A Hall Effect Resonance Rod Power Transmission System
Through the Hall effect resonant rod power transmission system, frequency and power detection are used to adjust the reactance filter and compensation capacitor bank, which solves the problem that traditional power pollution control methods are difficult to deal with instantaneous currents, surges, and harmonics, and achieves efficient power quality. Improved and stable equipment operation.
Patent Information
- Application Number
- CN202111233800.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-10-22
AI Technical Summary
Traditional power pollution control methods are difficult to effectively control instantaneous currents, surges, and harmonics, cannot meet the needs of high-precision electrical equipment, and lack a specifically designed power pollution feedback system.
Design a Hall effect resonant rod power transmission system, including a three-phase mains power supply line, a control switch, a reactance filter, a line detection device, a compensation capacitor bank and a PLC controller. The reactance filter and the PLC controller are adjusted through frequency and power detection. Compensation capacitor bank enables real-time monitoring and feedback of electric energy pollution.
It effectively avoids power transmission accidents caused by abnormal regulation, reduces equipment heating, vibration and noise, reduces the loss of the power distribution system, and improves power quality and equipment life.
Smart Images

Figure CN113972647B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of energy-saving protection, and in particular relates to a Hall effect resonance rod power transmission system. Background Art
[0002] The traditional method of controlling electrical energy pollution is to use active filtering or passive filtering technology. However, the effect of controlling transient current, surge and harmonics is often not ideal and it is difficult to meet the needs of high-precision electrical equipment.
[0003] Therefore, it is necessary to start from the causes of transient currents, surges, and harmonics, their operating mechanisms in the user's power distribution system, and the mutual superposition of electric energy. On the basis of traditional filtering concepts, targeted technologies such as increasing internal and external isolation, suppressing electric energy pollution, and absorbing electric energy pollution are proposed, and no relevant electric energy pollution control feedback system is designed.
[0004] That is, at this stage, it is necessary to design a Hall effect resonant rod power transmission system to solve the problem of power pollution. Summary of the invention
[0005] The purpose of the present invention is to provide a Hall effect resonance rod power transmission system for solving the technical problem of power pollution existing in the above-mentioned prior art.
[0006] To achieve the above object, the technical solution of the present invention is:
[0007] A Hall effect resonance rod power transmission system, characterized in that it includes a three-phase mains power supply line, a control switch, a reactance filter, a line detection device, a load, an AC contactor, a compensation capacitor group, and a PLC controller;
[0008] Wherein, the three-phase mains power supply line, control switch, reactance filter and load are connected in sequence;
[0009] The line detection device is used to detect line data of a node between the three-phase mains power supply line and the control switch;
[0010] The PLC controller is connected to the control switch, the line detection device, and the AC contactor respectively;
[0011] The compensation capacitor group is connected to the node between the control switch and the reactance filter through the AC contactor;
[0012] The compensation capacitor bank is used to compensate for reactive power;
[0013] The compensation capacitor group uses adjacent resonant rod conductors that produce the Hall effect;
[0014] The resonant rod conductor is made of rare earth material;
[0015] The line detection device includes a frequency detection device and a power detection device;
[0016] The frequency detection device and the power detection device are respectively connected to the PLC controller;
[0017] The frequency detection device is used to detect the real-time frequency data of the node between the three-phase mains power supply line and the control switch;
[0018] The power detection device is used to detect the real-time power data of the node between the three-phase mains power supply line and the control switch;
[0019] Wherein, the reactance filter and the compensation capacitor group are in a long-term closed state;
[0020] Also includes a data storage device, the data storage device is connected to the PLC controller;
[0021] The data storage device stores standard frequency data and standard power data of the node between the three-phase mains power supply line and the control switch under normal operation;
[0022] The PLC controller compares the real-time power data with the standard power data. If the real-time power data matches the standard power data, the PLC controller controls the compensation capacitor group to continue to be closed. If the real-time power data does not match the standard power data, the PLC controller controls the compensation capacitor group to start through the AC contactor.
[0023] The PLC controller compares the real-time frequency data with the standard frequency data. If the real-time frequency data matches the standard frequency data, the PLC controller controls the reactance filter to continue to be closed. If the real-time frequency data does not match the standard frequency data, the PLC controller controls the reactance filter to start.
