A Stochastic Production Simulation Method for Power System Frequency Response Capacity Planning
Through the stochastic production simulation method and multi-resource, multi-unit frequency response model, the problem of weakened frequency response capability of the power system is solved, more accurate frequency dynamic planning and capacity planning are achieved, and calculation efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202111238974.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-10-25
AI Technical Summary
As the proportion of thermal power generation units decreases and the rotational inertia of the power grid decreases, the frequency response capability of the power system weakens, and the risk of high-power loss failure increases. Existing technologies are difficult to effectively solve the frequency stability problem, especially in fast frequency response reserve capacity planning. There are deficiencies in this area.
Using a stochastic production simulation method for frequency response capacity planning, by establishing state probability models of wind turbines and conventional generators, combined with the Markov chain Monte Carlo principle and ARMA model, the system operating conditions are simulated and wind speed and output power are predicted. Introduce a fault filtering algorithm, establish a power system frequency response model, and aggregate frequency response models of multiple resources and multiple units to improve calculation efficiency.
This method can more accurately consider the frequency dynamic change process, meet the spare capacity planning requirements for fast frequency response, provide new ideas, reduce the model order, improve the calculation speed and accuracy, and effectively solve the problem of frequency stability deterioration.
Smart Images

Figure CN113991647B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of power grid frequency stability control and relates to a random production simulation method for frequency response capacity planning. Background Art
[0002] Frequency response capability is the first line of defense for power system frequency control. The primary frequency regulation process is a key stage to prevent low-frequency load shedding in power systems under large power shortages and maintain system stability. In traditional power systems dominated by thermal power, the primary frequency regulation capability is strong, and the demand for fast frequency response spare capacity is small. Its capacity planning is mainly based on the power supply and demand power deviation, that is, hot standby, cold standby and load standby, which is relatively rough. However, with the large-scale grid connection of possible source units, the high power electronics of power system control, and the gradual formation of ultra-high voltage AC / DC hybrid power grids, the proportion of conventional unit capacity in my country's power system has decreased, the power grid's rotational inertia has decreased, and the primary frequency regulation capability has weakened. The risk of large power shortage failures has increased, and the system frequency safety and stability situation has become increasingly severe. Therefore, under the new situation, in order to maintain the frequency safety and stability of the system, the power system has increased its demand for fast frequency response spare capacity. It is necessary to divide the frequency response capacity planning separately to solve the increasingly severe frequency stability problem. Summary of the invention
[0003] In view of the above problems existing in the prior art, the present invention provides a random production simulation method for frequency response capacity planning.
[0004] The technical solution adopted by the present invention is:
[0005] A method for simulating random production of a power system for frequency response capacity planning, the method comprising the following steps:
[0006] Step 1: Establish a power system state probability model to simulate the system operation status. The present invention divides it into two steps: the state probability model of the wind turbine generator set and the state probability model of the conventional generator set. The specific steps are as follows:
[0007] Step 1.1: Based on the Markov chain Monte Carlo principle, a state probability model of the wind turbine generator set is established, including the conversion between the wind turbine generator set operating state transfer and the derated state, and the conversion between the operating state and the shutdown state, such as Figure 1 As shown. 1 is the change rate of the fan system from the running state to the shutdown state, λ 2 is the change rate of the fan system from the operating state to the derated state, μ 1 is the repair rate of the fan system from shutdown state to operation state, μ 2is the repair rate of the fan system from the derated state to the operating state. According to the three-state model of the fan and Markov theory, the state transfer matrix T is established:
[0008]
[0009] Based on the approximation principle of Markov process, we define P as the state probability matrix, I as the identity matrix and P = [P 1 ,P 2 ,P 3 ], P 1 is the probability that the fan is in operation, P 2 is the probability that the fan is in a derated state, P 3 is the probability that the fan is in shutdown state, and we can get:
[0010]
[0011] Right now:
[0012]
[0013] Transpose the above model and add the full probability condition, replace the first set of equations in the matrix with the full probability condition, and we get:
[0014]
[0015] Therefore, with the above matrix equation, the probability of each state of the fan can be obtained:
[0016]
[0017] Obviously, when the probability of each state of the wind turbine is known, it is only necessary to use the Monte Carlo method to randomly sample the system to determine the operating state of the wind power generation system.
[0018] The duration that the system is in operation and has not entered the derated state is τ 12 :
[0019]
[0020] The duration that the system is in operation and has not entered the shutdown state is τ 13 :
[0021]
[0022] Among them, MTTF is the average continuous operation time before failure, γ 12 and γ 13 is a uniformly distributed random number in the interval [0,1].
[0023] The repair time for the system to transfer from the derated state or shutdown state to the normal operation state is τ 21 and τ 31 :
[0024]
[0025]
[0026] Among them, MTTR is the average repair time of the system, γ 21 and γ 31 is a uniformly distributed random number in the interval [0,1].
[0027] Step 1.2: Similarly, based on this principle, a state probability model of conventional units is established, mainly for the transition between operating state and shutdown state, such as Figure 2 FOR is defined as the forced outage rate, that is, when the Monte Carlo random sampling result is less than this value, the system enters the outage state; when its result is greater than this value, the system is in normal operation. The solution is as follows:
[0028]
[0029] The operating time of the system in each state is similar to the algorithm of the wind turbine generator set. The operating time in normal operation and shutdown state is τ 1 and τ 2 ,Right now:
[0030] τ 1 =-MTTF lnγ 1 (11)
[0031] τ 2 =-MTTRlnγ 2 (12)
[0032] Among them, γ 1 and γ 2 is a uniformly distributed random number in the interval [0,1].
[0033] Step 1.3: Based on the above model theory, the present invention implements it through programming and finds that continuous downtime may occur during the random sampling process of the Monte Carlo method. Therefore, the present invention introduces a fault filtering algorithm, and the program flow chart is as follows: Figure 3 Specifically:
[0034] 1) The i-th unit enters the fault filtering test to detect whether it has a continuous fault trend at the j-th moment in the entire cycle. If not, the fault filtering program is exited.
[0035] 2) If there is a continuous fault trend, search for the total number of fault moments starting from that moment. If it exceeds the specified time (the entire cycle), end the search calculation and assign 0 to the state after that moment and before the specified time; if it does not exceed the specified time, assign 0 to the state of all continuous fault moments after that moment.
[0036] 3) Continue to detect the fault time until the fault status of each unit at all times is fully detected, and then end the fault filtering.
[0037] Step 2: Through the state probability model, the production status of each type of unit is obtained. Now, the power system output power model is established in combination with its operating conditions to simulate the system's load loss. It is mainly divided into three steps: establishing a wind power output power model, establishing a conventional unit output power model, and establishing a load loss model.
[0038] Step 2.1: Establish a wind power output model. The output of a wind turbine is closely related to the wind speed of the wind farm where it is located, and has a certain degree of linear relationship. First, the wind speed of the wind farm needs to be simulated. Based on the basic idea of the ARMA model, the future wind speed is predicted and the wind speed of the wind farm is simulated.
