1 to obtain the model calculation results;
[0047] Then, based on the calculation results of the index model, a cross-comparison method is used to conduct a relative data analysis of the results between different suppliers that can make up orders.
[0048] And output the judgment results in the following way:
[0049] (1) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is also high, and the restored power % (historical peak) is high, it is believed that the supplier may be executing a large number of orders and is close to full capacity. It is not recommended to place additional orders;
[0050] (2) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is also high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and may have surplus production capacity, and additional orders can be given priority. According to further confirmation of the executed orders, if the order volume this year is the same as last year, the production capacity is relatively abundant; if the order volume this year is relatively large, there may be delivery risks;
[0051] (3) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification;
[0052] (4) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and does not need to rush work, and priority can be given to additional orders;
[0053] (5) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is high, it is considered that the supplier's cumulative production capacity does not meet demand, and the supplier is working at full capacity with no surplus production capacity. It is not recommended to place additional orders;
[0054] (6) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and is not working at full capacity. It is not recommended to place additional orders. If this year's orders are less than last year's, there is no need to rush to work; if this year's orders are relatively large, it may be difficult to restore production capacity;
[0055] (7) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification;
[0056] (8) When the supplier's cumulative output % (during the same period of the lunar calendar) is low, the restored power % (during the same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and the degree of restoration is low, and additional orders are not recommended;
[0057] S10: Based on the relative data analysis results in S9, the capacity recovery status of different suppliers and additional order suggestions, select the supplier that meets the requirements to sign the order;
[0058] S11: Adjust the list of suppliers that have already placed orders, and judge the possibility of suppliers that have already placed orders to deliver the ordered goods on time according to S7 and S8; when a delivery warning occurs, place additional orders according to S9 and S10; ensure that all ordered materials are obtained on time.
[0059] Furthermore, the present invention also discloses a method for calculating the basic power consumption, comprising the following steps:
[0060] J1: Select the historical daily electricity consumption data of the supplier to be analyzed as the total sample, and arbitrarily select k daily electricity consumption data samples as the initial cluster center points. Each sample is divided into the nearest cluster center according to certain selection criteria;
[0061] J2: Calculate the mean value of each cluster;
[0062] J3: According to the average value of each cluster, that is, the central sample, calculate the distance between each sample and these central samples;
[0063] J4: Divide each sample in the data set into the class with the smallest distance based on the distance from the k center points;
[0064] J5: Recalculate the mean of each cluster with changes;
[0065] J6: Repeat steps J2 to J5 until each cluster no longer changes;
[0066] J7: After determining the final clustering result, select the minimum value of the cluster center point from the k clusters as the basic electricity consumption of the supplier.
[0067] Further preferably, the historical daily electricity consumption data in step J1 is the daily electricity consumption data for the entire previous lunar year.
[0068] Further preferably, when the evaluation date and the same lunar day have a weekly rhythm misalignment between a working day and a non-working day, an offset processing is performed on it, with the same lunar day as the center, one day before and after is taken, and the maximum power consumption value within these three days is used as the power consumption data for the same period.
[0069] Further preferably, the present invention also discloses that in step S10, suppliers who have already placed orders are preferentially selected for additional orders. If none of the suppliers who have already placed orders meet the conditions for additional orders, a new supplier is selected to place additional orders.
[0070] The present invention uses the corrected basic electricity consumption as the evaluation benchmark, which is more scientific and has high reliability compared to the extensive direct comparison. At the same time, the present invention fully considers the characteristics of China's production planning and uses the lunar calendar as the comparison date standard. Through offset processing, the effectiveness and accuracy of the comparison can be fully guaranteed at the same time. More importantly, the present invention innovatively discloses a variety of index models. Through cross-comparison analysis of various indexes, it guides decision makers to evaluate whether individual suppliers have delivery risks during procurement, and reduce the impact of insufficient supplier production capacity on power grid construction. At the same time, in the present invention, the capacity rise and fall speed index is used to achieve accurate prediction and effective early warning of suppliers, ensuring accurate prediction of supplier production capacity in the productivity recovery stage, reducing delivery risks in order execution, and when an early warning occurs, timely adjusting the procurement strategy to ensure the effective implementation of power grid construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] Figure 1 The figure is a diagram of the restored electricity percentage (historical peak) of different suppliers.
