Island fault ride-through control method and system for receiving-end converter station of flexible direct current grid-connected system

By implementing island detection and fault control strategies in offshore wind power flexible direct grid connection system, using unloading circuits and energy storage devices for fault crossing, the heat dissipation and frequent start-up problems caused by island failure are solved, and the system is safe and controllable and Rapid recovery improves the applicability and economicality of the equipment.

CN113964864BActive Publication Date: 2024-11-22GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111216360.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-19
Publication Date
2024-11-22
Estimated Expiration
2041-10-19

AI Technical Summary

Technical Problem

In the prior art, offshore wind power flexible direct grid connection system has problems of slow heat dissipation and long time when the island failure of the receiving end converter station, which cannot ensure the stable operation of the system and cannot effectively deal with the failure of the unplanned island, resulting in reduced equipment life and Start frequently.

Method used

By implementing island detection, fault control strategy selection, fault duration analysis and grid-connected control in a flexible grid-connected system, unloading circuits, energy storage devices or combinations are used to pass through the fault, and the control strategy is changed to restore effective output, ensuring that The system is safe, controllable and fast recovery in an island state.

Benefits of technology

It effectively solves the overheating problem of offshore wind power flexible DC transmission system in island failures, ensures that the system is safe and controllable in a short time, avoids frequent start-up, and improves the applicability and economicality of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113964864B_ABST
    Figure CN113964864B_ABST
Patent Text Reader

Abstract

The present invention discloses a control method and system for island fault ride-through of a receiving-end converter station of a flexible direct current grid-connected system. The method includes performing island detection according to the grid-side information of the flexible direct current receiving-end converter station, judging whether the flexible direct current receiving-end converter station enters an island state according to the detection result; when it is judged that the flexible direct current receiving-end converter station enters an island state, selecting a corresponding fault control strategy according to different fault types; determining the fault duration, and adopting different fault ride-through strategies according to different fault durations; judging whether the fault is cleared, detecting the grid-side signal of the action circuit breaker after the fault is cleared, and reclosing the grid when the grid-side signal of the action circuit breaker meets the reclosing condition; changing the control strategy of the flexible direct current receiving-end converter station to restore the active output of the flexible direct current receiving-end converter station. The present invention can solve the problem of over-limit voltage on the grid side, improve the service life of the equipment, prevent the trouble of frequent restart of the flexible direct current system due to temporary fault shutdown, and contribute to the stable operation of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of protection and control of flexible direct current grid-connected systems, and in particular to a method and system for controlling island fault ride-through at a converter station at a receiving end of a flexible direct current grid-connected system. Background Art

[0002] At present, offshore wind power grid-connected solutions mostly adopt a centralized access mode based on wind farm groups, which can reduce engineering costs and improve the grid's control over connected wind farms. The economic and technical advantages are obvious compared to the decentralized access of each wind farm. The transmission method used for offshore wind power grid connection usually adopts high-voltage AC transmission or flexible DC transmission, and different transmission methods are adopted according to the distance from the shore of the wind farm. The advantage of high-voltage AC transmission is that the technology is mature and the price is low, but due to the limitation of charging power, the transmission distance is difficult to exceed 80km, which is generally suitable for offshore wind power access to the grid. For the centralized access of offshore wind farms more than 80km offshore, the use of flexible DC transmission technology is almost the only option.

[0003] In order to improve the control capability of offshore wind power through the fault ride-through of the flexible direct current grid-connected system, a lot of research has been invested. However, these studies are mainly aimed at the voltage drop of the flexible direct current receiving end converter station after a short-circuit fault occurs in the receiving end AC grid. In actual projects, the DC distribution room of the receiving end converter station is equipped with a DC reactor and a DC energy dissipation device, which are used to suppress the DC side short-circuit current rise rate and prevent the DC side voltage from excessively rising due to the inability to send power when the AC side fails. However, the existing methods lack special countermeasures for the island fault ride-through of the receiving end converter station of the offshore wind power through the flexible direct current grid-connected system. For example, affected by the overvoltage and overcurrent capabilities of the converter power electronic devices, the existing projects lock the receiving end converter after detecting a line break fault in the transmission line or detecting that the receiving end converter station enters the island state, and use the DC side energy dissipation device to balance the redundant energy. If the DC energy dissipation device is put into use for a long time, it will cause the device to overheat and reduce the life of the equipment. At the same time, if the receiving converter station is locked after entering the island state, there will be a problem of over-limit voltage on the grid side, and it is necessary to configure multiple groups of lightning arresters and reasonably set the setting value of overvoltage protection. If the fault lasts for a long time, the flexible DC system that does not have the ability to ride through the island fault can only be shut down. When the fault is cleared, the flexible DC system needs to be restarted, and it needs to absorb energy from the AC system, and the recovery time is long. Therefore, relying solely on the strategy of locking the converter after detecting the island and the method of investing in the DC side energy-consuming circuit will cause the problem of heat dissipation of the energy-consuming resistor; if the fault lasts for a long time, the suspended flexible DC system will have the problem of repeated system startup, which cannot meet the grid's requirements for the flexible DC system. Summary of the invention

[0004] The purpose of the present invention is to provide a method and system for controlling island fault ride-through of a receiving-end converter station of a flexible direct current grid-connected system, so as to solve the problems of slow heat dissipation, long time consumption and failure to ensure stable operation of the system in the prior art control method for island fault ride-through.

[0005] To achieve the above object, the present invention provides a method for controlling an island fault ride-through of a converter station at a receiving end of a flexible direct current grid-connected system, comprising:

[0006] Perform island detection based on the grid-side information of the flexible DC receiving converter station, and determine whether the flexible DC receiving converter station has entered an island state based on the detection results;

[0007] When it is determined that the flexible DC receiving end converter station enters the island state, the corresponding fault control strategy is selected according to different fault types;

[0008] Determine the fault duration and adopt different fault ride-through strategies according to different fault durations;

[0009] Determine whether the fault is cleared, detect the grid-side signal of the actuated circuit breaker after the fault is cleared, and reclose the grid when the grid-side signal of the actuated circuit breaker meets the reclosing condition;

[0010] Change the control strategy of the flexible DC receiving end converter station to restore the active output of the flexible DC receiving end converter station.