[0039] Based on the historical data of wind speed, it is standardized to obtain the average wind speed μ and variance σ, and the predicted wind speed SW at time t t The expression is as follows:
[0040] SW t =μ+σy t (13)
[0041] Among them, y t is the predicted time series value.
[0042] Because the ARMA model is not only related to historical data, but also closely related to historical system disturbances, it is assumed that the white noise sequence of system disturbances {ε t} has a mean of 0 and a variance of Then the time series y t The is:
[0043]
[0044] in, is the autoregressive coefficient, θ i (j=1,2,3,…,q) is the moving average coefficient, p and q are the autoregressive order and moving average order of the ARMA model respectively.
[0045] To solve the ARMA model, it is necessary to determine its order. The AIC criterion is used to determine the order of the ARMA model. The AIC criterion function is defined as follows:
[0046] AIC(p,q)=logσ 2 (p,q)+2(p+q+1) / N (15)
[0047] In the formula, σ 2 (p,q) is the residual variance of the predicted time series, and N is the number of samples.
[0048] In the AIC criterion model, according to the relevant theories of economics and mathematics, when p and q reach a certain value, the AIC value is minimized. At this time, the p and q that minimize the AIC value are the order of the ARMA model.
[0049] In a wind turbine generator set, the specific linear relationship between its wind turbine output and the wind speed of the wind farm is as follows Fig.14 As shown in the figure, v ci is the cut-in wind speed when the wind turbine starts, v r is the rated wind speed of the wind turbine during normal operation, v co It is the cut-out wind speed when the wind turbine is running. The purpose of setting it is to ensure the safety of the wind turbine and stop the wind turbine from working. r It is the rated power of the wind turbine generator set in normal operation under rated wind speed. ci And the rated wind speed v is not reached r The output power of the fan is nonlinearly related to the wind speed; when the wind speed exceeds the rated wind speed v r But the cut-out wind speed v is not reached co When the wind speed exceeds the cut-out wind speed v co When , the fan stops working. The above process is established as the following piecewise function:
[0050]
[0051] Among them, P w is the output power of the wind turbine at time t, v t is the predicted wind speed of the wind turbine at time t, α, β, γ are the unknown coefficients of the wind turbine output power, and the specific solution formula is as follows:
[0052]
[0053] Step 2.2: Establish the output power model of conventional units. There are three types of conventional generator sets under consideration, including thermal generator sets, hydroelectric generator sets and gas turbine generator sets. The present invention mainly calculates the output power of each unit based on the system capacity of each unit in the example IEEE RTS-79.
[0054] Step 2.3 In the total output power of the power system, it is established that the output of the power system is mainly provided by conventional units and wind turbines. Therefore, it is necessary to divide it into two parts, conventional and wind turbines, and combine the output power of the system with the system status and calculate them separately, namely:
[0055]
[0056] Where P is the total output power of the system, P i is the output power of each type of unit, α i It is the system status of each type of unit.
[0057] Therefore, the power system load loss ΔP d for:
[0058] ΔP d =PP L (19)
[0059] Among them, P L is the power system load in the example.
[0060] Step 3: Bring the system load loss calculated by the above simulation into the system frequency response model to solve the frequency dynamics of the system. Therefore, it is necessary to establish a frequency response model of the system under each resource. The present invention starts from the low-order frequency response model to establish and analyze the model. The following will analyze and establish the low-order frequency response models of thermal power, hydropower, gas turbine units and energy storage equipment one by one.
[0061] Step 3.1: Establish a low-order frequency response model of the thermal power unit. The structure diagram of the thermal power unit is as follows Figure 5 As shown, the unit power increment high-pressure cylinder turbine inertia link and mechanical power gain link are input into the generator inertia link together with the load side disturbance, and the frequency difference is output. Finally, the frequency difference is fed back to the input end through the negative feedback link of the speed regulator. Among them, P e is the load side power of the generator, P m is the mechanical power of the steam turbine, P SP is the unit power increment, P α is the system acceleration power. R is the reheating time constant, H is the system inertia constant, 1 / R T Negative feedback gain (R T is the adjustment coefficient), F H is the power proportionality coefficient of the high-pressure steam turbine, K T is the mechanical power gain, D is the damping coefficient, T 1 is the speed regulator time constant, T 2 is the steam capacity time constant.
[0062] Step 3.2: Establish the low-order frequency response model of the hydropower unit. The structural diagram of the hydropower unit is as follows Figure 6 As shown in the figure, the load side disturbance passes through the inertia link of the generator rotor of the hydropower unit, outputs the frequency difference, and finally the frequency difference passes through the negative feedback link of the speed regulator to the input end. Among them, H is the inertia time constant of the unit, D is the damping constant of the unit, T y is the response time constant of the relay, T w is the inertia time constant of water flow, T RH is the transient droop time constant of the turbine governor, T RS is the turbine governor reset time, 1 / R h is the regulation coefficient of the turbine.
[0063] Step 3.3: Establish a low-order frequency response model of the gas turbine unit. The structural diagram of the gas turbine unit is as follows Figure 7 As shown in the figure, the load side disturbance passes through the inertia link of the generator rotor of the gas turbine unit, outputs the frequency difference, and finally the frequency difference passes through the negative feedback link of the speed regulator to the input end. G is the system adjustment coefficient, K G is the power capacity ratio, c g and b g is the coefficient of the transfer function of the valve positioner in the fuel system, X g is the leading time constant of the speed regulator part, Y g is the lag time constant of the speed regulator part, T CR is the combustion reaction delay time constant, T F is the fuel system time constant, T CD is the compression displacement time constant.
[0064] Step 3.4: Establish a low-order frequency response model of the energy storage device. The structure diagram of the energy storage device is as follows: Figure 8 As shown, where T ESD is the energy storage time constant of the energy storage link.
[0065] Step 4: Based on the analysis of the low-order frequency response model of each resource, in order to improve the calculation speed, the whole system disturbance is used as the input, and the generator inertia is aggregated, and the output is the frequency difference. The frequency difference is fed back to the input end through each energy storage regulation link. The present invention establishes a frequency response aggregation model for a multi-resource, multi-machine system. The core idea of modeling is: aggregate multiple machines first, and then aggregate multiple resources.
[0066] Step 4.1: Establish a frequency response model for a multi-machine system. The multi-machine model of the thermal power unit is as follows: Fig. 9 As shown in the figure, the whole system disturbance is taken as input, and after the aggregated generator inertia, the output is the frequency difference, which is fed back to the input end through the speed regulator of each unit. In the frequency response model of the multi-machine system, the regulation coefficient R of each unitti and mechanical power gain K ti The apparent power S of the generator i Closely related, K ti It represents the power share of the whole power system generator. Therefore, in order to aggregate the model, the following definition is made:
[0067]
[0068] Among them, κ ti is the equivalent gain parameter of the thermal power unit. In order to simplify the aggregation model, the speed governor unit is normalized and the standardized gain λ of each thermal power unit branch is defined ti for:
[0069]
[0070] F H 、T R 、T G 、T C 、T R is the comprehensive equivalent parameter of the frequency response model after aggregation. In the aggregation calculation, it is necessary to find the optimal solution of thermal power parameters X = {T G ,T C ,F H ,T R}, that is, the aggregated frequency response model parameters can be equivalent to the weighted average of each unit parameter.