[0072] Figure 2 This is a diagram showing the percentage of electricity restored by different suppliers (during the same period of the lunar calendar).
[0073] Figure 3 Schematic diagram of the cumulative output % (during the same period of the lunar calendar) of different suppliers. DETAILED DESCRIPTION
[0074] In order to better understand the present invention, the present invention is further described below in conjunction with specific embodiments.
[0075] Take the 13 suppliers of a certain material in Jiangsu Province as an example. They were suspended from February 3, 2020 to February 9, 2020. They gradually resumed production from February 10, 2020. In order to predict the recovery of production capacity after the resumption of production, the power company analyzed its electricity consumption data in the previous year (Lunar New Year).
[0076] Preferably, in this embodiment, a clustering algorithm is used to calculate the basic power consumption, including the following steps:
[0077] J1: Select the historical daily electricity consumption data of the supplier to be analyzed as the total sample, and arbitrarily select k daily electricity consumption data samples as the initial cluster center points. Each sample is divided into the nearest cluster center according to certain selection criteria;
[0078] J2: Calculate the mean value of each cluster;
[0079] J3: According to the average value of each cluster, that is, the central sample, calculate the distance between each sample and these central samples;
[0080] J4: Divide each sample in the data set into the class with the smallest distance based on the distance from the k center points;
[0081] J5: Recalculate the mean of each cluster with changes;
[0082] J6: Repeat steps J2 to J5 until each cluster no longer changes;
[0083] J7: After determining the final clustering result, select the minimum value of the cluster center point from the k clusters as the basic electricity consumption of the supplier.
[0084] According to the above calculation, the basic electricity consumption of each supplier is obtained.
[0085] In order to predict the capacity recovery of each supplier and provide a reference for order signing, we randomly selected March 15, 2020 as the inspection day as the production capacity of each supplier gradually recovered. We calculated the data of each supplier's resumption of production power (historical peak value), resumption of production power (same period of the lunar calendar), and the supplier's cumulative output data in the following way:
[0086] Re-production power % (historical peak) = (power consumption on the day - basic power consumption) / (historical single-day peak power consumption - basic power consumption);
[0087] Re-production electricity % (during the same period of the lunar calendar) = (electricity consumption on the day - basic electricity consumption) / (electricity consumption during the same period of the previous lunar calendar - basic electricity consumption);
[0088] Supplier's cumulative output % (same period of the lunar calendar) = (total electricity consumption from the tenth day of the lunar year to the evaluation day of the current year - cumulative basic electricity consumption) / (total electricity consumption from the tenth day of the lunar year to the evaluation day of the previous year - cumulative basic electricity consumption) Calculate the cumulative output % (same period of the lunar calendar) data of each supplier.
[0089] The results are as follows Figures 1 to 3 as shown in .
[0090] The restored electricity volume (historical peak), restored electricity volume (during the same period of the lunar calendar), and cumulative output of suppliers (during the same period of the lunar calendar) of different suppliers are averaged to obtain the overall average value shown in the figure. Then, suppliers with output above the average value are considered to have high corresponding indicator parameters, and suppliers with output below the average value are considered to have low corresponding indicator parameters.