[0011] Furthermore, the island detection is performed according to the network side information of the flexible direct current receiving end converter station, including:

[0012] Use single criteria, combined criteria or comprehensive criteria to perform island detection;

[0013] The single criterion includes performing island detection according to the AC frequency of the flexible DC receiving converter station grid side, the change rate of the AC frequency of the flexible DC receiving converter station grid side, the circuit breaker status information, and the preset algorithm; wherein,

[0014] The island detection is performed by using a combined criterion to perform a combined judgment on the single criterion in parallel;

[0015] The use of comprehensive criteria for island detection is to perform sequential judgment according to the priority order of the single criteria.

[0016] Furthermore, the fault control strategy includes:

[0017] The locking strategy of the flexible DC receiving end converter station, the control strategy for power supply to the passive network under steady-state conditions, or the self-synchronization control strategy based on the decoupled dual-synchronous reference system.

[0018] Furthermore, the fault ride-through strategy includes:

[0019] The island fault ride-through strategy of the flexible DC system is realized by the unloading circuit, the island fault ride-through strategy of the flexible DC system is realized by the energy storage device instead of the unloading circuit, or the island fault ride-through strategy of the flexible DC system is realized by the combination of the unloading circuit and the energy storage device.

[0020] The present invention also provides an island fault ride-through control system for a converter station at a receiving end of a flexible direct current grid-connected system, comprising:

[0021] An islanding state judgment module is used to perform islanding detection according to the network side information of the flexible direct current receiving end converter station, and judge whether the flexible direct current receiving end converter station enters an islanding state according to the detection result;

[0022] The receiving-end converter station control module is used to select a corresponding fault control strategy according to different fault types when it is determined that the flexible direct current receiving-end converter station enters an island state;

[0023] A fault ride-through control module is used to determine the fault duration and adopt different fault ride-through strategies according to different fault durations;

[0024] A grid-connection control module, used to determine whether the fault is cleared, detect the grid-side signal of the actuated circuit breaker after the fault is cleared, and reconnect to the grid when the grid-side signal of the actuated circuit breaker meets the reclosing condition;

[0025] The control strategy selection module is used to change the control strategy of the flexible direct current receiving end converter station to restore the active power output of the flexible direct current receiving end converter station.

[0026] Furthermore, the island state determination module is also used for:

[0027] Use single criteria, combined criteria or comprehensive criteria to perform island detection;

[0028] The single criterion includes performing island detection according to the AC frequency of the flexible DC receiving converter station grid side, the change rate of the AC frequency of the flexible DC receiving converter station grid side, the circuit breaker status information, and the preset algorithm; wherein,

[0029] The island detection is performed by using a combined criterion to perform a combined judgment on the single criterion in parallel;

[0030] The use of comprehensive criteria for island detection is to perform sequential judgment according to the priority order of the single criteria.

[0031] Furthermore, the fault control strategy includes:

[0032] The locking strategy of the flexible DC receiving end converter station, the control strategy for power supply to the passive network under steady-state conditions, or the self-synchronization control strategy based on the decoupled dual-synchronous reference system.

[0033] Furthermore, the fault ride-through strategy includes:

[0034] The island fault ride-through strategy of the flexible DC system is realized by the unloading circuit, the island fault ride-through strategy of the flexible DC system is realized by the energy storage device instead of the unloading circuit, or the island fault ride-through strategy of the flexible DC system is realized by the combination of the unloading circuit and the energy storage device.

[0035] The present invention also provides a terminal device, comprising:

[0036] one or more processors;

[0037] A memory, coupled to the processor, for storing one or more programs;

[0038] When the one or more programs are executed by the one or more processors, the one or more processors implement the island fault ride-through control method for the receiving-end converter station of the flexible direct current grid-connected system as described in any of the above items.

[0039] The present invention also provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for controlling island fault ride-through of a receiving-end converter station of a flexible direct current grid-connected system as described in any one of the above items is implemented.

[0040] Compared with the prior art, the beneficial effects of the present invention are:

[0041] The present invention can effectively solve the problem of how the receiving-end converter station of the flexible direct current transmission system for centralized offshore wind power can cope with unplanned islanding. The solution proposed in the present invention can solve the problem that the conventional fault crossing method puts the direct current energy-consuming device into use for a long time, causing the device to overheat and reduce the life of the equipment. At the same time, the self-synchronization control strategy proposed in the present invention after the receiving-end converter station enters the island state can solve the problem of over-limit voltage on the grid side, and can achieve that after a short-term islanding fault occurs, the flexible direct current receiving-end converter station is still safe and controllable, preventing the flexible direct current system from being shut down due to temporary faults and the trouble of frequent restart, and has strong applicability and economy. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the implementation mode will be briefly introduced below. Obviously, the drawings described below are only some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0043] Figure 1 It is a flow chart of a method for controlling an island fault ride-through of a converter station at a receiving end of a flexible direct current grid-connected system provided by a certain embodiment of the present invention;

[0044] Figure 2 It is a schematic diagram of an offshore wind power system using double-terminal direct current transmission provided by a certain embodiment of the present invention;

[0045] Figure 3 It is a flowchart of a method for determining whether a flexible direct current receiving end converter station has entered an island fault by using an intelligent algorithm provided by a certain embodiment of the present invention;

[0046] Figure 4 It is a flowchart of a method for detecting island faults in a flexible direct current receiving-end converter station using a combined criterion provided by a certain embodiment of the present invention;

[0047] Figure 5 It is a flowchart of another method for detecting island faults in a flexible direct current receiving-end converter station using a comprehensive criterion provided by a certain embodiment of the present invention;

[0048] Figure 6 It is a schematic diagram of the principle of a control strategy applicable to a flexible direct current receiving end converter station after an island fault, provided by a certain embodiment of the present invention;

[0049] Figure 7 It is a schematic diagram of the principle of a self-synchronization control strategy based on a decoupled dual-synchronization reference system that can be adopted by a flexible direct current receiving end converter station after an island fault provided by a certain embodiment of the present invention;

[0050] Figure 8 yes Figure 1 Schematic diagram of the control strategy selection process after the flexible direct current receiving end converter station enters the island state in step S20;

[0051] Fig. 9 It is a flowchart of a control strategy for an island fault ride-through at a flexible direct current receiving end taking into account the fault duration provided by a certain embodiment of the present invention;

[0052] Fig.10 It is a flowchart of a control strategy for an island fault ride-through at a flexible DC receiving end taking into account the energy storage upper limit of a DC side energy storage type fault ride-through device provided by a certain embodiment of the present invention;

[0053] Fig.11 It is a structural schematic diagram of an island fault ride-through control device for a receiving-end converter station of a flexible direct current grid-connected system provided by a certain embodiment of the present invention;

[0054] Fig.12 It is a schematic diagram of the structure of a terminal device provided by a certain embodiment of the present invention. DETAILED DESCRIPTION

[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0056] It should be understood that the step numbers used in this document are only for convenience of description and are not intended to limit the order in which the steps are executed.