[0071]
[0072] The multi-machine frequency response model of hydropower units is as follows: Figure 6 As shown in the figure, the whole system disturbance is taken as input, and after the generator inertia is aggregated, the output is the frequency difference, which is fed back to the input end through the speed regulator of each unit. The adjustment coefficient of the aggregation model is defined as:
[0073]
[0074] Among them, κ hi is the equivalent gain parameter of the hydropower unit. Define the standardized gain λ of each hydropower unit branch hi for:
[0075]
[0076] Let the optimal solution of gas turbine parameters Y = {T w ,T y ,T RS ,T RH}, its system parameters are aggregated as follows:
[0077]
[0078] The multi-machine frequency response model of the gas turbine unit is as follows: Figure 7 As shown in the figure, the whole system disturbance is taken as input, and after the generator inertia is aggregated, the output is the frequency difference, which is fed back to the input end through the speed regulator of each unit. The aggregation model adjustment coefficient is defined as:
[0079]
[0080] Among them, κ gi is the equivalent gain parameter of the hydropower unit. Define the standardized gain λ of each hydropower unit branch gi for:
[0081]
[0082] Let the optimal solution of hydropower parameters Z = {c g ,b g ,X g ,Y g ,T CR ,T F ,T CD}, its system parameters are aggregated as follows:
[0083]
[0084] Step 4.2: After the above resource models are aggregated into single machine models, multiple resource models are aggregated. According to the aggregation theory of each resource model, it can be found that the mechanical power gain K is closely related to the capacity ratio of the system, that is:
[0085]
[0086] Among them, S i is the system capacity of each resource unit, S sys is the system capacity of the entire multi-resource unit.
[0087] In the generator and load part, based on the load-side power, the capacity proportion of each type of unit is calculated as follows:
[0088]
[0089] Among them, H i is the inertia time constant of the generator set of each unit, and H is the inertia time constant of the generator set of the aggregated system.
[0090] In the frequency response aggregation model of a power system with multiple resources and multiple units, since wind turbines do not have actual rotor inertia, the present invention does not consider their frequency regulation characteristics. Based on the core idea of "aggregating multiple units first, then aggregating multiple resources", a frequency response aggregation model of a multi-resource, multi-unit system is constructed. Fig.12 As shown, specifically: the disturbance of the entire system is taken as input, and the inertia of the aggregated generator is used as the output, and the frequency difference is fed back to the input end through the aggregated speed regulator of each resource unit.
[0091] Step 5: In order to improve the calculation rate, the frequency response aggregation model of the multi-resource and multi-machine system is now analyzed in an open loop. The above-mentioned power system frequency response aggregation model containing multiple resources is simplified in an open loop, and the speed regulator system of each type of unit is fitted as a first-order inertia link. In addition, the present invention also ignores the influence of load damping D on the frequency, and its output is the active output of each unit. The model is as follows Fig.13 As shown, specifically: the system load disturbance is taken as the input, the output through the generator inertia link is the frequency difference, and the open-loop frequency difference signal is fed back to the input end through the aggregate speed regulator of each resource unit.
[0092] According to the open-loop model, the output power of each unit is calculated as shown in the formula.
[0093]
[0094] In the formula, K i It represents the power-frequency static characteristic coefficient of each unit after fitting; T i Indicates the response time constant of each unit, ΔP Gi is the additional power of the speed regulator of each unit, and Δω is the frequency difference of the system. In practical engineering applications, it can be considered that the slope of the initial attenuation of the system frequency in the second scale is a constant m Δω like Fig.10 As shown, that is: after the disturbance time, the system frequency difference is linearly related to time, and the analytical expression is as follows.
[0095]
[0096] Therefore, for ΔP G The inverse Laplace transform can be obtained in the time domain:
[0097]
[0098] According to the simplified open-loop model and superposition theorem, the time domain expression of Δω is:
[0099]
[0100] Let the speed regulator fitting parameters After integration:
[0101]
[0102] When the system frequency reaches the lowest point, there is At this time, the time is t nadir, that is, the arrival time of the lowest frequency point:
[0103]
[0104] However, the C i ,t nadir They are all unknown quantities, that is, there are N+1 unknown quantities in total, so the following N+1-order equations must be established for solution.
[0105]
[0106] Maximum frequency difference Δω max for:
[0107]
[0108] Frequency minimum point f min for:
[0109] f min =f 0 -f B ·Δω max (39)
[0110] In the formula, f 0 is the steady-state frequency of the system before disturbance, f B is the system base frequency.
[0111] Step 6: Bring the system load loss calculated by the above simulation into the system frequency response model to solve the system frequency dynamics. Its main dynamic indicators are: maximum frequency deviation, arrival time at the lowest frequency point and initial frequency change rate.
[0112] Step 7: The above process is implemented by MATLAB. The simulation example and its results show that the random production simulation method proposed in the present invention takes into account the dynamic frequency change process. Compared with the traditional method, it is more accurate and can meet the demand for spare capacity planning for fast frequency response. It provides a new idea for spare capacity planning with low-frequency load reduction as an indicator.
[0113] Optionally, the system frequency response aggregation model containing multiple resources and multiple units exists in the form of a single machine in the model, mainly including: wind power, thermal power, hydropower, gas turbines and energy storage equipment, with a wide coverage, which can effectively reflect the current status of modern power systems. In addition, the aggregation model can reduce the model order and effectively improve the calculation speed for solving frequency dynamic indicators.
[0114] Optionally, large-scale wind power generation is introduced, and the operating conditions of the power system are considered in the traditional calculation method, and the optimization algorithm of fault filtering is added to better meet the actual power production needs. Subsequently, combined with the relevant wind speed prediction calculation method and example, the system output and load loss are simulated, which has strong practical significance.
[0115] Optionally, in the frequency response capacity planning process, the frequency dynamic change process needs to be considered to meet the fast frequency response requirements under large power shortages.