[0024] Also includes a first timing device, the first timing device is connected to the PLC controller;
[0025] The first timing device is in a long-term closed state;
[0026] When the PLC controller controls the reactance filter to start, the PLC controller controls the first timing device to start, and records the timing information of the first timing device as the real-time frequency adjustment time;
[0027] The data storage device stores the standard frequency adjustment time under normal operation of the reactance filter;
[0028] When the real-time frequency adjustment time reaches the standard frequency adjustment time, if the real-time frequency data matches the standard frequency data, it is determined that the reactance filter operates normally; if the real-time frequency data still does not match the standard frequency data, it is determined that the reactance filter operates abnormally;
[0029] Also includes a second timing device, the second timing device is connected to the PLC controller;
[0030] The second timing device is in a long-term closed state;
[0031] When the PLC controller controls the compensation capacitor group to start, the PLC controller controls the second timing device to start, and records the timing information of the second timing device as the real-time power adjustment time;
[0032] The data storage device stores the standard power adjustment time under normal operation of the compensation capacitor group;
[0033] When the real-time power adjustment time reaches the standard power adjustment time, if the real-time power data matches the standard power data, it is determined that the compensation capacitor group is operating normally; if the real-time power data still does not match the standard power data, it is determined that the compensation capacitor group is operating abnormally.
[0034] Furthermore, it also includes a frequency adjustment output detection device and a frequency adjustment input detection device;
[0035] The frequency adjustment output detection device and the frequency adjustment input detection device are respectively connected to the PLC controller;
[0036] The frequency regulation output detection device and the frequency regulation input detection device are in a long-term closed state;
[0037] The frequency adjustment output detection device is used to detect whether there is a standard control signal for controlling the operation of the reactance filter at the output end of the PLC controller;
[0038] The frequency adjustment input detection device is used to detect whether there is a standard control signal for controlling the operation of the reactance filter at the input end of the reactance filter;
[0039] When it is determined that the reactance filter operates abnormally, the PLC controller controls the frequency adjustment output detection device and the frequency adjustment input detection device to start;
[0040] If the frequency adjustment output detection device detects that the output end of the PLC controller does not contain a standard control signal for controlling the operation of the reactance filter, it is determined that the PLC controller is faulty;
[0041] If the frequency adjustment output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the reactance filter, and the frequency adjustment input detection device detects that the input end of the reactance filter does not have a standard control signal for controlling the operation of the reactance filter, it is determined that a transmission line between the PLC controller and the reactance filter is faulty;
[0042] If the frequency adjustment output detection device detects that a standard control signal for controlling the operation of the inductive filter exists at the output end of the PLC controller, and the frequency adjustment input detection device detects that a standard control signal for controlling the operation of the inductive filter exists at the input end of the inductive filter, it is determined that the inductive filter is faulty.
[0043] Furthermore, it also includes a power regulation output detection device and a power regulation input detection device;
[0044] The power regulation output detection device and the power regulation input detection device are respectively connected to the PLC controller;
[0045] The power regulation output detection device and the power regulation input detection device are in a long-term closed state;
[0046] The power regulation output detection device is used to detect whether there is a standard control signal for controlling the operation of the compensation capacitor group at the output end of the PLC controller;
[0047] The power regulation input detection device is used to detect whether there is a standard control signal for controlling the operation of the compensation capacitor group at the input end of the compensation capacitor group;
[0048] When it is determined that the compensation capacitor group operates abnormally, the PLC controller controls the power regulation output detection device and the power regulation input detection device to start;
[0049] If the power regulation output detection device detects that the output end of the PLC controller does not contain a standard control signal for controlling the operation of the compensation capacitor group, it is determined that the PLC controller is faulty;
[0050] If the power regulation output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the compensation capacitor group, and the power regulation input detection device detects that the input end of the compensation capacitor group does not have a standard control signal for controlling the operation of the compensation capacitor group, it is determined that a transmission line between the PLC controller and the compensation capacitor group is faulty;
[0051] If the power regulation output detection device detects that a standard control signal for controlling the operation of the compensation capacitor group exists at the output end of the PLC controller, and the power regulation input detection device detects that a standard control signal for controlling the operation of the compensation capacitor group exists at the input end of the compensation capacitor group, it is determined that the compensation capacitor group has a fault.
[0052] Furthermore, it also includes a standby frequency detection device;
[0053] The standby frequency detection device is connected to the PLC controller;
[0054] The standby frequency detection device is in a long-term closed state;
[0055] The standby frequency detection device has the same function as the frequency detection device and is independent of each other;
[0056] If it is determined for the first time that the real-time frequency data does not match the standard frequency data, the PLC controller controls the standby frequency detection device to start;
[0057] At this time, the real-time frequency data of the node between the three-phase mains power supply line and the control switch detected by the standby frequency detection device is recorded as the verification real-time frequency data;
[0058] If the verified real-time frequency data is different from the real-time frequency data, it is determined that the frequency detection device operates abnormally.