[0057] It should be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.

[0058] The terms “include” and “comprising” indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0059] The term "and / or" means and includes any and all possible combinations of one or more of the associated listed items.

[0060] See also Figure 1 A certain embodiment of the present invention provides a method for controlling island fault ride-through at a converter station at the receiving end of a flexible direct current grid-connected system. Figure 1 As shown, the control method for island fault ride-through of the receiving-end converter station of the flexible direct current grid-connected system includes steps S10 to S50. The specific steps are as follows:

[0061] S10. Perform island detection according to the network-side information of the flexible DC receiving-end converter station, and determine whether the flexible DC receiving-end converter station enters an island state according to the detection result.

[0062] Generally speaking, the island phenomenon described in the prior art refers to the state in which part of the power grid containing loads and power sources continues to operate in isolation after being separated from the main grid. Islands can be divided into unplanned islands and planned islands. Planned islands are mostly used in distribution networks. When the distribution network fails, it is converted into a planned island operation mode to minimize the power outage loss of the distribution network. At the same time, planned island operation can effectively play the positive role of distributed power sources. Islands formed by accidental factors such as fault tripping are called unplanned islands. The causes of unplanned islands may be one or more of the following: 1) The power grid detects a fault and trips the circuit breaker on the grid side, but the power generation device fails to detect the fault and continues to operate; 2) The normal power supply is unexpectedly interrupted due to a fault in the power grid equipment; 3) The power supply is interrupted due to power grid maintenance; 4) The staff makes a wrong operation; 5) Natural disasters. In order to prevent unplanned islands from affecting the power generation device or load, it is first necessary to detect and determine that the system has entered the island state, and then further adjust the system's working mode to ensure the safety of the equipment. The adjustment strategies for microgrid systems or active distribution systems, centralized and distributed new energy power generation systems (wind power or photovoltaic) entering the island state vary according to their respective characteristics. When the flexible DC inverter station enters the island state due to a temporary fault or misoperation, the voltage on its AC side will rise sharply. Under certain safety requirements, the flexible DC inverter station should change the original control strategy to ensure that the converter is controllable and can actively suppress overvoltage. For instantaneous faults, the fault crossing strategy coordinated with the island protection and the DC energy consumption circuit can ensure that the DC system does not stop in the case of serious faults; for the case where the fault lasts for a long time, it is also necessary to coordinate with the wind farm side to reduce the output of the wind farm in time to prevent the energy consumption circuit on the flexible DC side from being put into operation for a long time. After the fault is cleared, the flexible DC inverter side needs to smoothly switch to the networking mode according to the detection grid signal, and switch the control strategy of the flexible DC inverter station as needed to avoid overcurrent or overvoltage caused by the switching moment. To this end, an embodiment of the present invention proposes a coordinated control method and system for crossing an island fault at a receiving-end converter station of an offshore wind power system via a flexible direct current grid-connected system. Through coordination among the flexible direct current inverter side island protection, the flexible direct current side load unloading circuit, the wind farm and other parts, the offshore wind power can cross an island fault at a receiving-end converter station of the flexible direct current grid-connected system.

[0063] Specifically, the embodiments of the present invention are used in the following scenarios: Figure 2 As shown, Figure 2This is a case where three wind farms use flexible direct current transmission at both ends. After boosting, the three offshore wind farms are connected to the flexible direct current sending end converter station through a high-voltage AC submarine cable. The flexible direct current sending end converter station is connected to the flexible direct current receiving end converter station through a high-voltage DC submarine cable. The flexible direct current receiving end converter station is connected to the onshore power grid through the transmission line. The DC side of the flexible direct current receiving end converter station is equipped with an energy unloading circuit. When the DC voltage exceeds the limit, the unloading resistor is put into use; in the flexible direct current receiving end converter station, the AC side of the converter valve is connected to the connecting transformer, and the other two branches of the AC bus connected to the transmission line are connected to the station transformer and the connecting transformer respectively. For the case of multi-terminal direct current transmission, the structure of the flexible direct current converter station is the same as that of the converter station for double-terminal direct current transmission, mainly because the number of the sending end converter station and the receiving end converter station is more, and the topological structure of the DC submarine cable connecting multiple converter stations is more complex. The embodiment of the present invention focuses on the receiving end converter station and its coordination with the wind farm side, and does not focus on the specific structure of the transmission method, so the proposed coordination control method is also applicable to multi-terminal direct current. Furthermore, the problem addressed by the embodiments of the present invention is how to achieve stable control of the flexible direct current transmission system after the flexible direct current receiving end converter station on the onshore side of the offshore wind power flexible direct current grid-connected system enters an island state due to a fault or malfunction, and how to achieve rapid conversion to the grid-connected state and restore power supply capacity after the fault is cleared.

[0064] Specifically, the island fault of the receiving-end converter station in this embodiment refers to the onshore side of the offshore wind power flexible direct current grid-connected system causing the flexible direct current receiving-end converter station to enter the island state due to a fault or a malfunction of the circuit breaker. Specifically, the purpose of step S10 is to determine whether the flexible direct current receiving-end converter station enters the island fault state from the normal operating state due to a fault or a malfunction of the circuit breaker. The normal operating state refers to the flexible direct current receiving-end converter station side adopting a direct current control strategy based on a phase-locked loop, and the control target is to keep the DC voltage or active power constant and the AC voltage amplitude or reactive power or power factor constant; the control target of the sending-end converter station is to keep the AC voltage amplitude and frequency of the offshore AC system constant; the energy-consuming circuit configured at the flexible direct current receiving-end converter station is not put into operation.

[0065] Among them, for Figure 2 In the flexible direct current grid-connected system at both ends, the flexible direct current receiving end converter station adopts fixed DC voltage control and fixed reactive power control. Under the premise of ignoring losses, the active power transmitted by the flexible direct current system is the active power generated by the wind farm. The amount of active power generated by the wind farm is the amount of active power transmitted by the flexible direct current system. When the flexible direct current receiving end converter station is in normal operation, the DC side voltage, AC side current and voltage are all within a reasonable range and are controllable.