[0116] The beneficial effects of the present invention are: taking the maximum frequency deviation as the main dynamic indicator, it can better reflect the dynamic change process of the frequency compared with the quasi-steady-state frequency. When formulating the reserve capacity planning for the frequency response process, considering this dynamic indicator to effectively intercept the frequency deterioration has significant advantages. In addition, the present invention proposes to aggregate and analyze the frequency response models of multiple resources and multiple units, directly solve the lowest frequency point, reduce the model order, simplify the calculation process, greatly improve the calculation efficiency, and compared with the timing simulation results, its calculation accuracy is also within an acceptable margin range. BRIEF DESCRIPTION OF THE DRAWINGS
[0117] Figure 1 A state transition model of a wind turbine generator set provided by the present invention;
[0118] Figure 2 A state transition model of a conventional generator set provided by the present invention;
[0119] Figure 3 A system fault filtering model provided by the present invention;
[0120] Figure 4 A model of output power and wind speed of a wind turbine generator set provided by the present invention;
[0121] Figure 5 A low-order system frequency response model of a thermal power unit provided by the present invention;
[0122] Figure 6 A low-order system frequency response model of a hydroelectric generator set provided by the present invention;
[0123] Figure 7 A low-order system frequency response model of a gas generator set provided by the present invention;
[0124] Figure 8 A low-order system frequency response model of an energy storage device provided by the present invention;
[0125] Fig. 9 A multi-machine system frequency response model of a thermal power unit provided by the present invention;
[0126] Fig.10 A frequency response model of a multi-machine system of a hydropower unit provided by the present invention;
[0127] Fig.11 A multi-machine system frequency response model of a gas turbine unit provided by the present invention;
[0128] Fig.12 A system frequency response aggregation model containing multiple resources provided by the present invention;
[0129] Fig.13 A system frequency response aggregation open-loop model containing multiple resources provided by the present invention;
[0130] Fig.14 A schematic diagram of a model of the initial stage of system frequency change provided by the present invention;
[0131] Fig.15 The simulation results of the multi-machine frequency response model and the aggregation model of the thermal power unit provided by the present invention;
[0132] Fig.16 The simulation results of the multi-machine frequency response model and the aggregation model of the hydropower unit provided by the present invention;
[0133] Fig.17 The simulation results of the multi-machine frequency response model and the aggregation model of the gas turbine provided by the present invention;
[0134] Fig.18 The inertia link fitting result of the gas turbine unit provided by the present invention;
[0135] Fig.19 A load loss curve of a power system within one year provided by the present invention;
[0136] Fig. 20 A comparison of a quasi-steady-state frequency and timing simulation method and an analytical method provided by the present invention. DETAILED DESCRIPTION
[0137] The present invention will be further described below in conjunction with the accompanying drawings and specific implementations, but they are not intended to limit the present invention.
[0138] For capacity planning of frequency response, a random production simulation method considering frequency dynamics is established. Combined with the multi-resource structure of the power system and the demand for fast frequency response, it is mainly divided into two parts: the frequency response model of the multi-resource and multi-unit system and the solution of the load loss of the power system. In the first part, this paper simulates the operating conditions of each unit in the system based on the Markov chain Monte Carlo method. In the wind power generation system, in order to fit the actual operating conditions, the present invention uses historical data and the ARMA model to predict the wind speed of the wind farm, and combines the wind power output function to calculate the actual wind power output. In conventional generator sets, the improved IEEE RTS-79 example is mainly introduced to calculate the output. In the second part, starting from the low-order model, the connection between system parameters and the frequency dynamic change process and model aggregation is determined. Based on the idea of parameter aggregation, the frequency response model of wind power, thermal power, hydropower, gas turbine units and energy storage equipment containing multiple units is aggregated to reduce the model order, effectively improve the calculation speed, and facilitate the solution of frequency dynamics. Finally, the load loss calculation of the system is combined with the output of multiple resource units and brought into the aggregation model to solve the frequency dynamics in sharp contrast with the traditional method. The simulation example and its results show that the random production simulation method proposed in this paper considers the dynamic change process of frequency, which is more accurate than the traditional method, can meet the needs of spare capacity planning for fast frequency response, and provides a new idea for spare capacity planning with low-frequency load reduction as an indicator. The method design specifically includes the following steps:
[0139] Step 1: Establish a power system state probability model to simulate the system operation status. The present invention divides it into two steps: the state probability model of the wind turbine generator set and the state probability model of the conventional generator set. The specific steps are as follows:
[0140] Step 1.1: Based on the Markov chain Monte Carlo principle, a state probability model of the wind turbine generator set is established, including the conversion between the wind turbine generator set operating state transfer and the derated state and the conversion between the operating state and the shutdown state, such as Figure 1 As shown. 1 is the change rate of the fan system from the running state to the shutdown state, λ 2 is the change rate of the fan system from the operating state to the derated state, μ 1 is the repair rate of the fan system from shutdown state to operation state, μ 2 is the repair rate of the wind turbine system from the derated state to the operating state. According to the three-state model of the wind turbine and Markov theory, the state transfer matrix T is established as shown in formula (1).
[0141] Based on the approximation principle of Markov process, we define P as the state probability matrix, I as the identity matrix and P = [P 1 ,P 2 ,P3 ], P 1 is the probability that the fan is in operation, P 2 is the probability that the fan is in a derated state, P 3 is the probability that the fan is in shutdown state, and we can get:
[0142] Right now:
[0143]
[0144] Transpose the above model and add the full probability condition, replace the first set of equations in the matrix with the full probability condition, and we get:
[0145]
[0146] Therefore, with the above matrix equation, the probability of each state of the fan can be obtained:
[0147]
[0148] Obviously, when the probability of each state of the wind turbine is known, it is only necessary to use the Monte Carlo method to randomly sample the system to determine the operating state of the wind power generation system.
[0149] The duration that the system is in operation and has not entered the derated state is τ as shown in formula (6): 12 :
[0150] The duration that the system is in operation and has not entered the shutdown state is τ shown in formula (7): 13 :
[0151] The repair time for the system to transfer from the derated state or shutdown state to the normal operation state is τ shown in formula (8) 21 and is τ as shown in formula (9) 31 .
[0152] Step 1.2: Similarly, based on this principle, a state probability model of conventional units is established, mainly for the transition between operating state and shutdown state, such as Figure 2 FOR is defined as the forced outage rate, that is, when the Monte Carlo random sampling result is less than this value, the system enters the outage state; when its result is greater than this value, the system is in normal operation. The solution is as follows:
[0153]
[0154] The operating time of the system in each state is similar to the algorithm of the wind turbine generator set. The operating time in normal operation and shutdown state is τ 1 and τ 2 ,Right now:
[0155] τ 1 =-MTTF lnγ 1 (11)
[0156] τ 2 =-MTTRlnγ 2 (12)
[0157] Among them, γ 1 and γ 2 is a uniformly distributed random number in the interval [0,1].
[0158] Step 1.3: Based on the above model theory, the present invention implements it through programming and finds that continuous downtime may occur during the random sampling process of the Monte Carlo method. Therefore, the present invention introduces a fault filtering algorithm, and the program flow chart is as follows: Figure 3 Specifically:
[0159] 1) The i-th unit enters the fault filtering test to detect whether it has a continuous fault trend at the j-th moment in the entire cycle. If not, the fault filtering program is exited.
[0160] 2) If there is a continuous fault trend, search for the total number of fault moments starting from that moment. If it exceeds the specified time (the entire cycle), end the search calculation and assign 0 to the state after that moment and before the specified time; if it does not exceed the specified time, assign 0 to the state of all continuous fault moments after that moment.
[0161] 3) Continue to detect the fault time until the fault status of each unit at all times is fully detected, and then end the fault filtering.
[0162] Step 2: Through the state probability model, the production status of each type of unit is obtained. Now, the power system output power model is established in combination with its operating conditions to simulate the system's load loss. It is mainly divided into three steps: establishing a wind power output power model, establishing a conventional unit output power model, and establishing a load loss model.