[0059] Further, it also includes a frequency detection output identification device and a frequency detection input identification device;
[0060] The PLC controller is connected to the frequency detection output identification device and the frequency detection input identification device respectively;
[0061] The frequency detection output identification device and the frequency detection input identification device are in a long-term closed state;
[0062] The frequency detection output identification device is used to detect whether there is a standard frequency detection output signal at the output end of the frequency detection device;
[0063] The frequency detection input identification device is used to detect whether there is a standard frequency detection input signal at the input end of the PLC controller;
[0064] When it is determined that the frequency detection device operates abnormally, the PLC controller controls the frequency detection output identification device and the frequency detection input identification device to start;
[0065] If the frequency detection output identification device detects that there is no standard frequency detection output signal at the output end of the frequency detection device, it is determined that the frequency detection device is faulty;
[0066] If the frequency detection output identification device detects that there is a standard frequency detection output signal at the output end of the frequency detection device, and the frequency detection input identification device detects that there is no standard frequency detection input signal at the input end of the PLC controller, it is determined that a transmission line between the frequency detection device and the PLC controller is faulty;
[0067] If the frequency detection output identification device detects that there is a standard frequency detection output signal at the output end of the frequency detection device, and the frequency detection input identification device detects that there is a standard frequency detection input signal at the input end of the PLC controller, it is determined that the PLC controller is faulty.
[0068] Furthermore, it also includes a standby power detection device;
[0069] The standby power detection device is connected to the PLC controller;
[0070] The standby power detection device is in a long-term closed state;
[0071] The standby power detection device has the same function as the power detection device and is independent of each other;
[0072] If it is determined for the first time that the real-time power data does not match the standard power data, the PLC controller controls the standby power detection device to start;
[0073] At this time, the real-time power data of the node between the three-phase mains power supply line and the control switch detected by the standby power detection device is recorded as the verification real-time power data;
[0074] If the verified real-time power data is different from the real-time power data, it is determined that the power detection device operates abnormally.
[0075] Furthermore, it also includes a power detection output identification device and a power detection input identification device;
[0076] The PLC controller is connected to the power detection output identification device and the power detection input identification device respectively;
[0077] The power detection output identification device and the power detection input identification device are in a long-term closed state;
[0078] The power detection output identification device is used to detect whether there is a standard power detection output signal at the output end of the power detection device;
[0079] The power detection input identification device is used to detect whether there is a standard power detection input signal at the input end of the PLC controller;
[0080] When it is determined that the power detection device operates abnormally, the PLC controller controls the power detection output identification device and the power detection input identification device to start;
[0081] If the power detection output identification device detects that there is no standard power detection output signal at the output end of the power detection device, it is determined that the power detection device is faulty;
[0082] If the power detection output identification device detects that there is a standard power detection output signal at the output end of the power detection device, and the power detection input identification device detects that there is no standard power detection input signal at the input end of the PLC controller, it is determined that a transmission line between the power detection device and the PLC controller is faulty;
[0083] If the power detection output identification device detects that there is a standard power detection output signal at the output end of the power detection device, and the power detection input identification device detects that there is a standard power detection input signal at the input end of the PLC controller, it is determined that the PLC controller is faulty.
[0084] Compared with the prior art, the present invention has the following beneficial effects:
[0085] By judging whether the frequency detection is normal, the reactance filter is controlled to adjust the line; by judging whether the power detection is normal, the compensation capacitor group is controlled to adjust the line; and on the basis of the adjustment, both the frequency adjustment and the power adjustment are checked, and the adjustment process is accurately fed back, which can effectively avoid subsequent power transmission accidents caused by abnormal adjustment. BRIEF DESCRIPTION OF THE DRAWINGS
[0086] Figure 1 This is a schematic diagram of Example 1 of the specific implementation method of the present application.
[0087] Figure 2 This is a schematic diagram of Example 2 of the specific implementation method of the present application.