[0091] like Figures 1 to 3 As shown in Figure 1 In the , suppliers C, E, F, G, K, and L are all above the mean; Figure 2 In the , suppliers B, C, F, K, and L are all above the mean; Figure 3 Among them, suppliers B, C, D, G, H, I, K, L, and M are all above the mean;
[0092] Then perform a cross comparison and output the judgment results in the following way:
[0093] (1) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is also high, and the restored power % (historical peak) is high, it is considered that the supplier's cumulative production capacity meets the demand, and it is possible that the rush work has been completed and there is surplus production capacity, so the order can be placed first;
[0094] (2) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is also high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and may have surplus production capacity, so orders can be placed with priority. Based on further confirmation of the executed orders, if the order volume this year is the same as last year, the production capacity is relatively abundant; if the order volume this year is relatively large, there may be delivery risks;
[0095] (3) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification;
[0096] (4) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and does not need to be rushed, and the order can be placed first;
[0097] (5) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is high, it is considered that the supplier's cumulative production capacity does not meet demand, and the supplier is working at full capacity with no surplus production capacity. It is necessary to pay attention to the current order delivery date and it is not recommended to place an order;
[0098] (6) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and is not rushing to work at full capacity. It is not recommended to place an order, and attention should be paid to the delivery situation. Further verification based on the executed orders. If the orders this year are less than last year, there is no need to rush to work; if the orders this year are relatively large, there may be certain difficulties in restoring production capacity;
[0099] (7) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification;
[0100] (8) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and the degree of restoration is low. It is not recommended to place an order, and it is necessary to pay special attention to whether there is a delivery risk;
[0101] After comprehensive consideration, we choose Supplier C to sign the order;
[0102] Then, a capacity increase / decrease speed index is constructed to monitor the order digestion capacity of supplier C. The capacity increase / decrease speed index is determined based on the capacity recovery growth rate in the past three days, and is specifically calculated according to the following formula:
[0103] The growth rate of capacity recovery in the past three days (%) = (power consumption on the current day - power consumption on the previous day) / power consumption on the previous day;
[0104] Track the electricity consumption data of supplier C who signed the order for the material and judge the possibility of its on-time delivery of the ordered goods according to its capacity increase and decrease speed index.
[0105] Vn=(Pn-Pn-1) / Pn-1, (n is a natural number ≥ 2), where Pn represents the power consumption on the nth day; Vn represents the capacity recovery growth rate in the past three days calculated on the nth day;
[0106] Calculate the supplier's daily production volume M based on Vn,
[0107] Assume that the second day's production volume M2 = M1(1+V2) = M1(1+(P2-P1) / P1);
[0108] Production on the third day M3 = M1(1+V2)(1+V3) = M1(1+(P2-P1) / P1)(1+(P3-P2) / P2);
[0109] By analogy, the daily output for any day is:
[0110] Mn=M1(1+V2)(1+V3)...(1+Vn)=M1(1+(P2-P1) / P1)(1+(P3-P2) / P2)... (1+(Pn-Pn-1) / Pn-1);
[0111] Predicted production days D 生产 =(M 总 -M1-M2-M3-……Mn) / Mn, where M 总 is the total order quantity, and then D 生产 Compared with the order delivery time Dd,
[0112] (1) If D 生产 ≤Dd-Dn, then the supplier's current production speed can meet the project demand date;
[0113] (2) If D 生产 >Dd-Dn, n≤half of the order delivery period, it is considered that the supplier is in the early stage of resuming production, and the capacity increase and decrease rate index is in the rising period, and no warning is given at this time;
[0114] (3) If D 生产 >Dd-Dn, n> half of the order delivery period, the supplier's current production speed cannot meet the project's required date, and the power company's relevant departments are warned to make relevant resource allocations;
[0115] In this embodiment, the daily electricity consumption data of supplier C and the production volume calculated based on the electricity consumption are shown in Table 1.
[0116] Table 1: Power consumption and production of Supplier C from the time the order was signed on March 15 to the time when production started on March 16 until halfway through the order delivery period
[0117]
[0118] The total amount of materials ordered by the power company from it is 470 units.
[0119] The scheduled order delivery period is one month, with the deadline being April 14th.