[0163] Step 2.1: Establish a wind power output model. The output of a wind turbine is closely related to the wind speed of the wind farm where it is located, and has a certain degree of linear relationship. First, the wind speed of the wind farm needs to be simulated. Based on the basic idea of the ARMA model, the future wind speed is predicted and the wind speed of the wind farm is simulated.
[0164] Based on the historical data of wind speed, it is standardized to obtain the average wind speed μ and variance σ, and the predicted wind speed SW at time t t The expression is as follows:
[0165] SW t=μ+σy t (13)
[0166] Among them, y t is the predicted time series value.
[0167] Because the ARMA model is not only related to historical data, but also closely related to historical system disturbances, it is assumed that the white noise sequence of system disturbances {ε t} has a mean of 0 and a variance of Then the time series y t The is:
[0168]
[0169] in, is the autoregressive coefficient, θ i (j=1,2,3,…,q) is the moving average coefficient, p and q are the autoregressive order and moving average order of the ARMA model respectively.
[0170] To solve the ARMA model, it is necessary to determine its order. The AIC criterion is used to determine the order of the ARMA model. The AIC criterion function is defined as follows:
[0171] AIC(p,q)=logσ 2 (p,q)+2(p+q+1) / N (15)
[0172] In the formula, σ 2 (p,q) is the residual variance of the predicted time series, and N is the number of samples.
[0173] In the AIC criterion model, according to the relevant theories of economics and mathematics, when p and q reach a certain value, the AIC value is minimized. At this time, the p and q that minimize the AIC value are the order of the ARMA model.
[0174] In a wind turbine generator set, the specific linear relationship between its wind turbine output and the wind speed of the wind farm is as follows Fig.14 As shown in the figure, v ci is the cut-in wind speed when the wind turbine starts, v r is the rated wind speed of the wind turbine during normal operation, v co It is the cut-out wind speed when the wind turbine is running. The purpose of setting it is to ensure the safety of the wind turbine and stop the wind turbine from working. r It is the rated power of the wind turbine generator set in normal operation under rated wind speed. ci And the rated wind speed v is not reached r The output power of the fan is nonlinearly related to the wind speed; when the wind speed exceeds the rated wind speed v r But the cut-out wind speed v is not reachedco When the wind speed exceeds the cut-out wind speed v co When , the fan stops working. The above process is established as the following piecewise function:
[0175]
[0176] Among them, P w is the output power of the wind turbine at time t, v t is the predicted wind speed of the wind turbine at time t, α, β, γ are the unknown coefficients of the wind turbine output power, and the specific solution formula is as follows:
[0177]
[0178] Step 2.2: Establish the output power model of conventional units. There are three types of conventional generator sets under consideration, including thermal generator sets, hydroelectric generator sets and gas turbine generator sets. The present invention mainly calculates the output power of each unit based on the system capacity of each unit in the example IEEE RTS-79.
[0179] Step 2.3 In the total output power of the power system, it is established that the output of the power system is mainly provided by conventional units and wind turbines. Therefore, it is necessary to divide it into two parts, conventional and wind turbines, and combine the output power of the system with the system status and calculate them separately, namely: Where P is the total output power of the system, P i is the output power of each type of unit, α i It is the system status of each type of unit.
[0180] Therefore, the power system load loss ΔP d =ΔP d =PP L (19)
[0181] Among them, P L is the power system load in the example.
[0182] Step 3: Bring the system load loss calculated by the above simulation into the system frequency response model to solve the frequency dynamics of the system. Therefore, it is necessary to establish a frequency response model of the system under each resource. The present invention starts from the low-order frequency response model to establish and analyze the model. The following will analyze and establish the low-order frequency response models of thermal power, hydropower, gas turbine units and energy storage equipment one by one.
[0183] Step 3.1: Establish a low-order frequency response model of the thermal power unit. The structure diagram of the thermal power unit is as follows Figure 5As shown, the unit power increment high-pressure cylinder turbine inertia link and mechanical power gain link are input into the generator inertia link together with the load side disturbance, and the frequency difference is output. Finally, the frequency difference is fed back to the input end through the negative feedback link of the speed regulator. Among them, P e is the load side power of the generator, P m is the mechanical power of the steam turbine, P SP is the unit power increment, P α is the system acceleration power. R is the reheating time constant, H is the system inertia constant, 1 / R T Negative feedback gain (R T is the adjustment coefficient), F H is the power proportionality coefficient of the high-pressure steam turbine, K T is the mechanical power gain, D is the damping coefficient, T 1 is the speed regulator time constant, T 2 is the steam capacity time constant.
[0184] Step 3.2: Establish the low-order frequency response model of the hydropower unit. The structural diagram of the hydropower unit is as follows Figure 6 As shown, the load side disturbance passes through the inertia link of the generator rotor of the hydropower unit, outputs the frequency difference, and finally the frequency difference passes through the negative feedback link of the speed regulator to the input end. Among them, H is the inertia time constant of the unit, D is the damping constant of the unit, T y is the response time constant of the relay, T w is the inertia time constant of water flow, T RH is the transient droop time constant of the turbine governor, T RS is the turbine governor reset time, 1 / R h is the regulation coefficient of the turbine.
[0185] Step 3.3: Establish a low-order frequency response model of the gas turbine unit. The structural diagram of the gas turbine unit is as follows Figure 7 As shown in the figure, the load side disturbance passes through the inertia link of the generator rotor of the gas turbine unit, outputs the frequency difference, and finally the frequency difference passes through the negative feedback link of the speed regulator to the input end. G is the system adjustment coefficient, K G is the power capacity ratio, c g and b g is the coefficient of the transfer function of the valve positioner in the fuel system, X g is the leading time constant of the speed regulator part, Y g is the lag time constant of the speed regulator part, T CR is the combustion reaction delay time constant, T F is the fuel system time constant, T CD is the compression displacement time constant.
[0186] Step 3.4: Establish a low-order frequency response model of the energy storage device. The structure diagram of the energy storage device is as follows: Figure 8 As shown, where T ESD is the energy storage time constant of the energy storage link.
[0187] Step 4: Based on the analysis of the low-order frequency response model of each resource, in order to improve the calculation speed, the whole system disturbance is used as the input, and the generator inertia is aggregated, and the output is the frequency difference. The frequency difference is fed back to the input end through each energy storage regulation link. The present invention establishes a frequency response aggregation model for a multi-resource, multi-machine system. The core idea of modeling is: aggregate multiple machines first, and then aggregate multiple resources.
[0188] Step 4.1: Establish a frequency response model for a multi-machine system. The multi-machine model of the thermal power unit is as follows: Fig. 9 As shown in the figure, the whole system disturbance is taken as input, and after the aggregated generator inertia, the output is the frequency difference, which is fed back to the input end through the speed regulator of each unit. In the frequency response model of the multi-machine system, the regulation coefficient R of each unit ti and mechanical power gain K ti The apparent power S of the generator i Closely related, K ti It represents the power share of the whole power system generator. Therefore, in order to aggregate the model, the following definition is made:
[0189]
[0190] Among them, κ ti is the equivalent gain parameter of the thermal power unit. In order to simplify the aggregation model, the speed governor unit is normalized and the standardized gain λ of each thermal power unit branch is defined ti for:
[0191]
[0192] F H 、T R 、T G 、T C 、T R is the comprehensive equivalent parameter of the frequency response model after aggregation. In the aggregation calculation, it is necessary to find the optimal solution of thermal power parameters X = {T G ,T C ,F H ,T R}, that is, the aggregated frequency response model parameters can be equivalent to the weighted average of each unit parameter.