[0088] Figure 3 This is a schematic diagram of the Hall effect resonance rod before and after the electronic image in Example 1 of the specific implementation method of the present application. DETAILED DESCRIPTION
[0089] Below in conjunction with the appended Figure 1-3, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0090] Embodiment 1:
[0091] like Figure 1 As shown, a Hall effect resonance rod power transmission system is provided, characterized in that it includes a three-phase mains power supply line, a control switch, a reactance filter, a line detection device, a load, an AC contactor, a compensation capacitor group, and a PLC controller;
[0092] Wherein, the three-phase mains power supply line, control switch, reactance filter and load are connected in sequence;
[0093] The line detection device is used to detect line data of a node between the three-phase mains power supply line and the control switch;
[0094] The PLC controller is connected to the control switch, the line detection device, and the AC contactor respectively;
[0095] The compensation capacitor group is connected to the node between the control switch and the reactance filter through the AC contactor;
[0096] The compensation capacitor bank is used to compensate for reactive power;
[0097] The compensation capacitor group uses adjacent resonant rod conductors that produce the Hall effect;
[0098] The resonant rod conductor is made of rare earth materials (the abnormal Hall effect principle is integrated with the virtual capacitor, and the Xianghe rare earth Hall resonant rod made of rare earth materials, various precious metals, special metals, and non-metallic materials is combined with the virtual capacitor made of the principle of functional lesions of chronic diseases. By optimizing the power environment and controlling power pollution, the power quality of base stations / computer rooms / data centers is improved and enhanced, the communication equipment and facilities can run smoothly, the heating of communication equipment and facilities is reduced, the vibration is reduced, the noise is reduced, and the copper loss, iron loss, and line loss of the distribution system are reduced. The specific principle is as follows: The English name of the Xianghe rare earth Hall resonant rod is xianghe Rare Earth Hall Resonance Rod, referred to as XREHRR. It is a resonant metal alloy energy rod developed by Xianghe Energy Saving Group using rare earth materials known as "industrial gold" and "vitamin of modern industry", and composed of a variety of precious metals, special metals, non-metallic materials, etc., based on the quantum anomalous Hall effect of Hall, a world-renowned physicist and Nobel Prize winner. It has the functions of improving and enhancing the quality of electric energy, such as improving conductivity and energy efficiency and optimizing the electric energy environment. As we all know, when the current is large, the wire will heat up. This is because the electrons move and collide with each other in conventional conductors to generate heat, resulting in power loss. However, in the rare earth Hall resonance rod, the electrons run regularly and efficiently, and the heat generated is extremely low, thereby greatly reducing power loss. The design enables the electrons in the distribution system to form a resonance that is neat and tidy with a very low probability of colliding with each other. The effect is achieved by a specific frequency. The quantum anomalous Hall effect refers to the spontaneous magnetization of the material itself without the need for an external strong magnetic field, which generates a resonant frequency and forms a quantum anomalous Hall effect field. The irregularly moving electrons passing through the movement are made to run regularly under the action of the resonant frequency, thereby reducing electron spin collisions and mutual electron "excessive collisions", thereby reducing line losses in the power distribution system, and working in synergy with the special virtual capacitors that are purely physically wound and do not change with temperature and humidity, and are not afraid of shocks, to jointly reduce voltage sags and voltage bulges, suppress electromagnetic interference and electromagnetic leakage, and bidirectionally block, suppress, filter, and absorb transient currents, surges, and harmonic pollution, promote three-phase balance, improve power factor, reduce equipment temperature, reduce equipment noise, and reduce equipment maintenance and repair costs from the source of electricity, thereby extending the service life of the equipment. Long service life and extremely low failure rate, such as Figure 3 shown.
[0099] The line detection device includes a frequency detection device and a power detection device;
[0100] The frequency detection device and the power detection device are respectively connected to the PLC controller;
[0101] The frequency detection device is used to detect the real-time frequency data of the node between the three-phase mains power supply line and the control switch;
[0102] The power detection device is used to detect the real-time power data of the node between the three-phase mains power supply line and the control switch;
[0103] Wherein, the reactance filter and the compensation capacitor group are in a long-term closed state;
[0104] Also includes a data storage device, the data storage device is connected to the PLC controller;
[0105] The data storage device stores standard frequency data and standard power data of the node between the three-phase mains power supply line and the control switch under normal operation;
[0106] The PLC controller compares the real-time power data with the standard power data. If the real-time power data matches the standard power data, the PLC controller controls the compensation capacitor group to continue to be closed. If the real-time power data does not match the standard power data, the PLC controller controls the compensation capacitor group to start through the AC contactor.
[0107] The PLC controller compares the real-time frequency data with the standard frequency data. If the real-time frequency data matches the standard frequency data, the PLC controller controls the reactance filter to continue to be closed. If the real-time frequency data does not match the standard frequency data, the PLC controller controls the reactance filter to start.
[0108] Also includes a first timing device, the first timing device is connected to the PLC controller;
[0109] The first timing device is in a long-term closed state;
[0110] When the PLC controller controls the reactance filter to start, the PLC controller controls the first timing device to start, and records the timing information of the first timing device as the real-time frequency adjustment time;
[0111] The data storage device stores the standard frequency adjustment time under normal operation of the reactance filter;
[0112] When the real-time frequency adjustment time reaches the standard frequency adjustment time, if the real-time frequency data matches the standard frequency data, it is determined that the reactance filter operates normally; if the real-time frequency data still does not match the standard frequency data, it is determined that the reactance filter operates abnormally;
[0113] Also includes a second timing device, the second timing device is connected to the PLC controller;
[0114] The second timing device is in a long-term closed state;
[0115] When the PLC controller controls the compensation capacitor group to start, the PLC controller controls the second timing device to start, and records the timing information of the second timing device as the real-time power adjustment time;
[0116] The data storage device stores the standard power adjustment time under normal operation of the compensation capacitor group;
[0117] When the real-time power adjustment time reaches the standard power adjustment time, if the real-time power data matches the standard power data, it is determined that the compensation capacitor group is operating normally; if the real-time power data still does not match the standard power data, it is determined that the compensation capacitor group is operating abnormally.