[0120] According to the power consumption, 237.6 units were produced in the middle of the order delivery period (March 30). On March 31, the supplier's production capacity was predicted. It is predicted that it will take D 生产= (470-237.6) / 13.9 = 16.7 days. That is, the order can be completed around April 16, which exceeds the order delivery period and issues a warning.
[0121] We continue to monitor the actual electricity consumption of supplier C before April 14 and calculate its production volume. As shown in Table 2, 182.5 units will be produced within the remaining order delivery period.
[0122] Table 2: Actual electricity consumption statistics and forecasted production of Supplier C
[0123]
[0124] Adjust the purchasing strategy based on the supplier's on-time delivery analysis results. If the supplier's current production speed can meet the project's required date, continue to track electricity consumption data until the end of the order period;
[0125] If the supplier is in the early stage of resuming production and the capacity increase / decrease speed index is in the rising period, continue to track the power consumption data and continuously adjust the D according to the capacity increase / decrease speed index disclosed in S7. 生产 Compare with the order delivery period Dd until the judgment result is (1), enter the normal tracking until the end of the order period; if the judgment result turns to (3), then proceed according to the situation (3);
[0126] If the supplier's current production speed cannot meet the project's required date, an early warning will be issued to the relevant departments of the power company to make relevant resource allocations and adjust the procurement strategy;
[0127] In this embodiment, since supplier C cannot meet the project demand date, it is necessary to adjust the procurement strategy, coordinate production and supply with other suppliers, and continue to track its electricity consumption data until the end of the order period.
[0128] Finally, the delivery status of supplier C is that 420 units of production tasks were completed on April 14, and the total order volume was not completed within the order delivery period, which is consistent with the prediction. Therefore, the method disclosed in the present invention can accurately predict the supplier's supply status, which is of great significance for the adjustment of procurement strategies and effectively avoids project delays caused by delayed delivery.
[0129] The above is a specific implementation of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications are also considered to be within the protection scope of the present invention.
Claims
1. A decision-making support method for formulating a procurement strategy during the productivity recovery phase, characterized in that: The following steps are involved: S1: Construct a multi-dimensional index model based on basic electricity consumption; The multi-dimensional index model includes an index model with two dimensions: a capacity level index and a capacity cumulative recovery index; The capacity level index includes two index models: the restored power volume% (historical peak) and the restored power volume% (during the same period of the lunar calendar), which are calculated according to the following formula: Re-production power % (historical peak) = (power consumption on the day - basic power consumption) / (historical single-day peak power consumption - basic power consumption); Restored electricity % (during the same period of the lunar calendar) = (electricity consumption on the day - basic electricity consumption) / (electricity consumption during the same period of the previous lunar calendar - basic electricity consumption); The cumulative capacity recovery index is calculated by comparing the supplier's cumulative output with the electricity consumption in the same period, and is specifically calculated according to the following formula: Supplier's cumulative output % (during the same period of the lunar calendar) = (total electricity consumption from the tenth day of the first lunar month of the current year to the evaluation date - cumulative basic electricity consumption) / (total electricity consumption from the tenth day of the first lunar month of the previous year to the evaluation date - cumulative basic electricity consumption); S2: Obtain the electricity data of different suppliers of a certain material in the order; S3: Substitute the electricity data of different suppliers into the index model constructed in S1 for calculation; S4: Based on the calculation results of the index model, a cross-comparison method is used to conduct relative data analysis on the results between different suppliers. And output the judgment results in the following way: (1) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the resumed production power % (during the same period of the lunar calendar) is also high, and the resumed production power % (historical peak) is high, it is considered that the supplier's cumulative production capacity meets the demand, the rush work is completed, and there is surplus production capacity, and the order can be placed first; (2) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is also high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and has surplus production capacity, and orders can be placed with priority. Based on further confirmation of the executed orders, if the order volume this year is