[0066] The real-time information on the grid side of the flexible DC receiving converter station includes electrical quantity information and circuit breaker status information. The electrical quantity information includes the voltage, current, frequency and its change rate on the grid side of the flexible DC receiving converter valve; the circuit breaker status information includes whether the circuit breaker on the transformer valve side of the receiving converter station, the circuit breaker on the grid side of the transformer, and the circuit breakers at both ends of the transmission line are in operation.

[0067] In a specific embodiment, performing island detection according to the network side information of the flexible direct current receiving end converter station includes:

[0068] Use single criteria, combined criteria or comprehensive criteria to perform island detection;

[0069] The single criterion includes performing island detection according to the AC frequency of the flexible DC receiving converter station grid side, the change rate of the AC frequency of the flexible DC receiving converter station grid side, the circuit breaker status information, and the preset algorithm; wherein,

[0070] The island detection is performed by using a combined criterion to perform a combined judgment on the single criterion in parallel;

[0071] The use of comprehensive criteria for island detection is to perform sequential judgment according to the priority order of the single criteria.

[0072] In this embodiment, it should be pointed out that there are many methods for judging whether the receiving-end converter station is in an island fault state, such as judging whether the corresponding electrical quantity exceeds the corresponding threshold to determine whether it enters the island state. If it exceeds the threshold, it enters the island state, otherwise it is considered to be a disturbance during normal operation. Specifically, the optional methods are as follows:

[0073] Method 1: Set the time Δt set When the change of AC frequency Δf at the receiving end of the flexible DC converter station exceeds the set threshold Δf set When , it is determined that the flexible DC receiving end converter station enters the island state;

[0074] Method 2: Set the time Δt set When the change rate of the AC frequency at the grid side of the flexible DC receiving station is Exceeding the set threshold When , it is determined that the flexible DC receiving end converter station enters the island state;

[0075] Method 3: According to the collected status information of the circuit breaker, when the detected status of any relevant circuit breaker on the connection path between the receiving-end converter station and the receiving-end power grid is disconnected, it is determined that the flexible direct current receiving-end converter station has entered the island state;

[0076] Method 4: Set the time Δt set When the measured impedance Z is calculated by the external power method at the flexible DC receiving station testWhen it exceeds the set normal range, it is determined that the flexible DC receiving end converter station has entered an island state;

[0077] Method five: Use heuristic algorithms such as neural networks and machine learning to train the model through a large amount of data, and use the mapping relationship between the network input mode and the output mode to reflect and achieve the purpose of learning; the model established by the heuristic algorithm is a nonlinear model with multiple inputs and single output. The multiple inputs include the collected grid-side information of the receiving-end converter station, and the output signal is a digital signal for judging whether the receiving-end converter station has entered an island state; the parameters of the nonlinear model are obtained by repeatedly learning and training various samples; use a large amount of actual test data to train the model, and use the trained model to determine whether the flexible DC receiving-end converter station has entered an island fault based on the real-time detected grid-side electrical quantity information of the flexible DC receiving-end converter station. The process of using an intelligent algorithm to determine whether the flexible DC receiving-end converter station has entered an island mode is as follows: Figure 3 The specific contents of each step are as follows:

[0078] S101: Collect the experimental or historical operation data of the flexible DC receiving converter station. The data to be collected include the corresponding network-side information of the flexible DC receiving converter station under various operating conditions (including island fault, non-island fault, normal operation, etc.) during the operation of the flexible DC receiving converter station. The collected experimental data include simulation data of the flexible DC receiving converter station or field experimental measured data, and the historical operation data refers to the data collected during the operation of the flexible DC receiving converter station.

[0079] S102: Construct a mathematical model based on an intelligent algorithm and initialize the parameters. The intelligent algorithm is an intelligent algorithm that can implement machine learning, such as BP neural network, layered analysis method, expert system method, etc. The input variable for constructing the mathematical model is the grid-side information of the flexible direct current receiving converter station, and the output variable is a logical variable that characterizes whether the flexible direct current receiving converter station enters an island fault state. The modeling methods of different intelligent algorithms are different, so they will not be repeated here. After the model is established, the parameters therein, such as the number of layers in the neural network, the number of neurons in each layer, the transfer function between layers, and other parameters, need to be set to initial values ​​first.

[0080] S103: Using the detected grid-side information of the flexible DC receiving converter station as model input. During the actual grid-connected operation, the flexible DC receiving converter station detects grid-side point information in real time as input parameters of the trained model.

[0081] S104: Use existing data to train the model, determine the optimal values ​​of the parameters and test the rationality of the model. Different intelligent algorithms have different methods for determining the corresponding parameters and testing the model, which will not be described here.

[0082] S105: Calculate using the model to obtain a determination result. Calculate using the trained model to obtain the logic corresponding to the current grid-side information of the flexible DC receiving converter station to determine whether the flexible DC receiving converter station should enter the island fault ride-through mode.

[0083] Method 6: Since each single criterion has its own advantages and disadvantages, there may be certain contradictions between their respective speed, sensitivity and reliability. For methods one, two and four, if the upper limit of the action is set too high, it will be very reliable but the sensitivity will be insufficient. If the upper limit of the action is set too low, it will be easy to malfunction. For method three, it is impossible to judge the situation where the flexible direct current receiving end converter station enters the island state due to a fault in the receiving end power grid when the circuit breaker is closed. For method five, there is a certain calculation delay due to the complexity of the algorithm. Therefore, the combination of the above-mentioned multiple detection methods can be used to fully utilize their respective advantages. Among them, method six is ​​divided into two methods:

[0084] A method for detecting island faults in a flexible DC receiving converter station using a combined criterion is shown in Figure 4 As shown in the figure, the output of various single criteria is a logical variable. When the logical variable is 1, it indicates that the current flexible DC receiving end converter station is in an island fault state. When the logical variable is 0, it indicates that the current flexible DC island converter station is not in an island fault state. Figure 4 In the process, it is only necessary to use the judgment results of multiple single criteria as the input of an OR logic gate, and its output result can be used as the comprehensive judgment result.

[0085] Another method for detecting island faults in a flexible DC receiving converter station using a comprehensive criterion is as follows: Figure 5 As shown in the figure, multiple single criteria are judged separately according to their priorities, and the criterion with the highest priority is judged first.

[0086] S20: When it is determined that the flexible DC receiving-end converter station enters an island state, a corresponding fault control strategy is selected according to different fault types.