[0118] In the above scheme, by judging whether the frequency detection is normal, the reactance filter is controlled to adjust the line; by judging whether the power detection is normal, the compensation capacitor group is controlled to adjust the line; and on the basis of the adjustment, both the frequency adjustment and the power adjustment are checked, and the adjustment process is accurately fed back, which can effectively avoid subsequent power transmission accidents caused by abnormal adjustment.
[0119] Embodiment 2:
[0120] like Figure 2 As shown, based on Example 1, it further includes a frequency adjustment output detection device and a frequency adjustment input detection device;
[0121] The frequency adjustment output detection device and the frequency adjustment input detection device are respectively connected to the PLC controller;
[0122] The frequency regulation output detection device and the frequency regulation input detection device are in a long-term closed state;
[0123] The frequency adjustment output detection device is used to detect whether there is a standard control signal for controlling the operation of the reactance filter at the output end of the PLC controller;
[0124] The frequency adjustment input detection device is used to detect whether there is a standard control signal for controlling the operation of the reactance filter at the input end of the reactance filter;
[0125] When it is determined that the reactance filter operates abnormally, the PLC controller controls the frequency adjustment output detection device and the frequency adjustment input detection device to start;
[0126] If the frequency adjustment output detection device detects that the output end of the PLC controller does not contain a standard control signal for controlling the operation of the reactance filter, it is determined that the PLC controller is faulty;
[0127] If the frequency adjustment output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the reactance filter, and the frequency adjustment input detection device detects that the input end of the reactance filter does not have a standard control signal for controlling the operation of the reactance filter, it is determined that a transmission line between the PLC controller and the reactance filter is faulty;
[0128] If the frequency adjustment output detection device detects that a standard control signal for controlling the operation of the inductive filter exists at the output end of the PLC controller, and the frequency adjustment input detection device detects that a standard control signal for controlling the operation of the inductive filter exists at the input end of the inductive filter, it is determined that the inductive filter is faulty.
[0129] In the above scheme, when it is determined that the frequency regulation is abnormal, the frequency regulation output detection device and the frequency regulation input detection device cooperate with each other to quickly locate the fault of the frequency regulation abnormality, which is conducive to the relevant staff to quickly carry out maintenance and repair; at the same time, the frequency regulation output detection device and the frequency regulation input detection device are closed for a long time, and are only turned on when the frequency regulation is abnormal, which meets the requirements of energy conservation and emission reduction.
[0130] Furthermore, it also includes a power regulation output detection device and a power regulation input detection device;
[0131] The power regulation output detection device and the power regulation input detection device are respectively connected to the PLC controller;
[0132] The power regulation output detection device and the power regulation input detection device are in a long-term closed state;
[0133] The power regulation output detection device is used to detect whether there is a standard control signal for controlling the operation of the compensation capacitor group at the output end of the PLC controller;
[0134] The power regulation input detection device is used to detect whether there is a standard control signal for controlling the operation of the compensation capacitor group at the input end of the compensation capacitor group;
[0135] When it is determined that the compensation capacitor group operates abnormally, the PLC controller controls the power regulation output detection device and the power regulation input detection device to start;
[0136] If the power regulation output detection device detects that the output end of the PLC controller does not contain a standard control signal for controlling the operation of the compensation capacitor group, it is determined that the PLC controller is faulty;
[0137] If the power regulation output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the compensation capacitor group, and the power regulation input detection device detects that the input end of the compensation capacitor group does not have a standard control signal for controlling the operation of the compensation capacitor group, it is determined that a transmission line between the PLC controller and the compensation capacitor group is faulty;
[0138] If the power regulation output detection device detects that a standard control signal for controlling the operation of the compensation capacitor group exists at the output end of the PLC controller, and the power regulation input detection device detects that a standard control signal for controlling the operation of the compensation capacitor group exists at the input end of the compensation capacitor group, it is determined that the compensation capacitor group has a fault.
[0139] In the above scheme, when it is determined that power regulation is abnormal, the power regulation output detection device and the power regulation input detection device cooperate with each other to quickly locate the power regulation fault, which is conducive to the relevant staff to quickly carry out maintenance and repair; at the same time, the power regulation output detection device and the power regulation input detection device are closed for a long time, and are only turned on when power regulation is abnormal, which meets the requirements of energy conservation and emission reduction.