[0193]
[0194] The multi-machine frequency response model of hydropower units is as follows: Figure 6As shown in the figure, the whole system disturbance is taken as input, and after the generator inertia is aggregated, the output is the frequency difference, which is fed back to the input end through the speed regulator of each unit. The adjustment coefficient of the aggregation model is defined as:
[0195]
[0196] Among them, κ hi is the equivalent gain parameter of the hydropower unit. Define the standardized gain λ of each hydropower unit branch hi for:
[0197]
[0198] Let the optimal solution of gas turbine parameters Y = {T w ,T y ,T RS ,T RH}, its system parameters are aggregated as follows:
[0199]
[0200] The multi-machine frequency response model of the gas turbine unit is as follows: Figure 7 As shown in the figure, the whole system disturbance is taken as input, and after the generator inertia is aggregated, the output is the frequency difference, which is fed back to the input end through the speed regulator of each unit. The aggregation model adjustment coefficient is defined as:
[0201]
[0202] Among them, κ gi is the equivalent gain parameter of the hydropower unit. Define the standardized gain λ of each hydropower unit branch gi for:
[0203]
[0204] Let the optimal solution of hydropower parameters Z = {c g ,b g ,X g ,Y g ,T CR ,T F ,T CD}, its system parameters are aggregated as follows:
[0205]
[0206] Step 4.2: After the above resource models are aggregated into a single machine model, multiple resource models are aggregated. According to the aggregation theory of each resource model, the mechanical power gain K is closely related to the capacity ratio of the system, that is: Among them, S i is the system capacity of each resource unit, S sysis the system capacity of the entire multi-resource unit.
[0207] In the generator and load part, based on the load-side power, the capacity proportion of each type of unit is calculated as follows:
[0208]
[0209] Among them, H i is the inertia time constant of the generator set of each unit, and H is the inertia time constant of the generator set of the aggregated system.
[0210] In the frequency response aggregation model of a power system with multiple resources and multiple units, since wind turbines do not have actual rotor inertia, the present invention does not consider their frequency regulation characteristics. Based on the core idea of "aggregating multiple units first, then aggregating multiple resources", a frequency response aggregation model of a multi-resource, multi-unit system is constructed. Fig.12 As shown, specifically: the disturbance of the entire system is taken as input, and the inertia of the aggregated generator is used as the output, and the frequency difference is fed back to the input end through the aggregated speed regulator of each resource unit.
[0211] Step 5: In order to improve the calculation rate, the frequency response aggregation model of the multi-resource and multi-machine system is now analyzed in an open loop. The above-mentioned power system frequency response aggregation model containing multiple resources is simplified in an open loop, and the speed regulator system of each type of unit is fitted as a first-order inertia link. In addition, the present invention also ignores the influence of load damping D on the frequency, and its output is the active output of each unit. The model is as follows Fig.13 As shown, specifically: the system load disturbance is taken as the input, the output through the generator inertia link is the frequency difference, and the open-loop frequency difference signal is fed back to the input end through the aggregate speed regulator of each resource unit.
[0212] According to the open-loop model, the output power of each unit is calculated as shown in the formula:
[0213] In the formula, K i It represents the power-frequency static characteristic coefficient of each unit after fitting; T i Indicates the response time constant of each unit, ΔP Gi is the additional power of the speed regulator of each unit, and Δω is the frequency difference of the system. In practical engineering applications, it can be considered that the slope of the initial attenuation of the system frequency in the second scale is a constant m Δω like Fig.10 As shown, that is: after the disturbance time, the system frequency difference is linearly related to time, and the analytical expression is as follows.
[0214]
[0215] Therefore, for ΔP G The inverse Laplace transform can be obtained in the time domain:
[0216]
[0217] According to the simplified open-loop model and superposition theorem, the time domain expression of Δω is:
[0218]
[0219] Let the speed regulator fitting parameters After integration:
[0220]
[0221] When the system frequency reaches the lowest point, there is At this time, the time is t nadir , that is, the arrival time of the lowest frequency point:
[0222]
[0223] However, the C in the above formula i ,t nadir They are all unknown quantities, that is, there are N+1 unknown quantities in total, so the following N+1-order equations must be established for solution.
[0224]
[0225] Maximum frequency difference Δω max for:
[0226] Frequency minimum point f min is: f min =f 0 -f B ·Δω max (39)
[0227] In the formula, f 0 is the steady-state frequency of the system before disturbance, f B is the system base frequency.
[0228] Step 6: Bring the system load loss calculated by the above simulation into the system frequency response model to solve the system frequency dynamics. Its main dynamic indicators are: maximum frequency deviation, arrival time at the lowest frequency point and initial frequency change rate.
[0229] Step 7: The above process is implemented by MATLAB programming. The simulation example and its results show that the random production simulation method proposed in the present invention takes into account the dynamic change process of frequency. Compared with the traditional method, it is more accurate and can meet the demand for spare capacity planning for fast frequency response. It provides a new idea for spare capacity planning with low-frequency load reduction as an indicator.
[0230] For example, in the verification of the aggregation model of thermal power units, six 10MW units were used as the benchmark for parameter aggregation, and the results are shown in Fig.15 , take the lowest frequency point, f MM-SFR =-0.3517Hz, f ASFR =-0.3555Hz. It can be concluded that Δf = -0.0038Hz, and its error is: 1.08%, which is within the acceptable range. In the verification of the aggregation model of hydropower units, two 50MW units were used as the benchmark for parameter aggregation, and the results are shown in Fig.16 , take the lowest frequency point, f MM-ASFR =-0.4373Hz, f ASFR =-0.4321Hz. It is concluded that: Δf = 0.0052Hz, the error is: 1.19%, which is within the acceptable error range. In the verification of the aggregation model of gas units, parameter aggregation was performed based on a 150MW, a 100MW and a 120MW unit. The results are shown in Fig.17 , take the lowest frequency point, f MM-ASFR =-0.0246Hz, f ASFR =-0.0237Hz. It is concluded that: Δf = 0.0009Hz, the error is: 3.7%, and the error is within the acceptable error range. The three groups of aggregate model examples take the gas turbine unit as an example, and fit the first-order inertia link of the speed governor as follows Fig.18 , and its fitting error is within the error margin. In the example, the unit capacity is shown in Table 1, and the unit parameters are shown in Table 2. Combined with the above example data, the load loss of the simulated system in one year is as follows Fig.19 As shown in the figure, the quasi-steady-state frequency is used as a reference index to compare with the maximum frequency difference solved by the analytical method and the simulation method, as shown in Fig. 20 As shown in Figure 2, it illustrates the necessity and effectiveness of this method, as well as the characteristics of high accuracy and high speed of the analytical method.