[0087] Furthermore, the fault control strategy includes:

[0088] The locking strategy of the flexible DC receiving end converter station, the control strategy for power supply to the passive network under steady-state conditions, or the self-synchronization control strategy based on the decoupled dual-synchronous reference system.

[0089] In this step, the direct current control strategy based on the phase-locked loop is adopted in the normal operation of the flexible DC receiving end converter station. When the flexible DC receiving end converter station enters the island state due to external faults, the phase-locked loop control will fail because there is no synchronous power supply in the island system. If the flexible DC inverter station needs to be controllable, the original control strategy needs to be changed. There are three optional control strategies for island faults caused by different types of faults or malfunctions:

[0090] Solution 1: The flexible DC receiving-end converter station is locked, and the pulse signal of the converter valve is locked as a locking signal. The flexible DC receiving-end converter station does not send active and reactive power. This solution is suitable for the working conditions where the flexible DC receiving-end converter station is connected to the transformer valve-side circuit breaker or the grid-side circuit breaker is disconnected due to external faults or misoperation, resulting in the flexible DC entering an island fault (when there is no load in the system connected to the flexible DC receiving-end converter station, it is meaningless for the flexible DC converter station to continue to be connected to the grid), and the grid-side voltage and current seriously exceed the tolerance value of the receiving-end converter switch components.

[0091] Solution 2: The flexible DC receiving station adopts a control strategy to supply power to the passive network in a steady state. Figure 6 As shown, where u sabc 、i vabc They represent the detected three-phase voltage and three-phase current on the grid side respectively. A phase-locked loop is no longer required, and the phase angle θ is determined by equation (1):

[0092] θ=θ 0 +ω 0 t (1)

[0093] Where θ is the phase angle; θ 0 is the initial phase angle after entering the island state; w 0 is the rated angular frequency; t is the time, and it is confirmed that t corresponds to 0 when the island is crossed.

[0094] It should be noted that this solution is applicable to the situation where the isolated island system has a certain load after a fault, and the flexible DC voltage is controlled within a reasonable range by the fault ride-through control strategy, or is controlled by other flexible DC converter stations (for two-end DC, it is the flexible DC offshore sending-end converter station) using a fixed DC voltage control strategy.

[0095] Solution 3: If the flexible DC receiving end converter station adopts a self-synchronization control strategy based on a decoupled dual synchronous reference system, as shown in the attached Figure 7 As shown. Among them, u sabc 、i vabc Respectively represent the detected three-phase voltage and three-phase current on the grid side. The DDSRF module is represented by a positive and negative sequence decoupling module based on a decoupled dual synchronous coordinate system, which can decompose the three-phase current or three-phase voltage on the valve side into positive sequence components and negative sequence components, and convert them into d-axis and q-axis components in the forward and reverse rotating coordinate systems, respectively. The mathematical expression of the DDSRF module is an existing achievement and will not be repeated here. Here, a self-synchronous control method combining the decoupled dual synchronous reference system DDSRF method with the power synchronization loop PSL is used, that is, a method for calculating the phase angle θ. Among them, the mathematical model corresponding to the power synchronization loop PSL is as follows:

[0096]

[0097]

[0098] Where H is the inertia time constant, Δω=ω-ω 0 is the angular frequency deviation, ω is the actual angular frequency per unit value, ω 0 is the nominal angular frequency per unit value, t is the time, is the active reference value, p 0 is the instantaneous active power, and θ is the electrical angle.

[0099] Furthermore, p 0 The calculation formula for instantaneous active power is as follows:

[0100]

[0101] In the formula, u + sd 、i + vd 、u - sd 、i - vd 、u + sq 、i + vq 、u - sq 、i - vq The three-phase voltage and current are decoupled and transformed by the DDSRF module to obtain the d-axis and q-axis voltage components and current components in the dq coordinate system obtained by the forward and reverse rotation coordinate transformation, and they are all per-unit values. The active reference value is calculated by the PI controller using the difference between the DC voltage reference value and the square of the actual value. The expression is as follows:

[0102]

[0103] It should be noted that this solution is applicable to the situation where the island system has a certain load after a fault, but it can still effectively control the DC side voltage when the flexible DC receiving-end converter station is in an island fault state, and can suppress the overvoltage caused by the three-phase disconnection of a large number of loads. Due to the use of the positive and negative sequence decoupling module based on the decoupled dual synchronous reference system, this solution can be applied to the harsh working conditions such as excessive harmonics on the grid side of the flexible DC receiving-end converter station and large grid imbalance caused by island faults, ensuring that the flexible DC receiving-end converter station is still controllable under harsh working conditions.

[0104] In summary, the purpose of step S20 is to ensure that the flexible DC receiving-end converter station is still controllable after an island fault occurs. Different schemes can be selected according to the location of different faults and system requirements. Scheme 1 is only applicable to severe working conditions such as the action of specific circuit breakers inside the flexible DC receiving-end converter station; Scheme 2 needs to be coordinated with the fault ride-through strategy in step 3 and can only be given priority after the fault ride-through module is put into use; Scheme 3 has a wider range of applications and better control effects. Therefore, it is necessary to select the control strategy of the flexible DC receiving-end converter station according to the fault scenario and needs, and a control strategy selection process is proposed after the flexible DC receiving-end converter station enters the island state, such as Figure 8 shown.

[0105] S30: Determine the fault duration, and adopt different fault ride-through strategies according to different fault durations.

[0106] The fault ride-through strategy includes:

[0107] The island fault ride-through strategy of the flexible DC system is realized by the unloading circuit, the island fault ride-through strategy of the flexible DC system is realized by the energy storage device instead of the unloading circuit, or the island fault ride-through strategy of the flexible DC system is realized by the combination of the unloading circuit and the energy storage device.

[0108] It should be noted that the purpose of this step is to detect that after the flexible DC receiving-end converter station enters an island fault, the active power output is restricted, and a fault ride-through strategy needs to be adopted to ensure that the electrical quantity of the DC transmission system does not exceed the limit.