[0140] Furthermore, it also includes a standby frequency detection device;
[0141] The standby frequency detection device is connected to the PLC controller;
[0142] The standby frequency detection device is in a long-term closed state;
[0143] The standby frequency detection device has the same function as the frequency detection device and is independent of each other;
[0144] If it is determined for the first time that the real-time frequency data does not match the standard frequency data, the PLC controller controls the standby frequency detection device to start;
[0145] At this time, the real-time frequency data of the node between the three-phase mains power supply line and the control switch detected by the standby frequency detection device is recorded as the verification real-time frequency data;
[0146] If the verified real-time frequency data is different from the real-time frequency data, it is determined that the frequency detection device operates abnormally.
[0147] In the above scheme, by using the backup frequency detection device in conjunction with the frequency detection device, it is possible to effectively check whether the frequency detection device operates normally.
[0148] Further, it also includes a frequency detection output identification device and a frequency detection input identification device;
[0149] The PLC controller is connected to the frequency detection output identification device and the frequency detection input identification device respectively;
[0150] The frequency detection output identification device and the frequency detection input identification device are in a long-term closed state;
[0151] The frequency detection output identification device is used to detect whether there is a standard frequency detection output signal at the output end of the frequency detection device;
[0152] The frequency detection input identification device is used to detect whether there is a standard frequency detection input signal at the input end of the PLC controller;
[0153] When it is determined that the frequency detection device operates abnormally, the PLC controller controls the frequency detection output identification device and the frequency detection input identification device to start;
[0154] If the frequency detection output identification device detects that there is no standard frequency detection output signal at the output end of the frequency detection device, it is determined that the frequency detection device is faulty;
[0155] If the frequency detection output identification device detects that there is a standard frequency detection output signal at the output end of the frequency detection device, and the frequency detection input identification device detects that there is no standard frequency detection input signal at the input end of the PLC controller, it is determined that a transmission line between the frequency detection device and the PLC controller is faulty;
[0156] If the frequency detection output identification device detects that there is a standard frequency detection output signal at the output end of the frequency detection device, and the frequency detection input identification device detects that there is a standard frequency detection input signal at the input end of the PLC controller, it is determined that the PLC controller is faulty.
[0157] In the above scheme, when it is determined that the frequency detection device operates abnormally, the abnormal operation of the frequency detection device can be quickly located by using the frequency detection output identification device and the frequency detection input identification device in coordination.
[0158] Furthermore, it also includes a standby power detection device;
[0159] The standby power detection device is connected to the PLC controller;
[0160] The standby power detection device is in a long-term closed state;
[0161] The standby power detection device has the same function as the power detection device and is independent of each other;
[0162] If it is determined for the first time that the real-time power data does not match the standard power data, the PLC controller controls the standby power detection device to start;
[0163] At this time, the real-time power data of the node between the three-phase mains power supply line and the control switch detected by the standby power detection device is recorded as the verification real-time power data;
[0164] If the verified real-time power data is different from the real-time power data, it is determined that the power detection device operates abnormally.
[0165] In the above scheme, by using the backup power detection device in conjunction with the power detection device, it is possible to effectively check whether the power detection device operates normally.
[0166] Furthermore, it also includes a power detection output identification device and a power detection input identification device;
[0167] The PLC controller is connected to the power detection output identification device and the power detection input identification device respectively;
[0168] The power detection output identification device and the power detection input identification device are in a long-term closed state;
[0169] The power detection output identification device is used to detect whether there is a standard power detection output signal at the output end of the power detection device;
[0170] The power detection input identification device is used to detect whether there is a standard power detection input signal at the input end of the PLC controller;
[0171] When it is determined that the power detection device operates abnormally, the PLC controller controls the power detection output identification device and the power detection input identification device to start;
[0172] If the power detection output identification device detects that there is no standard power detection output signal at the output end of the power detection device, it is determined that the power detection device is faulty;
[0173] If the power detection output identification device detects that there is a standard power detection output signal at the output end of the power detection device, and the power detection input identification device detects that there is no standard power detection input signal at the input end of the PLC controller, it is determined that a transmission line between the power detection device and the PLC controller is faulty;
[0174] If the power detection output identification device detects that there is a standard power detection output signal at the output end of the power detection device, and the power detection input identification device detects that there is a standard power detection input signal at the input end of the PLC controller, it is determined that the PLC controller is faulty.
[0175] In the above scheme, when it is determined that the power detection device operates abnormally, the abnormal operation of the power detection device can be quickly located by using the power detection output identification device and the power detection input identification device in coordination.
[0176] The above are preferred embodiments of the present invention. Any changes made according to the technical solution of the present invention, as long as the resulting functions do not exceed the scope of the technical solution of the present invention, belong to the protection scope of the present invention.