[0231] The above-described embodiments merely express the implementation methods of the present invention, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A random production simulation method for power system for frequency response capacity planning, characterized in that: The simulation method comprises the following steps: Step 1: Establish a power system state probability model to simulate the system operation status; the power system state probability model includes a state probability model of a wind turbine generator set and a state probability model of a conventional generator set. The specific steps are as follows: Step 1.1: According to the Markov chain Monte Carlo principle, a state probability model of the wind turbine generator set is established, including the conversion between the operating state of the wind turbine generator set and the derated state and the conversion between the operating state and the shutdown state. λ1 is defined as the transfer change rate of the wind turbine system from the operating state to the shutdown state, λ2 is the transfer change rate of the wind turbine system from the operating state to the derated state, μ1 is the repair rate of the wind turbine system from the shutdown state to the operating state, and μ2 is the repair rate of the wind turbine system from the derated state to the operating state; then, according to the three-state model of the wind turbine and the Markov theory, the state transfer matrix T is established: Based on the approximation principle of Markov process, P is defined as the state probability matrix, I is the unit matrix and P = [P1, P2, P3], P1 is the probability that the fan is in the running state, P2 is the probability that the fan is in the derated state, and P3 is the probability that the fan is in the shutdown state. It is obtained that: By transposing the above model and adding the full probability condition, we can further derive the probability of each state of the wind turbine: When the probability of each state of the wind turbine is known, the operating state of the wind power generation system can be determined by randomly sampling the system using the Monte Carlo method; The duration that the system is in operation and has not entered the derated state is τ 12 : The duration that the system is in operation and has not entered the shutdown state is τ 13 : Among them, MTTF is the average continuous operation time before failure, γ 12 and γ 13 is a uniformly distributed random number in the interval [0,1]; The repair time for the system to transfer from the derated state or shutdown state to the normal operation state is τ 21 and τ 31 : Among them, MTTR is the average repair time of the system, γ 21 and γ 31 is a uniformly distributed random number in the interval [0,1]; Step 1.2: Similarly, according to the Markov chain Monte Carlo principle, a state probability model of conventional units is established, mainly for the transition between the operating state and the shutdown state. FOR is defined as the forced shutdown rate, that is, when the Monte Carlo random sampling result is less than this value, the system enters the shutdown state; when its result is greater than this value, the system is in normal operation; the solution method is as follows: The operating time of the system in each state is similar to the algorithm of the wind turbine generator set. The operating time in normal operation and shutdown state is τ1 and τ2 respectively, that is: τ1=-MTTF lnγ1 (11) τ2=-MTTR lnγ2 (12) Among them, γ1 and γ2 are random numbers uniformly distributed between the interval [0,1]; Step 1.3: Introduce a fault filtering algorithm to solve the problem of continuous outages during random sampling in the Monte Carlo method; Step 2: Through the state probability model, the production status of each type of unit is obtained, and the power system output power model is established in combination with its operating conditions to simulate the load loss of the system; including establishing a wind power output power model, a conventional unit output power model, and a load loss model; specifically: Step 2.1: Establish a wind power output model based on the ARMA model; Based on the historical data of wind speed, it is standardized to obtain the average wind speed μ and variance σ, and the predicted wind speed SW at time t t The expression is as follows: SW t =μ+σy t (13) Among them, y t is the predicted time series value; Assume that the system disturbance is a white noise sequence {ε t } has a mean of 0 and a variance of Then the time series y t The is: in, is the autoregressive coefficient, θ i (j=1,2,3,…,q) is the moving average coefficient, p and q are the autoregressive order and moving average order of the ARMA model respectively; The AIC criterion is used to determine the order of the ARMA model; In the AIC criterion model, when p and q reach a certain value, the AIC value is minimized; at this time, the p and q that minimize the AIC value are the order of the ARMA model; In a wind turbine, v is defined as ci is the cut-in wind speed when the wind turbine starts, v r is the rated wind speed of the wind turbine during normal operation, v co It is the cut-out wind speed when the wind turbine is running, which ensures the safety of the wind turbine and stops the wind turbine from working; P r It is the rated power of the wind turbine generator set in normal operation at rated wind speed; when the wind speed exceeds the cut-in wind speed v ci And the rated wind speed v is not reached r The output power of the fan is nonlinearly related to the wind speed; when the wind speed exceeds the rated wind speed v r But the cut-out wind speed v is not reached co When the wind speed exceeds the cut-out wind speed v co When , the fan stops working; the above process is established as the following piecewise function: Among them, P w is the output power of the wind turbine at time t, v t is the predicted wind speed of the wind turbine at time t, α, β, γ are the unknown coefficients of the wind turbine output power, Step 2.2: Establish the output power model of conventional units, where conventional generator sets include thermal generator sets, hydroelectric generator sets and gas turbine generator sets, and calculate their output power based on the system capacity of each unit in the example IEEE RTS-79; Step 2.3: In the total output power of the power system, including conventional and wind turbines, the system output power is combined with the system status and calculated separately, namely: Where P is the total output power of the system, P i is the output power of each type of unit, α i The system status of each type of unit; Therefore, the power system load loss ΔP d for: ΔP d =P-P L (19) Among them, P L is the power system load in the example; Step 3: Bring the system load loss calculated by the above simulation into the system frequency response model to solve the frequency dynamics of the system; therefore, it is necessary to establish the frequency response model of the system under each resource; starting from the low-order frequency response model, the model is established and analyzed; Step 3.1: Establish a low-order frequency response model of the thermal power unit; The unit power increment high-pressure cylinder turbine inertia link and mechanical power gain link are input into the generator inertia link together with the load side disturbance, and the frequency difference is output. Finally, the frequency difference is fed back to the input end through the negative feedback link of the speed governor; where P is defined e is the load side power of the generator, P m is the mechanical power of the steam turbine, P SP is the unit power increment, P α is the system acceleration power; T R is the reheating time constant, H is the system inertia constant, 1 / R T Negative feedback gain, R T is the adjustment coefficient, F H is the power proportionality coefficient of the high-pressure steam turbine, K T is the mechanical power gain, D is the damping coefficient, T1 is the governor time constant, and T2 is the steam capacity time constant; Step 3.2: Establish a low-order frequency response model of the hydropower unit; The load side disturbance passes through the inertia link of the generator rotor of the hydropower unit, outputs the frequency difference, and finally the frequency difference passes through the negative feedback link of the speed regulator to the input end; define H as the inertia time constant of the unit, D as the damping constant of the unit, T y is the response time constant of the relay, T w is the inertia time constant of water flow, T RH is the transient droop time constant of the turbine governor, T RS is the turbine governor reset time, 1 / R h is the regulation coefficient of the turbine; Step 3.3: Establish a low-order frequency response model of the gas turbine unit; The load side disturbance passes through the inertia link of the generator rotor of the gas turbine unit, outputs the frequency difference, and finally the frequency difference passes through the negative feedback link of the speed regulator to the input end; where R is defined G is the system adjustment