[0109] Due to a fault in the receiving-end power grid, after an island fault occurs in the flexible DC receiving-end power grid, the active output channel of the flexible DC system is blocked. If the control strategy of the flexible DC sending-end power grid remains unchanged, the sending-end wind farm will not feel the fault of the receiving-end power grid and will continue to send active power according to the original control strategy, that is, the active power transmitted by the flexible DC sending end remains unchanged, while the active power sent by the flexible DC receiving end becomes smaller or even close to zero. The difference between the two will cause the bus voltage on the DC side of the flexible DC to increase. If no measures are taken, the DC voltage will exceed the limit and threaten the safety of the system. In actual projects, a load shedding circuit is configured on the DC side of the flexible DC receiving-end converter station. When the DC voltage exceeds the limit, the load shedding circuit is activated to dissipate the redundant power in the form of heat energy on the load shedding resistor. However, long-term activation will cause the heat dissipation problem of the load shedding circuit, reducing the service life of the equipment. In addition, the existing fault strategies are mainly designed for short-circuit faults in the grid-side system. Since island faults are more serious and the redundant power is greater, the fault crossing strategy of the flexible DC system under this condition should require additional configuration. Specifically, the fault crossing strategies include the following three:

[0110] Solution A: For the solution of using load shedding circuit to realize island fault ride-through of flexible DC system, a control strategy for island fault ride-through of flexible DC receiving end considering the duration of fault is shown in the attached figure. Fig. 9As shown. When the flexible DC receiving converter station detects that it has entered the island state, it is necessary to put the DC side energy unloading circuit of the flexible DC receiving converter station into operation; if the detection time is long, when the fault has lasted for a period of time, it has caused the DC side voltage of the flexible DC receiving converter station to exceed the limit, and the DC side energy unloading circuit of the flexible DC receiving converter station will be put into operation due to the DC voltage exceeding the limit. The DC side energy unloading circuit of the flexible DC receiving converter station will exit after the system recloses after the fault is cleared. The specific judgment method is shown in steps S40 and S50. If the fault duration is short and the fault is cleared within the set time, there is no need to use additional control methods to control the wind farm to reduce the output. If the fault duration is very long and exceeds the set time, it is necessary to use communication means to issue an output reduction instruction to the wind farm to reduce the wind farm output and prevent the unloading circuit from overheating.

[0111] Optional solution B: The DC side unloading circuit of the flexible DC receiving converter can be replaced by an energy storage device due to heat dissipation problems. The energy storage device can absorb redundant power. The types of energy storage devices include supercapacitors, electrochemical energy storage, etc., which are used to temporarily store unbalanced energy. The corresponding control methods are basically similar. When the DC bus voltage exceeds the set upper limit in the event of a fault, it is considered to enter a fault ride-through state and the energy storage device is put into use. There is no heat dissipation problem when using an energy storage device to achieve ride-through of the flexible DC receiving converter station. However, if the fault time is long, the DC voltage will continue to rise after the storage energy of the energy storage device reaches the upper limit, and the regulatory effect of the energy storage device in the fault recovery stage will be affected after the fault is cleared. Therefore, it is necessary to set the energy storage upper limit of the energy storage device. If the fault has not been removed after exceeding the upper limit, it is necessary to issue a power reduction command to the wind farm to reserve and partially realize a certain regulatory effect in the fault recovery stage. A flexible DC receiving island fault ride-through control strategy that considers the energy storage upper limit of the DC side energy storage fault ride-through device, such as Fig.10 shown.

[0112] Option C: A combined fault ride-through mode, in which the DC side of the flexible DC receiving converter station is not only equipped with a load shedding circuit but also with an energy storage device. The respective control methods are similar to those of options A and B. The advantage is that when the combined fault ride-through scheme is adopted, the configuration capacity of the two fault ride-through devices will be reduced, and the corresponding action threshold needs to be configured according to the capacity. Since the control strategies of the two devices both include issuing an order to reduce the output of the wind farm, it can be selected to issue the order when both strategies issue an order to reduce the output; or when one strategy issues an order to reduce the output, which should be determined based on the configuration capacity of the two fault ride-through devices. If the configuration capacity of the energy storage scheme is greater than the configuration capacity of the load shedding circuit, it is recommended to issue the order when both strategies issue an order to reduce the output or when the energy storage device control strategy issues an order; if the configuration capacity of the energy storage scheme is equivalent to the configuration capacity of the load shedding circuit, it is recommended to issue the order when one strategy issues an order to reduce the output; if the configuration capacity of the energy storage scheme is less than the configuration capacity of the load shedding circuit, it is recommended to issue the order when both strategies issue an order to reduce the output or when the load shedding circuit device control strategy issues an order. It should be noted that the above three different schemes need to be determined based on the hardware devices configured on the DC side of the receiving-end converter station of the flexible DC system, and should be determined after weighing and comparing economic and technical performance during the planning stage.

[0113] S40, judging whether the fault is cleared, detecting the grid-side signal of the actuated circuit breaker after the fault is cleared, and reclosing the grid when the grid-side signal of the actuated circuit breaker meets the reclosing condition.

[0114] In this step, the purpose of the island fault crossing of the flexible DC receiving end converter station is to cross the island fault within the control capacity of the flexible DC receiving end converter station after the flexible DC receiving end converter station enters the island state due to the action of the relevant circuit breaker or the fault-free malfunction of the key circuit breaker after a temporary fault occurs on the interconnected line or in the receiving end power grid, and the flexible DC receiving end converter station can be reconnected to the grid by closing the actuated circuit breaker in time according to the reclosing conditions after the fault is cleared. The existing circuit breaker has the ability to check the synchronous closing, which will not be further described here.

[0115] In addition, it should be noted that when the circuit breaker that is activated after the fault is cleared meets the reclosing conditions, the closing signal needs to be transmitted to the flexible DC receiving end converter station through the communication device; if only relying on the islanding criterion of the flexible DC receiving end converter station to judge whether the flexible DC is converted from the islanding state to the grid-connected state, it will take a certain amount of time, and too long a delay time is not conducive to the recovery of the system after the fault is cleared.

[0116] S50. Change the control strategy of the flexible DC receiving-end converter station to restore the active output of the flexible DC receiving-end converter station.

[0117] In this step, after the flexible direct current receiving end converter station is converted from an isolated island state to a grid-connected state, the corresponding control strategy should be changed accordingly, depending on the control strategy adopted by the flexible direct current receiving end converter station when an island fault occurs.

[0118] Specifically, there are three situations:

[0119] For the flexible DC receiving-end converter that adopts the blocking strategy during the fault stage, after detecting the conversion to the grid-connected state, the converter is unlocked after a delay. The active control strategy of the converter is fixed DC voltage control. The fault ride-through module exits after a delay after the converter is unlocked, and the flexible DC receiving-end converter station resumes the normal grid-connected power generation state. For the working condition of reducing the output of the wind farm during the fault ride-through stage, after the flexible DC receiving-end converter station resumes the normal grid-connected state, the wind farm output recovery command is issued.