Claims
1. A Hall effect resonant rod power transmission system, It is characterized in that It includes three-phase mains power supply line, control switch, reactance filter, line detection device, load, AC contactor, compensation capacitor group, and PLC controller; Wherein, the three-phase mains power supply line, control switch, reactance filter and load are connected in sequence; The line detection device is used to detect line data of a node between the three-phase mains power supply line and the control switch; The PLC controller is connected to the control switch, the line detection device, and the AC contactor respectively; The compensation capacitor group is connected to the node between the control switch and the reactance filter through the AC contactor; The compensation capacitor bank is used to compensate for reactive power; The compensation capacitor group uses adjacent resonant rod conductors that produce the Hall effect; The resonant rod conductor is made of rare earth material; The line detection device includes a frequency detection device and a power detection device; The frequency detection device and the power detection device are respectively connected to the PLC controller; The frequency detection device is used to detect the real-time frequency data of the node between the three-phase mains power supply line and the control switch; The power detection device is used to detect the real-time power data of the node between the three-phase mains power supply line and the control switch; Wherein, the reactance filter and the compensation capacitor group are in a long-term closed state; Also includes a data storage device, the data storage device is connected to the PLC controller; The data storage device stores standard frequency data and standard power data of the node between the three-phase mains power supply line and the control switch under normal operation; The PLC controller compares the real-time power data with the standard power data. If the real-time power data matches the standard power data, the PLC controller controls the compensation capacitor group to continue to be closed. If the real-time power data does not match the standard power data, the PLC controller controls the compensation capacitor group to start through the AC contactor. The PLC controller compares the real-time frequency data with the standard frequency data. If the real-time frequency data matches the standard frequency data, the PLC controller controls the reactance filter to continue to be closed. If the real-time frequency data does not match the standard frequency data, the PLC controller controls the reactance filter to start. Also includes a first timing device, the first timing device is connected to the PLC controller; The first timing device is in a long-term closed state; When the PLC controller controls the reactance filter to start, the PLC controller controls the first timing device to start, and records the timing information of the first timing device as the real-time frequency adjustment time; The data storage device stores the standard frequency adjustment time under normal operation of the reactance filter; When the real-time frequency adjustment time reaches the standard frequency adjustment time, if the real-time frequency data matches the standard frequency data, it is determined that the reactance filter operates normally; if the real-time frequency data still does not match the standard frequency data, it is determined that the reactance filter operates abnormally; Also includes a second timing device, the second timing device is connected to the PLC controller; The second timing device is in a long-term closed state; When the PLC controller controls the compensation capacitor group to start, the PLC controller controls the second timing device to start, and records the timing information of the second timing device as the real-time power adjustment time; The data storage device stores the standard power adjustment time under normal operation of the compensation capacitor group; When the real-time power adjustment time reaches the standard power adjustment time, if the real-time power data matches the standard power data, it is determined that the compensation capacitor group operates normally; if the real-time power data still does not match the standard power data, it is determined that the compensation capacitor group operates abnormally; It also includes a frequency adjustment output detection device and a frequency adjustment input detection device; The frequency adjustment output detection device and the frequency adjustment input detection device are respectively connected to the PLC controller; The frequency regulation output detection device and the frequency regulation input detection device are in a long-term closed state; The frequency adjustment output detection device is used to detect whether there is a standard control signal for controlling the operation of the reactance filter at the output end of the PLC controller; The frequency adjustment input detection device is used to detect whether there is a standard control signal for controlling the operation of the reactance filter at the input end of the reactance filter; When it is determined that the reactance filter operates abnormally, the PLC controller controls the frequency adjustment output detection device and the frequency adjustment input detection device to start; If the frequency adjustment output detection device detects that the output end of the PLC controller does not contain a standard control signal for controlling the operation of the reactance filter, it is determined that the PLC controller is faulty; If the frequency adjustment output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the reactance filter, and the frequency adjustment input detection device detects that the input end of the reactance filter does not have a standard control signal for controlling the operation of the reactance filter, it is determined that a transmission line between the PLC controller and the reactance filter is faulty; If the frequency adjustment output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the reactance filter, and the frequency adjustment input detection device detects that the input end of the reactance filter has a standard control signal for controlling the operation of the reactance filter, it is determined that the reactance filter is faulty; Also included is a power regulation output detection device and a power regulation input detection device; The power regulation output detection device and the power regulation input detection device are respectively connected to the PLC controller; The power regulation output detection device and the power regulation input detection device are in a long-term closed state; The power regulation output detection device is used to detect whether there is a standard control signal for controlling the operation of the compensation capacitor group at the output end of the PLC controller; The power regulation input detection device is used to detect whether there is a standard control signal for controlling the operation of the compensation capacitor group at the input end of the compensation capacitor group; When it is determined that the compensation capacitor group operates abnormally, the PLC controller controls the power regulation output