the same as last year, then the production capacity is surplus; if the order volume this year is large, then there is a delivery risk; (3) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification; (4) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and does not need to rush work, and can be given priority for ordering; (5) When the supplier's cumulative output % (same period of the lunar calendar) is low, the resumed production power % (same period of the lunar calendar) is high, and the resumed production power % (historical peak) is high, it is considered that the supplier's cumulative production capacity does not meet demand, and the supplier is working at full capacity with no surplus production capacity. It is necessary to pay attention to the current order delivery date and it is not recommended to place an order; (6) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and is not rushing to work at full capacity. It is not recommended to place an order, and attention should be paid to the delivery situation. Further verification based on the executed orders. If the orders this year are less than last year, there is no need to rush to work; if the orders this year are more, it will be difficult to restore production capacity; (7) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification; (8) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and the degree of restoration is low. It is not recommended to place an order, and it is necessary to pay special attention to whether there is a delivery risk; S5: Based on the relative data analysis results in S4, the capacity recovery status of different suppliers and order placement suggestions, select the supplier that meets the requirements and sign the order; S6: Construct a capacity increase / decrease speed index, which is determined by the capacity recovery growth rate in the past three days and is specifically calculated according to the following formula: The growth rate of capacity recovery in the past three days = (power consumption on the current day - power consumption on the previous day) / power consumption on the previous day; S7: Track the electricity consumption data of a supplier who has signed an order for a certain material, and judge the possibility of the supplier delivering the ordered goods on time based on the capacity increase and decrease speed index. Vn=(Pn-Pn-1) / Pn-1, (n is a natural number ≥ 2), where Pn represents the power consumption on the nth day; Vn represents the growth rate of capacity recovery in the past three days calculated on the nth day; Calculate the supplier's daily production volume M based on Vn, Assume that the production volume on the second day is M2 = M1(1+V2) = M1(1+(P2-P1) / P1); The production volume on the third day is M3 = M1(1+V2) (1+V3) = M1(1+(P2-P1) / P1)(1+(P3-P2) / P2); By analogy, the daily output for any day is: Mn=M1(1+V2) (1+V3)...(1+Vn)=M1(1+(P2-P1) / P1)(1+(P3-P2) / P2)...(1+(Pn-Pn-1) / Pn-1); Predicted production days D 生产 =(M 总 -M1-M2-M3-……Mn) / Mn, where M 总 is the total order quantity, and then D 生产 Compared with the order delivery time Dd, (1) If D 生产 ≤Dd-Dn, the supplier's current production speed can meet the project demand date; (2) If D 生产 >Dd-Dn, n≤half of the order delivery period, it is considered that the supplier is in the early stage of resuming production, and the capacity increase and decrease rate index is in the rising period, and no warning is given at this time; (3) If D 生产 >Dd-Dn, n> half of the order delivery period, the supplier's current production speed cannot meet the project's required date, and the power company's relevant departments are warned to make relevant resource allocations; S8: Adjust the purchasing strategy based on the supplier delivery analysis results obtained in S7. If the supplier's current production rate can meet the project's required date, continue tracking electricity consumption data until the end of the order period; If the supplier is in the early stage of resuming production and the capacity increase / decrease speed index is in the rising period, continue to track the power consumption data and continuously adjust the D according to the capacity increase / decrease speed index disclosed in S7. 生产 Compare with the order delivery period Dd until the judgment result is (1), then enter normal tracking until the end of the order period; if the judgment result turns to (3), then proceed according to the situation (3); If the supplier's current production speed cannot meet the project's required date, an early warning will be issued to the relevant departments of the power company to make relevant resource allocations and adjust the procurement strategy; S9: When adjusting the purchasing strategy, First, the power data of suppliers that can produce the material is obtained according to the method in S2, and it is brought into the multi-dimensional index model in S1 to obtain the model calculation results; Then, based on the calculation results of the index model, a cross-comparison method is used to conduct a relative data analysis of the results between different suppliers that can make up orders. And output the judgment results in the following way: (1) When the supplier's cumulative output % (during the same period of the lunar calendar) is high, the restored power % (during the same period of the lunar calendar) is also high, and the restored power % (historical peak) is high, it is considered that the supplier is