[0120] For the flexible DC receiving-end converter that adopts the control strategy of supplying power to the passive network during the fault stage, after detecting the conversion to the grid-connected state, the active control strategy of the converter is converted to the fixed DC voltage control, and the fault ride-through module exits after a delay of a period of time after the converter control strategy is switched, and the flexible DC receiving-end converter station resumes the normal grid-connected power generation state. For the working condition of reducing the output of the wind farm during the fault ride-through stage, after the flexible DC receiving-end converter station resumes the normal grid-connected state, the wind farm output recovery command is issued.

[0121] For the flexible DC receiving-end converter that adopts the self-synchronous control strategy based on the decoupled dual synchronous reference system during the fault stage, after detecting the conversion to the grid-connected state, the active control strategy of the converter can be converted to fixed DC voltage control or self-synchronous control as needed. The fault ride-through module will exit after a period of delay after the flexible DC receiving-end converter station detects the conversion to the grid-connected state, and the flexible DC receiving-end converter station will resume the normal grid-connected power generation state. For the working condition of reducing the output of the wind farm during the fault ride-through stage, after the flexible DC receiving-end converter station resumes the normal grid-connected state, the wind farm output recovery command is issued.

[0122] The island fault ride-through control method for the receiving-end converter station of the flexible direct current grid-connected system provided in the embodiment of the present invention can effectively solve the problem of how the receiving-end converter station of the flexible direct current transmission system for concentrated offshore wind power can deal with unplanned islanding. The embodiment of the present invention can solve the problem that the conventional fault ride-through method puts direct current energy-consuming devices into use for a long time, causing the devices to overheat and reduce the life of the equipment. At the same time, the self-synchronization control strategy proposed in the embodiment of the present invention after the receiving-end converter station enters the island state can solve the problem of over-limit voltage on the grid side, and can achieve that after a short-term island fault occurs, the flexible direct current receiving-end converter station is still safe and controllable, preventing the flexible direct current system from being shut down due to temporary faults and the trouble of frequent restart, and has strong applicability and economy.

[0123] See also Fig.11 A certain embodiment of the present invention further provides a control system for island fault ride-through of a converter station at a receiving end of a flexible direct current grid-connected system, comprising:

[0124] The island state judgment module 01 is used to perform island detection according to the network side information of the flexible direct current receiving end converter station, and judge whether the flexible direct current receiving end converter station enters the island state according to the detection result;

[0125] The receiving-end converter station control module 02 is used to select a corresponding fault control strategy according to different fault types when it is determined that the flexible direct current receiving-end converter station enters an island state;

[0126] The fault ride-through control module 03 is used to determine the fault duration and adopt different fault ride-through strategies according to different fault durations;

[0127] The grid-connection control module 04 is used to determine whether the fault is cleared, detect the grid-side signal of the actuated circuit breaker after the fault is cleared, and reconnect to the grid when the grid-side signal of the actuated circuit breaker meets the reclosing condition;

[0128] The control strategy selection module 05 is used to change the control strategy of the flexible direct current receiving end converter station to restore the active power output of the flexible direct current receiving end converter station.

[0129] In one embodiment, the island state determination module 01 is further used for:

[0130] Use single criteria, combined criteria or comprehensive criteria to perform island detection;

[0131] The single criterion includes performing island detection according to the AC frequency of the flexible DC receiving converter station grid side, the change rate of the AC frequency of the flexible DC receiving converter station grid side, the circuit breaker status information, and the preset algorithm; wherein,

[0132] The island detection is performed by using a combined criterion to perform a combined judgment on the single criterion in parallel;

[0133] The use of comprehensive criteria for island detection is to perform sequential judgment according to the priority order of the single criteria.

[0134] In one embodiment, the fault control strategy includes:

[0135] The locking strategy of the flexible DC receiving end converter station, the control strategy for power supply to the passive network under steady-state conditions, or the self-synchronization control strategy based on the decoupled dual-synchronous reference system.

[0136] In one embodiment, the fault ride-through strategy includes:

[0137] The island fault ride-through strategy of the flexible DC system is realized by the unloading circuit, the island fault ride-through strategy of the flexible DC system is realized by the energy storage device instead of the unloading circuit, or the island fault ride-through strategy of the flexible DC system is realized by the combination of the unloading circuit and the energy storage device.

[0138] It can be understood that the island fault ride-through control system for the receiving-end converter station of the flexible direct current grid-connected system provided by the embodiment of the present invention is used to execute the island fault ride-through control method for the receiving-end converter station of the flexible direct current grid-connected system as described in any of the above embodiments. This embodiment can effectively solve the problem of how the receiving-end converter station of the flexible direct current transmission system for centralized offshore wind power can deal with unplanned islanding, as well as the problem that the conventional fault ride-through method puts direct current energy-consuming devices into use for a long time, causing the devices to overheat and reduce the life of the equipment. At the same time, the self-synchronization control strategy proposed in this embodiment after the receiving-end converter station enters the island state can solve the problem of over-limit voltage on the grid side, and can achieve that after a short-term island fault occurs, the flexible direct current receiving-end converter station is still safe and controllable, preventing the flexible direct current system from being shut down due to temporary faults and the trouble of frequent restarts, and has strong applicability and economy.

[0139] See also Fig.12 , a certain embodiment of the present invention further provides a terminal device, including:

[0140] one or more processors;

[0141] A memory, coupled to the processor, for storing one or more programs;

[0142] When the one or more programs are executed by the one or more processors, the one or more processors implement the above-mentioned method for controlling island fault ride-through at the receiving-end converter station of the flexible direct current grid-connected system.

[0143] The processor is used to control the overall operation of the terminal device to complete all or part of the steps of the above-mentioned flexible direct current grid-connected system receiving-end converter station island fault ride-through control method. The memory is used to store various types of data to support the operation of the terminal device, and these data may include, for example, instructions for any application or method used to operate on the terminal device, and data related to the application. The memory can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, disk or optical disk.

[0144] In an exemplary embodiment, the terminal device can be implemented by one or more application specific integrated circuits (Application Specific Integrated Circuit, ASC), digital signal processors (Digital Signal Processor, DSP), digital signal processing devices (Digital Signal Processing Device, DSPD), programmable logic devices (Programmable Logic Device, PLD), field programmable gate arrays (Field Programmable Gate Array, FPGA), controllers, microcontrollers, microprocessors or other electronic components, and is used to execute the island fault ride-through control method of the receiving-end converter station of the flexible direct current grid-connected system as described in any of the above embodiments, and achieve the technical effect consistent with the above method.