detection device and the power regulation input detection device to start; If the power regulation output detection device detects that the output end of the PLC controller does not contain a standard control signal for controlling the operation of the compensation capacitor group, it is determined that the PLC controller is faulty; If the power regulation output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the compensation capacitor group, and the power regulation input detection device detects that the input end of the compensation capacitor group does not have a standard control signal for controlling the operation of the compensation capacitor group, it is determined that a transmission line between the PLC controller and the compensation capacitor group is faulty; If the power regulation output detection device detects that the output end of the PLC controller has a standard control signal for controlling the operation of the compensation capacitor group, and the power regulation input detection device detects that the input end of the compensation capacitor group has a standard control signal for controlling the operation of the compensation capacitor group, it is determined that the compensation capacitor group has a fault; Also included is a backup frequency detection device; The standby frequency detection device is connected to the PLC controller; The standby frequency detection device is in a long-term closed state; The standby frequency detection device has the same function as the frequency detection device and is independent of each other; If it is determined for the first time that the real-time frequency data does not match the standard frequency data, the PLC controller controls the standby frequency detection device to start; At this time, the real-time frequency data of the node between the three-phase mains power supply line and the control switch detected by the standby frequency detection device is recorded as the verification real-time frequency data; If the verified real-time frequency data is different from the real-time frequency data, it is determined that the frequency detection device operates abnormally; It also includes a frequency detection output identification device and a frequency detection input identification device; The PLC controller is connected to the frequency detection output identification device and the frequency detection input identification device respectively; The frequency detection output identification device and the frequency detection input identification device are in a long-term closed state; The frequency detection output identification device is used to detect whether there is a standard frequency detection output signal at the output end of the frequency detection device; The frequency detection input identification device is used to detect whether there is a standard frequency detection input signal at the input end of the PLC controller; When it is determined that the frequency detection device operates abnormally, the PLC controller controls the frequency detection output identification device and the frequency detection input identification device to start; If the frequency detection output identification device detects that there is no standard frequency detection output signal at the output end of the frequency detection device, it is determined that the frequency detection device is faulty; If the frequency detection output identification device detects that there is a standard frequency detection output signal at the output end of the frequency detection device, and the frequency detection input identification device detects that there is no standard frequency detection input signal at the input end of the PLC controller, it is determined that a transmission line between the frequency detection device and the PLC controller is faulty; If the frequency detection output identification device detects that there is a standard frequency detection output signal at the output end of the frequency detection device, and the frequency detection input identification device detects that there is a standard frequency detection input signal at the input end of the PLC controller, it is determined that the PLC controller is faulty; Also includes a standby power detection device; The standby power detection device is connected to the PLC controller; The standby power detection device is in a long-term closed state; The standby power detection device has the same function as the power detection device and is independent of each other; If it is determined for the first time that the real-time power data does not match the standard power data, the PLC controller controls the standby power detection device to start; At this time, the real-time power data of the node between the three-phase mains power supply line and the control switch detected by the standby power detection device is recorded as the verification real-time power data; If the verified real-time power data is different from the real-time power data, it is determined that the power detection device operates abnormally; Also included is a power detection output identification device and a power detection input identification device; The PLC controller is connected to the power detection output identification device and the power detection input identification device respectively; The power detection output identification device and the power detection input identification device are in a long-term closed state; The power detection output identification device is used to detect whether there is a standard power detection output signal at the output end of the power detection device; The power detection input identification device is used to detect whether there is a standard power detection input signal at the input end of the PLC controller; When it is determined that the power detection device operates abnormally, the PLC controller controls the power detection output identification device and the power detection input identification device to start; If the power detection output identification device detects that there is no standard power detection output signal at the output end of the power detection device, it is determined that the power detection device is faulty; If the power detection output identification device detects that there is a standard power detection output signal at the output end of the power detection device, and the power detection input identification device detects that there is no standard power detection input signal at the input end of the PLC controller, it is determined that a transmission line between the power detection device and the PLC controller is faulty; If the power detection output identification device detects that there is a standard power detection output signal at the output end of the power detection device, and the power detection input identification device detects that there is a standard power detection input signal at the input end of the PLC controller, it is determined that the PLC controller is faulty.
Citation Information
Patent Citations
Quick dynamic reactive-power compensating method of combined electrical load
CN103825287A
Energy-saving quantity acceptance method for power utilization end system
CN112051767A
Safe and energy-saving transformer system
CN112908651A
Cited By
Modular transformer system
CN224366654U