coefficient, K G is the power capacity ratio, c g and b g is the coefficient of the transfer function of the valve positioner in the fuel system, X g is the leading time constant of the speed regulator part, Y g is the lag time constant of the speed regulator part, T CR is the combustion reaction delay time constant, T F is the fuel system time constant, T CD is the compression displacement time constant; Step 3.4: Establish a low-order frequency response model of the energy storage device, T ESD is the energy storage time constant of the energy storage link; Step 4: Based on the analysis of the low-order frequency response model of each resource, in order to improve the calculation speed, the disturbance of the entire system is used as the input, and the generator inertia is aggregated, and the output is the frequency difference, which is fed back to the input end through each energy storage regulation link; a multi-resource, multi-machine system frequency response aggregation model is established by aggregating multiple machines first and then aggregating multiple resources; the details are as follows: Step 4.1: Build a frequency response model for multi-machine aggregation The disturbance of the entire system is taken as input, and the output is the frequency difference after the aggregated generator inertia. The frequency difference is fed back to the input end through the speed governor of each unit. In the frequency response model of the multi-machine system, the regulation coefficient R of each unit is ti and mechanical power gain K ti The apparent power S of the generator i Closely related, K ti It represents the power share of the whole power system generator set; therefore, in order to aggregate the model, the following definition is made: Among them, κ ti is the equivalent gain parameter of the thermal power unit; to simplify the aggregation model, the governor unit is normalized and the standardized gain λ of each thermal power unit branch is defined ti for: Among them, F H 、T R 、T G 、T C 、T R is the comprehensive equivalent parameter of the aggregated frequency response model; the aggregated frequency response model parameter can be equivalent to the weighted average value of each unit parameter; The multi-machine frequency response model of the hydropower unit takes the disturbance of the entire system as the input, aggregates the generator inertia, and outputs the frequency difference, which is fed back to the input end through the speed governor of each unit; the adjustment coefficient of the aggregation model is defined as: Among them, κ hi is the equivalent gain parameter of the hydropower unit; defines the standardized gain λ of each hydropower unit branch hi for: Let the optimal solution of gas turbine parameters Y = {T w ,T y ,T RS ,T RH }, its system parameters are aggregated as follows: The multi-machine frequency response model of the gas turbine unit takes the disturbance of the entire system as the input, aggregates the generator inertia, and outputs the frequency difference, which is fed back to the input end through the speed governor of each unit; the aggregate model adjustment coefficient is defined as: Among them, κ gi is the equivalent gain parameter of the hydropower unit; defines the standardized gain λ of each hydropower unit branch gi for: Let the optimal solution of hydropower parameters Z = {c g ,b g ,X g ,Y g ,T CR ,T F ,T CD }, its system parameters are aggregated as follows: Step 4.2: After the above resource models are aggregated into a single machine model, multiple resource models are aggregated; according to the aggregation theory of each resource model, we get: Among them, S i is the system capacity of each resource unit, S sys The system capacity of the entire multi-resource unit; In the generator and load part, based on the load-side power, the capacity proportion of each type of unit is calculated as follows: Among them, H i is the inertia time constant of the generator set of each unit, and H is the inertia time constant of the generator set of the aggregated system; In the frequency response aggregation model of the power system with multiple resources and multiple units, its frequency regulation characteristics are not considered; the frequency response aggregation model of the multi-resource and multi-machine system is constructed according to the method of "aggregating multiple machines first, then aggregating multiple resources", specifically: the whole system disturbance is taken as the input, and the inertia of the aggregated generator is output as the frequency difference, which is fed back to the input end through the aggregated speed regulator of each resource unit; Step 5: Perform an open-loop analysis on the frequency response aggregation model of a multi-resource, multi-machine system; perform an open-loop simplification on the frequency response aggregation model of the power system containing multiple resources, and fit the speed regulator system of each type of unit as a first-order inertia link; in addition, ignore the influence of load damping D on the frequency, and its output is the active output of each unit. The model is: take the system load disturbance as the input, output through the generator inertia link as the frequency difference, and feed back the open-loop frequency difference signal to the input end through the aggregation speed regulator of each resource unit; According to the open-loop model, the output power of each unit is calculated as shown in the formula; In the formula, K i It represents the power-frequency static characteristic coefficient of each unit after fitting; T i Indicates the response time constant of each unit, ΔP Gi is the additional power of the speed governor of each unit, and Δω is the frequency difference of the system; When the system frequency reaches the lowest point, the time is t nadir , that is, the arrival time of the lowest frequency point: Establish the following N+1-order equation system to solve the above equation; Maximum frequency difference Δω max for: Frequency minimum point f min for: f min =f0-f B ·See max (39) Where f0 is the steady-state frequency before the system disturbance, f B is the system base frequency; Step 6: Bring the system load loss calculated by the above simulation into the system frequency response model to solve the system frequency dynamics. Its main dynamic indicators are: maximum frequency deviation, arrival time at the lowest frequency point, and initial frequency change rate; Step 7: Implement the above process through MATLAB.
2. A method for stochastic production simulation of a power system for frequency response capacity planning according to claim 1, characterized in that: The system frequency response aggregation model containing multiple resources and multiple units exists in the form of a single machine in the model, mainly including: wind power, thermal power, hydropower, gas turbines and energy storage equipment.
3. The method for random production simulation of a power system for frequency response capacity planning according to claim 1, characterized in that: In step 1.3 described in step 1, the specific process of introducing the fault filtering algorithm is as follows: 1) The i-th unit enters the fault filtering detection to detect whether it has a continuous fault trend at the j-th moment in the entire cycle; if not, the fault filtering program is jumped out; 2) If there is a continuous failure trend, search for the total number of failure moments starting from that moment; If the specified time is exceeded, the search calculation is terminated, and the state after this moment and before the specified time is assigned 0; if the specified time is not exceeded, the state of all fault continuous moments after this moment is assigned 0; 3) Continue to detect the fault time until the fault status of each unit at all times is fully detected, and then end the fault filtering.
4. The method for stochastic production simulation of a power system for frequency response capacity planning according to claim 1, characterized in that: Step 2 The function expression of the AIC criterion in step 2.1 is as follows: AIC(p,q)=logσ 2 (p,q)+2(p+q+1) / N (15) In the formula, σ 2 (p,q) is the residual variance of the predicted time series, and N is the number of samples.
5. The method for random production simulation of a power system for frequency response capacity planning according to claim 1, characterized in that: The solution formula for the unknown coefficients in formula (19) in step 2.1 is as follows:
Citation Information
Patent Citations
Wind power-containing power system frequency response model building method and frequency characteristic index calculation method
CN107679769A
Wind power penetration limit calculating method that considers frequency constraint and wind power frequency modulation
CN108832658A
Wind power proportion limit value analytical calculation method considering frequency constraints
CN110750882A
Multi-source power system day-ahead optimization scheduling method considering frequency constraints
CN112994013A
Energy Production and Frequency Regulation Co-Optimization for Power Generation Systems
US20180233922A1