[0145] In another exemplary embodiment, a computer-readable storage medium including a computer program is also provided, and when the computer program is executed by a processor, the steps of the method for controlling the island fault ride-through of the receiving-end converter station of the flexible direct current grid-connected system as described in any of the above embodiments are implemented. For example, the computer-readable storage medium may be the above-mentioned memory including the computer program, and the above-mentioned computer program may be executed by the processor of the terminal device to complete the method for controlling the island fault ride-through of the receiving-end converter station of the flexible direct current grid-connected system as described in any of the above embodiments, and achieve the technical effect consistent with the above-mentioned method.

[0146] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A method for controlling island fault ride-through at a converter station at the receiving end of a flexible direct current grid-connected system, characterized in that: include: Perform island detection based on the grid-side information of the flexible DC receiving converter station, and determine whether the flexible DC receiving converter station has entered an island state based on the detection results; When it is determined that the flexible DC receiving end converter station enters the island state, the corresponding fault control strategy is selected according to different fault types; Among them, for the working condition that the flexible DC receiving-end converter station is disconnected due to external faults or misoperation, causing the transformer valve-side circuit breaker or grid-side circuit breaker to be disconnected, resulting in the flexible DC receiving-end converter station entering an island state, a locking strategy for the flexible DC receiving-end converter station is selected; for the situation that the island system after the fault has a certain load, and the flexible DC voltage is controlled within a reasonable range by the fault ride-through control strategy, or is controlled by other flexible DC converter stations using a fixed DC voltage control strategy, a control strategy for supplying power to the passive network under steady-state conditions is selected; for the severe working condition caused by the island fault, where the grid-side harmonics of the flexible DC receiving-end converter station exceed the standard and the imbalance of the power grid is large, a self-synchronization control strategy based on the decoupled dual-synchronization reference system is selected; Determine the fault duration, and adopt different fault ride-through strategies according to different fault durations; the fault ride-through strategies include: implementing a flexible DC system island fault ride-through strategy by a load shedding circuit, implementing a flexible DC system island fault ride-through strategy by replacing the load shedding circuit with an energy storage device, or implementing a flexible DC system island fault ride-through strategy by combining a load shedding circuit and an energy storage device; Determine whether the fault is cleared, detect the grid-side signal of the actuated circuit breaker after the fault is cleared, and reclose the grid when the grid-side signal of the actuated circuit breaker meets the reclosing condition; Change the control strategy of the flexible DC receiving end converter station to restore the active output of the flexible DC receiving end converter station.

2. The method for controlling island fault ride-through of a converter station at the receiving end of a flexible direct current grid-connected system according to claim 1, characterized in that: The island detection is performed according to the network side information of the flexible direct current receiving end converter station, including: Use single criteria, combined criteria or comprehensive criteria to perform island detection; The single criterion includes performing island detection according to the AC frequency of the flexible DC receiving converter station grid side, the change rate of the AC frequency of the flexible DC receiving converter station grid side, the circuit breaker status information, and the preset algorithm; wherein, The island detection is performed by using a combined criterion to perform a combined judgment on the single criterion in parallel; The use of comprehensive criteria for island detection is to perform sequential judgment according to the priority order of the single criteria.

3. A control system for island fault ride-through of a converter station at the receiving end of a flexible direct current grid-connected system, characterized in that: include: An islanding state judgment module is used to perform islanding detection according to the network side information of the flexible direct current receiving end converter station, and judge whether the flexible direct current receiving end converter station enters an islanding state according to the detection result; The receiving-end converter station control module is used to select a corresponding fault control strategy according to different fault types when it is determined that the flexible direct current receiving-end converter station enters an island state; Among them, for the working condition that the flexible DC receiving-end converter station is disconnected due to external faults or misoperation, causing the transformer valve-side circuit breaker or grid-side circuit breaker to be disconnected, resulting in the flexible DC receiving-end converter station entering an island state, a locking strategy for the flexible DC receiving-end converter station is selected; for the situation that the island system after the fault has a certain load, and the flexible DC voltage is controlled within a reasonable range by the fault ride-through control strategy, or is controlled by other flexible DC converter stations using a fixed DC voltage control strategy, a control strategy for supplying power to the passive network under steady-state conditions is selected; for the severe working condition caused by the island fault, where the grid-side harmonics of the flexible DC receiving-end converter station exceed the standard and the imbalance of the power grid is large, a self-synchronization control strategy based on the decoupled dual-synchronization reference system is selected; A fault ride-through control module is used to determine the fault duration and adopt different fault ride-through strategies according to different fault durations; the fault ride-through strategies include: implementing a flexible DC system island fault ride-through strategy by a load shedding circuit, implementing a flexible DC system island fault ride-through strategy by replacing the load shedding circuit with an energy storage device, or implementing a flexible DC system island fault ride-through strategy by combining a load shedding circuit and an energy storage device; A grid-connection control module, used to determine whether the fault is cleared, detect the grid-side signal of the actuated circuit breaker after the fault is cleared, and reconnect to the grid when the grid-side signal of the actuated circuit breaker meets the reclosing condition; The control strategy selection module is used to change the control strategy of the flexible DC receiving end converter station to restore the active power output of the flexible DC receiving end converter station.

4. The island fault ride-through control system of the receiving-end converter station of the flexible direct current grid-connected system according to claim 3 is characterized in that: The island state determination module is further used for: Use single criteria, combined criteria or comprehensive criteria to perform island detection; The single criterion includes performing island detection according to the AC frequency of the flexible DC receiving converter station grid side, the change rate of the AC frequency of the flexible DC receiving converter station grid side, the circuit breaker status information, and the preset algorithm; wherein, The island detection is performed by using a combined criterion to perform a combined judgment on the single criterion in parallel; The use of comprehensive criteria for island detection is to perform sequential judgment according to the priority order of the single criteria.

5. A terminal device, characterized in that: include: one or more processors; A memory, coupled to the processor, for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the island fault ride-through control method for the receiving-end converter station of the flexible direct current grid-connected system as described in any one of claims 1-2.

6. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by the processor, the method for controlling island fault ride-through of a receiving-end converter station of a flexible direct current grid-connected system as described in any one of claims 1-2 is implemented.