executing many orders and is operating at full capacity, and additional orders are not recommended; (2) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored electricity % (same period of the lunar calendar) is also high, and the restored electricity % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and has surplus production capacity, and priority can be given to additional orders. Based on further confirmation of the executed orders, if the order volume this year is the same as last year, then the production capacity is surplus; if the order volume this year is large, then there is a delivery risk; (3) When the supplier's cumulative output % (same period of the lunar calendar) is high, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification; (4) When the supplier's cumulative output % (same period of the lunar calendar) is high, the resumed production power % (same period of the lunar calendar) is low, and the resumed production power % (historical peak) is low, it is considered that the supplier's cumulative production capacity meets the demand and does not need to rush work, and can be given priority for additional orders; (5) When the supplier's cumulative output % (same period of the lunar calendar) is low, the resumed production power % (same period of the lunar calendar) is high, and the resumed production power % (historical peak) is high, it is considered that the supplier's cumulative production capacity does not meet demand, and the supplier is working at full capacity with no surplus production capacity. It is not recommended to place additional orders; (6) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is high, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and is not working at full capacity. It is not recommended to place additional orders. If the orders this year are less than last year, there is no need to rush to work; if the orders this year are more, it will be difficult to restore production capacity; (7) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is high, the supplier's data is considered to be incorrect and needs further verification; (8) When the supplier's cumulative output % (same period of the lunar calendar) is low, the restored power % (same period of the lunar calendar) is low, and the restored power % (historical peak) is low, it is considered that the supplier's cumulative production capacity does not meet demand and the degree of restoration is low, and additional orders are not recommended; S10: Based on the relative data analysis results in S9, the capacity recovery status of different suppliers and additional order suggestions, select the supplier that meets the requirements to sign the order; S11: Adjust the list of suppliers that have already placed orders, and judge the possibility of suppliers that have already placed orders to deliver the ordered goods on time according to S7 and S8; when a delivery warning occurs, place additional orders according to S9 and S10; ensure that all ordered materials are obtained on time.
2. The method for predicting supplier production capacity in multiple dimensions during the productivity recovery phase according to claim 1 is characterized in that: The method for calculating the basic power consumption comprises the following steps: J1: Select the historical daily electricity consumption data of the supplier to be analyzed as the total sample, and arbitrarily select k daily electricity consumption data samples as the initial cluster center points. Each sample is divided into the nearest cluster center according to certain selection criteria; J2: Calculate the mean value of each cluster; J3: According to the average value of each cluster, that is, the central sample, calculate the distance between each sample and these central samples; J4: Divide each sample in the data set into the class with the smallest distance based on the distance from the k center points; J5: Recalculate the mean of each cluster with changes; J6: Repeat steps J2 to J5 until each cluster no longer changes; J7: After determining the final clustering result, select the minimum value of the cluster center point from the k clusters as the basic electricity consumption of the supplier.
3. The method for predicting supplier production capacity in multiple dimensions during the productivity recovery phase according to claim 2 is characterized in that: The historical daily electricity consumption data in step J1 is the daily electricity consumption data for the entire previous lunar year.
4. The method for predicting supplier production capacity in multiple dimensions during the productivity recovery phase according to claim 1 is characterized in that: When the evaluation date and the same lunar calendar day have a weekly rhythm misalignment between working days and non-working days, an offset process is performed on them. Taking the same lunar calendar day as the center, one day is taken before and after, and the maximum power consumption value within these three days is used as the power consumption data for the same period.
5. The method for predicting supplier production capacity in multiple dimensions during the productivity recovery phase according to claim 1 is characterized in that: In step S10, the supplier who has placed the order is preferentially selected for additional order. If none of the suppliers who have placed the order meets the conditions for additional order, a new supplier is selected for additional order.